Amendment #3
Table of Contents

As filed with the Securities and Exchange Commission on July 10, 2015

No. 333-203934

 

 

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

 

Amendment No. 3

to

FORM S-1

REGISTRATION STATEMENT

UNDER

THE SECURITIES ACT OF 1933

 

 

TerraForm Global, Inc.

(Exact name of registrant as specified in its charter)

 

Delaware   4911   47-1919173

(State or other jurisdiction of

incorporation or organization)

 

(Primary Standard Industrial

Classification Code Number)

  (I.R.S. Employer Identification No.)

7550 Wisconsin Avenue, 9th Floor

Bethesda, Maryland 20814

(240) 762-7700

(Address, including zip code, and telephone number, including area code, of registrant’s principal executive offices)

 

 

Carlos Domenech Zornoza

Chief Executive Officer

TerraForm Global, Inc.

7550 Wisconsin Avenue, 9th Floor

Bethesda, Maryland 20814

(240) 762-7700

(Name, address, including zip code, and telephone number, including area code, of agent for service)

 

 

Copies of all communications, including communications sent to agent for service, should be sent to:

 

Dennis M. Myers, P.C.   Kirk A. Davenport II
Paul D. Zier   Latham & Watkins LLP
Kirkland & Ellis LLP   885 Third Avenue
300 North LaSalle   New York, New York 10022
Chicago, Illinois 60654   (212) 906-1200
(312) 862-2000  

Approximate date of commencement of proposed sale to the public: As soon as practicable after this

Registration Statement becomes effective.

 

 

If any of the securities being registered on this Form are to be offered on a delayed or continuous basis pursuant to Rule 415 under the Securities Act of 1933, check the following box:  ¨

If this Form is filed to register additional securities for an offering pursuant to Rule 462(b) under the Securities Act, please check the following box and list the Securities Act registration statement number of the earlier effective registration statement for the same offering.  ¨

If this Form is a post-effective amendment filed pursuant to Rule 462(c) under the Securities Act, check the following box and list the Securities Act registration statement number of the earlier effective registration statement for the same offering.  ¨

If this Form is a post-effective amendment filed pursuant to Rule 462(d) under the Securities Act, check the following box and list the Securities Act registration statement number of the earlier effective registration statement for the same offering.  ¨

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company. See the definitions of “large accelerated filer,” “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act. (Check one):

 

Large accelerated filer   ¨     Accelerated filer   ¨
Non-accelerated filer   x   (Do not check if a smaller reporting company)   Smaller reporting company   ¨

 

 

CALCULATION OF REGISTRATION FEE

 

 

Title of Each Class of

Securities to be Registered

 

Proposed
Maximum

Offering Price(1)(2)

 

Amount of

Registration Fee(3)

Class A Common Stock, $0.01 par value per share

  $800,000,000   $92,960

 

 

(1)   Includes the offering price of the shares of common stock that may be sold if the underwriters exercise their option in full to purchase additional shares.
(2)   Estimated solely for purposes of calculating the registration fee pursuant to Rule 457(o) of the Securities Act of 1933, as amended.
(3)   Previously paid.

 

 

The registrant hereby amends this Registration Statement on such date or dates as may be necessary to delay its effective date until the registrant shall file a further amendment which specifically states that this Registration Statement shall thereafter become effective in accordance with Section 8(a) of the Securities Act of 1933, as amended, or until this Registration Statement shall become effective on such date as the Securities and Exchange Commission, acting pursuant to said Section 8(a), may determine.

 

 

 


Table of Contents

The information in this prospectus is not complete and may be changed. We may not sell these securities until the registration statement filed with the Securities and Exchange Commission is effective. This prospectus is not an offer to sell these securities and it is not soliciting an offer to buy these securities in any state where the offer or sale is not permitted.

 

Subject to completion, dated                     , 2015

Prospectus

             shares

LOGO

Class A common stock

This is an initial public offering of shares of Class A common stock of TerraForm Global, Inc. All of the shares of Class A common stock are being sold by us.

Prior to this offering, there has been no public market for our Class A common stock. It is currently estimated that the initial public offering price per share will be between $         and $        . We have applied to list our Class A common stock on the NASDAQ Global Select Market under the symbol “GLBL.”

We will have two classes of common stock outstanding after this offering: Class A common stock and Class B common stock. Each share of Class A common stock entitles its holder to one vote on all matters presented to our stockholders generally. All of our Class B common stock will be held by SunEdison, Inc., or our “Sponsor,” or its controlled affiliates. Each share of Class B common stock entitles our Sponsor to 100 votes on all matters presented to our stockholders generally. Immediately following this offering, the holders of our Class A common stock will collectively hold 100% of the economic interests in us and     % of the voting power in us, and our Sponsor will hold the remaining     % of the voting power in us. As a result, we will be a “controlled company” within the meaning of the corporate governance standards of the NASDAQ Global Select Market. See “Management—Controlled company.”

We are an “emerging growth company” as the term is used in the Jumpstart Our Business Startups Act of 2012 and, as such, have elected to comply with certain reduced public company reporting requirements.

 

      Per share      Total  

Initial public offering price

   $                    $                

Underwriting discounts and commissions(1)

   $         $     

Proceeds, before expenses, to us

   $         $     

 

 
(1)   Excludes a structuring fee payable to J.P. Morgan Securities LLC and Barclays Capital Inc. equal to             % of the gross offering proceeds. See “Underwriting (conflicts of interest).”

The underwriters have the option to purchase up to an additional              shares from us at the initial public offering price less the underwriting discounts and commissions for a period of 30 days after the date of this prospectus.

See “Risk factors” beginning on page 46 to read about factors you should consider before buying shares of our Class A common stock.

Neither the Securities and Exchange Commission nor any state securities commission has approved or disapproved of these securities or passed upon the accuracy or adequacy of this prospectus. Any representation to the contrary is a criminal offense.

We expect that the shares will be delivered against payment in New York, New York on                     , 2015.

 

J.P. Morgan   Barclays   Citigroup   Morgan Stanley

 

Goldman, Sachs & Co.

 

  BofA Merrill Lynch   Deutsche Bank Securities

                    , 2015.


Table of Contents

LOGO


Table of Contents

Table of contents

 

     Page  

Summary

     1   

Risk factors

     46   

Cautionary statement concerning forward-looking statements

     93   

Use of proceeds

     95   

Capitalization

     97   

Dilution

     99   

Cash dividend policy

     101   

Unaudited pro forma condensed consolidated financial statements

     115   

Selected historical combined financial data

     138   

Management’s discussion and analysis of financial condition and results of operations

     141   

Industry

     166   

Business

     188   

Management

     232   

Executive officer compensation

     237   

Security ownership of certain beneficial owners and management

     242   

Certain relationships and related party transactions

     244   

Description of certain indebtedness

     266   

Description of capital stock

     284   

Shares eligible for future sale

     292   

Material United States federal income tax consequences to non-U.S. holders

     295   

Underwriting (conflicts of interest)

     299   

Legal matters

     308   

Experts

     308   

Where you can find more information

     310   

Index to financial statements

     F-1   

We have not and the underwriters have not authorized anyone to provide you with any information other than that contained in this prospectus or in any free writing prospectus prepared by or on behalf of us or to which we have referred you. We are offering to sell, and seeking offers to buy, shares of our Class A common stock only in jurisdictions where such offers and sales are permitted. The information in this prospectus or any free writing prospectus is accurate only as of its date, regardless of its time of delivery or the time of any sale of shares of our Class A common stock. Our business, financial condition, results of operations and prospects may have changed since that date.

Until                     , 2015 (25 days after the date of this prospectus), all dealers that buy, sell or trade our Class A common stock, whether or not participating in this offering, may be required to deliver a prospectus. This is in addition to the dealers’ obligation to deliver a prospectus when acting as underwriters and with respect to their unsold allotments or subscriptions.

 

i


Table of Contents

Trademarks and trade names

We own or have rights to various trademarks, service marks and trade names that we use in connection with the operation of our business. This prospectus may also contain trademarks, service marks and trade names of SunEdison, Inc. and third parties, which are the property of their respective owners. Our use or display of third parties’ trademarks, service marks, trade names or products in this prospectus is not intended to, and should not be read to, imply a relationship with or endorsement or sponsorship of us. Solely for convenience, the trademarks, service marks and trade names referred to in this prospectus may appear without the ®, TM or SM symbols, but such references are not intended to indicate, in any way, that we will not assert, to the fullest extent under applicable law, our rights or the right of the applicable licensor to these trademarks, service marks and trade names.

Industry and market data

This prospectus includes industry data and forecasts that we obtained from industry publications and surveys, public filings and internal company sources. In particular, unless otherwise specified, we have relied upon the data collected and published by Bloomberg New Energy Finance (as accessed on June 1, 2015) with respect to all of the data included in this prospectus relating to the size of the various clean energy markets, including the expected growth of our initial target markets over the periods specified herein. Bloomberg New Energy Finance is a market research firm focused on the energy sector. Industry publications and surveys and forecasts generally state that the information contained therein has been obtained from sources believed to be reliable, but there can be no assurance as to the accuracy or completeness of the included information. Statements as to our market position and market estimates are based on independent industry publications, government publications, third-party forecasts, management’s estimates and assumptions about our markets and our internal research. While we are not aware of any misstatements regarding the market, industry or similar data presented herein, such data involve risks and uncertainties and are subject to change based on various factors, including those discussed under the headings “Risk factors” and “Cautionary statement concerning forward-looking statements” in this prospectus.

As used in this prospectus, all references to watts (e.g., megawatts, gigawatts, MW, GW, etc.) refer to measurements of direct current, or “DC,” with respect to solar generation assets, and measurements of alternating current, or “AC,” with respect to wind and hydro-electric generation assets.

Except as otherwise noted, all currency conversions referred to in this prospectus are calculated as of March 31, 2015.

Certain defined terms

Unless the context provides otherwise, references herein to:

 

 

“we,” “our,” “us,” “our company” and “Global” refer to TerraForm Global, Inc., together with, where applicable, its consolidated subsidiaries after giving effect to the Organizational Transactions (as defined herein), which corporation is the issuer of the Class A common stock offered hereby;

 

 

“First Wind” refers to First Wind Holdings, LLC, together with, where applicable, its consolidated subsidiaries, which our Sponsor and TerraForm Power, as appropriate, acquired on January 29, 2015;

 

 

“Global LLC” refers to TerraForm Global, LLC, which will be controlled by Global as its sole managing member upon the completion of the Organizational Transactions;

 

 

“Global Operating LLC” refers to TerraForm Global Operating, LLC, a wholly owned subsidiary of Global LLC, which will, through its direct and indirect subsidiaries, conduct our business and operations;

 

ii


Table of Contents
 

“SunEdison” and “Sponsor” refer to SunEdison, Inc., together with, where applicable, its consolidated subsidiaries;

 

 

“TerraForm Power” refers to TerraForm Power, Inc., together with, where applicable, its consolidated subsidiaries, which is a publicly traded subsidiary of our Sponsor that also owns and operates clean power assets; and

 

 

“$” refers to U.S. dollars, “CNY” refers to Chinese Yuan Renminbi, “BRL” refers to Brazilian Real, “INR” refers to Indian Rupee, “ZAR” refers to South African Rand, “MYR” refers to Malaysian Ringgit, “THB” refers to Thai Baht and “PEN” refers to Peruvian Nuevo Sol.

See “Summary—Organizational Transactions” for more information regarding our ownership structure.

 

iii


Table of Contents

Summary

The following summary highlights information contained elsewhere in this prospectus. It does not contain all the information you need to consider in making your investment decision. Before making an investment decision, you should read this entire prospectus carefully and should consider, among other things, the matters set forth under “Risk factors,” “Selected historical combined financial data,” “Management’s discussion and analysis of financial condition and results of operations” and the financial statements and related notes thereto appearing elsewhere in this prospectus. Unless otherwise specifically noted, (i) all operating and similar data for our business or our Sponsor’s business included in this prospectus is as of March 31, 2015 and (ii) all references to MW or GW in relation to our initial portfolio (or our portfolio of call right or right of first offer projects) represent the rated generation capacity at standard test conditions of a project multiplied by our percentage of economic ownership (or the ownership we may acquire) of such project, or “net capacity,” as of the date of this prospectus.

About TerraForm Global, Inc.

Overview

We are a high-growth, globally diversified renewable energy company that owns long-term contracted wind, solar and hydro-electric power plants. Our business objective is to increase our dividend to stockholders by continuing to acquire, from SunEdison and unaffiliated third parties, clean power generation assets that produce high-quality, long-term contracted cash flows, primarily by serving utility and commercial customers with strong credit profiles. Our initial target markets will be China, Brazil, India, South Africa, Honduras, Costa Rica, Peru, Uruguay, Malaysia and Thailand. Several of these markets, including China, Brazil and India, are expected to be among the fastest growing solar and wind energy markets worldwide from 2015 to 2020 in terms of annual installations and capital investment in renewable energy projects.

Our initial portfolio consists of solar projects located in China, India, South Africa, Honduras, Uruguay, Malaysia and Thailand, wind projects located in China, Brazil, India, South Africa, Honduras, Costa Rica and Nicaragua and hydro-electric projects located in Brazil and Peru. These projects have a total combined capacity of 1,406.1 MW, and we forecast that they will generate an aggregate of $231.5 million of cash available for distribution for the year ending December 31, 2016. Our initial portfolio includes 921.7 MW of projects that we expect to acquire from third parties concurrently with the completion of this offering or, in certain limited cases, during the remainder of 2015. All of these projects are supported by power purchase agreements, or “PPAs,” with creditworthy counterparties. The PPAs for projects included in our initial portfolio have a weighted average remaining life of 19 years as of March 31, 2015.

We have a well diversified project portfolio, across both geographies and renewable energy technologies, which we believe enables us to generate consistent quarterly cash flows. For example, projects in our initial portfolio located in any single country are not expected to represent more than 30% of our projected cash available for distribution for the year ending December 31, 2016. We intend to rapidly expand and diversify our initial project portfolio by acquiring utility-scale solar and commercial and industrial distributed solar, wind and hydro-electric power generation assets located in our initial target markets, which we expect will also have long-term PPAs with creditworthy counterparties. We expect to pursue opportunities in other high-growth emerging markets that have characteristics similar to those of our initial target markets, with a focus on markets located in Asia (except Japan), Africa, Latin America and the Middle East. Over time, we may selectively acquire other clean power generation assets, including natural gas, biomass and hybrid energy and storage solutions, as well as transmission lines, that enable us to provide power on a 24/7 basis, as well as to add solar generation assets serving residential and commercial building customers.

 

 

1


Table of Contents

Portfolio growth

Call and ROFO rights

We believe we will be able to rapidly expand our initial project portfolio as a result of the significant project acquisition call rights and rights of first offer, or “ROFO rights,” that we have with our Sponsor and the project acquisition call rights and ROFO rights we expect to have with third-party developers of clean power generation assets. Upon completion of this offering, we will have call rights and third-party ROFO rights with respect to identified projects that have an aggregate capacity of 5,366.9 MW.

We will enter into a support agreement with our Sponsor immediately prior to the completion of this offering, pursuant to which our Sponsor will agree to offer us additional qualifying projects through the fifth anniversary of the completion of this offering that are projected to generate an aggregate of at least $1.4 billion of cash available for distribution during their respective first twelve months of commercial operations. We expect that our Sponsor will continue to provide us with the opportunity to acquire additional qualifying projects after it has satisfied its minimum commitment under the support agreement in order to maximize the value of its equity ownership and incentive distribution rights. The support agreement with our Sponsor will also grant us ROFO rights with respect to additional clean energy projects that our Sponsor elects to sell or otherwise transfer and that are located in our initial target markets or other emerging markets that we mutually agree upon.

In addition, we have an agreement with Renova Energia S.A., the largest renewable energy company in Brazil, or “Renova,” pursuant to which we have ROFO rights with respect to its operating, contracted and development pipeline, or the “Renova ROFO Projects.”

Third-party acquisitions

We also intend to rapidly expand our project portfolio by acquiring renewable energy projects from third parties. As discussed below, our Sponsor and its operating subsidiary, TerraForm Power, have a strong record of third-party project and corporate acquisitions. We expect that our initial portfolio will include 1.1 GW of projects acquired from third parties in nine acquisitions. We expect to continue to have significant opportunities to acquire projects from third-party developers, enabling us to expand our project portfolio through acquisitions for the foreseeable future.

Our Sponsor

Our U.S.-based Sponsor is the largest globally diversified developer of wind and solar energy projects in the world and has been one of the top three developers and installers of solar energy facilities in the world in each of the past two years based on megawatts installed. As of March 31, 2015, our Sponsor had a 7.5 GW pipeline of development-stage solar and wind projects, including 1.7 GW in our initial and future target markets, and approximately 4.9 GW of self-developed and third-party developed solar and wind power generation assets under management. Our Sponsor has developed over 1,300 solar and wind projects in 20 countries and has completed all of the projects on which it has commenced construction, including over 140 projects in our initial target markets. Our Sponsor has over 1,900 development and operations employees, over 700 of which service our initial and future target markets. We believe we are well positioned to capitalize on favorable market trends in the renewable power generation segment due to our relationship with our Sponsor, which has an established presence in each of our initial target markets, a strong asset development pipeline and acquisition track record, significant project financing experience and asset management and operational expertise.

 

 

2


Table of Contents

Yieldco experience

Our Sponsor has significant experience in acquiring, financing and operating clean power generation assets through a publicly listed dividend-oriented company. We will be the second yieldco vehicle to launch with our Sponsor’s support. Our Sponsor’s subsidiary, TerraForm Power, which owns and operates clean power assets located in the United States and other select jurisdictions, completed its initial public offering in July 2014. With our Sponsor’s support, TerraForm Power has raised approximately $3.9 billion in acquisition and permanent financing to pursue acquisitions of renewable energy projects totaling 1,703.0 MW as of May 1, 2015. We intend to capitalize on our Sponsor’s experience in successfully launching and supporting TerraForm Power.

M&A expertise

During the year ended December 31, 2014, our Sponsor completed 32 corporate and project acquisitions worldwide, which included operating projects with an aggregate capacity of 1.5 GW. On January 29, 2015, our Sponsor completed the purchase of First Wind’s development platform, pipeline and projects in development, including over 1.6 GW of wind and solar generation assets under development, and increased its assets under management by 1.5 GW. Our Sponsor: (i) will acquire Latin America Power Holding, B.V.’s, or “LAP’s,” asset management platform, its operation and maintenance personnel expertise in Peru and certain rights with respect to a pipeline of Peruvian hydro-electric development assets and (ii) has acquired an asset management platform in China consisting of operations and maintenance personnel and management expertise from Honiton Energy Caymans, Ltd., or “Honiton.” We expect to continue to leverage our Sponsor’s significant development expertise, project pipeline and third-party acquisition track record. For example, we have completed or expect to complete in connection with the closing of this offering or, in certain limited cases, during the remainder of 2015, nine separate acquisitions representing 1.1 GW in the aggregate of projects located across multiple geographies that utilize a variety of renewable energy technologies.

Market opportunity

The global renewable power generation segment is large and growing rapidly due to significant increases in energy demand, decreasing cost of renewable energy, the emergence in various energy markets of “grid parity,” which is the point at which renewable energy sources can generate electricity at a cost equal to or lower than prevailing retail electricity prices, and strong social and political support for renewable energy, among other factors. We expect the cost to produce energy from conventional sources will continue to rise, owing to the required investments in transmission and distribution infrastructure and increasing regulatory costs relating to conventional energy sources. We believe accelerating industrialization, an expanding middle class and the need to develop energy grid infrastructure will continue to drive demand in our initial target markets for the foreseeable future. We believe that solar and wind energy systems are particularly attractive in addressing the undersupply of electrical generation capacity in emerging markets due to their relative ease and speed of installation, scalability and, with respect to solar energy systems, their ability to be located near the customer, thereby reducing the customer’s transmission and distribution costs. In addition, we believe that hydro-electric energy represents a significant acquisition opportunity for us because it is a proven renewable technology with significant installed capacity of more than 412 GW in our initial target markets.

The global renewables market is projected to require more than $2.1 trillion of investment in capacity expansions over the period from 2015 through 2020, of which approximately 35% of such capacity expansion is expected to occur in our initial target markets. Of this total expected investment, more than $723 billion and $664 billion is expected to be in global solar and wind generation capacity expansions, respectively. Our initial

 

 

3


Table of Contents

target markets are expected to account for 48% and 41% of global wind and solar capacity expansions, respectively. In addition, more than $253 billion is expected to be invested globally in hydro-electric generation assets through 2016, of which our initial target markets are expected to account for 27% of such capacity expansion.

The installed base of renewable energy generation capacity in our initial target markets is greater than 622 GW, including more than 39 GW of solar capacity, 138 GW of wind capacity and 412 GW of hydro-electric capacity. Driven by the increasing cost competitiveness of wind and solar energy, accelerating industrialization, an expanding middle class and attractive regulatory policies that incentivize renewable energy investments, we expect substantial growth in installed renewable energy capacity over the next several years. Solar energy capacity additions are expected to total over 179 GW between 2014 and 2020 in our initial target markets and are expected to grow at a compound annual growth rate, or “CAGR,” of 32% between 2014 and 2020 in our initial target markets. Over the same period, wind energy capacity additions are expected to total over 188 GW in our initial target markets and are expected to grow at a CAGR of 14% between 2014 and 2020, in our initial target markets.

Sponsor Support Agreement

Immediately prior to the completion of this offering, we will enter into a project support agreement, or the “Support Agreement,” with our Sponsor, which will require our Sponsor to offer us additional qualifying projects from its development pipeline through the fifth anniversary of the completion of this offering that are projected to generate an aggregate of at least $1.4 billion of cash available for distribution during the first twelve months following the qualifying projects’ respective commercial operation dates, or “Projected FTM CAFD.” We refer to these projects as the “Call Right Projects.” If the amount of Projected FTM CAFD of the projects we acquire under the Support Agreement through the fifth anniversary of the completion of this offering is less than $1.4 billion, our Sponsor has agreed that it will continue to offer us sufficient, qualifying Call Right Projects from its pipeline until the total aggregate Projected FTM CAFD commitment has been satisfied.

In addition, the Support Agreement grants us a right of first offer with respect to any clean energy projects (other than Call Right Projects) that our Sponsor elects to sell or otherwise transfer during the six-year period following the completion of this offering and that are located in our initial target markets and other emerging markets that we mutually agree upon. We refer to these projects as the “SunEdison ROFO Projects.” The Support Agreement does not identify the SunEdison ROFO Projects since our Sponsor will not be obligated to sell any project that would constitute a SunEdison ROFO Project. In the event that our Sponsor elects to sell such assets, it will not be required to accept any offer we make to acquire any SunEdison ROFO Project and, following the completion of good faith negotiations with us, our Sponsor may choose to sell such assets to a third party or not to sell the assets at all.

Cash dividend policy

We intend to use a portion of the cash available for distribution, or “CAFD,” generated by our project portfolio to pay regular quarterly cash dividends to holders of our Class A common stock. After determining an appropriate reserve for our working capital needs and the prudent conduct of our business, our objective is to pay our Class A common stockholders a consistent and growing cash dividend that is sustainable on a long-term basis. Based on our forecast and the related assumptions and our intention to acquire assets with characteristics similar to those in our initial portfolio, we expect to grow our CAFD and increase our quarterly cash dividends over time. Our initial quarterly dividend will be set at $         per share of Class A common stock,

 

 

4


Table of Contents

or $         per share on an annualized basis. We established our initial quarterly dividend level based upon a targeted payout ratio by Global LLC of approximately 85% of projected annual CAFD. This dividend payout ratio is not prescribed by our governing documents and is subject to change based on the discretion of our board of directors. We expect our dividend payout ratio to vary as we intend to maintain or increase our dividend despite variations in our CAFD from period to period. In addition, we may adjust our dividend payout ratio from time to time based on changes in our portfolio in terms of size and scope, working capital and capital expenditure requirements, operating expenses and market conditions, including acquisition opportunities and our ability to borrow funds and access capital markets.

We intend to target a 20% CAGR in dividends per share over the three-year period following the completion of this offering. This target is based on, and supported by, our Sponsor’s $1.4 billion aggregate Projected FTM CAFD commitment to us under the Support Agreement and our Sponsor’s track record of successful project acquisitions from unaffiliated third parties, which will provide us the opportunity to grow our CAFD following this offering. While we believe our targeted growth rate is reasonable for the emerging markets on which we focus, it is based on estimates and assumptions regarding a number of factors, many of which are beyond our control, including the market value of projects we acquire from third parties, the purchase price we pay for acquired projects, our cost of capital, the ratio of debt to equity with respect to the financing of acquisitions, whether we have the financial resources to acquire the Call Right Projects and the timing of such acquisitions. Prospective investors should read “Cash dividend policy,” including our financial forecast and related assumptions, and “Risk factors,” including the risks and uncertainties related to our forecasted results, completion of construction of projects and acquisition opportunities, in their entirety.

We intend to cause Global LLC to distribute a portion of its CAFD to the holders of its units (including us as the sole holder of the Class A units and our Sponsor as the sole holder of the Class B units) pro rata, based on the number of units held, subject to the incentive distribution rights, or “IDRs,” held by our Sponsor that are described below. However, the Class B units held by our Sponsor are deemed “subordinated” because for a period of time, referred to as the “Subordination Period,” the Class B units will not be entitled to receive any distributions from Global LLC until the Class A units and Class B1 units (which may be issued upon reset of IDR target distribution levels or in connection with acquisitions from our Sponsor or third parties) have received quarterly distributions in an amount equal to $         per unit, or the “Minimum Quarterly Distribution,” plus any arrearages in the payment of the Minimum Quarterly Distribution from prior quarters. The practical effect of the subordination of the Class B units is to increase the likelihood that during the Subordination Period there will be sufficient CAFD to pay the Minimum Quarterly Distribution on the Class A units and Class B1 units (if any). For a description of the IDRs and the Subordination Period, see “Certain relationships and related party transactions—Amended and Restated Operating Agreement of Global LLC—Distributions.”

Our initial portfolio includes 921.7 MW of projects that we expect to acquire from third parties concurrently with or, in certain limited cases, during the remainder of 2015, which we refer to herein as the “Pending Acquisitions.” The closing of this offering is not conditioned on the consummation of the Pending Acquisitions. Our initial portfolio also includes 128.2 MW of projects that have not reached their commercial operation dates, or “CODs,” to be contributed to us by our Sponsor once such projects reach their respective COD, or the “Contributed Construction Projects.” The Contributed Construction Projects are expected to achieve their CODs during the remainder of 2015. To reduce the effect on the Class A units of delays (if any) in the closing of the Pending Acquisitions or the completion of the Contributed Construction Projects, our Sponsor has agreed to forego distributions under certain circumstances. In particular, our Sponsor has agreed to forego any distributions on its Class B units with respect to the third and fourth quarters of 2015 (i.e., distributions declared on or prior to March 31, 2016), and thereafter to forego distributions on its Class B units until the end

 

 

5


Table of Contents

of the Distribution Forbearance Period to the extent the holders of the Class A units and Class B1 units have not received distributions in an amount equal to the Minimum Quarterly Distribution plus any arrearages in the payment of Minimum Quarterly Distributions from prior quarters.

For a description of the IDRs, the Subordination Period and the Distribution Forbearance Period, including the definitions of Subordination Period, As Delivered CAFD, Closed Acquisition CAFD, CAFD Forbearance Threshold and Distribution Forbearance Period, see “Certain relationships and related party transactions—Amended and Restated Operating Agreement of Global LLC—Distributions.”

Purpose of TerraForm Global, Inc.

We intend to create value for the holders of our Class A common stock by achieving the following objectives:

 

 

owning and operating a diverse platform of renewable energy projects, including solar, wind, hydro-electric and other clean power generation technologies, that provide long-term contracted cash flows from creditworthy counterparties;

 

 

creating a geographically diverse platform of renewable energy generation assets;

 

 

growing our project portfolio through the exercise of our call rights and the completion of third-party acquisitions;

 

 

capitalizing on the expected high growth in the worldwide clean power generation market;

 

 

creating an attractive investment opportunity for dividend growth-oriented investors; and

 

 

gaining access to a broad investor base with a more competitive source of equity capital that accelerates our long-term growth and acquisition strategy.

 

 

6


Table of Contents

Our initial portfolio, the Call Right Projects and ROFO Projects

The following table provides an overview of the projects that we expect will comprise our initial portfolio. We expect to acquire certain of the projects included in our initial portfolio through the consummation of the Pending Acquisitions. We anticipate that substantially all of the Pending Acquisitions will be completed concurrently with the completion of this offering. This offering is not conditioned on the concurrent closing of all of the Pending Acquisitions. As of the date of this prospectus, we have not yet received all of the governmental, regulatory or third-party approvals or consents required to complete all of these acquisitions, and the timing for those approvals is outside of our control. As a result, we cannot assure you that all of the Pending Acquisitions will be consummated on the timetable currently contemplated. For more information about the projects included in our initial portfolio, see “Business—Our portfolio.”

 

Country   Total
Net Capacity
(MW)(1)
    % of Total
MW
    Pending
Acquisition
Net Capacity
(MW)(2)
   

# of

Sites

    Remaining
Duration of PPA
(Years)(3)

 

Brazil Projects:

         

Wind

    294.4        20.9%        294.4        14      17

Hydro

    41.8        3.0        41.8        3      13
 

 

 

   

 

 

   

 

 

   

 

 

   

Total Brazil

    336.2        23.9%        336.2        17      17

India Projects:

         

Wind(4)

    119.4        8.5        101.6        4      18

Solar

    134.0        9.5        0.0        12      23
 

 

 

   

 

 

   

 

 

   

 

 

   

Total India

    253.3        18.0%        101.6        16      21

Honduras Projects:

         

Wind

    126.0        9.0        126.0        1      22

Solar(5)

    82.0        5.8        82.0        3      20
 

 

 

   

 

 

   

 

 

   

 

 

   

Total Honduras

    208.0        14.8%        208.0        4      21

China Projects:

         

Wind

    148.5        10.6        0.0        3      15

Solar

    18.0        1.3        0.0        1      18
 

 

 

   

 

 

   

 

 

   

 

 

   

Total China

    166.5        11.8%        0.0        4      16

Uruguay Solar Projects(5)

    101.1        7.2%        26.4        3      28

South Africa Projects:

         

Wind

    17.6        1.2        17.6        1      19

Solar

    81.3        5.8        41.4        5      19
 

 

 

   

 

 

   

 

 

   

 

 

   

Total South Africa

    98.8        7.0%        59.0        6      19

Costa Rica Wind Projects

    74.0        5.3%        74.0        2      14

Peru Hydro Projects

    72.5        5.2%        72.5        6      18

Nicaragua Wind Project

    44.0        3.1%        44.0        1      18

Thailand Solar Projects(4)

    39.3        2.8%        0.0        9      26

Malaysia Solar Projects

    12.3        0.9%        0.0        4      20
 

 

 

   

 

 

   

 

 

   

 

 

   

Total(6)

    1,406.1        100.0%        921.7        72      19
 

 

 

   

 

 

   

 

 

   

 

 

   

 

(1)   Net capacity represents the maximum, or rated, generating capacity at standard test conditions of a facility multiplied by our percentage of economic ownership of that facility as of the date of this prospectus. Generating capacity may vary based on a variety of factors discussed elsewhere in this prospectus. For projects referenced herein that have not yet achieved their COD, the figures reflect expected final capacity.

 

 

7


Table of Contents
(2)   Certain of the Pending Acquisitions are subject to the receipt of governmental, regulatory or third-party approvals or consents. For more information relating to the outstanding conditions precedent to closing, see “Risk factors—Risks related to our business—There can be no assurance that the Pending Acquisitions will be consummated on the timetable currently anticipated, and the closing of this offering is not conditioned on the consummation of these acquisitions.”

 

(3)   Calculated as of March 31, 2015.

 

(4)   Pursuant to an investment agreement with our Sponsor, our Sponsor will contribute to us: (i) the Bora Bora wind project in India, representing 17.8 MW; (ii) the NPS Star and WXA solar projects in Thailand, representing an aggregate of 35.7 MW; and (iii) the Del Litoral and El Naranjal solar projects in Uruguay, representing an aggregate of 74.8 MW. The contribution with respect to each project will occur on or about the date that such project reaches COD, except that 74% of the Bora Bora project will be contributed on or about its COD with the remaining 26% to be contributed on the one-year anniversary of the project’s COD. We expect these projects to achieve COD in the second half of 2015.

 

(5)   We do not expect to complete three of the Pending Acquisitions, consisting of an 82.0 MW solar project located in Honduras (Choluteca), a 26.4 MW solar project located in Uruguay (Alto Cielo) and a 50.0 MW wind project located in Costa Rica (Orosi), until the respective project achieves COD, which is expected to occur in the second half of 2015.

 

(6)   Amounts may not sum due to rounding.

The following charts provide an overview of our initial project portfolio by geography and technology:

 

LOGO

The projects in our initial portfolio, as well as the call right projects discussed below, were selected because they are located in our initial target markets and have or will have PPAs or other offtake arrangements with creditworthy counterparties that we believe will provide sustainable and predictable cash flows to fund the regular quarterly cash dividends that we intend to pay to holders of our Class A common stock. With the exception of five projects representing an aggregate 128.2 MW, all of the Sponsor contributed projects included in our initial portfolio have reached their COD. We expect the remaining five projects to reach COD before the end of 2015. Our initial portfolio includes the Pending Acquisitions representing 921.7 MW that we expect to close concurrently with the completion of this offering, or in certain limited cases, during the remainder of 2015. The Pending Acquisitions include three non-operational projects representing an aggregate 158.4 MW. Our acquisition of these projects is subject to their reaching COD, which we expect to occur before the end of 2015. We cannot assure you that all of the Pending Acquisitions will be consummated at the closing of this offering, and the closing of this offering is not conditioned on the consummation of the Pending Acquisitions. Therefore, the size of our initial portfolio and the corresponding forecasted CAFD at the closing of this offering may be smaller than the portfolio and forecasted CAFD presented in this prospectus. See “Risk factors—Risks related to our business—There can be no assurance that the Pending Acquisitions will be consummated on the timetable currently anticipated, and the closing of this offering is not conditioned on the consummation of these acquisitions.”

We will have the right to acquire the Call Right Projects set forth in the table below at prices to be determined by good faith negotiations between us and our Sponsor. The price for each of these Call Right Projects will be the fair market value of such project. The Support Agreement provides that we will work with our Sponsor to mutually agree on the fair market value, but if we are unable to, we and our Sponsor will engage a third-party advisor to determine the fair market value, after which we have the right (but not the obligation) to acquire

 

 

8


Table of Contents

such Call Right Project. Until the price for such Call Right Project is mutually agreed to by us and our Sponsor, should our Sponsor receive a bona fide offer for a Call Right Project from a third party, we will have the right to match any price offered by such third party and acquire such Call Right Project on the terms our Sponsor could obtain from the third party. After the price for a Call Right Project has been agreed upon and until the total aggregate Projected FTM CAFD commitment has been satisfied, our Sponsor may not market, offer or sell that Call Right Project to any third party without our consent. The Support Agreement will further provide that our Sponsor is required to offer us additional qualifying Call Right Projects from its pipeline on a quarterly basis until we have acquired projects under the Support Agreement that have the specified minimum amount of Projected FTM CAFD covered by the Support Agreement. We cannot assure you that we will be offered these Call Right Projects on terms that are favorable to us. See “Certain relationships and related party transactions—Project Support Agreement” for additional information.

We recently executed call right agreements with seven third-party developers pursuant to which we have the right to purchase, at our election, an aggregate of 43 solar, wind and hydro projects located in China with an aggregate capacity of 1,559.7 MW, for a specified period following such projects commercial operations date. Twelve of these projects with an aggregate capacity of 322.2 MW have reached their commercial operations date. The remainder of these projects are expected to achieve their COD at varying times prior to the end of 2017. We refer to these call rights as our “Third-Party Call Right Projects.”

In connection with the Renova Transaction, Renova has granted us a right of first offer with respect to any sale or transfer of any development or operating project of Renova for the 25-year period after the date of our agreement with Renova. Prior to selling or transferring any Renova ROFO Project, Renova has agreed to provide us with written notice and to negotiate with us in good faith, for a period of 45 days, regarding the terms and conditions of a purchase by us of the applicable Renova ROFO Project.

 

 

9


Table of Contents

The following table provides an overview of our currently identified Call Right Projects, Third-Party Call Right Projects and Renova ROFO Projects:

 

Country   Technology     Net  Capacity(1)
(MW)
         % of Total
MW
    Expected COD     # of
Projects
 

 

   

 

 

 

Sponsor Operating Call Right Projects:

           

India

    Solar        1.0          0.0%        Q1 15        1   
    Wind        242.5          4.5           Q3 07 - Q4 14        4   

Malaysia

    Solar        5.3          0.1           Q1 14 - Q3 14        5   
   

 

 

     

 

 

     

 

 

 

Sponsor Operating Call Right Projects

      248.8          4.6%          10   

Sponsor Development Call Right Projects:

           

China

    Solar        68.0          1.3           Q2 16 - Q4 16        2   

India

    Solar        625.3          11.7           Q3 15 - Q3 17        20   
    Wind        170.0          3.2           Q4 15        1   

South Africa

    Solar        274.0          5.1           Q2 17 - Q3 18        6   

Latin America (excluding Brazil)

    Wind        80.0          1.5           Q3 16        1   

Thailand

    Solar        148.9          2.8           Q1 16 - Q4 16        19   

Philippines

    Solar        22.5          0.4           Q4 15        1   
   

 

 

     

 

 

     

 

 

 

Sponsor Development Call Right Projects

      1,388.7          25.9%          50   
   

 

 

     

 

 

     

 

 

 

Total Sponsor Call Right Projects

      1,637.5          30.5%          60   

Third-Party Operating Call Rights Projects:

           

China

    Wind        210.5          3.9%        Q1 11 - Q3 14        7   
    Hydro        111.7          2.1           Q3 98 - Q2 10        5   
   

 

 

     

 

 

     

 

 

 

Third-Party Operating Call Rights Projects

      322.2          6.0%          12   

Third-Party Development Call Rights Projects:

           

China

    Wind        794.5          14.8           Q4 15 - Q4 17        16   
    Solar        400.0          7.5           Q4 15 - Q4 17        13   
    Hydro        43.0          0.8           Q4 15        2   
   

 

 

     

 

 

     

 

 

 

Third-Party Development Call Rights Projects

      1,237.5          23.1%          31   
   

 

 

     

 

 

     

 

 

 

Total Third-Party Call Rights Projects

      1,559.7          29.1%          43   

Renova Operating ROFO Rights:

           

Brazil

    Wind        386.0          7.2           Q3 14 - Q2 15        2   
    Hydro        148.4          2.8           Q3 08        1   
   

 

 

     

 

 

     

 

 

 

Renova Operating ROFO Rights

      534.4          10.0%          3   

Renova Development ROFO Rights:

           

Brazil

    Wind        1,582.4          29.5           Q3 15 - Q1 19        11   
    Solar        53.0          1.0           Q3 17        1   
   

 

 

     

 

 

     

 

 

 

Total Renova Development ROFO Rights

      1,635.4          30.5%          12   
   

 

 

     

 

 

     

 

 

 

Total Renova ROFO Rights

      2,169.8          40.4%          15   
   

 

 

     

 

 

     

 

 

 

Total Call Right and ROFO Projects

      5,366.9          100.0%          76   
   

 

 

     

 

 

     

 

 

 

 

   

 

 

 
(1)   Net capacity represents the maximum, or rated, generating capacity at standard test conditions of a facility multiplied by our expected percentage of economic ownership of such facility as of the date of this prospectus. Generating capacity may vary based on a variety of factors discussed elsewhere in this prospectus.

The following charts provide an overview of our currently identified Call Right Projects, Third-Party Call Right Projects and Renova ROFO Projects by geography and technology:

 

LOGO

 

 

10


Table of Contents

Industry overview

We expect to benefit from continued high growth in clean energy demand across the utility, commercial and residential customer segments. We believe the solar and wind segments of the clean power generation industry are particularly attractive, as declining solar and wind electricity costs and increasing grid electricity prices are trending towards grid parity in emerging markets. We also believe the hydro-electric segment of the clean power generation industry represents an attractive market given its long-term contracts with creditworthy counterparties, significant installed base, extended useful life and prospective acquisition opportunities.

Solar energy benefits from highly predictable energy generation, the absence of fuel costs and proven technology. In addition, solar generating assets have the potential to be located at a customer’s site, which reduces the customer’s transmission and distribution costs. Finally, solar energy generation benefits from governmental, public and private support due to the environmentally friendly attributes of solar energy.

The increasing adoption of wind energy across the globe relative to other power generation technologies is expected to be driven by its increasing cost competitiveness, broad resource availability, well established technology, non-reliance on water and ancillary societal benefits, such as job creation and energy security.

Hydro-electric power generation is a well established clean energy technology. Its multiple methods of generation, such as conventional dam, pumped storage and run-of-river, have led to its diverse use in renewable power generation from large-scale (greater than or equal to 50 MW rated capacity) to small-scale (less than 50 MW rated capacity) facilities.

The following charts summarize anticipated growth in our initial target markets:

 

      Total solar energy generation rated capacity in MW  
     

    2014 Actual

         2017 Expected          2020 Expected                 CAGR(1)  

China

     32,925         85,420         161,881        30%   

Brazil

     37         1,430         3,654        115%   

India

     3,259         14,606         31,205        46%   

South Africa

     1,075         2,588         2,588 (2)      16%   

Honduras

    

  
    
376
  
     376 (2)        

Costa Rica

             25         25 (2)        

Peru

     84         200         200 (2)      16%   

Uruguay

             223         223 (2)      178%   

Malaysia

     200         377         639        21%   

Thailand

     1,197         2,323         2,323 (2)      12%   
  

 

 

    

 

 

    

 

 

   

Total

     38,778         107,568         203,113        32%   

 

 

 

 

11


Table of Contents
      Total wind energy generation rated capacity in MW  
     

    2014 Actual

         2017 Expected          2020 Expected                  CAGR(1)  

China

     110,409         169,126         228,876         13%   

Brazil

     5,069         14,382         22,676         28%   

India

     20,529         30,029         38,729         11%   

South Africa

     606         2,400         4,240         38%   

Honduras

    
126
  
    
251
  
     381         20%   

Costa Rica

     127         278         558         28%   

Peru

     146         313         533         24%   

Uruguay

     379         1,651         2,101         33%   

Malaysia

     N/A         N/A         N/A         N/A   

Thailand

     242         242         242           
  

 

 

    

 

 

    

 

 

    

Total

     137,634         218,672         298,335         14%   

 

 

Source: Bloomberg New Energy Finance

(1)   Represents compound annual growth rate from 2014 to 2020. Where 2020 data is unavailable, represents compound annual growth rate from 2014 to 2017.

 

(2)   Bloomberg New Energy Finance does not provide 2020 projections for these countries. As such, 2017 capacity has been held constant through 2020.

Cash available for distribution

The table below summarizes our estimated cash available for distribution per share of Class A common stock for the twelve months ending June 30, 2016 and December 31, 2016 based on our forecasts included elsewhere in this prospectus:

 

(in thousands, except share, per share and project data)

 

   Forecast for the twelve months ending  
       June 30, 2016      December 31, 2016  
     (unaudited)  

Assumed operating MW at the beginning of the period

     1,119.5         1,406.1   

Cash available for distribution by Global LLC(1)

   $ 195,808       $ 231,452   

Cash available for distribution to holders of Class A shares(1)(2)

   $                    $                

Class A shares at period end

     

Cash available for distribution per Class A share(1)

   $                    $                

 

 

 

(1)   Cash available for distribution is not a measure of performance under U.S. generally accepted accounting principles, or “GAAP.” For a reconciliation of these forecasted metrics to their closest GAAP measure, see “Cash dividend policy—Estimate of future cash available for distribution” elsewhere in this prospectus.

 

(2)   Does not give effect to any reductions of distributions on the Class B units during the Distribution Forbearance Period.

We define “cash available for distribution,” or “CAFD,” as net cash provided by the operating activities of Global LLC as adjusted for certain other cash flow items that we associate with our operations. It is a non-GAAP measure of our ability to generate cash to service our dividends. As calculated in this prospectus, cash available for distribution represents net cash provided by (used in) operating activities of Global LLC: (i) plus or minus changes in assets and liabilities as reflected on our statements of cash flows, (ii) minus deposits into (or plus withdrawals from) restricted cash accounts required by project financing arrangements to the extent they decrease (or increase) cash provided by operating activities, (iii) minus cash distributions paid to non-controlling interests in our projects, if any, (iv) minus scheduled project-level and other debt service payments and repayments in accordance with the related borrowing arrangements, to the extent they are paid from operating cash flows during a period, (v) minus non-expansionary capital expenditures, if any, to the extent they are paid from operating cash flows during a period, (vi) plus cash contributions from our Sponsor pursuant to the Interest Payment Agreement, (vii) plus operating costs and expenses paid by our Sponsor pursuant to the Management Services Agreement to the extent such costs or expenses exceed the fee payable by us pursuant to

 

 

12


Table of Contents

such agreement but otherwise reduce our net cash provided by operating activities and (viii) plus or minus operating items as necessary to present the cash flows we deem representative of our core business operations, with the approval of the audit committee. Our intention is to cause Global LLC to distribute a portion of the CAFD generated by our project portfolio to its members each quarter, after appropriate reserves for our working capital needs and the prudent conduct of our business. For further discussion of cash available for distribution, including a reconciliation of net cash provided by (used in) operating activities to cash available for distribution and a discussion of its limitations, see footnote (2) under the heading “—Summary historical and pro forma financial data” elsewhere in this prospectus.

Our business strategy

Our primary business strategy is to increase the cash dividends we pay to the holders of our Class A common stock over time. Our plan for executing this strategy includes the following:

Focus on long-term contracted clean power generation assets.    All projects included in our initial portfolio, together with any call right project that we acquire, will have a PPA with a creditworthy counterparty or be subject to a similar offtake arrangement such as a feed-in tariff program. We intend to focus on owning and operating long-term contracted clean power generation assets with proven technologies, low operating risks and stable cash flows consistent with our initial portfolio. We believe industry trends will support significant growth opportunities for long-term contracted power in the clean power generation segment as various emerging markets continue to rapidly grow their electricity usage and approach grid parity.

Grow our business through acquisitions of long-term contracted operating assets.    We intend to acquire additional long-term contracted clean power generation assets from our Sponsor and unaffiliated third parties to increase our CAFD. The Support Agreement establishes: (i) a minimum commitment from our Sponsor to provide us with $1.4 billion of Projected FTM CAFD through the fifth anniversary of the completion of this offering, which will be satisfied either through (x) the option to acquire the identified Call Right Projects, which currently represent an aggregate capacity of approximately 1,637.4 MW, or (y) the option to acquire additional projects from our Sponsor’s development pipeline that will in the future be designated as Call Right Projects; and (ii) a right of first offer on the SunEdison ROFO Projects. We also have and expect to enter into additional call rights agreements with third parties. In addition, we have a right of first offer with respect to the Renova ROFO Projects. Given the strong growth trends in our initial target markets, we also expect to have significant opportunities to acquire other clean power generation assets from third-party developers, independent power producers and financial investors. We believe our acquisition strategies, based on an extensive knowledge of the market, third-party relationships, operating expertise and access to capital, will enhance our ability to grow and generate CAFD and provide us with a competitive advantage in acquiring new assets.

Attractive, high-growth asset class.    We intend to initially focus on the solar and wind energy segments because we believe they are currently the fastest growing segments of the clean power generation industry globally and offer attractive opportunities to own assets and deploy long-term capital due to the predictability of their cash flows, and the hydro-electric energy segment because we believe its significant market size presents numerous investment opportunities. Also, we believe the solar, wind and hydro-electric energy segments are attractive because there is no associated fuel cost risk, their associated technologies have become highly reliable and, based on the experience of our Sponsor, require low operational and maintenance expenditures and a low level of interaction from managers as compared to conventional energy assets. Solar, wind and hydro-electric projects also have an expected life which can exceed 30 years. In addition, the projects in our initial portfolio generally operate under long-term PPAs with terms of up to 30 years.

 

 

13


Table of Contents

Focus on emerging markets with favorable investment attributes.    While our current focus is on solar, wind and hydro-electric energy generation assets in our initial target markets, we will selectively consider acquisitions of clean power generation assets in other geographies. We expect to pursue opportunities in other high-growth emerging markets that have characteristics similar to those of our initial target markets, with a focus on other markets located in Asia (except Japan), Africa, Latin America and the Middle East. We believe there will be ample opportunities to acquire high-quality contracted clean power generation assets in high-growth emerging markets with these attributes.

Technology-neutral clean power platform.    We intend to expand upon our Sponsor’s technology-neutral platform. Our Sponsor’s platform enables the development, acquisition, maintenance and operation of renewable energy generation assets across various renewable energy technologies, including solar, wind and hydro-electric. This technology-neutral platform enables our open architecture approach, which provides us with the ability to evaluate a broad range of development partnerships and acquisition opportunities and support the rapid growth of our portfolio.

Maintain sound financial practices.    We intend to maintain our commitment to disciplined financial analysis and a balanced capital structure. Our financial practices will include: (i) a risk and credit policy focused on transacting with creditworthy counterparties; (ii) a financing policy focused on achieving an optimal capital structure through various capital formation alternatives to minimize interest rates, refinancing risks and tax withholdings; (iii) utilizing derivative financial instruments to minimize our net exposure to currency fluctuations; and (iv) a dividend policy that is based on distributing the CAFD generated by our project portfolio (after deducting appropriate reserves for our working capital needs and the prudent conduct of our business). Our initial dividend was established based on our targeted payout ratio of approximately 85% of projected CAFD. See “Cash dividend policy.”

Our competitive strengths

We believe our key competitive strengths include:

Diversity.    Our initial project portfolio is well diversified in terms of geography, market segment, counterparty, and types of renewable energy technology. We serve utility, commercial, industrial and governmental customers and may serve residential business lines in the future. We have projects located across 11 countries and four continents. Projects in our initial portfolio located in any single country are not expected to represent more than 30% of our projected CAFD for the year ending December 31, 2016, thereby reducing our operating risk profile and reliance on any single market or segment. We utilize several renewable energy technologies, the production profiles of which complement one another, which we believe enables us to generate consistent cash flow. We believe our diverse customer base, geographic presence and technology improves our business development opportunities by enhancing our industry relationships, reputation and understanding of regional power market dynamics.

Portfolio growth opportunities.    We believe we will be able to rapidly expand our initial project portfolio through several channels. We have significant project acquisition call rights and ROFO rights with our Sponsor and the Renova ROFO Projects. We also expect to have call rights with third-party developers of clean power generation assets, including the Third-Party Call Right Projects. We and our Sponsor have strategically located project origination teams, along with relationships with regionally-focused clean power generation companies, that we believe will facilitate the growth of our project pipeline. We expect to have significant opportunities to expand our project portfolio through additional third-party acquisitions for the foreseeable future.

 

 

14


Table of Contents

Stable, high-quality cash flows.    Our initial portfolio of projects, together with the call right projects that we acquire, will provide us with a stable, predictable cash flow profile. We sell the electricity generated by our projects under PPAs or similar offtake arrangements, such as feed-in tariff programs, with creditworthy counterparties. As of March 31, 2015, the weighted average (based on megawatts) remaining life of our PPAs was 19 years. All of our projects have highly predictable operating costs, in large part due to solar, wind and hydro-electric facilities having no fuel cost and utilizing reliable technology. We intend to utilize foreign exchange and foreign tax strategies in an effort to mitigate the impact of cross-border costs. Finally, based on our initial portfolio of projects, we do not expect to pay significant U.S. federal income taxes in the near term.

Relationship with SunEdison.    We believe our relationship with our Sponsor provides us with significant benefits, including the following:

 

 

Strong asset development track record.    Our Sponsor has demonstrated a significant track record in developing both solar and, as a result of its acquisition of First Wind, wind energy generation facilities. Over the last three calendar years, our Sponsor has constructed solar power generation assets with an aggregate capacity of 2.0 GW and, as of March 31, 2015, was constructing additional solar power generation assets expected to have an aggregate capacity of approximately 773.7 MW. Our Sponsor has been one of the top three developers and installers of solar energy facilities in the world in each of the past two years based on megawatts installed. Our Sponsor has developed over 1,300 solar and wind projects and has completed all of the projects on which it has commenced construction, including over 140 projects in our initial target markets. In addition, our Sponsor had a 7.5 GW pipeline of development stage solar and wind projects as of March 31, 2015, including 1.7 GW in our initial and future target markets. As of the same date, our Sponsor employed 3,400 people globally, of which over 1,900 were serving as developers and operators of renewable energy projects. Our Sponsor’s operating history demonstrates its organic project development capabilities in our initial target markets. We believe our Sponsor’s relationships, knowledge and employees will facilitate our ability to rapidly acquire operating projects from our Sponsor in our initial target markets.

 

 

Yieldco experience.    Our Sponsor’s subsidiary, TerraForm Power, which owns and operates clean power assets located in the United States and other select jurisdictions, completed its initial public offering in July 2014. With our Sponsor’s support, TerraForm Power has raised approximately $3.9 billion in acquisition and permanent financing to pursue acquisitions of renewable energy projects totaling 1,703.0 MW as of May 1, 2015.

 

 

Proven acquisition expertise.    In 2014, our Sponsor completed 32 corporate and project acquisitions worldwide, which included operating projects with an aggregate nameplate capacity of 1.5 GW. In addition, our Sponsor, through TerraForm Power, completed the acquisition on January 29, 2015 of First Wind’s 500.0 MW of operating wind generation assets and 21.1 MW of operating solar generation assets and 1.66 GW of wind and solar generation assets under development. These acquisitions include two wholly owned subsidiaries of Honiton, which provides our Sponsor with an operating and maintenance platform in China. Additionally, our Sponsor’s pending acquisition of LAP will provide it with a hydro-electric development pipeline in Peru and an operations and maintenance platform in Latin America. We believe our Sponsor’s significant acquisition experience and expertise will enable us to expand our portfolio through additional acquisitions of operating projects from unaffiliated third parties in our initial target markets. Our initial portfolio includes two projects that we have acquired from third parties. Concurrently with this offering or, in certain limited cases, during the remainder of 2015, we expect to complete seven separate transactions to acquire projects included in our initial portfolio, expanding our geographic footprint and diversifying our renewable energy technologies.

 

 

15


Table of Contents
 

Project financing experience.    We believe our Sponsor has demonstrated a successful track record of sourcing long-term capital to fund project acquisitions and the development and construction of projects located in our initial target markets. To date, our Sponsor has raised an aggregate of $3.0 billion since January 1, 2014 to support its development and acquisition activities. We expect that we will realize significant benefits from our Sponsor’s financing and structuring expertise as well as its relationships with financial institutions and other providers of capital.

 

 

Asset management expertise.    We will have access to the significant resources of our Sponsor to support the high-growth strategy of our business. As of March 31, 2015, our Sponsor had over 4.9 GW of projects under management across 20 countries. Approximately 16.1% of these projects are third-party power generation facilities, demonstrating our Sponsor’s collaboration with multiple developers and owners. These projects utilize 29 different module types and inverters from 17 different manufacturers. As of March 31, 2015, our Sponsor had approximately 700 employees servicing operations and management in our initial target markets. In addition, our Sponsor maintains three renewable energy operation centers to service assets under management. Our Sponsor’s asset management experience helps ensure that our facilities will be monitored and maintained to maximize cash generation. We also benefit from First Wind’s asset management expertise as the First Wind team has been integrated with our Sponsor.

Access to and experience in mature capital markets.    As a publicly listed company in the United States, we will have access to a broad investor base with a competitive source of capital. We believe access to this market will accelerate our long-term growth and acquisition strategy and provide us with a competitive advantage over regional renewable energy developers in our target markets where we may be competing to acquire assets or development rights. We believe that both our Sponsor and TerraForm Power have benefited from their status as publicly listed companies in the United States. To date, our Sponsor and TerraForm Power have raised an aggregate of $8.1 billion since January 1, 2014, providing them with the capital necessary to acquire projects and development platforms to grow TerraForm Power’s portfolio of operational renewable energy projects in mature markets. In addition, we believe that a public listing in the United States will provide transparency to investors regarding our operations that will help us attract and retain capital.

Long-term contracted portfolio.    We benefit from a portfolio of relatively newly constructed assets, with most of the projects in our initial portfolio having achieved COD within the past five years or expected to reach COD by the end of 2015. The PPAs for projects included in our initial portfolio have a weighted average remaining life of 19 years as of March 31, 2015. The projects in our initial portfolio and the call right projects utilize proven and reliable technologies provided by leading equipment manufacturers and, as a result, we expect to achieve high project availability and predictable maintenance capital expenditures.

Experienced management team.    Under the Management Services Agreement, our Sponsor has committed to provide us with a team of experienced professionals to serve as our executive officers and other key officers. We expect that certain of these professionals will provide such services to us on a dedicated basis. Our officers have considerable experience in developing, acquiring and operating clean power generation assets, with an average of over five years of experience in the sector. Mr. Domenech, our Chief Executive Officer, and his team have been successful in expanding TerraForm Power’s project portfolio from 807.7 MW as of its initial public offering in July 2014 to 1,703.0 MW as of May 1, 2015, an increase of 111%. Our management team will also have access to the other significant management resources of our Sponsor to support the operational, financial, legal and regulatory aspects of our business.

 

 

16


Table of Contents

Agreements with our Sponsor

We will enter into the agreements described below with our Sponsor immediately prior to the completion of this offering. For a more comprehensive discussion of these agreements, see “Certain relationships and related party transactions.” For a discussion of the risks related to our relationship with our Sponsor, see “Risk factors—Risks related to our relationship with our Sponsor.” In addition, we will amend Global LLC’s operating agreement to provide for Class A units, Class B units and Class B1 units and will convert our Sponsor’s interest in Global’s common equity into Global LLC Class B units and issue the IDRs to our Sponsor. As a result of holding Class B units and IDRs, subject to certain limitations during the Subordination Period and the Distribution Forbearance Period, our Sponsor will be entitled to share in distributions from Global LLC to its unit holders. See “Certain relationships and related party transactions—Amended and Restated Operating Agreement of Global LLC.”

Support Agreement.    Pursuant to the Support Agreement, our Sponsor will provide us with the right, but not the obligation, to purchase for cash certain clean energy projects from its project pipeline with aggregate Projected FTM CAFD of at least $1.4 billion through the fifth anniversary of the completion of this offering. If the amount of Projected FTM CAFD of the projects we acquire under the Support Agreement through the fifth anniversary of the completion of this offering is less than $1.4 billion, our Sponsor has agreed that it will continue to offer us sufficient Call Right Projects until the total aggregate Projected FTM CAFD commitment has been satisfied. We have agreed to pay cash for each Call Right Project that we acquire, unless we and our Sponsor otherwise mutually agree. The Support Agreement provides that we will work with our Sponsor to mutually agree on the fair market value of each Call Right Project within a reasonable time after it is added to the list of identified Call Right Projects. If we are unable to agree on the fair market value, we and our Sponsor will engage a third-party advisor to determine the fair market value, after which we will have the right (but not the obligation) to acquire such Call Right Project. Until we provide our Sponsor with written notice of exercise of our right to purchase a Call Right Project, should our Sponsor receive a bona fide offer for a Call Right Project from a third party, our Sponsor must give us notice of such offer in reasonable detail and we will have the right to acquire such project on terms substantially similar to those our Sponsor could have obtained from such third party, but at a price no less than the price specified in the third-party offer. After the price for a Call Right Project has been agreed upon and until the total aggregate Projected FTM CAFD commitment has been satisfied, our Sponsor may not market, offer or sell that Call Right Project to any third party without our consent.

The Call Right Projects are to be offered to us on a quarterly basis until we have acquired projects under the Support Agreement that have the specified minimum amount of Projected FTM CAFD for the period covered by the Support Agreement. These Call Right Projects must satisfy certain criteria. In addition, our Sponsor may remove a project then under construction from the Call Right Project list if, in its reasonable discretion, the project is unlikely to be successfully completed or if we have not exercised our call right with respect to an operating Call Right Project within twelve months of it being identified in the Support Agreement. In that case, the Sponsor will be required to replace such project with one or more additional reasonably equivalent projects that have a similar economic profile. Generally, we may exercise our call right with respect to any pre-COD Call Right Project identified in the Support Agreement at any time until 30 days prior to COD for such project, and with respect to any operating Call Right Project at any time within twelve months of it being added to the list. If we exercise our option to purchase a project under the Support Agreement and reach a mutually agreed upon price, our Sponsor is required to sell us that project on such date as we may agree or, in the case of a project under construction, on or about the date of its COD.

 

 

17


Table of Contents

In addition, our Sponsor has agreed to grant us a right of first offer on any of the SunEdison ROFO Projects that it determines to sell or otherwise transfer during the six-year period following the completion of this offering. Under the terms of the Support Agreement, our Sponsor will agree to negotiate with us in good faith, for a period of 20 days, to reach an agreement with respect to any proposed sale of a SunEdison ROFO Project for which we have exercised our right of first offer before it may sell or otherwise transfer such SunEdison ROFO Project to a third party. However, our Sponsor will not be obligated to sell any of the SunEdison ROFO Projects and, as a result, we do not know when, if ever, any SunEdison ROFO Projects will be offered to us. In addition, in the event that our Sponsor elects to sell SunEdison ROFO Projects, it will not be required to accept any offer we make and may choose to sell the assets to a third party or not sell the assets at all.

Under our related party transaction policy, the prior approval of our Corporate Governance and Conflicts Committee will be required for each material transaction with our Sponsor under the Support Agreement. See “—Conflicts of interest” below.

Management Services Agreement.    Pursuant to the Management Services Agreement, our Sponsor will provide, or arrange for the provision of, operational, management and administrative services to us and our subsidiaries, and we will pay our Sponsor a base management fee as follows: (i) 2.5% of Global LLC’s CAFD in each of 2016, 2017 and 2018; and (ii) an amount equal to our Sponsor’s actual cost for providing services to us pursuant to the terms of the Management Services Agreement in 2019 and thereafter. We and our Sponsor may agree to adjust the management fee as a result of a change in the scope of services provided under the Management Services Agreement, but no adjustment will be required solely as a result of our acquisition of Call Right Projects or other assets. The prior approval of our Corporate Governance and Conflicts Committee will be required for each material transaction with our Sponsor under the Management Services Agreement unless such transaction is expressly contemplated by the agreement.

Repowering Services Agreement.    Immediately prior to the completion of this offering, Global, Global LLC and Global Operating LLC, collectively, the “Service Recipients,” will enter into a Repowering Services Agreement with our Sponsor, pursuant to which our Sponsor will be granted a right of first refusal to provide certain services, including (i) repowering power generation projects and providing related services to analyze, design and replace or improve any of the power generation projects through the modification of the relevant energy system or the installation of new components, but excluding any maintenance, and (ii) such other services as may from time to time be reasonably requested by the Service Recipients related to any such repowerings, collectively, the “Repowering Services.”

Investment Agreements.    On December 22, 2014, Global LLC entered into an investment agreement with our Sponsor pursuant to which our Sponsor agreed to (i) provide support with respect to the interest payment obligations due under the Bridge Facility and (ii) contribute certain enumerated projects to Global LLC. Immediately prior to the completion of this offering, we will enter into an additional investment agreement with our Sponsor pursuant to which our Sponsor will agree to contribute to us the Bora Bora wind project in India, the NPS Star and WXA solar projects in Thailand and the Del Litoral and El Naranjal solar projects in Uruguay, all of which are currently under construction.

Interest Payment Agreement.    Immediately prior to the completion of this offering, Global LLC and Global Operating LLC will enter into an agreement with our Sponsor and SunEdison Holdings Corporation, pursuant to which our Sponsor will agree to pay all of the scheduled interest on Global Operating LLC’s senior unsecured notes until December 31, 2016 and up to an aggregate amount of $40 million in 2017, $30 million in 2018, $20 million in 2019 and $10 million in 2020, plus any interest due on any payment not remitted when due, or the “Interest Payment Agreement.” Our Sponsor will not be obligated to pay any amounts due under such senior indebtedness in connection with an acceleration of the payment of the principal amount of such indebtedness. Global LLC will be

 

 

18


Table of Contents

entitled to set off any amounts owing by SunEdison pursuant to the Interest Payment Agreement against any and all sums owed by Global LLC to SunEdison under the distribution provisions of the amended and restated operating agreement of Global LLC, and Global LLC may pay such amounts to Global Operating LLC.

Project contracts.    Our contributed projects were or are being built pursuant to engineering, procurement and construction, or “EPC,” contracts, and we anticipate they will be operated and maintained pursuant to operations and maintenance, or “O&M,” contracts with affiliates of our Sponsor. Under the EPC contracts, the relevant Sponsor affiliates provide liquidated damages to cover delays in project completion, as well as market standard warranties, including performance ratio guarantees, designed to ensure the expected level of electricity generation is achieved, for periods that range between two and five years after project completion depending on the relevant market. The O&M contracts with affiliates of our Sponsor provide for the performance of preventive and corrective maintenance services for fees as defined in such agreements. The applicable Sponsor affiliates also provide project availability guarantees of 98% including as to a majority of the solar projects that we own (on a megawatt basis), designed to ensure the expected level of power plant operation is achieved, and certain related liquidated damage obligations. See “Management’s discussion and analysis of financial condition and results of operations—Key metrics—Operating metrics—Project availability” for a description of “project availability.”

Conflicts of interest.    While our relationship with our Sponsor and its subsidiaries is a significant strength, it is also a source of potential conflicts. As discussed above, our Sponsor and its affiliates will provide important services to us, including assisting with our day-to-day management and providing individuals who will serve as our executive officers and other key officers. Our management team, including our officers, will remain employed by and, in certain cases, will continue to serve as executive officers or other senior officers of SunEdison or its affiliates. For example, our Chief Executive Officer also serves as the Chief Executive Officer and Director of TerraForm Power. Following this offering, our officers will also generally continue to have economic interests in our Sponsor and, with respect to our Chief Executive Officer, in TerraForm Power. These same officers may help our board of directors and, in particular, our Corporate Governance and Conflicts Committee evaluate potential acquisition opportunities presented by our Sponsor under the Support Agreement. As a result of their employment by, and economic interest in, our Sponsor, our officers may be conflicted when advising our board of directors or Corporate Governance and Conflicts Committee or otherwise participating in the negotiation or approval of such transactions.

Notwithstanding the significance of the services to be rendered by our Sponsor or its designated affiliates on our behalf in accordance with the terms of the Management Services Agreement or of the assets which we may elect to acquire from our Sponsor in accordance with the terms of the Support Agreement or otherwise, our Sponsor will not owe fiduciary duties to us or our stockholders and will have significant discretion in allocating acquisition opportunities (except with respect to the Call Right Projects and SunEdison ROFO Projects) to us or to itself or third parties. Under the Management Services Agreement, our Sponsor will not be prohibited from acquiring operating assets of the kind that we seek to acquire. See “Risk factors—Risks related to our relationship with our Sponsor.”

Any material transaction between us and our Sponsor (including the proposed acquisition of any material Call Right Project or any material SunEdison ROFO Project pursuant to the Support Agreement) will be subject to our related party transaction policy, which will require prior approval of such transaction by our Corporate Governance and Conflicts Committee. That committee will be comprised of at least three directors, each of whom will satisfy the requirements for independence under applicable laws and regulations of the Securities and Exchange Commission, or the “SEC,” and the rules of the NASDAQ Global Select Market. See “Risk factors—Risks related to our relationship with our Sponsor,” “Certain relationships and related party transactions—

 

 

19


Table of Contents

Procedures for review, approval and ratification of related-person transactions; conflicts of interest” and “Management—Committees of the board of directors—Corporate Governance and Conflicts Committee” for a discussion of the risks associated with our organizational and ownership structure and corporate strategy for mitigating such risks.

Renova ROFO Agreement

In connection with the Renova Transaction, Renova has granted us a right of first offer with respect to any sale or transfer of any development or operating project of Renova for the 25-year period after the date of our agreement with Renova. Prior to selling or transferring any Renova ROFO Project, Renova has agreed to provide us with a written notice and to negotiate with us in good faith, for a period of 45 days, regarding the terms and conditions of a purchase by us of the applicable Renova ROFO Project. At the conclusion of the negotiation period, we have the right, in our sole discretion, to submit a binding offer to Renova for the applicable Renova ROFO Project. If we do not submit a binding offer with respect to the applicable Renova ROFO Project, Renova will have the right to sell such project to a third party. In the event that we submit a binding offer to acquire the applicable project, Renova may either accept the offer and sell us the project within the time periods prescribed by the agreement, or sell the applicable project to a third party on terms and conditions that are more favorable to Renova in the aggregate than our offer, in the sole discretion of Renova. Renova is not obligated to sell any of the Renova ROFO Projects and, therefore, we do not know when, if ever, any Renova ROFO Projects will be offered to, or acquired by, us. Additionally, in the event that Renova elects to sell any Renova ROFO Projects, Renova will not be required to accept any offer we make and may choose to sell the projects to a third party (provided that the terms are no less favorable to Renova than those offered to us) or not to sell the projects at all. Furthermore, our right of first offer does not apply to any merger transaction involving Renova or to a sale of all or substantially all of Renova’s assets.

Organizational Transactions

Formation Transactions

Equity Grants. TerraForm Global, Inc. is a Delaware corporation formed on September 12, 2014 by SunEdison to serve as the issuer of the Class A common stock offered hereby. Shortly thereafter, we granted certain employees of SunEdison who will perform services for us equity incentive awards under the TerraForm Global, Inc. 2014 Long-Term Incentive Plan, or the “2014 Incentive Plan,” in the form of restricted shares of Global. See “Executive officer compensation—Equity incentive awards.”

Contributed and Acquired Projects. Global LLC was formed by SunEdison in connection with this offering as a Delaware limited liability company that owns and operates through its subsidiaries a portfolio of contracted clean power generation assets acquired and to be acquired from SunEdison and unaffiliated third parties. Prior to the completion of this offering: (i) SunEdison and its subsidiaries will have contributed or have committed to contribute to subsidiaries of Global LLC the clean technology energy projects developed or acquired by SunEdison that are included in our initial portfolio, which we refer to as the “Contributed Projects” and (ii) we will complete the following acquisitions:

 

 

Chint-NSM Transaction—the acquisition from an affiliate of Chint Solar (Zhejiang) Co., Ltd., of the remaining 51% interest in the 23.9 MW solar project NSM 24 located in India; and

 

 

Hercules Transaction—the acquisition of two wholly owned subsidiaries of Honiton, which includes the 148.5 MW wind project located in China.

 

 

20


Table of Contents

We collectively refer to these acquisitions as the “Acquired Projects.” We paid an aggregate of $114.4 million in cash for the Acquired Projects.

Bridge Facility. On December 22, 2014, Global LLC entered into a new $150.0 million term loan bridge facility, or the “Bridge Facility,” to provide funding for any acquisitions of clean technology energy projects developed by third parties that may be completed by Global LLC or its subsidiaries prior to the completion of this offering or to repay certain of the project-level indebtedness incurred by projects included in our initial portfolio. On May 6, 2015, the Bridge Facility was amended to increase the aggregate commitment to $450.0 million, of which $87.5 million was subsequently prepaid with a portion of the net proceeds from the Units Private Placements. On June 5, 2015, the Bridge Facility was further amended to increase the aggregate commitment to $550.0 million.

Units Private Placements. On May 6, 2015, we raised $175.0 million from the sale to investment vehicles affiliated with Blackstone Alternative Solutions L.L.C., Everstream Opportunities Fund and Altai Capital Master Fund of 50,000, 100,000 and 25,000 Class D units of Global LLC for a cash purchase price of $50.0 million, $100.0 million and $25.0 million, respectively. Concurrently with the closing of this offering, these purchasers will receive on account of such Class D units a number of shares of our Class A common stock equal to the quotient of (x) the original price of such Class D units and (y) 90% of the initial public offering price of our Class A common stock. Based on an assumed initial public offering price of $         per share, which is the midpoint of the range listed on the cover of this prospectus, these purchasers will receive an aggregate of                  shares of our Class A common stock on account of their Class D units purchased in the private placements. Global will receive the same number of newly issued Class A units of Global LLC in connection with the issuance of its Class A common stock on account of the Class D units. Global LLC used a portion of the net proceeds from the sale of these Class D units to reduce its borrowings under the Bridge Facility and expects to use the remainder to complete acquisitions of projects from third parties and to reduce certain project-level indebtedness.

On June 9, 2015, we raised an additional $335.0 million from the sale of an aggregate of 335,000 Class D units of Global LLC to certain investors, including certain of the Baron Funds and investment vehicles affiliated therewith, Capricorn Investment Group, GE, Glenview Capital Management, Kingdon Capital Management and Zimmer Partners. Concurrently with the closing of this offering, these purchasers will receive on account of such Class D units a number of shares of our Class A common stock equal to the quotient of (x) the original price of such Class D units and (y) 95% of the initial public offering price of our Class A common stock. Based on an assumed initial public offering price of $         per share, which is the midpoint of the range listed on the cover of this prospectus, these purchasers will receive an aggregate of                  shares of our Class A common stock on account of their Class D units purchased in the private placements. Global will receive the same number of newly issued Class A units of Global LLC in connection with the issuance of its Class A common stock on account of the Class D units. Global LLC expects to use the net proceeds from the sale of the Class D units to complete acquisitions of projects from third parties and to reduce certain project-level indebtedness.

We collectively refer to these purchases as the “Units Private Placements.” We relied upon the “private placement” exemption from the registration requirements of the Securities Act provided by Section 4(a)(2) thereof in connection with the sale of these Class D units. For a further discussion of these private placement transactions, see “Certain relationships and related party transactions—Private Placements.”

For each $1.00 increase (decrease) in the initial public offering price from the midpoint of the range set forth on the cover page of this prospectus, the number of shares of Class A common stock issued to the investors in the Units Private Placements on account of their Class D units will decrease (increase) by                  shares.

We collectively refer to all of the foregoing transactions as the “Formation Transactions.”

 

 

21


Table of Contents

Pending Acquisitions

We intend to complete the following acquisitions from third parties concurrently with the completion of this offering or, in certain limited cases, upon the COD of the applicable project:

 

 

Solarpack Transaction—the acquisition from Solarpack Corporación Tecnológica, S.L., a Spanish solar developer, or “Solarpack,” of the 26.4 MW solar project Alto Cielo located in Uruguay;

 

 

Chint-Soutpan/Witkop Transaction—the acquisition of an additional 41.3% interest in the solar projects Soutpan and Witkop located in South Africa and currently owned by an affiliate of Chint Solar (Zhejiang) Co., Ltd., representing 26.4 MW in the aggregate;

 

 

BioTherm Transaction—the acquisition from BTSA Netherlands Cooperative U.A., a South African renewable project developer, or “BioTherm,” of the solar projects Aries and Konkoonsies and the wind project Klipheuwel located in South Africa, representing 32.6 MW in the aggregate;

 

 

FERSA Transaction—the acquisition from Fersa Energías Renovables, S.A., a Spanish wind energy developer, of the wind projects Bhakrani, Gadag and Hanumanhatti located in India, representing 101.6 MW in the aggregate;

 

 

Renova Transaction—the acquisition from Renova of three wind and hydro-electric projects located in Brazil, representing 336.2 MW in the aggregate, and a right of first offer with respect to the Renova ROFO Projects;

 

 

LAP Transaction—the acquisition of six hydro-electric projects located in Peru, representing 72.5 MW in the aggregate, as part of our Sponsor’s acquisition of LAP, a developer and operator of hydro-electric generation facilities; and

 

 

GME Transaction—the acquisition of Globeleq Mesoamérica Energy Wind Energy Limited, or “GME,” including a portfolio consisting of solar and wind projects located in Honduras, Costa Rica and Nicaragua, representing 326.0 MW in the aggregate.

We collectively refer to these acquisitions as the “Pending Acquisitions” and, together with the Acquired Projects, as the “Acquisitions.” As consideration for the Pending Acquisitions, we expect to pay an aggregate of $1,120.0 million in cash. With respect to the BioTherm Transaction and the GME Transaction, we will pay $8.2 million and $10.5 million of additional consideration in shares of Class A common stock, or          shares and          shares, respectively, in each case assuming an initial public offering price of $         per share, which is the midpoint of the price range listed on the cover of this prospectus. The seller in the Renova Transaction will also have an option to take a portion of the purchase price in shares of Class A Common Stock, subject to our approval.

We anticipate that substantially all of the Pending Acquisitions will be completed concurrently with the completion of this offering. We expect that the Solarpack Transaction and the acquisition of an 82.0 MW solar project (Choluteca) and a 50.0 MW wind project (Orosi) that are part of the GME Transaction will be completed when those respective projects achieve COD, which is expected to occur in the second half of 2015. This offering, however, is not conditioned on the concurrent closing of all of the Pending Acquisitions. As of the date of this prospectus, we have not yet received all of the governmental, regulatory or third-party approvals or consents required to complete all of these acquisitions, and the timing for and terms of those approvals are outside of our control. As a result, we cannot assure you that all of the Pending Acquisitions will be consummated on the timetable currently contemplated. To reduce the effect on the Class A units of delays (if any) in the closing of the Pending Acquisitions or the completion of the Contributed Construction Projects, our Sponsor has agreed to forego distributions on its Class B units under certain circumstances. See “—The offering—Distribution

 

 

22


Table of Contents

Forbearance Provisions” and “Risk factors—Risks related to our business—There can be no assurance that the Pending Acquisitions will be consummated on the timetable currently anticipated, and the closing of this offering is not expressly conditioned on the consummation of the these acquisitions.”

Concurrent Class A Common Stock Private Placement

On June 9, 2015, certain of the Baron Funds and Zimmer Partners entered into a stock purchase agreement with Global in which they agreed to purchase $42.5 million and $25.0 million, respectively, of its Class A common stock at a price per share equal to the initial public offering price in a separate private placement transaction. These share purchases are subject to certain customary closing conditions and will be completed concurrently with the closing of this offering. Based on an assumed initial public offering price of $         per share, which is the midpoint of the range listed on the cover of this prospectus, these purchasers will purchase an aggregate of                      shares of our Class A common stock in this concurrent private placement. For each $1.00 increase (decrease) in the initial public offering price from the midpoint of the range set forth on the cover page of this prospectus, the number of shares of Class A common stock issued to the investors in the Class A Common Private Placement in the aggregate will decrease (increase) by                      shares. We will rely upon the “private placement” exemption from the registration requirements of the Securities Act provided by Section 4(a)(2) thereof in connection with the sale of these shares of Class A common stock and accordingly, these shares will not be registered under the Securities Act.

Throughout this prospectus, we refer to this concurrent private placement of Class A common stock as the “Class A Common Private Placement” and collectively with the Units Private Placements as the “Private Placements.” For a further discussion of these private placement transactions, see “Certain relationships and related party transactions–Private Placements.”

Offering Transactions

Concurrently with the completion of this offering, based on an assumed initial public offering price of $         per share, which is the midpoint of the range listed on the cover page of this prospectus:

 

 

we will amend and restate Global’s certificate of incorporation to provide for Class A common stock, Class B common stock and Class B1 common stock (which Class B1 common stock may be issued in the future upon a reset of IDR target distribution levels or in connection with acquisitions from our Sponsor or third parties), at which time SunEdison’s interest in Global’s common equity will solely be shares of Class B common stock and interests in Global LLC (as described below) and the restricted shares issued under the 2014 Incentive Plan will automatically convert into a number of shares of Class A common stock that represent an aggregate 6.0% economic interest in Global LLC, subject to certain adjustments to prevent dilution;

 

 

we will amend Global LLC’s operating agreement to provide for Class A units, Class B units and Class B1 units (which Class B1 units may be issued in the future upon a reset of IDR target distribution levels or in connection with acquisitions from our Sponsor or third parties) and to convert our Sponsor’s interest in Global’s common equity into Class B units, issue to Global a number of Class A units equal to the number of shares of Class A common stock (including any restricted shares) outstanding immediately after Global amends and restates its certificate of incorporation as described above, issue the IDRs to our Sponsor and appoint Global as the sole managing member of Global LLC;

 

 

Global will issue             shares of its Class A common stock to the purchasers in this offering (or             shares if the underwriters exercise in full their option to purchase additional shares of Class A common stock) in exchange for net proceeds of approximately $             million (or approximately

 

 

23


Table of Contents
 

$             million if the underwriters exercise in full their option to purchase additional shares of Class A common stock), after deducting underwriting discounts and commissions, the structuring fee and offering expenses payable by us;

 

 

Global will (i) issue             shares of its Class A common stock on account of the Class D units of Global LLC issued to the purchasers in the Units Private Placements and will receive the same number of newly issued Class A units in Global LLC and (ii) issue              shares of its Class A common stock to the purchasers in the Class A Common Private Placement;

 

 

Global will issue              shares and              shares of Class A common stock to BioTherm (or its affiliate) and GME, which are the selling parties in the BioTherm Transaction and the GME Transaction, respectively, based in each case on an initial public offering price of $             per share, which is the midpoint of the price range listed on the cover of this prospectus;

 

 

Global will use all of the net proceeds from this offering and the Class A Common Private Placement to purchase newly issued Class A units of Global LLC, representing     % of Global LLC’s outstanding membership units (or     % if the underwriters exercise in full their option to purchase additional shares of Class A common stock);

 

 

Global Operating LLC will issue $         million of senior unsecured notes due                 , or the “Senior Notes,” to qualified institutional buyers in reliance on Rule 144A under the Securities Act and to certain non-U.S. persons in offshore transactions in reliance on Regulation S promulgated under the Securities Act;

 

 

Global LLC will use net proceeds of this offering and the Class A Common Private Placement, together with the net proceeds from the issuance of the Senior Notes by Global Operating LLC, to repay the outstanding principal amount of the Bridge Facility (including accrued interest), to pay fees and expenses associated with the Revolver (as defined below), to complete the Pending Acquisitions and the repayment of certain project-level indebtedness;

 

 

Global Operating LLC will enter into a new $             million revolving credit facility, or the “Revolver,” which will remain undrawn at the completion of this offering; and

 

 

we will enter into various agreements with our Sponsor, including the Support Agreement, the Management Services Agreement, the Repowering Services Agreement, the Interest Payment Agreement and the Project Investment Agreement.

We collectively refer to the foregoing transactions, together with the Class A Common Private Placement, as the “Offering Transactions” and, together with the Formation Transactions and the Pending Acquisitions, as the “Organizational Transactions.”

We intend to use any net proceeds we receive as a result of the underwriters’ option to purchase additional shares of Class A common stock, which we estimate will be approximately $         million after deducting underwriting discounts and commissions, a pro rata portion of the structuring fee and offering expenses payable by us, to purchase Class B units (and shares of Class B common stock) held by our Sponsor at a price equal to the initial public offering price in this offering less the underwriting discounts and commissions and structuring fee, and immediately cancel such Class B units (and shares of Class B common stock) contemporaneously with Global LLC issuing Class A units to us. Accordingly, we will not retain any such proceeds used by us to acquire Class B units (and shares of Class B common stock) from our Sponsor.

Our Sponsor will not receive any of the net proceeds or other consideration in connection with this offering, other than (i) the net proceeds used by us to purchase Class B units of Global LLC (and the related shares of Class B common stock) in the event the underwriters exercise their option to purchase additional shares and

 

 

24


Table of Contents

(ii) the Class B common stock, Class B units of Global LLC and the IDRs issued to it in the Offering Transactions on account of its existing ownership interest. Following completion of this offering, we may elect to use a portion of the net proceeds to fund acquisitions from our Sponsor, including pursuant to the Support Agreement.

Immediately following the completion of this offering:

 

 

Global will be a holding company and the sole material asset of Global will be the Class A units of Global LLC;

 

 

Global will be the sole managing member of Global LLC and will control the business and affairs of Global LLC and its subsidiaries;

 

 

Global will hold         Class A units of Global LLC representing approximately     % of Global LLC’s total outstanding membership units (or     %, if the underwriters exercise in full their option to purchase additional shares of Class A common stock);

 

 

SunEdison, through a wholly owned subsidiary, will own Class B units of Global LLC, representing approximately     % of Global LLC’s total outstanding membership units (or     %, if the underwriters exercise in full their option to purchase additional shares of Class A common stock);

 

 

SunEdison or one of its subsidiaries will be the holder of the IDRs;

 

 

SunEdison, through the ownership by a wholly owned subsidiary of our Class B common stock, will have     % of the combined voting power of all of our common stock and, through such subsidiary’s ownership of Class B units of Global LLC, will hold, subject to the right of holders of IDRs to receive a portion of distributions after certain thresholds are met and certain limitations during the Subordination Period and the Distribution Forbearance Period, approximately     % of the economic interest in our business (or     % of the combined voting power of our common stock and a     % economic interest in our business if the underwriters exercise in full their option to purchase additional shares of Class A common stock); and

 

 

the purchasers in this offering will own                  shares of our Class A common stock, representing     % of the combined voting power of all of our common stock and, through our ownership of Class A units of Global LLC, subject to the right of holders of IDRs to receive a portion of distributions after certain thresholds are met, approximately     % of the economic interest in our business (or     % of the combined voting power of our common stock and a     % economic interest if the underwriters exercise in full their option to purchase additional shares of Class A common stock).

At any time, SunEdison (or any other permitted holder) may exchange its Class B units or Class B1 units in Global LLC, together with a corresponding number of shares of Class B common stock or shares of Class B1 common stock, as applicable, for shares of our Class A common stock on a one-for-one basis, subject to equitable adjustments for stock splits, stock dividends and reclassifications in accordance with the terms of the exchange agreement we will enter into with SunEdison concurrently with the completion of this offering. When a holder exchanges a Class B unit or Class B1 unit of Global LLC for a share of our Class A common stock, (i) Global LLC will cancel the Class B units or Class B1 units, as applicable, (ii) Global LLC will issue additional Class A units to us, (iii) we will cancel a corresponding number of shares of our Class B common stock or Class B1 common stock, as applicable, and (iv) we will issue a corresponding number of shares of Class A common stock to such holder. See “Certain relationships and related party transactions—Amended and Restated Operating Agreement of Global LLC—Exchange Agreement.”

We have established the Class B1 common stock and Class B1 units primarily to be issued in connection with resetting the IDR target distribution levels. We may issue such shares and units in the future in connection with acquisitions from our Sponsor or third parties.

 

 

25


Table of Contents

The following chart summarizes certain relevant aspects of our ownership structure and principal indebtedness as of March 31, 2015, after giving effect to the Organizational Transactions and this offering, based on the assumptions set forth in “—The offering—Certain assumptions”:

 

LOGO

 

(1)   Our Sponsor’s economic interest is subject to certain limitations on distributions to holders of Class B units during the Subordination Period and the Distribution Forbearance Period. See “Certain relationships and related party transactions—Amended and Restated Operating Agreement of Global LLC—Distributions.” In the future, our Sponsor may receive Class B1 units and Class B1 common stock in connection with a reset of the IDR target distribution levels or sales of projects to Global LLC.

 

(2)   Based on an assumed initial public offering price of $             per share which is the midpoint of the range listed on the cover of this prospectus. A $1.00 increase (decrease) in the initial public offering price would decrease (increase) the voting interest and economic interest by     % and     %, respectively.

 

(3)   The economic interest of holders of Class A units, Class B units and Class B1 units, and, in turn, holders of shares of Class A common stock, is subject to the right of holders of the IDRs to receive a portion of distributions after certain distribution thresholds are met. See “—The offering—IDRs” and “Certain relationships and related party transactions—Amended and Restated Operating Agreement of Global LLC—Distributions.”

 

 

26


Table of Contents
(4)   Incentive distribution rights, or “IDRs,” represent a variable interest in distributions by Global LLC and therefore cannot be expressed as a fixed percentage interest. All of our IDRs will be issued to SunEdison Holdings Corporation, which is a wholly owned subsidiary of our Sponsor. In connection with a reset of the target distribution levels, holders of IDRs will be entitled to receive newly issued Class B1 units of Global LLC and shares of our Class B1 common stock. See “Certain relationships and related party transactions—Amended and Restated Operating Agreement of Global LLC—Distributions” for further description of the IDRs and “Description of capital stock—Class B1 common stock” for further description of the Class B1 common stock.

 

(5)   Concurrently with the completion of this offering, Global Operating LLC plans to enter into the Revolver, which will provide for a revolving line of credit of $             million. The closing of the Revolver will be conditioned upon completion of this offering, the implementation of our Organizational Transactions and other customary closing conditions.

 

(6)   The closing of the offering of the Senior Notes will be conditioned upon the completion of this offering.

 

(7)   All of our project-level indebtedness is denominated in either U.S. dollars, Indian Rupee, Malaysian Ringgit, South African Rand, Thai Baht, Brazilian Real or Chinese Yuan Renminbi. We converted such indebtedness into U.S. dollars using the applicable conversion rate as of March 31, 2015. For additional information regarding our project-level indebtedness, see “Description of certain indebtedness—Project-level financing arrangements.”

Material United States tax consequences

If we make a distribution from current or accumulated earnings and profits, as computed for United States federal income tax purposes, such distribution will generally be taxable to holders of our Class A common stock in the current period as ordinary income for United States federal income tax purposes, eligible under current law for the lower tax rates applicable to qualified dividend income of non-corporate taxpayers. If a distribution exceeds our current and accumulated earnings and profits as computed for United States federal income tax purposes, such excess distribution will constitute a non-taxable return of capital to the extent of a holder’s United States federal income tax basis in our Class A common stock and will result in a reduction of such basis. The portion of any such excess distribution that exceeds a holder’s basis in our Class A common stock will be taxed as capital gain. While we expect that a portion of our distributions to holders of our Class A common stock may exceed our current and accumulated earnings and profits as computed for United States federal income tax purposes and therefore constitute a non-taxable return of capital to the extent of a holder’s basis in our Class A common stock, no assurance can be given that this will occur. See “Risk factors—Risks related to taxation—Distributions to holders of our Class A common stock may be taxable as dividends.” Upon the sale of our Class A common stock, the holder generally will recognize capital gain or loss measured by the difference between the sale proceeds received by the holder and the holder’s basis in the Class A common stock sold, adjusted to reflect prior distributions that were treated as return of capital. Based on our current portfolio of assets and the projected allocations of depreciation and amortization deductions, we expect to generate net operating losses, or “NOLs,” and NOL carryforwards that we can utilize to offset a significant portion of our taxable income in the near term. See “Risk factors—Risks related to taxation—Our ability to use NOLs to offset future income may be limited.” As such, we do not anticipate paying significant United States federal income taxes in the near term. However, the availability of the NOLs and NOL carryforwards could be reduced or limited either by the United States Internal Revenue Service, or “IRS,” (pursuant to a successful challenge in a tax audit or otherwise) or as a result of an “ownership change” or a change in law. Any such reduction or limitation may result in a material increase in our estimated future tax liability and may negatively impact our business, financial condition and operating results. See “Risk Factors—Risks related to taxation—Our future tax liability may be greater than expected if we do not generate NOLs sufficient to offset taxable income.” If you are a non-U.S. investor, please read “Material United States federal income tax consequences to non-U.S. holders” for a more complete discussion of the expected material United States federal income tax consequences of owning and disposing of shares of our Class A common stock.

 

 

27


Table of Contents

Certain risk factors

We are subject to a number of risks, including risks that may prevent us from achieving our business objectives or may materially and adversely affect our business, financial condition, results of operations, cash flows and prospects. You should carefully consider these risks, including the risks discussed in the section entitled “Risk factors,” before investing in our Class A common stock.

Risks related to our business include, among others:

 

 

counterparties to our PPAs may not fulfill their obligations, which could result in a material adverse impact on our business, financial condition, results of operations and cash flows;

 

 

we may enter into PPAs for certain projects that will be subject to periodic price adjustments or require renegotiation of price terms over time, and if the price terms under these PPAs fall below the initial price terms, our business, financial condition, results of operations and cash flows may be materially and adversely affected;

 

 

there can be no assurance that the Pending Acquisitions will be consummated on the timetable currently anticipated, and the closing of this offering is not conditioned on the consummation of these acquisitions;

 

 

certain of the PPAs for the projects in our initial portfolio and those for projects that we may acquire in the future contain, or will contain, provisions that allow the offtake purchaser to terminate or buy out the project or require us to pay liquidated damages upon the occurrence of certain events, and if these provisions are exercised our cash available for distribution could materially decline; and

 

 

the growth of our business depends on locating and acquiring interests in additional, attractive clean energy projects in emerging markets from our Sponsor and unaffiliated third parties at favorable prices.

Risks related to our international operations include, among others:

 

 

we operate in emerging markets and may expand our operations into countries where we currently have no presence, which subjects us to economic, social and political risks and uncertainties;

 

 

changes in foreign withholding taxes could adversely affect our results of operations; and

 

 

we are exposed to foreign currency exchange risks because all of our projects are located in foreign countries.

Risks related to our relationship with our Sponsor include, among others:

 

 

our Sponsor will be our controlling stockholder and will exercise substantial influence over Global, and we are highly dependent on our Sponsor;

 

 

we may not be able to consummate future acquisitions from our Sponsor; and

 

 

our organizational and ownership structure may create significant conflicts of interest that may be resolved in a manner that is not in our best interests or the best interests of holders of our Class A common stock and that may have a material adverse effect on our business, financial condition, results of operations and cash flows.

Risks related to an investment in the Class A common stock offered in this offering include, among others:

 

 

we may not be able to continue paying comparable or growing cash dividends to holders of our Class A common stock in the future;

 

 

28


Table of Contents
 

the assumptions underlying the forecasts presented elsewhere in this prospectus are inherently uncertain and subject to significant business, economic, financial, regulatory and competitive risks that could cause our actual cash available for distribution to differ materially from our forecasts;

 

 

we are a holding company and our only material asset after completion of this offering will be our interest in Global LLC, and we are accordingly dependent upon distributions from Global LLC and its subsidiaries to pay dividends and taxes and other expenses;

 

 

we are a “controlled company,” controlled by our Sponsor, whose interest in our business may be different from ours or yours;

 

 

the holder or holders of our IDRs may elect to cause Global LLC to issue Class B1 units in connection with a resetting of target distribution levels, which could result in lower distributions to holders of our Class A common stock; and

 

 

we are an “emerging growth company” and have elected in this prospectus, and may elect in future SEC filings, to comply with reduced public company reporting requirements, which could make our Class A common stock less attractive to investors.

Corporate information

Our principal executive offices are located at 7550 Wisconsin Avenue, 9th Floor, Bethesda, Maryland 20814. Our telephone number is (240) 762-7700. Our website is www.                     .com. Information contained on our website is not incorporated by reference into the prospectus and does not constitute part of this prospectus.

JOBS Act

As a company with less than $1.0 billion in revenue during our last fiscal year, we qualify as an “emerging growth company,” as defined in the Jumpstart Our Business Startups Act of 2012, or the “JOBS Act.” Section 107 of the JOBS Act provides that an emerging growth company can take advantage of the extended transition period provided in Section 7(a)(2)(B) of the Securities Act for complying with new or revised accounting standards. Thus, an emerging growth company can delay the adoption of certain accounting standards until those standards would otherwise apply to private companies.

An emerging growth company may also take advantage of reduced reporting requirements that are otherwise applicable to public companies. These provisions include, but are not limited to:

 

 

being permitted to present only two years of audited financial statements and only two years of related “Management’s discussion and analysis of financial condition and results of operations” in this prospectus;

 

 

not being required to comply with the auditor attestation requirements of Section 404 of the Sarbanes-Oxley Act of 2002, as amended, or the “Sarbanes-Oxley Act”;

 

 

reduced disclosure obligations regarding executive compensation in our periodic reports, proxy statements and registration statements; and

 

 

exemptions from the requirements of holding a nonbinding advisory vote on executive compensation and stockholder approval of any golden parachute payments not previously approved.

We may take advantage of these provisions until the last day of our fiscal year following the fifth anniversary of the date of the first sale of our common equity securities pursuant to an effective registration statement under

 

 

29


Table of Contents

the Securities Act, which such fifth anniversary will occur in 2020. However, if certain events occur prior to the end of such five-year period, including if we become a “large accelerated filer,” our annual gross revenues exceed $1.0 billion or we issue more than $1.0 billion of non-convertible debt securities in any three-year period, we will cease to be an emerging growth company prior to the end of such five-year period.

We have elected to take advantage of certain of the reduced disclosure obligations regarding financial statements and executive compensation in this prospectus and may elect to take advantage of other reduced burdens in future filings. As a result, the information that we provide to our stockholders may be different than you might receive from other public reporting companies in which you hold equity interests.

In addition, Section 107(b) of the JOBS Act also provides that an emerging growth company can take advantage of the extended transition period provided in Section 7(a)(2)(B) of the Securities Act for complying with new or revised accounting standards. In other words, an emerging growth company can delay the adoption of certain accounting standards until those standards would otherwise apply to private companies. We are choosing to “opt in” to such extended transition period election under Section 107(b). Therefore, we are electing to delay adoption of new or revised accounting standards and, as a result, we may choose not to comply with new or revised accounting standards on the relevant dates on which adoption of such standards is required for non-emerging growth companies. As a result of such election, our financial statements may not be comparable to the financial statements of other public companies.

 

 

30


Table of Contents

The offering

 

Shares of Class A common stock offered by us

            shares of our Class A common stock.

 

Shares of Class A common stock to be sold in the Class A Common Private Placement

             shares of our Class A common stock.

 

Option to purchase additional shares of our Class A common stock

We have granted the underwriters an option to purchase up to              additional shares of our Class A common stock, at the initial public offering price, less the underwriting discounts and commissions and structuring fee, within 30 days of the date of this prospectus. We intend to use the net proceeds from the exercise of such option, if any, to purchase Class B units (and shares of Class B common stock) from our Sponsor, which would be immediately cancelled in connection with our receiving a corresponding number of Class A units from Global LLC.

 

Shares of Class A common stock outstanding after this offering and the Class A Common Private Placement

            shares of our Class A common stock (or             shares, if the underwriters exercise in full their option to purchase additional shares of Class A common stock).

 

Shares of Class B common stock outstanding after this offering

            shares of our Class B common stock (or              shares, if the underwriters exercise in full their option to purchase additional shares of Class A common stock), all of which will be beneficially owned by our Sponsor.

 

Class A units and Class B units of Global LLC outstanding after this offering

            Class A units and             Class B units of Global LLC (or             Class A units and             Class B units of Global LLC if the underwriters exercise in full their option to purchase additional shares of Class A common stock).

 

Shares of Class B1 common stock and Class B1 units outstanding after this offering

None.

 

  We have established the Class B1 common stock and Class B1 units primarily to be issued in connection with resetting the IDR target distribution levels. We may issue such shares and units in the future in connection with acquisitions from our Sponsor or third parties.

 

 

31


Table of Contents

Use of proceeds

Assuming no exercise of the underwriters’ option to purchase additional shares of Class A common stock, we estimate that the net proceeds to us from this offering will be approximately $         million after deducting underwriting discounts and commissions, the structuring fee and offering expenses payable by us. We will also receive net proceeds of $                 million from the sale of the Class A common stock in the Class A Common Private Placement.

 

  We intend to use the net proceeds from this offering and the Class A Common Private Placement to acquire newly issued Class A units of Global LLC directly from Global LLC, representing     % of Global LLC’s outstanding membership units after this offering (calculated without regard to the IDRs) assuming the underwriters do not exercise their option to purchase additional shares, or     % if the underwriters exercise that option to purchase additional shares. Global will not retain any net proceeds from this offering.

 

  The net proceeds from this offering and the Class A Common Private Placement, together with the net proceeds from the issuance of the Senior Notes, will be used to repay all outstanding indebtedness (including accrued interest) under the Bridge Facility and certain project-level indebtedness, to pay fees and expenses related to the Revolver and the issuance of the Senior Notes and to fund the Pending Acquisitions included in our initial portfolio. See “Use of proceeds.”

 

  If the underwriters exercise in full their option to purchase additional shares of Class A common stock, we estimate that the additional net proceeds will be approximately $         million after deducting underwriting discounts and commissions, a pro rata portion of the structuring fee and offering expenses payable by us. We will use any such additional net proceeds to purchase Class B units of Global LLC (and shares of our Class B common stock) from our Sponsor at a price equal to the initial public offering price in this offering less the underwriting discounts and commissions and structuring fee, following which those Class B units (and the related shares of Class B common stock) would be immediately cancelled in connection with our receiving a corresponding number of Class A units from Global LLC.

 

  Our Sponsor will not receive any of the net proceeds or other consideration in connection with this offering, other than: (i) the net proceeds used by us to purchase Class B units of Global LLC (and the related shares of Class B common stock) in the event the underwriters exercise their option to purchase additional shares of Class A common stock and (ii) the Class B common stock, Class B units of Global LLC and the IDRs issued to it in the Offering Transactions on account of its existing ownership interest. Following completion of this offering, we may elect to use a portion of the net proceeds to fund acquisitions from our Sponsor, including pursuant to the Support Agreement.

 

 

32


Table of Contents

Voting rights

Each share of our Class A common stock and Class B1 common stock will entitle its holder to one vote on all matters to be voted on by stockholders generally.

 

  All of our Class B common stock will be held by our Sponsor or its controlled affiliates. Each share of our Class B common stock will entitle our Sponsor to 100 votes on matters presented to our stockholders generally. Our Sponsor, as the holder of our Class B common stock, will control a majority of the vote on all matters submitted to a vote of stockholders for the foreseeable future following the completion of this offering. Any Class B units of Global LLC transferred by our Sponsor (other than to its controlled affiliates) will be automatically exchanged (along with a corresponding number of shares of Class B common stock) into shares of our Class A common stock in connection with such transfer. See “Certain relationships and related party transactions—Amended and Restated Operating Agreement of Global LLC—Issuances and transfer of units” and “Certain relationships and related party transactions—Amended and Restated Operating Agreement of Global LLC—Exchange Agreement.”

 

  Holders of our Class A common stock, Class B common stock and Class B1 common stock will vote together as a single class on all matters presented to stockholders for their vote or approval, except as otherwise required by law. See “Description of capital stock.”

 

Economic interest

Immediately following this offering, subject to the right of holders of IDRs to receive a portion of distributions after certain thresholds are met, the purchasers in this offering will own in the aggregate a     % economic interest in our business through our ownership of Class A units of Global LLC, our Sponsor will own a     % economic interest in our business through its ownership of Class B units of Global LLC (or a     % economic interest and a     % economic interest, respectively, if the underwriters exercise in full their option to purchase additional shares of our Class A common stock). See “—IDRs” and “Certain relationships and related party transactions—Amended and Restated Operating Agreement of Global LLC—Distributions.”

 

  Our Sponsor’s economic interest in our business, through its ownership of Class B units of Global LLC, is subject to the limitations on distributions to holders of Class B units of Global LLC during the Subordination Period and the Distribution Forbearance Period.

 

Exchange and registration rights

Each Class B unit and each Class B1 unit of Global LLC, together with a corresponding number of shares of Class B common stock or Class B1 common stock, as applicable, will be exchangeable for a share of our Class A common stock at any time, subject to equitable adjustments for stock splits, stock dividends and reclassifications, in accordance with the terms of the exchange agreement we will enter into with our Sponsor concurrently with the completion of this offering. At any time, our Sponsor (or any other permitted holder) may exchange its Class B units or Class B1 units in Global LLC, together with a corresponding number of shares of Class B common stock or shares of Class B1

 

 

33


Table of Contents
 

common stock, as applicable, for shares of our Class A common stock on a one-for-one basis, subject to equitable adjustments for stock splits, stock dividends and reclassifications, in accordance with the terms of the exchange agreement we will enter into with our Sponsor concurrently with the completion of this offering. When a holder exchanges a Class B unit or Class B1 unit of Global LLC for a share of our Class A common stock, (i) such holder will surrender such Class B unit or Class B1 unit, as applicable, and a corresponding share of our Class B common stock or Class B1 common stock, as applicable, to Global LLC, (ii) we will issue and contribute a share of Class A common stock to Global LLC for delivery of such share by Global LLC to the exchanging holder, (iii) Global LLC will issue a Class A unit to us, (iv) Global LLC will cancel the Class B unit or Class B1 unit, as applicable, and we will cancel the corresponding share of our Class B common stock or Class B1 common stock, as applicable, and (v) Global LLC will deliver the share of Class A common stock it receives to the exchanging holder. See “Certain relationships and related party transactions—Amended and Restated Operating Agreement of Global LLC—Exchange Agreement.”

 

  Pursuant to the registration rights agreement that we will enter into with our Sponsor concurrently with the completion of this offering, we will agree to file a registration statement for the sale of the shares of our Class A common stock that are issuable upon exchange of Class B units or Class B1 units of Global LLC upon request and cause that registration statement to be declared effective by the SEC as soon as practicable thereafter. See “Certain relationships and related party transactions—Registration Rights Agreement” for a description of the timing and manner limitations on resales of these shares of our Class A common stock.

 

Cash dividends:

 

 

Class A common stock

Upon completion of this offering, we intend to pay a regular quarterly dividend to holders of our Class A common stock. Our initial quarterly dividend will be set at $         per share of Class A common stock ($         per share on an annualized basis), which amount may be changed in the future without advance notice. Our ability to pay the regular quarterly dividend is subject to various restrictions and other factors described in more detail under the caption “Cash Dividend Policy.”

 

  We expect to pay a quarterly dividend on or about the 75th day following the expiration of each fiscal quarter to holders of our Class A common stock of record on or about the 60th day following the last day of such fiscal quarter. With respect to our first dividend payable on                 , 2015, we intend to pay a pro-rated dividend (calculated from the completion date of this offering through and including                 , 2015) of $         per share of Class A common stock.

 

 

We believe, based on our financial forecast and related assumptions included in “Cash dividend policy—Estimated cash available for distribution for the twelve months ending June 30, 2016 and December 31, 2016” and our acquisition strategy, that we will generate sufficient cash available for distribution to support our Minimum Quarterly Distribution of $         per share of Class A

 

 

34


Table of Contents
 

common stock ($         per share on an annualized basis). However, we do not have a legal obligation to declare or pay dividends at such initial quarterly dividend level or at all. See “Cash dividend policy.”

 

Class B common stock

Holders of our Class B common stock will not have any right to receive cash dividends. See “Description of capital stock—Class B common stock—Dividend and liquidation rights.” However, holders of our Class B common stock will also hold Class B units issued by Global LLC. As a result of holding the Class B units, subject to certain limitations during the Subordination Period and the Distribution Forbearance Period, our Sponsor will be entitled to share in distributions from Global LLC to its unit holders (including distributions to us as the holder of the Class A units of Global LLC). See “Certain relationships and related party transactions—Amended and Restated Operating Agreement of Global LLC—Distributions.”

 

Class B1 common stock

Holders of our Class B1 common stock will not have any right to receive cash dividends. See “Description of capital stock—Class B1 common stock—Dividend and liquidation rights.” However, holders of our Class B1 common stock will also hold Class B1 units issued by Global LLC. As a result of holding Class B1 units, such holders will be entitled to share in distributions from Global LLC to its unit holders (including distributions to us as the holder of the Class A units of Global LLC) pro rata based on the number of units held. See “Certain relationships and related party transactions—Amended and Restated Operating Agreement of Global LLC—Distributions.”

 

IDRs

The IDRs represent the right to receive increasing percentages (15.0%, 25.0% and 50.0%) of Global LLC’s quarterly distributions after the Class A units, Class B units and Class B1 units of Global LLC have received quarterly distributions in an amount equal to $         per unit, or the “Minimum Quarterly Distribution,” and the target distribution levels have been achieved. Our Sponsor may not sell, transfer, exchange, pledge (other than as collateral under its credit facilities) or otherwise dispose of the IDRs to any third party (other than its controlled affiliates) until after it has satisfied its $1.4 billion aggregate Projected FTM CAFD commitment to us in accordance with the Support Agreement (after which the IDRs will be transferable without restriction). Our Sponsor will pledge the IDRs as collateral under its existing credit agreement, but the IDRs may not be transferred upon foreclosure until after our Sponsor has satisfied its Projected FTM CAFD commitment to us. Our Sponsor has granted us a right of first refusal with respect to any proposed sale of IDRs to a third party (other than its controlled affiliates), which we may exercise to purchase the IDRs proposed to be sold on the same terms offered to such third party at any time within 30 days after we receive written notice of the proposed sale and its terms.

 

 

35


Table of Contents
  If for any quarter:

 

   

Global LLC has made cash distributions to the holders of its Class A units, Class B1 units and, subject to the Subordination Period and the Distribution Forbearance Provisions, Class B units in an amount equal to the Minimum Quarterly Distribution; and

 

   

Global LLC has distributed cash to the holders of its Class A units and Class B1 units in an amount necessary to eliminate any arrearages in payment of the Minimum Quarterly Distribution;

 

  then, subject to the Distribution Forbearance Provisions, Global LLC will make additional cash distributions for that quarter to holders of its Class A units, Class B units, Class B1 units and the IDRs in the following manner:

 

   

first, to all holders of Class A units, Class B1 units and Class B units, pro rata, until each holder receives a total of $         per unit for that quarter, or the “First Target Distribution” (115.0% of the Minimum Quarterly Distribution);

 

   

second, 85.0% to all holders of Class A units, Class B1 units and Class B units, pro rata, and 15.0% to the holders of the IDRs, until each holder of Class A units, Class B1 units and Class B units receives a total of $         per unit for that quarter, or the “Second Target Distribution” (125.0% of the Minimum Quarterly Distribution);

 

   

third, 75.0% to all holders of Class A units, Class B1 units and Class B units, pro rata, and 25.0% to the holders of the IDRs, until each holder of Class A units, Class B1 units and Class B units receives a total of $         per unit for that quarter, or the “Third Target Distribution” (150.0% of the Minimum Quarterly Distribution); and

 

   

thereafter, 50.0% to all holders of Class A units, Class B1 units and Class B units, pro rata, and 50.0% to the holders of the IDRs.

 

 

36


Table of Contents
  The following table illustrates the percentage allocations of distributions between the holders of Class A units, Class B units and Class B1 units of Global LLC and the IDRs based on the specified target distribution levels. The amounts set forth under the column heading “Marginal percentage interest in distributions” are the percentage interests of the holders of Class A units, Class B units and Class B1 units of Global LLC and the IDRs in any distributions Global LLC makes up to and including the corresponding amount under the column heading “Total quarterly distribution per unit.” The percentage interests set forth below assume there are no arrearages on Class A units or Class B1 units of Global LLC and the Distribution Forbearance Provisions have terminated or otherwise do not apply.

 

     Total quarterly
distribution per unit
    Marginal
percentage interest
in distributions to
 
       Unitholders     IDR
holders
 

Minimum Quarterly Distribution

      up to $        (1 )      100.0%        0.0%   

First Target Distribution

  above $                 up to $        (2 )      100.0%        0.0%   

Second Target Distribution

  above $          up to $        (3 )      85.0%        15.0%   

Third Target Distribution

  above $          up to $        (4 )      75.0%        25.0%   

Thereafter

  above $            50.0%        50.0%   

 

 

 

  (1)   This amount is equal to the Minimum Quarterly Distribution.

 

  (2)   This amount is equal to 115.0% of the Minimum Quarterly Distribution.

 

  (3)   This amount is equal to 125.0% of the Minimum Quarterly Distribution.

 

  (4)   This amount is equal to 150.0% of the Minimum Quarterly Distribution.

 

Right to reset incentive distribution levels

Our Sponsor, as the holder of the IDRs, has the right, after Global LLC has made cash distributions in excess of the Third Target Distribution (e.g., 75.0% to holders of units and 25.0% to the holder of the IDRs) for four consecutive quarters, to elect to relinquish the right to receive incentive distribution payments based on the initial target distribution levels and to reset, at higher levels, the target distribution levels upon which the incentive distribution payments would be set.

 

  In connection with the resetting of the target distribution levels and the corresponding relinquishment by our Sponsor of incentive distribution payments based on the target distribution levels prior to the reset, our Sponsor will be entitled to receive a number of newly issued Class B1 units of Global LLC and shares of our Class B1 common stock based on the formula described below that takes into account the “cash parity” value of the cash distributions related to the IDRs for the two consecutive quarters immediately prior to the reset event as compared to the cash distribution per unit in such quarters.

 

 

The number of Class B1 units of Global LLC and shares of Class B1 common stock to be issued in connection with a resetting of the Minimum Quarterly Distribution amount and the target distribution levels then in effect would equal

 

 

37


Table of Contents
 

the quotient determined by dividing (i) the average aggregate amount of cash distributions received in respect of the IDRs during the two consecutive fiscal quarters ended immediately prior to the date of such reset election by (ii) the average of the aggregate amount of cash distributed per Class A unit, Class B1 unit and Class B unit of Global LLC during each of those two quarters.

 

Post-Reset IDRs

Following a reset election, a baseline Minimum Quarterly Distribution amount will be calculated as an amount equal to the average cash distribution amount per Class A unit, Class B1 unit and Class B unit of Global LLC for the two consecutive fiscal quarters immediately preceding the reset election, which amount we refer to as the “Reset Minimum Quarterly Distribution,” and the target distribution levels will be reset to be correspondingly higher than the Reset Minimum Quarterly Distribution. Following a resetting of the Minimum Quarterly Distribution amount, Global LLC would, subject to the Distribution Forbearance Provisions, make distributions for each quarter ending after the reset date as follows:

 

   

first, to all holders of Class A units, Class B1 units and Class B units, pro rata, until each holder receives an amount per unit for that quarter equal to 115% of the Reset Minimum Quarterly Distribution;

 

   

second, 85.0% to all holders of Class A units, Class B1 units and Class B units, pro rata, and 15.0% to the holders of the IDRs, until each holder of Class A units, Class B1 units and Class B units receives an amount per unit for that quarter equal to 125.0% of the Reset Minimum Quarterly Distribution;

 

   

third, 75.0% to all holders of Class A units, Class B1 units and Class B units, pro rata, and 25.0% to the holders of the IDRs, until each holder of Class A units, Class B1 units and Class B units receives an amount per unit for that quarter equal to 150.0% of the Reset Minimum Quarterly Distribution; and

 

   

thereafter, 50.0% to all holders of Class A units, Class B1 units and Class B units, pro rata, and 50.0% to the holders of the IDRs.

 

Subordination of Class B units

During the Subordination Period, holders of the Class B units of Global LLC will not be entitled to receive any distributions until the Class A units and Class B1 units of Global LLC (if any) have received the Minimum Quarterly Distribution for such quarter plus any arrearages in the payment of the Minimum Quarterly Distribution from prior quarters. Class B units of Global LLC will not accrue arrearages. See “Certain relationships and related party transactions—Amended and Restated Operating Agreement of Global LLC—Distributions.”

 

 

38


Table of Contents

Subordination Period

The “Subordination Period” means the period beginning on the closing date of this offering and extending until each of the following tests has been met, which will be a minimum three-year period ending no earlier than the beginning of the period for which a distribution is paid for the first quarter of 2018:

 

   

distributions of CAFD on each of the outstanding Class A units, Class B units and Class B1 units of Global LLC equaled or exceeded $         per unit (the annualized Minimum Quarterly Distribution) for each of the three consecutive, non-overlapping, four-quarter periods immediately preceding that date;

 

   

the CAFD generated during each of the three consecutive, non-overlapping, four-quarter periods immediately preceding that date equaled or exceeded the sum of $         per unit (the annualized Minimum Quarterly Distribution) on all of the outstanding Class A units, Class B units and Class B1 units of Global LLC during those periods on a fully diluted basis; and

 

   

there are no arrearages in payment of the Minimum Quarterly Distribution on the Class A units or Class B1 units of Global LLC.

 

  Notwithstanding the foregoing, the Subordination Period will automatically terminate when each of the following tests are met:

 

   

distributions of CAFD on each of the outstanding Class A units, Class B units and Class B1 units of Global LLC equaled or exceeded $         per unit (150.0% of the annualized Minimum Quarterly Distribution) for the four-quarter period immediately preceding that date;

 

   

the CAFD generated during the four-quarter period immediately preceding that date equaled or exceeded the sum of (i) $         per unit (150.0% of the annualized Minimum Quarterly Distribution) on all of the outstanding Class A units, Class B units and Class B1 units of Global LLC during such four quarters on a fully diluted basis, and (ii) the corresponding distributions on the IDRs during such four quarters; and

 

   

there are no arrearages in payment of the Minimum Quarterly Distributions on the Class A units or Class B1 units of Global LLC.

 

Distribution Forbearance Provisions

Our Sponsor has agreed to forego any distributions on its Class B units with respect to the third and fourth quarters of 2015 (i.e., distributions declared on or prior to March 31, 2016), and thereafter, under certain circumstances, to forego distributions on its Class B units until the expiration of the Distribution Forbearance Period. Between March 31, 2016 and the end of the Distribution Forbearance Period our Sponsor has agreed to forego distributions on its Class B units to the extent the holders of Class A units have not received distributions in an amount equal to the Minimum Quarterly Distribution plus any arrearages in the payment of Minimum Quarterly Distributions from prior quarters. See “Certain relationships and related party transactions—Amended and Restated Operating Agreement of Global LLC—Distributions.”

 

 

39


Table of Contents

Material federal income tax consequences to non-U.S. holders

For a discussion of the material United States federal income tax consequences that may be relevant to prospective investors who are non-U.S. holders, please read “Material United States federal income tax consequences to non-U.S. holders.”

 

Reserved share program

At our request, the underwriters have reserved up to 5% of the shares for sale at the initial public offering price to persons who are directors, officers or employees, or who are otherwise associated with us through a directed share program. The number of shares available for sale to the general public will be reduced by the number of directed shares purchased by participants in the program. Except for certain of our officers, directors and employees who have entered into lock-up agreements, each person buying shares through the directed share program has agreed that, for a period of 180 days from the date of this prospectus, he or she will not, without the prior written consent of J.P. Morgan Securities LLC, Barclays Capital Inc., Citigroup Global Markets Inc. and Morgan Stanley & Co. LLC dispose of or hedge any shares or any securities convertible into or exchangeable for our common stock with respect to shares purchased in the program.

 

  Any directed shares not purchased will be offered by the underwriters to the general public on the same basis as all other shares offered. We have agreed to indemnify the several underwriters against certain liabilities and expenses, including liabilities under the Securities Act, in connection with the sales of the directed shares. See “Underwriting (conflicts of interest).”

 

Conflicts of interest

Affiliates of J.P. Morgan Securities LLC, Barclays Capital Inc., Citigroup Global Markets Inc., Morgan Stanley & Co. LLC, Goldman, Sachs & Co., Merrill Lynch, Pierce, Fenner & Smith Incorporated and Deutsche Bank Securities Inc. are lenders under our Bridge Facility. As described in “Use of proceeds,” a portion of the net proceeds of this offering will be used to repay amounts then outstanding under our Bridge Facility. Because affiliates of J.P. Morgan Securities LLC, Barclays Capital Inc., Citigroup Global Markets Inc. and Morgan Stanley & Co. LLC will receive more than 5% of the net proceeds of this offering due to the repayment of amounts outstanding under our Bridge Facility, each of J.P. Morgan Securities LLC, Barclays Capital Inc., Citigroup Global Markets Inc. and Morgan Stanley & Co. LLC is deemed to have a conflict of interest under Rule 5121 of the Financial Industry Regulatory Authority, Inc., or “FINRA.” Accordingly, this offering will be conducted in compliance with FINRA Rule 5121, which requires, among other things, that a “qualified independent underwriter” participate in the preparation of, and exercise the usual standards of “due diligence” with respect to, the registration statement and this prospectus.             has agreed to act as the qualified independent underwriter for this offering and to undertake the legal responsibilities and liabilities of an underwriter under the Securities Act, specifically including those inherent in Section 11 of the Securities Act.

 

 

40


Table of Contents

Stock exchange listing

We have applied to list our Class A common stock on the NASDAQ Global Select Market under the symbol “GLBL.”

 

Controlled company exemption

After completion of this offering, we will be considered a “controlled company” for the purposes of the NASDAQ Global Select Market listing requirements. As a “controlled company,” we are not required to establish a compensation or nominating committee under the listing rules of the NASDAQ Global Select Market and we do not intend to establish such committees in connection with the completion of this offering.

Certain assumptions

The number of shares of our common stock and the number of units of Global LLC to be outstanding after this offering and the Class A Common Private Placement, the combined voting power that identified stockholders will hold after this offering and the economic interest in our business that identified stockholders will hold after this offering are based on                 shares of our Class A common stock (including                 shares issued upon conversion of the Class D units sold in the Units Private Placements),                 shares of our Class B common stock,             Class A units of Global LLC and             Class B units of Global LLC outstanding immediately after this offering and the Class A Common Private Placement, based on an assumed initial public offering price of $         per share, which is the midpoint of the range set forth on the cover page of this prospectus, and excludes:

 

 

shares of our Class A common stock which may be issued upon the exercise of the underwriters’ option to purchase additional shares of our Class A common stock and the corresponding number of Class A units of Global LLC that we would purchase from Global LLC with the net proceeds therefrom;

 

 

shares of our Class A common stock reserved for issuance upon the subsequent exchange of Class B units of Global LLC that will be outstanding immediately after this offering; and

 

 

shares of our Class A common stock reserved for future issuance under our 2014 Incentive Plan, including an aggregate of approximately             shares underlying restricted stock units that are expected to be granted to several persons who have provided or are expected to provide services to us in connection with the completion of this offering as discussed in “Executive officer compensation—Equity incentive awards—IPO Grants.”

Except as otherwise indicated, all information in this prospectus also assumes:

 

 

we will file our amended and restated certificate of incorporation and adopt our amended and restated bylaws immediately prior to the completion of this offering;

 

 

we will cause Global LLC to amend and restate its operating agreement immediately prior to the completion of this offering; and

 

 

an initial public offering price of $         per share of Class A common stock, which is the midpoint of the range set forth on the cover page of this prospectus.

 

 

41


Table of Contents

Summary historical and pro forma financial data

The following table shows summary historical and pro forma financial data at the dates and for the periods indicated. The summary historical financial data as of and for the years ended December 31, 2013 and 2014 have been derived from the audited combined financial statements of our accounting predecessor included elsewhere in this prospectus. The summary historical financial data as of March 31, 2015 and for the three months ended March 31, 2014 and 2015 have been derived from the unaudited condensed combined financial statements of our accounting predecessor included elsewhere in this prospectus, which include all adjustments, consisting of normal recurring adjustments, that management considers necessary for a fair presentation of the financial position and the results of operations for such periods. Results for the interim periods are not necessarily indicative of the results for the full year. The historical combined financial statements of our accounting predecessor as of and for the years ended December 31, 2013 and 2014, and as of March 31, 2015 and for the three months ended March 31, 2014 and 2015, are intended to represent the financial results of SunEdison’s contracted renewable energy assets that have been or will be contributed to Global LLC as part of the Contributed Projects.

The summary unaudited pro forma financial data have been derived by the application of pro forma adjustments to the historical combined financial statements of our accounting predecessor included elsewhere in this prospectus. The summary unaudited pro forma statements of operations data for the year ended December 31, 2014 and for the three months ended March 31, 2015 give effect to the Organizational Transactions (as described under “—Organizational Transactions”), including the completion of the Contributed Projects and the Acquisitions and the use of the estimated net proceeds from this offering, as if they had occurred on January 1, 2014. The summary unaudited pro forma balance sheet data as of March 31, 2015 give effect to the Organizational Transactions, including the completion of the Contributed Projects and the Acquisitions, this offering and the use of the estimated net proceeds therefrom, as if each had occurred on such date. See “Unaudited pro forma condensed financial statements” for additional information. As described in “—Organizational Transactions,” Global will own approximately             % of Global LLC’s outstanding membership interests after completion of the Organizational Transactions based on the assumptions set forth in “—The offering—Certain assumptions,” including no exercise by the underwriters of their option to purchase additional shares.

The following table should be read together with, and is qualified in its entirety by reference to, the historical combined financial statements and the accompanying notes appearing elsewhere in this prospectus. Among other things, the historical combined financial statements include more detailed information regarding the basis of presentation for the information in the following table. The table should also be read together with “Management’s discussion and analysis of financial condition and results of operations” and “Certain relationships and related party transactions—Management Services Agreement.”

Our summary unaudited pro forma financial data are presented for informational purposes only. The pro forma adjustments are based upon available information and certain assumptions that we believe are reasonable. Our summary unaudited pro forma financial information does not purport to represent what our results of operations or financial position would have been if we operated as a public company during the periods presented and may not be indicative of our future performance.

 

 

42


Table of Contents

Financial data of TerraForm Global, Inc. has not been presented in this prospectus as it is a newly incorporated entity, had no business transactions or activities and had no assets or liabilities during the periods presented in this prospectus.

 

     For the year ended December 31,     For the three months ended March 31,  
(in thousands, except Operating Data)   2013     2014     Pro forma
2014
    2014     2015     Pro forma
2015
 
                (unaudited)     (unaudited)     (unaudited)     (unaudited)  

Statement of Operations Data:

           

Revenue

  $ 22,196      $ 39,449      $ 298,899      $ 8,826      $ 17,806      $ 100,810   

Operating costs and expenses:

           

Cost of operations

    355        1,999        44,754        441        358        12,507   

Cost of operations–affiliate

    1,311        2,257        2,666        725        964        1,068   

General and administrative

    1,047        1,349        17,960        574        4,486        8,332   

General and administrative–affiliate

    4,790        10,850        14,761        3,856        2,967        2,967   

Depreciation, amortization and accretion

    4,785        7,167        131,393        1,735        2,735        34,144   
 

 

 

   

 

 

   

 

 

   

 

 

 

Total operating costs and expenses

    12,288        23,622        211,534        7,331        11,510        59,018   
 

 

 

   

 

 

   

 

 

   

 

 

 

Operating (loss) income

    9,908        15,827        87,365        1,495        6,296        41,792   

Other (income) expense:

           

Interest expense

    11,812        24,294        51,547        3,903        16,821        19,472   

Other expense (income) net

    2,024        (5,128     (13,891     (1,642     (418     (3,057
 

 

 

   

 

 

   

 

 

   

 

 

 

Total other expenses, net

    13,836        19,166        37,656        2,261        16,403        16,415   
 

 

 

   

 

 

   

 

 

   

 

 

 

Loss before income tax (benefit) expense

    (3,928     (3,339     49,709        (766     (10,107     25,377   

Income tax (benefit) expense

    (1,651     1,700        5,630        438        1,118        2,882   
 

 

 

   

 

 

   

 

 

   

 

 

 

Net loss

  $ (2,277   $ (5,039   $ 44,079     $ (1,204   $ (11,225   $ 22,495   
 

 

 

   

 

 

   

 

 

   

 

 

 

Other Financial Data (unaudited):

           

Adjusted EBITDA(1)

  $ 12,511      $ 28,827      $ 233,354      $ 3,516      $ 10,043      $ 79,587   

Cash available for distribution(2)

    (42,532     (4,847     166,191        3,488        (10,610     32,410   

Cash Flow Data:

           

Net cash provided by (used in):

           

Operating activities

  $ (16,972   $
15,060
  
    $ 24,562      $ 1,374     

Investing activities

    (101,953     (231,853       (64,920     (52,494  

Financing activities

    118,639        365,519          48,130        37,949     

Effect of exchange rate changes on cash

    (576     (1,728       (2,396     (617  

Balance Sheet Data (at period end):

           

Cash and cash equivalents

  $
3,148
  
  $ 150,146          $ 136,358      $   

Restricted cash(3)

    47,279        85,811            77,045        245,060   

Property and equipment, net

    210,017        386,079            415,537        2,407,938   

Total assets

    291,111        673,456            685,688        3,616,628   

Total liabilities

    221,410        624,692            638,693        1,415,635   

Total equity

    69,701        48,764            46,995        2,200,993   

Operating Data (for the period):

           

GWh sold(4) (unaudited)

    109.5        157.9            58.6     

 

   

 

 

   

 

 

   

 

 

 

 

(1)   Adjusted EBITDA is a non-GAAP financial measure. This measurement is not recognized in accordance with GAAP and should not be viewed as an alternative to GAAP measures of performance. The presentation of Adjusted EBITDA should not be construed as an inference that our future results will be unaffected by unusual or non-recurring items.

 

 

43


Table of Contents

We define Adjusted EBITDA as net income (loss) plus interest expense, unrealized (gains) losses on interest rate swaps, income taxes, depreciation and accretion and stock compensation expense after eliminating the impact of non-recurring items and other factors that we do not consider indicative of future operating performance. We believe Adjusted EBITDA is useful to investors in evaluating our operating performance because:

 

   

securities analysts and other interested parties use such calculations as a measure of financial performance and debt service capabilities; and

 

   

it is used by our management for internal planning purposes, including aspects of our consolidated operating budget and capital expenditures.

Adjusted EBITDA has limitations as an analytical tool, and should not be considered in isolation or as a substitute for an analysis of our results as reported under GAAP. Some of these limitations include:

 

   

it does not reflect our cash expenditures or future requirements for capital expenditures or contractual commitments;

 

   

it does not reflect changes in, or cash requirements for, working capital;

 

   

it does not reflect significant interest expense or the cash requirements necessary to service interest or principal payments on our outstanding debt;

 

   

it does not reflect payments made or future requirements for income taxes;

 

   

it adjusts for contract amortization, mark-to-market gains or losses, asset write-offs, impairments and factors that we do not consider indicative of future performance;

 

   

it reflects adjustments for factors that we do not consider indicative of future performance, even though we may, in the future, incur expenses similar to the adjustments reflected in our calculation of Adjusted EBITDA in this prospectus; and

 

   

although depreciation and accretion are non-cash charges, the assets being depreciated and the liabilities being accreted will often have to be replaced or paid in the future and Adjusted EBITDA does not reflect cash requirements for such replacements or payments.

Investors are encouraged to evaluate each adjustment and the reasons we consider it appropriate for supplemental analysis.

The following table presents a reconciliation of net (loss) income to Adjusted EBITDA:

 

      For the year ended December 31,      For the three months ended March 31,  
(in thousands) (unaudited)    2013     2014     Pro forma
2014
               2014               2015     Pro
forma
2015
 

Net loss

   $ (2,277   $ (5,039   $ 44,079       $ (1,204   $ (11,225   $ 22,495   

Add:

             

Depreciation, amortization and accretion

     4,785        7,167        131,393         1,735        2,735        34,144   

Interest expense

     11,812        24,294        51,547        
3,903
  
    16,821        19,472   

Unrealized (gains) losses on interest rate swaps

     (158     705        705         (1,356     594        594   

Income tax (benefit) expense

     (1,651     1,700        5,630         438        1,118        2,882   

Stock compensation expense

                                           
  

 

 

    

 

 

   

 

 

   

 

 

 

Adjusted EBITDA

   $ 12,511      $ 28,827      $ 233,354       $ 3,516      $ 10,043      $ 79,587   

 

    

 

 

   

 

 

   

 

 

 

 

(2)   Cash available for distribution represents net cash provided by (used in) operating activities of Global LLC (i) plus or minus changes in assets and liabilities as reflected on our statements of cash flows, (ii) minus deposits into (or plus withdrawals from) restricted cash accounts required by project financing arrangements to the extent they decrease (or increase) cash provided by operating activities, (iii) minus cash distributions paid to non-controlling interests in our projects, if any, (iv) minus scheduled project-level and other debt service payments in accordance with the related borrowing arrangements, to the extent they are paid from operating cash flows during a period, (v) minus non-expansionary capital expenditures, if any, to the extent they are paid from operating cash flows during a period, (vi) plus cash contributions from our Sponsor pursuant to the Interest Payment Agreement, (vii) plus operating costs and expenses paid by our Sponsor pursuant to the Management Services Agreement to the extent such costs or expenses exceed the fee payable by us pursuant to such agreement but otherwise reduce our net cash provided by operating activities and (viii) plus or minus operating items as necessary to present the cash flows we deem representative of our core business operations, with the approval of our audit committee. Our intention is to cause Global LLC to distribute a portion of the cash available for distribution generated by our project portfolio as distributions each quarter, after appropriate reserves for our working capital needs and the prudent conduct of our business.

We disclose cash available for distribution because management recognizes that it will be used as a supplemental measure by investors and analysts to evaluate our liquidity. However, cash available for distribution is a non-GAAP measure and should not be considered an alternative to net (loss) income, net cash provided by (used in) operating activities or any other liquidity measure determined in accordance with GAAP, nor is it indicative of funds available to fund our cash needs. In addition, our calculation of cash available for distribution is not necessarily comparable to cash available for distribution as calculated by other companies. Investors should not rely on these measures as a substitute for any GAAP measure, including net income (loss) and net cash provided by (used in) operating activities. For a discussion of the risks and uncertainties with respect to our forecasted cash available for distribution see “Risk factors—Risks inherent in an investment in us—We may not be able to continue paying comparable or growing cash dividends to holders of our Class A common stock in the future,” “—The assumptions underlying the forecast and targeted growth rate presented elsewhere in this prospectus are inherently uncertain and subject to significant business, economic, financial, regulatory and competitive risks that could cause our actual cash available for distribution in the aggregate and/or on a per-share basis, to differ materially from our forecasts” and “—We are a holding company and our only material asset after completion of this offering will be our interest in Global LLC, as we are accordingly dependent upon distributions from Global LLC and its subsidiaries to pay dividends and taxes and other expenses.”

 

 

44


Table of Contents

The most directly comparable GAAP measure to cash available for distribution is net cash provided by (used in) operating activities. The following table is a reconciliation of our net cash provided by (used in) operating activities to cash available for distribution for the periods presented:

 

      For the year ended December 31,     For the three months ended March 31,  
(in thousands) (unaudited)            2013     2014     Pro forma
2014
    2014     2015     Pro
forma
2015
 

Adjustments to reconcile net cash provided by operating activities to cash available for distributions:

            

Net cash provided by (used in) operating activities

   $ (16,972   $ 15,060      $ 209,817      $ 24,562      $ 1,374      $ 63,681   

Changes in operating assets and liabilities

     18,138        (9,626     (16,491     (24,844     (7,835     (3,200

Deposits into/withdrawals from restricted cash accounts paid from operating cash flows

     (38,776     (1,509     2,284        10,670        819        (9,401

Cash distributions to non-controlling interests

                   (6,570                   (2,724

Scheduled project-level and other debt service repayments

     (4,922     (8,693     (13,312     (1,497     (3,607     (13,223

Non-expansionary capital expenditures

            (79     (9,537     (5,403     (1,361     (2,723

Contributions under the Interest Payment Agreement from our Sponsor

                                          

Other items(a)

                                          
  

 

 

   

 

 

   

 

 

   

 

 

 

Estimated cash available for distribution by Global LLC

   $ (42,532   $ (4,847   $ 166,191      $ 3,488      $ (10,610   $ 32,410   

 

   

 

 

   

 

 

   

 

 

 

 

  (a)   Represents cash distributions to our Sponsor.

 

(3)   Restricted cash includes current restricted cash, non-current restricted cash and cash committed for construction.

 

(4)   For any period presented, GWh sold represents the amount of electricity measured in GWh that our projects generated and sold.

 

 

45


Table of Contents

Risk factors

This offering and an investment in our Class A common stock involve a high degree of risk. You should carefully consider the risks described below, together with the financial and other information contained in this prospectus, before you decide to purchase shares of our Class A common stock. If any of the following risks actually occurs, our business, financial condition, results of operations, cash flows and prospects could be materially and adversely affected. As a result, the trading price of our Class A common stock could decline and you could lose all or part of your investment in our Class A common stock.

Risks related to our business

Counterparties to our PPAs may not fulfill their obligations, which could result in a material adverse impact on our business, financial condition, results of operations and cash flows.

Substantially all of the electric power generated by our initial portfolio of projects will be sold under long-term PPAs with public utilities or commercial, industrial or government end users. We expect the call right projects will also have long-term PPAs or similar offtake arrangements such as feed-in tariff programs. With respect to China, see “—The operating results of any energy projects that we acquire in China may be adversely affected by changes in governmental policies that currently subsidize renewable energy.” If, for any reason, any of the purchasers of power under these contracts are unable or unwilling to fulfill their related contractual obligations or if they refuse to accept delivery of power delivered thereunder or if they otherwise terminate such agreements prior to the expiration thereof, our assets, liabilities, business, financial condition, results of operations and cash flows could be materially and adversely affected. To the extent any of our power purchasers are, or are controlled by, governmental entities, our facilities may be subject to legislative or other political action that may impair their contractual performance or contain contractual remedies that do not provide adequate compensation in the event a counterparty defaults. For example, the counterparty to the PPA for two of our Indian projects included in our initial portfolio is a governmental trading corporation and external events, such as severe economic downturn or poor financial health, could adversely affect its ability to pay for the electricity received. We are required to contract with a single state-owned offtaker in South Africa, which concentrates our credit risk in that country. See “—Under renewable energy programs, in certain of the countries in which we operate, renewable energy producers are required to contract with a single offtake purchaser resulting in concentrated counterparty risk.” While we are entitled to charge penalty interest for any delay in payments under such PPA, the delay in recovering the amounts due could nonetheless have a material adverse effect on the cash flows from, and CAFD generated by, such projects.

We may enter into PPAs for certain projects that will be subject to periodic price adjustments or require renegotiation of price terms over time. If the price terms under these PPAs fall below the initial price terms, our business, financial condition, results of operations and cash flows may be materially and adversely affected.

Certain of our PPAs or other long-term arrangements with our customers are subject to price adjustments over time. For example, the PPAs for the Malaysian projects and two Indian projects included in our initial portfolio provide for price term adjustments. In Malaysia, there can be adjustments to the feed-in tariffs on the total solar energy generated in a year if the Sustainable Energy Development Authority of Malaysia, or “SEDA,” determines that the project has achieved cost parity (which occurs once displaced costs have increased to be equal to or greater than the feed-in tariff rate). In addition, if the total solar energy generated in a year exceeds the planned amount for that year, the rate paid for the excess energy may be a price lower than the initial feed-in tariff rate. In India, two of our PPAs in the state of Karnataka, have a fixed price for the first ten years and have a reset in year 11, to be determined by the state electricity regulatory commission. As a result, we are unable to ascertain the rate

 

46


Table of Contents

that may occur in such cases. If the price under any of our PPAs is reduced below the initial feed-in tariff rate, our business, financial condition, results of operations and cash flows may be materially and adversely affected.

There can be no assurance that the Pending Acquisitions will be consummated on the timetable currently anticipated, and the closing of this offering is not conditioned on the consummation of these acquisitions.

This offering is not conditioned on the closing of the Pending Acquisitions currently identified in this prospectus, and we cannot assure you that all of the Pending Acquisitions will be consummated on the timetable currently contemplated or that regulatory authorities will not impose additional terms or conditions. Each of the purchase agreements related to these project acquisitions contains customary and other closing conditions. In order to consummate these acquisitions, in certain instances, we must obtain regulatory and other approvals and consents in a timely manner. If, for any particular project acquisition, these approvals or consents are not received, or they are not received on terms that satisfy the conditions set forth in the relevant purchase agreement, then we and/or the applicable seller may not be obligated to complete such transaction. Also, we may not receive these approvals or consents in respect of these acquisitions before the currently anticipated timing for closing such acquisitions.

The following sets forth the regulatory approvals and third-party consents that we still need to obtain in order to complete the Pending Acquisitions:

 

 

BioTherm Transaction—we have yet to receive (i) a consent to transfer from the South African Department of Energy, (ii) exchange control approval by the Financial Surveillance Department of the South African Reserve Bank and (iii) a consent to transfer from project lenders;

 

 

FERSA Transaction—we have yet to receive a consent to transfer from a project lender;

 

 

Renova Transaction—we have yet to receive (i) a consent to transfer from the Brazilian Electricity Regulatory Agency and (ii) a consent to transfer from project lenders;

 

 

LAP Transaction—we have yet to receive a consent to transfer from project lenders; and

 

 

GME Transaction—we have yet to receive (i) antitrust approval from the Honduras antitrust authority, (ii) share transfer approval from the Bermuda Monetary Authority and (iii) a consent to transfer from project lenders.

We expect to receive the foregoing consents and approvals prior to or shortly after the completion of this offering. There can be no assurances, however, that we will receive these regulatory or third-party approvals or consents on the timetable currently contemplated. We cannot assure you that regulatory authorities in the jurisdictions governing the Pending Acquisitions will not impose additional or unanticipated terms and conditions or regulatory approvals as new conditions to closing such acquisitions. The imposition of any new term or condition or additional regulatory approval may further delay our ability to close the Pending Acquisitions on the timetable currently contemplated or adversely affect the benefits we expect from such transactions. In addition, we expect that each of the Solarpack Transaction and the acquisition of an 82.0 MW solar project (Choluteca) and a 50.0 MW wind project (Orosi) that are part of the GME Transaction will be completed when these respective projects achieve COD, which is expected to occur in the second half of 2015.

Therefore, upon the closing of this offering, you will become a holder of our Class A common stock irrespective of whether these acquisitions are consummated or delayed. If these acquisitions are not completed, our Class A common stock that you have purchased in this offering will not reflect any interest in the Pending Acquisitions, and if an acquisition is delayed, this interest will not be reflected during the period of delay. Also, the price of our Class A common stock may decline to the extent that the market price of our Class A common stock at any

 

47


Table of Contents

time reflects a market assumption that the Pending Acquisitions will be consummated and that we will realize certain anticipated benefits from the acquisitions. The occurrence of any of these events individually or in combination could have a material adverse effect on our forecasted CAFD, business, financial condition and results of operations.

Our forecasted and unaudited pro forma financial information included elsewhere in this prospectus assumes the completion of all of the Pending Acquisitions.

Preparing the pro forma financial information contained in this prospectus involved making several assumptions, including that we would complete all of the Pending Acquisitions concurrently with the completion of this offering on the terms contemplated by each of the respective purchase agreements. As previously noted, each of these purchase agreements contains customary and other closing conditions, some of which are outside of our control. As a result, the assumption that all of the Pending Acquisitions will be completed concurrently with this offering may prove inaccurate if any of the Pending Acquisitions were unexpectedly delayed or otherwise terminated. In that case, the forecasted and unaudited pro forma financial information included elsewhere in this prospectus may not be indicative of what our results of operations, financial position and cash flows will be in the future depending on the size of the transaction and length of delay in the completion of any such Pending Acquisition. See “Cash dividend policy” and “Unaudited pro forma condensed consolidated financial statements.”

Certain of the PPAs for the projects in our initial portfolio and those for projects that we may acquire in the future contain or will contain provisions that allow the offtake purchaser to terminate or buy out the project or require us to pay liquidated damages upon the occurrence of certain events. In addition, certain of our project financing arrangements provide for acceleration upon the occurrence of such events. If these provisions are exercised, our cash available for distribution could materially decline.

Certain of the PPAs for the projects that we may acquire in the future allow the offtake purchaser to purchase the applicable project from us. Additionally, certain of the PPAs associated with projects in our initial portfolio allow the offtake purchaser to terminate the PPA or receive liquidated damages in the event certain operating thresholds, performance measures or any other material terms of the PPA are breached or are not achieved within specified time periods. We are therefore subject to the risk of counterparty termination or payment of damages based on such criteria for such projects. We cannot provide any assurance that PPAs containing such provisions will not be terminated or that we will not be required to pay liquidated damages with respect to projects governed by PPAs containing such provisions. If any such PPA is terminated or project bought out, we may not be able to enter into a replacement PPA or timely invest in a suitable replacement project. Any replacement PPA may be on terms less favorable to us than those that were terminated and any replacement project may possess economic characteristics less favorable to us than those of the project that was bought out. In the event a PPA is terminated, a project is bought out or we are required to pay liquidated damages under such provisions, it could materially and adversely affect our business, financial condition, results of operations and cash flows until we are able to obtain a replacement PPA on similar terms, reinvest in a suitable replacement project or the payment of such liquidated damages ceases.

Additionally, certain of the project-level financing arrangements for projects in our initial portfolio allow the lenders or investors to accelerate the repayment of the financing arrangement in the event that a PPA is terminated or if certain operating thresholds or performance measures are not achieved within specified time periods. We are therefore subject to the risk of lender or investor termination based on such criteria. In the event a project-level financing arrangement for one or more of our projects is accelerated under such provisions, it could materially and adversely affect our business, financial condition, results of operations and cash flows until we are able to obtain replacement financing on similar terms. We cannot provide any assurance that financing arrangements containing such provisions will not be terminated and repayments accelerated, or

 

48


Table of Contents

in the event of such termination or acceleration, that we will be able to enter into replacement financing arrangements on commercially reasonable terms or at all.

Certain of our PPAs and project-level financing arrangements include, and PPAs and project-level financing arrangements with respect to our future projects may include, provisions that would permit the counterparty to terminate the contract or accelerate maturity in the event our Sponsor ceases to control or own, directly or indirectly, a majority of our company.

Certain of our PPAs and project-level financing arrangements contain, and future PPAs and project-level financing arrangements may contain, change-of-control provisions that provide the counterparty with a termination right or the ability to accelerate maturity if a change-of-control consent is not received. Generally, these provisions are, or will be, triggered in the event our Sponsor owns, directly or indirectly, less than 50% of the combined voting power which is equal to approximately     % of our outstanding capital stock, or, in some cases if our Sponsor ceases to be the majority owner, directly or indirectly, of the applicable project subsidiary. As a result, if our Sponsor ceases to control, or in some cases own a majority of, Global, the counterparties could terminate such contracts or accelerate the maturity of such financing arrangements. The termination of any of our PPAs or the acceleration of the maturity of any of our project-level financing as a result of a change in control of Global could have a material adverse effect on our business, financial condition, results of operations and cash flows.

We may face delays in entering into PPAs for some of our projects or may not be able to replace expiring PPAs with contracts on similar terms. If we are unable to replace an expired distributed generation PPA with an acceptable new contract, we may be required to remove the energy assets from the site or, alternatively, we may sell the assets to the site host.

We may experience delays in entering into PPAs for some of our projects or may not be able to replace an expiring PPA with a contract on equivalent terms and conditions, including at prices that permit operation of the related facility on a profitable basis. In India, as opposed to the mechanism for the sale of energy from solar power projects, there is no designated central agency for the purchase of wind power. Consequently, if we acquire Indian wind power projects in the future, we will be required to enter into offtake arrangements with commercial and industrial offtakers, wholesalers or distribution utilities, which in most of the states can be done only after a project reaches COD. Similarly, in South Africa, delays related to the implementation of the Renewable Energy Independent Power Producer Procurement program on the part of the South African government may cause delays in finalizing PPAs with Eskom Holdings Limited, or “Eskom.” In Brazil, we may be forced to buy electricity at spot market prices to resell to government counterparties under the applicable PPA if we fail to begin generation of electricity or do not generate sufficient electricity to satisfy the terms of the PPA for any projects we may enter into before such projects become operational. Any delay in entering into PPAs may adversely affect our cash flows from and CAFD generated by such projects.

If we are unable to replace an expiring PPA with an acceptable new PPA, the affected site may temporarily or permanently cease operations. In the case of a distributed generation project that ceases operations, the PPA terms generally require that we remove the assets, including fixing or reimbursing the site owner for any damages caused by the assets or the removal of such assets. The cost of removing a significant number of distributed generation projects could be material. Alternatively, we may agree to sell the assets to the site owner, but we can offer no assurances as to the terms and conditions, including price, that we would receive in any sale, and the sale price may not be sufficient to replace the revenue previously generated by the project.

Certain of our PPAs do not include inflation-based price increases.

Certain of the PPAs that have been entered into for the projects in our initial portfolio and the call right projects do not contain inflation-based price increase provisions. Certain of the countries in which we have operations,

 

49


Table of Contents

or that we may expand into in the future, have in the past experienced high inflation. To the extent that the countries in which we conduct our business experience high rates of inflation, thereby increasing our operating costs in those countries, we may not be able to generate sufficient revenues to offset the effects of inflation, which could materially and adversely affect our business, financial condition, results of operations and cash flows.

Certain of our PPAs contain joint and several liability between holding companies and operational companies.

In Brazil, certain of our PPAs in the government regulated market have counterparties that are special purpose entities under the control of the legal entities that participate in the government auctions. If a special purpose entity fails to deliver the commitments under the government auction rules, the controlling entity that participated in the auction is jointly and severally liable for all obligations and liabilities arising from the government auction and the applicable PPA. Therefore, liability is not isolated to a specific project simply by operating the project under a separate legal entity. Significant potential liabilities could arise from: (i) the delay in any of the milestones for the implementation of the projects; (ii) subject to certain related obligations, the delay in recovering the value or delivery of the performance bond; and (iii) the failure to satisfy all the qualification requirements under the applicable government auction rules and the applicable PPA. The failure to comply with government auction milestones may also trigger enforcement of bonds (participation and performance), payment of fines and suspension from participating in any public auction for up to two years. There is no limit on the amount and kind of losses and damages covered under the government auction rules and the applicable PPA. Therefore, damages could potentially include the loss of profits and consequential damages.

A material increase in the availability of utility-generated electricity or electricity from other sources could increase competition for new PPAs.

Generally, to the extent offtakers are not required to acquire the output from our projects under feed-in tariff regulations or renewable portfolio standards, the decision by an end user to buy energy from projects in our initial portfolio is primarily driven by a deficit of available energy in such markets and the availability of domestic resources to meet those needs in a timely fashion. The end user’s decision may also be affected by the cost of other conventional and clean energy sources. Decreases in the retail prices of electricity supplied by utilities or other clean energy sources could harm our ability to offer competitive pricing and to sign new customers. The availability of electricity could increase and the price of electricity could decrease in our target markets for a number of reasons, including:

 

 

the construction of a significant number of new power generation plants, including nuclear, coal, natural gas or renewable energy facilities;

 

 

the construction of additional electric transmission and distribution lines;

 

 

a reduction in the price of natural gas, including as a result of new drilling techniques or a relaxation of associated regulatory standards; and

 

 

the development of new clean energy technologies.

An increase in the availability of electricity or reduction in retail electricity prices in our target markets would make the purchase of solar or wind energy, as the case may be, less economically attractive. In addition, a shift in the timing of peak rates for utility-supplied electricity to a time of day when solar and wind energy generation is less efficient or not available could make solar or wind energy less competitive and reduce demand. If the availability of energy were to increase or the price of electricity were to decrease in the markets in which we operate, we would be at a competitive disadvantage, we may be unable to attract new customers and our growth may be limited.

 

50


Table of Contents

Certain of our generation assets operate, partially, without long-term power sale agreements.

Less than 1% of the total expected CAFD of our initial portfolio is not subject to offtake arrangements. We sell the energy produced with respect to this capacity in the merchant power market at the then current market price determined by auction or other variable price determination mechanisms. The price at which we sell energy in these markets varies, sometimes significantly, based on supply and demand. If we are unable sell energy produced with respect to this capacity on favorable terms, if at all, there may be a material adverse effect on our business, financial condition, results of operations and cash flows.

We are exposed to risks associated with the projects in our initial portfolio that are newly constructed and the call right projects that are newly constructed or are under construction.

Our expectations for the operating performance of newly constructed projects and projects under construction are based on assumptions and estimates made without the benefit of operating history. Projections contained in this prospectus regarding our ability to pay dividends to holders of our Class A common stock assume such projects perform to our expectations. However, the ability of these projects to meet our performance expectations is subject to the risks inherent in newly constructed power generation facilities and the construction of such facilities, including, but not limited to, degradation of equipment in excess of our expectations, system failures and outages. The failure of these facilities to perform as we expect could have a material adverse effect on our business, financial condition, results of operations and cash flows and our ability to pay dividends to holders of our Class A common stock.

Additionally, certain of the projects in our initial portfolio and certain of the call right projects are still in development or under construction. We may experience delays or unexpected costs during the completion of construction of these projects, and if any project is not completed according to specification, we may incur liabilities and suffer reduced project efficiency, higher operating costs and reduced cash flows. Our call right projects that are in development or under construction may not be completed on schedule or at all, in which case any such project would not be available for acquisition by us during the time frame we currently expect or at all. Since our primary growth strategy is the acquisition of new clean energy projects, including under the Support Agreement, a delay in our ability to acquire a call right project could materially and adversely affect our expected growth.

Certain of our projects depend on third-party service providers for construction, operation and maintenance services, and we may not be able to control their work as effectively as if we or our Sponsor performed these functions. Certain of the projects we expect to acquire in the Acquisitions may encounter transition and integration difficulties in transferring these services to us or our Sponsor.

Our Sponsor contracts with third-party service providers for certain functions related to the construction and operation of certain of our projects. Outsourcing these functions involves the risk that third parties may not perform to our standards, may not produce results in a timely manner or may fail to perform at all. Although we have not experienced any significant difficulties with our third-party service providers, it is possible that we could experience difficulties in the future. Certain of our projects located in China, Brazil, India, South Africa, Costa Rica, Peru and Uruguay utilize third-party service providers for construction, operation and maintenance. If these third-party service providers default on their contractual obligations to us it may: (i) cause us to default in our regulatory obligations; (ii) adversely impact the ongoing operation of our plants; or (iii) temporarily reduce our capacity to generate power. Certain of our acquired projects may encounter difficulties in transitioning operation and maintenance services from the existing service provider to us and our Sponsor, which may have a material adverse effect on the business results of our operations and performance.

 

51


Table of Contents

We have a limited operating history and as a result there is no assurance we can operate on a profitable basis.

We have a relatively new portfolio of assets, including several projects that have only recently commenced operations, and a limited operating history on which to base an evaluation of our business and prospects. Our prospects must be considered in light of the risks, expenses and difficulties frequently encountered by companies in their early stages of operation, particularly in a rapidly evolving industry such as ours. We cannot assure you that we will be successful in addressing the risks we may encounter, and our failure to do so could have a material adverse effect on our business, financial condition, results of operations and cash flows.

We may incur unexpected expenses if the suppliers of components in our clean energy projects default in their warranty obligations or our operators default on their operation and maintenance obligations.

The solar panels, inverters, and other system components utilized in our solar energy projects and, in more limited circumstances, turbines utilized in our wind energy and hydro-electric projects are generally covered by manufacturers’ warranties, which typically range from five to 20 years. In the event any such components fail to operate as required, we may be able to make a claim against the applicable warranty to cover all or a portion of the expense associated with the faulty component. However, these suppliers could cease operations and no longer honor the warranties, which would leave us to cover the expense associated with the faulty component. Our operators may default or underperform in performing operation and maintenance services, which may result in unexpected capital expenditures, major repairs and project underperformance. Our business, financial condition, results of operations and cash flows could be materially adversely affected if we cannot make claims under warranties covering our projects.

The growth of our business depends on locating and acquiring interests in attractive clean energy projects in emerging markets from our Sponsor and unaffiliated third parties at favorable prices. Additionally, even if we consummate such acquisitions on terms that we believe are favorable, such acquisitions may in fact result in a decrease in cash available for distribution per Class A common share.

Our primary business strategy is to acquire clean energy projects that are operational at the time of acquisition. We may also, in limited circumstances, acquire clean energy projects that are pre-operational. We intend to pursue opportunities to acquire projects from both our Sponsor and third parties. The following factors, among others, could affect the availability of attractive projects to grow our business:

 

 

competing bids for a project, including from companies that may have substantially greater capital and other resources than we do;

 

 

fewer third-party acquisition opportunities than we expect, which could result from, among other things, available projects having less desirable economic returns or higher risk profiles than we believe suitable for our business plan and investment strategy;

 

 

our Sponsor’s failure to complete the development of (i) the Call Right Projects, which could result from, among other things, challenges in obtaining necessary permits, failure to procure the requisite financing, equipment or interconnection, or an inability to satisfy the conditions to effectiveness of project agreements such as PPAs, and (ii) any of the other projects in its development pipeline in a timely manner, or at all, in either case, which could limit our acquisition opportunities under the Support Agreement;

 

 

our failure to reach an agreement with our Sponsor and third parties regarding pricing of the applicable call right projects; and

 

 

our failure to exercise our rights under the Support Agreement or third-party call rights agreements to acquire assets from our Sponsor or such third parties.

 

52


Table of Contents

We will not be able to achieve our target dividend per share annual growth rate unless we are able to acquire additional clean energy projects in emerging markets at favorable prices. Even if we consummate acquisitions that we believe will be accretive to our dividends per share, those acquisitions may in fact result in a decrease in dividends per share as a result of incorrect assumptions in our evaluation of such acquisitions, unforeseen consequences or other external events beyond our control.

Our acquisition strategy exposes us to substantial risks.

The acquisition of power generation assets is subject to substantial risks, including the failure to identify material problems during due diligence (for which we may not be indemnified post-closing), the risk of over-paying for assets or not making acquisitions on an accretive basis, the ability to obtain or retain customers and, if the projects are in new markets, the risk of entering markets and technologies where we have limited or no experience. While we will perform our due diligence on prospective acquisitions, we may not be able to discover all potential operational deficiencies in such projects. The integration and consolidation of acquisitions requires substantial human, financial and other resources and may divert management’s attention from our existing business concerns, disrupt our ongoing business or otherwise fail to be successfully integrated. There can be no assurance that any future acquisitions will perform as expected or that the returns from such acquisitions will support the financing utilized to acquire them or maintain them. As a result, the consummation of acquisitions may have a material adverse effect on our ability to execute our growth strategy, business, financial condition, results of operations and cash flows and ability to pay dividends to holders of our Class A common stock.

In addition, the development of clean energy projects is a capital intensive, high-risk business that relies heavily on the availability of debt and equity financing sources to fund projected construction and other projected capital expenditures. As a result, in order to successfully develop a clean energy project, development companies, including our Sponsor, from which we may seek to acquire projects, must obtain at-risk funds sufficient to complete the development phase of their projects. We, on the other hand, must anticipate obtaining funds from equity or debt financing sources, including pursuant to our Revolver and Senior Notes offering, or from government grants in order to successfully fund and complete acquisitions of projects. Any significant disruption in the credit or capital markets, or a significant increase in interest rates, could make it difficult for our Sponsor or other development companies to successfully develop attractive projects and may also limit their ability to obtain project-level financing to complete the construction of projects we may seek to acquire. It could also adversely affect our ability to fund acquisitions and/or operating costs. If our Sponsor or other development companies from which we seek to acquire projects are unable to raise funds when needed, or if we or they are unable to secure adequate financing, the ability to grow our project portfolio may be limited, which could have a material adverse effect on our ability to implement our growth strategy and, ultimately, our business, financial condition, results of operations and cash flows.

Projects in our initial portfolio, and that we may acquire, will need governmental approvals and permits, including environmental approvals and permits, for construction and operation. Any failure to obtain and maintain necessary permits could adversely affect our ability to operate and grow.

The operation of solar, wind and hydro-electric energy projects is highly regulated, requires various governmental approvals and permits, including environmental approvals and permits, and may be subject to the imposition of related conditions that vary by jurisdiction. We cannot predict whether all permits required for a given project will be granted or whether the conditions associated with the permits will be achievable. In addition, many of the local governments in jurisdictions in which we operate have enacted laws that require us to obtain operating permits to conduct our business. Due to administrative delays, certain of our projects in these jurisdictions are operating without such permits because the local government is not enforcing its permit requirement. The denial or loss of a permit essential to a project, the imposition of impractical conditions upon renewal or the initiation of enforcement actions could impair our ability to operate a project. In addition, we

 

53


Table of Contents

cannot predict whether the permits will attract significant opposition or whether the permitting process will be lengthened due to complexities, legal claims or appeals. Delays in the review and permitting process for a project can impair or delay our ability to acquire a project or increase the cost such that the project is no longer attractive to us. If we fail to satisfy the conditions or comply with the restrictions imposed by governmental approvals and permits, or the restrictions imposed by any other statutory or regulatory requirements, we may be subject to regulatory enforcement action, fines, penalties or additional costs or revocation of such approvals or permits and the operation of the applicable projects could be adversely affected. Any failure to procure, renew or maintain necessary authorizations and permits could materially adversely affect the continuing operation of our projects or our ability to acquire additional projects.

Laws, governmental regulations and policies supporting renewable energy, and specifically solar, wind and hydro-electric energy (including tax incentives and feed-in tariffs), could change at any time, including as a result of new political leadership, and such changes may materially adversely affect our business and our growth strategy.

Renewable generation assets currently benefit from various national, provincial, state and local governmental incentives. Certain of the projects in our initial portfolio and certain call right projects rely on capital subsidies from government authorities in jurisdictions where such projects are located. Governmental regulations and policies could be changed to provide for new rate programs that undermine the economic returns for both new and existing projects by charging additional, non-negotiable fixed or demand charges or other fees or reductions in the number of projects allowed under net metering policies. In addition, unanticipated events beyond our control, such as a change in law may require us to make improvements or other modifications to one or more of our projects, which could have an adverse effect on our operating results. Our business could also be subject to new and burdensome interconnection processes, delays and upgrade costs or local permit and site restrictions.

In addition, we face risks related to potential changes in tax laws that may limit the benefits of solar, wind and hydro-electric energy investment. For example, our solar projects in Thailand currently benefit from a “tax holiday” granted by Thailand’s Board of Investment. This incentive includes an eight-year tax holiday, customs duty exemptions and a number of other non-tax incentives. There is a risk that the tax holiday may be revoked and that the rate of income tax may be increased from the current rate of 20%. In Brazil, certain tax benefits associated with inputs and equipment are necessary to construct renewable energy power plants. Most of these tax benefits have expiration dates that may or may not be extended. Without these tax benefits the cost of constructing renewable energy projects would significantly increase. Government incentives provide significant support for renewable energy sources, such as solar and wind energy, and a decrease in these tax benefits could increase the costs of investment in solar, wind and hydro-electric energy.

If any of the laws or governmental regulations or policies that support renewable energy, including solar, wind and hydro-electric energy, change or are terminated, or if we are subject to new and burdensome laws or regulations, such changes may have a material adverse effect on our business, financial condition, results of operations and cash flows. In addition, any changes to or termination of the regulations and governmental incentives discussed in detail under “Business—Government incentives” in this prospectus may also significantly affect our business.

Our ability to grow and make acquisitions with cash on hand may be limited by our cash dividend policy.

As discussed in “Cash dividend policy,” our dividend policy is to cause Global LLC to distribute the CAFD generated by our project portfolio (after deducting appropriate reserves for our working capital needs and the prudent conduct of our business) and to rely primarily upon external financing sources, including the issuance of debt and equity securities and, if applicable, borrowings under our Revolver, to fund our acquisitions and growth capital expenditures, which we define as costs and expenses associated with the acquisition of project

 

54


Table of Contents

assets from our Sponsor and third parties and capitalized expenditures on existing projects to expand capacity. Certain of our project-level subsidiaries pay cash distributions to us in the form of dividends or other cash distributions such as shareholder loan repayments or capital reductions and, as a result, our ability to pay or grow our dividends is dependent upon the performance of our subsidiaries and their ability to distribute cash to us. The ability of our project-level subsidiaries to make cash distributions to us may be restricted by, among other things, the provisions of existing and future indebtedness, applicable corporation laws and other laws and regulations. We may be precluded from pursuing otherwise attractive acquisitions if the projected short-term cash flows from the acquisition or investment are insufficient to service any associated debt or adequately compensate the invested capital, after giving effect to our available cash reserves. See “Cash dividend policy—Our ability to grow our business and dividend.”

We intend to use a portion of the CAFD generated by our project portfolio to pay regular quarterly cash dividends to holders of our Class A common stock. We may make distributions to our shareholders by way of capital reduction in lieu of dividends in some years. Our initial quarterly dividend will be set at $         per share of Class A common stock, or $         per share on an annualized basis. We established our initial quarterly dividend based upon a targeted payout ratio by Global LLC of approximately     % of projected annual CAFD. As such, our growth may not be as fast as that of businesses that reinvest their available cash to expand ongoing operations. To the extent we issue additional equity securities in connection with any acquisitions or growth capital expenditures, the payment of dividends on these additional equity securities may increase the risk that we will be unable to maintain or increase our dividend per share. There will be no limitations in our amended and restated certificate of incorporation (other than a specified number of authorized shares) on our ability to issue equity securities, including securities ranking senior to our common stock. The incurrence of bank borrowings or other debt by Global Operating LLC or by our project-level subsidiaries to finance our growth strategy will result in increased interest expense and the imposition of additional or more restrictive covenants which, in turn, may impact the cash distributions we make to holders of our Class A common stock.

Our indebtedness could adversely affect our financial condition and ability to operate our business, including restricting our ability to pay cash dividends or react to changes in the economy or our industry.

As of March 31, 2015, after giving pro forma effect to the Organizational Transactions, we would have had approximately $         million of indebtedness and an additional $         million available for future borrowings under our Revolver. Our substantial debt following the completion of this offering could have important negative consequences on our financial condition, including:

 

 

increasing our vulnerability to general economic and industry conditions;

 

 

requiring a substantial portion of our cash flows from operations to be dedicated to the payment of principal and interest on our indebtedness, thereby reducing our ability to pay dividends to holders of our Class A common stock or to use our cash flows to fund our operations, capital expenditures and future business opportunities;

 

 

limiting our ability to enter into or receive payments under long-term power or fuel purchase contracts that require credit support;

 

 

limiting our ability to fund operations or future acquisitions;

 

 

restricting our ability to make certain distributions with respect to our capital stock and the ability of our subsidiaries to make certain distributions to us, in light of restricted payment and other financial covenants in our credit facilities and other financing agreements;

 

 

exposing us to the risk of increased interest rates because certain of our borrowings, which may include borrowings under our Revolver, are at variable rates of interest;

 

55


Table of Contents
 

limiting our ability to obtain additional financing for working capital, including collateral postings, capital expenditures, debt service requirements, acquisitions and general corporate or other purposes; and

 

 

limiting our ability to adjust to changing market conditions and placing us at a competitive disadvantage compared to our competitors who have less debt.

Our Revolver and the indenture governing the Senior Notes will contain financial and other restrictive covenants that limit our ability to return capital to stockholders or otherwise engage in activities that may be in our long-term best interests. Our inability to satisfy certain financial covenants could prevent us from paying cash dividends, and our failure to comply with those and other covenants could result in an event of default which, if not cured or waived, may entitle the related lenders to demand repayment or enforce their security interests. The occurrence of an event of default under our Revolver or the indenture governing the Senior Notes could have a material adverse effect on our business, financial condition, results of operations and cash flows. In addition, failure to comply with such covenants may entitle the related lenders to demand repayment and accelerate all such indebtedness.

The agreements governing our project-level financing contain financial and other restrictive covenants that limit our project subsidiaries’ ability to make distributions to us or otherwise engage in activities that may be in our long-term best interests. The project-level financing agreements generally prohibit distributions or dividends from the project entities to us unless certain specific conditions are met, including the satisfaction of certain financial ratios, such as debt service, leverage and loan life ratios, payment of operating and maintenance expenses, capital expenditures and finance charges and the satisfaction of scheduled payments under such financing agreements. Our inability to satisfy certain financial covenants may prevent cash distributions by the particular project(s) to us and our failure to comply with those or other covenants could result in an event of default which, if not cured or waived, may entitle the related lenders to demand repayment and accelerate all such indebtedness or enforce their security interests, which could have a material adverse effect on our business, results of operations and financial condition. If we are unable to make distributions from our project-level subsidiaries, it would likely have a material adverse effect on our ability to pay dividends to holders of our Class A common stock. Certain financing agreements contain restricted cash provisions which require the deposit of cash into debt service or lockbox accounts, and require the maintenance of such accounts until certain conditions are satisfied or for the duration of the financing. As a result, funds subject to such restricted cash provisions will not be available for distribution by project entities, and any increase in restricted cash levels will decrease the amount of cash available to such project entity to make distributions or pay dividends to us. Additionally, the project financing arrangements for most of our Indian projects require that we obtain lender consent prior to making any distributions or paying any dividends from the project entity to us regardless of whether the other conditions of the financing arrangement have been satisfied. The project financing arrangements for some of our Indian projects do not permit them to make any dividend payments until the expiry of a certain number of years from COD, or until full repayment of the facility.

For example, we were not in compliance with a financial maintenance covenant of the term loan for the Silverstar Pavilion project at the end of the second quarter of 2014. This non compliance constituted an event of default under the project’s loan agreement, and resulted in us being unable to distribute any cash generated by the Silverstar Pavilion project. The lenders would have been able to accelerate repayment of the loan at any time until such default was cured or waived. Subsequent to such default, we obtained a waiver of the default from the lenders, and as of the end of the third quarter of 2014, we were in compliance with the financial maintenance covenant. Although we have obtained a waiver of the default from the lenders, we can provide no assurance that, if such loan had been accelerated, we would have been able to replace the term loan on commercially reasonable terms or at all.

 

56


Table of Contents

If our subsidiaries default on their obligations under their project-level indebtedness, this may constitute an event of default under our Revolver or the indenture governing the Senior Notes, and we may be required to make payments to lenders to avoid such default or to prevent foreclosure on the collateral securing the project-level debt. If we are unable to or decide not to make such payments, we would lose certain of our projects upon foreclosure.

Our subsidiaries incur, and we expect will in the future incur, various types of project-level indebtedness. Non-recourse debt is repayable solely from the applicable project’s revenues and is secured by the project’s physical assets, major contracts, cash accounts and, in many cases, our ownership interest in the project subsidiary. Limited recourse debt is debt where we have provided a limited guarantee, and recourse debt is debt where we have provided a full guarantee. If our subsidiaries default on projects subject to our full guarantee, we will be liable directly to those lenders; however, in the case of limited recourse debt, we are liable only to the extent of the collateral securing the debt. To satisfy recourse debt obligations, we may be required to use amounts distributed by our other subsidiaries as well as other sources of available cash, reducing our cash available to execute our business plan and pay dividends to holders of our Class A common stock. In addition, if our subsidiaries default on their obligations under non-recourse financing agreements this may, under certain circumstances, result in an event of default under our Revolver or the indenture governing the Senior Notes, allowing our lenders or noteholders to foreclose on their security interests, including the pledge of any equity interests. Even if that is not the case, we may decide to make payments to prevent the lenders of these subsidiaries from foreclosing on the relevant collateral. Such a foreclosure could result in our losing our ownership interest in the subsidiary or in some or all of its assets. The loss of our ownership interest in one or more of our subsidiaries or some or all of their assets could have a material adverse effect on our business, financial condition, results of operations and cash flows.

If we are unable to renew letter of credit facilities, our business, financial condition, results of operations and cash flows may be materially adversely affected.

We expect our Revolver to include a letter of credit facility to support project-level contractual obligations. This letter of credit facility will need to be renewed after three years, at which time we will need to satisfy applicable financial ratios and covenants. If we are unable to renew our letters of credit as expected or if we are only able to replace them with letters of credit under different facilities on less favorable terms, we may experience a material adverse effect on our business, financial condition, results of operations and cash flows. Furthermore, the inability to provide letters of credit may constitute a default under certain project-level financing arrangements, restrict the ability of the project-level subsidiary to make distributions to us and/or reduce the amount of cash available at such subsidiary to make distributions to us.

Our ability to raise additional capital to fund our operations may be limited.

Our ability to arrange additional financing, either at the corporate level or at a non-recourse project-level subsidiary, may be limited. Additional financing, including the costs of such financing, will be dependent on numerous factors, including:

 

 

general economic and capital market conditions;

 

 

credit availability from banks and other financial institutions;

 

 

investor confidence in us, our partners, our Sponsor, as our principal stockholder (on a combined voting basis) and manager under the Management Services Agreement, and the regional wholesale power markets;

 

 

our financial performance and the financial performance of our subsidiaries;

 

 

our level of indebtedness and compliance with covenants in debt agreements;

 

57


Table of Contents
 

maintenance of acceptable project credit ratings or credit quality, including maintenance of the legal and tax structure of the project-level subsidiary upon which the credit ratings may depend;

 

 

our cash flows; and

 

 

provisions of tax and securities laws that may impact raising capital.

We may not be successful in obtaining additional financing for these or other reasons. Furthermore, we may be unable to refinance or replace project-level financing arrangements or other credit facilities on favorable terms or at all upon the expiration or termination thereof. Our failure, or the failure of any of our projects, to obtain additional capital or enter into new or replacement financing arrangements when due may constitute a default under such existing indebtedness and may have a material adverse effect on our business, financial condition, results of operations and cash flows.

Our ability to generate revenue from certain utility energy projects depends on having interconnection arrangements and services.

Our future success will depend, in part, on our ability to maintain satisfactory interconnection agreements. If the interconnection or transmission agreement of an energy project is terminated for any reason or is not renewed, we may not be able to replace it with an interconnection and transmission arrangement on terms as favorable as the existing arrangement, or at all, or we may experience significant delays or costs related to securing a replacement. If a network to which one or more of the energy projects is connected experiences “down time,” which may be due to matters not within our control, such as substation or transmission network upgrades, the affected project may lose revenue and be exposed to non-performance penalties and claims from its customers. These may include claims for damages incurred by customers, such as the additional cost of acquiring alternative electricity supply at then-current spot market rates. The owners of the network will not usually compensate electricity generators for lost income due to down time. These factors could materially affect our ability to forecast operations and negatively affect our business, results of operations, financial condition and cash flows.

For most of our projects, we rely on electric interconnection and transmission facilities that we do not own or control and that are subject to transmission constraints. If these facilities fail to provide us with adequate transmission capacity, we may be restricted in our ability to deliver electric power to our customers and we may incur additional costs or forego revenues.

For our utility-scale projects, we depend on electric transmission facilities owned and operated by others to deliver the power we generate and sell at wholesale to our utility customers. A failure or delay in the operation or development of these transmission facilities could result in our losing revenues. Such failures or delays could limit the amount of power our operating facilities deliver or delay the completion of our call right projects. Additionally, such failures, delays or increased costs could have a material adverse effect on our business, financial condition and results of operations. If a region’s power transmission infrastructure is inadequate, our recovery of wholesale costs and profits may be limited. If restrictive transmission price regulation is imposed, the transmission companies may not have a sufficient incentive to invest in expansion of transmission infrastructure. We also cannot predict whether transmission facilities will be expanded in specific markets to accommodate competitive access to those markets. In addition, certain of our operating facilities’ generation of electricity may be physically or economically curtailed without compensation due to transmission limitations or limitations on the transmission grid’s ability to accommodate all of the generating resources seeking to move power over or sell power through the grid, reducing our revenues and impairing our ability to capitalize fully on a particular facility’s generating potential. In certain markets in which we expect to acquire projects, the electric transmission and distribution infrastructure generally needs significant improvement, which may also cause grid connections for some of our projects to be delayed. Such curtailments could have a material adverse effect on our business, financial condition, results of operations and cash flows. Furthermore, economic

 

58


Table of Contents

congestion on the transmission grid (for instance, a positive price difference between the location where power is put on the grid by a project and the location where power is taken off the grid by the project’s customer) in certain of the bulk power markets in which we operate may occur and we may be deemed responsible for those congestion costs. If we were liable for such congestion costs, our financial results could be adversely affected.

We face competition from conventional and other renewable energy companies.

The solar and wind industries are highly competitive and continually evolving as market participants strive to distinguish themselves within their markets and compete with large incumbent utilities and new market entrants. We believe that our primary competitors in these industries are the incumbent utilities that supply energy to our potential customers under highly regulated rate and tariff structures. We compete with these conventional utilities primarily based on price, predictability of price and the ease with which customers can switch to electricity generated by our solar and wind energy systems. If we cannot offer compelling value to our customers based on these factors, then our solar and wind energy-based business will not grow. Traditional utilities generally have substantially greater financial, technical, operational and other resources than we do. As a result of their greater size, these competitors may be able to devote more resources to the research, development, promotion and sale of their products or respond more quickly to evolving industry standards and changes in market conditions than we can. Conventional utilities could also offer other value-added products or services that could help them to compete with us even if the cost of electricity they offer is higher than ours. In addition, a majority of conventional utilities’ sources of electricity is non-renewable, which may allow them to sell electricity more cheaply than electricity generated by our solar and wind energy systems.

We also face competition in the energy efficiency evaluation and upgrades market and we expect to face competition as we introduce new energy-related products and services. As the solar and wind industries grow and evolve, we will also face new competitors who are not currently in the market. Our failure to adapt to changing market conditions and to compete successfully with existing or new competitors will limit our growth and will have a material adverse effect on our business and prospects.

There are a limited number of purchasers of utility-scale quantities of electricity, which exposes us and our utility-scale projects to additional risk.

Since the transmission and distribution of electricity is either monopolized or highly concentrated in most jurisdictions, there are a limited number of possible purchasers for utility-scale quantities of electricity in a given geographic location, including transmission grid operators, state and investor-owned power companies, public utility districts and cooperatives. As a result, there is a concentrated pool of potential buyers for electricity generated by our plants and projects, which may restrict our ability to negotiate favorable terms under new PPAs and could impact our ability to find new customers for the electricity generated by our generation facilities should this become necessary. Additionally, the PPAs in India, Thailand, China and Peru are in the standard form prescribed by the utilities and accordingly, we have limited or no ability to negotiate the terms of such PPAs. Furthermore, if the financial condition of these utilities and/or power purchasers deteriorated or government policies or regulations to which they are currently subject that compel them to source renewable energy supplies change, demand for electricity produced by our plants could be negatively impacted. In addition, provisions in our power sale arrangements or applicable laws may provide for the curtailment of delivery of electricity for various reasons, including to prevent damage to transmission systems, for system emergencies, force majeure or for economic reasons. Such curtailment would reduce revenues to us from power sale arrangements. If we cannot enter into power sale arrangements on terms favorable to us, or at all, or if the purchaser under our power sale arrangements were to exercise its curtailment or other rights to reduce purchases or payments under such arrangements, our revenues and our decisions regarding development of additional projects may be adversely affected.

 

59


Table of Contents

A significant deterioration in the financial performance of our commercial, industrial or government customers could materially adversely affect our distributed generation business.

The financial performance of our distributed generation business depends in part upon the continued viability and financial stability of our customers in the commercial, industrial and governmental sectors. If our commercial, industrial or governmental customers are materially and adversely affected by an economic downturn, increase in inflation or other factors, one or more of our largest customers could encounter financial difficulty and possibly bankruptcy. If one or more of our largest customers were to encounter financial difficulty or declare bankruptcy, they may reduce their payments under the PPA to us or stop them altogether. Any interruption or termination in payments by our customers would result in less cash being paid to the special purpose legal entities we establish to own and finance our projects, which could adversely affect the entities’ ability to pay our lenders. In such a case, the amount of distributable cash held by the entities would decrease, adversely affecting the cash flows we receive from such entities. In addition, our ability to finance additional new projects with PPAs from such customers would be adversely affected, undermining our ability to grow our business. Any reduction or termination of payments by one or more of our principal distributed generation customers could have a material adverse effect on our business, financial condition and results of operations.

The generation of electric energy from solar, wind and hydro-electric energy sources depends heavily on suitable meteorological conditions. If weather conditions are unfavorable, our electricity generation, and therefore revenue from our renewable generation facilities using our systems, may be substantially below our expectations.

The electricity produced and revenues generated by a solar electric generation facility are inherently dependent on suitable solar conditions and associated weather conditions. The operating performance of wind farms depends on wind speeds and other meteorological and physical conditions at the relevant site. The operating performance of a hydro-electric generation facility depends on favorable hydrological conditions. Objects such as buildings, trees or other wind turbines near our wind farms may reduce wind resources due to the disruption of wind flows. Furthermore, components of our system, such as solar panels and inverters or wind turbines, could be damaged by severe weather, such as hailstorms, typhoons or tornadoes. We generally will be obligated to bear the expense of repairing damage to our energy systems caused by severe weather, and replacement and spare parts for key components may be difficult or costly to acquire or may be unavailable. Unfavorable weather and atmospheric conditions could impair the effectiveness of our assets or reduce their output beneath their rated capacity or require shutdown of key equipment, impeding operation of our assets and our ability to achieve forecasted revenues and cash flows. Sustained unfavorable weather could also unexpectedly delay the installation of energy systems, which could result in a delay in us acquiring new projects or increase the cost of such projects.

Specifically, hydro-electric power generation facilities require continuous water flow for their operation. Shifts in weather or climate patterns, seasonal precipitation, the timing and rate of melting, run off and other factors beyond our control may reduce the water flow to our hydro-electric facilities. In addition, water rights are also generally owned or controlled by government entities that reserve the right to control water levels or may impose water-use requirements as a condition of license renewal. Any material reduction in the water flow to our hydro-electric facilities would limit our ability to produce and market electricity from these facilities and could have a material adverse effect on the results of our operations. For example, Brazil is currently experiencing a historic drought that has led to expansive blackouts due to the country’s reliance on hydro-electric power. The drought has affected the electricity production at certain of our hydro-electric facilities. If the drought continues in these areas it could materially reduce electricity production at certain of our hydro-electric facilities and any additional hydro-electric facilities we may acquire in the future.

 

60


Table of Contents

We base our investment decisions with respect to each energy facility on the findings of related studies conducted on-site prior to construction or based on historical conditions at existing facilities. In addition, we rely on hydrological studies and data to confirm there is sufficient water flow available to generate enough electricity for our hydro-electric projects to be economically viable and such studies may prove unreliable. However, actual climatic conditions at a facility site may not conform to the findings of these studies and, therefore, our energy facilities may not meet anticipated production levels or the rated capacity of our generation assets, which could adversely affect our business, financial condition and results of operations and cash flows. For example, in selecting sites in India, we depend on meteorological and topographical data compiled by a third-party expert as there are no feasibility or site selection studies carried out by governmental entities. There can be no assurance that the actual weather conditions will conform to the historical measured data or that the assumptions made during the assessment of the relevant site for the power project are correct.

While we currently own only solar, wind and hydro-electric energy projects, in the future we expect to expand our acquisition strategy to include other types of energy or transmission projects. To the extent that we expand our operations to include new business segments, our business operations may suffer from a lack of experience, which may materially and adversely affect our business, financial condition, results of operations and cash flows.

We have limited experience in energy generation operations other than those involving the generation of solar, wind or hydro-electric power. As a result of this lack of experience, we may be prone to errors if we expand our projects to include technologies beyond solar, wind and hydro-electric energy. We lack the technical training and experience with developing, starting or operating such other generation facilities. With no direct training or experience in these areas, our management may not be fully aware of the many specific requirements related to working in industries beyond solar, wind and hydro-electric energy generation. Additionally, we may be exposed to increased operating costs, unforeseen liabilities or risks, and regulatory and environmental concerns associated with entering new sectors of the power generation industry, which could have an adverse impact on our business as well as place us at a competitive disadvantage relative to more established non-solar, non-wind or non-hydro-electric energy market participants. In addition, such ventures could require a disproportionate amount of our management’s attention and resources. Our operations, earnings and ultimate financial success could suffer irreparable harm due to our management’s lack of experience in these industries. We may rely, to a certain extent, on the expertise and experience of industry consultants, and we may have to hire additional experienced personnel to assist us with our operations. We can offer no assurance that if we expand our business beyond solar, wind and hydro-electric energy generation, we will be able to effectively acquire and operate projects in such new areas and achieve our targeted financial goals.

Operation of power generation facilities involves significant risks and hazards that could have a material adverse effect on our business, financial condition, results of operations and cash flows. We may not have adequate insurance to cover these risks and hazards.

The ongoing operation of our facilities involves risks that include the breakdown or failure of equipment or processes or performance below expected levels of output or efficiency due to wear and tear, latent defect, design error or operator error or force majeure events, among other things. Operation of our facilities also involves risks that we will be unable to transport our product to our customers in an efficient manner due to a lack of transmission capacity. Unplanned outages of generating units, including extensions of scheduled outages, occur from time to time and are an inherent risk of our business. Unplanned outages typically increase our operation and maintenance expenses and may reduce our revenues as a result of generating and selling less power or require us to incur significant costs in connection with obtaining replacement power from third parties in the open market to satisfy our forward power sales obligations.

 

61


Table of Contents

Our inability to operate our energy assets efficiently, manage capital expenditures and costs and generate earnings and cash flows from our asset-based businesses could have a material adverse effect on our business, financial condition, results of operations and cash flows. While we maintain insurance, obtain warranties from vendors and obligate contractors to meet certain performance levels, the proceeds of such insurance, warranties or performance guarantees may not cover our lost revenues, increased expenses or liquidated damages payments should we experience equipment breakdown or non-performance by contractors or vendors.

Power generation involves hazardous activities, including delivering electricity to transmission and distribution systems. In addition to natural risks such as earthquake, drought, flood, lightning, hurricane, typhoon, maelstrom and windstorm, other hazards, such as fire, structural collapse and machinery failure, are inherent risks in our operations. These and other hazards can cause significant personal injury or loss of life, severe damage to and destruction of property, plant and equipment and contamination of, or damage to, the environment and suspension of operations. The occurrence of any one of these events may result in our being named as a defendant in lawsuits asserting claims for substantial damages, including for environmental cleanup costs, personal injury and property damage and fines and/or penalties. Brazil, for example, has established strict liability for environmental and other damages related to the operation of electric power plants. Any damages related to these occurrences could negatively impact our reputation. We maintain an amount of insurance protection that we consider adequate but we cannot provide any assurance that our insurance will be sufficient or effective under all circumstances and against all hazards or liabilities to which we may be subject. Furthermore, our insurance coverage is subject to deductibles, caps, exclusions and other limitations. A loss for which we are not fully insured could have a material adverse effect on our business, financial condition, results of operations or cash flows. Further, due to rising insurance costs and changes in the insurance markets, we cannot provide any assurance that our insurance coverage will continue to be available at all or at rates or on terms similar to those presently available. Any losses not covered by insurance could have a material adverse effect on our business, financial condition, results of operations and cash flows.

Our business is subject to substantial governmental regulation and may be adversely affected by changes in laws or regulations, as well as liability under, or any future inability to comply with, existing or future regulations or other legal requirements.

Our business is subject to extensive national, provincial, state and local laws and regulations in the countries in which we operate. Compliance with the requirements under these various regulatory regimes may cause us to incur significant costs, and failure to comply with such requirements could result in the shutdown of the non-complying facility or, the imposition of liens, fines and/or civil or criminal liability. In addition, new regulatory guidelines for renewable projects that impose stability, dependability or other requirements may lead to additional costs for our business and may reduce electricity generation during the time in which we bring the affected projects into compliance, which could have a material adverse effect on our business, financial condition, results of operations, cash flows and CAFD.

Substantially all of our assets are also subject to the rules and regulations applicable to power generators generally. If we fail to comply with these mandatory reliability standards, we could be subject to sanctions, including substantial monetary penalties, increased compliance obligations and disconnection from the grid.

Our Sponsor, and third parties with whom we have entered into or expect to enter into call rights agreements, may incur additional costs or delays in completing the construction of certain power generation facilities, which could materially adversely affect our growth strategy.

Our growth strategy is dependent to a significant degree on acquiring new clean energy projects from our Sponsor and third parties. Our Sponsor’s or such third parties’ failure to complete such projects in a timely

 

62


Table of Contents

manner, or at all, could have a material adverse effect on our growth strategy. The construction of clean energy facilities involves many risks including:

 

 

delays in obtaining, or the inability to obtain, necessary permits and licenses;

 

 

delays and increased costs related to the interconnection of new power generation facilities to the transmission system;

 

 

the inability to acquire or maintain land use and access rights;

 

 

the failure to receive contracted third-party services;

 

 

interruptions to dispatch at our facilities;

 

 

supply interruptions;

 

 

work stoppages;

 

 

labor disputes;

 

 

weather interferences;

 

 

unforeseen engineering, environmental, geological and hydrological problems;

 

 

unanticipated cost overruns in excess of budgeted contingencies;

 

 

failure of contracting parties to perform under contracts, including engineering, procurement and construction contractors; and

 

 

operations and maintenance costs not covered by warranties or that occur following expiration of warranties.

Any of these risks could cause a delay in the completion of projects under development, which could have a material adverse effect on our growth strategy.

Maintenance, expansion and refurbishment of power generation facilities involve significant risks that could result in unplanned power outages or reduced output.

Our facilities may require periodic upgrading and improvement. Any unexpected operational or mechanical failure, including failure associated with breakdowns and forced outages, and any decreased operational or management performance, could reduce our facilities’ generating capacity below expected levels, thereby reducing our revenues and jeopardizing our ability to pay dividends to holders of our Class A common stock at forecasted levels or at all. Degradation of the performance of our solar facilities above levels provided for in the related PPAs may also reduce our revenues. Unanticipated capital expenditures associated with maintaining, upgrading or repairing our facilities may also reduce profitability.

We may also choose to refurbish or upgrade our facilities based on our assessment that such activity will provide adequate financial returns. Such activities require time for capital expenditures before repowering, and key assumptions underpinning a decision to make such an investment may prove incorrect, including assumptions regarding costs, timing, available financing and future power prices. This could have a material adverse effect on our business, financial condition, results of operations and cash flows.

Moreover, spare parts for wind and hydro-electric turbines and solar facilities and key pieces of equipment may be difficult to acquire or be unavailable to us. Sources of some significant spare parts and other equipment are located outside the jurisdictions in which we operate. In addition, with respect to wind and hydro-electric projects, from time to time we may use less well known turbine suppliers, or may purchase wind and hydro-

 

63


Table of Contents

electric turbines and spare parts with less established track records. If we were to experience a shortage of or inability to acquire critical spare parts we could incur significant delays in returning facilities to full operation, which could negatively impact our business financial condition, results of operations and cash flows.

Our Sponsor and other developers of energy projects depend on a limited number of suppliers of solar panels, inverters, wind turbines, water turbines and other system components. Any shortage, delay or component price change from these suppliers could result in construction or installation delays, which could affect the number of projects we are able to acquire in the future.

Our solar projects are constructed with solar panels, inverters and other system components from a limited number of suppliers. Similarly, there are a limited number of suppliers of wind and water turbines and other related system components. This makes us susceptible to quality issues, shortages and price changes. If our Sponsor or third parties from whom we may acquire energy projects in the future fail to develop, maintain and expand relationships with these or other suppliers, or if they fail to identify suitable alternative suppliers in the event of a disruption with existing suppliers, the construction or installation of new solar, wind, hydro-electric or other clean power generation projects may be delayed or abandoned, which would reduce the number of available projects that we may have the opportunity to acquire in the future.

There have also been periods of industry-wide shortage of key components, including solar panels, in times of rapid industry growth. The manufacturing infrastructure for some of these components has a long lead time, requires significant capital investment and relies on the continued availability of key commodity materials, potentially resulting in an inability to meet demand for these components.

India recently considered an anti-dumping duty on solar cells and panels imported from China, Taiwan, Malaysia and the United States. However, there are currently no anti-dumping duties levied on such imported solar cells and panels. Moreover, we are not aware of any additional threatened tariffs and/or duties by governments on solar cells or other components and materials used in the development of solar generation facilities in the countries in which we operate or may operate in the future. However, such tariffs or duties could be imposed in the relevant jurisdictions in the future. The imposition of such tariffs or duties could hinder or reduce future development of solar generation facilities in the affected market and limit the number of solar projects we are able to acquire in such markets.

A shortage of key commodity materials could also lead to a reduction in the number of projects that we may have the opportunity to acquire in the future, or delay or increase the costs of acquisitions.

Negative public or community response to the development of power projects in general, or to the call right projects specifically, could adversely affect our ability to acquire additional projects and thereby limit our ability to grow our CAFD.

Negative public or community response to power projects in general or the call right projects specifically could adversely affect our ability to operate our power generation projects. This type of negative response can lead to legal, public relations and other challenges that impede our Sponsor’s and third-party developers’ ability to meet development and construction targets and achieve commercial operations for projects on schedule. This could lead to an adverse effect on our ability to acquire additional projects and grow our CAFD. For example, some projects in India are and have been the subject of administrative and legal challenges from groups opposed to power projects in general or concerned with potential environmental, noise, health or aesthetic impacts, impacts on property values or the rewards of property ownership, or impacts on the natural beauty of public lands and rivers. An increase in opposition to requests for permits or successful challenges or appeals to permits issued to developers of power generation projects could have a material adverse effect on our acquisition plans.

 

64


Table of Contents

In addition, negative public opinion of energy projects in particular could adversely affect our ability to operate our projects. Among concerns often cited by local community and other interest groups are objections to the aesthetic effect or noise disruption of plants and wind farms on rural sites near residential areas, reduction of farmland and the possible displacement or disruption of wildlife. We expect this type of opposition to continue as our Sponsor and other developers complete projects and construct future projects. It is possible that we may also face resistance from aboriginal communities in connection with any proposed expansion onto sites that may be subject to land claims. Opposition to our requests for permits or successful challenges or appeals to permits issued to us could lead to legal, public relations and other drawbacks and costs that impede our ability to meet our growth targets, continue operations for a project on schedule and generate revenues.

We are subject to environmental, health and safety laws and regulations and related compliance expenditures and liabilities.

Our assets are subject to numerous and significant national, provincial, state and local laws, including statutes, regulations, guidelines, policies, directives and other requirements governing or relating to, among other things: protection of wildlife, including threatened and endangered species and their habitat; air emissions; discharges into water; water use; the storage, handling, use, transportation and distribution of dangerous goods and hazardous, residual and other regulated materials, such as chemicals; the prevention of releases of hazardous materials into the environment; the prevention, investigation, monitoring and remediation of hazardous materials in soil and groundwater, both on- and off-site; land use and zoning matters; and workers’ health and safety matters. Our facilities could experience incidents, malfunctions and other unplanned events, such as spills of hazardous materials that may result in personal injury, penalties and property damage. In addition, certain environmental laws may result in liability, regardless of fault, concerning contamination at a range of properties, including properties currently or formerly owned, leased or operated by us and properties where we disposed of, or arranged for disposal of, waste. As such, the operation of our facilities carries an inherent risk of environmental, health and safety liabilities (including potential civil actions, compliance or remediation orders, fines and other penalties), and may result in our involvement from time to time in administrative and judicial proceedings relating to such matters. While we have implemented environmental, health and safety management programs designed to continually improve environmental, health and safety performance, we cannot assure you that such liabilities, as well as the costs for complying with environmental laws and regulations, will not have a material adverse effect on our business, financial condition, results of operations and cash flows.

Risks that are beyond our control, including but not limited to acts of terrorism or related acts of war, natural disasters, hostile cyber intrusions, outbreak of infectious diseases, theft or other catastrophic events, could have a material adverse effect on our business, financial condition, results of operations and cash flows.

Energy generation facilities that we acquired from our Sponsor as Contributed Projects or those that we otherwise acquire in the future, including the Call Right Projects, Third-Party Call Right Projects, any SunEdison ROFO Projects and any Renova ROFO Projects, and the properties of unaffiliated third parties on which they may be located, may be targets of terrorist activities, as well as events occurring in response to or in connection with them, that could cause environmental repercussions and/or result in full or partial disruption of the facilities’ ability to generate, transmit, transport or distribute electricity. Strategic targets, such as energy-related facilities, may be at greater risk of future terrorist activities than other domestic targets. Hostile cyber intrusions, including those targeting information systems as well as electronic control systems used at the generating plants and for the related distribution systems, could severely disrupt business operations and result in loss of service to customers, as well as create significant expense to repair security breaches or system damage. Additionally, jurisdictions in which we operate have experienced political instability. For example, Thailand experienced a coup d’état in May 2014. Events such as these may negatively impact favorable

 

65


Table of Contents

regulatory frameworks and governmental incentives that currently support our projects. If additional events such as these occur in the future, our results of operations may be negatively impacted.

Furthermore, in the future we may acquire projects and may conduct operations located in regions that are susceptible to natural disasters. The occurrence of a natural disaster, such as an earthquake, drought, flood, or typhoon, or localized extended outages of critical utilities or transportation systems, or any critical resource shortages, affecting us, SunEdison or third parties from whom we may seek to acquire projects in the future, could cause a significant interruption in our business, damage or destroy our facilities or those of our suppliers or the manufacturing equipment or inventory of our suppliers.

Additionally, certain of our power generation assets and equipment are at risk for theft, vandalism and damage. Although theft of equipment is rare, its occurrence can be significantly disruptive to our operations. For example, because we utilize copper wire as an essential component in our electricity generation and transportation infrastructure, we are at risk for copper wire theft due to an increased demand for copper. Theft of copper wire or solar panels can cause significant disruption to our operations for a period of months and can lead to operating losses at those locations.

Any such terrorist acts, environmental repercussions or disruptions, outbreak of infectious diseases resulting in quarantine or travel restrictions, natural disasters, or theft incidents could result in a significant decrease in revenues or significant reconstruction, remediation or replacement costs, beyond what could be recovered through insurance policies, which could have a material adverse effect on our business, financial condition, results of operations and cash flows.

The accounting treatment for many aspects of our energy business is complex and any changes to the accounting interpretations or accounting rules governing our energy business could have a material adverse effect on our GAAP-reported results of operations and financial results.

The accounting treatment for many aspects of our energy business is complex, and our future results could be adversely affected by changes in the accounting treatment applicable to our energy business. In particular, any changes to the accounting rules regarding the following matters may require us to change the manner in which we operate and finance our energy business:

 

 

revenue recognition and related timing;

 

 

related-party contracts;

 

 

operation and maintenance contracts;

 

 

joint venture accounting, including the consolidation of joint venture entities and the inclusion or exclusion of their assets and liabilities on our balance sheet;

 

 

long-term vendor agreements; and

 

 

foreign holding company tax treatment.

The seasonality of our operations may affect our liquidity.

We will need to maintain sufficient financial liquidity to absorb the impact of seasonal variations in energy production or other significant events. Following the completion of this offering, we expect that our principal source of liquidity will be cash generated from our operating activities, the cash retained by us for working capital purposes out of the gross proceeds of this offering and borrowing capacity under our Revolver. Our quarterly results of operations may fluctuate significantly for various reasons, mostly related to economic incentives and weather patterns.

 

66


Table of Contents

The amount of electricity our solar power generation assets produce is dependent in part on the amount of sunlight, or irradiation, where the assets are located. Because shorter daylight hours in winter months results in less irradiation, the generation of particular assets will vary depending on the season. Additionally, to the extent more of our solar power generation assets are located in the northern or southern hemisphere, overall generation of our entire asset portfolio could be impacted by seasonality. Further, time-of-day pricing factors vary seasonally which contributes to variability of revenues.

The plant load factor of wind and hydro-electric energy generators and the amount of electricity generated by, and the profitability of, our wind and hydro-electric projects depend on meteorological conditions, particularly wind and water conditions, which can vary across seasons, from year-to-year and between locations and the altitude of our wind farms. Such wind conditions are also subject to general climatic changes and changing weather patterns which are variable and difficult to predict. The wind energy generators work only when wind speeds exceed certain thresholds and if wind speeds are insufficient, the electricity output from these wind farms will decrease or cease. Extreme wind or weather conditions may also affect the productivity of the wind power projects. The hydro-electric generators are dependent on water flows in order to generate electricity. These flows may vary from season-to-season and over multi-year cycles. These flows may be affected by factors such as rainfall, snowfall and snow melt.

In addition, in India, Thailand and Malaysia, the construction of energy systems may be impacted by the monsoon season, which generally lasts from May through September. As a result, we expect our initial portfolio of power generation assets to generate the lowest amount of electricity during the third quarter of each year. We therefore expect our revenue and cash available for distribution to be lower during the third quarter.

If we fail to adequately manage the fluctuations in the timing of our projects, our business, financial condition or results of operations could be materially affected. The seasonality of our energy production may create increased demands on our working capital reserves and borrowing capacity under our Revolver during periods where cash generated from operating activities is lower. In the event that our working capital reserves and borrowing capacity under our Revolver are insufficient to meet our financial requirements, or in the event that the restrictive covenants in our Revolver restrict our access to such facilities, we may require additional equity or debt financing to maintain our solvency. There can be no assurance that additional equity or debt financing will be available when required or available on commercially favorable terms or on terms that are otherwise satisfactory to us, in which event our financial condition may be materially adversely affected.

We may be required to take action or restrict operations to mitigate hazards to air navigation and interference with other air space users.

Wind energy towers and turbines can interfere with air navigation, and solar facilities can generate glare that may have a distracting effect on pilots. There is some chance that the facilities we expect to acquire could result in adverse effects on air safety, or that we could be ordered to mark our facilities or modify operations to avoid such effects. In addition, we could incur fines or penalties in connection with the failure to property notify the proper regulatory authorities or otherwise fail to comply with regulations relating to hazardous to air navigation. In addition, wind energy facilities can interfere with military radar operations or telecommunications. If such interference occurs, we may be required to modify our operations to avoid such interference. Any of these events could have a material adverse effect on our business, financial condition and results of operations.

Harming of protected species can result in curtailment of wind project operations.

The construction and operation of energy projects can adversely affect endangered, threatened or otherwise protected animal species. Wind projects, in particular, involve a risk that protected species will be harmed, as

 

67


Table of Contents

the turbine blades travel at a high rate of speed and may strike flying animals (birds or bats) that happen to travel into the path of rotating blades. While pre-construction studies are conducted to avoid siting wind projects in areas where protected species are highly concentrated, there is often a level of unavoidable risk that flying species will be harmed by project operation.

Wind energy projects like the ones we intend to acquire are likely to strike and kill bats and birds, and occasionally strike and kill endangered or protected species. As a result, we will implement applicable industry guidelines and governmentally-recommended best practices to avoid harm to protected species, such as avoiding structures with perches, avoiding guy wires that may kill birds or bats in flight, or avoiding lighting that may attract protected species at night. In addition, we will attempt to reduce the attractiveness of a site to predatory birds by site maintenance (e.g., by mowing or removal of animal and bird carcasses).

Where possible, we will obtain permits for incidental take of protected species. Taking of protected species, even if unanticipated or if the species was not known to be present in the area prior to development of the project, can result in enforcement actions and requirements to implement mitigation strategies, which may include habitat preservation efforts or curtailment of operations.

Risks related to our international operations

We operate in emerging markets and may expand our operations into countries where we currently have no presence, which subjects us to economic, social and political risks and uncertainties.

Our initial portfolio consists of projects located in China, Brazil, India, South Africa, Honduras, Costa Rica, Nicaragua, Peru, Uruguay, Malaysia and Thailand. We intend to rapidly expand and diversify our initial project portfolio by acquiring additional utility-scale and distributed clean generation assets located in other emerging markets in Asia (except Japan), Africa and Latin America, and in similar geographies in the Middle East. Our operations in emerging markets involve a number of risks that are more prevalent than in developed markets. As a result, we are subject to a number of risks and uncertainties associated with operating and expanding internationally and in emerging markets. These include, but are not limited to:

 

 

political, social and economic instability, including wars, acts of terrorism, political unrest, boycotts, sanctions and other business restrictions;

 

 

the macroeconomic climate, including high rates of inflation, and levels of energy consumption in the countries where we have operations;

 

 

foreign exchange rate fluctuations, the imposition of currency controls and restrictions on repatriation of earnings and cash;

 

 

nationalization or other expropriation of private enterprises and land;

 

 

protectionist and other adverse public policies, including local content requirements, import/export tariffs, increased regulations or capital investment requirements;

 

 

unexpected changes in laws or enforcement practices, including those relating to land use regulations and permitting requirements, taxation policies and/or the regulatory or legislative environment in the countries in which we operate, including reductions to renewable power incentive programs or changes in renewable power pricing policies, possibly with retroactive effect;

 

 

measures restricting the ability of our facilities to access the grid to deliver electricity at certain times or at all;

 

 

the comparative cost of other sources of energy;

 

68


Table of Contents
 

longer sales and payment cycles and greater difficulty collecting accounts receivable;

 

 

inability to obtain adequate financing on attractive terms and conditions;

 

 

difficulty in developing any necessary partnerships with local businesses on commercially acceptable terms and/or timely identifying, attracting and retaining qualified technical and other personnel;

 

 

difficulty competing against competitors who may have greater financial resources and/or a more effective or established localized business presence;

 

 

international business practices that may conflict with other customs or legal requirements to which we are subject, including anti-bribery and anti-corruption laws;

 

 

any downgrading of the sovereign debt ratings of the countries in which we operate by an international rating agency;

 

 

inability to obtain, maintain or enforce intellectual property rights; and

 

 

being subject to the jurisdiction of courts other than those of the United States, including uncertainty of judicial processes and difficulty enforcing contractual agreements or judgments in foreign legal systems or incurring additional costs to do so.

For example, Thailand was assessed as a high political risk by AON Political Risk, a risk management, insurance and consulting firm. In May 2014, Thailand experienced a coup d’état, following which martial law was enforced for nearly a year. A succession crisis could cause increased instability and unrest, and the government could repeal certain incentives each project receives under Board of Investment promotion. Moreover, the Brazilian government has exercised and continues to exercise substantial influence over many aspects of the Brazilian economy. The Brazilian government’s actions to control inflation and other policies and regulations have often involved, among other measures, high interest rates, wage and price controls, currency devaluations, capital controls and limits on imports. These types of risks and uncertainties, many of which are beyond our control, could have a material adverse effect on our business, financial condition, results of operations and cash flows. Additionally, doing business in new international markets will require us to be able to respond to rapid changes in the particular market, legal, social and political conditions in these countries. We may not be able to timely develop and implement policies and strategies that will be effective in each international jurisdiction where we may decide to conduct business, which could have a material adverse effect on our business, financial condition, results of operations and cash flows.

We are exposed to foreign currency exchange risks because all of our projects are located in foreign countries.

We generate substantially all of our revenues and incur a portion of our expenses in currencies other than U.S. dollars. Changes in economic or political conditions in any of the countries in which we operate could result in exchange rate movement, new currency or exchange controls or other currency restrictions being imposed. Because our financial results are reported in U.S. dollars, if we generate revenue or earnings in other currencies, the translation of those results into U.S. dollars can result in a significant increase or decrease in the amount of those revenues or earnings. To the extent that we are unable to match revenues received in foreign currencies with costs paid in the same currency, exchange rate fluctuations in any such currency could have an adverse effect on our profitability. Substantially all of our cash flows are generated in foreign currencies and, therefore, significant changes in the value of such foreign currencies relative to the U.S. dollar could have a material adverse effect on our financial condition and our ability to meet interest and principal payments on debts denominated in U.S. dollars. In addition to currency translation risks, we incur currency transaction risks whenever we or one of our projects enter into a purchase or sales transaction using a currency other than the local currency of the transacting entity.

 

69


Table of Contents

Given the volatility of exchange rates, we cannot assure you that we will be able to effectively manage our currency transaction and/or translation risks. It is possible that volatility in currency exchange rates will have a material adverse effect on our financial condition or results of operations. We expect to experience economic losses and gains and negative and positive impacts on earnings as a result of foreign currency exchange rate fluctuations, particularly as a result of changes in the value of the Indian Rupee, the Brazilian Real and the Chinese Yuan Renminbi.

Additionally, although a portion of our revenues and expenses are denominated in foreign currencies, we will pay dividends to holders of our Class A common stock in U.S. dollars. The amount of U.S. dollar denominated dividends paid to our holders of our Class A common stock will therefore be exposed to currency exchange rate risk. Although we intend to enter into hedging arrangements to help mitigate some of this exchange rate risk, there can be no assurance that these arrangements will be sufficient. Changes in the foreign exchange rates could have a material adverse effect on our results of operations and may adversely affect the amount of cash dividends paid by us to holders of our Class A common stock.

Land title in India can be uncertain and there is no assurance of clean title.

There is no central title registry for real property in India. Property records in India are generally maintained at the state and district level and are updated manually through physical records of all land-related documents and may not be available online for inspection or updated in a timely manner. This could result in property records investigations taking a significant amount of time or being inaccurate in certain respects, which may impact the ability to rely on them. Land records are often handwritten, in local languages and not legible, which makes it difficult to determine the content. In addition, land records are often in poor condition and are at times untraceable, which materially impedes the title investigation process. Further, improperly executed, unregistered or insufficiently stamped conveyance instruments in a property’s chain of title, unregistered encumbrances in favor of third parties, rights of adverse possessors, ownership claims of family members of prior owners or third parties, or other defects that a purchaser may not be aware of, can affect the title to a property. As a result, potential disputes or claims regarding title to the land on which projects are developed or used for operations, or will be constructed in the future, may arise.

The Brazilian hydro-electric projects included in our initial product portfolio or that we may acquire as Renova ROFO Projects may fail to be eligible to participate in Brazil’s energy reallocation mechanism in the event they do not satisfy certain minimum operating performance requirements, which could have a material adverse effect on such projects’ operating results.

Brazil has adopted an energy reallocation mechanism (“MRE”) in an effort to mitigate the risks faced by hydro-electric generators due to variations in river flows, the centralized management of generation and of generation of use of water reservoirs by the National Grid Operator. Under Brazilian law, each hydro-electric project that is eligible and has elected to participate in the MRE is assigned a determined amount of “assured energy,” according to an energy supply risk criteria defined by Brazil’s Ministry of Mines and Energy based on the historical river flow records. Pursuant to the MRE, all participating projects are entitled to their assured energy, irrespective of the volume of electricity generated by them as a result of the transfer of the surplus energy from those who have produced in excess of their assured energy to those that have produced less than their assured energy. Also, we cannot be assured that our projects participating in the MRE will in the future receive their full revenue payment allocation. Participating projects are subject to decreases in their energy entitlement in the event the pool of participating projects fail to meet the aggregate specified “assured energy” production across the entire pool. In addition, in order to continue to remain in the pool of projects participating in the MRE, hydro-electric projects are required to satisfy certain minimum operating performance requirements in terms of generated energy. In the event that any such project fails to meet such requirements, it is no longer eligible to participate in the MRE and would generally only be able to receive

 

70


Table of Contents

revenue for energy that it actually produced under its PPA. The 41.8 MW project known as ESPRA that is included in our initial product portfolio has been unable to meet its minimum operating requirements due to the ongoing drought in Brazil and is no longer eligible to participate in the MRE. As a result, we cannot provide any assurance that all of our Brazilian hydro-electric projects will continue to receive revenue based on their “assured energy” rating or otherwise be eligible to participate in the MRE or that the failure to continue to be eligible to participate in the MRE will not materially and adversely affect our business, financial condition, results of operations and cash flows.

Changing laws, rules and regulations and legal uncertainties in India may adversely affect our business and operations.

The business and operations of our projects located in India are governed by various laws and regulations, such as the Electricity Act, 2003, National Electricity Policy, 2005 and National Tariff Policy, 2006, corporate, environmental and labor laws and other legislation enacted by the Indian government and the relevant state governments in India. The business and financial performance of our Indian operations could be adversely affected by any change in laws or interpretations of existing, or the promulgation of new laws, rules and regulations applicable to our Indian operations. For example, the Indian government recently adopted a new company law framework, which, among other things, imposed significant and new corporate governance requirements, accounting policies and audit matters and certain spending requirements for corporate social responsibility activities in the event a company’s net worth or turnover meets the prescribed thresholds. The Indian government also recently adopted new legislation to facilitate the acquisition of land in India, which may affect our Indian subsidiaries, including provisions stipulating restrictions on acquisition of certain types of agricultural land and compensation, rehabilitation and resettlement of affected people residing on such acquired land. There can be no assurance that the Indian government or any state government in India will not implement new regulations and policies which will require our Indian subsidiaries to obtain additional approvals and licenses or impose onerous requirements and conditions on their operations. Any such changes and the related uncertainties with respect to the implementation of regulations may have a material adverse effect on our Indian projects and our business, financial condition and results of operations.

We do not own a controlling equity interest in any of our projects located in Malaysia and may not own a controlling equity interest in any projects in Malaysia or certain projects in Thailand that we may acquire in the future due to the local law ownership requirements. As a result, our ability to control management decisions and other significant matters at these projects may be limited and our interests in such projects may be subject to transfer or other related restrictions.

We do not own a controlling equity interest in any of our projects located in Malaysia and may not own a controlling equity interest in any projects in Malaysia or certain projects in Thailand acquired in the future due to the local law ownership requirements. In the future, we are likely to acquire additional projects in which we own less than a majority of the related equity interests in such projects. With respect to our Malaysian projects, provisions of the charter documents provide us with the right to appoint all or a majority of the board of directors, as the case may be, which in turn directs management in the operation of the relevant project companies. In future investments where we do not own a controlling interest, we will seek to exert a degree of influence with respect to the management and operation of assets in which we own less than a majority of the interests by negotiating to obtain positions on management committees or to receive certain limited governance rights. However, we may not always succeed in such negotiations, and we may be dependent on our co-venturers to operate such assets. Our co-venturers may not have the level of experience, technical expertise, human resources management and other attributes necessary to operate these assets optimally. In addition, conflicts of interest may arise in the future between us and our stockholders, on the one hand, and our co-venturers, on the other hand. Further, disagreements or disputes between us and our co-venturers could result

 

71


Table of Contents

in litigation, which could increase our expenses and potentially limit the time and effort our officers and directors are able to devote to our business.

The approval of co-venturers also may be required for us to receive distributions of funds from assets or to sell, pledge, transfer, assign or otherwise convey our interest in such assets, or for us to acquire our Sponsor’s interests in such co-ventures as an initial matter. Alternatively, our co-venturers may have rights of first refusal or rights of first offer in the event of a proposed sale or transfer of our interests in such assets. These restrictions may limit the price or interest level for our interests in such assets, in the event we want to sell such interests.

Our failure to comply with South Africa’s renewable energy program could have a material adverse effect on South African energy projects.

South Africa’s renewable energy program requires all renewable energy generation projects to satisfy a number of social and economic development requirements that are complex and expensive to implement. Any failure to comply with these social and economic development requirements can result in reduced tariff payments under the applicable PPA or the ultimate termination of the PPA. In general, these requirements relate to the attainment of black economic empowerment, economic development and socio-economic development objectives. In addition, South Africa’s renewable energy program’s economic development requirements fit within the broader framework of the South African government’s empowerment program currently being implemented through the Broad-Based Black Economic Empowerment Act, or “BEE.” This law recognizes two distinct mechanisms for the achievement of BEE objectives-compliance with codes of good practice, which have already been issued, and compliance with industry-specific transformation charters. One component of BEE is achieving a certain percentage of shareholdings by black South Africans in South African businesses over a period of years. Other components include procuring goods and services from black-owned businesses or from businesses that have earned good BEE scores and achieving certain levels of black South African employment. Compliance with the codes and applicable charters are not enforced through civil or criminal sanction, but compliance will have an effect on our ability to secure contracts in the public and private sectors. If we acquire additional energy projects located in South Africa, but are unable to comply with the requirements of the renewable energy program or achieve applicable BEE objectives, it could have a material adverse effect on our business, financial condition, results of operations, cash flows and CAFD.

Labor disputes and the labor laws could have a material adverse effect on the operation and financial performance of South African projects.

Although there is a history of positive and constructive engagement with labor unions in South Africa in recent years, there have been periods during which the various stakeholders are unable to agree on dispute resolution processes resulting in significant labor disputes and disruptive labor activities. Although we expect to contract with third-parties for the operation and maintenance of our South African projects and not hire local employees for such projects, any such project will nonetheless be at risk of its operations being disrupted for indefinite periods due to labor strikes and other labor disputes related to the parties from whom we contract operating and maintenance services. Significant labor disruptions may have a material adverse effect on the operations and financial results and condition of our South African projects.

The operating results of our energy projects in China may be adversely affected by changes in governmental policies that currently subsidize renewable energy.

The Chinese government has enacted a series of financial incentives designed to promote the development of solar and wind projects. Most importantly, the feed-in tariff program currently provides that solar projects are eligible to receive increased tariffs in an amount in excess of the benchmark tariff received by local desulfurized coal-fired generating units. The amount of the tariff to be paid to the project is established by the government based on a number of factors that are designed to make the project economically viable. The operating results of a

 

72


Table of Contents

project would be adversely affected in the event the government reduced the tariff payable to one or more of our projects. There can be no assurance that the Chinese government will not elect to reduce or eliminate the ongoing tariff payments to our renewable energy projects in China.

Pursuant to the Chinese government’s Renewable Energy Law, all electrical power generated from clean and renewable energy sources is required to be purchased by the grid company provided that on-grid technical standards have been complied with and required approvals have been obtained. Nevertheless, solar and wind projects have periodically experienced periods of curtailment by the grid company due to a lack of infrastructure and transmission capacity. Curtailment results in reduced tariff payments to the project as the project is only entitled to receive payment for energy delivered to the grid companies. Our projects in China may experience periodic reductions in revenue due to curtailments attributable to limitations on the electricity grids served by these projects.

Chinese solar and wind projects typically enter into a “framework” PPA with a power grid company with an initial term typically ranging from three to five years. These framework PPAs do not necessarily specify any volume or price obligations on the part of the offtake purchaser. The solar and wind project and the power grid company will further enter into short-term agreements under the framework PPA, which are subject to automatic annual renewals. The terms of these annual supplemental agreements are subject to change to the extent the government changes its tariff rate. As a result, our projects in China will likely not have any long-term contractual protection on the price at which they may sell the power they generate. Although China has indicated an intention to keep the subsidized tariff rates in effect for the foreseeable future, it is under no obligation to do so and therefore the profitability of solar and wind projects in China is subject to change with little or no advance notice.

Changes in foreign withholding taxes could adversely affect our results of operations.

We currently conduct our operations in China, Brazil, India, South Africa, Honduras, Costa Rica, Nicaragua, Peru, Uruguay, Malaysia and Thailand and expect in the future to expand our business into other foreign countries. Currently, distributions of earnings and other payments, including interest, to us from our projects may be subject to withholding taxes imposed by the jurisdiction in which the project entities are formed or operating. Any such withholding taxes will reduce the amount of after-tax cash we can receive. In addition, we are subject to risks that foreign countries may restrict distributions from the project entities or impose additional withholding taxes or otherwise tax our foreign income. If distributions are restricted, those withholding taxes are increased or additional foreign taxes are imposed, the amount of after-tax cash we receive will be further reduced. For additional discussion of risks related to taxation, see “—Risks related to taxation—United States and foreign tax provisions and policies could change at any time, and such changes may result in a material increase in our estimated future income tax liability.”

Under renewable energy programs in certain of the countries in which we operate, renewable energy producers are required to contract with a single offtake purchaser resulting in concentrated counterparty risk.

Under South Africa’s renewable energy program, for example, the only offtake purchaser of electricity produced by renewable energy producers is Eskom, which is the country’s largest state-owned power utility that currently generates approximately 95% of South Africa’s electricity. As a result, material counterparty credit risk resides in a single public utility and not multiple local utilities. Eskom’s credit ratings have declined in recent years, and we can provide no assurances that its credit profile will not continue to deteriorate. Under its renewable energy program, the South African government guarantees the payment of Eskom’s obligations under its PPAs with renewable energy producers in defined circumstances, and in 2014 the National Treasury of South Africa announced a support package for Eskom approved by the Cabinet of South Africa. We can provide no assurance that the South African government will be able to honor its guarantee of Eskom’s obligations or

 

73


Table of Contents

that the support package approved by the National Treasury of South Africa will be sufficient in assisting Eskom in fulfilling its obligation under our PPAs. For more information, see “Business—Government incentives—South Africa.” If Eskom were to default on its performance of obligations under the applicable PPA for our South African projects, and the South African government did not fulfill its guarantee, it may have a material adverse effect on the operations, financial results and condition of our South African projects.

Our international operations require us to comply with anti-corruption laws and regulations of the United States government and various non-U.S. jurisdictions.

We operate on a global basis with projects, offices or activities on five continents. Doing business in multiple countries requires us and our subsidiaries to comply with the laws and regulations of the United States government and various non-U.S. jurisdictions. Our failure to comply with these rules and regulations may expose us to liabilities. These laws and regulations may apply to us, our subsidiaries, joint ventures in which we may be invested, individual directors, officers, employees and agents, and those of our Sponsor, and may restrict our operations, trade practices, investment decisions and partnering activities. In particular, our operations are subject to U.S. and foreign anti-corruption laws and regulations, such as the Foreign Corrupt Practices Act of 1977, or the “FCPA.” The FCPA prohibits United States companies and their officers, directors, employees and agents acting on their behalf from corruptly offering, promising, authorizing or providing anything of value to foreign officials for the purposes of influencing official decisions or obtaining or retaining business or otherwise obtaining favorable treatment. The FCPA also requires companies to make and keep books, records and accounts that accurately and fairly reflect transactions and dispositions of assets and to maintain a system of adequate internal accounting controls. As part of our business, we deal with state-owned business enterprises, the employees and representatives of which may be considered foreign officials for purposes of the FCPA. Additionally, we are aggressively growing our business through acquisitions, and as a result, may expose ourselves to FCPA or similar violations if our due diligence processes are unable to uncover or detect existing violations of applicable anti-corruption laws. As a result, business dealings between us and our Sponsor and any such foreign official could expose our company to the risk of violating anti-corruption laws even if such business practices may be customary or are not otherwise prohibited between our company and a private third party. Violations of these legal requirements are punishable by criminal fines and imprisonment, civil penalties, disgorgement of profits, injunctions, debarment from government contracts, as well as other remedial measures. Additionally, under certain of our PPAs such violations entitle counterparties to terminate the agreement. We have established policies and procedures designed to assist us and our personnel in complying with applicable United States and non-U.S. laws and regulations; however, we cannot assure you that these policies and procedures will completely eliminate the risk of a violation of these legal requirements, and any such violation (inadvertent or otherwise) could have a material adverse effect on our business, financial condition and results of operations.

Changes in local policies regarding high interest rates may affect the results of our operations.

Our projects are located in countries, such as Brazil, that have traditionally adopted a monetary policy that maintains high interest rates in order to offset inflation. These monetary policies can inhibit economic growth and reduce industrial power consumption. As a result, future investments in power generation may be limited due to lower market prices for electricity than currently expected.

We are subject to claims in the ordinary course of business.

We are involved in various disputes, litigation and regulatory matters incidental to our business, including employment matters, commercial disputes, government contract compliance matters, disputes regarding environmental clean-up costs and other matters arising out of the normal course of our business. For example, we are currently in a dispute with Gujarat Urja Vikas Nigam Ltd., the offtaker for certain of our Indian projects, relating to a proposed reduction of tariffs under the relevant PPAs and a change in shareholder structure that

 

74


Table of Contents

occurred following the effective dates of the relevant PPAs. If we are unsuccessful, the relevant tariffs may be reduced or the PPA may be deemed void. For more information, see “Business—Legal proceedings.” We intend to vigorously defend ourselves in such matters. From time to time, we are named as a defendant in cases as a result of our generation of electricity. While the impact of these disputes or litigation has historically been immaterial, there can be no assurance that the impact of pending or future claims will not be material to our business, financial condition or results of operations in the future.

Under Brazilian law, we are strictly liable for any damages resulting from inadequate supply of electricity to distribution companies, and our contracted insurance policies may not fully cover such damages.

Under Brazilian law, we are strictly liable for direct and indirect damages resulting from the inadequate supply of electricity to distribution companies, such as abrupt interruptions or disturbances arising from the generation, distribution or transmission systems. Accordingly, we may be held liable for such damages even if we were not at fault. As a result of the inherent uncertainty involved in these matters, we do not maintain any provisions in relation to potential damage, and these interruptions or disturbances may not be covered by our insurance policies or may exceed the coverage limits of such policies. Accordingly, if we are found liable of damages in a material amount, our financial condition and results of operations would be materially adversely affected to a greater degree than those claims where we have recorded reserve provisions.

Risks related to our relationship with our Sponsor

Our Sponsor will be our controlling stockholder and will exercise substantial influence over us, and we are highly dependent on our Sponsor.

Our Sponsor will beneficially own all of our outstanding Class B common stock upon completion of this offering. Each share of our outstanding Class B common stock will entitle our Sponsor to 100 votes on all matters presented to our stockholders generally. As a result of its ownership of our Class B common stock, our Sponsor will possess approximately     % (or approximately     % if the underwriters exercise in full their option to purchase additional shares of Class A common stock) of the combined voting power of our Class A common stock and Class B common stock even though our Sponsor will own only     % of our Class A common stock, Class B common stock and Class B1 common stock on a combined basis (or approximately     % if the underwriters exercise in full their option to purchase additional shares of Class A common stock). We intend to use any net proceeds we receive as a result of the exercise of the underwriters’ option to purchase additional shares of Class A common stock to purchase Class B Units (and shares of Class B common stock) held by our Sponsor. However, our Sponsor will continue to have a controlling interest in our voting stock and has expressed its intention to maintain a controlling interest in us going forward. As a result of this ownership, our Sponsor will continue to have a substantial influence on our affairs and its voting power will constitute a large percentage of any quorum of our stockholders voting on any matter requiring the approval of our stockholders. Such matters include the election of directors, the adoption of amendments to our amended and restated certificate of incorporation and bylaws and approval of mergers or sale of all or substantially all of our assets. This concentration of ownership may also have the effect of delaying or preventing a change in control of our company or discouraging others from making tender offers for our shares, which could prevent stockholders from receiving a premium for their shares. In addition, our Sponsor, for so long as it and its controlled affiliates possess a majority of the combined voting power, will have the power to appoint all of our directors. Our Sponsor will also have a right to specifically designate up to two additional directors to our board of directors until such time as our Sponsor and its controlled affiliates cease to own shares representing a majority voting power in us. Our Sponsor may cause corporate actions to be taken even if its interests conflict with the interests of our other stockholders (including holders of our Class A common stock). See “Certain relationships and related party transactions—Procedures for review, approval and ratification of related-person transactions; conflicts of interest.”

 

75


Table of Contents

Furthermore, we will depend on the management and administration services provided by or under the direction of our Sponsor under the Management Services Agreement. Other than personnel designated as dedicated to us, SunEdison personnel and support staff that provide services to us under the Management Services Agreement will not be required to, and we do not expect that they will, have as their primary responsibility the management and administration of our business or act exclusively for us. Under the Management Services Agreement, our Sponsor will have the discretion to determine which of its employees will perform assignments required to be provided to us under the Management Services Agreement. Certain personnel, including our Chief Executive Officer, may be designated to perform services for us and for TerraForm Power at the same time. Any failure to effectively manage our operations or to implement our strategy could have a material adverse effect on our business, financial condition, results of operations and cash flows. The Management Services Agreement will continue in perpetuity, until terminated in accordance with its terms. The non-compete provisions of the Management Services Agreement will survive termination indefinitely.

The Support Agreement provides us the option to purchase additional projects that have Projected FTM CAFD of at least $1.4 billion through the fifth anniversary of the completion of this offering. The Support Agreement also provides us a right of first offer with respect to the SunEdison ROFO Projects. Any failure by our Sponsor to perform its requirements under these arrangements or the failure by us to identify and contract with replacement service providers, if required, could adversely affect the operation of our facilities and have a material adverse effect on our business, financial condition, results of operations and cash flows.

We may not be able to consummate future acquisitions from our Sponsor.

Our ability to grow through acquisitions depends, in part, on our Sponsor’s ability to identify and present us with acquisition opportunities. While SunEdison established our company to hold and acquire a diversified suite of power-generating assets, there are a number of factors which could materially and adversely impact the extent to which suitable acquisition opportunities are made available from our Sponsor.

In particular, the question of whether a particular asset is suitable is highly subjective and is dependent on a number of factors, including an assessment by our Sponsor relating to our liquidity position at the time, the risk profile of the opportunity and its fit with the balance of our portfolio. If our Sponsor determines that an opportunity is not suitable for us, it may still pursue such opportunity on its own behalf.

In making these determinations, our Sponsor may be influenced by factors that result in a misalignment or conflict of interest. See “—Risks related to our business—We may not be able to effectively identify or consummate any future acquisitions on favorable terms, or at all. Additionally, even if we consummate acquisitions on terms that we believe are favorable, such acquisitions may in fact result in a decrease in cash available for distribution per Class A common share.”

The departure of some or all of our Sponsor’s employees, particularly executive officers or key employees, could prevent us from achieving our objectives.

Our growth strategy relies on our and our Sponsor’s executive officers and key employees for their strategic guidance and expertise in the selection of projects that we may acquire in the future. Because the solar power industry is relatively new, there is a scarcity of experienced executives and employees in the solar power industry. The same is true of the wind power industry. Our future success will depend on the continued service of these individuals. Our Sponsor has experienced departures of key professionals and personnel in the past and may do so in the future, and we cannot predict the impact that any such departures will have on our ability to achieve our objectives. The departure of a significant number of our Sponsor’s professionals or a material portion of its employees who perform services for us or on our behalf, or the failure to appoint qualified or effective successors in the event of such departures, could have a material adverse effect on our ability to

 

76


Table of Contents

achieve our objectives. The Management Services Agreement will not require our Sponsor to maintain the employment of any of its professionals that are providing services to us or, to cause any particular professional to provide services to us or on our behalf and our Sponsor may terminate the employment of any professional. Additionally, our Chief Executive Officer also serves as the chief executive officer of TerraForm Power and is not contractually or otherwise required to allocate any specific amount of time to matters pertaining to our business.

Our organizational and ownership structure may create significant conflicts of interest that may be resolved in a manner that is not in our best interests or the best interests of holders of our Class A common stock and that may have a material adverse effect on our business, financial condition, results of operations and cash flows.

Our organizational and ownership structure involves a number of relationships that may give rise to certain conflicts of interest between us and holders of our Class A common stock, on the one hand, and our Sponsor, on the other hand. Immediately prior to the completion of this offering, we will enter into the Management Services Agreement with our Sponsor. Our executive officers will be employees of our Sponsor and certain of them will continue to have equity interests in our Sponsor and TerraForm Power and, accordingly, the benefit to our Sponsor from a transaction between us and our Sponsor will proportionately inure to their benefit as holders of equity interests in our Sponsor. Following the completion of this offering, our Sponsor will be a related party under the applicable securities laws governing related party transactions and may have interests which differ from our interests or those of holders of our Class A common stock, including with respect to the types of acquisitions made, the timing and amount of dividends by Global, the reinvestment of returns generated by our operations, the use of leverage when making acquisitions and the appointment of outside advisors and service providers.

Any material transaction between us and our Sponsor (including the acquisition of Call Right Projects and SunEdison ROFO Projects) will be subject to our related party transaction policy, which will require prior approval of such transaction by our Corporate Governance and Conflicts Committee, as discussed in “Management—Committees of the board of directors—Corporate Governance and Conflicts Committee.” Those of our executive officers who will continue to have economic interests in our Sponsor following the completion of this offering may be conflicted when advising our Corporate Governance and Conflicts Committee or otherwise participating in the negotiation or approval of such transactions. These executive officers have significant project- and industry-specific expertise that could prove beneficial to our Corporate Governance and Conflicts Committee’s decision-making process and the absence of such strategic guidance could have a material adverse effect on the Corporate Governance and Conflicts Committee’s ability to evaluate any such transaction. Furthermore, the creation of our Corporate Governance and Conflicts Committee and our related party transaction approval policy may not insulate us from derivative claims pertaining to related party transactions and the conflicts of interest described in this risk factor. Regardless of the merits of such claims, we may be required to expend significant management time and financial resources in the defense thereof.

Additionally, to the extent we fail to appropriately deal with any such claims, it could negatively impact our reputation and ability to raise additional funds and the willingness of counterparties to do business with us, all of which could have a material adverse effect on our business, financial condition, results of operations and cash flows.

 

77


Table of Contents

The holder or holders of our IDRs may elect to cause Global LLC to issue Class B1 units to it or them in connection with a resetting of target distribution levels related to the IDRs, without the approval of our Corporate Governance and Conflicts Committee or the holders of Global LLC’s units, us as manager of Global LLC, or our board of directors (or any committee thereof). This could result in lower distributions to holders of our Class A common stock.

The holder or holders of a majority of the IDRs (initially our Sponsor through a wholly owned subsidiary) have the right, if the Subordination Period has expired and if we have made cash distributions in excess of the then-applicable Third Target Distribution for each of the prior four consecutive fiscal quarters, to reset the initial target distribution levels at higher levels based on Global LLC’s cash distribution levels at the time of the exercise of the reset election. The right to reset the target distribution levels may be exercised without the approval of the holders of Global LLC’s units, us, as manager of Global LLC, or our board of directors (or any committee thereof). Following a reset election, a baseline distribution amount will be calculated as an amount equal to the average cash distribution per Class A unit, Class B1 unit and Class B unit for the two consecutive fiscal quarters immediately preceding the reset election, such amount is referred to as the “Reset Minimum Quarterly Distribution,” and the target distribution levels will be reset to correspondingly higher levels based on percentage increases above the Reset Minimum Quarterly Distribution.

In connection with the reset election, the holders of the IDRs will receive Global LLC’s Class B1 units and shares of our Class B1 common stock. Therefore, the reset of the IDRs will dilute existing stockholders’ ownership. This dilution of ownership may cause dilution of future distributions per share as a higher percentage of distributions per share would go to our Sponsor or a future owner of the IDRs if the IDRs are sold.

We anticipate that our Sponsor would exercise this reset right in order to facilitate acquisitions or internal growth projects that would not be sufficiently accretive to cash distributions without such conversion. However, it is possible that our Sponsor (or another holder) could exercise this reset election at a time when Global LLC is experiencing declines in aggregate cash distributions or is expected to experience declines in its aggregate cash distributions. In such situations, the holder of the IDRs may desire to be issued Class B1 units rather than retain the right to receive incentive distributions based on the initial target distribution levels. As a result, a reset election may cause Global (which will hold all of Global LLC’s Class A units), and, in turn, holders of our Class A common stock, to experience a reduction in the amount of cash distributions that they would have otherwise received had Global LLC not issued new Class B1 units to the holders of the IDRs in connection with resetting the target distribution levels. See “Certain relationships and related party transactions—Amended and Restated Operating Agreement of Global LLC—Distributions.”

The IDRs may be transferred to a third party without the consent of holders of Global LLC’s units, us, as manager of Global LLC, or our board of directors (or any committee thereof).

Our Sponsor may not sell, transfer, exchange, pledge (other than as collateral under its credit facilities) or otherwise dispose of the IDRs to any third party (other than its controlled affiliates) until after it has satisfied its $1.4 billion aggregate Projected FTM CAFD commitment to us in accordance with the Support Agreement. Our Sponsor will pledge the IDRs as collateral under its existing credit agreement concurrently with the consummation of this offering, but the IDRs may not be transferred upon foreclosure until after our Sponsor has satisfied its Projected FTM CAFD commitment to us. After that period, our Sponsor may transfer the IDRs to a third party at any time without the consent of the holders of Global LLC’s units, us, as manager of Global LLC, or our board of directors (or any committee thereof). However, our Sponsor has granted us a right of first refusal with respect to any proposed sale of IDRs to a third party (other than its controlled affiliates), which we may exercise to purchase the IDRs proposed to be sold on the same terms offered to such third party at any time within 30 days after we receive written notice of the proposed sale and its terms. If our Sponsor transfers the IDRs to a third party, our Sponsor would not have the same incentive to grow our business and increase

 

78


Table of Contents

quarterly distributions to holders of Class A common stock over time. For example, a transfer of IDRs by our Sponsor could reduce the likelihood of our Sponsor accepting offers made by us relating to assets owned by our Sponsor, as it would have less of an economic incentive to grow our business, which in turn would impact our ability to grow our portfolio.

If we incur material tax liabilities, distributions to holders of our Class A common stock may be reduced, without any corresponding reduction in the amount of distributions paid to our Sponsor or other holders of the IDRs, Class B units and Class B1 units.

We are entirely dependent upon distributions we receive from Global LLC in respect of the Class A units held by us for payment of our expenses and other liabilities. We must make provisions for the payment of our income tax liabilities, if any, before we can use the cash distributions we receive from Global LLC to make distributions to our Class A common stockholders. If we incur material tax liabilities, our distributions to holders of our Class A common stock may be reduced. However, the cash available to make distributions to the holders of the Class B units and IDRs issued by Global LLC (all of which will initially be held by our Sponsor), or to the holders of any Class B1 units that may be issued by Global LLC in connection with an IDR reset or otherwise, will not be reduced by the amount of our tax liabilities. As a result, if we incur material tax liabilities, distributions to holders of our Class A common stock may be reduced, without any corresponding reduction in the amount of distributions paid to our Sponsor or other holders of the IDRs, Class B units and Class B1 units of Global LLC.

Our ability to terminate the Management Services Agreement early will be limited.

The Management Services Agreement will provide that we may terminate the agreement upon 90 days’ prior written notice to our Sponsor upon the occurrence of any of the following: (i) our Sponsor defaults in the performance or observance of any material term, condition or covenant contained therein in a manner that results in material harm to us and the default continues unremedied for a period of 30 days after written notice thereof is given to our Sponsor; (ii) our Sponsor engages in any act of fraud, misappropriation of funds or embezzlement that results in material harm to us; (iii) our Sponsor is grossly negligent in the performance of its duties under the agreement and such negligence results in material harm to us; (iv) upon the happening of certain events relating to the bankruptcy or insolvency of our Sponsor; (v) upon the earlier to occur of the five-year anniversary of the date of the agreement and the end of any twelve-month period ending on the last day of a calendar quarter during which we generated cash available for distribution in excess of $         million; or (vi) on such date as our Sponsor and its affiliates no longer beneficially hold more than 50% of the voting power of our capital stock. Furthermore, if we request an amendment to the scope of services provided by our Sponsor under the Management Services Agreement and we are not able to agree with our Sponsor as to a change to the service fee resulting from a change in the scope of services within 180 days of the request, we will be able to terminate the agreement upon 30 days’ prior notice to our Sponsor.

We will not be able to terminate the agreement for any other reason, and the agreement continues in perpetuity until terminated in accordance with its terms. The Management Services Agreement includes non-compete provisions that will prohibit us from engaging in certain activities competitive with our Sponsor’s power project development and construction business. These non-compete provisions will survive termination indefinitely. If our Sponsor’s performance does not meet the expectations of investors, and we are unable to terminate the Management Services Agreement, the market price of our Class A common stock could suffer.

If our Sponsor terminates the Management Services Agreement or defaults in the performance of its obligations under the agreement, we may be unable to contract with a substitute service provider on similar terms, or at all.

We will rely on our Sponsor to provide us with management services under the Management Services Agreement and will not have independent executive, senior management or other personnel. The Management

 

79


Table of Contents

Services Agreement will provide that our Sponsor may terminate the agreement upon 90 days’ prior written notice of termination to us upon the occurrence of any of the following: (i) we default in the performance or observance of any material term, condition or covenant contained in the agreement in a manner that results in material harm to our Sponsor and the default continues unremedied for a period of 30 days after written notice of the breach is given to us; (ii) upon the happening of certain events relating to our bankruptcy or insolvency; (iii) upon the earlier to occur of the five-year anniversary of the date of the agreement and the end of any twelve-month period ending on the last day of a calendar quarter during which we generated cash available for distribution in excess of $          million; or (iv) on such date as our Sponsor and its affiliates no longer beneficially hold more than 50% of the voting power of our capital stock. If our Sponsor terminates the Management Services Agreement or defaults in the performance of its obligations under the agreement, we may be unable to contract with a substitute service provider on similar terms or at all, and the costs of substituting service providers may be substantial. In addition, in light of our Sponsor’s familiarity with our assets, a substitute service provider may not be able to provide the same level of service due to lack of pre-existing synergies. If we cannot locate a service provider that is able to provide us with substantially similar services as our Sponsor does under the Management Services Agreement on similar terms, it would likely have a material adverse effect on our business, financial condition, results of operation and cash flows.

We must still agree on a number of additional matters covered by the Support Agreement, including the timeline for the Call Right Projects.

Pursuant to the Support Agreement, our Sponsor will provide us with the right, but not the obligation, to purchase for cash certain clean energy projects from its project pipeline with aggregate Projected FTM CAFD of at least $1.4 billion by the fifth anniversary of the completion of this offering. Our Sponsor may, however, remove a project under construction from the Call Right Project list if, in its reasonable discretion, a project is unlikely to be successfully completed or, with respect to an operating Call Right Project, if we have not exercised the call right with respect to such project within twelve months of it being included in the Support Agreement. In that case, the Sponsor will be required to replace such project with one or more additional reasonably equivalent projects that have a similar economic profile.

The Support Agreement also provides that our Sponsor is required to offer us additional qualifying Call Right Projects from its pipeline on a quarterly basis until we have acquired Call Right Projects that are projected to generate the specified minimum amount of Projected FTM CAFD covered by the Support Agreement. These additional Call Right Projects must satisfy certain criteria, including being subject to a fully executed PPA (or expected to have a fully executed PPA prior to the commencement of commercial operations) with a creditworthy counterparty. The price for each Call Right Project will be the fair market value. The Support Agreement provides that we will work with our Sponsor to mutually agree on the fair market value and Projected FTM CAFD of each Call Right Project within a reasonable time after it is added to the list of identified Call Right Projects. If we are unable to agree on the fair market value or Projected FTM CAFD for a project within 90 calendar days after it is added to the list (or such shorter period as will still allow us to complete the call right exercise process), we or our Sponsor, upon written notice from either party, will engage a third-party advisor to determine the disputed item so that such material economic terms reflect common practice in the relevant market. The other economic terms with respect to our purchase of a Call Right Project will also be determined by mutual agreement or, if we are unable to reach agreement, by a third-party advisor. We may not achieve all of the expected benefits from the Support Agreement if we are unable to mutually agree with our Sponsor with respect to these matters. Until the price for a Call Right Project is agreed or determined, in the event our Sponsor receives a bona fide offer for a Call Right Project from a third party, we have the right to match the price offered by such third party and acquire such Call Right Project on the terms our Sponsor could obtain from the third party. In addition, our effective remedies under the Support Agreement may also be limited in the event that a material dispute with our Sponsor arises under the terms of the Support Agreement.

 

80


Table of Contents

In addition, our Sponsor has agreed to grant us a right of first offer on any of the SunEdison ROFO Projects that it determines to sell or otherwise transfer during the six-year period following the completion of this offering. Under the terms of the Support Agreement, our Sponsor will agree to negotiate with us in good faith, for a period of 20 days, to reach an agreement with respect to any proposed sale of a SunEdison ROFO Project for which we have exercised our right of first offer before it may sell or otherwise transfer such SunEdison ROFO Project to a third party. However, our Sponsor will not be obligated to sell any of the SunEdison ROFO Projects and, as a result, we do not know when, if ever, any SunEdison ROFO Projects will be offered to us. Furthermore, in the event that our Sponsor elects to sell SunEdison ROFO Projects, our Sponsor will not be required to accept any offer we make and may choose to sell the assets to a third party or not sell the assets at all.

The liability of our Sponsor is limited under our arrangements with it and we have agreed to indemnify our Sponsor against claims that it may face in connection with such arrangements, which may lead it to assume greater risks when making decisions relating to us than it otherwise would if acting solely for its own account.

Under the Management Services Agreement, our Sponsor will not assume any responsibility other than to provide or arrange for the provision of the services described in the Management Services Agreement in good faith. In addition, under the Management Services Agreement, the liability of our Sponsor and its affiliates will be limited to the fullest extent permitted by law to conduct involving bad faith, fraud, willful misconduct or gross negligence or, in the case of a criminal matter, action that was known to have been unlawful. In addition, we will agree to indemnify our Sponsor to the fullest extent permitted by law from and against any claims, liabilities, losses, damages, costs or expenses incurred by an indemnified person or threatened in connection with our operations, investments and activities or in respect of or arising from the Management Services Agreement or the services provided by our Sponsor, except to the extent that the claims, liabilities, losses, damages, costs or expenses are determined to have resulted from the conduct in respect of which such persons have liability as described above. These protections may result in our Sponsor tolerating greater risks when making decisions than otherwise would be the case, including when determining whether to use leverage in connection with acquisitions. The indemnification arrangements to which our Sponsor is a party may also give rise to legal claims for indemnification that are adverse to us or holders of our Class A common stock.

Risks inherent in an investment in us

We may not be able to continue paying comparable or growing cash dividends to holders of our Class A common stock in the future.

The amount of our cash available for distribution principally depends upon the amount of cash we generate from our operations, which will fluctuate from quarter to quarter based on, among other things:

 

 

the level and timing of capital expenditures we make;

 

 

the completion of ongoing construction activities on time and on budget;

 

 

the level of our operating and general and administrative expenses, including reimbursements to our Sponsor for services provided to us in accordance with the Management Services Agreement;

 

 

seasonal variations in revenues generated by the business;

 

 

our debt service requirements and other liabilities;

 

 

fluctuations in our working capital needs;

 

 

our ability to borrow funds and access capital markets;

 

 

fluctuations in foreign exchange rates;

 

81


Table of Contents
 

restrictions contained in our debt agreements (including our project-level financing, the indenture governing the Senior Notes and, if applicable, our Revolver); and

 

 

other business risks affecting our cash levels.

As a result of all these factors, we cannot guarantee that we will have sufficient cash generated from operations to pay a specific level of cash dividends to holders of our Class A common stock. Furthermore, holders of our Class A common stock should be aware that the amount of cash available for distribution depends primarily on our cash flow, and is not solely a function of profitability, which is affected by non-cash items. We may incur other expenses or liabilities during a period that could significantly reduce or eliminate our cash available for distribution and, in turn, impair our ability to pay dividends to holders of our Class A common stock during the period. Because we are a holding company, our ability to pay dividends on our Class A common stock is limited by restrictions on the ability of our subsidiaries to pay dividends or make other distributions to us, including restrictions under the terms of the agreements governing project-level financing. Our project-level financing agreements generally prohibit distributions from the project entities prior to COD and, in certain cases, for a period after COD, and thereafter prohibit distributions to us unless certain specific conditions are met, including the satisfaction of financial ratios, and, in the case of our Indian projects, the consent of the lender is obtained. Our Revolver and the indenture governing the Senior Notes will also restrict our ability to declare and pay dividends if an event of default has occurred and is continuing or if the payment of the dividend would result in an event of default.

Global LLC’s CAFD will likely fluctuate from quarter to quarter, in some cases significantly, due to seasonality. See “Management’s discussion and analysis of financial condition and results of operations—Factors that significantly affect our results of operations and business—Seasonality.” As a result, we may cause Global LLC to reduce the amount of cash it distributes to its members in a particular quarter to establish reserves to fund distributions to its members in future periods for which the cash distributions we would otherwise receive from Global LLC would otherwise be insufficient to fund our quarterly dividend. If we fail to cause Global LLC to establish sufficient reserves, we may not be able to maintain our quarterly dividend with respect to a quarter adversely affected by seasonality.

Finally, dividends to holders of our Class A common stock will be paid at the discretion of our board of directors. Our board of directors may decrease the level of or entirely discontinue payment of dividends. For a description of additional restrictions and factors that may affect our ability to pay cash dividends, please read “Cash dividend policy.”

Capital controls could limit our ability to finance the acquisition of renewable energy projects and our ability to repatriate cash.

Certain jurisdictions in which projects in our initial portfolio are located or in which we expect to acquire projects in the future impose capital controls that either restrict investment by foreign sources, restrict the transfer of capital to foreign recipients or both. For example, South Africa currently has an exchange control regime which includes restrictions on exporting capital from South Africa and which may accordingly place constraints on cash flows from the South African projects. While exchange controls have been relaxed in recent years, South African companies remain subject to restrictions on their ability to raise and deploy capital outside of the Southern African Common Monetary Area. Similarly, companies incorporated in India are subject to regulatory restrictions on borrowing in foreign currencies and the granting of security interests in collateral. Such restrictions could limit our ability to raise financings on competitive terms and refinance existing indebtedness. Additionally, our ability to borrow money against the collateral located in India is subject to exchange control regulations in India and may require the prior approval of the Indian regulatory authorities.

 

82


Table of Contents

The assumptions underlying the forecasts and targeted growth rate presented elsewhere in this prospectus are inherently uncertain and subject to significant business, economic, financial, regulatory and competitive risks that could cause our actual cash available for distribution, in the aggregate and/or on a per-share basis, to differ materially from our forecasts.

The forecasts presented elsewhere in this prospectus only include projects that are in our initial portfolio and were prepared using assumptions that our management believes are reasonable. See “Cash dividend policy—Assumptions and considerations.” These include assumptions regarding the future operating costs of our facilities, the dates that projects in our initial portfolio will reach COD, our facilities’ future level of power generation, interest rates, administrative expenses, tax treatment of income, future capital expenditure requirements, budget and the absence of material adverse changes in economic conditions or government regulations. They also include assumptions based on solar and wind resource studies and hydrological evaluations that take into account meteorological conditions and on the availability of our facilities. The forecasts assume that no unexpected risks materialize during the forecast periods. Any one or more than one of these assumptions may prove to be incorrect, in which case our actual results of operations will be different from, and possibly materially worse than, those contemplated by the forecasts. There can be no assurance that the assumptions underlying the forecasts presented elsewhere in this prospectus will prove to be accurate. Actual results for the forecast periods will likely vary from the forecast results and those variations may be material. We make no representation that actual results achieved in the forecast periods will be the same, in whole or in part, as those forecasted herein.

The factors described above may also impact our ability to achieve our target dividend per share annual growth rate over the three-year period following the completion of this offering. This target assumes that no unexpected risks materialize over the next three years and is based on additional assumptions, including the market value of projects we acquire from third parties, our cost of capital, the ratio of debt to equity with respect to the financing of acquisitions and whether we have the financial resources to acquire call right projects and the timing of such acquisitions. Even if the Projected FTM CAFD commitment is satisfied we may not achieve the targeted growth rate. Our Sponsor is not obligated to sell us any of the Call Right Projects at a price that will allow us to achieve our targeted growth rate. Accordingly, we may not be able to consummate acquisitions with our Sponsor or unaffiliated third parties that enable us to achieve our targeted growth rate.

On a pro forma basis, we would not have had sufficient CAFD to pay the full initial quarterly distribution on all of our common units for the three months ended March 31, 2015 or the year ended December 31, 2014.

Global LLC must generate approximately $         million and $         million of CAFD for us to pay the aggregate initial quarterly distributions for the next one and four quarters, respectively, on all of our common stock that will be outstanding immediately following this offering, assuming no reserves are established. The amount of pro forma CAFD was $166.2 million and $32.4 million for the three months ended March 31, 2015 and for the year ended December 31, 2014, respectively, which would have allowed us to pay     % and     % of the aggregate initial quarterly distribution on all of our common stock during those periods. For a calculation of our ability to make cash distributions to our stockholders based on our historical as adjusted results, see “Cash distribution policy.” If Global LLC is not able to generate additional cash for distribution to us in future periods, we may not be able to pay the full initial quarterly distribution or any amount on our common stock, in which event the market price of our Class A common stock may decline materially.

We are a holding company and our only material asset after completion of this offering will be our interest in Global LLC, and we are accordingly dependent upon distributions from Global LLC and its subsidiaries to pay dividends and taxes and other expenses.

Global is a holding company and has no material assets other than its ownership of membership interests in Global LLC, a holding company that will have no material assets other than its interest in Global Operating LLC,

 

83


Table of Contents

whose sole material assets are the projects that have been or will be contributed to it by SunEdison in the Contributed Projects and the projects that have been or will be acquired through any acquisitions. None of Global, Global LLC or Global Operating LLC have any independent means of generating revenue. We intend to cause Global Operating LLC’s subsidiaries to make distributions to Global Operating LLC and, in turn, make distributions to Global LLC, and, Global LLC, in turn, to make distributions to Global in an amount sufficient to cover all applicable taxes payable and dividends, if any, declared by us. To the extent that we need funds to pay a quarterly cash dividend to holders of our Class A common stock or otherwise, and Global Operating LLC or Global LLC is restricted from making such distributions under applicable law or regulation or is otherwise unable to provide such funds (including as a result of Global Operating LLC’s operating subsidiaries being unable to make distributions), it could materially adversely affect our liquidity and financial condition and limit our ability to pay dividends to holders of our Class A common stock.

Market interest rates may have an effect on the value of our Class A common stock.

One of the factors that will influence the price of shares of our Class A common stock will be the effective dividend yield of such shares (i.e., the yield as a percentage of the then current market price of our shares) relative to market interest rates. An increase in market interest rates, which are currently at low levels relative to historical rates, may lead prospective purchasers of shares of our Class A common stock to expect a higher dividend yield. If market interest rates increase and we are unable to increase our dividend in response, including due to an increase in borrowing costs, insufficient cash available for distribution or otherwise, investors may seek alternative investments with higher yield, which would result in selling pressure on, and a decrease in the market price of, our Class A common stock. As a result, the price of our Class A common stock may decrease as market interest rates increase.

If you purchase shares of Class A common stock sold in this offering, you will incur immediate and substantial dilution.

If you purchase shares of Class A common stock in this offering, you will incur immediate and substantial dilution in the amount of $         per share, because the assumed initial public offering price of $         per share (which is the midpoint of the price range set forth on the cover page of this prospectus) is substantially higher than the as adjusted net tangible book value per share of our outstanding Class A common stock on an as adjusted basis giving effect to the Organizational Transactions. The as adjusted net tangible book value of our Class A common stock is $         per share. For additional information, see “Dilution.”

If we are deemed to be an investment company, we may be required to institute burdensome compliance requirements and our activities may be restricted, which may make it difficult for us to complete strategic acquisitions or effect combinations.

If we are deemed to be an investment company under the Investment Company Act of 1940, or the “Investment Company Act,” our business would be subject to applicable restrictions under the Investment Company Act, which could make it impractical for us to continue our business as contemplated.

We believe our company is not an investment company under Section 3(b)(1) of the Investment Company Act because we are primarily engaged in a non-investment company business, and we intend to conduct our operations so that we will not be deemed an investment company. However, if we were to be deemed an investment company, restrictions imposed by the Investment Company Act, including limitations on our capital structure and our ability to transact with affiliates, could make it impractical for us to continue our business as contemplated.

 

84


Table of Contents

Market volatility may affect the price of our Class A common stock and the value of your investment.

Following the completion of this offering, the market price for our Class A common stock is likely to be volatile, in part because our shares have not been previously traded publicly. We cannot predict the extent to which a trading market will develop or how liquid that market may become. If you purchase shares of our Class A common stock in this offering, you will pay a price that was not established in the public trading markets. The initial public offering price will be determined by negotiations between the underwriters and us. You may not be able to resell your shares above the initial public offering price and may suffer a loss on your investment. In addition, the market price of our Class A common stock may fluctuate significantly in response to a number of factors, most of which we cannot predict or control, including general market and economic conditions, disruptions, downgrades, credit events and perceived problems in the credit markets; actual or anticipated variations in our quarterly operating results or dividends; changes in our investments or asset composition; write-downs or perceived credit or liquidity issues affecting our assets; market perception of our Sponsor, our business and our assets; our level of indebtedness and/or adverse market reaction to any indebtedness we incur in the future; our ability to raise capital on favorable terms or at all; loss of any major funding source; the termination of the Management Services Agreement or additions or departures of our Sponsor’s key personnel; changes in market valuations of similar power generation companies; and speculation in the press or investment community regarding us or our Sponsor.

In addition, securities markets in general have experienced extreme volatility that has often been unrelated to the operating performance of particular companies. Any broad market fluctuations may adversely affect the trading price of our Class A common stock.

We are a “controlled company,” controlled by our Sponsor, whose interest in our business may be different from ours or yours.

Each share of our Class B common stock will entitle our Sponsor or its controlled affiliates to 100 votes on matters presented to our stockholders generally. Following the completion of this offering, our Sponsor will own all of our Class B common stock, representing     % of our Class A common stock, Class B common stock and Class B1 common stock on a combined basis and representing approximately     % of our combined voting power, based on the assumptions set forth in “Summary—The offering—Certain assumptions,” including no exercise by the underwriters of their option to purchase additional shares. Therefore, our Sponsor will control a majority of the vote on all matters submitted to a vote of the stockholders including the election of our directors, for the foreseeable future following this offering even if its ownership of our Class B common stock represents less than 50% of the outstanding Class A common stock, Class B common stock and Class B1 common stock on a combined basis. As a result, we will be considered a “controlled company” for the purposes of the NASDAQ Global Select Market listing requirements. As a “controlled company,” we will be permitted to opt out of the NASDAQ Global Select Market listing requirements that would require (i) a majority of the members of our board of directors to be independent, (ii) that we establish a compensation committee and a nominating and governance committee, each comprised entirely of independent directors, or (iii) an annual performance evaluation of the nominating and governance and compensation committees. We intend to rely on exceptions with respect to having a majority of independent directors, establishing a compensation committee or nominating committee and annual performance evaluations of such committees.

The NASDAQ Global Select Market listing requirements are intended to ensure that directors who meet the independence standard are free of any conflicting interest that could influence their actions as directors. As further described above in “—Risks related to our relationship with our Sponsor,” it is possible that the interests of our Sponsor may in some circumstances conflict with our interests and the interests of holders of our Class A common stock. Should our Sponsor’s interests differ from those of other stockholders, the other stockholders

 

85


Table of Contents

may not have the same protections afforded to stockholders of companies that are subject to all of the corporate governance rules for listed companies. Our status as a controlled company could make our Class A common stock less attractive to some investors or otherwise harm our stock price.

Provisions of our charter documents or Delaware law could delay or prevent an acquisition of us, even if the acquisition would be beneficial to holders of our Class A common stock, and could make it more difficult for you to change management.

Provisions of our amended and restated certificate of incorporation and bylaws may discourage, delay or prevent a merger, acquisition or other change in control that holders of our Class A common stock may consider favorable, including transactions in which such stockholders might otherwise receive a premium for their shares. This is because these provisions may prevent or frustrate attempts by stockholders to replace or remove members of our management. These provisions include:

 

 

a prohibition on stockholder action through written consent once our Sponsor ceases to hold a majority of the combined voting power of our common stock;

 

 

a requirement that special meetings of stockholders be called upon a resolution approved by a majority of our directors then in office;

 

 

the right of our Sponsor as the holder of our Class B common stock, to appoint up to two additional directors to our board of directors;

 

 

advance notice requirements for stockholder proposals and nominations; and

 

 

the authority of the board of directors to issue preferred stock with such terms as the board of directors may determine.

Section 203 of the Delaware General Corporation Law, or the “DGCL,” prohibits a publicly held Delaware corporation from engaging in a business combination with an interested stockholder, generally a person that together with its affiliates owns or within the last three years has owned 15% of voting stock, for a period of three years after the date of the transaction in which the person became an interested stockholder, unless the business combination is approved in a prescribed manner. As a result of these provisions in our charter documents following the completion of the Organizational Transactions and Delaware law, the price investors may be willing to pay in the future for shares of our Class A common stock may be limited. See “Description of capital stock—Antitakeover effects of Delaware law and our certificate of incorporation and bylaws.”

You may experience dilution of your ownership interest due to the future issuance of additional shares of our Class A common stock.

We are in a capital intensive business, and may not have sufficient funds to finance the growth of our business, future acquisitions or to support our projected capital expenditures. As a result, we may require additional funds from further equity or debt financings, including sales of preferred shares or convertible debt to complete future acquisitions, expansions and capital expenditures and pay the general and administrative costs of our business. In the future, we may issue our previously authorized and unissued securities, resulting in the dilution of the ownership interests of purchasers of our Class A common stock offered hereby. Under our amended and restated certificate of incorporation, we will be authorized to issue              shares of Class A common stock,              shares of Class B common stock,              shares of Class B1 common stock and              shares of preferred stock with preferences and rights as determined by our board of directors. The potential issuance of additional shares of common stock or preferred stock or convertible debt may create downward pressure on the trading price of our Class A common stock. We may also issue additional shares of our Class A common stock or other securities that are convertible into or exercisable

 

86


Table of Contents

for our Class A common stock in future public offerings or private placements for capital raising purposes or for other business purposes, potentially at an offering price, conversion price or exercise price that is below the offering price for our Class A common stock in this offering.

If securities or industry analysts do not publish or cease publishing research or reports about us, our business or our market, or if they change their recommendations regarding our Class A common stock adversely, the stock price and trading volume of our Class A common stock could decline.

The trading market for our Class A common stock will be influenced by the research and reports that industry or securities analysts may publish about us, our business, our market or our competitors. If any of the analysts who may cover us change their recommendation regarding our Class A common stock adversely, or provide more favorable relative recommendations about our competitors, the price of our Class A common stock would likely decline. If any analyst who may cover us were to cease coverage of our company or fail to regularly publish reports on us, we could lose visibility in the financial markets, which in turn could cause the stock price or trading volume of our Class A common stock to decline.

There is no existing market for our Class A common stock, and we do not know if one will develop with adequate liquidity to sell our Class A common stock at prices equal to or greater than the offering price.

Prior to this offering, there has not been a public market for our Class A common stock. We cannot predict the extent to which investor interest in our company will lead to the development of an active trading market on the NASDAQ Global Select Market or otherwise or how liquid that market might become. If an active trading market does not develop, you may have difficulty selling our Class A common stock that you purchase in this offering. The initial public offering price for our Class A common stock was determined by negotiations between us, SunEdison and the underwriters and may not be indicative of prices that will prevail in the open market following this offering. Consequently, you may not be able to sell our Class A common stock at prices equal to or greater than the price you paid in this offering or at all.

Future sales of our common stock by our Sponsor or the investors in the Private Placements may cause the price of our Class A common stock to fall.

The market price of our Class A common stock could decline as a result of sales of such shares (issuable to our Sponsor upon the exchange of some or all of its Class B units or Class B1 units of Global LLC) by our Sponsor into the market, by the Private Placements or the perception that these sales could occur. After the completion of this offering, we will have              shares of Class A common stock authorized and              shares of Class A common stock outstanding. The number of outstanding shares includes              shares of Class A common stock that we are selling in this offering, which may be resold immediately in the public market. All of the remaining shares of Class A common stock, or approximately              shares, or     % of our total outstanding shares of Class A common stock, and all of the outstanding shares of our Class B common stock, are restricted from immediate resale under the lock-up agreements entered into between the holders thereof, including our Sponsor, executive officers and directors, the Private Placement investors and the underwriters as described in “Underwriting (conflicts of interest).” These shares (including shares of Class A common stock issuable to our Sponsor upon the exchange of some or all of its Global LLC Class B units or Class B1 units) will become available for sale following the expiration of the lock-up agreements, which, without the prior consent of J.P. Morgan Securities LLC, Barclays Capital Inc., Citigroup Global Markets Inc. and Morgan Stanley & Co. LLC, is 180 days after the date of the closing of this offering, subject to compliance with the applicable requirements of Rule 144 promulgated under the Securities Act.

The market price of our Class A common stock may also decline as a result of our Sponsor disposing or transferring some or all of our outstanding Class B common stock, which disposals or transfers would reduce our Sponsor’s ownership interest in, and voting control over, us. These sales might also make it more difficult for us to sell equity securities at a time and price that we deem appropriate.

 

87


Table of Contents

Our Sponsor and certain of its affiliates and the investors in the Private Placements have certain demand and piggyback registration rights with respect to shares of our Class A common stock issuable upon the exchange of Class B units or Class B1 units of Global LLC. The presence of additional shares of our Class A common stock trading in the public market, as a result of the exercise of such registration rights may have a material adverse effect on the market price of our securities. See “Certain relationships and related party transactions—Registration Rights Agreement.”

Our Sponsor has pledged the shares of Class B common stock that it owns to its lenders under its credit facility. If the lenders foreclose on these shares, the market price of our shares of Class A common stock could be materially adversely affected.

Our Sponsor has pledged all of the shares of Class B common stock that it owns to its lenders as security under its credit facility with Wells Fargo Bank, National Association, as administrative agent, Goldman Sachs Bank USA and Deutsche Bank AG New York Branch, as joint lead arrangers and joint syndication agents, Goldman Sachs Bank USA, Deutsche Bank AG New York Branch, Wells Fargo Securities, LLC and Macquarie Capital (USA) Inc., as joint bookrunners, and the lenders identified in the credit agreement. If SunEdison breaches certain covenants and obligations in its credit facility, an event of default could result and the lenders could exercise their right to accelerate all the debt under the credit facility and foreclose on the pledged shares (and a corresponding number of Class B units). While the pledged shares are subject to the 180-day lock-up restrictions described in “Shares eligible for future sale—Lock-up agreements,” any future sale of the shares of Class A common stock received upon foreclosure of the pledged securities after the expiration of the lock-up period could cause the market price of our Class A common stock to decline. In addition, because SunEdison owns a majority of the combined voting power of our common stock, the occurrence of an event of default, foreclosure, and a subsequent sale of all, or substantially all, of the shares of Class A common stock received upon foreclosure of the pledged securities could result in a change of control, even when such change may not be in the best interest of our stockholders.

We will incur increased costs as a result of being a publicly traded company.

As a public company we will incur additional legal, accounting and other expenses that have not been reflected in our predecessor’s historical financial statements or our pro forma financial statements. In addition, rules implemented by the SEC and the NASDAQ Global Select Market have imposed various requirements on public companies, including establishment and maintenance of effective disclosure and financial controls and changes in corporate governance practices. Our management and other personnel will need to devote a substantial amount of time to these compliance initiatives. These rules and regulations will result in our incurrence of legal and financial compliance costs and will make some activities more time-consuming and costly. For example, we expect these rules and regulations to make it more difficult and more expensive for us to obtain director and officer liability insurance, and we may be required to accept reduced policy limits and coverage or incur substantially higher costs to obtain the same or similar coverage. As a result, it may be more difficult for us to attract and retain qualified people to serve on our board of directors, our board committees or as executive officers.

Our legal, accounting and other expenses relating to being a publicly traded company will be paid for by our Sponsor pursuant to the terms of the Management Services Agreement. The Management Services Agreement does not have a fixed term, but may be terminated by us or our Sponsor in certain circumstances, including upon the earlier to occur of (i) the five-year anniversary of the date of the agreement and (ii) the end of any twelve-month period ending on the last day of a calendar quarter during which we generated cash available for distribution in excess of $         million. Following the termination of the Management Services Agreement we will be required to pay for these expenses directly. See “Certain relationships and related party transactions—Management Services Agreement.”

 

88


Table of Contents

Our failure to achieve and maintain effective internal control over financial reporting in accordance with Section 404 of the Sarbanes-Oxley Act as a public company could have a material adverse effect on our business and share price.

Prior to completion of this offering, we have not operated as a public company and have not had to independently comply with Section 404(a) of the Sarbanes-Oxley Act. We anticipate being required to meet these standards in the course of preparing our financial statements as of and for the year ended December 31, 2016, and our management will be required to report on the effectiveness of our internal control over financial reporting for such year. Additionally, once we are no longer an emerging growth company, as defined by the JOBS Act, our independent registered public accounting firm will be required pursuant to Section 404(b) of the Sarbanes-Oxley Act to attest to the effectiveness of our internal control over financial reporting on an annual basis. The rules governing the standards that must be met for our management to assess our internal control over financial reporting are complex and require significant documentation, testing and possible remediation.

Internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements in accordance with generally accepted accounting principles. We are currently in the process of reviewing, documenting and testing our internal control over financial reporting, but we are not currently in compliance with, and we cannot be certain when we will be able to implement the requirements of Section 404(a). We may encounter problems or delays in implementing any changes necessary to make a favorable assessment of our internal control over financial reporting. In addition, we may encounter problems or delays in completing the implementation of any requested improvements and receiving a favorable assessment in connection with the attestation to be provided by our independent registered public accounting firm after we cease to be an emerging growth company. If we cannot favorably assess the effectiveness of our internal control over financial reporting, or if our independent registered public accounting firm is unable to provide an unqualified attestation report on our internal controls after we cease to be an emerging growth company, investors could lose confidence in our financial information and the price of our Class A common stock could decline.

Additionally, the existence of any material weakness or significant deficiency would require management to devote significant time and incur significant expense to remediate any such material weaknesses or significant deficiencies and management may not be able to remediate any such material weaknesses or significant deficiencies in a timely manner. The existence of any material weakness in our internal control over financial reporting could also result in errors in our financial statements that could require us to restate our financial statements, cause us to fail to meet our reporting obligations and cause shareholders to lose confidence in our reported financial information, all of which could materially and adversely affect our business and share price.

We are an “emerging growth company” and have elected in this prospectus, and may elect in future SEC filings, to comply with reduced public company reporting requirements, which could make our Class A common stock less attractive to investors.

We are an “emerging growth company,” as defined by the JOBS Act. For as long as we continue to be an emerging growth company, we may choose to take advantage of exemptions from various public company reporting requirements. These exemptions include, but are not limited to, (i) being permitted to provide only two years of audited financial statements, in addition to any required unaudited interim financial statements, with correspondingly reduced “Management’s discussion and analysis of financial condition and results of operations” disclosure; (ii) not being required to comply with the auditor attestation requirements of Section 404 of the Sarbanes-Oxley Act, (iii) reduced disclosure obligations regarding executive compensation in our periodic reports, proxy statements and registration statements, and (iv) exemptions from the requirements of holding a nonbinding advisory vote on executive compensation and stockholder approval of any golden parachute payments not previously approved. In this prospectus, we have elected to take advantage of certain

 

89


Table of Contents

of the reduced disclosure obligations regarding financial statements and executive compensation. In addition, Section 107(b) of the JOBS Act also provides that an emerging growth company can take advantage of the extended transition period provided in Section 7(a)(2)(B) of the Securities Act for complying with new or revised accounting standards. In other words, an emerging growth company can delay the adoption of certain accounting standards until those standards would otherwise apply to private companies. We are choosing to “opt in” to such extended transition period election under Section 107(b). Therefore, we are electing to delay adoption of new or revised accounting standards and, as a result, we may choose not to comply with new or revised accounting standards on the relevant dates on which adoption of such standards is required for non-emerging growth companies. As a result of such election, our financial statements may not be comparable to the financial statements of other public companies.

We could be an emerging growth company for up to five years after the first sale of our common equity securities pursuant to an effective registration statement under the Securities Act, which such fifth anniversary will occur in 2020. However, if certain events occur prior to the end of such five-year period, including if we become a “large accelerated filer,” our annual gross revenues exceed $1.0 billion or we issue more than $1.0 billion of non-convertible debt in any three-year period, we would cease to be an emerging growth company prior to the end of such five-year period. We have taken advantage of certain of the reduced disclosure obligations regarding executive compensation in this prospectus and may elect to take advantage of other reduced burdens in future filings. As a result, the information that we provide to holders of our Class A common stock may be different than you might receive from other public reporting companies in which you hold equity interests. We cannot predict if investors will find our Class A common stock less attractive as a result of our reliance on these exemptions. If some investors find our Class A common stock less attractive as a result of any choice we make to reduce disclosure, there may be a less active trading market for our Class A common stock and the price for our Class A common stock may be more volatile.

Under the JOBS Act, emerging growth companies can delay adopting new or revised accounting standards until such time as those standards apply to private companies. We have elected to avail ourselves of this extended transition period for complying with new or revised accounting standards and, therefore, we will not be subject to the same new or revised accounting standards as other public companies that are not emerging growth companies.

Risks related to taxation

In addition to reading the following risk factors, if you are a non-U.S. investor, please read “Material United States federal income tax consequences to non-U.S. holders” for a more complete discussion of the expected material United States federal income tax consequences of owning and disposing of shares of our Class A common stock.

Our future tax liability may be greater than expected if we do not generate NOLs sufficient to offset taxable income.

We expect to generate NOLs and NOL carryforwards that we can utilize to offset all but an insignificant portion of our future taxable income. Based on our current portfolio of assets and the projected allocations of depreciation and amortization deductions, and subject to tax obligations resulting from potential tax audits, we do not expect to pay significant United States federal income tax in the near term. However, in the event these losses are not generated as expected, are successfully challenged by the IRS (in a tax audit or otherwise), or are subject to future limitations as a result of an “ownership change” as discussed below, our ability to realize these future tax benefits may be limited. Any such reduction, limitation, or challenge may result in a material increase in our estimated future income tax liability and may negatively impact our business, financial condition and operating results.

 

90


Table of Contents

Our ability to use NOLs to offset future income may be limited.

Our ability to use NOLs generated in the future could be substantially limited if we were to experience an “ownership change” as defined under Section 382 of the United States Internal Revenue Code of 1986, as amended, or the “Code.” In general, an ownership change occurs if the aggregate stock ownership of certain holders (generally 5% holders, applying certain look-through and aggregation rules) increases by more than 50% over such holders’ lowest percentage ownership over a rolling three-year period. If a corporation undergoes an ownership change, its ability to use its pre-change NOL carryforwards and other pre-change deferred tax attributes to offset its post-change income and taxes may be limited. Future sales of our Class A common stock by SunEdison, as well as future issuances by us, could contribute to a potential ownership change.

A valuation allowance may be required for our deferred tax assets.

Our expected NOLs will be reflected as a deferred tax asset as they are generated until utilized to offset income. Valuation allowances may need to be maintained for deferred tax assets that we estimate are more likely than not to be unrealizable, based on available evidence at the time the estimate is made. Valuation allowances related to deferred tax assets can be affected by changes to tax laws, statutory tax rates and future taxable income levels and based on input from our auditors, tax advisors or regulatory authorities. In the event that we were to determine that we would not be able to realize all or a portion of our net deferred tax assets in the future, we would reduce such amounts through a charge to income tax expense in the period in which that determination was made, which could have a material adverse impact on our financial condition and results of operations and our ability to maintain profitability.

Distributions to holders of our Class A common stock may be taxable as dividends.

If we make distributions from current or accumulated earnings and profits as computed for United States federal income tax purposes, such distributions will generally be taxable to holders of our Class A common stock in the current period as ordinary dividend income for United States federal income tax purposes, eligible under current law for the lower tax rates applicable to qualified dividend income of non-corporate taxpayers. While we expect that a portion of our distributions to holders of our Class A common stock may exceed our current and accumulated earnings and profits as computed for United States federal income tax purposes and therefore constitute a non-taxable return of capital to the extent of a holder’s basis in our Class A common stock, no assurance can be given that this will occur.

You may be subject to Indian taxes on income arising through the sale of our equity shares.

Several of our projects are located in India. Pursuant to the Indian Income Tax Act, 1961, as amended, or “Indian Income Tax Act,” income arising directly or indirectly through the sale of a capital asset, including any share or interest in a company or entity registered or incorporated outside of India, will be taxable in India if such share or interest derives its value, directly or indirectly, substantially from assets located in India. This tax is applicable whether or not the seller of such share or interest has a residence, place of business, business connection or any other presence in India. The Indian Income Tax Act does not currently define the term “substantially.” If it is determined that these Indian Income Tax Act provisions apply to shares of our Class A common stock, any transfer of such shares may be taxable in India, subject to the protections, if any, available under a double taxation agreement entered into by the Government of India with the country of which the transferor is a resident. Budget proposals currently pending in India would define “substantially” to require the fair market value of Indian assets to represent at least 50% of the value of all assets owned by the entity. Moreover, such budget proposals would exempt from such tax persons who have not owned over 5% of the stock of the entity in question. There can be no assurance that these budget proposals will be ultimately enacted into law, or that they will be interpreted in a manner consistent with the above description.

 

91


Table of Contents

United States and foreign tax provisions and policies could change at any time, and such changes may result in a material increase in our estimated future income tax liability.

While we are a U.S. taxpayer, substantially all of our assets are located in foreign tax jurisdictions and are subject to reduced tax rates or are free of tax under various tax holidays that expire in whole or in part from time to time. Many of these holidays may be extended when certain conditions are met, or terminated if certain conditions are not met. If the tax holidays are not extended, or if we fail to satisfy the conditions of the reduced tax rate, of if a change in law revokes a tax holiday, then our effective tax rate could increase in the future. 

We are planning to elect to treat our foreign subsidiaries as “flow-through” or “pass-through” entities for United States federal income tax purposes (any such elections being solely for United States federal income tax purposes and not applying for purposes of foreign tax law), and therefore the United States generally will tax us on the earnings of those subsidiaries on a current basis, even if no income is distributed to us. We are subject to risks that foreign countries may restrict distributions from our foreign subsidiaries, in which case we would be subject to United States federal income tax on any such foreign subsidiary’s current earnings, but be unable to receive a distribution to cover the cash tax liability. With respect to any of our foreign subsidiaries that are treated as corporations for United States federal income tax purposes, their earnings generally will not be subject to United States federal income tax until those earnings are distributed to us as a dividend. At the time of the repatriation of earnings from any corporate foreign subsidiaries, the United States generally will tax the foreign earnings as a dividend, allowing a foreign tax credit for any foreign income and certain other creditable foreign taxes previously paid on the earnings.

Changes in tax rates, the expiration or revocation of tax holidays, and changes to the application of foreign tax withholding requirements in foreign jurisdictions where we own power generation assets, as well as any changes in the United States’ tax law, including changes in United States’ tax rates, treatment of income from foreign sources (including the availability of foreign tax credits), and changes to United States’ tax depreciation rules could result in a material increase in our estimated future income tax liability and may negatively impact our business, financial condition and results of operations.

 

92


Table of Contents

Cautionary statement concerning forward-looking statements

This prospectus contains forward-looking statements within the meaning of the federal securities laws. All statements other than statements of historical fact included in this prospectus are forward-looking statements. These statements relate to analyses and other information, which are based on forecasts of future results and estimates of amounts not yet determinable. These statements also relate to our future prospects, developments and business strategies. These forward-looking statements are identified by the use of terms and phrases such as “anticipate,” “believe,” “could,” “estimate,” “expect,” “intend,” “may,” “plan,” “predict,” “project,” “target,” “will” and similar terms and phrases, including references to assumptions. However, these words are not the exclusive means of identifying such statements. These statements are contained in many sections of this prospectus, including those entitled “Summary,” “Cash dividend policy,” “Management’s discussion and analysis of financial condition and results of operations” and “Business.” Although we believe that our plans, intentions and expectations reflected in or suggested by such forward-looking statements are reasonable, we cannot assure you that we will achieve those plans, intentions or expectations. All forward-looking statements are subject to risks and uncertainties that may cause actual results to differ materially from those that we expected.

The following factors, among others, could cause our actual results, performance or achievements to differ from those set forth in the forward-looking statements:

 

 

the willingness of counterparties to our offtake agreements and ability to fulfill their obligations under such agreements;

 

 

delays or unexpected developments in connection with the completion of the Pending Acquisitions;

 

 

price fluctuations, termination provisions and buyout provisions related to our offtake agreements;

 

 

our ability to enter into contracts to sell power on acceptable terms as our offtake agreements expire;

 

 

our ability to successfully identify, evaluate and consummate acquisitions;

 

 

government regulation, including compliance with regulatory and permit requirements and changes in market rules, rates, tariffs and environmental laws;

 

 

operating and financial restrictions placed on us and our subsidiaries related to agreements governing our indebtedness and other agreements of certain of our subsidiaries and project-level subsidiaries generally and in the agreement governing our Revolver and the indenture governing the Senior Notes;

 

 

our ability to borrow additional funds and access capital markets, as well as our substantial indebtedness and the possibility that we may incur additional indebtedness going forward;

 

 

changes in foreign withholding taxes and foreign currency conversion rates;

 

 

our ability to compete against conventional and other renewable energy companies;

 

 

hazards customary to the power production industry and power generation operations, such as unusual weather conditions, catastrophic weather-related or other damage to facilities, unscheduled generation outages, maintenance or repairs, interconnection problems or other developments, environmental incidents, or electric transmission constraints and the possibility that we may not have adequate insurance to cover losses as a result of such hazards;

 

 

delays or unexpected costs during the completion of construction of our projects;

 

 

our ability to expand into new business segments or new geographies;

 

93


Table of Contents
 

economic, social and political risks and uncertainties inherent in our international operations, including that we operate in emerging markets and may expand our operations into countries where we currently have no presence; and

 

 

our ability to operate our businesses efficiently, manage capital expenditures and costs tightly, manage risks related to international operations and generate earnings and cash flows from our asset-based businesses in relation to our debt and other obligations.

Additional factors that could cause actual results to differ materially from our expectations, or cautionary statements, are disclosed under the sections entitled “Risk factors” and “Management’s discussion and analysis of financial condition and results of operations” in this prospectus. All written and oral forward-looking statements attributable to us, or persons acting on our behalf, are expressly qualified in their entirety by the cautionary statements contained in this prospectus under the heading “Risk factors” as well as other cautionary statements that are made from time to time in our other SEC filings and public communications. You should evaluate all forward-looking statements made in this prospectus in the context of these risks and uncertainties.

We caution you that the important factors referenced above may not contain all of the factors that are important to you. In addition, we cannot assure you that we will realize the results or developments we expect or anticipate or, even if substantially realized, that they will result in the consequences or affect us or our operations in the way we expect. The forward-looking statements included in this prospectus are made only as of the date hereof. We undertake no obligation to publicly update or revise any forward-looking statement as a result of new information, future events or otherwise, except as otherwise required by law.

 

94


Table of Contents

Use of proceeds

Assuming no exercise of the underwriters’ option to purchase additional shares of Class A common stock, we expect to receive approximately $         million of net proceeds from the sale of the Class A common stock offered hereby based upon the assumed initial public offering price of $         per share, the midpoint of the range set forth on the cover page of this prospectus, after deducting underwriting discounts and commissions, the structuring fee and offering expenses payable by us. If the underwriters exercise in full their option to purchase additional shares of Class A common stock, we estimate that additional net proceeds will be approximately $         million, after deducting underwriting discounts and commissions, a pro rata portion of the structuring fee and offering expenses payable by us. We will also receive net proceeds of $         million from the sale of shares of Class A common stock in connection with the Class A Common Private Placement.

We intend to use the net proceeds from this offering and the Class A Common Private Placement to acquire newly issued Class A units of Global LLC, representing     % of Global LLC’s outstanding membership units after this offering (calculated without regard to the IDRs). Global will not retain any net proceeds from this offering or the Class A Common Private Placement.

The following table illustrates the estimated sources and uses of the funds to be used to complete the Organizational Transactions, assuming they were completed as of March 31, 2015. Actual amounts may vary from estimated amounts.

 

Sources of funds      Uses of funds  
(in millions)  

Class A common stock offered hereby(1)

   $                   

Repayment of Bridge Facility

   $                

Class A Common Private Placement

     

Acquisition consideration(3)

  

Revolver(2)

     —        

Repayment of certain project-level debt

  

Senior Notes(2)

     

Estimated fees and expenses(4)

  
  

 

 

       

 

 

 

Total sources

   $        

Total uses

   $     

 

 

 

(1)   We expect to receive approximately $         million of net proceeds from the sale of the Class A common stock offered hereby based upon the assumed initial public offering price of $         per share, the midpoint of the range set forth on the cover page of this prospectus, after deducting underwriting discounts and commissions, the structuring fee and offering expenses payable by us.

 

(2)   Concurrently with the completion of this offering, Global Operating LLC plans to (i) enter into the Revolver, which will provide for a revolving line of credit of $         million and (ii) issue the Senior Notes. The closing of the Revolver and the issuance of the Senior Notes will be conditioned upon completion of this offering, the implementation of our Organizational Transactions and other customary closing conditions. We do not expect to have any outstanding borrowings under the Revolver upon completion of this offering. See “Description of certain indebtedness—Revolving credit facility” and “—Senior Notes.”

 

(3)   Global LLC expects to use approximately $             million of net proceeds from this offering, the Class A Common Private Placement and the offering of the Senior Notes to fund the Pending Acquisitions.

 

(4)   Includes fees and expenses related to entering into the Revolver and the issuance of the Senior Notes, as well as other expenses related to the Organizational Transactions not deducted from the proceeds of this offering when computing net proceeds.

We intend to use any net proceeds we receive as a result of the exercise of the underwriters’ option to purchase additional shares to purchase Class B units and shares of Class B common stock held by our Sponsor at a price equal to the initial public offering price less the underwriting discounts and commissions, a pro rata portion of the structuring fee and offering expenses payable by us. Accordingly, we will not retain any such excess proceeds. Any such Class B units and Class B common stock purchased from our Sponsor would be immediately cancelled in connection with our receipt of a corresponding number of Class A units.

The Bridge Facility will have outstanding indebtedness of approximately $             million as of the completion of this offering but prior to its repayment. The effective interest rate on borrowings under the Bridge Facility was 8.5% as of December 31, 2014, increased by 0.50% on May 22, 2015 and increases by 0.25% each 90 days thereafter until maturity or the repayment of all outstanding indebtedness under the Bridge Facility. The Bridge Facility consists of a term loan maturing in December 2016.

 

95


Table of Contents

See “Description of certain indebtedness—Project-level financing arrangements” for additional details regarding our project-level indebtedness.

J.P. Morgan Securities LLC and/or its affiliates acted as arranger of, and is the administrative agent under, our Bridge Facility. Affiliates of each of J.P. Morgan Securities LLC, Barclays Capital Inc., Citigroup Global Markets Inc., Morgan Stanley & Co. LLC, Goldman, Sachs & Co., Merrill Lynch, Pierce, Fenner & Smith Incorporated and Deutsche Bank Securities Inc. are lenders under the Bridge Facility. Because affiliates of J.P. Morgan Securities LLC, Barclays Capital Inc., Citigroup Global Markets Inc. and Morgan Stanley & Co. LLC will each receive more than 5% of the net proceeds of this offering due to the repayment of amounts outstanding under our Bridge Facility, each of J.P. Morgan Securities LLC, Barclays Capital Inc., Citigroup Global Markets Inc. and Morgan Stanley & Co. LLC is deemed to have a conflict of interest under FINRA Rule 5121. Accordingly, this offering is being made in compliance with the requirements of FINRA Rule 5121. See “Underwriting (conflicts of interest).”

Our Sponsor will not receive any of the net proceeds or other consideration in connection with this offering, other than (i) the net proceeds used by us to purchase Class B units (and the related shares of Class B common stock) in the event the underwriters exercise their option to purchase additional shares of Class A common stock and (ii) the Class B common stock, Class B units of Global LLC and the IDRs issued to it in the Offering Transactions on account of its existing ownership interest. Following completion of this offering, we may elect to use a portion of the net proceeds to fund acquisitions from our Sponsor, including pursuant to the Support Agreement. The Class B common stock will not entitle our Sponsor to any economic interest in Global and the Class B units will entitle our Sponsor, subject to certain limitations on distributions to holders of Class B units during the Subordination Period and the Distribution Forbearance Provisions, to a     % economic interest in Global LLC.

 

96


Table of Contents

Capitalization

The following table sets forth our predecessor’s cash and cash equivalents, including restricted cash and cash committed for construction projects, and consolidated capitalization as of March 31, 2015 on: (i) a historical basis; (ii) an as adjusted basis to give effect to the Acquisitions; (iii) an as further adjusted basis to give effect to additional Formation Transactions; and (iv) an as further adjusted basis to give effect to the Offering Transactions, including this offering and the application of the net proceeds of this offering in the manner set forth under the heading “Use of proceeds.”

You should read the following table in conjunction with the sections entitled “Use of proceeds,” “Selected historical combined financial data,” “Management’s discussion and analysis of financial condition and results of operations,” “Description of certain indebtedness” and our combined financial statements and related notes thereto included elsewhere in this prospectus.

 

     March 31, 2015  
(in thousands, except share data)   Actual     As
adjusted for
Acquisitions(1)
    As further
adjusted for
additional
Formation
Transactions
    As further
adjusted for
Offering
Transactions
 
   

(unaudited)

 

Cash and cash equivalents, including cash committed for construction projects and restricted cash(2)

  $ 213,403      $ 402,079      $ 311,718      $ 245,060   
 

 

 

   

 

 

   

 

 

   

 

 

 

Long-term debt (including current portion):

       

Revolver(3)

  $      $      $      $     

Senior Notes(3)

                      

Bridge Facility(4)

    150,000        150,000        462,467          

Project-level debt(5)

    407,757        1,594,060        848,711        757,298   
 

 

 

   

 

 

   

 

 

   

 

 

 

Total long-term debt (including current portion)

  $ 557,757      $ 1,744,060      $ 1,311,178      $ 757,298   

Equity:

       

Net parent investment(6)

  $ 69,142      $ 70,749      $ 54,547      $ 32,991   

Class A common stock, par value $0.01 per share,              shares authorized, no shares issued and outstanding, actual;              shares issued and outstanding, as adjusted(7)

                      

Class B common stock, par value $0.01 per share,              shares authorized, no shares issued and outstanding, actual;              shares issued and outstanding, as adjusted(7)

                      

Class B1 common stock, par value $0.01 per share,              shares authorized, no shares issued and outstanding, actual; no shares issued and outstanding, as adjusted

                      

Preferred stock, par value $0.01 per share, no shares authorized, issued and outstanding, actual;              authorized and no shares issued and outstanding, as adjusted

                      

Additional paid-in capital(8)

                  486,250        1,364,250   

Accumulated other comprehensive (loss) income

    (22,147     (22,147     (22,147     (22,147

Non-controlling interest

           86,169        86,169        86,169   

Stockholders’ equity

           1,243,509        1,122,089        739,810   
 

 

 

   

 

 

   

 

 

   

 

 

 

Total equity

    46,995        1,378,280        1,726,908        2,200,993   
 

 

 

   

 

 

   

 

 

   

 

 

 

Total capitalization

  $ 604,752      $ 3,122,340      $ 3,038,086      $ 2,958,291   
 

 

 

   

 

 

   

 

 

   

 

 

 

 

 

 

97


Table of Contents
(1)   Amount includes adjustments for the Acquired Projects and the Pending Acquisitions.

 

(2)  

Amount includes restricted cash and cash committed for construction projects of $77.0 million (actual), $210.6 million (as adjusted for Acquisitions), $272.0 million (as adjusted for Formation Transactions) and $245.1 million (as adjusted for Offering Transactions).

 

(3)   Concurrently with the completion of this offering, Global Operating LLC plans to (i) enter into the Revolver, which will provide for a revolving line of credit of $         million and (ii) issue the Senior Notes. The closing of the Revolver and the issuance of the Senior Notes will be conditioned upon completion of this offering, the implementation of our Organizational Transactions and other customary closing conditions.

 

(4)   We entered into the Bridge Facility on December 22, 2014, which provided for borrowings of $150.0 million. On May 6, 2015, the Bridge Facility was amended to increase the aggregate principal commitment to $450 million, of which $87.5 million was subsequently prepaid with a portion of the net proceeds from the Units Private Placements. On June 5, 2015, the Bridge Facility was further amended to increase the aggregate commitment to $550.0 million. Borrowings under the Bridge Facility were used to finance acquisitions prior to the completion of this offering or to repay certain of the project-level indebtedness incurred by projects included in our initial portfolio.

 

(5)   All of our project-level indebtedness is denominated in either U.S. dollars, Indian Rupee, Malaysian Ringgit, South African Rand, Thai Baht, Brazilian Real or Chinese Yuan Renminbi. We converted such indebtedness into U.S. dollars using the applicable conversion rate as of March 31, 2015. See “Management’s discussion and analysis of financial condition and results of operations—Liquidity and capital resources—Sources of liquidity—Project-level financing arrangements” and “Description of indebtedness—Project-level financing arrangements.”

 

(6)   Net parent investment reflects our Sponsor’s interest in the predecessor. This interest will be reclassified to non-controlling interest at the closing of this offering and the other Organizational Transactions.

 

(7)   These share numbers do not give effect to the exercise of the underwriters’ option to purchase additional shares of our Class A common stock. We intend to use any net proceeds we receive as a result of any such exercise to purchase Class B units (and shares of Class B common stock) held by our Sponsor at a price equal to the initial public offering price less the underwriting discounts and commissions, a pro rata portion of the structuring fee and offering expenses payable by us. In that event, the number of shares of Class B common stock will be reduced and the number of shares of Class A common stock will be increased by a corresponding amount.

 

(8)   Represents proceeds from this offering, the Class A Common Private Placement and the Units Private Placements, net of fees, expenses and restricted cash placed in escrow.

 

98


Table of Contents

Dilution

Dilution is the amount by which the offering price paid by the purchasers of our Class A common stock sold in this offering will exceed the as adjusted net tangible book value per share of our Class A common stock after the offering. Net tangible book value per share of our Class A common stock as of a particular date represents the amount of our total tangible assets less our total liabilities divided by the number of shares of Class A common stock outstanding as of such date. As of March 31, 2015, after giving effect to the Formation Transactions, our net tangible book value would have been approximately $         million, or $         per share of Class A common stock, assuming that our Sponsor exchanged all of its Global LLC Class B units for newly issued shares of our Class A common stock on a one-for-one basis. Purchasers of our Class A common stock in this offering will experience substantial and immediate dilution in net tangible book value per share of our Class A common stock for financial accounting purposes, as illustrated in the following table.

 

Assumed initial public offering price per share            $              

Net tangible book value per share as of March 31, 2015 after giving effect to the Formation Transactions

   $                   

Increase in as adjusted net tangible book value per share attributable to purchasers in this offering and the Class A Common Private Placement

     
  

 

 

    

Net tangible book value per share after giving effect to the Organizational Transactions, including this offering and the Class A Common Private Placement and the use of proceeds therefrom

     
     

 

 

 

Immediate dilution in net tangible book value per share to purchasers in this offering and the Class A Common Private Placement

      $                

 

 

Because our Sponsor does not currently own any Class A common stock, we have presented dilution in net tangible book value per share of Class A common stock to investors in this offering assuming that our Sponsor exchanged its Global LLC Class B units for newly issued shares of our Class A common stock on a one-for-one basis in order to more meaningfully present the dilutive impact on the purchasers in this offering.

If the underwriters exercise their option to purchase additional shares of our Class A common stock in full, the net tangible book value per share after giving effect to this offering would be $         per share due to the decrease in Class B common stock owned by our Sponsor and the equivalent increase in Class A common stock purchased by the underwriters. This represents an increase in net tangible book value of $         per share to our existing stockholder and dilution in net tangible book value of $         per share to purchasers in this offering.

 

99


Table of Contents

The following table sets forth, as of March 31, 2015, the differences among the number of shares of Class A common stock purchased, the total consideration paid or exchanged and the average price per share paid by (i) our Sponsor and the management stockholders, (ii) the purchasers in the Private Placements and

(iii) purchasers of our Class A common stock in this offering, based on our assumed initial public offering price of $         per share, the midpoint of the range set forth on the cover page of this prospectus, and assuming that our Sponsor exchanged all of its Global LLC Class B units for shares of our Class A common stock on a one-for-one basis and no exercise of the underwriters’ option to purchase additional shares of Class A common stock.

 

      Shares of Class A
common stock
     Total consideration     

Average
price

per
share

 
      Number    Percent      Amount      Percent     

Our Sponsor and management stockholders(1)

            %       $                          %       $                

Private Placement investors and third-party developers

            %       $               %       $     

Purchasers in the offering

            %       $               %       $     
  

 

  

 

 

    

 

 

    

 

 

    

Total

        100.0%       $           100.0%      

 

 

 

(1)   The assets contributed by our Sponsor in the Contributed Projects will be recorded at historical cost. The book value of the consideration to be provided by our Sponsor in the Contributed Projects as of March 31, 2015 was approximately $         million.

 

100


Table of Contents

Cash dividend policy

You should read the following discussion of our cash dividend policy in conjunction with “—Assumptions and considerations” below, which includes the factors and assumptions upon which we base our cash dividend policy. In addition, you should read “Cautionary statement concerning forward-looking statements” and “Risk factors” for information regarding statements that do not relate strictly to historical or current facts and certain risks inherent in our business.

This forecast of future operating results and cash available for distribution in future periods is based on the assumptions described below and other assumptions believed by us to be reasonable as of the date of this prospectus. However, we cannot assure you that any or all of these assumptions will be realized. These forward-looking statements are based upon estimates and assumptions about circumstances and events that have not yet occurred and are subject to all of the uncertainties inherent in making projections. This forecast should not be relied upon as fact or as an accurate representation of future results. Future results will be different from this forecast and the differences may be materially less favorable.

For additional information regarding our historical combined results of operations, you should refer to our audited historical combined financial statements as of and for the years ended December 31, 2013 and 2014 and unaudited historical combined financial statements as of March 31, 2015 and for the three months ended March 31, 2014 and 2015 included elsewhere in this prospectus.

General

We intend to pay regular quarterly cash dividends to holders of our Class A common stock. After determining an appropriate reserve for our working capital needs and the prudent conduct of our business, our objective is to pay our Class A common stockholders a consistent and growing cash dividend that is sustainable on a long-term basis. Based on our forecast and the related assumptions and our intentions to acquire assets with characteristics similar to those in our initial portfolio, we expect to grow our CAFD and increase our quarterly cash dividends over time. Our quarterly dividend will initially be set at $         per share of our Class A common stock, or $         per share on an annualized basis, and the amount may be changed in the future without advance notice. We established our initial quarterly dividend level based upon a targeted payout ratio by Global LLC of approximately 85% of projected annual cash available for distribution. This dividend payout ratio is not prescribed by our governing documents and is subject to change based on the discretion of our board of directors. We expect our dividend payout ratio to vary as we intend to increase our dividend despite variations in our cash available for distribution from period to period. In addition, we may adjust our dividend payout ratio from time to time based on changes in our portfolio in terms of size and scope, working capital and capital expenditure requirements, operating expenses and market conditions, including acquisition opportunities and our ability to borrow funds and access capital markets.

We expect to pay a quarterly dividend on or about the 75th day following the expiration of each fiscal quarter to holders of our Class A common stock of record on or about the 60th day following the last day of such fiscal quarter. With respect to our first dividend payable on                     , 2015 to holders of record on                     , 2015, assuming a completion date of                     , 2015, we intend to pay a pro-rated initial dividend of $         per share.

We intend to cause Global LLC to distribute a portion of its CAFD to holders of its units, including to us as the sole holder of the Class A units, to our Sponsor as the sole holder of the Class B units, pro rata based on the number of units held, and, if applicable, to the holders of the IDRs (all of which will initially be held by our Sponsor). In addition, during the Subordination Period described below, the Class B units held by our Sponsor are deemed “subordinated” because for a three-year period, the Class B units will not be entitled to receive any

 

101


Table of Contents

distributions from Global LLC until the Class A units and Class B1 units have received quarterly distributions in an amount equal to $         per unit, or the “Minimum Quarterly Distribution,” plus any arrearages in the payment of the Minimum Quarterly Distribution from prior quarters. The practical effect of the subordination of the Class B units is to increase the likelihood that during the Subordination Period there will be sufficient CAFD to pay the Minimum Quarterly Distribution on the Class A units (and Class B1 units, if any).

To reduce the effect on the Class A units of delays (if any) in the closing of the Pending Acquisitions or the completion of the Contributed Construction Projects, our Sponsor has agreed to forego distributions on its Class B units under certain circumstances. In particular, our Sponsor has agreed to forego any distributions on its Class B units with respect to the third and fourth quarters of 2015 (i.e., distributions declared on or prior to March 31, 2016), and thereafter, under certain circumstances, to forego distributions on its Class B units until the expiration of the Distribution Forbearance Period. Between March 31, 2016 and the end of the Distribution Forbearance Period our Sponsor has agreed to forego distributions on its Class B units to the extent the holders of Class A units have not received distributions in an amount equal to the Minimum Quarterly Distribution plus any arrearages in the payment of Minimum Quarterly Distributions from prior quarters. For a description of the IDRs, the Subordination Period and the Distribution Forbearance Period, including the definitions of Subordination Period, As Delivered CAFD, Closed Acquisition CAFD, CAFD Forbearance Threshold and Distribution Forbearance Period see “Certain relationships and related party transactions—Amended and Restated Operating Agreement of Global LLC—Distributions.”

Rationale for our dividend

We have established our initial quarterly dividend level after considering the amount of cash we expect to receive from Global LLC as a result of our membership interest in Global LLC after this offering. In accordance with its operating agreement and our capacity as the sole managing member, we intend to cause Global LLC to make regular quarterly cash distributions to its members in an amount equal to cash available for distribution generated during a particular quarter, less reserves for working capital needs and the prudent conduct of our business, and to use the amount distributed to us to pay regular quarterly dividends to holders of our Class A common stock.

Our cash available for distribution is likely to fluctuate from quarter to quarter, in some cases significantly, as a result of the seasonality of our assets and maintenance and outage schedules, among other factors. Accordingly, during quarters in which Global LLC generates cash available for distribution in excess of the amount necessary to distribute to us to pay our stated quarterly dividend, we may cause it to reserve a portion of the excess to fund its cash distribution in future quarters. In quarters in which we do not generate sufficient cash available for distribution to fund our stated quarterly cash dividend, if our board of directors so determines, we may use sources of cash not included in our calculation of cash available for distribution, such as net cash provided by financing activities, receipts from network upgrade reimbursements, all or any portion of the cash on hand or, if applicable, borrowings under our Revolver, to pay dividends to holders of our Class A common stock. Although these other sources of cash may be substantial and available to fund a dividend payment in a particular period, we exclude these items from our calculation of cash available for distribution because we consider them non-recurring or otherwise not representative of the operating cash flows we typically expect to generate.

Estimate of future cash available for distribution

We primarily considered forecasted cash available for distribution in assessing the amount of cash that we expect our assets will be able to generate for the purposes of our initial dividend. Accordingly, we believe that an understanding of cash available for distribution is useful to investors in evaluating our ability to pay

 

102


Table of Contents

dividends pursuant to our stated cash dividend policy. In general, we expect that “cash available for distribution” each quarter will equal net cash provided by (used in) the operating activities of Global LLC, calculated pursuant to GAAP:

 

 

plus or minus changes in assets and liabilities as reflected on our statements of cash flows;

 

 

minus deposits into (or plus withdrawals from) restricted cash accounts required by project financing arrangements to the extent they decrease (or increase) cash provided by operating activities;

 

 

minus cash distributions paid to non-controlling interests in our projects, if any;

 

 

minus scheduled project-level and other debt service payments and repayments in accordance with the related borrowing arrangements, to the extent they are paid from operating cash flows during a period;

 

 

minus non-expansionary capital expenditures, if any, to the extent they are paid from operating cash flows during a period;

 

 

plus cash contributions from our Sponsor pursuant to the Interest Payment Agreement;

 

 

plus operating costs and expenses paid by our Sponsor pursuant to the Management Services Agreement to the extent such costs or expenses exceed the fee payable by us pursuant to such agreement but otherwise reduce our net cash provided by operating activities; and

 

 

plus or minus operating items as necessary to present the cash flows we deem representative of our core business operations, with the approval of our audit committee.

Limitations on cash dividends and our ability to change our cash dividend policy

There is no guarantee that we will pay quarterly cash dividends to holders of our Class A common stock. We do not have a legal obligation to pay our initial quarterly dividend or any other dividend. Our cash dividend policy may be changed at any time and is subject to certain restrictions and uncertainties, including the following:

 

 

As the sole managing member of Global LLC, we and, accordingly, our board of directors will have the authority to establish, or cause Global LLC to establish, cash reserves for working capital needs and the prudent conduct of our business, and the establishment of or increase in those reserves could result in a reduction in cash dividends from levels we currently anticipate pursuant to our stated cash dividend policy. These reserves may account for the fact that our project-level cash flows may vary from year to year based on, among other things, changes in prices under offtake agreements for energy and other environmental attributes, other project contracts, changes in regulated transmission rates, compliance with the terms of non-recourse project-level financing, including debt repayment schedules, the transition to market or recontracted pricing following the expiration of offtake agreements, domestic and international tax laws and tax rates, foreign exchange fluctuations, working capital requirements and the operating performance of the assets. Furthermore, our board of directors may increase, or cause Global LLC to increase reserves to account for the seasonality that has historically existed in our assets’ cash flows and the variances in the pattern and frequency of distributions to us from our assets during the year.

 

 

Prior to Global LLC making any cash distributions to its members, Global LLC will reimburse our Sponsor and its affiliates for certain governmental charges they incur on our behalf pursuant to the Management Services Agreement. Global LLC’s amended and restated operating agreement will not limit the amount of governmental charges for which our Sponsor and its affiliates may be reimbursed. The Management Services Agreement will provide that our Sponsor will determine in good faith the governmental charges that are allocable to us. Accordingly, the reimbursement of governmental charges and payment of fees, if any, to our Sponsor and its affiliates will reduce the amount of our cash available for distribution.

 

103


Table of Contents
 

Section 170 of the DGCL allows our board of directors to declare and pay dividends on the shares of our Class A common stock either:

 

   

out of its surplus, as defined in and computed in accordance with the DGCL; or

 

   

in case there shall be no such surplus, out of its net profits for the fiscal year in which the dividend is declared and/or the preceding fiscal year.

 

 

We may lack sufficient cash to pay dividends to holders of our Class A common stock due to cash flows shortfalls attributable to a number of operational, commercial or other factors, including low availability, as well as increases in our operating and/or general and administrative expenses, principal and interest payments on our outstanding debt, income tax expenses, working capital requirements or anticipated cash needs at our project-level subsidiaries.

 

 

Global LLC’s cash distributions to us and, as a result, our ability to pay or grow our dividends is dependent upon the performance of our subsidiaries and their ability to distribute cash to us. The ability of our project-level subsidiaries to make cash distributions to Global LLC may be restricted by, among other things, the provisions of existing and future indebtedness, applicable national, provincial, state and local corporation laws and other laws and regulations.

Our ability to grow our business and dividend

We intend to grow our business primarily through the acquisition of contracted clean power generation assets, which, we believe, will facilitate the growth of our cash available for distribution and enable us to increase our dividend per share over time. However, the determination of the amount of cash dividends to be paid to holders of our Class A common stock will be made by our board of directors and will depend upon our financial condition, results of operations, cash flows, long-term prospects and any other matters that our board of directors deems relevant.

We expect that we will rely primarily upon external financing sources, including commercial bank borrowings and issuances of debt and equity securities, to fund any future growth capital expenditures. To the extent we are unable to finance growth externally, our cash dividend policy could significantly impair our ability to grow because we do not currently intend to reserve a substantial amount of cash generated from operations to fund growth opportunities. If external financing is not available to us on acceptable terms, our board of directors may decide to finance acquisitions with cash from operations, which would reduce or even eliminate our cash available for distribution and, in turn, impair our ability to pay dividends to holders of our Class A common stock. To the extent we issue additional shares of capital stock to fund growth capital expenditures, the payment of dividends on those additional shares may increase the risk that we will be unable to maintain or increase our per share dividend level. There are no limitations in our bylaws or certificate of incorporation (other than a specified number of authorized shares), and there will not be any limitations under our Revolver or in the indenture governing the Senior Notes, on our ability to issue additional shares of capital stock, including preferred stock that would have priority over our Class A common stock with respect to the payment of dividends. Additionally, the incurrence of additional commercial bank borrowings or other debt to finance our growth would result in increased interest expense, which may impact our cash available for distribution and, in turn, our ability to pay dividends to holders of our Class A common stock.

Minimum quarterly distribution

Upon completion of this offering, the amended and restated operating agreement of Global LLC will provide that, during the Subordination Period, the holders of Class A units (and Class B1 units, if any), will have the right to receive the “Minimum Quarterly Distribution” of $         per unit for each whole quarter, or $         per unit on

 

104


Table of Contents

an annualized basis, before any distributions are made to the holders of Class B units. The payment of the full Minimum Quarterly Distribution on all of the Class A units, Class B1 units and Class B units to be outstanding after completion of this offering would require Global LLC to have CAFD of approximately $         million per quarter, or $166.3 million per year (assuming an 85% payout ratio). Global LLC’s ability to make cash distributions at the Minimum Quarterly Distribution rate will be subject to the factors described above under “—Limitations on cash dividends.” The table below sets forth the amount of Class A units, Class B1 units and Class B units that will be outstanding immediately after this offering and the CAFD needed to pay the aggregate Minimum Quarterly Distribution on all of such units for a single fiscal quarter and a four-quarter period (assuming no exercise and full exercise of the underwriters’ option to purchase additional shares of Class A common stock):

 

      No exercise of option to
purchase additional
Class A common stock
     Full exercise of option to purchase
additional Class A common stock
 
     Aggregate minimum quarterly
distribution
     Aggregate minimum quarterly
distributions
 
      Number
of units
     One
quarter
     Four
quarters
     Number of
units
     One
quarter
     Four
quarters
 

Class A units

      $                    $                       $                    $                

Class B1 units

                                               

Class B units

                 
  

 

 

 

Total

      $         $            $         $     

 

 

We intend to use any net proceeds we receive as a result of the exercise of the underwriters’ option to purchase additional shares of Class A common stock to purchase Class B units (and Class B common stock) held by our Sponsor at a price equal to the initial public offering price less the underwriting discounts and commissions and a pro rata portion of the structuring fee, and immediately cancel such Class B units (and shares of Class B common stock) contemporaneously with Global LLC issuing Class A units to us. When we purchase a Class B unit (and share of Class B stock) from our Sponsor and contemporaneously receive a Class A unit, the aggregate minimum quarterly distribution with respect to the Class A units and Class B units will increase or decrease, respectively, by $         per quarter and by $         per four quarters.

Subordination of Class B units

During the Subordination Period, holders of the Class B units are not entitled to receive any distribution until the Class A units and Class B1 units (if any) have received the Minimum Quarterly Distribution for the current quarter plus any arrearages in the payment of the Minimum Quarterly Distribution from prior quarters. The Class B units will not accrue arrearages.

To the extent Global LLC does not pay the Minimum Quarterly Distribution on the Class A units and Class B1 units, holders of such units will not be entitled to receive such payments in the future except during the Subordination Period. To the extent Global LLC has CAFD in any future quarter during the Subordination Period in excess of the amount necessary to pay the Minimum Quarterly Distribution to holders of its Class A units and Class B1 units, Global LLC will use this excess cash to pay any distribution arrearages on Class A units and Class B1 units related to prior quarters ending during the Subordination Period before any cash distribution is made to holders of Class B units. After the Subordination Period ends, Class A units and Class B1 units will not accrue arrearages. Please read “Certain relationships and related party transactions—Amended and Restated Operating Agreement of Global LLC—Distributions—Subordination period.”

 

105


Table of Contents

Distribution Forbearance Period

To reduce the effect on the Class A units of delays (if any) in the closing of the Pending Acquisitions or the completion of the Contributed Construction Projects, our Sponsor has agreed to forego distributions on its Class B units under certain circumstances. In particular, our Sponsor has agreed to forego any distributions on its Class B units with respect to the third and fourth quarters of 2015 (i.e., distributions declared on or prior to March 31, 2016), and thereafter, under certain circumstances, to forego distributions on its Class B units until the expiration of the Distribution Forbearance Period. Between March 31, 2016 and the end of the Distribution Forbearance Period our Sponsor has agreed to forego distributions on its Class B units to the extent the holders of Class A units have not received distributions in an amount equal to the Minimum Quarterly Distribution plus any arrearages in the payment of Minimum Quarterly Distributions from prior quarters. See “Certain relationships and related party transactions—Amended and Restated Operating Agreement of Global LLC—Distributions.”

Unaudited pro forma cash available for distribution for the year ended December 31, 2014 and the three months ended March 31, 2015

If we had completed the Organizational Transactions on January 1, 2014, our unaudited cash available for distribution for the year ended December 31, 2014 and the three months ended March 31, 2015 would have been approximately $166.2 million and $32.4 million, of which $         million and $         million, respectively, would have been distributed by Global LLC to Global as the holder of Class A units of Global LLC. These amounts would have been insufficient to pay the full quarterly cash dividend on all of our Class A common stock to be outstanding immediately after completion of this offering based on our initial quarterly dividend of $         per share of our Class A common stock (or $         per share on an annualized basis).

Our calculation of unaudited pro forma cash available for distribution includes the management fee payable to our Sponsor under the Management Services Agreement. The calculation also reflects all costs of doing business, including all expenses paid by our Sponsor in excess of the payments required under the Management Services Agreement. These costs include incremental general and administrative expenses as a result of being a publicly traded company, including costs associated with SEC reporting requirements, independent auditor fees, investor relations activities, stock exchange listing, registrar and transfer agent fees, incremental director and officer liability insurance and director compensation, because those expenses will be paid by our Sponsor under the Management Services Agreement.

Our unaudited pro forma combined financial statements, from which our unaudited cash available for distribution was derived, do not purport to present our results of operations had the transactions contemplated in this prospectus actually been completed as of the dates indicated. Furthermore, cash available for distribution is a cash method concept, while our predecessor’s historical financial statements were prepared on an accrual basis. We derived the amounts of unaudited cash available for distribution stated above in the manner shown in the table below. As a result, the amount of unaudited pro forma cash available should only be viewed as a general indicator of the amount of cash available for distribution that we might have generated had we been formed and completed the transactions contemplated in this prospectus in earlier periods.

 

106


Table of Contents

The footnotes to the table below provide additional information about the adjustments and should be read along with the table.

 

     Pro forma  
(in thousands, except share and per share data)   Year ended
December 31,
2014
    Three months
ended March 31,
2015
 

Operating revenues

  $ 298,899      $ 100,810   

Operating costs and expenses:

   

Cost of operations

    47,420        13,575   

Depreciation, amortization and accretion

    131,393        34,144   

General and administration(1)

    32,721        11,299   
 

 

 

   

 

 

 

Total operating costs and expenses

    211,534        59,018   
 

 

 

   

 

 

 

Operating income

    87,365        41,792   

Other (income) expense:

   

Interest expense

    51,547        19,472   

Other (income) expense

    (13,891     (3,057
 

 

 

   

 

 

 

Total other expense

    37,656        16,415   
 

 

 

   

 

 

 

Income before income tax expense

    49,709        25,377   

Income tax expense

    5,630        2,882   
 

 

 

   

 

 

 

Net income

    44,079        22,495   
 

 

 

   

 

 

 

Add:

   

Depreciation, amortization and accretion

    131,393        34,144   

Interest expense

    51,547        19,472   

Income tax expense

    5,630        2,882   

Stock compensation expense

             
 

 

 

   

 

 

 

Adjusted EBITDA(2)

  $ 232,649      $ 78,993   
 

 

 

   

 

 

 

Adjustments to reconcile net income to net cash provided by operating activities:

   

Net income

  $ 44,079      $ 22,495   

Depreciation, amortization, and accretion

    131,393        34,144   

Other non-cash items

    11,464        2,277   

Changes in assets and liabilities

    16,491        3,200   
 

 

 

   

 

 

 

Net cash provided by operating activities

  $ 203,427      $ 62,116   
 

 

 

   

 

 

 

Adjustments to reconcile net cash provided by operating activities to cash available for distribution:

   

Net cash provided by operating activities

    203,427      $ 62,116   

Changes in assets and liabilities

    (16,491     (3,200

Deposits into/withdrawals from restricted cash accounts paid from operating cash flows

    2,284        (9,401

Cash distributions to non-controlling interests

    (6,570     (2,724

Scheduled project-level and other debt service repayments

    (13,312     (13,223

Non-expansionary capital expenditures(3)

    (9,537     (2,723

Contributions received pursuant to agreements with our Sponsor

             

Other items

             
 

 

 

   

 

 

 

Estimated cash available for distribution by Global LLC

  $ 159,801      $ 30,845   
 

 

 

   

 

 

 

Estimated cash available for distribution to holders of Class A common stock(4)

  $        $     

Estimated aggregate annual dividend

  $        $     

Shares of Class A common stock

   

Estimated dividend per share of Class A common stock

  $        $     

 

   

 

 

 

 

(1)   Reflects all costs of doing business, including all expenses paid by our Sponsor in excess of the payments required under the Management Services Agreement.

 

107


Table of Contents
(2)   Adjusted EBITDA, and cash available for distribution are non-GAAP measures. You should not consider these measures as alternatives to net income (loss), determined in accordance with GAAP, or net cash provided by (used in) operating activities, determined in accordance with GAAP. For definitions of Adjusted EBITDA and cash available for distribution and a complete discussion of their limitations, see footnotes (1) and (2), respectively, under the heading “Summary—Summary historical and pro forma financial data” elsewhere in this prospectus.

 

(3)   Represents capital expenditures for maintenance and up-keep associated with our project portfolio.

 

(4)   Does not give effect to any reductions of distributions on the Class B units during the Distribution Forbearance Period.

Estimated cash available for distribution for the twelve months ending June 30, 2016 and December 31, 2016

We forecast that our cash available for distribution during the twelve months ending June 30, 2016 and December 31, 2016 will be approximately $195.8 million and $231.5 million, respectively, of which we forecast $         million will be distributed by Global LLC to Global as the holder of Class A units of Global LLC for the twelve months ending June 30, 2016 and $         million for the twelve months ending December 31, 2016. This amount (together with our other sources of liquidity) would be sufficient to pay our initial quarterly dividend of $         per share on all outstanding shares of our Class A common stock immediately after completion of this offering for each quarter in the twelve months ending June 30, 2016 and December 31, 2016. Based on the assumptions described below, we forecast total available liquidity of $         million (including $         million of availability under the Revolver) as of June 30, 2016, assuming that we do not acquire any additional projects prior to that date.

We are providing this forecast to supplement our predecessor’s historical combined financial statements and to support our belief that we will have sufficient cash available for distribution to allow Global LLC to make distributions to Global as the holder of Class A units of Global LLC in amounts sufficient to allow Global to pay a regular quarterly dividend on all of our outstanding Class A common stock immediately after completion of this offering for each quarter in fiscal year 2015, at our initial quarterly dividend of $         per share (or $         per share on an annualized basis). Please read “—Assumptions and considerations” for further information as to the assumptions we have made for the forecast.

Our forecast is a forward-looking statement and reflects our best estimate and judgment as of the date of this prospectus of the conditions we expect to exist and the course of action we expect to take with respect to our initial portfolio of projects during each of the twelve-month periods ending June 30, 2016 and December 31, 2016. Although acquisitions are an important part of our growth strategy, the forecast does not include the effects of, and we have not included any adjustments with respect to, any acquisitions we may complete during the periods covered by our forecast. It should be read together with the historical combined financial statements and the accompanying notes thereto included elsewhere in this prospectus and “Management’s discussion and analysis of financial condition and results of operations.” We believe that we have a reasonable basis for these assumptions and that our actual results of operations will approximate those reflected in our forecast, but we can give no assurance that our forecasted results will be achieved. The assumptions and estimates underlying the forecast, as described below under “—Assumptions and considerations,” are inherently uncertain and, although we consider them reasonable as of the date of this prospectus, they are subject to a wide variety of significant business, economic and competitive risks and uncertainties that could cause actual results to differ materially from forecasted results, including, among others, the risks and uncertainties described in “Risk factors.” For purposes of our forecast, we have assumed that no unexpected risks will materialize during the forecast periods. Any of the risks discussed in this prospectus, to the extent they occur, could cause actual results of operations to vary significantly from those that would enable us to generate sufficient cash available for distribution to allow Global LLC to make distributions in amounts sufficient to allow us to pay the aggregate annualized regular quarterly dividend on all outstanding shares of our Class A common stock for the twelve-month periods ending June 30, 2016 and December 31, 2016, calculated at the initial quarterly dividend rate of $         per share (or $         per share on an annualized basis).

 

108


Table of Contents

Accordingly, there can be no assurance that the forecast will be indicative of our future performance or that actual results will not differ materially from those presented in the forecast. If our forecasted results are not achieved, we may not be able to pay a regular quarterly dividend to holders of our Class A common stock at our initial quarterly dividend level or at all. Inclusion of the forecast in this prospectus should neither be regarded as a fact nor a representation by us, the underwriters or any other person that the results contained in the forecast will be achieved.

The accompanying forecast was not prepared with a view toward complying with the guidelines established by the American Institute of Certified Public Accountants, or the “AICPA,” with respect to prospective financial information. Neither our independent auditors, nor any other independent accountants, have compiled, examined or performed any procedures with respect to our forecast, nor have they expressed any opinion or any other form of assurance on our forecast or its achievability, and neither our independent auditors nor any other independent accountants assume responsibility for, and claim any association with, our forecast.

We do not undertake any obligation to release publicly any revisions or updates that we may make to the forecast or the assumptions used to prepare the forecast to reflect events or circumstances after the date of this prospectus. In light of this, the statement that we believe that we will have sufficient cash available for distribution (together with our other sources of liquidity) to allow Global LLC to make distributions to Global as the holder of Class A units of Global LLC in amounts sufficient to allow Global to pay the full regular quarterly dividend on all of our Class A common stock outstanding immediately after the completion of this offering for each quarter in the twelve-month periods ending June 30, 2016 and December 31, 2016, based on our initial quarterly dividend rate of $         per share (or $         per share on an annualized basis), should not be regarded as a representation by us, the underwriters or any other person that we will pay such dividends. Therefore, you are cautioned not to place undue reliance on this information.

 

109


Table of Contents

TerraForm Global, Inc.

Estimated cash available for distribution

 

(in thousands, except share and per share data)   

12 Months Ending
Year ended
June 30,

2016

    12 Months Ending
Year ended
December 31,
2016
 

Operating revenues

   $ 397,201      $ 466,978   

Operating costs and expenses:

    

Cost of operations

     70,629        83,175   

Depreciation, amortization and accretion

     137,770        141,891   

General and administration(1)

     21,297        21,297   
  

 

 

   

 

 

 

Total operating costs and expenses

     229,696        246,364   
  

 

 

   

 

 

 

Operating income

     167,505        220,614   

Other (income) expense:

    

Interest expense

     74,204        82,453   

Other (income) expense

     10,476        12,511   
  

 

 

   

 

 

 

Total other expense

     84,680        94,964   
  

 

 

   

 

 

 

Income before income tax benefit

     82,825        125,651   

Income tax benefit

     7,155        8,762   
  

 

 

   

 

 

 

Net Income

   $ 75,670      $ 116,888   
  

 

 

   

 

 

 

Add:

    

Depreciation, amortization and accretion

     137,770        141,891   

Interest expense

     74,204        82,453   

Income tax expense (benefit)

     7,155        8,762   

Stock compensation expense

              
  

 

 

   

 

 

 

Adjusted EBITDA(2)

   $ 294,800      $ 349,994   
  

 

 

   

 

 

 

Adjustments to reconcile net income to net cash provided by operating activities:

    

Net income

     75,670        116,888   

Depreciation and accretion

     137,770        141,891   

Other non-cash items

              

Changes in assets and liabilities

     (10,730     (7,939
  

 

 

   

 

 

 

Net cash provided by operating activities

   $ 202,710      $ 250,840   
  

 

 

   

 

 

 

Adjustments to reconcile net cash provided by operating activities to cash available for distributions:

    

Net cash provided by operating activities

     202,710        250,840   

Changes in assets and liabilities

     10,730        7,939   

Deposits into/withdrawals from restricted cash accounts paid from operating cash flows

     (1,586     (1,357

Cash distributions to non-controlling interests

     (15,995     (14,033

Scheduled project-level and other debt service repayments

     (20,193     (30,361

Non-expansionary capital expenditures(3)

     (5,561     (545

Contributions received pursuant to agreements with our Sponsor

     18,062        15,042   

Other items

     7,641        3,928   
  

 

 

   

 

 

 

Estimated cash available for distribution by Global LLC

   $ 195,808      $ 231,452   
  

 

 

   

 

 

 

Estimated cash available for distribution to holders of

    

Class A common stock

    

Estimated aggregate annual dividend

    

Shares of Class A common stock

    

Estimated dividend per share of Class A common stock

    

 

 
(1)   Reflects all costs of doing business, including all expenses paid by our Sponsor in excess of the payments required under the Management Services Agreement.

 

(2)   Adjusted EBITDA and cash available for distribution are non-GAAP measures. You should not consider these measures as alternatives to net income (loss), determined in accordance with GAAP, or net cash provided by (used in) operating activities, determined in accordance with GAAP. For definitions of Adjusted EBITDA and cash available for distribution and a complete discussion of their limitations, see footnotes (1) and (2), respectively, under the heading “Summary—Summary historical and pro forma financial data” elsewhere in this prospectus.

 

(3)   Represents capital expenditures for maintenance and up-keep associated with our project portfolio.

 

110


Table of Contents

Assumptions and considerations

Set forth below are the material assumptions that we have made to demonstrate our ability to generate our estimated Adjusted EBITDA and estimated cash available for distribution for each of the twelve months ending June 30, 2016 and December 31, 2016. The forecast has been prepared by and is the responsibility of our management. Our forecast reflects our judgment of the conditions we expect to exist and the course of action we expect to take during the forecast period. While the assumptions disclosed in this prospectus are not all inclusive, such assumptions are those that we believe are material to our forecasted results of operations. We believe we have a reasonable basis for these assumptions. We believe that our historical results of operations will approximate those reflected in our forecast. However, we can give no assurance that our forecasted results will be achieved. We have assumed that no unexpected risks will materialize during the forecast periods. There will likely be differences between our forecasted and our historical results, and those differences may be material. If our forecast is not achieved, we may not be able to pay cash dividends on our Class A common stock at the initial quarterly dividend level or at all.

General considerations

 

 

The forecast assumes that in                      2015, we will raise: (i) net proceeds of $         million in this offering (after deducting underwriting discounts and commissions, the structuring fee and offering expenses payable by us) through the issuance of          of our shares of Class A common stock at a price of $         per share; (ii) and net proceeds of $         million from the sale of                  shares of our Class A common stock in the Class A Common Private Placement; and (iii) net proceeds of $         million from the issuance of the Senior Notes. We have also assumed that immediately following the completion of this offering, Global LLC will have          Class A units and          Class B units outstanding and that all of such Class A units will be held by Global. The forecast also assumes that the proceeds of this offering will be used as described in “Use of proceeds” elsewhere in this prospectus and that in connection with the completion of this offering, the other transactions contemplated upon under the heading “Summary—Organizational Transactions” will have been completed on or prior to the closing of this offering (other than the exercise by the underwriters of their option to purchase additional shares of our Class A common stock).

 

 

The pro forma period for the year ended December 31, 2014 includes the results for our initial portfolio, which have a total net capacity of 1,061.2 MW, which does not include any projects for which we hold a minority interest. Projects with a total net capacity of 344.9 MW are expected to reach COD in 2015.

 

 

The forecast periods include the results of the projects that will be included in our initial portfolio.

 

 

The forecast periods include the results of operations for the projects in our initial portfolio, each of which reached COD prior to the beginning of such periods.

 

 

Revenues reflect the terms specified in the PPAs or similar offtake arrangements for 100% of energy production. The electricity pricing used in the forecast is based on our expected annual electricity generation and contracted sales under PPAs or similar offtake arrangements.

 

 

Cost of operations and expenses are forecast based on historical experience, contracted service arrangements and other management estimates. We believe the forecast cost structure is reasonable based on leveraging our existing infrastructure, our experience in operating the projects and expected economies of scale from the additional contributed and acquired projects.

 

 

The forecast assumes our projects will operate within budgeted operating costs, including with respect to operations and maintenance activities pursuant to our O&M agreements and that there will be no unusual, non-recurring or unexpected operating, repair or maintenance charges.

 

111


Table of Contents
 

The historical period and the forecast periods only include projects that we have included in our initial portfolio and do not include any of the Call Right Projects or the Third-Party Call Right Projects.

Revenue

We estimate that we will generate revenue of $397.2 million for the twelve months ending June 30, 2016 and $467.0 million for the twelve months ending December 31, 2016, compared to $298.9 million for the unaudited pro forma year ended December 31, 2014. The increase in our forecasted periods compared to the historical pro forma period is attributed to higher generation as a result of the additional contributed and acquired projects referenced in the general considerations. We estimate megawatts in operation will be 1,119.5 MW for the twelve months ending June 30, 2016 and 1,406.1 MW for the period ending December 31, 2016, compared to 1,061.2 MW for the unaudited pro forma year ended December 31, 2014. Our revenues are primarily a result of the energy produced at our projects and the rates for incentives and rates for sale of generation established under PPAs for each project. We estimate 3,748.2 GWh of production for the twelve months ending June 30, 2016, and 4,396.3 GWh for the twelve months ending December 31, 2016, compared to 2,426.8 GWh for the unaudited pro forma year ended December 31, 2014. We estimate that 5.6% and 6.2% of revenue will come from incentives in the twelve-month periods ending June 30, 2016 and December 31, 2016, respectively, compared to 0.7% for the unaudited pro forma year ended December 31, 2014. The forecasted amount of revenues with respect to individual projects are approximately proportional to the generation capacity of such project and correlated to the respective dates as of which the project commenced or will commence operations.

Cost of operations

We estimate that we will incur a cost for operations expense of $70.6 million for the twelve months ending June 30, 2016 and $83.2 million for the twelve months ending December 31, 2016, compared to $47.4 million for the unaudited pro forma year ended December 31, 2014. This increase in our forecasted periods from the pro forma historical period is primarily attributed to the additional contributed and acquired projects referenced in the general considerations.

Depreciation, amortization and accretion

We estimate that we will incur depreciation, amortization and accretion expense of $137.8 million for the twelve months ending June 30, 2016 and $141.9 million for the twelve months ending December 31, 2016 compared to $131.4 million for the unaudited pro forma year ended December 31, 2014. This increase in our forecasted periods from the pro forma historical period is primarily attributed to the additional contributed and acquired projects referenced in the general considerations. Forecasted depreciation and accretion expense reflects management’s estimates, which are based on consistent average depreciable asset lives and depreciation methodologies under GAAP. We have assumed that the average depreciable asset lives are 25, 30 and 40 years for our wind, solar and hydro-electric energy systems, respectively.

General and administrative

We estimate that we will incur general and administrative expenses of $21.3 million for the twelve months ending June 30, 2016 and $21.3 million for the twelve months ended December 31, 2016, compared to $32.7 million for the unaudited pro forma year ended December 31, 2014. These expenses include stock compensation expense of $         million and $         million during the twelve months ending June 30, 2016 and December 31, 2016, respectively, and all costs of doing business.

 

112


Table of Contents

Capital expenditures

We define growth capital expenditures as costs incurred by our Sponsor for contributed projects and payments to third parties for acquired projects. We estimate these costs to be $         million for the twelve months ending June 30, 2016 and $         million for the twelve months ending December 31, 2016, compared to $354.5 million for the unaudited pro forma year ended December 31, 2014.

Financing and other

We estimate that interest expense will be $74.2 million for the twelve months ending June 30, 2016 and $82.5 million for the twelve months ending December 31, 2016, compared to $51.5 million for the unaudited pro forma year ended December 31, 2014. Forecasted interest expense is based on the following assumptions:

 

 

we estimate that our debt level will be approximately $868.8 million as of June 30, 2016 and $843.9 million as of December 31, 2016; and

 

 

we estimate that our borrowing costs will average 8.5% and 9.8% for the twelve-month periods ending June 30, 2016 and December 31, 2016, respectively.

We estimate that principal amortization of indebtedness will be $20.2 million for the twelve months ending June 30, 2016 and $30.4 million for the twelve months ending December 31, 2016, compared to $13.3 million for the unaudited pro forma year ended December 31, 2014. The increase is primarily attributed to additional amortization following COD for projects in our initial portfolio and acquisitions.

Our projects

The forecast above assumes that our portfolio of projects will consist of our initial portfolio during the relevant periods. See “Business—Our initial portfolio.” All the projects we have included in our initial portfolio have already reached their COD, with the exception of eight projects with an aggregate of 286.6 MW, each of which is expected to reach COD in the second half of 2015. Our initial portfolio includes the Contributed Projects, the Acquired Projects and those projects that we expect to acquire in connection with the closing of the Pending Acquisitions. All of the Contributed Projects will be contributed to us prior to or concurrently with the completion of this offering, except for the Bora Bora, NPS Star, WXA, Del Litoral and EI Naranjal projects, which our Sponsor has committed to contribute to us at the time each reaches its respective COD. We expect to acquire substantially all of the projects subject to the Pending Acquisitions concurrently with the completion of this offering. This offering, however, is not conditioned on the concurrent closing of all of the Pending Acquisitions. We do not expect to complete the Pending Acquisitions consisting of an 82.0 MW solar project located in Honduras (Choluteca), a 26.4 MW solar project located in Uruguay (Alto Cielo) or a 50.0 MW wind project located in Costa Rica (Orosi) until such respective projects achieve COD, which is expected to occur in the second half of 2015. Except as part of the completion of the Pending Acquisitions, we have assumed that we will not make any additional acquisitions during the forecast periods. See “Risk factors—Risks related to our business—Our forecasted and unaudited pro forma financial information included elsewhere in this prospectus assumes the completion of all of the Pending Acquisitions.”

Megawatt-hours sold

Our ability to generate sufficient cash available for distribution to pay dividends to holders of our Class A common stock is primarily a function of the volume of electricity generated and sold by our solar energy projects as well as, to a lesser extent, where applicable, other environmental attributes related to energy generation. The volume of electricity generated and sold by our projects during a particular period is also

 

113


Table of Contents

impacted by the number of projects that have commenced commercial operations, as well as both scheduled and unexpected repair and maintenance required to keep our projects operational. The volume of electricity generated and sold by our projects will be negatively impacted if any projects experience higher than normal downtime as a result of equipment failures, electrical grid disruption or curtailment, weather disruptions or other events beyond our control. We have assumed that unscheduled outages during the forecast periods will be consistent with our historical experience.

As of March 31, 2015, the weighted average (based on megawatts) remaining life of our PPAs was 19 years. Pricing under the PPAs is contracted for the duration of the contract for all projects. Certain of our PPAs will have price escalators based on an index (such as the consumer price index) or other rates specified in the applicable PPA.

Regulatory, industry and economic factors

Our estimated results of operations for the forecasted period are based on the following assumptions related to regulatory, industry and economic factors:

 

 

the Pending Acquisitions will be completed on the timetables currently contemplated and there will be no delays in the expected COD for the Contributed Construction Projects;

 

 

no material nonperformance or credit-related defaults by customers, suppliers, our Sponsor or any of our customers;

 

 

no new or material amendments to national, provincial, state and local laws or regulations (including tax laws, tariffs and regulations), or interpretation or application of existing laws or regulations, relating to renewable energy generally, or solar energy specifically, that in either case will be materially adverse to our business or our suppliers’, our Sponsor’s or any of our customers’ businesses or operations;

 

 

no material adverse effects to our business, industry or our suppliers’, our Sponsor’s or any of our customers’ businesses or operations on account of natural disasters;

 

 

no material adverse change resulting from supply disruptions, reduced demand for electricity or electrical grid or interconnection disruption or curtailment;

 

 

no material adverse changes in market, regulatory and overall economic conditions; and

 

 

no material adverse changes in the existing regulatory framework, such as regulations relating to net metering or third-party ownership of electrical generation.

 

114


Table of Contents

Unaudited pro forma condensed consolidated financial statements

The unaudited pro forma condensed consolidated financial statements for the year ended December 31, 2014 and as of and for the three months ended March 31, 2015 have been derived from the predecessor audited and unaudited combined financial statements appearing elsewhere in this prospectus and give pro forma effect to the Organizational Transactions, including the use of the estimated net proceeds from this offering, and the completion of the Contributed Projects and the Acquisitions. The unaudited pro forma condensed consolidated statements of operations give effect to the Organizational Transactions and the Acquisitions as if they had occurred on January 1, 2014. The unaudited pro forma condensed consolidated balance sheet reflects such transactions as if they had occurred on March 31, 2015. We derived the following unaudited pro forma condensed consolidated financial statements or the “pro forma financial statements” by applying pro forma adjustments to the predecessor combined financial statements and the financial statements of the businesses that have been or will be acquired in the Acquisitions included elsewhere in this prospectus. The predecessor combined financial statements appearing elsewhere in this prospectus are intended to represent the financial results of our Sponsor’s solar assets that will be contributed to Global LLC as part of the Contributed Projects for that period.

The Formation Transactions for which we have made pro forma adjustments are as follows:

 

 

the contribution of Contributed Projects and the acquisition of the Acquired Projects;

 

 

Global LLC’s entry into the $150.0 million Bridge Facility on December 22, 2014, which was amended on May 6, 2015 to increase the aggregate principal commitment to $450.0 million, of which $87.5 million was subsequently prepaid with a portion of the net proceeds from the Units Private Placements, and which was further amended on June 5, 2015 to increase the aggregate principal commitment to $550.0 million;

 

 

Global LLC’s use of the Bridge Facility to fund a portion of the Acquisitions’ purchase price and the reduction of certain project-level indebtedness;

 

 

the sale of 510,000 Class D units of Global LLC in the Units Private Placements for an aggregate of $510.0 million in cash; and

 

 

Global LLC’s use of the net proceeds from the Units Private Placements to fund a reduction in borrowings under the Bridge Facility, a portion of the Acquisitions’ purchase price and the reduction of certain project-level indebtedness.

The Offering Transactions for which we will make pro forma adjustments are as follows:

 

 

the amendment and restatement of Global’s certificate of incorporation to provide for Class A common stock, Class B common stock and Class B1 common stock, and the concurrent conversion of (i) SunEdison’s interest in Global’s common equity into shares of Class B common stock and (ii) certain equity interests held by certain of our executives and other employees of SunEdison into shares of Class A common stock;

 

 

the issuance of restricted stock units to be granted to several persons who have provided or are expected to provide services to us in connection with the completion of this offering, or the “IPO Grants”;

 

 

the amendment of Global LLC’s operating agreement to provide for Class A units, Class B units and Class B1 units and to convert SunEdison’s units into Class B units, issue the IDRs to our Sponsor and appoint Global as the sole managing member of Global LLC;

 

115


Table of Contents
 

the sale of              shares and                  shares of our Class A common stock to the purchasers in this offering and the Class A Common Private Placement, respectively, in exchange for gross proceeds of $800.0 million and $67.5 million, respectively, assuming no exercise of the underwriters’ option to purchase additional shares of Class A common stock, reduced for underwriting discounts and commissions, the structuring fee and offering expenses payable by us of $                    ;

 

 

our use of all of the net proceeds from this offering and the Class A Common Private Placement to purchase newly issued Class A units of Global LLC, representing     % of Global LLC’s outstanding membership units, assuming no exercise of the underwriters’ option to purchase additional shares of Class A common stock;

 

 

Global Operating LLC’s issuance of an aggregate of $             million in Senior Notes;

 

 

Global LLC’s use of the net proceeds received from Global, together with the net proceeds from the issuance of the Senior Notes, to repay the outstanding principal amount of the Bridge Facility (including accrued interest), to pay fees and expenses associated with the Revolver and the issuance of the Senior Notes, to repay certain project-level debt, to fund a portion of the Acquisitions’ purchase price and the repayment of certain project-level indebtedness;

 

 

the completion of the Pending Acquisitions, including the issuance of                  shares and              shares of Class A common stock to BioTherm (or its affiliate) and GME, the selling parties in the BioTherm Transaction and GME Transaction, respectively;

 

 

the issuance of                      shares of Class A common stock in exchange for Class D units previously issued by Global LLC as part of the Units Private Placements;

 

 

Global Operating LLC’s execution of a new $         million Revolver, which will remain undrawn at the completion of this offering; and

 

 

our entering into the Support Agreement, the Management Services Agreement, the Repowering Services Agreement, the Interest Payment Agreement and the Project Investment Agreement with our Sponsor.

The pro forma adjustments we have made with respect to the Acquisitions are as follows:

 

 

adjustments to record acquired assets and assumed liabilities at their fair value;

 

 

adjustments to reflect depreciation and amortization, as applicable, of fair value adjustments for acquired property and equipment, intangible assets and debt assumed; and

 

 

adjustments to reflect operating activity of the Acquired Projects.

The pro forma financial statements combine the predecessor combined financial statements and the historical financial statements of the project-level entities acquired in the Acquisitions to illustrate the effect of the Acquisitions. The pro forma financial statements were based on, and should be read in conjunction with:

 

 

the accompanying notes to the pro forma financial statements;

 

 

the predecessor combined financial statements as of and for the year ended December 31, 2014 and as of and for the three months ended March 31, 2015 and the notes relating thereto included elsewhere in this prospectus; and

 

 

the financial statements of the project-level entities acquired or to be acquired in the Acquisitions as of and for the year ended December 31, 2014 and as of and for the three months ended March 31, 2015 and the notes relating thereto included elsewhere in this prospectus.

 

116


Table of Contents

The predecessor combined financial statements have been adjusted in the pro forma condensed consolidated financial statements to give pro forma effect to events that are (1) directly attributable to the Acquisitions, (2) factually supportable and (3) with respect to the pro forma condensed consolidated statement of operations, expected to have a continuing impact on the combined results.

As described in the accompanying notes, the unaudited pro forma condensed consolidated financial statements have been prepared using the acquisition method of accounting under existing GAAP. The predecessor has been treated as the acquirer in the Acquisitions for accounting purposes. The purchase price will be allocated to the assets and liabilities of the businesses that have been or will be acquired in the Acquisitions based upon their estimated fair values as of the date of completion of the applicable Acquisition. The allocation is dependent on certain valuations and other studies that have not progressed to a stage where there is sufficient information to make a final definitive allocation. A final determination of the fair value of the assets and liabilities of the businesses that have been or will be acquired in the Acquisitions, which cannot be made prior to the completion of the relevant transaction, will be based on the actual net tangible and intangible assets of the businesses that have been or will be acquired in the Acquisitions that existed as of the date of completion of the applicable Acquisition. Accordingly, the pro forma purchase price adjustments are preliminary, subject to future adjustments, and have been made solely for the purpose of providing the unaudited pro forma condensed consolidated financial information presented below. Adjustments to these preliminary estimates are expected to occur and these adjustments could have a material impact on the accompanying unaudited pro forma condensed consolidated financial statements, although we do not expect the adjustments to have a material effect on the combined company’s future results of operations and financial position.

The unaudited pro forma condensed consolidated financial statements are presented for informational purposes only. The pro forma adjustments are based upon available information and certain assumptions that we believe are reasonable. The unaudited pro forma condensed consolidated financial statements do not purport to represent what our results of operations or financial condition would have been had the transactions to which the pro forma adjustments relate actually occurred on the dates indicated, and they do not purport to project our results of operations or financial condition for any future period or as of any future date. This offering is not conditioned on the prior closing of the Pending Acquisitions, and we cannot assure you that all of the Pending Acquisitions will be consummated on the timetable currently contemplated.

The unaudited pro forma condensed consolidated balance sheet and statement of operations should be read in conjunction with the sections entitled “Summary—Organizational Transactions,” “Use of proceeds,” “Capitalization,” “Selected historical combined financial data,” “Management’s discussion and analysis of financial condition and results of operations,” “Certain relationships and related party transactions—Management Services Agreement” and the historical financial statements and related notes thereto included elsewhere in this prospectus. See “Risk factors—Risks related to our business—Our pro forma financial information included elsewhere in this prospectus assumes the completion of the Pending Acquisitions.”

 

117


Table of Contents

Unaudited pro forma condensed consolidated statement of operations for the three months ended March 31, 2015

 

                   Pro forma adjustments         
(in thousands, except share and per
share data)
  Predecessor    

Acquisitions(1)

   

Acquisition

adjustments

   

Formation

Transactions

   

Offering

Transactions

    TerraForm
Global, Inc.
Pro forma
 

Statement of Operations Data:

           

Revenue

  $ 17,806      $ 83,004      $      $      $            —      $ 100,810   

Operating costs and expenses:

           

Cost of operations

    358        11,880        269 (2)                    12,507   

Cost of operations—affiliate

    964        373        (269 )(2)                    1,068   

General and administrative

    4,486        3,685        161 (3)      (7)             8,332   

General and administrative—affiliate

    2,967        161        (161 )(3)             (9)      2,967   

Depreciation, amortization and accretion

    2,735        18,830        12,579 (4)                    34,144   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total operating costs and expenses

    11,510        34,929        12,579                      59,018   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Operating income (loss)

    6,296        48,075        (12,579                   41,792   

Other (income) expense:

           

Interest expense

    16,821        28,767               (13,013 )(8)      (13,103 )(10)      19,472   

Other (income) expense

    (418     (2,639                           (3,057
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total other expense, net

    16,403        26,128               (13,013     (13,103     16,415   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Income (loss) before income tax expense

    (10,107     21,947        (12,579     13,013        13,103        25,377   

Income tax expense (benefit)

    1,118        2,874        (2,675 )(5)      1,565 (5)      (11)      2,882   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net income (loss)

    (11,225     19,073        (9,904     11,448        13,103        22,495   

Less net income attributable to non-controlling interest

                  (433 )(6)             (12)      (433
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net income (loss) attributable to Global

  $ (11,225   $ 19,073      $ (10,337   $ 11,448      $ 13,103      $ 22,062   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Pro forma basic and diluted loss per share(13)

           

Pro forma weighted average shares outstanding(13)

           

 

118


Table of Contents
(1)   The following table represents the consolidating schedule of the historical results of the businesses that have been or will be acquired in the Acquisitions reflected in the unaudited pro forma condensed consolidated statement of operations for the three months ended March 31, 2015 derived from their historical financial statements:

 

(in thousands)   Chint -
NSM 24(a)
    BioTherm     Chint -
Soutpan/
Witkop(c)
    FERSA(a)     Hercules     LAP(d)(f)     Renova(e)(g)     GME(h)     Acquisitions  

Statement of Operations Data:

                 

Revenue

  $ 1,408      $ 6,162      $ 9,274      $ 1,694      $ 6,192        $6,934        $20,322      $ 31,018      $ 83,004   

Operating costs and expenses:

                 

Cost of operations(b)

    104        327        717        461        304        897        2,201        6,869        11,880   

Cost of operations — affiliate(b)

           373                                                  373   

General and administrative

    30        317        223        97        310        394        1,636        678        3,685   

General and administrative — affiliate

           161                                                  161   

Depreciation, amortization, and accretion

    292        1,303        1,694        879        3,784        726        5,733        4,419        18,830   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total operating costs and expenses

    426        2,481        2,634        1,437        4,398        2,017        9,570        11,966        34,929   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Operating income (loss)

    982        3,681        6,640        257        1,794        4,917        10,752        19,052        48,075   

Other (income) expense:

                 

Interest expense, net

    823        2,168        6,073        1,290        2,435        2,832        6,513        6,633        28,767   

Other (income) expense

    -        (283     (1,139     (142     (2,486     3,294        (1,901     18        (2,639
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total other expense, net

    823        1,885        4,934        1,148        (51     6,126        4,612        6,651        26,128   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Income (Loss) before income tax expense

    159        1,796        1,706        (891     1,845        (1,209     6,140        12,401        21,947   

Income tax expense (benefit)

    126        570        (252     (539     (11     1,044        1,315        621        2,874   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net income (loss)

  $ 33      $ 1,226      $ 1,958      $ (352   $ 1,856      $ (2,253   $ 4,825      $ 11,780      $ 19,073   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

  (a)   The statement of operations for the three months ended March 31, 2015 has been translated from Indian Rupee to U.S. dollars at the average three-months ended March 31, 2015 rate of 0.016090 INR/USD.

 

  (b)   BioTherm cost of operations consists of operations management fees and plant operating costs on the BioTherm historical financial statements. BioTherm cost of operations—affiliate consists of operations management fees—related party and plant operating costs—related party on the BioTherm historical financial statements.

 

  (c)   The statement of operations for the three months ended March 31, 2015 has been translated from South African Rand to U.S. dollars at the average three-months ended March 31, 2015 rate of 0.084933 ZAR/USD.

 

  (d)   The statement of operations for the three months ended March 31, 2015 has been translated from Peruvian Nuevo Sol to U.S. dollars at the average three-months ended March 31, 2015 rate of 0.318830 PEN/USD.

 

  (e)   The statement of operations for the three months ended March 31, 2015 has been translated from Brazilian Real to U.S. dollars at the average three-months ended March 31, 2015 rate of 0.341640 BRL/USD.

 

  (f)   The unaudited historical statement of operations for the LAP Transaction is presented in accordance with GAAP and has been derived from the unaudited historical statement of comprehensive income of Empresa de Generación Eléctrica de Junĺn S.A.C. and Hidroeléctrica Santa Cruz S.A.C. (collectively “LAP”) for the three months ended March 31, 2015, prepared in accordance with International Financial Reporting Standards (“IFRS”), as issued by the International Accounting Standards Board (“IASB”) (specifically, International Accounting Standard No. 34 Interim Financial Reporting). The historical IFRS statements of comprehensive income of LAP have been adjusted by reclassifying certain line items in order to conform to the predecessor’s statement of operations presentation which is under GAAP. The adjustment to depreciation and amortization expense to align depreciable lives with Global’s policy is included in footnote (4). No other significant adjustments were necessary to conform LAP’s historical IFRS accounting policies to that of the GAAP policies of the predecessor.

 

  (g)   The unaudited historical statement of operations for Renova is presented in accordance with GAAP and has been derived from the unaudited historical condensed combined income statement of Renova Energy Projects I for the three month period ended March 31, 2015, prepared in accordance with IFRS, as issued by IASB (specifically, International Accounting Standard No. 34 Interim Financial Reporting). The historical IFRS income statement information of Renova has been adjusted by reclassifying certain line items in order to conform to the predecessor’s statement of operations presentation which is under GAAP. The adjustment to depreciation and amortization expense to align depreciable lives with Global’s policy is included in footnote (4). No other significant adjustments were necessary to conform Renova’s historical IFRS accounting policies to that of the GAAP policies of the predecessor.

 

119


Table of Contents
  (h)   The unaudited historical statement of operations for the GME Transaction is presented in accordance with GAAP and has been derived from the unaudited historical statements of comprehensive income of Energĺa Eólica de Honduras, S.A. (“Ceno de Hula”), Eolo de Nicaragua, S.A. (“EOLO”), Inversiones Eólicas de Orosĺ Dos, S.A. (“Orosĺ “) and Plantas Eólicas, S.R.L. (“PERSL”) for the three months ended March 31, 2015, prepared in accordance with IFRS (as issued by IASB) (specifically, International Accounting Standard No. 34 Interim Financial Reporting). Below is a summary of the IFRS to GAAP adjustments:

 

(in thousands)   Cerro de
Hula
    Eolo     Orosi     PESRL     Combined
Historical
(IFRS)(i)
    IFRS to GAAP
Adjustments
           Historical
Adjusted
(GAAP)
 

Revenue

  $ 20,028      $ 8,451      $ 5,782      $ 2,541      $ 36,802      $ (5,784     (ii), (iii)      $ 31,018   

Operating costs and expenses:

               

Cost of operations

    2,610        1,194        2,553        512        6,869                 6,869   

Cost of operations — affiliate

                                                  

General and administrative

    66        79        251        282        678                 678   

General and administrative — affiliate

                                                  

Depreciation, amortization and accretion

    3,373        1,014        20        12        4,419                 4,419  (vi) 
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total operating costs and expenses

    6,049        2,287        2,824        806        11,966                 11,966   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Operating income (loss)

    13,979        6,164        2,958        1,735        24,836        (5,784       19,052   

Other (income) expense:

               

Interest expense

    4,669        1,963        1               6,633                 6,633   

Other (income) expense

    63        33        59        (137     18                 18   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total other expense, net

    4,732        1,996        60        (137     6,651                 6,651   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Income (Loss) before income tax expense

    9,247        4,168        2,898        1,872        18,185        (5,784       12,401   

Income tax expense (benefit)

    (50     306        1,526        553        2,335        (1,714     (iv), (v)        621   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net income (loss)

  $ 9,297      $ 3,862      $ 1,372      $ 1,319      $ 15,850      $ (4,070     $ 11,780   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

  (i)   The historical IFRS statements of operations of the GME operating projects have been combined and adjusted by reclassifying certain line items in order to conform to the predecessor’s statement of operations presentation presented under GAAP. There are no significant intercompany transactions between the four operating projects that require elimination.

 

  (ii)   Revenue - Represents the reversal of the revenue recognized under IFRS in connection with the construction phase of a service concession arrangement. We reversed $0.1 million of revenue related to the adjustment for the three months ended March 31, 2015.

 

  (iii)   Revenue - Represents the reversal of the revenue recognized for the liquidated damages under IFRS and rather recognizes the liquidated damages as a reduction in the carrying value of the intangible asset in accordance with GAAP. We reversed $5.7 million of revenue related to the adjustment for the three months ended March 31, 2015.

 

  (iv)   Income tax - Represents the reversal of the deferred taxes recognized under IFRS related to non-monetary assets and liabilities that are remeasured from local currency into their functional currency. We recorded $0.02 million of income tax expense related to the adjustment for the three months ended March 31, 2015, calculated at the statutory rates in effect in each jurisdiction.

 

  (v)   This adjustment reflects the tax effect of adjustments (ii) and (iii), calculated at the statutory rates in effect in each jurisdiction.

 

  (vi)   The adjustment to depreciation and amortization expense to align depreciable lives with Global’s policy is included in footnote (4).

 

(2)   Cost of operations—affiliate—Represents a recharacterization of expense from related party to non-related party. The expense was related to an affiliate of BioTherm, which is an unrelated third party to us. Also includes a recharacterization of expense to related party for NSM 24 for costs incurred related to our Sponsor.

 

(3)   General and administrative—affiliate—Represents a recharacterization of expense from related party to non-related party. The expense was related to an affiliate of BioTherm, which is an unrelated third party to us.

 

120


Table of Contents
(4)   Depreciation, amortization and accretion—Represents the impact of the following acquisition adjustments (in thousands):

 

Amortization due to fair value adjustments to intangible assets

   $ 9,901   

Depreciation due to fair value adjustments to property and equipment and alignment of depreciable lives

     2,678   
  

 

 

 

Total

   $ 12,579   

 

  

 

 

 

Depreciation of property and equipment is recognized using a straight-line method over the estimated useful lives of the solar, wind and hydro-electric energy systems, which are 30, 25 and 40 years, respectively, or the lesser of the term of the underlying property lease to which the assets are affixed.

Amortization of the fair value adjustments to intangible assets totals $9.9 million due to acquired PPA intangible assets recognized over the terms of such agreements over periods ranging from 6 to 24 years. The fair values adjustments of the Acquisitions’ intangible assets were valued primarily using a variation of the income approach. The estimate of the amortization of the PPA intangible assets is preliminary, subject to change and could vary materially from the actual adjustment at the time the acquisition is completed.

The pro forma adjustment to depreciation of $2.7 million represents the net depreciation of the fair value adjustments for the property and equipment of the businesses that have been or will be acquired in the Acquisitions and alignment of the depreciable lives to Global’s accounting policies. The fair values of property and equipment acquired were valued primarily using a cost approach and limited to what is economically supportable as indicated by an income approach. Under this approach, the fair value approximates the current cost of replacing an asset with another of equivalent economic utility adjusted for functional obsolescence and physical depreciation. The estimate is preliminary, subject to change and could vary materially from the actual adjustment at the time the acquisition is completed. The estimated remaining useful lives of the property and equipment acquired range from 6 to 40 years.

 

(5)   Income tax expense—Represents the adjustment to record the tax effect of pro forma adjustments to expense attributable to the Acquisitions, calculated at the statutory rates in effect in each jurisdiction. This adjustment also gives pro forma effect to the Formation Transactions, calculated using the predecessor’s estimated combined statutory federal, foreign and state tax rate.

 

(6)   Net income attributable to non-controlling interest—Represents the adjustment to reflect the 32.4% non-controlling interest in the BioTherm pro forma results of operations and the 49.0% non-controlling interest in the Chint-Soutpan/Witkop pro forma results of operations.

 

(7)   General and administrative—Represents stock compensation expense of approximately $         million related to the grants of restricted stock to certain employees in connection with the formation of Global and $         million of stock compensation expense related to the IPO Grants, which will be recognized over the applicable service period.

 

(8)  

Interest expense—Represents (i) a reduction of $19.7 million in interest expense as a result of the repayment of certain project-level indebtedness in the amount of $742.7 million using funds received from the Bridge Facility and (ii) a net increase of $6.7 million in interest expense, net of capitalized interest, on net borrowings under the Bridge Facility of $462.5 million (after giving effect to the reduction of $87.5 million principal using a portion of the proceeds from the Units Private Placements), as if both occurred as of January 1, 2014. We are assuming all of the outstanding indebtedness of the businesses that have been or will be acquired in the Acquisitions. The fair value of debt assumed was based on market rates for similar project-level debt. Total interest for the Bridge Facility is estimated based on the effective interest rate on borrowings under the Bridge Facility of 8.5% at December 31, 2014, which increased by 0.5% on

 

121


Table of Contents
 

May 22, 2015 and increases by 0.25% each 90 days thereafter until the maturity in December 2016 or repayment of all outstanding indebtedness under the Bridge Facility. The pro forma adjustment for the Bridge Facility interest expense of $6.7 million is net of estimated capitalized interest, plus an estimate of amortization of the Bridge Facility debt issuance costs and discounts. The actual interest rates may vary from that estimate and a  1/8 variance in the estimated interest rate would result in a $0.1 million change in pro forma interest expense for the three months ended March 31, 2015. See “Description of certain indebtedness—Bridge Facility.”

 

(9)   General and administrative-affiliate—General and administrative expenses include certain historical costs incurred by our Sponsor and allocated to our accounting predecessor. These costs are not necessarily indicative of costs which would have been incurred had Global been a standalone entity nor are these costs necessarily indicative of what our general and administrative expenses will be in the future in accordance with the terms of the Management Services Agreement with our Sponsor.

 

(10)   Interest expense—Represents the net impact to interest expense resulting from the (i) repayment of the Bridge Facility and certain project-level debt using a portion of the net proceeds from this offering resulting in a decrease in interest expense of $13.1 million and (ii) additional interest expense of $             million resulting from the Senior Notes offering.

 

(11)   Income tax expense—Represents the tax effect of pro forma adjustments to expense, and to give pro forma effect to the Offering Transactions, calculated using the predecessor’s estimated combined statutory federal, foreign and state tax rate.

 

(12)   Net loss attributable to non-controlling interest—Global will become the sole managing member of Global LLC immediately prior to the consummation of this offering. After consummation of the Organizational Transactions, Global will own less than 100% of the economic interests in Global LLC but will have 100% of the voting power and control the management of Global LLC. In addition, Global LLC will own less than 100% of certain consolidated project entities. Giving pro forma effect to the Organizational Transactions, including the use of proceeds from this offering as if each had occurred on January 1, 2014, the non-controlling interest would have been     % of the net loss of Global LLC, which received less than 100% of the income from the underlying consolidated project entities.

 

(13)   Pro forma basic and diluted loss per share—Pro forma basic and diluted loss per share is calculated as follows:

 

(in thousands, except share and per share data)    Basic      Diluted  

 

 

EPS Numerator:

     

Net loss attributable to Class A common stock

   $                    $                
  

 

 

 

EPS Denominator:

     

Class A shares offered hereby

     

Class A shares issued in connection with Pending Acquisitions and Class A shares issued in connection with Private Placements

     

Restricted Class A shares

     
  

 

 

 

Total Class A shares

     
  

 

 

 

Loss per share

   $         $     

 

 

 

122


Table of Contents

Unaudited pro forma condensed consolidated statement of operations for the year ended December 31, 2014

 

                   Pro forma adjustments         

(in thousands, except share and per

share data)

  Predecessor     Acquisitions(1)     Acquisition
adjustments
    Formation
Transactions
    Offering
Transactions
    TerraForm
Global, Inc.
Pro Forma
 

Statement of Operations Data:

           

Revenue

  $ 39,449      $ 259,450      $      $      $      $ 298,899   

Operating costs and expenses:

           

Cost of operations

    1,999        41,317        1,438 (2)                    44,754   

Cost of operations - affiliate

    2,257        1,847        (1,438 )(2)                    2,666   

General and administrative

    1,349        16,046        565 (3)      (8)             17,960   

General and administrative - affiliate

    10,850        4,476        (565 )(3)             (10)      14,761   

Depreciation, amortization and accretion

    7,167        73,663        50,563 (4)                    131,393   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total operating costs and expenses

    23,622        137,349        50,563                      211,534   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Operating income (loss)

    15,827        122,101        (50,563                   87,365   

Other (income) expense:

           

Interest expense

    24,294        101,014               (24,251 )(9)      (49,510 )(11)      51,547   

Other (income) expense

    (5,128     (8,763     (5)                    (13,891
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total other expense, net

    19,166        92,251               (24,251     (49,510     37,656   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Income (loss) before income tax expense

    (3,339     29,850        (50,563     24,251        49,510        49,709   

Income tax expense (benefit)

    1,700        11,054        (13,514 )(6)      6,390 (6)         (12)      5,630   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net income (loss)

    (5,039     18,796        (37,049     17,861        49,510        44,079   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Less net income attributable to non-controlling interest

                  7,831 (7)                (13)      7,831   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net income (loss) attributable to Global

  $ (5,039   $ 18,796      $ (29,218   $ 17,861      $ 49,510      $ 51,911   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Pro forma basic and diluted loss per share(14)

           

Pro forma weighted average shares outstanding(14)

           

 

123


Table of Contents

Notes to the unaudited pro forma condensed consolidated statement of operations for the year ended December 31, 2014

 

(1)   The following table represents the consolidating schedule of the historical results of the businesses that have been or will be acquired in the Acquisitions reflected in the unaudited pro forma condensed consolidated statement of operations for the year ended December 31, 2014 derived from their historical financial statements:

 

(in thousands)                                                               
    

Chint —

NSM 24(a)

    BioTherm    

Chint —

Soutpan /
Witkop(c)

    FERSA(a)     Hercules     LAP(d)(f)     Renova(e)(g)     GME(h)    

Acquisitions

 
                                  (unaudited)    

(unaudited)

   

(unaudited)

       
Statement of Operations Data:                                                      

Revenue

  $ 5,896      $ 21,032      $ 14,702      $ 10,710      $ 24,672      $ 9,881      $ 94,331      $ 78,226      $ 259,450   

Operating costs and expenses:

                 

Cost of operations (b)

    409        1,143        1,268        1,765        1,713        2,196        18,011        14,812        41,317   

Cost of operations - affiliate (b)

           1,847                                                  1,847   

General and administrative

    179        1,500        1,474        308        1,872        890        7,864        1,959        16,046   

General and administrative - affiliate

           565        3,911                                           4,476   

Depreciation, amortization, and accretion

    1,216        5,178        2,951        3,397        15,079        1,437        28,992        15,413        73,663   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total operating costs and expenses

    1,804        10,233        9,604        5,470        18,664        4,523        54,867        32,184        137,349   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Operating income (loss)

    4,092        10,799        5,098        5,240        6,008        5,358        39,464        46,042        122,101   

Other (income) expense:

                 

Interest expense, net

    3,533        8,558        12,792        5,075        10,674        4,107        32,358        23,917        101,014   

Other (income) expense

           (854     (1,702     (806     (3,390     6,185        (8,503     307        (8,763
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total other expense, net

    3,533        7,704        11,090        4,269        7,284        10,292        23,855        24,224        92,251   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Income (Loss) before income tax expense

    559        3,095        (5,992     971        (1,276     (4,934     15,609        21,818        29,850   

Income tax expense (benefit)

    550        1,170        1,018        820        (46     926        5,289        1,327        11,054   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Net income (loss)

  $ 9      $ 1,925      $ (7,010   $ 151      $ (1,230   $ (5,860   $ 10,320      $ 20,491      $ 18,796   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

  (a)   The statement of operations for the year ended December 31, 2014 has been translated from Indian Rupee to U.S. dollars at the average fiscal 2014 rate of 0.016358 INR/USD.

 

  (b)   BioTherm Cost of operations consists of operations management fees and plant operating costs on the BioTherm historical financial statements. BioTherm Cost of operations—affiliate consists of operations management fees—related party and plant operating costs—related party on the BioTherm historical financial statements.

 

  (c)   The statement of operations for the year ended December 31, 2014 has been translated from South African Rand to U.S. dollars at the average fiscal 2014 rate of 0.0921 ZAR/USD.

 

  (d)   The statement of operations for the year ended December 31, 2014 has been translated from Peruvian Nuevo Sol to U.S. dollars at the average fiscal 2014 year rate of 0.3453 PEN/USD.

 

  (e)   The statement of operations for the year ended December 31, 2014 has been translated from Brazilian Real to U.S. dollars at the average fiscal 2014 rate of 0.4259 BRL/USD.

 

  (f)   The unaudited historical statement of operations for the LAP Transaction is presented in accordance with GAAP and has been derived from the audited historical statement of comprehensive income of Empresa de Generación Eléctrica de Junĺn S.A.C. and Hidroeléctrica Santa Cruz S.A.C. for the year ended December 31, 2014, prepared in accordance with IFRS, as issued by the IASB. The historical IFRS statements of comprehensive income of LAP have been adjusted by reclassifying certain line items in order to conform to the predecessor’s statement of operations presentation which is under GAAP. The adjustment to depreciation and amortization expense to align depreciable lives with Global’s policy is included in footnote (4). No other significant adjustments were necessary to conform LAP’s historical IFRS accounting policies to that of the GAAP policies of the predecessor.

 

124


Table of Contents
  (g)   The unaudited historical statement of operations for Renova is presented in accordance with GAAP and has been derived from the audited historical combined income statement of Renova Energy Projects I for the year ended December 31, 2014, prepared in accordance with IFRS (as issued by IASB). The historical IFRS income statement information of Renova has been adjusted by reclassifying certain line items in order to conform to the predecessor’s statement of operations presentation which is under GAAP. The adjustment to depreciation and amortization expense to align depreciable lives with Global’s policy is included in footnote (4). No other significant adjustments were necessary to conform Renova’s historical IFRS accounting policies to that of the GAAP policies of the predecessor.

 

  (h)   The unaudited historical statement of operations for the GME Transaction is presented in accordance with GAAP and has been derived from the audited historical statements of comprehensive income of Energĺa Eólica de Honduras, S.A. (“Ceno de Hula”), Eolo de Nicaragua, S.A. (“EOLO”), Inversiones Eólicas de Orosĺ Dos, S.A. (“Orosĺ”), and Plantas Eólicas, S.R.L. (“PERSL”) for the year ended December 31, 2014, prepared in accordance with IFRS (as issued by IASB). Below is the summary of the IFRS to GAAP adjustments:

 

(in thousands)    Cerro de
Hula
    Eolo      Orosi     PESRL     Combined
Historical
(IFRS) (i)
     IFRS to
GAAP
Adjustments
     Historical
Adjusted
(GAAP)
 

Revenue

   $ 48,160      $ 24,355       $ 732      $ 5,711      $ 78,958       $ (732 (ii)     $ 78,226   

Operating costs and expenses:

                 

Cost of operations

     6,845        4,537         1,171        2,259        14,812         —           14,812   

Cost of operations - affiliate

     —          —           —          —          —           —           —     

General and administrative

     406        353         116        1,084        1,959         —           1,959   

General and administrative - affiliate

     —          —           —          —          —           —           —     

Depreciation, amortization and accretion

     11,007        4,058         50        298        15,413         —           15,413 (v) 
  

 

 

   

 

 

    

 

 

   

 

 

   

 

 

    

 

 

    

 

 

 

Total operating costs and expenses

     18,258        8,948         1,337        3,641        32,184         —           32,184   
  

 

 

   

 

 

    

 

 

   

 

 

   

 

 

    

 

 

    

 

 

 

Operating income (loss)

     29,902        15,407         (605     2,070        46,774         (732      46,042   

Other (income) expense:

                 

Interest expense

     15,975        7,940         —          2        23,917         —           23,917   

Other (income) expense

     610        193         (356     (140     307         —           307   
  

 

 

   

 

 

    

 

 

   

 

 

   

 

 

    

 

 

    

 

 

 

Total other expense, net

     16,585        8,133         (356     (138     24,224         —           24,224   

Income (Loss) before income tax expense

     13,317        7,274         (249     2,208        22,550         (732      21,818   

Income tax expense (benefit)

     (165     1,216         68        720        1,840         (513 (iii), (iv)       1,327   
  

 

 

   

 

 

    

 

 

   

 

 

   

 

 

    

 

 

    

 

 

 

Net income (loss)

   $ 13,482      $ 6,058       $ (317   $ 1,488      $ 20,710       $ (219    $ 20,491   
  

 

 

   

 

 

    

 

 

   

 

 

   

 

 

    

 

 

    

 

 

 

 

  

 

 

   

 

 

    

 

 

   

 

 

   

 

 

    

 

 

    

 

 

 

 

  (i)   The historical IFRS statements of operations of the GME operating projects have been combined and adjusted by reclassifying certain line items in order to conform to the predecessor’s statement of operations presentation which is presented under GAAP. There are no significant intercompany transactions between the four operating projects that require elimination.

 

  (ii)   Revenue - Represents the reversal of the revenue recognized under IFRS in connection with the construction phase of a service concession arrangement in order to conform with GAAP.

 

  (iii)   Income taxes - Represents the reversal of the deferred taxes recognized under IFRS related to non-monetary assets and liabilities that are remeasured from local currency into their functional currency. A reduction of $0.3 million in income tax expense was recorded related to the adjustment for the year ended December 31, 2014 calculated at the statutory rates in effect in each jurisdiction.

 

  (iv)   This adjustment reflects the tax effect of adjustment (ii) calculated at the statutory rates in effect in each jurisdiction.

 

  (v)   The adjustment to depreciation and amortization expense to align depreciable lives with Global’s policy is included in footnote (4).

 

(2)   Cost of operations—affiliate—Represents a recharacterization of expense from related party to non-related party. The expense was related to an affiliate of BioTherm, which is an unrelated third party to us. Also includes a recharacterization of expense to related party for NSM 24 for costs incurred related to our Sponsor.

 

(3)   General and administrative—affiliate—Represents a recharacterization of expense from related party to non-related party. The expense was related to an affiliate of BioTherm, which is an unrelated third party to us.

 

125


Table of Contents
(4)   Depreciation, amortization and accretion—Represents the impact of the following acquisition adjustments (in thousands):

 

Amortization due to fair value adjustments to intangible assets

   $ 39,917   

Depreciation due to fair value adjustments to property and equipment and alignment of depreciable lives

     10,646   
  

 

 

 

Total

   $ 50,563   

 

  

 

 

 

Depreciation of property and equipment is recognized using a straight-line method over the estimated useful lives of the solar, wind and hydro-electric energy systems, which is 30, 25 and 40 years, respectively, or the lesser of the term of the underlying property lease to which the assets are affixed.

Amortization of the fair value adjustments to intangible assets totals $39.9 million due to acquired PPA intangible assets recognized over the terms of such agreements over periods ranging from 6 to 24 years. The fair value adjustments for the intangible assets of the businesses that have been or will be acquired in the Acquisitions were valued primarily using a variation of the income approach. The estimate of the amortization of the PPA intangible assets are preliminary, subject to change and could vary materially from the actual adjustment at the time the acquisition is completed.

The pro forma adjustment to depreciation of $10.6 million represents the net depreciation of the fair value adjustments for the property and equipment of the businesses that have been or will be acquired in the Acquisitions and alignment of the depreciable lives to Global’s accounting policies. The fair value of property and equipment acquired was valued primarily using a cost approach and limited to what is economically supportable as indicated by an income approach. Under this approach, the fair value approximates the current cost of replacing an asset with another of equivalent economic utility adjusted for functional obsolescence and physical depreciation. The estimate is preliminary, subject to change and could vary materially from the actual adjustment at the time the applicable acquisition is completed. The estimated remaining useful lives of the property and equipment acquired ranges from 6 to 40 years.

 

(5)   Other (income) expense, net—As a result of our Sponsor’s contributions of its equity interests in NSM 24 to us and our acquisition of the remaining NSM 24 equity interests at the purchase price in the Chint-NSM Transaction as reflected herein, we anticipate recording $1.6 million for NSM 24 gain on remeasurement to fair value of the Sponsor’s contributed interest. This gain is not reflected in the unaudited pro forma condensed consolidated statement of operations because of its non-recurring nature.

 

(6)   Income tax expense—Represents the adjustment to record the tax effect of pro forma adjustments to expense attributable to the Acquisitions, calculated at the statutory rates in effect in each jurisdiction. This adjustment also gives pro forma effect to the Formation Transactions, calculated using the predecessor’s estimated combined statutory federal, foreign and state tax rate.

 

(7)   Net income attributable to non-controlling interest—Represents the adjustment to reflect the 32.4% non-controlling interest in the BioTherm pro forma results of operations and the 49.0% non-controlling interest in the Chint-Soutpan/Witkop pro forma results of operations.

 

(8)   General and administrative—Represents stock compensation expense of approximately $         million related to the grants of restricted stock to certain employees in connection with the formation of Global and $         million of stock compensation expense related to the IPO Grants, which will be recognized over the applicable service period.

 

(9)  

Interest expense—Represents: (i) a reduction of $72.9 million in interest expense as a result of the repayment of certain project-level indebtedness in the amount of $742.7 million using funds received from the Bridge Facility; and (ii) an increase of $48.7 in interest expense, net of capitalized interest, on net

 

126


Table of Contents
 

borrowings under the Bridge Facility of $462.5 million (after giving effect to the reduction of $87.5 million principal using a portion of the proceeds from the Units Private Placements), as if both occurred as of January 1, 2014. We are assuming all of the outstanding indebtedness of the businesses that have been or will be acquired in the Acquisitions. The fair value of debt assumed was based on market rates for similar project-level debt. Total interest for the Bridge Facility is estimated based on the effective interest rate on borrowings under the Bridge Facility of 8.5% at December 31, 2014, which increased by 0.50% on May 22, 2015 and will increase by 0.25% each 90 days thereafter until the maturity in December 2016 or repayment of all outstanding indebtedness under the Bridge Facility. The pro forma adjustment for the Bridge Facility interest expense of $48.7 million is net of estimated capitalized interest, plus an estimate of amortization of the Bridge Facility debt issuance costs and discounts. The actual interest rates may vary from that estimate and a 1/8% variance in the estimated interest rate would result in a $0.4 million change in pro forma interest expense for the year ended December 31, 2014. See “Description of certain indebtedness—Bridge Facility.”

 

(10)    General and administrative - affiliate—General and administrative expenses include certain historical costs incurred by our Sponsor and allocated to our accounting predecessor. These costs are not necessarily indicative of costs which would have been incurred had Global been a standalone entity nor are these costs necessarily indicative of what our general and administrative expenses will be in the future in accordance with the terms of the Management Services Agreement with our Sponsor.

 

(11)    Interest expense—Represents the net impact to interest expense resulting from (i) the repayment of the Bridge Facility and certain project-level debt using a portion of the net proceeds from this offering resulting in a decrease in interest expense of $49.5 million and (ii) additional interest expense of $             million resulting from the Senior Notes offering.

 

(12)   Income tax expense—Represents the tax effect of pro forma adjustments to expense, and to give pro forma effect to the Offering Transactions, calculated using the predecessor’s estimated combined statutory federal, foreign and state tax rate.

 

(13)   Net loss attributable to non-controlling interest—Global will become the sole managing member of Global LLC immediately prior to the consummation of this offering. After consummation of the Organizational Transactions, Global will own less than 100% of the economic interests in Global LLC but will have 100% of the voting power and control the management of Global LLC. In addition Global LLC will own less than 100% of certain consolidated project entities. Giving pro forma effect to the Organizational Transactions, including the use of proceeds from this offering as if each had occurred on January 1, 2014, the non-controlling interest would have been         % of the net loss of Global LLC, which received less than 100% of the income from the underlying consolidated project entities.

 

(14)    Pro forma basic and diluted earnings per share—Pro forma basic and diluted earnings per share is calculated as follows:

 

(in thousands, except share and per share data)    Basic      Diluted  

 

 

EPS Numerator:

     

Net earnings attributable to Class A common stock

   $                    $                
  

 

 

 

EPS Denominator:

     

Class A shares offered hereby

     

Class A shares issued in connection with Pending Acquisitions and Class A shares issued in connection with Private Placements

     

Restricted Class A shares

     
  

 

 

 

Total Class A shares

     
  

 

 

 

Earnings per share

   $         $     

 

 

 

127


Table of Contents

Unaudited pro forma condensed consolidated balance sheet as of March 31, 2015

 

    

Predecessor

   

Acquisitions(1)

    Pro forma adjustments     TerraForm
Global, Inc.
Pro Forma
 
(in thousands, except share and per share data)       Acquisition
Adjustments
    Formation
Transactions
    Offering
Transactions
   

Assets

           

Current assets:

           

Cash and cash equivalents

  $ 136,358      $ 55,123      $      $ (151,792 )(13)    $ (39,689 )(20)    $       —   

Cash committed for construction projects

    34,281        503                             34,784   

Restricted cash

    20,472        39,646               20,979  (14)      (26,969 )(21)      54,128   

Accounts receivable, net

    12,603        75,164        4,074  (2)                    91,841   

Due from parent and affiliates

    747        4,074        (4,074 )(2)                    747   

Deferred financing costs, net

    5,263        354        (354 )(3)      3,181  (15)      (8,193 )(22)      251   

Deferred tax assets

    83        453                             536   

Other current assets

    1,840        27,335                             29,175   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total current assets

    211,647        202,652        (354     (127,632     (74,851     211,462   

Property and equipment, net

    415,537        1,409,279        583,122  (4)                    2,407,938   

Intangible assets

           125,118        637,286  (5)                    762,404   

Due from parent and affiliates

    140        3,300                             3,440   

Deferred financing costs, net

    6,199        3,825        (3,825 )(3)      2,493  (15)      (4,943 )(22)      3,749   

Restricted cash, long-term

    22,292        93,404               40,452  (14)             156,148   

Deferred tax assets

    98        17,838         (6)                    17,936   

Other assets

    29,775        27,076        (3,300 )(7)                    53,551   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total Assets

  $ 685,688      $ 1,882,492      $ 1,212,929      $ (84,687   $ (79,794   $ 3,616,628   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Liabilities and Equity

           

Current liabilities:

           

Current portion of long-term debt

  $ 39,957      $ 92,532      $ 5,602  (8)    $ (104,988 )(16)    $ (7,614 )(16)    $ 25,489   

Accounts payable

    1,093        20,898        187,271  (2)                    209,262   

Accrued expenses and other current liabilities

    2,102        56,256        (3,767 )(9)                    54,591   

Deferred tax liabilities

    259                                    259   

Due to parent and affiliates

    34,314        197,416        (187,271 )(2)                    44,459   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total current liabilities

    77,725        367,102        1,835        (104,988     (7,614     334,060   

Long-term debt, less current portion

    517,800        1,067,715        20,454  (8)      (327,894 )(16)      (546,265 )(16)      731,810   

Due to parent and affiliates

    6,968        30,504        (274 )(2)                    37,198   

Asset retirement obligations and other liabilities

    33,344        33,646        (11,868 )(2), (9)      (433 )(17)             54,689   

Deferred tax liability

    2,856        25,590        229,432  (6)              (23)      257,878   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total liabilities

  $ 638,693      $ 1,524,557      $ 239,579      $ (433,315   $ (553,879   $ 1,415,635   

Equity:

           

Net parent investment

  $ 69,142      $      $ 1,607  (10)    $ (16,202 )(18)    $ (21,635 )(24)    $ 32,911   

Class A common stock, par value $0.01 per share, shares authorized, no shares issued and outstanding, actual;              shares issued and outstanding, as adjusted

                                 (25)        

Class B common stock, par value $0.01 per share, shares authorized, no shares issued and outstanding, actual;              shares issued and outstanding, as adjusted

                                 (25)        

Class B1 common stock, par value $0.01 per share, shares authorized, no shares issued and outstanding, actual; no shares issued and outstanding, as adjusted

                                 (25)        

Preferred stock, par value $0.01 per share, no shares authorized, issued and outstanding, actual; authorized and no shares issued and outstanding, as adjusted

                                         

Additional paid-in capital

                         486,250  (19)      878,000 (24)      1,364,250   

Accumulated other comprehensive loss

    (22,147                                 (22,147

Non-controlling interest

                  86,169  (11)              (26)      86,169   

Members’ equity

           357,935        885,574  (10), (12)      (121,420 )(12)      (382,279 )(12)      739,810   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total equity

    46,995        357,935        973,350        348,628        474,085        2,200,993   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total liabilities and equity

  $ 685,688      $ 1,882,492      $ 1,212,929      $ (84,687   $ (79,794   $ 3,616,628   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

128


Table of Contents

Notes to the unaudited pro forma condensed consolidated balance sheet as of March 31, 2015

 

(1)   The following table represents the consolidating schedule of the historical balance sheets of the businesses that have been or will be acquired in the Acquisitions reflected in the unaudited pro forma condensed consolidated balance sheet as of March 31, 2015 derived from their historical financial statements:

 

(in thousands)

  Chint –
NSM 24(a)
    BioTherm     Chint –
Soutpan/
Witkop(b)
    FERSA(a)     Hercules     LAP(c)(e)     Renova(d)(f)     GME(g)     Acquisitions  
                 

Assets

                 

Current assets:

                 

Cash and cash equivalents

  $ 9      $ 24,575      $ 9,271      $ 156      $ 4,475      $ 1,768      $ 7,142      $ 7,727      $ 55,123   

Cash committed for construction projects

                                       503                      503   

Restricted cash

    7,203               10,739        290        5,589                      15,825        39,646   

Accounts receivable, net

    966        4,370        6,694        956        20,019        5,453        6,894        29,812        75,164   

Due from parent and affiliates

                                4,041        33                      4,074   

Deferred financing costs

    55               12        99                      188               354   

Deferred tax assets

                  453                                           453   

Other current assets

    27        3,438        552        1,089        2,874        1,053        12,092        6,210        27,335   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total current assets

    8,260        32,383        27,721        2,590        36,998        8,810        26,316        59,574        202,652   

Property and equipment, net

    34,146        79,781        182,645        66,818        204,285        125,455        418,704        297,445        1,409,279   

Intangible assets

           3,807                             32               121,279        125,118   

Due from parent and affiliates

                                                     3,300        3,300   

Deferred financing costs

    683               118        567                      2,457               3,825   

Restricted cash, long-term

    2,151                      5,518        391               52,075        33,269        93,404   

Deferred tax assets

           13,677                                           4,161        17,838   

Other assets

    1                      1,744        3,545        10,106        2,532        9,148        27,076   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total Assets

  $ 45,241      $ 129,648      $ 210,484      $ 77,237      $ 245,219      $ 144,403      $ 502,084      $ 528,176      $ 1,882,492   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Liabilities and Equity

                 

Current liabilities:

                 

Current portion of long-term debt

  $ 1,303      $ 2,040      $ 1,135      $ 4,911      $ 40,543      $ 3,081      $ 21,548      $ 17,971      $ 92,532   

Accounts payable

    14        3,582        10        303        11,035        103        5,001        850        20,898   

Accrued expenses and other current liabilities

    693        2,415        1,899        85        1,402        4,049        9,893        35,820        56,256   

Deferred tax liabilities

                                                              

Due to parent and affiliates

    4,562        8,325        5,484        94        178,244        608               99        197,416   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total current liabilities

    6,572        16,362        8,528        5,393        231,224        7,841        36,442        54,740        367,102   

Long-term debt, less current portion

    24,595        74,095        158,389        35,317        27,990        101,179        269,242        376,908        1,067,715   

Due to parent and affiliates

                  30,231                      273                      30,504   

Asset retirement obligations and other long term liabilities

           1,320        3,724        1,519        14,405               5,497        7,181        33,646   

Deferred tax liabilities

    956        14,786        1,120        2,716        525        2,560               2,927        25,590   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total liabilities

  $ 32,123      $ 106,563      $ 201,992      $ 44,945      $ 274,144      $ 111,853      $ 311,181      $ 441,756      $ 1,524,559   

Equity:

                 

Members’ equity / shareholder’s net investment

  $ 13,118      $ 23,085      $ 8,492      $ 32,292      $ (28,925   $ 32,550      $ 190,903      $ 86,420      $ 357,935   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total equity

    13,118        23,085        8,492        32,292        (28,925     32,550        190,903        86,420        357,935   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total liabilities and equity

  $ 45,241      $ 129,648      $ 210,484      $ 77,237      $ 245,219      $ 144,403      $ 502,084      $ 528,176      $ 1,882,492   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 
  (a)   The balance sheet as of March 31, 2015 has been translated from Indian Rupee to U.S. dollars at a rate of 0.015970 INR/USD.

 

  (b)   The balance sheet as of March 31, 2015 has been translated from South African Rand to U.S. dollars at a rate of 0.082510 ZAR/USD.

 

  (c)   The balance sheet as of March 31, 2015 has been translated from Peruvian Nuevo Sol to U.S. dollars at a rate of 0.316830 PEN/USD.

 

129


Table of Contents
  (d)   The balance sheet as of March 31, 2015 has been translated from Brazilian Real to U.S. dollars at a rate of 0.304500 BRL/USD.

 

  (e)   The unaudited historical balance sheet for LAP is presented in accordance with GAAP and has been derived from the unaudited historical balance sheets of Empresa de Generación Eléctrica de Junĺn S.A.C. and Hidroeléctrica Santa Cruz S.A.C. as of March 31, 2015, prepared in accordance with IFRS, as issued by the IASB (specifically, International Accounting Standard No. 34—Interim Financial Reporting). The historical IFRS balance sheet information of LAP has been adjusted by reclassifying certain line items in order to conform to the predecessor’s financial statement presentation which were prepared in accordance with GAAP. Intangible assets of $0.7 million have been reclassified to property and equipment, net, for certain capitalized development costs. The adjustment to depreciation and amortization expense to align depreciable lives with Global’s policy is included in footnote (4). No other significant adjustments were necessary to conform LAP’s historical IFRS accounting policies with that of the GAAP policies of the predecessor.

 

  (f)   The unaudited historical balance sheet for Renova is presented in accordance with GAAP and has been derived from the unaudited condensed combined balance sheet of Renova Energy Projects I as of March 31, 2015, prepared in accordance with IFRS, as issued by IASB (specifically International Accounting Standard No. 34-Interim Financial Reporting). The historical IFRS balance sheet information of Renova has been adjusted by reclassifying certain line items in order to conform to the predecessor’s financial statement presentation. Deferred financing costs, which were classified as part of borrowings in the historical Renova IFRS balance sheet have been reclassified to current deferred financing costs and non-current deferred financing costs in the amounts of $0.2 million and $2.5 million, respectively. The adjustment to depreciation and amortization expense to align depreciable lives with Global’s policy is included in footnote (4). No other significant adjustments were necessary to conform Renova’s historical IFRS accounting policies with that of the GAAP policies of the predecessor.

 

  (g)   The unaudited historical balance sheet for GME is presented in accordance with GAAP and has been derived from the unaudited balance sheets of Energĺa Eólica de Honduras, S.A. (“Ceno de Hula”), Eolo de Nicaragua, S.A. (“EOLO”), Inversiones Eólicas de Orosi Dos, S.A. (“Orosi”) and Plantas Eólicas, S.R.L. (“PERSL”) as of March 31, 2015, prepared in accordance with IFRS, as issued by IASB (specifically International Accounting Standard No. 34—Interim Financial Reporting). Below is the summary of the IFRS to GAAP adjustments.

 

(in thousands)   Cerro de
Hula
    Eolo     Orosi     PESRL     Combined
Historical
(IFRS) (i)
    IFRS to
GAAP
Adjustments
          Historical
Adjusted
(GAAP)
 

Assets

                

Current assets:

                

Cash and cash equivalents

  $ 2,189      $ 1,225      $ 3,466      $ 847      $ 7,727      $ -         $ 7,727   

Cash committed for construction projects

    -        -        -        -        -        -           -   

Restricted cash

    12,095        3,690        40        -        15,825        -           15,825   

Accounts receivable, net

    12,539        6,335        8,612        2,326        29,812        -           29,812   

Due from parent and affiliates

    -        -        -        -        -        -           -   

Deferred financing costs, net

    -        -        -        -        -        -           -   

Deferred tax assets

    -        -        -        -        -        -           -   

Other current assets

    3,525        489        1,483        713        6,210        -           6,210   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

  

 

 

 

Total current assets

    30,348        11,739        13,601        3,886        59,574        -           59,574   

Property and equipment, net

    225,370        70,589        427        1,059        297,445        -          297,445   

Intangible assets

    13,237        3,133        111,459        -        127,829        (6,550   (ii)(iii)      121,279   

Due from parent and affiliates

    -        3,300        -        -        3,300        -           3,300   

Deferred financing costs, net

    -        -        -        -        -        -           -   

Restricted cash, long-term

    25,704        7,565        -        -        33,269        -           33,269   

Deferred tax assets

    233        -        1,668        -        1,901        2,260      (iv), (v)      4,161   

Other assets

    2,456        534        6,145        13        9,148        -           9,148   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

  

 

 

 

Total assets

  $ 297,348      $ 96,860      $ 133,300      $ 4,958      $ 532,466      $ (4,290      $ 528,176   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

  

 

 

 

Liabilities and Equity

                

Current liabilities:

                

Current portion of long-term debt

  $ 10,836      $ 4,750      $ 2,385      $ -      $ 17,971      $ -         $ 17,971   

Accounts payable

    -        727        123        -        850        -           850   

Accrued expenses and other current liabilities

    7,160        742        27,187        731        35,820        -           35,820   

Deferred tax liabilities

    -        -        -        -        -        -           -   

Due to parent and affiliates

    -        -        -        99        99        -           99   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

  

 

 

 

Total current liabilities

    17,996        6,219        29,695        830        54,740        -           54,740   

Long-term debt, less current portion

    210,411        77,469        89,028        -        376,908        -           376,908   

Due to parent and affiliates

    -        -        -        -        -        -           -   

Asset retirement obligations

    829        335        624        587        2,375        -           2,375   

Other Long-term liabilities

    4,806        -        -        -        4,806        -           4,806   

Deferred tax liability

    -        2,874        -        53        2,927        -           2,927   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

  

 

 

 

Total liabilities

  $ 234,042      $ 86,897      $ 119,347      $ 1,470      $ 441,756      $ -      $      441,756   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

  

 

 

 

 

130


Table of Contents
(in thousands)   Cerro de
Hula
    Eolo     Orosi     PESRL     Combined
Historical
(IFRS) (i)
    IFRS to
GAAP
Adjustments
         Historical
Adjusted
(GAAP)
 

Equity:

               

Members’ equity

    63,306        9,963        13,953        3,488        90,710        (4,290   (ii), (iii), (iv), (v)     86,420   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

 

Total equity

    63,306        9,963        13,953        3,488        90,710        (4,290       86,420   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

 

Total liabilities and equity

  $ 297,348      $ 96,860      $ 133,300      $ 4,958      $ 532,466      $ (4,290     $ 528,176   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

 

 

  (i)   The historical IFRS balance sheets of the GME operating projects have been combined and adjusted by reclassifying certain line items in order to conform to the predecessor’s balance sheet presentation which is under GAAP. There are no significant intercompany transactions between the four operating projects that require elimination.

 

  (ii)   Intangible assets—The adjustment reflects the reversal of $0.9 million in intangible assets recorded under IFRS in connection with the construction phase of a service concession arrangement in order to conform with GAAP.

 

  (iii)   Intangible assets—This adjustment reflects the reversal of the revenue recognized for the liquidated damages under IFRS and rather recognizes the liquidated damages as a $5.7 million reduction of the carrying value of the intangible asset in accordance with GAAP.

 

  (iv)   Deferred taxes—This adjustment reflects the reversal of the $0.3 million in deferred taxes recognized under IFRS related to non-monetary assets and liabilities that are remeasured from local currency into their functional currency.

 

  (v)   This adjustment reflects the tax effect of adjustments (ii) and (iii) calculated at the statutory rates in effect in each jurisdiction.

 

(2)   Accounts receivable, accounts payable and other liabilities—Represents the recharacterization of accounts receivable, accounts payable or other payables from related party to non-related party.

 

(3)   Deferred financing costs—Represents adjustment for reversal of the Acquisitions’ historical deferred financing costs as the applicable debt was revalued under purchase accounting.

 

(4)   Property and equipment—Represents the adjustment to reflect the Acquisitions’ property and equipment at their estimated fair values. The fair values of property and equipment acquired were valued primarily using a cost approach and limited to what is economically supportable as indicated by an income approach. The fair value approximates the current cost of replacing an asset with another asset of equivalent economic utility adjusted further for functional obsolescence and physical depreciation. The estimate is preliminary, subject to change and could vary materially from the actual adjustment at the time the acquisition is completed. The estimated remaining useful lives of the property and equipment acquired range from 6 to 40 years.

 

(5)   Intangible assets—Represents the adjustment to record the PPAs of the businesses that have been or will be acquired in the Acquisitions at their estimated fair values. The estimated fair values were valued primarily using a variation of the income approach. The estimated remaining useful lives of the intangibles range from 6 to 24 years. The estimate is preliminary, subject to change and could vary materially from the actual adjustment at the time the acquisition is completed.

 

(6)   Deferred tax assets and liabilities—Represents the adjustment to recognize deferred taxes resulting from the temporary differences between fair value and the tax basis of assets and liabilities acquired.

 

(7)   Other assets—Represents the elimination of an intercompany loan receivable upon consolidation.

 

(8)   Current and long-term debt—Represents the adjustment to recognize debt assumed in the Acquisitions at fair value.

 

(9)   Deferred revenue—Represents the adjustment to record deferred revenue at fair value in purchase accounting.

 

131


Table of Contents
(10)   Net parent investment—Represents the Sponsor’s contribution to us of its equity method investment in NSM 24 in connection with the Chint-NSM Transaction at its historical cost of $7.1 million, and the $1.6 million gain on remeasurement to fair value of the equity method investment.

 

(11)   Non-controlling interest—Represents the 32.4% non-controlling interest in BioTherm and the 49.0% non-controlling interest in Chint-Soutpan/Witkop not acquired by us.

 

(12)   Member’s equity—Represents the reallocation of equity as a result of this offering.

 

(13)   Cash and cash equivalents—Represents the impact of the following adjustments:

 

Net proceeds from increased borrowings under the Bridge Facility

   $ 310,802   

Net proceeds from the Units Private Placements

     416,598   

Repayment of certain project-level and Acquired Projects’ indebtedness and penalties

     (764,860)   

Cash paid for Acquired Projects

     (114,332)   
  

 

 

 

Net adjustment

   $ (151,792)   

 

(14)   Restricted cash—Represents proceeds from the increased borrowings under the Bridge Facility and the Units Private Placements that is required to be restricted in accordance with the terms of the arrangements.

 

(15)   Deferred financing costs—Represents adjustments to deferred financing costs from the net increased borrowings under the Bridge Facility.

 

(16)   Current and long-term debt—Represents the effect of the following Formation Transactions: (i) the additional borrowings under the Bridge Facility of $400.0 million; (ii) reduced for the repayment of $87.5 million using proceeds from the Units Private Placements; and (iii) repayment of $745.3 million of certain project-level and Acquired Projects’ indebtedness. Additionally, represents the effect of the following Offering Transactions: (i) $             million of additional indebtedness as a result of the issuance of Senior Notes; (ii) $462.5 million repayment of the outstanding principal amount of the Bridge Facility; and (iii) $91.4 million repayment of certain project-level debt.

 

(17)   Asset retirement obligations and other liabilities—Represents the settlement of the related interest rate swaps of $0.4 million in connection with the repayment of certain project-level indebtedness.

 

(18)   Net parent investment—Represents the net impact to net parent investment for the write-off of $4.2 million of deferred financing fees and $19.1 million of penalties on repayment of certain project-level and Acquired Projects’ debt, offset by Sponsor’s contribution of its equity method investment in NSM 24 of $7.1 million.

 

(19)   Additional paid-in capital—Represents proceeds from private placements of Class D units of Global LLC, net of fees and expenses.

 

(20)   Cash—Represents the effect of the following Offering Transactions:

 

Proceeds from this offering received by Global

   $ 800,000   

Proceeds from Class A Common Private Placement

     67,500   

Proceeds from the issuance of the Senior Notes

  

Cash paid for Pending Acquisitions

     (371,799 )(a) 

Repayment of the Bridge Facility

     (435,497

Repayment of certain project-level debt

     (99,913
  

 

 

 

Net adjustment

   $ (39,689

 

  (a)   A portion of the Pending Acquisitions purchase price will be paid using the proceeds from the issuance of the Senior Notes.

 

132


Table of Contents
(21)   Restricted cash—represents the release of restricted cash as a result of the repayment of the Bridge Facility.

 

(22)   Deferred financing costs—Represents the adjustment to (i) write off current and non-current deferred financing costs of $8.2 million and $4.9 million, respectively, as a result of the repayment of the outstanding principal amount of the Bridge Facility and the repayment of certain project-level debt and (ii) recording of deferred financing costs of $     million related to the issuance of the Senior Notes.

 

(23)   Deferred tax assets and liabilities—Represents the impact to deferred taxes as a result of this offering.

 

(24)   Net parent investment—Represents the net impact to net parent investment for the write-off of $13.1 million of deferred financing fees and $8.5 million of penalties on repayment of certain project-level debt and the Bridge Facility. Additionally, represents the reallocation of equity as a result of this offering.

 

(25)   Class A, B and B1 common stock—Represents the par value of common stock issued and outstanding as a result of this offering.

 

(26)   Non-controlling interest—Represents the reclassification of our Sponsor’s investment and other third parties’ investments in our subsidiaries to non-controlling interest.

 

133


Table of Contents

Note 1. Basis of Pro Forma Presentation—Acquisitions

The unaudited pro forma condensed consolidated statement of operations for the year ended December 31, 2014 and for the three months ended March 31, 2015 give effect to the Formation Transactions, the Offering Transactions and the Acquisitions as if they were completed on January 1, 2014. The unaudited pro forma condensed consolidated balance sheet as of March 31, 2015 gives effect to the Formation Transactions, the Offering Transactions and the Acquisitions as if they were completed on March 31, 2015.

The pro forma financial statements have been derived from the audited and unaudited combined financial statements of the predecessor (the “predecessor combined financial statements”) and the financial statements of the businesses that have been or will be acquired in the Acquisitions that are included elsewhere in this registration statement. Assumptions and estimates underlying the pro forma adjustments are described in the accompanying notes, which should be read in connection with the pro forma financial statements.

The pro forma financial statements were prepared using the acquisition method of accounting under GAAP. The predecessor has been treated as the acquirer in the Acquisitions for accounting purposes. Acquisition accounting requires, among other things, that assets acquired and liabilities assumed be recognized at fair value as of the acquisition date. Because acquisition accounting is dependent upon certain valuations and other studies that must be completed as of the acquisition date, at this time there is not sufficient information for a definitive measurement. Differences between these preliminary estimates and the final acquisition accounting will occur and these differences could have a material impact on the accompanying pro forma condensed consolidated financial statements and the combined company’s future results of operations and financial position.

The Acquisitions included in the pro forma condensed consolidated financial statements are accounted for using the accounting guidance for business combinations. Under the acquisition method, the total estimated purchase price is calculated as described in Note 3 to the pro forma condensed consolidated financial statements under the heading “Estimated purchase price and preliminary purchase price allocation.” In accordance with accounting guidance for business combinations, the assets acquired and the liabilities assumed have been measured at fair value. The fair value measurements utilize estimates based on key assumptions of the acquisition, including prior acquisition experience, benchmarking of similar acquisitions and historical and current market data. The pro forma adjustments included herein are likely to be revised as additional information becomes available and as additional analyses are performed. The final purchase price allocation will be determined after the acquisitions are completed and the final amounts recorded for the acquisitions may differ materially from the information presented in these pro forma condensed consolidated financial statements.

The pro forma condensed consolidated financial statements do not reflect any cost savings from operating efficiencies or synergies that could result from the Acquisitions.

For the purpose of measuring the estimated fair value of the assets acquired and liabilities assumed, as reflected in the pro forma condensed consolidated financial statements, we have applied the accounting guidance for fair value measurements, which defines fair value as the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date.

 

134


Table of Contents

Note 2. Acquisitions

Subsequent to March 31, 2015, we have completed or expect to complete the Acquisitions described below to expand our initial portfolio. The initial accounting for these business combinations is not complete because the evaluation necessary to assess the fair values of certain net assets acquired is still in process and the acquisitions have not yet closed, except for the Chint-NSM Transaction and the Hercules Transaction that have already closed. The provisional amounts are subject to revision until the evaluations are completed to the extent that any additional information is obtained about the facts and circumstances that existed as of the acquisition date.

BioTherm Transaction

In April 2015, Global signed agreements to acquire equity interests in the BioTherm projects (70% of Aries, 70% of Konkoonsies and 65% of Klipheuwel), all of which are located in South Africa. These projects have a combined capacity of 32.6 MW based on our ownership percentages. The aggregate consideration paid for ownership in these projects from BioTherm and other minority investors is expected to be approximately $63.4 million, comprised of cash of approximately $55.2 million and              shares of our Class A common stock with a value of approximately $8.2 million, assuming an initial public offering price of $             per share, which is the midpoint of the price range listed on the cover page of this prospectus. In addition to the foregoing, Global has agreed to pay BioTherm approximately $20.5 million in additional cash consideration for certain rights and services.

Chint-NSM Transaction

On June 9, 2015, Global acquired a 51% equity interest in NSM 24 from a subsidiary of Chint Solar (Zhejiang) Co., Ltd. pursuant to a share purchase agreement executed on May 6, 2015. NSM 24 is an operating solar energy system located in India with a capacity of 23.9 MW. The aggregate consideration paid for the acquisition of this interest was $9.1 million. Concurrently, our Sponsor contributed its equity investment (49% equity interest) in NSM 24 to us, which was revalued to fair value of $8.7 million at the time of the acquisition.

Chint-Soutpan/Witkop Transaction

In April 2015, our Sponsor agreed to acquire an additional 41.3% equity interest in each of Soutpan and Witkop presently owned by a subsidiary of Chint Solar (Zhejiang) Co., Ltd. Soutpan is an operating solar energy system located in South Africa with a capacity of 15.8 MW. Witkop is an operating solar energy system located in South Africa with a net capacity of 16.8 MW. The aggregate consideration expected to be paid for the acquisition of these interests is $38.7 million in cash. Our Sponsor will transfer its resulting aggregate 51% interest in each of Soutpan and Witkop to us as part of the Formation Transactions.

Hercules Transaction

On May 14, 2015, Global acquired two wholly owned subsidiaries of Honiton Energy Cayman Limited located in China pursuant to a share purchase agreement. The Hercules Transaction consists of three wind sites with a combined 148.5 MW of capacity. The aggregate consideration paid for the 100% equity interests was $105.3 million in cash.

FERSA Transaction

In May 2015, Global signed an agreement to acquire from FERSA the wind projects Bhakrani, Gadag and Hanumanhatti located in India, representing 101.6 MW of capacity in the aggregate. The aggregate consideration expected to be paid for the 100% equity interests is $33.1 million in cash. This acquisition is expected to close concurrently with this offering.

 

135


Table of Contents

LAP Transaction

In May 2015, our Sponsor agreed to acquire six hydro-electric projects controlled by LAP, which will be transferred to us in connection with this offering. The projects are located in Peru, representing capacity of 72.5 MW in the aggregate. The aggregate consideration expected to be paid for the 100% equity interest in the six projects is $103.1 million in cash.

Renova Transaction

In May 2015, Global signed an agreement with Renova to acquire three wind and hydro-electric projects, including the Renova ROFO Projects. The projects are located in Brazil and have capacity of 336.2 MW in the aggregate. The aggregate cash consideration payable for this acquisition is expected to be $527.8 million. The Renova Transaction is expected to close concurrently with this offering.

GME Transaction

In June 2015, Global signed an agreement with GME to acquire four wind projects. The projects are located in Honduras, Costa Rica and Nicaragua, representing capacity of 326.0 MW in the aggregate. The aggregate consideration paid for this acquisition is expected to be $326.4 million, comprised of cash of $315.9 million and              shares of Class A common stock of Global with a value of $10.5 million, assuming an initial public offering price of $         per share of Class A common stock, which is the midpoint of the range set forth on the cover page of this prospectus. The GME Transaction is expected to close concurrently with this offering. We expect the acquisition of an 82.0 MW solar project (Choluteca) and a 50.0 MW wind project (Orosi), which is one part of the GME Transaction, will be completed when the projects achieve COD, which is expected to occur in the second half of 2015.

Solarpack Transaction

In April 2015, Global signed an agreement for the acquisition from Solarpack Corporación Tecnológica, S.L. of the 26.4 MW capacity Alto Cielo solar project located in Uruguay. The Solarpack Transaction has not been included in these pro forma financial statements as it is not material as compared to our historical combined financial statements. We expect the Solarpack Transaction will be completed when the project achieves COD, which is expected to occur in the second half of 2015.

 

136


Table of Contents

Note 3. Estimated purchase price and preliminary purchase price allocation

The allocation of the preliminary purchase price to the fair values of assets acquired and liabilities assumed includes pro forma adjustments to reflect the fair values of Acquisition’s assets and liabilities at the acquisition date. The final allocation of the purchase price could differ materially from the preliminary allocation used for the unaudited pro forma condensed consolidated balance sheet primarily because power market prices, interest rates and other valuation variables will fluctuate over time and differ at the time of completion of the acquisition compared to the amounts assumed in the pro forma adjustments. The following is a summary of the preliminary purchase price allocations for the Acquisitions:

 

(in thousands)  

Chint-NSM

Transaction

   

BioTherm

Transaction

   

Chint-
Soutpan/Witkop

Transaction

   

FERSA

Transaction

   

Hercules

Transaction

   

LAP

Transaction

   

Renova

Transaction

    GME
Transaction
   

Total

Estimated

Allocation

 

Property and equipment

  $ 38,100      $ 108,600      $ 211,400      $ 68,301      $ 211,600      $ 167,200      $ 726,000      $ 426,100      $ 1,992,401   

Other assets

    10,357        46,060        27,709        9,753        40,934        18,916        80,735        106,152        340,616   

Intangible assets (PPA)

    2,926        115,362        125,966        371        154,905        59,074        32,220        271,580        762,403   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total assets acquired

    51,383        270,022        365,075        78,425        407,439        245,190        838,955        838,932        3,095,420   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Debt

    25,898        76,135        185,580        40,228        68,533        104,260        290,790        394,879        1,186,303   

Other liabilities

    7,740        69,733        85,790        5,088        233,624        37,830        20,391        117,638        577,832   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total liabilities assumed

    33,638        145,868        271,370        45,316        302,157        142,090        311,181        512,517        1,764,135   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Non-controlling interest

           40,253        45,916                                           86,169   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Purchase price

  $ 17,745      $ 83,901      $ 47,789      $ 33,109      $ 105,282      $ 103,100      $ 527,774      $ 326,416      $ 1,245,115   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

 

Note 4. Significant accounting policies

Based upon the predecessor’s initial review of the significant accounting policies as disclosed in its predecessor audited combined financial statements included in this registration statement, as well as on preliminary discussions with management of the businesses that have been or will be acquired in the Acquisitions, the pro forma consolidated combined financial statements assume there will be no significant adjustments necessary to conform the accounting policies of the businesses that have been or will be acquired in the Acquisitions to the predecessor’s accounting policies (other than the alignment of depreciable lives of property and equipment to Global’s accounting policies as described in footnote (4) to the unaudited pro forma condensed consolidated statements of operations). Upon completion of the Acquisitions and a more comprehensive comparison and assessment, differences may be identified that would necessitate changes to the future accounting policies of the businesses that have been or will be acquired in the Acquisitions and such changes could result in material differences in future reported results of operations and the financial position for operations of the businesses that have been or will be acquired in the Acquisitions as compared to historically reported amounts.

 

137


Table of Contents

Selected historical combined financial data

The following table shows selected historical combined financial data at the dates and for the periods indicated. The selected historical combined financial data as of and for the years ended December 31, 2013 and 2014 has been derived from the predecessor audited combined financial statements of our accounting predecessor included elsewhere in this prospectus. The selected historical combined financial data and balance sheet data as of March 31, 2015 and for the three months ended March 31, 2014 and 2015 have been derived from our unaudited condensed combined financial statements included elsewhere in this prospectus, which include all adjustments, consisting of normal recurring adjustments, that management considers necessary for a fair presentation of the financial position and the results of operations for such periods. Results for the interim periods are not necessarily indicative of the results for the full year. The predecessor combined financial statements as of and for the years ended December 31, 2013 and 2014, and as of March 31, 2015 and for the three months ended March 31, 2014 and 2015, are intended to represent the financial results of SunEdison’s contracted renewable energy assets that will be contributed to Global LLC as part of the Contributed Projects.

The following table should be read together with, and is qualified in its entirety by reference to, the predecessor audited and unaudited combined financial statements and the accompanying notes appearing elsewhere in this prospectus. Among other things, the predecessor combined financial statements include more detailed information regarding the basis of presentation for the information in the following table. The table should also be read together with “Management’s discussion and analysis of financial condition and results of operations.”

 

138


Table of Contents

Financial data of TerraForm Global, Inc. has not been presented in this prospectus as it is a newly incorporated entity, had no business transactions or activities and had no assets or liabilities during the periods presented in this prospectus.

 

      For the year ended
December 31,
    For the three months
ended March 31,
 
(in thousands)    2013     2014     2014     2015  
                 (unaudited)     (unaudited)  

Statement of Operations Data:

        

Revenue

   $ 22,196      $ 39,449      $ 8,826      $ 17,806   

Operating costs and expenses:

        

Cost of operations

     355        1,999        441        358   

Cost of operations–affiliate

     1,311        2,257        725        964   

General and administrative

     1,047        1,349        574        4,486   

General and administrative–affiliate

     4,790        10,850        3,856        2,967   

Depreciation, amortization and accretion

     4,785        7,167        1,735        2,735   
  

 

 

   

 

 

   

 

 

 

Total operating costs and expenses

     12,288        23,622        7,331        11,510   
  

 

 

   

 

 

   

 

 

 

Operating (loss) income

     9,908        15,827        1,495        6,296   

Other (income) expense:

        

Interest expense

     11,812        24,294        3,903        16,821   

Other expense (income) net

     2,024        (5,128     (1,642     (418
  

 

 

   

 

 

   

 

 

 

Total other expenses, net

     13,836        19,166        2,261        16,403   
  

 

 

   

 

 

   

 

 

 

Loss before income tax benefit

     (3,928     (3,339     (766     (10,107

Income tax (benefit) expense

     (1,651     1,700        438        1,118   
  

 

 

   

 

 

   

 

 

 

Net loss

   $ (2,277   $ (5,039   $ (1,204   $ (11,225
  

 

 

   

 

 

   

 

 

 
        

Other Financial Data (unaudited):

        

Adjusted EBITDA(1)

   $ 12,511      $ 28,827      $ 3,516      $ 10,043   

Cash Flows Data:

        

Net cash provided by (used in):

        

Operating activities

   $ (16,972   $ 15,060      $        $ 1,374   

Investing activities

     (101,953     (231,853       (52,494

Financing activities

     118,639        365,519          37,949   

Effect of exchange rate changes on cash

     (576     (1,728       (617

Balance Sheet Data (at period end):

        

Cash and cash equivalents

   $ 3,148      $ 150,146        $ 136,358   

Restricted cash(2)

     47,279        85,811          77,045   

Property and equipment, net

     210,017        386,079          415,537   

Total assets

     291,111        673,456          685,688   

Total liabilities

     221,410        624,692          638,693   

Total equity

     69,701        48,764          46,995   

 

   

 

 

   

 

 

 
(1)   Adjusted EBITDA is a non-GAAP financial measure. This measurement is not recognized in accordance with GAAP and should not be viewed as an alternative to GAAP measures of performance. The presentation of Adjusted EBITDA should not be construed as an inference that our future results will be unaffected by unusual or non-recurring items.

 

139


Table of Contents

We define Adjusted EBITDA as net income (loss) plus interest expense, unrealized (gains) losses on interest rate swaps, income taxes, depreciation and accretion and stock compensation expense, after eliminating the impact of non-recurring items and other factors that we do not consider indicative of future operating performance. We believe Adjusted EBITDA is useful to investors in evaluating our operating performance because:

 

   

securities analysts and other interested parties use such calculations as a measure of financial performance and debt service capabilities; and

 

   

it is used by our management for internal planning purposes, including aspects of our operating budget and capital expenditures.

Adjusted EBITDA has limitations as an analytical tool, and you should not consider it in isolation or as a substitute for analysis of our results as reported under GAAP. Some of these limitations include:

 

   

it does not reflect our cash expenditures or future requirements for capital expenditures or contractual commitments;

 

   

it does not reflect changes in, or cash requirements for, working capital;

 

   

it does not reflect significant interest expense or the case requirements necessary to service interest or principal payments on our outstanding debt;

 

   

it does not reflect payments made or future requirements for income taxes;

 

   

it adjusts for contract amortization, mark-to-market gains or losses, asset write-offs, impairments and factors that we do not consider indicative of future performance;

 

   

it reflects adjustments for factors that we do not consider indicative of future performance, even though we may, in the future, incur expenses similar to the adjustments reflected in our calculation of Adjusted EBITDA in this prospectus; and

 

   

although depreciation and accretion are non-cash charges, the assets being depreciated and accreted will often have to be replaced or paid in the future and Adjusted EBITDA does not reflect cash requirements for such replacements or payments.

Investors are encouraged to evaluate each adjustment and the reasons we consider it appropriate for supplemental analysis.

The following table presents a reconciliation of net loss to Adjusted EBITDA:

 

      For the year ended
December 31,
    For the three months
ended March 31,
 
(in thousands) (unaudited)    2013     2014     2014     2015  
                 (unaudited)     (unaudited)  

Net loss

   $ (2,277   $ (5,039   $ (1,204   $ (11,225

Add:

        

Depreciation, amortization and accretion

     4,785        7,167        1,735        2,735   

Interest expense

     11,812        24,294        3,903        16,821   

Unrealized (gains) losses on interest rate swaps

     (158     705        (1,356     594   

Income tax (benefit) expense

     (1,651     1,700        438        1,118   
  

 

 

   

 

 

   

 

 

 

Adjusted EBITDA

   $ 12,511      $ 28,827      $ 3,516      $ 10,043   

 

   

 

 

   

 

 

 

 

(2)   Restricted cash includes current restricted cash, non-current restricted cash and cash committed for construction.

 

140


Table of Contents

Management’s discussion and analysis of financial condition and results of operations

The following discussion contains forward-looking statements that involve risks and uncertainties. Our actual results may differ materially from those discussed in the forward-looking statements as a result of various factors, including, without limitation, those set forth in “Risk factors,” “Cautionary statement concerning forward-looking statements” and other matters included elsewhere in this prospectus. The following discussion of our financial condition and results of operations should be read in conjunction with our predecessor’s historical combined financial statements and the notes thereto included elsewhere in this prospectus and our unaudited pro forma financial data, as well as the information presented under “Summary—Summary historical and pro forma financial data,” “Selected historical combined financial data,” and “Unaudited pro forma condensed financial statements.”

Overview

We are a high-growth, globally diversified renewable energy company that owns long-term contracted wind, solar and hydro-electric power plants. Our business objective is to increase our dividend to stockholders by continuing to acquire, from SunEdison and unaffiliated third parties, clean power generation assets that produce high-quality, long-term contracted cash flows, primarily by serving utility and commercial customers with strong credit profiles. Our initial target markets will be China, Brazil, India, South Africa, Honduras, Costa Rica, Peru, Uruguay, Malaysia and Thailand. Several of these markets, including China, Brazil and India, are expected to be among the fastest growing solar and wind energy markets worldwide from 2015 to 2020 in terms of annual installations and capital investment in renewable energy projects.

Our initial portfolio consists of solar projects located in China, India, South Africa, Honduras, Uruguay, Malaysia and Thailand, wind projects located in China, Brazil, India, South Africa, Honduras, Costa Rica and Nicaragua and hydro-electric projects located in Brazil and Peru. These projects have a total combined capacity of 1,406.1 MW, and we forecast that they will generate an aggregate of $231.5 million of cash available for distribution for the year ending December 31, 2016. Our initial portfolio includes 921.7 MW of projects that we expect to acquire from third parties concurrently with the completion of this offering or, in certain limited cases, during the remainder of 2015. All of these projects are supported by PPAs with creditworthy counterparties. The PPAs for projects included in our initial portfolio have a weighted average remaining life of 19 years as of March 31, 2015.

We have a well diversified project portfolio, across both geographies and renewable energy technologies, which we believe enables us to generate consistent quarterly cash flows. For example, projects in our initial portfolio located in any single country are not expected to represent more than 30% of our projected cash available for distribution for the year ending December 31, 2016. We intend to rapidly expand and diversify our initial project portfolio by acquiring utility-scale solar and commercial and industrial distributed solar, wind and hydro-electric power generation assets located in our initial target markets, which we expect will also have long-term PPAs with creditworthy counterparties. We expect to pursue opportunities in other high-growth emerging markets that have characteristics similar to those of our initial target markets, with a focus on markets located in Asia (except Japan), Africa, Latin America and the Middle East. Over time, we may selectively acquire other clean power generation assets, including natural gas, biomass and hybrid energy and storage solutions, as well as transmission lines, that enable us to provide power on a 24/7 basis, as well as to add solar generation assets serving residential and commercial building customers.

 

141


Table of Contents

The following table sets forth selected information relating to the Contributed Projects that we have included in our initial project portfolio:

 

Country    Net Capacity
(MW)(1)
     % of Total
MW
     # of
Sites
 

 

 

India Projects:

        

Wind

     17.8         5.8%         1   

Solar

     110.1         36.0%         11   
  

 

 

    

 

 

    

 

 

 

Total India Projects

     127.9         41.8%         12   

Uruguay Projects:

        

Solar

     74.8         24.4%         2   

Thailand Projects:

        

Solar

     39.3         12.8%         9   

South Africa Projects:

        

Solar

     33.6         11.0%         1   

China Projects:

        

Solar

     18.0         5.9%         1   

Malaysia Projects:

        

Solar

     12.3         4.0%         4   
  

 

 

    

 

 

    

 

 

 

Total

     305.9         100.0%         29   
  

 

 

 

 

  

 

 

 
(1)   Net capacity represents the maximum, or rated, generating capacity at standard test conditions of a facility multiplied by our percentage of economic ownership of that facility as of the date of this prospectus. Generating capacity may vary based on a variety of factors discussed elsewhere in this prospectus. For projects referenced herein that have not yet achieved their commercial operations date, or “COD,” the figures reflect expected final capacity.

Factors that significantly affect our results of operations and business

We expect the following factors will affect our results of operations:

Increasing utilization of clean power generation sources

Clean energy has been one of the fastest growing sources of electricity generation globally over the past decade. We expect the renewable energy generation segment in particular to continue to offer high growth opportunities driven by:

 

 

the competitive cost of most clean energy technologies and, most significantly, the ongoing reduction in the cost of clean energy, which will increase the number of markets that are trending towards grid parity;

 

 

transmission and distribution charges and the effects of an aging transmission infrastructure, which enable renewable energy generation sources located at a customer’s site, or “distributed generation,” to be more competitive with, or cheaper than, grid-supplied electricity;

 

 

the replacement of aging and conventional power generation facilities in the face of increasing industry challenges, such as regulatory barriers, increasing costs of and difficulties in obtaining and maintaining applicable permits, and the decommissioning of certain types of conventional power generation facilities, such as coal and nuclear facilities;

 

 

the ability to couple renewable power generation with other forms of power generation, creating a hybrid energy solution capable of providing energy on a 24/7 basis while reducing the average cost of electricity obtained through the system;

 

142


Table of Contents
 

the desire of energy consumers to lock in a predictable rate for long-term pricing of a reliable energy source;

 

 

renewable power generation’s ability to utilize freely available sources of fuel, thus avoiding the risks of price volatility and market disruptions associated with many conventional fuel sources;

 

 

environmental concerns over conventional power generation; and

 

 

government policies that encourage development of renewable power, such as national, provincial, state or local renewable portfolio standard programs, which motivate utilities to procure electricity from renewable resources.

In addition to renewable energy, we expect natural gas to grow as a source of electricity generation due to its relatively low cost and low environmental impact compared to other fossil fuel sources, such as coal and oil.

Project operations and generation

Our revenue is primarily a function of the volume of electricity generated and sold by our projects. Our initial portfolio of power generation assets is generally contracted under long-term PPAs with creditworthy counterparties. As of March 31, 2015, the weighted average remaining life of our PPAs was 19 years. In most instances, pricing of the electricity sold under these PPAs is contracted for the duration of the contract. We also expect that certain of our PPAs will have price escalators based on an index (such as the consumer price index) or other rates specified in the applicable PPA.

We define “project availability” as the actual amount of time a power generation asset is available to produce electricity divided by the amount of time during the defined measurement period, after excluding the duration of events such as anticipated maintenance and interconnection interruptions. Our ability to generate electricity in an efficient and cost-effective manner is impacted by our ability to maintain and utilize the electrical generation capacity of our projects. The volume of electricity generated and sold by our projects during a particular period is also impacted by the number of projects that have commenced commercial operations, scheduled and unexpected repair and maintenance required to keep our projects operational and other factors. Equipment performance often represents the primary factor affecting our operating results because equipment downtime impacts the volume of the electricity that we are able to generate from our projects. The volume of electricity generated and sold by our projects will be negatively impacted if any projects experience higher than normal downtime as a result of equipment failures, electrical grid disruption or curtailment, weather disruptions, short to medium term weather variations from long-term averages or other events beyond our control.

Generally, over longer time periods, we expect our portfolio will exhibit less variability in generation compared to shorter periods. It is likely that we will experience more generation variability in monthly or quarterly production than we do for annual production. As a result, our periodic cash flows and payout ratios will reflect more variability during periods shorter than a year. While we intend to reserve a portion of our cash available for distribution and maintain a revolving credit facility in order to, among other things, facilitate the payment of dividends to our stockholders, unpredicted variability in generation could result in variability of our dividend payments to the extent we lack sufficient reserves and liquidity.

We use reliable and proven solar panels, inverters and other equipment for each of our solar projects and quality wind turbines, water turbines and other system components for each of our wind and hydro-electric projects. We believe this significantly reduces the probability of unexpected equipment failures. Additionally, through our Management Services Agreement with our Sponsor, one of the world’s largest solar and wind energy developers and operators, we have access to significant resources to support the maintenance and

 

143


Table of Contents

operation of our business. We believe our relationship with our Sponsor provides us with the opportunity to benefit from our Sponsor’s expertise in solar, wind and hydro-electric technology, project development, finance and management and operations.

Project acquisitions

Our ability to execute our growth strategy is dependent on our ability to acquire additional clean power generation assets from our Sponsor and unaffiliated third parties. We are focused on acquiring long-term contracted clean power generation assets with proven technologies, low operating risks and stable cash flows in geographically diverse locations with growing demand and stable legal and political systems. We expect to have the opportunity to increase our cash available for distribution and, in turn, our quarterly dividend per share by acquiring additional assets from our Sponsor, including those available to us under the Support Agreement, and from third parties.

As of March 31, 2015, our Sponsor had a 7.5 GW pipeline (as defined below) of development-stage solar projects, including 1.7 GW in our initial and future target markets. On January 29, 2015, our Sponsor completed the purchase of First Wind’s development platform, pipeline and projects in development, including over 1.6 GW of wind and solar generation assets under development. We benefit from this pipeline because our Sponsor has granted us a right to acquire the Call Right Projects and a right of first offer with respect to the SunEdison ROFO Projects pursuant to the Support Agreement.

SunEdison includes a clean energy system project in its “pipeline” when it has a signed or an awarded PPA or other energy offtake agreement has achieved each of the following three items: (i) site control; (ii) an identified interconnection point with an estimate of the interconnection costs; and (iii) an executed energy offtake agreement or the determination that there is a reasonable likelihood that an energy offtake agreement will be signed. There can be no assurance that SunEdison’s pipeline will be converted into completed projects or that we will acquire these projects.

Immediately prior to the completion of this offering, we will enter into the Support Agreement with our Sponsor, which requires our Sponsor to offer us Call Right Projects from its development pipeline through the fifth anniversary of the completion of this offering that have at least $1.4 billion of Projected FTM CAFD. If the amount of Projected FTM CAFD of the projects we acquire under the Support Agreement through the fifth anniversary of the completion of this offering is less than $1.4 billion, our Sponsor has agreed that it will continue to offer to us sufficient Call Right Projects until the total aggregate Projected FTM CAFD commitment has been satisfied. The Support Agreement provides that our Sponsor is required to update the list of Call Right Projects with additional qualifying Call Right Projects from its pipeline on a quarterly basis until we have acquired Call Right Projects that have the specified minimum amount of Projected FTM CAFD covered by the Support Agreement.

In addition, the Support Agreement grants us a right of first offer with respect to the SunEdison ROFO Projects. The Support Agreement does not identify the SunEdison ROFO Projects because our Sponsor will not be obligated to sell any project that would constitute a SunEdison ROFO Project. As a result, we do not know when, if ever, any SunEdison ROFO Projects or other assets will be offered to us. In addition, in the event that our Sponsor elects to sell such assets, it will not be required to accept any offer we make to acquire any SunEdison ROFO Project and, following the completion of good faith negotiations with us, our Sponsor may choose to sell such assets to a third party or not sell the assets at all.

When we acquire clean power generation assets from a party other than our Sponsor, our financial statements will generally reflect such assets and their associated operations beginning on the date the acquisition is consummated. For so long as our Sponsor controls us, acquisitions from it will result in a recast of our financial

 

144


Table of Contents

statements for prior periods in accordance with accounting rules applicable to transactions between entities under common control. As a result, our financial statements would reflect such assets and resulting costs and operations for periods prior to the consummation of the acquisition, which would be reflected as our Sponsor’s historical cost.

In addition to acquiring clean power generation assets from our Sponsor, we intend to pursue additional acquisition opportunities that are complementary to our business from unaffiliated third parties. See “Business—Our business strategy.”

Seasonality

The amount of electricity our solar power generation assets produce is dependent in part on the amount of sunlight, or irradiation, where the assets are located. Because shorter daylight hours in winter months result in less irradiation, the generation of particular assets will vary depending on the season and year. Additionally, the plant load factor of wind energy generators and the amount of electricity generated by, and the profitability of, our wind projects depend on meteorological conditions, particularly wind conditions, which can vary across seasons and years. The wind energy generators work only when wind speeds exceed certain thresholds and if wind speeds are insufficient, the electricity output from these wind farms will decrease or cease. Hydro-electric generators are dependent on water flows, which vary from season to season as a result of rainfall, snowfall and snowmelt.

To the extent more of our solar power generation assets are located in the northern or southern hemisphere, overall generation of our entire asset portfolio could be impacted by seasonality. While we expect seasonal variability to occur, we expect aggregate seasonal variability to decrease if geographic diversity of our portfolio between the northern and southern hemisphere increases.

Location of power generation assets/tax repatriation

While we will be a U.S. taxpayer, substantially all of our assets are located in foreign tax jurisdictions, and we expect that we will acquire additional power generation assets in foreign tax jurisdictions in the future. Changes in tax rates and the application of foreign tax withholding requirements in foreign jurisdictions where we own power generation assets will impact the contribution from such assets to cash available for distribution.

In order to minimize withholdings at the project level, cash from profits may be maintained at the local legal entity level for future acquisitions. Intercompany loans may be structured at the parent level to allow for the efficient flow of cash and to fund the dividend requirements.

Cash distribution restrictions

In many cases, we obtain project-level financing for our clean power generation assets. These project financing arrangements typically restrict the ability of our project subsidiaries to distribute funds to us unless specific financial thresholds are satisfied on specified dates. Although our calculation of cash available for distribution, or “CAFD,” will reflect the cash generated by such project subsidiaries, we may not have sufficient liquidity to make corresponding distributions until the cash is actually distributed and/or such financial thresholds are satisfied. As a result, Global LLC may incur borrowings under our Revolver to fund dividends or increase our reserves for the prudent conduct of our business.

 

145


Table of Contents

Foreign exchange

Our operating results are reported in U.S. dollars. However, most of our project-level revenues and expenses are generated in currencies other than U.S. dollars (including Chinese Yuan Renminbi, Brazilian Real, Indian Rupee, Malaysian Ringgit, South African Rand, Thai Baht and other currencies). As a result, we expect our revenues and expenses will be exposed to foreign exchange fluctuations in local currencies where our clean power generation assets are located. We intend to use derivative financial instruments, such as purchasing currency options, to minimize our net exposure to currency fluctuations. Specifically, we intend to utilize these instruments to mitigate our risk exposure to currency fluctuations on a rolling three-year basis with regard to our projected CAFD. To the extent that significant debt is denominated in currencies other than local currency, we have limited our currency risk with respect to our project-level long-term debt by entering into fixed currency rate swap agreements that limit our foreign exchange exposure.

Interest rates

As of March 31, 2015, our long-term debt was borrowed at variable interest rates. In the future, we expect a substantial amount of our corporate and project-level capital structure will also be financed with variable rate debt or similar arrangements. We also expect that we will refinance our debt from time to time. If we incur variable rate debt or refinance our fixed rate debt, changes in interest rates could have an adverse effect on our cost of capital. To limit our interest rate risk with respect to our project-level long-term variable rate debt, we have entered into interest rate swap agreements.

Government incentives

Each of the markets in which we expect to operate has established various incentives and financial mechanisms to support reimbursements of the cost of and accelerate the adoption of renewable energy. These incentives help catalyze private sector investments in renewable energy and efficiency measures and are described in further detail under “Business—Government incentives” in this prospectus. Such incentives are generally in the form of feed-in tariffs and other programs designed to facilitate the development, financing and operation of renewable energy projects, including solar and wind energy. The incentives are aimed at reducing the development costs of renewable energy projects or providing favorable contract prices for such renewable energy. Our operations benefit from these government incentives, and any adverse change or termination of these incentives would have a material adverse effect on our business, financial condition, results of operations and cash flows. In addition, a loss or reduction in such incentives may decrease the attractiveness of renewable energy projects to developers, including SunEdison, which could reduce our acquisition opportunities.

Key metrics

Operating metrics

Megawatt capacity

We measure the electricity-generating production capacity of our power generation assets in net megawatt capacity (measured in direct current, or “DC,” with respect to solar generation assets, and alternating current, or “AC,” with respect to wind and hydro-electric generation assets). Net megawatt capacity, or net capacity, represents the rated generation capacity at standard test conditions of a project multiplied by our percentage of economic ownership of such project as of the relevant date. Rated capacity is the expected maximum output a power generation system can produce without exceeding its design limits. The size of our power generation assets varies significantly among the assets comprising our portfolio. We believe the aggregate net megawatt capacity of our portfolio is indicative of our overall production capacity and period-to-period comparisons of our net megawatt capacity are indicative of the growth rate of our business.

 

146


Table of Contents

Project availability

Project availability refers to the actual amount of time a power generation asset is available to produce electricity divided by the amount of time during the defined measurement period, after excluding the duration of events, such as anticipated maintenance and interconnection interruptions. We track project availability as a measure of the operational efficiency of our business.

Megawatt-hour generation

Megawatt-hour generation refers to the actual amount of electricity a power generator produces over a specific period of time. We track the aggregate generation of our power generation assets as it is indicative of the periodic production of our business operations.

Megawatt-hours sold

Megawatt-hours sold refers to the actual volume of electricity generated and sold by our projects during a particular period. We track megawatt-hours sold as an indicator of our ability to recognize revenue from the generation of electricity at our projects.

Financial metrics

Cash available for distribution

As calculated in this prospectus, CAFD represents net cash provided by (used in) the operating activities of Global LLC (i) plus or minus changes in assets and liabilities as reflected on our statements of cash flows, (ii) minus deposits into (or plus withdrawals from) restricted cash accounts required by project financing arrangements to the extent they decrease (or increase) cash provided by operating activities, (iii) minus cash distributions paid to non-controlling interests in our projects, if any, (iv) minus scheduled project-level and other debt service payments and repayments in accordance with the related borrowing arrangements, to the extent they are paid from operating cash flows during a period, (v) minus non-expansionary capital expenditures, if any, to the extent they are paid from operating cash flows during a period, (vi) plus cash contributions from our Sponsor pursuant to the Interest Payment Agreement, (vii) plus operating costs and expenses paid by our Sponsor pursuant to the Management Services Agreement to the extent such costs or expenses exceed the fee payable by us pursuant to such agreement but otherwise reduce our net cash provided by operating activities and (viii) plus or minus operating items as necessary to present the cash flows we deem representative of our core business operations, with the approval of the audit committee.

We believe CAFD is useful to investors in evaluating our operating performance because securities analysts and other interested parties use such calculations as a measure of financial performance. In addition, CAFD is used by our management team for internal planning purposes. For a further discussion of CAFD, including a reconciliation of net cash provided by (used in) operating activities to cash available for distribution and a discussion of its limitations, see footnote (2) under the heading “Summary—Summary historical and pro forma financial data” elsewhere in this prospectus.

Adjusted EBITDA

We define Adjusted EBITDA as net income plus interest expense, unrealized (gains) losses on interest rate swaps, income taxes, depreciation and accretion and stock compensation expense, after eliminating the impact of non-recurring items and other factors that we do not consider indicative of future operating performance.

 

147


Table of Contents

We believe Adjusted EBITDA is useful to investors in evaluating our operating performance because securities analysts and other interested parties use such calculations as a measure of financial performance and debt service capabilities. In addition, Adjusted EBITDA is used by our management for internal planning purposes, which includes certain aspects of our operating budget and capital expenditures. See footnote (1) under the heading “Summary—Summary historical and pro forma financial data” elsewhere in this prospectus for a discussion on the limitations of Adjusted EBITDA.

Components of results of operations

Revenue

A significant majority of our revenues are obtained through the sale of energy pursuant to terms of PPAs or other contractual arrangements, which have a weighted average (based on megawatts) remaining life of 19 years as of March 31, 2015. PPAs are accounted for as operating leases with no minimum lease payment. Revenue is recorded as income when the electricity is delivered.

Incentives

We anticipate receiving performance-based incentives, or “PBIs,” from governmental agencies in connection with certain sponsored programs. PBI revenue is generally based on the actual level of output generated from our solar energy systems recognized upon validation of the kilowatt-hours produced from a third-party metering company.

We intend to negotiate and expect to receive upfront incentives or subsidies from various governmental jurisdictions for operating certain of our solar energy systems. When amounts are deferred, they will be recognized as revenue on a straight-line basis over the estimated useful life of the solar energy system.

None of the projects included in our initial portfolio has received any PBIs or other upfront incentives or subsidies that would be classified as incentive revenue in our combined statements of operations.

Operating costs and expenses

Cost of operations

Cost of operations is comprised of operations and maintenance expenses incurred in order to operate our solar power generation assets, as well as property and other taxes, property insurance, land leases, rental expense and other licenses. Cost of operations—affiliates represents operation and maintenance services provided under fixed price agreements with affiliates of the Sponsor, which may include annual price increases. Cost of operations—affiliates also includes project-level management administration agreements.

Depreciation and accretion

Depreciation expense is recognized using the straight-line method over the estimated useful lives of our solar power generation assets. Accretion expense represents the increase in asset retirement obligations over the remaining operational life of the associated solar power generation assets.

 

148


Table of Contents

General and administrative

Our general and administrative expenses consist primarily of the allocation of general corporate overhead costs from our Sponsor that are attributable to our predecessor operations, “affiliate expenses.” These costs include legal, accounting, tax, treasury, IT infrastructure, insurance, employee benefit costs, communications, human resources and procurement. Upon completion of this offering, we anticipate our general and administrative expense to be comprised of the management fee we will pay to our Sponsor for the management and administration services provided to us under the Management Services Agreement and all costs of doing business. See “Certain relationships and related party transactions—Management Services Agreement.”

Interest expense

Interest expense is comprised of interest incurred under our variable rate financing arrangements and the amortization of deferred financing costs incurred in connection with obtaining construction and term financing, net of amounts capitalized and included in property and equipment, net.

Income tax expense

Income tax benefit (expense) consists of national, provincial, state and local income taxes in our initial target markets and deferred income taxes and changes in related valuation allowance reflecting the net tax effects of temporary differences between the carrying amounts of assets and liabilities for financial reporting purposes and the amounts used for income tax purposes.

Our income tax balances are determined and reported using a “separate return” method. Income taxes as presented herein allocate current and deferred income taxes of the parent to us in a manner that is systematic, rational and consistent with the asset and liability method. The sum of the amounts allocated to the Company’s carve-out tax provisions may not equal the historical consolidated provision. Under the separate return method, deferred tax assets and liabilities are recognized for the future tax consequences attributable to differences between the financial statement carrying amounts of existing assets and liabilities and their respective tax bases and operating loss carry forwards.

 

149


Table of Contents

Combined results of operations of our predecessor

Three months ended March 31, 2015 compared to the three months ended March 31, 2014

The following table summarizes our historical combined statements of operations as a percentage of operating revenue for the periods shown:

 

      For the three months ended
March 31,
 
(as a percent of revenue)            2014             2015  

Revenue

     100     100

Operating costs and expenses:

    

Cost of operations

     5        2   

Cost of operations—affiliate

     8        5   

General and administrative

     7        25   

General and administrative—affiliate

     44        17   

Depreciation and accretion

     20        15   
  

 

 

   

 

 

 

Total operating costs and expenses

     83        65   
  

 

 

   

 

 

 

Operating income (loss)

     17        35   

Other expense (income):

    

Interest expense

     44        94   

Other (income) expense, net

     (19     (2
  

 

 

   

 

 

 

Total other expenses, net

     26        92   
  

 

 

   

 

 

 

Loss before income tax expense (benefit)

     (9     (57

Income tax expense (benefit)

     5        6   
  

 

 

   

 

 

 

Net loss

     (14 )%      (63 )% 

 

 

Revenue

Revenue for the three months ended March 31, 2015 and 2014 was as follows:

 

      For the three months ended
March 31,
 
(in thousands, except for GWh and MW data)            2014              2015  

Revenue

   $ 8,826       $ 17,806   

GWh sold

     34.7         58.6   

Net megawatt capacity (MW)(1)(2)

     74.8         166.4 (3) 

 

 

 

(1)   Operational at end of period.
(2)   Net capacity represents the maximum generating capacity at standard test conditions of a facility multiplied by our percentage of economic ownership of that facility.
(3)   Does not include any projects in which we hold a minority interest.

Revenues were $17.8 million and $8.8 million for the three months ended March 31, 2015 and 2014, respectively, an increase of $9.0 million. The increase was primarily due to South African solar energy systems put into commercial operation during the first quarter of 2015 that were not complete in the first quarter 2014. Gigawatt-hours sold increased to 58.6 GWh and total megawatt capacity increased to 166.4 MW during the year ended March 31, 2015.

 

150


Table of Contents

Costs of Operations

 

      For the three
months ended
March 31,
 
(in thousands)            2014              2015  

Cost of operations

   $ 441       $ 358   

Cost of operations—affiliate

     725         964   
  

 

 

    

 

 

 

Total cost of operations

   $ 1,166       $ 1,322   

 

 

Costs of operations totaled $1.3 million and $1.2 million for the three months ended March, 2015 and 2014, respectively, an increase of $0.1 million. Cost of operations-affiliate increased $0.2 million during the three months ended March 31, 2015 compared to 2014. The increase is primarily due to additional operations and maintenance expenses related to the solar energy systems that were in operation in the first quarter 2015 and not in the first quarter 2014.

General and administrative expense

General and administrative expense totaled $4.5 million and $0.6 million for the three months ended March 31, 2015 and 2014, respectively, an increase of $3.9 million. General and administrative—affiliate expense was $3.0 million and $3.9 million for the three months ended March 31, 2015 and 2014, respectively, a decrease of $0.9 million.

Depreciation and accretion

Depreciation and accretion expense increased from $1.7 million for the three months ended March 31, 2014 to $2.7 million in the three months ended March 31, 2015, primarily due to depreciation related to the Boshof solar energy system plant that was operational in the first quarter for 2015 and not in the first quarter of 2014.

Interest expense

Interest expense was $16.8 million and $3.9 million for the three months ended March 31, 2015 and 2014, respectively, an increase of $12.9 million. The increase was primarily due to an increase in term debt as solar energy systems were constructed.

Other income, net

Other income, net totaled $0.4 million in the three months ended March 31, 2015, primarily due to gains on foreign currency exchange and interest income earned from restricted cash accounts. Other income, net totaled $1.6 million in the three months ended March 31, 2014, primarily due to gains on foreign currency exchange.

Income tax expense

Income tax expense was $1.1 million for the three months ended March 31, 2015 compared to an income tax expense of $0.4 million for the three months ended March 31, 2014 primarily due to an increase in revenue not offset by tax benefit carryforwards.

 

151


Table of Contents

Year ended December 31, 2014 compared to year ended December 31, 2013

The following table summarizes our historical combined statements of operations as a percentage of operating revenue for the periods shown:

 

      For the year ended
December 31,
 
(as a percent of revenue)            2013             2014  

Revenue

     100     100

Operating costs and expenses:

    

Cost of operations

     2        5   

Cost of operations—affiliate

     6        6   

General and administrative

     5        3   

General and administrative—affiliate

     22        28   

Depreciation and accretion

     22        18   
  

 

 

   

 

 

 

Total operating costs and expenses

     57        60   
  

 

 

   

 

 

 

Operating income (loss)

     45        40   

Other expense (income):

    

Interest expense

     53        62   

Other (income) expense, net

     9        (13
  

 

 

   

 

 

 

Total other expenses, net

     62        49   
  

 

 

   

 

 

 

Loss before income tax expense (benefit)

     (19     (9

Income tax expense (benefit)

     (8     4   
  

 

 

   

 

 

 

Net loss

     (11 )%      (13 )% 

 

 

Revenue

Revenue for the years ended December 31, 2014 and 2013 was as follows:

 

      For the year ended
December 31,
 
(in thousands, except for GWh and MW data)            2013              2014  

Revenue

   $ 22,196       $ 39,449   

GWh sold

     109.5         157.9   

Net megawatt capacity (MW)(1)(2)

     74.6         118.1 (3) 

 

 

 

(1)   Operational at end of period.
(2)   Net capacity represents the maximum generating capacity at standard test conditions of a facility multiplied by our percentage of economic ownership of that facility.
(3)   Does not include any projects in which we hold a minority interest.

Revenues were $39.4 million and $22.2 million for the years ended December 31, 2014 and 2013, respectively, an increase of $17.2 million. The increase was primarily due to the Malaysian solar energy systems put into commercial operation in the fourth quarter of 2013 and being in operation the full year in 2014. Gigawatt-hours sold increased to 157.9 GWh and total megawatt capacity increased to 118.1 MW during the year ended December 31, 2014.

 

152


Table of Contents

Costs of Operations

 

      For the year ended
December 31,
 
(in thousands)            2013              2014  

Cost of operations

   $ 355       $ 1,999   

Cost of operations—affiliate

     1,311         2,257   
  

 

 

    

 

 

 

Total cost of operations

   $ 1,666       $ 4,256   

 

 

Costs of operations totaled $2.0 million and $0.4 million for the years ended December 31, 2014 and 2013, respectively, an increase of $1.6 million. Cost of operations-affiliate increased $1.0 million during the year ended December 31, 2014 compared to 2013. The increase is primarily due to additional operations and maintenance expenses related to the Malaysian solar energy systems which were in operation all of 2014 versus being put in operation in the last quarter of 2013.

General and administrative expense

General and administrative expense totaled $1.3 million and $1.0 million for the years ended December 31, 2014 and 2013, respectively, an increase of $0.3 million. General and administrative—affiliate expense was $10.9 million and $4.8 million for the years ended December 31, 2014 and 2013, respectively, an increase of $6.1 million. The increase is due to the overall increase in the capacity of our operational solar energy systems.

Depreciation and accretion

Depreciation and accretion expense increased from $4.8 million for the year ended December 31, 2013 to $7.2 million in the year ended December 31, 2014 primarily due to Malaysian solar energy system plants becoming commercially operational in December 2013 and South Africa and Thailand solar energy systems becoming commercially operational in the fourth quarter of 2014.

Interest expense

Interest expense was $24.3 million and $11.8 million for the years ended December 31, 2014 and 2013, respectively, an increase of $12.5 million. The increase was primarily due to an increase in term debt as solar energy systems were constructed.

Other (income) expense, net

Other income, net totaled $5.1 million in the year ended December 31, 2014 primarily due to gains on foreign currency exchange and interest income earned from restricted cash accounts. Other expense, net totaled $2.0 million in the year ended December 31, 2013, primarily due to losses on foreign currency exchange.

Income tax expense (benefit)

Income tax expense was $1.7 million for the year ended December 31, 2014 compared to an income tax benefit of $1.7 million for the year ended December 31, 2013 primarily due to an increase in revenue not offset by tax benefit carryforwards.

Liquidity and capital resources

Our principal liquidity requirements are to finance current operations, service our debt and fund cash dividends to our investors. We will also use capital in the future to finance expansion capital expenditures and acquisitions. Historically, our predecessor operations were financed as part of our Sponsor’s integrated

 

153


Table of Contents

operations and largely relied on internally generated cash flows as well as corporate and/or project-level borrowings to satisfy capital expenditure requirements. As a normal part of our business, depending on market conditions, we will from time to time consider opportunities to repay, redeem, repurchase or refinance our indebtedness. Changes in our operating plans, lower than anticipated electricity sales, increased expenses, acquisitions or other events may cause us to seek additional debt or equity financing in future periods. There can be no guarantee that financing will be available on acceptable terms or at all. Debt financing, if available, could impose additional cash payment obligations and additional covenants and operating restrictions. Equity financing, if any, could result in the dilution of our existing stockholders and make it more difficult for us to maintain our dividend policy. In addition, any of the items discussed in detail under “Risk factors” in this prospectus may also significantly impact our liquidity.

Liquidity position

We believe that following the completion of this offering we will have sufficient availability under the Revolver, liquid assets and cash flows from operations to meet our financial commitments, debt service obligations, contingencies and anticipated required capital expenditures for at least the next twelve months. As of March 31, 2015, December 31, 2014 and December 31, 2013, our liquidity was approximately $213.4 million, $236.0 million and $50.4 million, respectively, comprised of cash, cash committed for construction projects, and restricted cash.

We are subject to business and operational risks that could adversely affect our cash flow. A material decrease in our cash flows would likely produce a corresponding adverse effect on our borrowing capacity.

Sources of liquidity

Following the completion of this offering, we expect our ongoing sources of liquidity to include cash on hand, cash generated from operations, borrowings under new and existing financing arrangements and the issuance of additional equity securities, as appropriate, given market conditions. We expect that these sources of funds will be adequate to provide for our short-term and long-term liquidity needs. Our ability to meet our debt service obligations and other capital requirements, including capital expenditures, as well as make acquisitions, will depend on our future operating performance which, in turn, will be subject to general economic, financial, business, competitive, legislative, regulatory and other conditions, many of which are beyond our control. As described in Note 5, Debt, to our combined financial statements and below, our financing arrangements as of March 31, 2015 consist of a bridge term loan, project-level term loans and construction loans for our various solar energy projects.

Bridge Facility

On December 22, 2014, Global LLC entered into the Bridge Facility with JPMorgan Chase Bank, N.A., as administrative agent. As of December 31, 2014, the total principal amount outstanding under the Bridge Facility was $150.0 million. The Bridge Facility matures in December 2016. On May 6, 2015, the Bridge Facility was amended to increase the aggregate principal amount of bridge commitments to $450 million, of which $87.5 million was subsequently prepaid with a portion of the proceeds from the Units Private Placements, through the addition of Barclays Bank PLC, Citibank, N.A. and Morgan Stanley Senior Funding, Inc. as lenders in the Bridge Facility. On June 5, 2015, the Bridge Facility was further amended to increase the aggregate principal amount of commitments to $550 million, through the addition of Goldman Sachs Bank USA, Bank of America, N.A. and Deutsche Bank AG New York Branch as lenders. The purpose of the Bridge Facility is to fund the acquisition of certain clean energy projects and to repay certain of the project level indebtedness incurred by projects included in our initial portfolio. Global LLC’s obligations under the Bridge Facility are secured by first priority

 

154


Table of Contents

liens on and security interests in substantially all present and future assets of Global LLC and certain of its domestic subsidiaries, as guarantors, under the Bridge Facility (including membership interests held by Global LLC and Global Operating LLC but excluding any membership interests in non-recourse subsidiaries). For more information regarding the terms of our Bridge Facility, see “Description of certain indebtedness—Bridge Facility.”

Revolving credit facility

In connection with this offering, we anticipate that Global Operating LLC will enter into the Revolver, which is expected to provide for a revolving line of credit of approximately $         million. The Revolver will include borrowing capacity available for letters of credit and for incremental commitments of up to $         million. We expect that Global LLC will be a guarantor under the Revolver. The Revolver is expected to contain certain financial covenants, including maximum borrower leverage ratio and minimum borrower debt service coverage ratio. In general, Global Operating LLC expects that the Revolver will contain covenants that are customary for this type of financing, including limitations on indebtedness, liens, investments and restricted payments; provided, however, that we expect that each of Global Operating LLC and Global LLC will be permitted to pay distributions to unitholders out of available cash so long as no default or event of default under the Revolver shall have occurred and be continuing at the time of such distribution or would result therefrom and it is in compliance with its financial covenants. In connection with the Revolver, Global Operating LLC expects that Global LLC will be required to pledge 100% of the equity in Global Operating LLC as collateral to the lenders. Foreclosure upon such equity pledge would result in a substantial loss of value to us. See “Risk factors—Risks related to our business—If our subsidiaries default on their obligations under their project-level indebtedness, this may constitute an event of default under our Revolver, and we may be required to make payments to lenders to avoid such default or to prevent foreclosure on the collateral securing the project-level debt. If we are unable to or decide not to make such payments, we would lose certain of our renewable energy projects upon foreclosure.” Global Operating LLC expects that the Revolver will contain events of default that are customary for this type of financing. Global Operating LLC is still in preliminary discussions with potential arrangers and lenders with respect to the terms of the Revolver. The actual terms of the Revolver will depend on the results of negotiations with lenders. We expect that affiliates of certain of the underwriters will participate as arrangers and/or lenders under the Revolver.

Senior Notes

Concurrently with the completion of this offering, we intend to complete the sale of $         million of Senior Notes by Global Operating LLC in a private offering exempt from the registration requirements of the Securities Act to persons reasonably believed to be qualified institutional buyers in accordance with Rule 144A under the Securities Act and to persons outside of the United States pursuant to Regulation S under the Securities Act. We intend to use the estimated net proceeds therefrom together with the net proceeds from this offering and the Class A Common Private Placement to repay borrowings under the Bridge Facility, fund the Pending Acquisitions and repay certain project-level debt. This prospectus shall not be deemed to be an offer to sell or a solicitation of an offer to buy any securities offered in the Senior Notes offering. The Senior Notes will be general unsecured senior obligations of Global Operating LLC and guaranteed by Global LLC and will mature on the             anniversary of their issue date. For more information regarding the terms of the Senior Notes, see “Description of certain indebtedness—Senior Notes.”

 

155


Table of Contents

Project-level financing arrangements

We have outstanding project-specific non-recourse financing that is backed by our solar energy system assets. The table below summarizes certain terms of our project-level financing arrangements for our initial portfolio as of March 31, 2015:

 

Name of Project

  

Aggregate
principal
amount(1)

(in thousands)

     Type of financing    Maturity date  

Raj 5

   $ 6,009       Term loan      April 30, 2026   

NSM Suryalabh

     29,429       Construction loan      April 30, 2016   

NSM L’Volta

     15,968       Term loan      March 31, 2030   

NSM Sitara

     23,952       Term loan      March 31, 2030   

Brakes India

     5,652       Term loan      December 31, 2029   

PP Solar

     6,883       Term loan      August 31, 2023   

Fortune 11

     9,471       Term loan      March 31, 2028   

Silverstar Pavilion

     24,135       Term loan      March 31, 2028   

Corporate Season

     7,116       Term loan      December 31, 2028   

Boshof

     185,002       Term loan      September 31, 2031   

Dunhuang

     7,893       Term loan      July 31, 2015   

Dunhuang

     20,342       Construction loan      December 31, 2016   

Focal

     11,117       Term loan      December 31, 2033   

Millennium

     13,664       Term loan      March 1, 2026   

SE 25

     40,229       Term loan      June 30, 2029   

Azure

     10,651       Term loan      September 15, 2026   

ESP Urja

     10,429       Term loan      December 31, 2026   
  

 

 

       

Total

   $ 427,942         

 

 

 

(1)   All of our project-level indebtedness is denominated in either U.S. dollars, Indian Rupee, Malaysian Ringgit, South African Rand or Thai Baht. We converted such indebtedness into U.S. dollars using the applicable conversion rate as of March 31, 2015.

The agreements governing our project-level financing contain financial and other restrictive covenants that limit our project subsidiaries’ ability to make distributions to us or otherwise engage in activities that may be in our long-term best interests. The project-level financing agreements generally prohibit distributions from the project entities to us unless certain specific conditions are met, including the satisfaction of certain financial ratios. For more information regarding the terms of our project-level financing, see “Description of certain indebtedness—Project-level financing arrangements.”

Uses of liquidity

Our principle requirements for liquidity and capital resources, other than for operating our business, can generally be categorized as follows: (i) debt service obligations, (ii) funding acquisitions, if any, and (iii) cash dividends to investors. Generally, once COD is reached clean power generation assets do not require significant capital expenditures to maintain operating performance.

 

156


Table of Contents

Debt service obligations

Principal payments on our debt as of December 31, 2014 are due in the following periods:

 

In thousands    2015      2016      2017      2018      2019      Thereafter      Total  

Maturities of debt

   $ 31,542       $ 167,112       $ 18,308       $ 17,205       $ 20,343       $ 269,601       $ 524,111   

 

  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

The above amounts do not include any indebtedness we incurred or assumed since that date in connection with expanding our initial project portfolio. See “Unaudited pro forma condensed financial statements.”

Acquisitions

Following the completion of this offering, we expect to continue to acquire additional projects. Although we have no commitments to make any such acquisitions, we expect to acquire certain of the Call Right Projects, Third-Party Call Right Projects and ROFO projects from SunEdison and third-party developers of clean power generation assets. We do not expect to have sufficient amounts of cash on hand to fund the acquisition costs of all of such Call Right Projects, Third-Party Call Right Projects or the ROFO projects. As a result, we will need to finance a portion of such acquisitions by either raising additional equity or issuing new debt. We believe that we will have the financing capacity to pursue such opportunities, but we are subject to business, operational and macroeconomic risks that could adversely affect our cash flows and ability to raise capital. A material decrease in our cash flows or downturn in the equity or debt capital markets would likely produce a corresponding adverse effect on our ability to finance such acquisitions.

Cash dividends to investors

We intend to cause Global LLC to distribute to its unitholders in the form of a quarterly distribution a portion of the cash available for distribution that is generated each quarter after appropriate reserves for our working capital needs and the prudent conduct of our business. In turn, we intend to use the amount of cash available for distribution that Global receives from such distribution to pay quarterly dividends to the holders of our Class A common stock. The cash available for distribution is likely to fluctuate from quarter to quarter and in some cases significantly if any projects experience higher than normal downtime as a result of equipment failures, electrical grid disruption or curtailment, weather disruptions or other events beyond our control. We expect our dividend payout ratio to vary as we intend to maintain or increase our dividend despite variations in our cash available for distribution from period to period.

Global LLC is a holding company and will be dependent on receiving cash distributions from Global Operating LLC in order to fund quarterly distributions to its unitholders, including Global. Global Operating LLC is also a holding company and will in turn be dependent on receiving cash distributions from its project-level subsidiaries to fund any distributions to Global LLC. The ability of such project-level subsidiaries to make cash distributions to Global Operating LLC may be restricted by, among other things, the provisions of existing and future indebtedness or other financing agreements, applicable national, provincial, state and local corporation laws and other laws and regulations, such as capital controls that either restrict investment by foreign sources, restrict the transfer of capital to foreign recipients or both. Some of the jurisdictions in which the projects in our initial portfolio are located impose material limitations on their ability to make cash distributions to Global Operating LLC. For example, South Africa currently has an exchange control regime which includes restrictions on exporting capital from South Africa. Once the appropriate regulatory approval is obtained, however, we believe that these restrictions will not impose significant constraints on the ability of any South African project-level subsidiary that we may acquire in the future to distribute its earnings to Global Operating LLC.

See “Cash dividend policy—Assumptions and considerations.”

 

157


Table of Contents

Cash flow discussion

We use traditional measures of cash flow, including net cash related to operating, investing and financing activities, as well as cash available for distribution to evaluate our periodic cash flow results.

Three months ended March 31, 2015 compared to three months ended March 31, 2014

The following table reflects the changes in cash flows for the comparative periods:

 

      For the three months
ended March 31,
        
  

 

 

   

 

 

   
(in thousands) (unaudited)            2014             2015     Change  

Net cash provided by operating activities

   $ 24,562      $ 1,374      $ (23,188

Net cash used in investing activities

     (64,920     (52,494     12,426   

Net cash provided by financing activities

     48,130        37,949        (10,181

Effect of exchange rate charges on cash

     (2,396     (617     1,779   
  

 

 

   

 

 

   

 

 

 

Total

   $ 5,376      $ (13,788   $ (19,165

 

 

Net cash used by operating activities

The change to net cash provided by operating activities is primarily driven by the timing of cash payments on amounts due to our parent and affiliates for reimbursement of operating expenses paid by our Sponsor or its affiliates.

Net cash used by investing activities

The change to net cash used by investing activities is driven by capital expenditures related to the construction of solar energy systems and changes in restricted cash and cash committed for construction in accordance with the restrictions in our debt agreements.

Net cash provided by financing activities

The change in net cash provided by financing activities is primarily driven by proceeds from project construction and term debt financing arrangements and net investments from our Sponsor.

Year ended December 31, 2014 compared to year ended December 31, 2013

The following table reflects the changes in cash flows for the comparative periods:

 

      For the year ended
December 31,
        
(in thousands)                2013                 2014     Change  

Net cash provided by (used in) operating activities

   $ (16,972   $ 15,060      $ 32,032   

Net cash used in investing activities

     (101,953     (231,853     (129,900

Net cash provided by financing activities

     118,639        365,519        246,880   

Effect of exchange rate changes on cash

     (576     (1,728     (1,152
  

 

 

   

 

 

 

Total

   $ (862   $ 146,998      $ 147,860   

 

   

 

 

 

 

158


Table of Contents

Net cash-operating activities

The change to net cash provided by operating activities is primarily driven by the timing of cash payments on amounts due to our parent and affiliates for reimbursement of operating expenses paid by our Sponsor or its affiliates.

Net cash-investing activities

The change to net cash used by investing activities is driven by capital expenditures related to the construction of solar energy systems and changes in restricted cash and cash committed for in accordance with the restrictions in our debt agreements.

Net cash-financing activities

The change in net cash provided by financing activities is primarily driven by proceeds from project construction and term debt financing arrangements and net investments from our Sponsor.

Contractual obligations and commercial commitments

We have a variety of contractual obligations and other commercial commitments that represent prospective cash requirements. The following table summarizes our outstanding contractual obligations and commercial commitments as of December 31, 2014.

 

      Payment due by period  

(in thousands)

   Under 1 year      1-3 Years      3-5 Years      Over 5 years      Total  

Long-term debt (principal)(1)

   $ 31,542       $ 185,420       $ 37,548       $ 269,601       $ 524,111   

Long-term debt (interest)

     50,461         94,522         72,355         33,931         251,269   

Purchase obligations(2)

     5,168         20,805         27,404         64,098         117,475   

Operating leases(3)

     169         366         382         3,649         4,566   

Asset retirement obligations

                             5,049         5,049   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total contractual obligations

   $ 87,340       $ 301,113       $ 137,689       $ 376,328       $ 902,470   

 

(1)   Does not include obligations under the Revolver or the Senior Notes that we intend to enter into in connection with this offering or any indebtedness assumed since that date in connection with expanding our initial project portfolio. In addition, this table does not include additional obligations under our Bridge Facility to the extent such obligations were incurred after December 31, 2014, of which $87.5 million was subsequently prepaid with a portion of the net proceeds from the Units Private Placements. On June 5, 2015, the Bridge Facility was further amended to increase the aggregate principal commitment to $550 million. See “Unaudited pro forma condensed consolidated financial statements.”

 

(2)   Consists primarily of contractual payments due for operation and maintenance services. Does not include payments under the Management Services Agreement, which we will enter into upon the completion of this offering.

 

(3)   Certain of our solar energy assets are located on property that we lease under operating leases. See Note 10 to the audited combined financial statements included elsewhere in this prospectus.

Off-balance sheet arrangements

We are not a party to any off-balance sheet arrangements.

Critical accounting policies and estimates

Our discussion and analysis of our financial condition and results of operations are based on our predecessor’s combined historical financial statements that are included elsewhere in this prospectus, which have been prepared in accordance with GAAP. In applying the critical accounting policies set forth below, our management uses its judgment to determine the appropriate assumptions to be used in making certain estimates. These estimates are based on management’s experience, the terms of existing contracts, management’s observance

 

159


Table of Contents

of trends in the power industry, information provided by our power purchasers and information available to management from other outside sources, as appropriate. These estimates are subject to an inherent degree of uncertainty.

We use estimates, assumptions and judgments for certain items, including the depreciable lives of property and equipment, income tax, revenue recognition and certain components of cost of revenue. These estimates, assumptions and judgments are derived and continually evaluated based on available information, experience and various assumptions we believe to be reasonable under the circumstances. To the extent these estimates are materially incorrect and need to be revised, our operating results may be materially adversely affected.

Our significant accounting policies are summarized in Note 2, Summary of Significant Accounting Policies, to our predecessor audited combined financial statements included elsewhere in this prospectus. We identify our most critical accounting policies as those that are the most pervasive and important to the portrayal of our financial position and results of operations, and that require the most difficult, subjective and/or complex judgments by management regarding estimates about matters that are inherently uncertain.

Use of estimates

In preparing our predecessor audited combined financial statements, we use estimates and assumptions that may affect reported amounts and disclosures. Estimates are used when accounting for depreciation, leases, derivatives, asset retirement obligations, accrued liabilities, and income taxes, among others. These estimates and assumptions are based on current facts, historical experience and various other factors that we believe to be reasonable under the circumstances, the results of which form the basis for making judgments about the carrying values of assets and liabilities and the recording of revenue, costs and expenses that are not readily apparent from other sources. To the extent there are material differences between the estimates and actual results, our future results of operations would be affected.

Asset retirement obligations

We operate under solar power services agreements with some customers that include a requirement for the removal of the solar energy systems at the end of the term of the agreement. Asset retirement obligations are recognized at fair value in the period in which they are incurred and the carrying amount of the related long-lived asset is correspondingly increased. Over time, the liability is accreted to its expected future value. The corresponding asset capitalized at inception is depreciated over the useful life of the solar energy system.

Revenue recognition

A significant majority of our revenues are obtained through the sale of energy (based on megawatts) pursuant to terms of PPAs or other contractual arrangements, which have a weighted average remaining life of 19 years as of March 31, 2015. All PPAs are accounted for as operating leases, have no minimum lease payments and all of the rental income under these leases is recorded as income when the electricity is delivered.

Impairment of long-lived assets

Long-lived assets that are held and used are reviewed for impairment whenever events or changes in circumstances indicate carrying values may not be recoverable. An impairment loss is recognized if the total future estimated undiscounted cash flows expected from an asset are less than its carrying value. An impairment charge is measured as the difference between an asset’s carrying amount and fair value with the difference recorded in operating costs and expenses in the statement of operations. Fair values are determined by a variety of valuation methods, including appraisals, sales prices of similar assets and present value techniques.

 

160


Table of Contents

Derivative financial instruments and hedging activities

All derivative instruments are recognized in the combined balance sheet at fair value. Derivatives not designated for hedge accounting and used to hedge foreign-currency denominated balance sheet items are reported directly in earnings along with offsetting transaction gains and losses on the items being hedged. Derivatives used to hedge foreign-currency denominated cash flows and floating rate debt may be accounted for as cash flows hedges, as deemed appropriate. Gains and losses on derivatives designated as cash flows hedges are recorded in other comprehensive (loss) income and reclassified to earnings in a manner that matches the timing of the earnings impact of the hedged transactions. The ineffective portion of all hedges, if any, is recognized currently in earnings. The effective portion of the hedge will be recorded in the same manner as foreign currency translation adjustment in other comprehensive (loss) income. When the hedge position is dissolved and we recognize a gain or loss in other income (expense), the associated hedge gain or loss in other comprehensive (loss) income will be reclassified to other income (expense).

Stock-based compensation

On September 29, 2014 and March 31, 2015, we granted 31,350 shares and 35,250 shares of restricted stock, respectively, to certain employees of SunEdison that will perform services for us. This represents 5.6% of the estimated fair value of the total equity in Global as of the grant date. Upon the completion of our initial public stock offering, the restricted shares will be convertible to a number of shares of Class A common stock that represents the percentage interest noted above. We will begin recognizing stock-based compensation expense on the date of the initial public offering based on the grant-date fair value of these awards using the straight-line attribution method, net of estimated forfeitures.

Income taxes

Our income tax balances are determined and reported using a “separate return” method. Income taxes as presented herein allocate current and deferred income taxes of the parent to us in a manner that is systematic, rational and consistent with the asset and liability method. The sum of the amounts allocated to the Company’s carve-out tax provisions may not equal the historical consolidated provision. Under the separate return method, deferred tax assets and liabilities are recognized for the future tax consequences attributable to differences between the financial statement carrying amounts of existing assets and liabilities and their respective tax bases and operating loss carry forwards.

Deferred tax assets and liabilities are measured using enacted tax rates expected to apply to taxable income in the years in which those temporary differences are expected to be recovered or settled. The effect on deferred tax assets and liabilities of a change in tax rate is recognized in operations in the period that includes the enactment date. Valuation allowances are established when management determines that it is more likely than not that some portion, or all of the deferred tax asset, will not be realized. The financial effect of changes in tax laws or rates is accounted for in the period of enactment.

Deferred income taxes arise primarily because of differences in the bases of assets or liabilities between financial statement accounting and tax accounting which are known as temporary differences. We record the tax effect of these temporary differences as deferred tax assets (generally items that can be used as a tax deduction or credit in future periods) and deferred tax liabilities (generally items for which we receive a tax deduction, but have not yet been recorded in the combined statement of operations).

We regularly review our deferred tax assets for realizability, taking into consideration all available evidence, both positive and negative, including historical pre-tax and taxable income, projected future pre-tax and

 

161


Table of Contents

taxable income and the expected timing of the reversals of existing temporary differences. In arriving at these judgments, the weight given to the potential effect of all positive and negative evidence is commensurate with the extent to which it can be objectively verified.

We believe our tax positions are in compliance with applicable tax laws and regulations. Tax benefits are recognized only for tax positions that are more likely than not to be sustained upon examination by tax authorities. The amount recognized is measured as the largest amount of benefit that is greater than 50% likely to be realized upon ultimate settlement. We believe that our liabilities for unrecognized tax benefits, including related interest, are adequate in relation to the potential for additional tax assessments. There is a risk, however, that the amounts ultimately paid upon resolution of audits could be materially different from the amounts previously included in our income tax expense and, therefore, could have a material impact on our tax provision, net income and cash flows.

Common stock valuation

We are required to estimate the fair value of the common stock when performing the fair value calculations. The fair value of the restricted shares was determined by our board of directors, with input from management and contemporaneous third-party valuations. We believe that our board of directors has the relevant experience and expertise to determine the fair value of our common stock.

Given the absence of a public trading market of our common stock, and in accordance with the American Institute of Certified Public Accountants Accounting and Valuation Guide: Valuation of Privately-Held-Company Equity Securities Issued as Compensation, our board of directors exercised reasonable judgment and considered numerous objective and subjective factors to determine the best estimate of the fair value of our common stock including:

 

 

contemporaneous valuations performed by unrelated third-party specialists;

 

 

our operating and financial performance;

 

 

current business conditions and projections;

 

 

hiring of key personnel and the experience of our management;

 

 

our stage of development;

 

 

stage of project acquisitions, construction and revenue arrangements;

 

 

likelihood of achieving a liquidity event, such as an initial public offering or a sale of the company;

 

 

lack of marketability of our common stock;

 

 

the market performance of comparable publicly traded companies; and

 

 

United States and global capital market conditions.

In valuing our common stock, our board of directors determined the equity value of our business using the income approach valuation method. The income approach estimates value based on the expectation of future cash flows that a company will generate. These future cash flows are discounted to their present values using a discount rate derived from an analysis of the cost of capital of comparable publicly traded companies in our industry or similar lines of business as of the valuation date and are adjusted to reflect the risks inherent in our cash flows.

Once we determined an equity value, we used the Probability Weighted Expected Return Method, or “PWERM,” to allocate our equity value among the various outcomes. Under the PWERM, the value of equity is estimated

 

162


Table of Contents

based on analyses of future values for the enterprise assuming various possible outcomes. Share value is based on the probability-weighted present value of expected future returns to the equity investor, considering the likely future scenarios available to the enterprise and the rights and preferences of each share class.

After the equity value is determined, a discount for lack of marketability is applied to our common stock to arrive at the fair value of our common stock. The probability and timing of each scenario were based upon discussions between our board of directors and our management team. Under the PWERM, the value of our common stock was based upon two possible future events for our company:

 

 

initial public offering; and

 

 

no initial public offering.

We believe we applied a reasonable valuation method to determine the estimated fair value of our common stock on the grant date:

Between our date of formation of September 12, 2014 and the date of this prospectus, we granted the following shares:

 

      Historical      As converted(1)  
Grant date    Number of shares(2)      Fair value per
share on date of
grant
     Number of shares    Fair value per
share on date of
grant
 

September 29, 2014

     20,450       $ 21.80          $                

March 31, 2015

     35,250       $ 37.10          $     

 

 

 

(1)   Effective upon the filing of our amended and restated certificate of incorporation prior to the completion of this offering, we will effect a     -for-one stock split of the outstanding shares of our Class A common stock and our restricted shares will be converted into shares of our Class A common stock on a     -for-one basis.
(2)   Net of forfeitures.

The restricted stock vests in four equal annual installments commencing on the first anniversary of the completion of this offering, subject to accelerated vesting upon certain events. Under certain circumstances upon a termination of employment, any unvested shares of Class A common stock held by the terminated employee will be forfeited. The restricted stock awards are subject to certain adjustments to prevent dilution at the time of conversion to Class A common stock.

Valuation inputs

In estimating the fair value of our common stock, our board of directors considered a valuation analysis for our common stock dated as of September 23, 2014 and March 31, 2015, respectively and valuation analysis reflected a fair value for our common stock of $21.8 million and $37.1 million, respectively.

With respect to the September 29, 2014 grant, the primary valuation considerations were an enterprise value determined from the income-based approach using an enterprise value multiple applied to our forward revenue metric and a lack of marketability discount of 10%. The illiquidity discount model utilized the following assumptions: (i) a time to liquidity event of six months; (ii) a risk free rate of 3.0%; and (iii) volatility of 40% over the time to a liquidity event. Estimates of the volatility of our common stock were based on available information on the volatility of common stock of comparable publicly traded companies. Our board of directors considered the proximity relative to the September 23, 2014 valuation and our financial performance in establishing the fair value of the common stock.

With respect to the March 31, 2015 grant, the primary valuation considerations were an enterprise value determined from the income-based approach using an enterprise value multiple applied to our forward revenue

 

163


Table of Contents

metric and a lack of marketability discount of 5%. The illiquidity discount model utilized the following assumptions: (i) a time to liquidity event of three months; (ii) a risk free rate of 2.3%; and (iii) volatility of 40% over the time to a liquidity event. Estimates of the volatility of our common stock were based on available information on the volatility of common stock of comparable publicly traded companies. Our board of directors considered the proximity relative to the March 31, 2015 valuation and our financial performance in establishing the fair value of the common stock.

JOBS Act

Section 107(b) of the JOBS Act provides that an emerging growth company can take advantage of the extended transition period provided in Section 7(a)(2)(B) of the Securities Act for complying with new or revised accounting standards. In other words, an emerging growth company can delay the adoption of certain accounting standards until those standards would otherwise apply to private companies. We are choosing to “opt in” to such extended transition period election under Section 107(b). Therefore, we are electing to delay adoption of new or revised accounting standards and, as a result, we may choose not to comply with new or revised accounting standards on the relevant dates on which adoption of such standards is required for non-emerging growth companies. As a result of such election, our financial statements may not be comparable to the financial statements of other public companies.

Recent accounting pronouncements

In July 2013, FASB issued ASU No. 2013-11, Income Taxes (Topic 740) Presentation of an Unrecognized Tax Benefit When a Net Operating Loss Carryforward, a Similar Tax Loss, or a Tax Credit Carryforward Exists, or ASU No. 2013-11. The amendments of ASU No. 2013-11, which were adopted on January 1, 2014, require an entity to present an unrecognized tax benefit, or a portion of an unrecognized tax benefit, as a reduction of a deferred tax asset for a net operating loss, or NOL, a similar tax loss or tax credit carryforward rather than a liability when the uncertain tax position would reduce the NOL or other carryforward under the tax law of the applicable jurisdiction and the entity intends to use the deferred tax asset for that purpose. The adoption of this guidance did not result in any material impact to our combined financial statements.

In May 2014, FASB issued ASU No. 2014-09, Revenue from Contracts with Customers, which requires an entity to recognize the amount of revenue to which it expects to be entitled for the transfer of promised goods or services to customers. ASU 2014-09 will replace most existing revenue recognition guidance in GAAP when it becomes effective. ASU 2014-09 is effective for us on January 1, 2017. Early application is not permitted. A delay in the effective date is currently being considered by the FASB, which we expect will result in at least a one year deferral. The standard permits the use of either a retrospective or cumulative effect transition method. We have not determined which transition method we will adopt, and we are currently evaluating the impact that ASU 2014-09 will have on our combined financial statements and related disclosures upon adoption.

In August 2014, FASB issued ASU 2014-15, Disclosure of Uncertainties about an Entity’s Ability to Continue as a Going Concern, which describes how an entity should assess its ability to meet obligations and sets rules for how this information should be disclosed in the financial statements. The standard provides accounting guidance that will be used along with existing auditing standards. The new standard applies to all entities for the first annual period ending after December 15, 2016, and interim periods thereafter. Management has evaluated the guidance and concluded that the adoption of this guidance will not result in any material impact to our combined financial statements.

 

164


Table of Contents

Quantitative and qualitative disclosures about market risk

We are exposed to several market risks in our normal business activities. Market risk is the potential loss that may result from market changes associated with our business or with an existing or forecasted financial or commodity transaction. The types of market risks we are exposed to are interest rate risk, foreign currency risk, liquidity risk and credit risk.

Interest rate risk

As of December 31, 2014, our long-term debt was at variable interest rates. A hypothetical increase or decrease in our variable interest rates by 1% would have had a $573 thousand and $941 thousand net effect on our predecessor’s earnings for the years ended December 31, 2013 and 2014, respectively.

We expect to enter into the Revolver upon completion of this offering. We expect that borrowings under the Revolver will be at variable interest rates. Although we intend to use hedging strategies to mitigate our exposure to interest rate fluctuations, we may not hedge all of our interest rate risk and, to the extent we enter into interest rate hedges, our hedges may not necessarily have the same duration as the associated indebtedness. Our exposure to interest rate fluctuations will depend on the amount of indebtedness that bears interest at variable rates, the time at which the interest rate is adjusted, the amount of the adjustment, our ability to prepay or refinance variable rate indebtedness when fixed rate debt matures and needs to be refinanced and hedging strategies we may use to reduce the impact of any increases in rates.

Foreign currency risk

During the years ended December 31, 2013 and 2014, all of our revenues were generated in Indian Rupee, Malaysian Ringgit, South African Rand and Thai Baht, and were translated into the U.S. dollar, which is our reporting currency. We expect the PPAs, operating and maintenance agreements, financing arrangements and other contractual arrangements relating to our initial project portfolio will be denominated in Chinese Yuan Renminbi, Brazilian Real, Indian Rupee, Malaysian Ringgit, South African Rand, Peruvian Nuevo Sol and Thai Baht, but in the future we expect such arrangements may also be denominated in other currencies. We expect to use derivative financial instruments, such as forward exchange contracts and purchases of currency options to minimize our net exposure to currency fluctuations.

 

165


Table of Contents

Industry

Unless otherwise specified, we have relied upon the data collected and published by Bloomberg New Energy Finance (as accessed on June 1, 2015) with respect to all of the data included in this prospectus relating to the size of the various solar and wind energy markets, including the expected growth of our initial target markets over the periods specified herein. Bloomberg New Energy Finance is a market research firm focused on the energy sector. We have cited 2013 market data instead of 2014 in circumstances where 2013 is the most recent period for which historical data is available. See “Industry and market data” for more information. All references to MW or GWh in this section represent the rated capacity at standard test conditions of energy generating facilities.

Overview of the clean energy industry

Global power generation capacity is forecasted to expand by 47% from 4,739 GW in 2010 to 6,970 GW in 2020. Clean power sources, including solar, wind, hydro-electricity and geothermal, as well as natural gas, are expected to account for 76% of the new power generation capacity added globally from 2010 to 2020. Solar and wind energy generation are the fastest growing segments of clean energy, with CAGRs of 31% and 14%, respectively, during this period. Through 2020, an estimated $2.1 trillion of investment in global renewable power generation capacity is forecasted to be required, which would realize an average annual investment of approximately $343 billion. We estimate that approximately 35% of these global renewable energy capacity additions will occur in our initial target markets. The following chart reflects the historical and projected evolution of cumulative installed generation capacity from various sources from 2010 to 2020:

Global cumulative power generation capacity (in GW), 2010–2020

LOGO

 

Note: “Other” represents waste, geothermal and biomass.

Source: Bloomberg New Energy Finance

Within our initial target markets, cumulative generation capacity from renewable energy sources is expected to grow at a CAGR of 9% from 2014 to 2017, with solar and wind sources expected to grow at a combined CAGR of 23% during this period.

 

166


Table of Contents

We expect the renewable generation segment to continue to offer high-growth opportunities driven by:

 

 

increasing demand for power sources due to accelerating industrialization, an expanding middle class and the need to develop energy grid infrastructure in our initial target markets;

 

 

the competitive cost of most clean energy technologies and, most significantly, the ongoing reduction in the cost of solar and wind energy, which will increase the number of markets in which grid parity is achieved;

 

 

transmission and distribution charges and the effects of an aging transmission infrastructure, which enable renewable energy generation sources located at customer sites, or “distributed generation,” to be more competitive with, or cheaper than, grid-supplied electricity;

 

 

the replacement of aging and conventional power generation facilities in the face of increasing industry challenges, such as regulatory barriers, increasing costs of and difficulties in obtaining and maintaining applicable permits and the decommissioning of certain types of conventional power generation facilities, such as coal and nuclear facilities;

 

 

the ability to couple renewable power generation with other forms of power generation, creating a hybrid energy solution capable of providing energy on a 24/7 basis while reducing the average cost of electricity obtained through the system;

 

 

the desire of energy consumers to lock in predictable rate long-term pricing of a reliable energy source;

 

 

renewable power generation’s ability to utilize freely available sources of fuel, avoiding the risks of price volatility and market disruptions associated with many conventional fuel sources;

 

 

environmental concerns over conventional power generation; and

 

 

government policies that encourage development of renewable power, such as national, provincial, state or local renewable portfolio standard programs, which motivate utilities to procure electricity supply from renewable resources.

In addition to renewable energy, we expect natural gas to grow as a source of electricity generation due to its relatively low cost and low environmental impact compared to other fossil fuel sources, such as coal and oil.

Solar energy

Solar energy is the fastest growing source of cumulative generation capacity, with a projected CAGR of 31% from 2010 to 2020. Annual global solar energy installations are expected to increase from 40 GW in 2013 to 85 GW in 2020. The following chart reflects the actual and projected growth of annual global solar energy installations from 2010 to 2020:

Global annual solar energy installations (in GW), 2010–2020

LOGO

 

167


Table of Contents

 

Source: Bloomberg New Energy Finance

 

(1)   We expect our future markets to include other markets in Asia (except Japan), Africa, Latin America and the Middle East.

 

(2)   Other includes markets in North America, Oceania, Japan and Chile.

Annual solar energy installations in our initial target markets are expected to add more than 179 GW between 2014 and 2020, representing a CAGR of 32%.

From 2015 to 2020, 399 GW of aggregate solar energy generation capacity is expected to be installed globally, requiring total investments of approximately $723 billion. The following chart reflects the expected total annual investment in global solar energy installations from 2015 to 2020:

Total annual investment in global solar capacity (in billions), 2015–2020

 

LOGO

Source: Bloomberg New Energy Finance

Solar energy segments

Solar energy systems can be classified into four segments: (i) utility-scale; (ii) commercial and industrial, or “C&I”; (iii) residential; and (iv) off-grid. We are primarily focused on the first two of these segments. The utility-scale segment represents projects where either the purchaser of the electricity or the owner of the system is an electric utility. The C&I segment represents commercial firms, industrial companies, academic institutions, government entities, hospitals, non-profits and all other entities that are neither a utility nor a residential customer that purchase solar power directly from a generation company or a solar power plant. The residential segment represents residential homeowners with solar energy generation capabilities. The off-grid segment specifies projects that serve energy demand that is not interconnected with the electricity grid.

In the C&I segment, most commercial or industrial firms do not own the solar assets, but rather sign a PPA with a generation company that owns the assets. Demand for C&I and residential solar is driven largely by customers’ desire for contracted long-term energy prices, corporate “green” initiatives, state and federal incentives and/or net metering policies.

While solar utility projects compete with other wholesale generation plants, solar energy in the C&I and residential markets competes with the retail price of electricity. The retail electricity price includes generation costs, as well as transmission and distribution charges. Solar generating assets can be located at a customer’s site, which reduces the customer’s transmission and distribution charges and allows these distributed solar generation assets to compete favorably with the retail cost of electricity. By competing with the retail price of electricity, solar energy is able to reach grid parity and reduce customer electricity costs.

 

168


Table of Contents

The vast majority of utility solar projects are structured so that the utility does not own the generating assets, but rather the utility signs a long-term PPA to buy the electricity from the plant. Demand for utility PPAs is largely driven by (i) the utility’s need to meet renewables mandates, (ii) energy demand growth and (iii) the retirement of existing generation assets.

Key drivers of solar energy growth

We believe the following factors have driven, and will continue to drive, the global growth of solar energy:

Grid parity.    We define “grid parity” as the point at which renewable energy sources can generate electricity at a cost, excluding any government incentives or subsidies, equal to or lower than prevailing retail electricity prices.

The cost of solar energy has undergone a significant decline and is expected to continue to decline going forward. On a global basis, the average total installation cost of solar energy projects is expected to decline by more than 66% in the ten-year period ending in 2020. In 2010, the average installation cost per watt of capacity in the utility market was $3.24 and fell to $1.50 in 2014. By 2020, this number is expected to fall to $1.09.

Conversely, we expect retail electricity prices to continue to rise primarily due to increasing costs of conventional sources of energy, required investments in transmission and distribution infrastructure and increasing regulatory costs for conventional energy sources. We believe accelerating industrialization, an expanding middle class and the need to develop energy grid infrastructure will continue to drive demand in our initial target markets for the foreseeable future. Rising retail electricity prices create a significant and growing market opportunity for lower-cost retail energy. Solar energy may be able to offer C&I customers clean electricity at a price lower than their current utility rate. Whether solar power generation has achieved grid parity is dependent upon a number of factors, including the scale of and technology utilized by the generation project, cost of capital, applicable installation costs and maintenance expenses, local electricity rates, local meteorological characteristics, transmission fees and taxes. As a result, we evaluate grid parity on a project-by-project basis at the time such project achieves its commercial operation date. None of our projects in our initial portfolio achieved grid parity at the time of their respective COD. We do, however, believe grid parity has been reached in certain areas within our target markets where our Sponsor is actively pursuing development activities. For example, we believe that grid parity has been achieved in certain Indian states, such as Maharashtra, for certain industrial customers based upon a comparison of energy pricing data provided by the Government of India and recent pricing contained in PPA offers made by our Sponsor. At this time, we do not know the specific timing as to when grid parity will be achieved for any new projects we acquire in our initial target markets.

Movement to distributed generation.    Although some locations are more suitable than others, solar energy systems can generate electricity nearly anywhere. By contrast, hydro-electric power, wind or geothermal electricity generating systems are site-specific and location is critical. This means power generated by solar energy systems can sometimes be delivered at a relatively low cost to areas that were previously difficult to service, have high transmission and distribution charges, or have high load requirements. Solar power can, in some cases, defer transmission and distribution investments and replace or significantly reduce the use of expensive and environmentally detrimental on-site power generation technologies, such as diesel generators.

Distributed solar energy systems provide customers with an alternative to traditional utility energy suppliers. Distributed resources are smaller in unit size and can be constructed at a customer’s site, removing the need for lengthy transmission and distribution lines. By bypassing the traditional utility suppliers, distributed energy

 

169


Table of Contents

systems delink the customer’s price of power from external factors such as volatile commodity prices, costs of the incumbent energy supplier and transmission and distribution charges. This makes it possible for distributed energy purchasers to buy energy at a predictable and stable price over a long period of time.

Within our initial target markets, distributed solar energy systems are particularly attractive in addressing the historical undersupply of energy generation capacity in such markets due to their ease and speed of installation, reliability, scalability and ability to be located near the end customer.

Solar power generation typically coincides with the times of peak energy demand and the highest cost of energy.    Solar energy systems generate most of their electricity during the afternoon hours, when the energy from the sun is strongest. This generally corresponds to peak demand hours and the most expensive energy prices.

Acceptance and support for solar energy.    Solar energy has gained increased acceptance from the investment community because it: (i) is a reliable and predictable energy output; (ii) has low and predictable operational and maintenance costs; (iii) is lower risk than other energy sources due to minimal asset complexity and use of proven technologies; and (iv) does not face commodity risk.

Wind energy

The adoption of wind energy across the globe relative to other power generation technologies is expected to be driven by its cost competitiveness, broad resource availability, well established technology, non-reliance on water, and ancillary societal benefits, such as job creation and energy security. The cost competitiveness of wind energy and its growth relative to other conventional sources of power generation have been driven by:

 

 

the advancement of turbine technology, including larger rotor diameters and higher hub heights, has increased energy capture and operational efficiency;

 

 

competition among turbine manufacturers and associated manufacturing cost reductions have led to a decline in wind turbine prices of 23% since 2010;

 

 

emergence of wind turbines designed specifically for regions with lower wind speeds, allowing for broader deployment of wind energy; and

 

 

many countries have adopted renewable energy targets and financially incentivized investment in wind energy in an effort to reduce carbon emissions.

 

170


Table of Contents

Wind energy is the second fastest growing source of generation capacity, with a projected CAGR of 14% from 2010 to 2020. Annual global wind energy installations are expected to increase from 49 GW in 2014 to 57 GW in 2020. The following chart reflects the actual and projected growth of annual global wind energy installations from 2010 to 2020:

Global annual wind energy installations (in GW), 2010–2020

 

LOGO

Source: Bloomberg New Energy Finance

 

(1)   We expect our future markets to include other markets in Asia (except Japan), Africa, Latin America and the Middle East.

 

(2)   Other includes markets in North America, Oceania, Japan and Chile.

Driven by policy uncertainty in the United States, demand for wind energy generation capacity temporarily contracted in 2013. Due to this technology’s increasing cost competitiveness and geographic diversification, global demand for wind power is currently less subject to policy uncertainty in individual markets. Annual wind energy installations in our initial target markets are expected to add 188 GW between 2014 and 2020, representing a CAGR of 14%.

From 2015 to 2020, 334 GW of aggregate wind energy generation capacity is expected to be installed globally, requiring total investments of approximately $664 billion. The following chart reflects the total annual investment in global wind installations from 2015 to 2020:

Total annual investment in global wind capacity (in billions), 2015–2020

 

LOGO

Source: Bloomberg New Energy Finance

Hydro-electric energy

Hydro-electricity is the largest source of renewable energy, with 978 GW of global installed capacity in 2013, representing 63% of global renewable energy installed capacity. Hydro-electric generation is a well established

 

171


Table of Contents

clean power technology and its multiple methods of generation, such as conventional dam, pumped storage and run-of-river, have led to its diverse use in renewable generation from large-scale (greater than or equal to 50 MW) to small-scale (less than 50 MW) facilities.

The continued installation and operation of hydro-electric power generation is expected to be driven by:

 

 

its predictable, low operating costs and low maintenance requirements;

 

 

its high reliability, flexibility and dispatchability allow utilities and grid operators to deploy hydro-electricity as baseload capacity;

 

 

its long asset life, which are typically 40 to 50 years with significant extensions possible through maintenance and equipment replacement; and

 

 

hydro-electric generation produces essentially no emissions or direct waste and, with respect to run-of-river systems, minimizes the overall environmental impact and generates electricity without altering the existing water flow or water levels.

Hydro-electricity is expected to increase its installed capacity at a projected CAGR of 3% from 2010 to 2020. Annual global hydro-electricity installations are expected to be sustained around 33 GW from 2014 to 2020. The following chart reflects the actual and projected global hydro-electricity capacity from 2010 to 2020.

Global annual hydro-electric energy installations (in GW), 2010–2020

 

LOGO

Source: Bloomberg New Energy Finance

From 2015 to 2020, an aggregate of 163 GW of hydro-electricity generation capacity is expected to be installed globally, requiring total investments of approximately $437 billion. The following chart reflects the projected total annual investment in global hydro-electricity installations from 2015 to 2020:

Total annual investment in global hydro-electric capacity (in billions), 2015–2020

 

LOGO

Source: Bloomberg New Energy Finance

 

172


Table of Contents

Solar, wind and hydro-electric energy markets

Set forth below is a summary of the key markets in which the projects in our initial portfolio operate or that we expect to have projects operating in the near term.

China

The installed base of energy generation capacity in China increased from 963 GW in 2010 to 1,245 GW in 2013, or a CAGR of 9%. The following table summarizes the components of China’s installed energy generation capacity for 2013:

 

Fuel type    Percentage  

Coal

     63.8%   

Hydro-electric

     20.8      

Wind

     7.2      

Gas

     3.7      

Solar

     1.6      

Nuclear

     1.2      

Oil

     1.1      

Biomass

     0.7      
  

 

 

 

Total

     100.0%   

 

 

Retail electricity prices have risen in China at a CAGR of 7% over a seven-year period. We expect retail electricity prices in China to continue to rise primarily due to increasing costs of conventional energy, an expanding middle class, increased industrialization and continuing environmental restrictions on conventional energy sources.

China’s renewable power market has also seen significant growth over the last three years. The cumulative installed capacity of renewable energy sources in China grew from 248 GW in 2010 to 377 GW in 2013, or a CAGR of 15%. Renewable energy accounted for 46% of overall energy capacity growth from 2010 to 2013. Renewable energy sources are expected to grow to 541 GW in 2017, or a CAGR of 9% from 2014 to 2017.

China’s cumulative solar energy generation capacity grew from 789 MW in 2010 to 32.9 GW in 2014, representing a CAGR of 154%. During the same period, the cumulative wind energy generation capacity grew from 42 GW to 110 GW, or a CAGR of 27%. The chart below shows the cumulative solar and wind energy generation capacity in China’s solar and wind energy market from 2010 to 2020:

China cumulative solar and wind energy generation capacity (in MW), 2010–2020

 

 

LOGO

Source: Bloomberg New Energy Finance

 

173


Table of Contents

Key drivers of renewable energy growth in China

Energy demand in China has increased significantly due to rapid industrialization, a growing population and improving standards of living. China has actively been pursuing alternative sources of energy due to environmental concerns about pollution problems in major cities and high levels of carbon dioxide emissions. As part of this initiative, China has committed to increase non-fossil-fuel generation capacity to 15% of the country’s overall total primary energy mix by 2020. Consequently, China has categorized renewable energy as one of nine strategic priorities in its thirteenth five-year plan for energy (2016 to 2020). Initiatives to increase the level of utilization of renewable energy sources through grid enhancements and energy storage are also promoted by the Chinese government.

China’s government has enacted significant financial support policies to promote the development of renewable energy sources, including generation-based incentives as well as tax-based incentives. In 2009, the Chinese government launched a feed-in tariff program for wind energy. This feed-in tariff program makes wind energy projects eligible to receive tariffs in amounts in excess of the benchmark tariff received by local desulfurization coal-fired generating power plants. These tariffs range from CNY 0.51/kWh to CNY 0.61/kWh. In 2013, China launched a feed-in tariff program for solar energy. This feed-in tariff program makes solar energy projects eligible to receive tariffs in an amount in excess of the benchmark tariff received by local desulfurization coal-fired generating power plants. These tariffs range from CNY 0.90/kWh to CNY 1.00/kWh. In addition, certain provinces have launched generation-based incentive programs to promote solar energy growth, which are additive to the national feed-in tariff program. China has chosen to further incentivize commercial solar installation with a higher generation-based incentive policy.

Brazil

The installed base of energy generation capacity in Brazil increased from 113 GW in 2010 to 126 GW in 2013, or a CAGR of 4%. The following table summarizes the components of Brazil’s installed energy generation capacity for 2013:

 

Fuel type    Percentage  

Hydro-electric

     69.0%   

Gas

     9.8%   

Biomass

     9.1%   

Oil

     7.6%   

Coal

     2.7%   

Wind

     1.8%   

Solar

     0.1%   
  

 

 

 

Total

     100.0%   

 

 

Retail electricity prices increased in Brazil at a CAGR of 4% between 2006 and 2012. We expect retail electricity prices in Brazil to continue to rise primarily due to the recently announced increase of Brazil’s electricity tariffs, and overall growth in electricity demand.

Brazil’s renewable power market has also seen significant growth over the last three years. The cumulative installed capacity of renewable energy sources grew from 88 GW in 2010 to 99 GW in 2013, or a CAGR of 4%. Renewable energy accounted for 85% of overall energy capacity growth from 2010 to 2013. Renewable energy sources are expected to grow to 125 GW in 2017, a CAGR of 6% from 2014 to 2017.

 

174


Table of Contents

Brazil’s cumulative solar energy generation capacity grew from 14 MW in 2010 to 37 MW in 2014, and its cumulative wind energy generation capacity grew from 930 MW in 2010 to 5.1 GW in 2014, a CAGR of 53%. The chart below shows the historical and forecasted cumulative solar and wind energy generation capacity in Brazil from 2010 to 2020:

Brazil cumulative solar and wind energy generation capacity (in MW), 2010–2020

LOGO

Source: Bloomberg New Energy Finance

Key drivers of renewable energy growth in Brazil

Energy demand in Brazil has increased over the past couple of years due to improving standards of living and overall macroeconomic growth. In addition, the Brazilian government is seeking to diversify the country’s electricity mix. We expect wind and solar generation to experience continued growth supported by high energy prices, continued generation-focused federal auctions and an increasing shift towards a more balanced generation mix. The Brazilian government’s renewable expansion plan forecasts that 22.4 GW of wind and 3.5 GW of solar capacity will be installed by 2023.

Federal generation auctions are the main driver of clean energy investments in Brazil. In 2014, Brazil’s federal government held five generation and two transmission auctions, contracting 2.2 GW of wind and 1.0 GW of solar projects with 20-year contracts, projected to reach COD in 2017. For 2015, the government has announced that at least three generation auctions for new build projects will be held. We expect the Brazilian government to keep its commitment to hold an increasing number of auctions.

Fundamentals for wind development remain strong. Wind speed characteristics in Brazil are among the best in the world for energy generation, and transmission constraints for new wind developments have started to ease, which, coupled with the federal generation auctions, should continue to drive new wind installation. Increasing interconnection availability allowed a record amount of 2.7 GW of wind capacity to come online in 2014. Solar projects secured contracts for the first time in the federal auction held in October 2014. The auction was the first to feature a carve-out specifically for solar projects, and the government request for 1 GW of solar projects surpassed market expectations.

 

175


Table of Contents

Hydro-electric

The cumulative hydro-electric generation capacity grew from 81 GW in 2010 to 87 GW in 2014, a CAGR of 2%. The chart below shows the historical and forecasted cumulative hydro-electric generation capacity in Brazil from 2010 to 2016:

Brazil cumulative hydro-electric energy generation capacity (in MW), 2010–2016

 

LOGO

Source: Bloomberg New Energy Finance

India

Since 2010, the installed base of energy generation capacity in India has increased from 173 GW to 234 GW in 2013, or a CAGR of 11%. The chart below shows India’s generation capacity fuel mix as of year-end 2013:

 

Fuel type    Percentage  

Coal

     64.6

Hydro-electric

     20.7  

Gas

     9.1   

Wind

     8.6  

Biomass

     2.9   

Nuclear

     2.3   

Solar

     1.2   

Oil

     1.2   
  

 

 

 

Total

     100.0

 

 

Retail electricity prices have risen in India at a CAGR of 7% over the past four years. We expect retail electricity prices in India to continue to rise due primarily to increasing costs of conventional sources of energy and overall demand for energy and the removal of government subsidies available to conventional energy sources.

India’s renewable power market has also seen significant growth over the last three years. The cumulative installed capacity of renewable energy sources in India grew from 56 GW in 2010 to 70 GW in 2013, or a CAGR of 8%. Renewable energy accounted for 24% of overall energy capacity growth from 2010 to 2013. Renewable energy sources are expected to grow to 100 GW of cumulative installations by 2017, or a CAGR of 10% from 2014 to 2017.

 

176


Table of Contents

The cumulative installed capacity of solar energy in India grew from 82 MW in 2010 to 3,259 MW by 2014, or a CAGR of 151%. The cumulative installed capacity of wind energy in India grew from 11 GW in 2010 to 21 GW by 2014, or a CAGR of 17%. The following chart reflects actual and projected growth in India’s cumulative solar and wind energy generation capacity from 2010 to 2020.

India cumulative solar and wind energy generation capacity (in MW), 2010–2020

 

 

LOGO

Source: Bloomberg New Energy Finance

Key drivers of renewable energy growth in India

India’s overall demand for energy has increased significantly over the last several years due to the increase in its population, rapid industrialization and improvements in living standards. During the same period, the Indian government has increased its focus on developing renewable power generation to diversify the range of sources used in energy generation and to reduce greenhouse gas emissions. During the period from 2007 to 2012, a total of 18 GW of renewable energy generating capacity was installed in India, which significantly exceeded the 11 GW that were commissioned and planned by the Indian government during this period. India’s National Action Plan on Climate Change establishes a goal to generate 15% of its electricity from renewable energy sources, other than hydro-electric power, by 2019. India has also announced its goal of reducing the country’s greenhouse gas emissions by between 20% and 25% from 2005 levels by 2020.

We expect, based on our industry experience, that solar and wind power are well positioned to fulfill this expected growth in renewable energy generating capacity. Similarly, we expect solar and wind energy technology to increasingly become cost competitive with grid-supplied electricity.

Historically, the solar market has been augmented by off-grid applications, but on-grid installations have increased in recent years due to increasing price competitiveness and the adoption of new policies and incentives. In 2009, the Indian government launched its flagship solar initiative known as Jawaharlal Nehru National Solar Mission, or the “National Solar Mission,” to rapidly scale up the development of grid-connected, utility-scale solar projects. The National Solar Mission establishes a target of 20 GW of installed solar energy generation capacity by 2022, or approximately 3% of its total energy generating capacity. However, the Indian Government plans to increase the target to 100 GW by 2022, with a targeted capacity addition of 1 GW annually. India’s Ministry of Power has proposed an amendment to the Electricity Act 2003 that would require State Electricity Regulatory Commissions to purchase 8% of their power generation from solar resources by March 2019, a goal that may require as much as 70 GW of new capacity additions. Various state and local initiatives are also driving the continued development of the solar energy market in India. The Indian state of Gujarat alone is planning installations of 10 GW of solar energy capacity by 2022.

 

177


Table of Contents

In addition, several new solar programs have recently been announced that will be implemented in the next few years, including tenders for utility offtake purchasers in the states of Karnataka (500 MW), Andhra Pradesh (500 MW) and Telengana (500 MW), as well as Tata Power (500 MW) and NTPC (250 MW). Implementation of these programs would significantly increase installed solar capacity in India.

Similar to solar power, wind power has also received strong governmental support. The Indian government is targeting 40 GW of new wind installations by 2019. Several states in India have feed-in tariff programs with fixed or escalating tariffs for durations of up to 25 years. Under these feed-in tariff programs, the applicable tariffs for projects commissioned between fiscal year 2014 and 2015 currently range from between INR 3.65/kWh and 5.81/kWh, depending on the state, regions within a given state, and whether accelerated depreciation is available. In addition to the state level feed-in tariff programs, wind developers in India also benefit from central government policies, including accelerated depreciation and generation-based incentives. Originally effective from 2002 to 2012 and reinstated in 2014, the accelerated depreciation program provides a tax benefit to wind developers by reducing taxable income in the initial years of a project. Introduced in 2009, the generation-based incentives scheme provides wind developers an INR 0.50/kWh payment for a period of four to ten years, with a cap of INR 10 million/MW.

South Africa

The installed base of energy generation capacity in South Africa increased from 41 GW in 2010 to 43 GW in 2013, a CAGR of 2%. The chart below shows South Africa’s generation capacity fuel mix as of year-end 2013:

 

Fuel type    Percentage  

Coal

     86.8%   

Oil

     5.5      

Nuclear

     4.3      

Hydro-electric

     1.1      

Gas

     0.8      

Biomass

     0.6      

Solar

     0.4      

Wind

     0.1      
  

 

 

 

Total

     100.0%   

 

 

Retail electricity prices rose in South Africa by 18% last year. We expect retail electricity prices in South Africa to continue to rise due to an accelerating demand for energy.

South Africa’s renewable power market has also seen significant growth over the last three years. The cumulative installed capacity of renewable energy sources in South Africa grew from 925 MW in 2010 to 1,147 MW in 2013, or a CAGR of 7%. Renewable energy accounted for 8% of overall energy capacity growth from 2010 to 2013. Renewable energy sources are expected to grow to 6.0 GW of cumulative installations by 2017, a CAGR of 32% from 2014 to 2017.

 

178


Table of Contents

The cumulative installed capacity of solar energy in South Africa grew from 0 MW in 2010 to 1,075 MW in 2014, while the cumulative installed capacity of wind energy grew from 8 MW to 606 MW during the same period. The following chart reflects actual and projected growth in South Africa’s cumulative solar and wind energy generation capacity from 2010 to 2017:

South Africa cumulative solar and wind energy generation capacity (in MW), 2010–2017

 

 

LOGO

Source: Bloomberg New Energy Finance

Key drivers of renewable energy growth in South Africa

South Africa’s Department of Energy expects South Africa’s energy demand to double by 2030 as a result of continued economic and population growth and its current program to expand the availability of electricity throughout all regions of South Africa. In 2010, South Africa approved the Integrated Resource Plan 2010 to 2030 (updated in November 2012), which outlines a strategy for ensuring that electricity generation capacity is sufficient to meet future demand in South Africa. Under this plan, the South African government guarantees the payment obligations of the primary utility offtake purchaser under PPAs with renewable energy producers in defined circumstances. This has facilitated private sector development of renewable energy, as financing sources and investors have been willing to accept sovereign country risk without requiring political risk insurance, as would be the case in virtually every other African jurisdiction, in light of South Africa’s relatively strong international credit standing.

South Africa’s Renewable Energy Independent Power Producer Procurement program contemplates a total of 6,925 MW of new electricity generation capacity being added from renewable energy technologies through a multiple round bidding process in which renewable energy developers are eligible to receive a feed-in tariff that is determined based on the bidding process. Each bid is evaluated under this program based 70% on amount of the proposed tariff and 30% on specified economic development criteria. Under this program, the government expects to procure 2,925 MW and 3,320 MW of installed solar and wind capacity, respectively. See “Business—Government incentives—South Africa.”

South Africa’s Integrated Resource Plan estimates that renewable energy sources will account for 42% of all new electricity generation in South Africa over the next 20 years. As a result, the South African Department of Energy is developing a long-term plan to facilitate the development of a renewable power market. As a signatory to the Kyoto protocol, the government has been focused on fulfilling its carbon reduction obligations by increasing the share of renewable resources in its total energy mix. For example, South Africa announced in 2011 a target of 4% of the total energy mix to come from renewable energy sources by 2016.

South Africa is well suited for the development of solar power due to its high levels of solar irradiation. The Integrated Resource Plan (2010 – 2030) estimates that solar energy will be a significant portion of the growth in renewables and account for 8.4 GW of cumulative capacity by 2030.

 

179


Table of Contents

Wind power has also received government support through the Renewable Energy Independent Power Producer Procurement program. Under this program, the government is targeting to achieve 8.4 GW of installed wind capacity by 2030.

 

Honduras

Since 2010, the installed base of energy generation capacity in Honduras increased from 1.5 GW to 1.6 GW in 2013, or a CAGR of 3%. The chart below shows Honduras’ generation capacity fuel mix as of year-end 2013.

 

Fuel type    Percentage  

Oil

     55.4%  

Hydro-electric

     32.7     

Wind

     6.2     

Gas

     4.4     

Coal

     1.3      
  

 

 

 

Total

     100.0%   

 

 

Retail electricity prices have risen in Honduras at a CAGR of 8% over the past seven years. We expect retail electricity prices in Honduras to continue to rise, primarily due to increasing costs of conventional sources of energy and overall demand for energy and the removal of government subsidies available to conventional energy sources.

Honduras’ renewable power market has experienced growth over the last three years, with the cumulative installed capacity of renewable energy sources increasing from 527 MW in 2010 to 640 MW in 2013. Renewable energy accounted for 90% of the overall energy capacity growth from 2010 to 2013.

The cumulative installed capacity of hydro-electric energy in Honduras grew from 527 MW in 2010 to 538 MW in 2013. The cumulative installed capacity of wind energy in Honduras grew from 0 MW in 2010 to 126 MW in 2014.

The chart below shows the cumulative solar and wind energy generation capacity from 2010 to 2017:

Honduras cumulative solar and wind energy generation capacity (in MW), 2010-2020

 

LOGO

Source: Bloomberg New Energy Finance

 

180


Table of Contents

Key drivers of renewable energy growth in Honduras

The Honduras energy matrix is reliant on liquid fossil fuels for power generation; therefore, Honduras’ power prices are sensitive to oil price fluctuations. The government of Honduras has been focused on changing the country’s energy matrix, fostering the development of renewable energy generation. Under the Honduras National Plan 2010–2022, the government has set a goal that 60% of Honduras’ electricity demand be met by renewable energy generation by 2022. To achieve this goal, the Honduran government gives preferential tax treatment for renewable energy projects (tax exemption from income tax, import duty and sales tax) and provides a 10% payment bonus for MW solar PV projects (less than 50 MW) installed by year-end 2015.

Costa Rica

From 2010 to 2013, the installed base of energy generation capacity in Costa Rica has increased from 2.4 GW to 2.7 GW or a CAGR of 4%. The chart below shows Costa Rica’s generation capacity fuel mix as of year-end 2013:

 

Fuel type    Percentage  

Hydro-electric

     64.6%   

Oil

     22.9     

Geothermal

     8.1     

Wind

     2.9     

Biomass

     1.5     
  

 

 

 

Total

     100.0%   

 

 

Retail electricity prices have risen in Costa Rica at a CAGR of 11% over the past seven years. We expect retail electricity prices in Costa Rica to continue to rise, primarily due to increasing costs of conventional sources of energy and overall demand for energy and the removal of government subsidies available to conventional energy sources.

The cumulative installed capacity of renewable energy sources in Costa Rica increased from 1,743 MW in 2010 to 2,064 MW in 2013. Renewable energy accounted for 117% of overall energy capacity growth from 2010 to 2013, in part, displacing fossil fuel capacity, which has declined 7% over that time period.

The cumulative installed capacity of wind energy in Costa Rica grew from 50 MW in 2010 to 127 MW in 2014, or a CAGR of 27%.

The following chart reflects actual and projected growth in Costa Rica’s cumulative solar and wind energy generation capacity from 2010 to 2017:

Costa Rica cumulative solar and wind energy generation capacity (in MW), 2010-2020

 

LOGO

Source: Bloomberg New Energy Finance

 

181


Table of Contents

Key drivers of renewable energy growth in Costa Rica

Costa Rica has committed to becoming the first carbon-neutral country by 2021, with renewable energy playing an important role in attaining that goal. Costa Rica has established several initiatives to achieve their carbon-neutral goal, including tax incentives (specifically import, value added and income tax breaks on select renewable energy materials and equipment) and renewable power tenders held by Instituto Costarricense de Electricidad, a state-owned vertically integrated utility.

Peru

Since 2010, the installed base of energy generation capacity in Peru has increased from 8 GW to 10 GW in 2013, or a CAGR of 5%. The chart below shows Peru’s generation capacity fuel mix as of year-end 2013:

 

Fuel type    Percentage  

Gas

     39.8%   

Hydro-electric

     36.4%   

Oil

     20.7%   

Coal

     1.6%   

Solar

     0.9%   

Biomass

     0.8%   
  

 

 

 

Total

     100.0%   

 

 

Retail electricity prices increased in Peru at a CAGR of 4% between 2006 and 2013. We expect retail electricity prices in Peru to continue to rise due primarily to increasing costs of conventional sources of energy and overall demand for energy and the removal of government subsidies available to conventional energy sources.

Peru’s renewable power market has seen growth over the last three years, with the cumulative installed capacity of renewable energy sources increasing from 3.5 GW in 2010 to 3.7 GW in 2013. Renewable energy accounted for 13% of overall energy capacity growth from 2010 to 2013.

The cumulative installed capacity of solar energy in Peru grew from 0 MW in 2010 to 84 MW by 2014. The cumulative installed capacity of wind energy in Peru grew from 0 MW in 2010 to 146 MW in 2014. The chart below shows the cumulative solar and wind energy generation capacity from 2010 to 2017:

Peru cumulative solar and wind energy generation capacity (in MW), 2012–2017

 

LOGO

Source: Bloomberg New Energy Finance

 

182


Table of Contents

Key drivers of renewable energy growth in Peru

Energy demand in Peru has increased significantly due to rapid industrialization, a growing population and the expansion of the energy-intensive mining sector. The current capacity mix is already primarily composed of clean energy sources, with natural gas representing 29% and hydro-electric representing 39% of the installed capacity in 2014. To further promote generation from renewable sources, Peru offers several policy incentives, including priority grid dispatch, 20% accelerated tax depreciation and technology-specific auctions for renewables.

The Peruvian government established renewable technology-specific auctions in 2008 to support growth. At each auction, the Ministry of Energy and Mines, or the “MINEM,” defines the proportional participation of each type of renewable technology and awards 20-year PPAs to developers who offer the lowest tariff for a given technology. There have been four auctions since its introduction and 58 biomass, hydro-electric (less than 20 MW), solar and wind projects, representing 882 MW of capacity, have been awarded PPAs through the auction mechanism. The fourth auction is expected to be held in August 2015. In addition to the incentives outlined above, Peru is one of the few countries in Latin America with a specified renewable energy target. The current target, which was last set in 2008 and subject to revision at the next review in May 2015, is set at 5% of Peru’s total electricity consumption.

Hydro-electric

The size of the hydro-electricity market in Peru has remained stable at above 3.2 GW over the past five years and presents substantial acquisition opportunities.

Peru cumulative hydro-electric energy generation capacity (in MW), 2010–2016

LOGO

Source: Bloomberg New Energy Finance

Uruguay

Since 2010, the installed base of energy generation capacity in Uruguay has increased from 2.7 GW to 3.1 GW in 2013, or a CAGR of 5%. The chart below shows Uruguay’s generation capacity fuel mix as of year-end 2013:

 

Fuel type    Percentage  

Hydro-electric

     49.5%   

Oil

     40.9%   

Biomass

     8.1%   

Wind

     1.5%   

Solar

     0.02%   
  

 

 

 

Total

     100.0%   

 

 

 

183


Table of Contents

Retail electricity prices have risen in Uruguay at a CAGR of 7% over the past three years. We expect retail electricity prices in Uruguay to continue to rise due primarily to increasing costs of conventional sources of energy and overall demand for energy and the removal of government subsidies available to conventional energy sources.

The cumulative installed capacity of renewable energy sources in Uruguay increased from 1,807 MW in 2010 to 1,836 MW in 2013. Renewable energy accounted for 7% of overall energy capacity growth from 2010 to 2013.

The cumulative installed capacity of solar energy in Uruguay grew from 0 MW in 2010 to 0.5 MW by 2014. The cumulative installed capacity of wind energy in Uruguay grew from 33 MW in 2010 to 379 MW by 2014, or a CAGR of 84%.

The following chart reflects actual and projected growth in Uruguay’s cumulative solar and wind energy generation capacity from 2010 to 2017.

Uruguay cumulative solar and wind energy generation capacity (in MW), 2010–2017

 

LOGO

Source: Bloomberg New Energy Finance

Key drivers of renewable energy growth in Uruguay

Non-hydro-electric renewable energy only represents 10% of Uruguay’s installed capacity. In response, Uruguay established medium and long-term diversification goals through the National Energy Policy from 2005 to 2030, which set a target for clean energy generation to represent 15% of total installed capacity by 2015. As of 2014, Uruguay had achieved the target, with clean energy representing 25% of total installed capacity.

To facilitate the development required to meet the target, six technology-specific auctions were held, with four wind projects and 16 solar projects, representing 934 MW and 199 MW of capacity, respectively, awarded contracts with the state-owned utility. In addition, other renewable energy incentives include a value-added tax exemption for wind generation and an income tax reduction for clean energy and energy efficiency projects.

 

184


Table of Contents

Malaysia

From 2010, the installed base of energy generation capacity in Malaysia has increased from 24 GW to 26 GW in 2013, or a CAGR of 2%. The chart below shows Malaysia’s generation capacity fuel mix as of year-end 2013:

 

Fuel type    Percentage  

Gas

     52.4%   

Coal

     33.0      

Hydro-electric

     12.8      

Other

     0.9      

Solar

     0.6      

Biomass

     0.4      
  

 

 

 

Total

     100.0%  

 

 

Retail electricity prices in Malaysia rose 15% last year, and we expect retail electricity prices in Malaysia to continue to rise due primarily to increasing costs of conventional sources of energy and overall demand for energy and the removal of government subsidies available to conventional energy sources.

The growth of Malaysia’s power market has been driven primarily by renewable energy. The cumulative installed capacity of renewable energy sources in Malaysia grew from 2.2 GW in 2010 to 3.5 GW in 2013, or a CAGR of 17%.

The cumulative installed capacity of solar energy generation in Malaysia grew from 13 MW in 2010 to 200 MW in 2014, or a CAGR of 98%. Malaysia does not have any installed wind capacity, and no meaningful wind market is expected to develop in the near future given that the feed-in tariff program for renewable energy does not currently cover wind. In 2013, SEDA began conducting a study of wind resources for the potential inclusion of wind as another renewable resource under the feed-in tariff program. No public announcement has been made on the outcome of this study. The following chart reflects actual and projected growth in Malaysia’s cumulative solar energy generation capacity from 2010 to 2020.

Malaysia cumulative solar and wind energy generation capacity (in MW), 2010–2020

 

LOGO

Source: Bloomberg New Energy Finance

Key drivers of renewable energy growth in Malaysia

Malaysia is the third largest consumer of energy in Southeast Asia. The demand for energy is expected to continue to increase due to ongoing industrialization and population growth.

 

185


Table of Contents

Malaysia has adopted several initiatives to support the development of renewable energy sources, including the National Renewable Energy Policy and Action Plan, the Renewable Energy Act and the Sustainable Energy Development Authority Act. These incentives primarily include a feed-in tariff program for eligible renewable energy projects, including solar energy projects. Under this arrangement, the offtake counterparty pays the renewable energy generator the feed-in tariff rate for power that is purchased under the PPA and is subsequently reimbursed by Malaysia’s renewable energy fund for the amount such feed-in tariff exceeds the prevailing “displaced costs” of such power. In addition, the Malaysian government has introduced incentives, such as financing programs and tax incentives, to promote the application and development of green technology. See “Business—Government incentives—Malaysia.”

Malaysia has historically subsidized liquid fuels, natural gas and electricity prices. In 2014, Malaysia began to implement a subsidy removal program for these fuel types, which will likely increase the price of natural gas and electricity. These rising prices could contribute to an increase in demand for solar energy, as it will be more cost competitive.

Thailand

The installed base of energy generation capacity in Thailand increased from 32 GW in 2010 to 33 GW in 2013, or a CAGR of 1%. The following table summarizes the components of Thailand’s installed energy generation capacity for 2013:

 

Fuel type    Percentage  

Gas

     57.9%   

Hydro-electric

     16.0      

Coal

     11.6      

Biomass

     6.3      

Oil

     5.0      

Solar

     2.5      

Wind

     0.7      
  

 

 

 

Total

     100.0%   

 

 

Thailand’s renewable power market has seen growth over the last three years. The cumulative installed capacity of renewable energy sources in Thailand grew from 7 GW in 2010 to 8 GW in 2013, or a CAGR of 5%. Renewable energy sources are expected to grow to 11 GW in 2017 or a CAGR of 7% from 2014 to 2017.

 

186


Table of Contents

Thailand’s cumulative solar energy generation capacity grew from 61 MW in 2010 to 1,197 MW in 2014, representing a CAGR of 110%. During the same period, the cumulative wind energy generation capacity grew from 5 MW to 242 MW, representing a CAGR of 164%. The following chart reflects actual and projected growth in Thailand’s cumulative solar and wind power generation capacity from 2010 to 2017:

Thailand cumulative solar and wind energy generation capacity (in MW), 2010–2017

 

 

LOGO

Source: Bloomberg New Energy Finance

Key drivers of renewable energy growth in Thailand

Under the Alternative Energy Development Plan, Thailand’s government is targeting renewable energy to account for 25% of total energy consumption by 2021. Under this development, installed capacity targets for solar and wind power are 3,000 MW and 1,800 MW, respectively. According to Thailand’s Ministry of Energy, installed solar and wind capacity at year-end 2013 accounted for approximately 27% and 12% of the 2021 installed capacity targets for solar and wind, respectively.

Solar power has received governmental support through various feed-in tariff programs. Approved by the government in 2006 and implemented in 2007, the “adder” feed-in tariff program provided eligible renewable energy developers with a fixed “adder” tariff, which is an additional payment in addition to the tariffs that power producers would receive when selling electricity. For solar projects, the adder tariff amounted to THB 8.0/kWh in 2007 and was revised downward to THB 6.5/kWh in 2010 for new projects. In 2014, the adder program was replaced with a fixed feed-in tariff program that currently provides that new solar projects with up to 90 MW in installed capacity and commissioned before year-end 2015 will receive a flat tariff of THB 5.66/kWh for 25 years. New rooftop solar projects with up to 10 kW in installed capacity and commissioned before year-end 2015 will receive a flat tariff of THB 6.96/kWh for 25 years.

Wind power continues to be supported by the “adder” feed-in tariff program described above. For eligible wind projects, the adder tariff amounts to THB 4.5/kWh for projects up to 50 kW in installed capacity and THB 3.5/kWh for projects over 50 kW in installed capacity.

 

187


Table of Contents

Business

About TerraForm Global, Inc.

Overview

We are a high-growth, globally diversified renewable energy company that owns long-term contracted wind, solar and hydro-electric power plants. Our business objective is to increase our dividend to stockholders by continuing to acquire, from SunEdison and unaffiliated third parties, clean power generation assets that produce high-quality, long-term contracted cash flows, primarily by serving utility and commercial customers with strong credit profiles. Our initial target markets will be China, Brazil, India, South Africa, Honduras, Costa Rica, Peru, Uruguay, Malaysia and Thailand. Several of these markets, including China, Brazil and India, are expected to be among the fastest growing solar and wind energy markets worldwide from 2015 to 2020 in terms of annual installations and capital investment in renewable energy projects.

Portfolio growth

Call and ROFO rights

We believe we will be able to rapidly expand our initial project portfolio as a result of the significant project acquisition call rights and ROFO rights that we have with our Sponsor and the project acquisition call rights and ROFO rights we expect to have with third-party developers of clean power generation assets. Upon completion of this offering, we will have call rights and third-party ROFO rights, with respect to identified projects, that have an aggregate of 5,366.9 MW capacity.

We will enter into a support agreement with our Sponsor immediately prior to the completion of this offering, pursuant to which our Sponsor will agree to offer us additional qualifying projects through the fifth anniversary of the completion of this offering that are projected to generate an aggregate of at least $1.4 billion of cash available for distribution during their respective first twelve months of commercial operations. We expect that our Sponsor will continue to provide us with the opportunity to acquire additional qualifying projects after it has satisfied its minimum commitment under the support agreement in order to maximize the value of its equity ownership and incentive distribution rights. The support agreement with our Sponsor will also grant us ROFO rights with respect to additional clean energy projects that our Sponsor elects to sell or otherwise transfer and that are located in our initial target markets or other emerging markets that we mutually agree upon.

In addition, we have an agreement with Renova, the largest renewable energy company in Brazil, pursuant to which we have ROFO rights with respect to the Renova ROFO Projects.

Third-party acquisitions

We also intend to rapidly expand our project portfolio by acquiring renewable energy projects from third

parties. As discussed below, our Sponsor and its operating subsidiary, TerraForm Power, have a strong record of third-party project and corporate acquisitions. We expect that our initial portfolio will include 1.1 GW of projects acquired from third parties in nine acquisitions. We expect to continue to have significant opportunities to acquire projects from third-party developers, enabling us to expand our project portfolio through acquisitions for the foreseeable future.

 

188


Table of Contents

Our Sponsor

Our U.S.-based Sponsor is the largest globally diversified developer of wind and solar energy projects in the world and has been one of the top three developers and installers of solar energy facilities in the world in each of the past two years based on megawatts installed. As of March 31, 2015, our Sponsor had a 7.5 GW pipeline of development-stage solar and wind projects, including 1.7 GW in our initial and future target markets, and approximately 4.9 GW of self-developed and third-party developed solar and wind power generation assets under management. Our Sponsor has developed over 1,300 solar and wind projects in 20 countries and has completed all of the projects on which it has commenced construction, including over 140 projects in our initial target markets. Our Sponsor has over 1,900 development and operations employees, over 700 of which service our initial and future target markets. We believe we are well positioned to capitalize on favorable market trends in the renewable power generation segment due to our relationship with our Sponsor, which has an established presence in each of our initial target markets, a strong asset development pipeline and acquisition track record, significant project financing experience and asset management and operational expertise.

Yieldco experience

Our Sponsor has significant experience in acquiring, financing and operating clean power generation assets through a publicly listed dividend-oriented company. We will be the second yieldco vehicle to launch with our Sponsor’s support. Our Sponsor’s subsidiary, TerraForm Power, which owns and operates clean power assets located in the United States and other select jurisdictions, completed its initial public offering in July 2014. With our Sponsor’s support, TerraForm Power has raised approximately $3.9 billion in acquisition and permanent financing to pursue acquisitions of renewable energy projects totaling 1,703.0 MW as of May 1, 2015. We intend to capitalize on our Sponsor’s experience in successfully launching and supporting TerraForm Power.

M&A expertise

During the year ended December 31, 2014, our Sponsor completed 32 corporate and project acquisitions worldwide, which included operating projects with an aggregate capacity of 1.5 GW. On January 29, 2015, our Sponsor completed the purchase of First Wind’s development platform, pipeline and projects in development, including over 1.6 GW of wind and solar generation assets under development, and increased its assets under management by 1.5 GW. Our Sponsor: (i) will acquire LAP’s asset management platform, its operation and maintenance personnel expertise in Peru and certain rights with respect to a pipeline of Peruvian hydro-electric development assets and (ii) has acquired an asset management platform in China consisting of operations and maintenance personnel and management expertise from Honiton. We expect to continue to leverage our Sponsor’s significant development expertise, project pipeline and third-party acquisition track record. For example, we have completed or expect to complete in connection with the closing of this offering or, in certain limited cases, during the remainder of 2015, nine separate acquisitions representing 1.1 GW in the aggregate of projects located across multiple geographies that utilize a variety of renewable energy technologies.

Market opportunity

The global renewable power generation segment is large and growing rapidly due to significant increases in energy demand, decreasing cost of renewable energy, the emergence in various energy markets of “grid parity,” which is the point at which renewable energy sources can generate electricity at a cost equal to or lower than prevailing retail electricity prices, and strong social and political support for renewable energy, among other factors. We expect the cost to produce energy from conventional sources will continue to rise, owing to the required investments in transmission and distribution infrastructure and increasing regulatory costs relating to conventional energy sources. We believe accelerating industrialization, an expanding middle

 

189


Table of Contents

class and the need to develop energy grid infrastructure will continue to drive demand in our initial target markets for the foreseeable future. We believe that solar and wind energy systems are particularly attractive in addressing the undersupply of electrical generation capacity in emerging markets due to their relative ease and speed of installation, scalability and, with respect to solar energy systems, their ability to be located near the customer, thereby reducing the customer’s transmission and distribution costs. In addition, we believe that hydro-electric energy represents a significant acquisition opportunity for us because it is a proven renewable technology with significant installed capacity of more than 412 GW in our initial target markets.

The global renewables market is projected to require more than $2.1 trillion of investment in capacity expansions over the period from 2015 through 2020, of which approximately 35% of such capacity expansion is expected to occur in our initial target markets. Of this total expected investment, more than $723 billion and $664 billion is expected to be in global solar and wind generation capacity expansions, respectively. Our initial target markets are expected to account for 48% and 41% of global wind and solar capacity expansions, respectively. In addition, more than $253 billion is expected to be invested globally in hydro-electric generation assets through 2016, of which our initial target markets are expected to account for 27% of such capacity expansion.

The installed base of renewable energy generation capacity in our initial target markets is greater than 622 GW, including more than 39 GW of solar capacity, 138 GW of wind capacity and 412 GW of hydro-electric capacity. Driven by the increasing cost competitiveness of wind and solar energy, accelerating industrialization, an expanding middle class and attractive regulatory policies that incentivize renewable energy investments, we expect substantial growth in installed renewable energy capacity over the next several years. Solar energy capacity additions are expected to total over 179 GW between 2014 and 2020 in our initial target markets and are expected to grow at a CAGR of 32% between 2014 and 2020 in our initial target markets. Over the same period, wind energy capacity additions are expected to total over 188 GW in our initial target markets and are expected to grow at a CAGR of 14% between 2014 and 2020, in our initial target markets.

TerraForm Global, Inc. is a Delaware corporation formed on September 12, 2014 and headquartered in Bethesda, Maryland.

Purpose of TerraForm Global, Inc.

We intend to create value for the holders of our Class A common stock by achieving the following objectives:

 

 

owning and operating a diverse platform of renewable energy projects, including solar, wind, hydro-electric and other clean power generation technologies, that provide long-term contracted cash flows from creditworthy counterparties;

 

 

creating a geographically diverse platform of renewable energy generation assets;

 

 

growing our project portfolio through the exercise of our call rights and the completion of third-party acquisitions;

 

 

capitalizing on the expected high growth in the worldwide clean power generation market;

 

 

creating an attractive investment opportunity for dividend growth-oriented investors; and

 

 

gaining access to a broad investor base with a more competitive source of equity capital that accelerates our long-term growth and acquisition strategy.

 

190


Table of Contents

Our business strategy

Our primary business strategy is to increase the cash dividends we pay to the holders of our Class A common stock over time. Our plan for executing this strategy includes the following:

Focus on long-term contracted clean power generation assets.    All projects included in our initial portfolio, together with any call right project that we acquire, will have a PPA with a creditworthy counterparty or be subject to a similar offtake arrangement such as a feed-in tariff program. We intend to focus on owning and operating long-term contracted clean power generation assets with proven technologies, low operating risks and stable cash flows consistent with our initial portfolio. We believe industry trends will support significant growth opportunities for long-term contracted power in the clean power generation segment as various emerging markets continue to rapidly grow their electricity usage and approach grid parity.

Grow our business through acquisitions of long-term contracted operating assets.    We intend to acquire additional long-term contracted clean power generation assets from our Sponsor and unaffiliated third parties to increase our CAFD. The Support Agreement establishes: (i) a minimum commitment from our Sponsor to provide us with $1.4 billion of Projected FTM CAFD through the fifth anniversary of the completion of this offering, which will be satisfied either through (x) the option to acquire the identified Call Right Projects, which currently represent an aggregate capacity of approximately 1,637.4 MW, or (y) the option to acquire additional projects from our Sponsor’s development pipeline that will in the future be designated as Call Right Projects; and (ii) a right of first offer on the SunEdison ROFO Projects. We also have and expect to enter into additional call rights agreements with third parties. In addition, we have a right of first offer with respect to the Renova ROFO Projects. Given the strong growth trends in our initial target markets, we also expect to have significant opportunities to acquire other clean power generation assets from third-party developers, independent power producers and financial investors. We believe our acquisition strategies, based on an extensive knowledge of the market, third-party relationships, operating expertise and access to capital, will enhance our ability to grow and generate CAFD and provide us with a competitive advantage in acquiring new assets.

Attractive, high-growth asset class.    We intend to initially focus on the solar and wind energy segments because we believe they are currently the fastest growing segments of the clean power generation industry globally and offer attractive opportunities to own assets and deploy long-term capital due to the predictability of their cash flows, and the hydro-electric energy segment because we believe its significant market size presents numerous investment opportunities. Also, we believe the solar, wind and hydro-electric energy segments are attractive because there is no associated fuel cost risk, their associated technologies have become highly reliable and, based on the experience of our Sponsor, require low operational and maintenance expenditures and a low level of interaction from managers as compared to conventional energy assets. Solar, wind and hydro-electric projects also have an expected life which can exceed 30 years. In addition, the projects in our initial portfolio generally operate under long-term PPAs with terms of up to 30 years.

Focus on emerging markets with favorable investment attributes.    While our current focus is on solar, wind and hydro-electric energy generation assets in our initial target markets, we will selectively consider acquisitions of clean power generation assets in other geographies. We expect to pursue opportunities in other high-growth emerging markets that have characteristics similar to those of our initial target markets, with a focus on other markets located in Asia (except Japan), Africa, Latin America and the Middle East. We believe there will be ample opportunities to acquire high-quality contracted clean power generation assets in high-growth emerging markets with these attributes.

Technology-neutral clean power platform.    We intend to expand upon our Sponsor’s technology-neutral platform. Our Sponsor’s platform enables the development, acquisition, maintenance and operation of renewable energy generation assets across various renewable energy technologies, including solar, wind and

 

191


Table of Contents

hydro-electric. This technology-neutral platform enables our open architecture approach, which provides us with the ability to evaluate a broad range of development partnerships and acquisition opportunities and support the rapid growth of our portfolio.

Maintain sound financial practices.    We intend to maintain our commitment to disciplined financial analysis and a balanced capital structure. Our financial practices will include: (i) a risk and credit policy focused on transacting with creditworthy counterparties; (ii) a financing policy focused on achieving an optimal capital structure through various capital formation alternatives to minimize interest rates, refinancing risks and tax withholdings; (iii) utilizing derivative financial instruments to minimize our net exposure to currency fluctuations; and (iv) a dividend policy that is based on distributing the CAFD generated by our project portfolio (after deducting appropriate reserves for our working capital needs and the prudent conduct of our business). Our initial dividend was established based on our targeted payout ratio of approximately 85% of projected CAFD. See “Cash dividend policy.”

Our competitive strengths

We believe our key competitive strengths include:

Diversity.    Our initial project portfolio is well diversified in terms of geography, market segment, counterparty, and types of renewable energy technology. We serve utility, commercial, industrial and governmental customers and may serve residential business lines in the future. We have projects located across 11 countries and four continents. Projects in our initial portfolio located in any single country are not expected to represent more than 30% of our projected CAFD for the year ending December 31, 2016, thereby reducing our operating risk profile and reliance on any single market or segment. We utilize several renewable energy technologies, the production profiles of which complement one another, which we believe enables us to generate consistent cash flow. We believe our diverse customer base, geographic presence and technology improves our business development opportunities by enhancing our industry relationships, reputation and understanding of regional power market dynamics.

Portfolio growth opportunities.    We believe we will be able to rapidly expand our initial project portfolio through several channels. We have significant project acquisition call rights and ROFO rights with our Sponsor and the Renova ROFO Projects. We also expect to have call rights with third-party developers of clean power generation assets, including the Third-Party Call Right Project. We and our Sponsor have strategically located project origination teams, along with relationships with regionally-focused clean power generation companies, that we believe will facilitate the growth of our project pipeline. We expect to have significant opportunities to expand our project portfolio through additional third-party acquisitions for the foreseeable future.

Stable, high-quality cash flows.    Our initial portfolio of projects, together with the call right projects that we acquire, will provide us with a stable, predictable cash flow profile. We sell the electricity generated by our projects under PPAs or similar offtake arrangements, such as feed-in tariff programs, with creditworthy counterparties. As of March 31, 2015, the weighted average (based on megawatts) remaining life of our PPAs was 19 years. All of our projects have highly predictable operating costs, in large part due to solar, wind and hydro-electric facilities having no fuel cost and utilizing reliable technology. We intend to utilize foreign exchange and foreign tax strategies in an effort to mitigate the impact of cross-border costs. Finally, based on our initial portfolio of projects, we do not expect to pay significant U.S. federal income taxes in the near term.

 

192


Table of Contents

Relationship with SunEdison.    We believe our relationship with our Sponsor provides us with significant benefits, including the following:

 

 

Strong asset development track record.    Our Sponsor has demonstrated a significant track record in developing both solar and, as a result of its acquisition of First Wind, wind energy generation facilities. Over the last three calendar years, our Sponsor has constructed solar power generation assets with an aggregate capacity of 2.0 GW and, as of March 31, 2015, was constructing additional solar power generation assets expected to have an aggregate capacity of approximately 773.7 MW. Our Sponsor has been one of the top three developers and installers of solar energy facilities in the world in each of the past two years based on megawatts installed. Our Sponsor has developed over 1,300 solar and wind projects and has completed all of the projects on which it has commenced construction, including over 140 projects in our initial target markets. In addition, our Sponsor had a 7.5 GW pipeline of development stage solar and wind projects as of March 31, 2015, including 1.7 GW in our initial and future target markets. As of the same date, our Sponsor employed 3,400 people globally, of which over 1,900 were serving as developers and operators of renewable energy projects. Our Sponsor’s operating history demonstrates its organic project development capabilities in our initial target markets. We believe our Sponsor’s relationships, knowledge and employees will facilitate our ability to rapidly acquire operating projects from our Sponsor in our initial target markets.

 

 

Yieldco experience.    Our Sponsor’s subsidiary, TerraForm Power, which owns and operates clean power assets located in the U.S. and other select jurisdictions, completed its initial public offering in July 2014. With our Sponsor’s support, TerraForm Power has raised approximately $3.9 billion in acquisition and permanent financing to pursue acquisitions of renewable energy projects totaling 1,703.0 MW as of May 1, 2015.

 

 

Proven acquisition expertise.    In 2014, our Sponsor completed 32 corporate and project acquisitions worldwide, which included operating projects with an aggregate nameplate capacity of 1.5 GW. In addition, our Sponsor, through TerraForm Power, completed the acquisition on January 29, 2015 of First Wind’s 500.0 MW of operating wind generation assets and 21.1 MW of operating solar generation assets and 1.66 GW of wind and solar generation assets under development. These acquisitions include two wholly owned subsidiaries of Honiton, which provides our Sponsor with an operating and maintenance platform in China. Additionally, our Sponsor’s pending acquisition of LAP will provide it with a hydro-electric development pipeline in Peru and an operations and maintenance platform in Latin America. We believe our Sponsor’s significant acquisition experience and expertise will enable us to expand our portfolio through additional acquisitions of operating projects from unaffiliated third parties in our initial target markets. Our initial portfolio includes two projects that we have acquired from third parties. Concurrently with this offering or, in certain limited cases, during the remainder of 2015, we expect to complete seven separate transactions to acquire projects included in our initial portfolio, expanding our geographic footprint and diversifying our renewable energy technologies.

 

 

Project financing experience.    We believe our Sponsor has demonstrated a successful track record of sourcing long-term capital to fund project acquisitions and the development and construction of projects located in our initial target markets. Over the twelve months ended January 31, 2015, our Sponsor has raised over $2.4 billion, including $2.1 billion to finance acquisitions. We expect that we will realize significant benefits from our Sponsor’s financing and structuring expertise as well as its relationships with financial institutions and other providers of capital.

 

 

Asset management expertise.    We will have access to the significant resources of our Sponsor to support the high-growth strategy of our business. As of March 31, 2015, our Sponsor had over 4.9 GW of projects under management across 20 countries. Approximately 16.1% of these projects are third-party power generation facilities, demonstrating our Sponsor’s collaboration with multiple solar developers and owners. These

 

projects utilize 29 different module types and inverters from 17 different manufacturers. As of March 31,

 

193


Table of Contents
 

2015, our Sponsor had approximately 700 employees servicing operations and management in our initial target markets. In addition, our Sponsor maintains three renewable energy operation centers to service assets under management. Our Sponsor’s asset management experience helps ensure that our facilities will be monitored and maintained to maximize cash generation. We also benefit from First Wind’s asset management expertise as the First Wind team has been integrated with our Sponsor.

Access to and experience in mature capital markets.    As a publicly listed company in the United States, we will have access to a broad investor base with a competitive source of capital. We believe access to this market will accelerate our long-term growth and acquisition strategy and provide us with a competitive advantage over regional renewable energy developers in our target markets where we may be competing to acquire assets or development rights. We believe that both our Sponsor and TerraForm Power have benefited from their status as publicly listed companies in the United States. To date, our Sponsor and TerraForm Power have raised an aggregate of $8.1 billion since January 1, 2014, providing them with the capital necessary to acquire projects and development platforms to grow TerraForm Power’s portfolio of operational renewable energy projects in mature markets. In addition, we believe that a public listing in the United States will provide transparency to investors regarding our operations that will help us attract and retain capital.

Long-term contracted portfolio.    We benefit from a portfolio of relatively newly constructed assets, with most of the projects in our initial portfolio having achieved COD within the past five years or expected to reach COD by the end of 2015. The PPAs for projects included in our initial portfolio have a weighted average remaining life of 19 years as of March 31, 2015. The projects in our initial portfolio and the call right projects utilize proven and reliable technologies provided by leading equipment manufacturers and, as a result, we expect to achieve high project availability and predictable maintenance capital expenditures.

Experienced management team.    Under the Management Services Agreement, our Sponsor has committed to provide us with a team of experienced professionals to serve as our executive officers and other key officers. We expect that certain of these professionals will provide such services to us on a dedicated basis. Our officers have considerable experience in developing, acquiring and operating clean power generation assets, with an average of over five years of experience in the sector. Mr. Domenech, our Chief Executive Officer, and his team have been successful in expanding TerraForm Power’s project portfolio from 807.7 MW as of its initial public offering in July 2014 to 1,703.0 MW as of May 1, 2015, an increase of 111%. Our management team will also have access to the other significant management resources of our Sponsor to support the operational, financial, legal and regulatory aspects of our business.

Our portfolio

Our initial portfolio consists of solar projects located in China, India, South Africa, Honduras, Uruguay, Malaysia and Thailand, wind projects located in China, Brazil, India, South Africa, Honduras, Costa Rica and Nicaragua and hydro-electric projects located in Brazil and Peru. These projects have a total combined capacity of 1,406.1 MW, and we forecast that they will generate an aggregate of $231.5 million of cash available for distribution for the year ending December 31, 2016. Our initial portfolio includes 921.7 MW of projects that we expect to acquire from third parties concurrently with the completion of this offering or, in certain limited cases, during the remainder of 2015. All of these projects are supported by PPAs with creditworthy counterparties. The PPAs for projects included in our initial portfolio have a weighted average remaining life of 19 years as of March 31, 2015.

We have a well diversified project portfolio, across both geographies and renewable energy technologies, which we believe enables us to generate consistent quarterly cash flows. For example, projects in our initial portfolio located in any single country are not expected to represent more than 30% of our projected cash available for

 

194


Table of Contents

distribution for the year ending December 31, 2016. We intend to rapidly expand and diversify our initial project portfolio by acquiring utility-scale solar and commercial and industrial distributed solar, wind and hydro-electric power generation assets located in our initial target markets, which we expect will also have long-term PPAs with creditworthy counterparties. We expect to pursue opportunities in other high-growth emerging markets that have characteristics similar to those of our initial target markets, with a focus on markets located in Asia (except Japan), Africa, Latin America and the Middle East. Over time, we may selectively acquire other clean power generation assets, including natural gas, biomass and hybrid energy and storage solutions, as well as transmission lines, that enable us to provide power on a 24/7 basis, as well as to add solar generation assets serving residential and commercial building customers.

 

195


Table of Contents

Our initial portfolio

The following table provides an overview of the assets that will comprise our initial portfolio. We expect to acquire certain of the projects included in our initial portfolio through the consummation of the Pending Acquisitions. We anticipate that substantially all of the Pending Acquisitions will be completed concurrently with the completion of this offering. This offering, however, is not conditioned on the concurrent closing of all of the Pending Acquisitions. As of the date of this prospectus, we have not yet received all of the governmental, regulatory or third-party approvals or consents required to complete all of these acquisitions, and the timing for those approvals is outside of our control. As a result, we cannot assure you that all of the Pending Acquisitions will be consummated on the timetable currently contemplated.

 

                         Offtake agreements              
Project Name   Net
Capacity
(MW)(1)
 

Owner-

ship

Interest

(%)

    Status(2)     

PPA

Counter-

party(3)

    

PPA

Counter-

party

credit

rating(4)

    

Remaining
Duration
of PPA

(years)(5)

  

Commercial
Operation

Date(6)

     Location

 

 

 

 

 

   

 

    

 

    

 

    

 

  

 

    

 

Brazil

                    

 

 

 

 

 

 

   

 

 

    

 

 

    

 

 

    

 

  

 

 

    

 

Wind

                    

Salvador

  195.2     100.0        P         CCEE         N/A       17      Q3 2012       Guanambi, Caetité, and Igaporã of Bahia

Bahia

    99.2     100.0        P         CCEE         N/A       17      Q3 2012       Guanambi and Igaporã of Bahia

Subtotal Wind

  294.4              17      

Hydro

                    

ESPRA

    41.8     100.0        P         Eletrobras         BBB-       13      Q1 2008       Teixeira de Freitas, Vereda e Itamaraju of Bahia

Total Brazil

  336.2              17      

 

 

 

 

 

 

   

 

 

    

 

 

    

 

 

    

 

  

 

 

    

 

India

                    

 

 

 

 

 

 

   

 

 

    

 

 

    

 

 

    

 

  

 

 

    

 

Wind

                    

Hanumanhatti

    50.4     100.0        P         HESCOM         N/A       16      Q2 2011       Belgaum, Karnataka

Gadag

    31.2     100.0        P         BESCOM         BBB+       14      Q3 2008       Gadag, Karnataka

Bhakrani

    20.0     100.0        P         JVVNL         N/A       24      Q2 2014       Jaisalmer, Rajasthan

Bora Bora(10)

    17.8     74.0        P         A PSPDCL         BB+       26      Q4 2015       Anantpur, Andhra Pradesh

Subtotal Wind

  119.4              18      

Solar

                    

SE 25

    25.0     N/A        O         GUVNL         A+       22      Q1 2012       Patan, Gujarat

NSM 24

    23.9     100.0        0         NVVN         AA+       23      Q1 2013       Jodhpur, Rajasthan

NSM Suryalabh

    19.1     49.0        O         SECI         N/A       25      Q1 2015       Jodhpur, Rajasthan

NSM Sitara

    15.2     49.0        O         SECI         N/A       25      Q1 2015       Mandsaur, Madhya Pradesh

NSM L’Volta

    12.7     49.0        O         SECI         N/A       25      Q1 2015       Mandsaur, Madhya Pradesh

Focal

    11.3     49.0        0         SECI         N/A       25      Q2 2015       Mandsaur, Madhya Pradesh

Brakes

      7.5     97.5 (8)      O         BIL         AA+       15      Q4 2014       Tirunelveli, Tamil Nadu

Millenium

      6.9     74.0        O         GUVNL         A+       22      Q1 2012       Surendranagar, Gujarat

Raj 5

      5.0     100.0        O         NVVN         AA+       22      Q4 2011       Jodhpur, Rajasthan

ESP Urja

      3.7     74.0        O         GUVNL         A+       22      Q4 2011       Surendranagar, Gujarat

Azure

      3.7     74.0        O         GUVNL         A+       22      Q4 2011       Surendranagar, Gujarat

Subtotal Solar

  134.0              23      

Total India

  253.3              21      

 

 

 

 

 

 

   

 

 

    

 

 

    

 

 

    

 

  

 

 

    

 

Honduras

                    

 

 

 

 

 

 

   

 

 

    

 

 

    

 

 

    

 

  

 

 

    

 

Wind

                    

Cerro de Hula

  126.0     100.0        P         ENE         B       22      Q4 2011       Santa Ana and San Buenaventura

Solar

                    

Choluteca(11)

    82.0     100.0        P         ENE         B       20      Q3 2015       Choluteca

Total Honduras

  208.0              21      

 

 

 

 

 

 

   

 

 

    

 

 

    

 

 

    

 

  

 

 

    

 

 

196


Table of Contents
                          Offtake agreements             
Project Name   Net
Capacity
(MW)(1)
   

Owner-

ship

Interest

(%)

    Status(2)    

PPA

Counter-

party(3)

 

PPA

Counter-

party

credit

rating(4)

   

Remaining
Duration
of PPA

(years)(5)

 

Commercial
Operation

Date(6)

     Location

 

 

 

   

 

   

 

   

 

 

 

   

 

 

 

    

 

China

                

 

 

 

 

   

 

 

   

 

 

   

 

 

 

 

   

 

 

 

 

    

 

Wind

                

Hercules

    148.5        100.0        O      IMPGCL     N/A      15(7)    

 

Q3 2008

Q3 2011

  

  

   Inner Mongolia

Solar

                

Dunhuang

      18.0        100.0        O      GPEPC     Aa3      18(7)     Q4 2012       Dunhuang, Gansu Province

Total China

    166.5              16     

 

 

 

 

   

 

 

   

 

 

   

 

 

 

 

   

 

 

 

 

    

 

Uruguay

                

 

 

 

 

   

 

 

   

 

 

   

 

 

 

 

   

 

 

 

 

    

 

Solar

                

El Naranjal(10)

      57.4        100.0        P      UTE     N/A      28     Q4 2015       Salto Department

Alto Cielo(11)

      26.4        100.0        P      UTE     N/A      28     Q4 2015       Artigas Department

Del Litoral(10)

      17.4        100.0        P      UTE     N/A      28     Q4 2015       Salto Department

Total Uruguay

    101.1              28     

 

 

 

 

   

 

 

   

 

 

   

 

 

 

 

   

 

 

 

 

    

 

South Africa

                

 

 

 

 

   

 

 

   

 

 

   

 

 

 

 

   

 

 

 

 

    

 

Wind

                

Klipheuwel

      17.6        65.0        P      Eskom     BB+      19     Q2 2014       Caledon, Western Cape Province

Solar

                

Boshof(9)

      33.6        51.0        0      Eskom     BB+      20     Q4 2014       Boshof, Free State Province

Witkop(9)

      16.8        51.0        P      Eskom     BB+      19     Q3 2014       Polokwane Municipality, Limpopo Province

Soutpan(9)

      15.8        51.0        P      Eskom     BB+      19     Q3 2014       Blouberg Municipality, Limpopo Province

Aries

        7.5        70.0        P      Eskom     BB+      19     Q1 2014       Kernhardt, Northern Cape Province

Konkoonsies

        7.5        70.0        P      Eskom     BB+      19     Q1 2014       Pofadder, Northern Cape Province

Subtotal Solar

      81.3              19     

Total South Africa

    98.8              19     

 

 

 

 

   

 

 

   

 

 

   

 

 

 

 

   

 

 

 

 

    

 

Costa Rica

                

 

 

 

 

   

 

 

   

 

 

   

 

 

 

 

   

 

 

 

 

    

 

Wind

                

Orosi(11)

    50.0        100.0        P      ICE     BB+      19     Q3 2015       Guanacaste

PESRL

    24.0        100.0        P      ICE     BB+        6     Q4 1996       Guanacaste

Total Costa Rica

    74.0              14     

 

 

 

 

   

 

 

   

 

 

   

 

 

 

 

   

 

 

 

 

    

 

Peru

                

 

 

 

 

   

 

 

   

 

 

   

 

 

 

 

   

 

 

 

 

    

 

Hydro

                

LAP-Junín

      39.1        100.0        P      MINEM     BBB+      20     Q4 2014       Junín region

LAP-HSC

      33.4        100.0        P      MINEM     BBB+      16    

 

Q1 2009

Q2 2012

  

  

   Ancash and Junín regions

Total Peru

      72.5              18     

 

 

 

 

   

 

 

   

 

 

   

 

 

 

 

   

 

 

 

 

    

 

Nicaragua

                

 

 

 

 

   

 

 

   

 

 

   

 

 

 

 

   

 

 

 

 

    

 

Wind

                

Eolo

    44.0        100.0        P      DD     N/A      18     Q4 2012       Rivas

 

 

 

 

   

 

 

   

 

 

   

 

 

 

 

   

 

 

 

 

    

 

Thailand

                

 

 

 

 

   

 

 

   

 

 

   

 

 

 

 

   

 

 

 

 

    

 

Solar

                

NPS Star(10)

    17.9        100.0        P      PEA     N/A      26     Q3 2015       Pichit Province

WXA(10)

    17.9        100.0        P      PEA     N/A      26     Q3 2015       Pichit Province

PP Solar

        3.6        100.0        O      PEA     N/A      29     Q1 2015       Amphur Kranuan, Khonkaen Province

Total Thailand

      39.3              26     

 

 

 

 

   

 

 

   

 

 

   

 

 

 

 

   

 

 

 

 

    

 

Malaysia

                

 

 

 

 

   

 

 

   

 

 

   

 

 

 

 

   

 

 

 

 

    

 

Solar

                

Silverstar Pavilion

        5.1        51.0        O      MASSB     N/A      20     Q4 2013       Kuala Lumpur International Airport, Sepang

Fortune 11

        4.8        95.0        O      TNB     BBB+      20     Q4 2013       Kuala Lumpur International Airport, Sepang

Corporate Season

        2.5        62.0        O      MASSB     N/A      20     Q4 2013       Kuala Lumpur International Airport, Sepang

Total Malaysia

      12.3              20     

 

 

 

 

   

 

 

   

 

 

   

 

 

 

 

   

 

 

 

 

    

 

Total Initial Portfolio

    1,406.1              19     

 

 

 

 

   

 

 

   

 

 

   

 

 

 

 

   

 

 

 

 

    

 

 

197


Table of Contents
(1)   Net capacity represents the maximum generating capacity at standard test conditions of a facility multiplied by our percentage of economic ownership of that facility after taking into account any redeemable preferred shares and shareholder loans that we hold. Generating capacity may vary based on a variety of factors discussed elsewhere in this prospectus. For projects referenced herein that have not yet achieved their COD, the figures reflect expected final capacity.

 

(2)   Reflects our current ownership of the respective projects as of the date of this prospectus. “O” represents that we own the percentage of the project as set forth in this table. “P” represents that (i) we expect to acquire the project, pursuant to the applicable Pending Acquisition, concurrently with the completion of this offering, or (ii) our Sponsor will contribute the project to us upon such project reaching its COD.

 

(3)   For more information regarding our PPA counterparties, see “Business—Our portfolio—Project descriptions.”

 

(4)   Reflects the counterparty’s or guarantor’s issuer credit ratings issued by S&P or Moody’s or their local affiliates. Projects with N/A include (i) unrated government entities and (ii) unrated private entities that have not issued public securities. We believe these entities are high credit quality counterparties based on our review of their financial statements or parent entity financial position.

 

(5)   Calculated as of March 31, 2015.

 

(6)   Represents the actual or anticipated COD, as applicable, unless otherwise indicated.

 

(7)   The PPAs for the China projects are subject to automatic annual renewal, based on a 20 year green tariff policy and the expected useful life of the project. For more information, see “Business—Our portfolio—Project descriptions—Our China projects.

 

(8)   We own 70% of the common equity of this project, and as a result of an arrangement with our local partner, we have an effective economic interest of 97.5%. The additional pecuniary interest was received in exchange for a shareholder loan made in our local partner’s favor.

 

(9)   The termination date of the PPA for this project is subject to change, depending on the outcome of our discussions with Eskom, but will not be earlier than the date given. This project did not achieve COD by the date required by the PPA, and as a result, the length of the PPA is subject to shortening.

 

(10)   Pursuant to an investment agreement with our Sponsor, our Sponsor will contribute to us: (i) the Bora Bora wind project in India, representing 17.8 MW; (ii) the NPS Star and WXA solar projects in Thailand, representing an aggregate of 35.7 MW and (iii) the Del Litoral and El Naranjal solar projects in Uruguay, representing 74.8 MW. The contribution with respect to each project will occur on or about the date that such project reaches COD, except that 74% of the Bora Bora project will be contributed on or about its COD with the remaining 26% to be contributed on the one-year anniversary of the project’s COD. We expect these projects to achieve COD in the second half of 2015.

 

(11)   We expect to complete the pending acquisition of this project once it achieves COD, which is expected to occur in the second half of 2015.

The following charts provide an overview of our project portfolio by geography and technology:

 

LOGO

Project descriptions

Set forth below is a brief summary of each of the projects that we expect will be included in our initial portfolio assuming completion of the Organizational Transactions. Unless otherwise noted, we expect that affiliates of our Sponsor will provide O&M for such projects. In addition, several of these projects are subject to project-level financing arrangements. See “Description of certain indebtedness—Project-level financing arrangements” for additional information regarding these financing arrangements.

Our Brazil projects

ESPRA

Our ESPRA project is located in the cities of Itamaraju, Jucuruça, Vereda and Medeiros Neto of Bahia, Brazil. This 41.8 MW capacity project commenced commercial operations during the first quarter of 2008. This project has three individual hydro-electric assets. Upon completion of the Renova Transaction, we will have a 100% ownership interest in this project.

 

198


Table of Contents

The PPA counterparty is Centrais Eléctricas Brasileiras, or “Eletrobas,” the largest electric power company in Latin America with 42.3 GW of installed capacity and 55.1 thousand kilometers of transmission lines. Eletrobras has a long-term credit rating of Baa3 by Moody’s and a long-term local issuer rating of BBB+ by S&P. The PPA is scheduled to terminate during the second quarter of 2028 and provides for a base price of BRL 117/MWh (approximately $0.04 KWh), adjusted annually based on the IGP-M general price index.

Salvador

Our Salvador project is located in the cities of Guanambi, Caetité and Igaporã of Bahia, Brazil. This 195.2 MW capacity project commenced commercial operations during the third quarter of 2012. This project has nine individual sites with a total of 122 wind generator turbines. Upon completion of the Renova Transaction, we will have a 100% ownership interest in this project.

The PPA counterparty is the Chamber of Electric Energy Commercialization, or “CCEE,” which has 2,953 agents and 19,918 registered contracts with 88.8 GW of energy traded. With a contracted capacity of 84.0 MW, the PPA is scheduled to terminate during the second quarter of 2032 and provides for an average price on base date of BRL 145.8/MWh (approximately $0.05 KWh), adjusted annually based on the IPCA consumer price index. The PPA provides for surplus or compensation payment over the contracted amount, with production over 130% or under 90% paid the subsequent year, and production within 90% and 130% paid every four years. The project employs GE 1.6xle turbines.

Bahia

Our Bahia project is located in the cities of Guanambi and Igaporã of Bahia, Brazil. This 99.2 MW capacity project commenced commercial operations during the third quarter of 2012. This project has five individual sites with a total of 62 wind generator turbines. Upon completion of the Renova Transaction, we will have a 100% ownership interest in this project.

The PPA counterparty is the CCEE. With a contracted capacity of 43.0 MW, the PPA is scheduled to terminate during second quarter of 2032 and provides for an average price on base date of BRL 145.8/MWh (approximately $0.05 KWh), adjusted annually based on the IPCA consumer price index. The PPA provides for surplus or compensation payment over the contracted amount, with production over 130% or under 90% paid the subsequent year, and production within 90% and 130% paid every four years. The project employs GE 1.6xle turbines.

Our India projects

NSM 24

Our NSM 24 project is located in the Ugaras Village, Tehsil Phalodi, Jodhpur District, of Rajasthan, India. This 23.9 MW capacity project commenced commercial operations during the first quarter of 2013. This project utilizes fixed tilt technology, whereby the solar photovoltaic, or “PV,” panels are directionally tilted and remain in that same position through the life of the project. We have a 100% ownership interest in this project. The project is part of the Jawaharlal Nehru National Solar Mission, India’s flagship solar policy program.

The counterparty to the PPA is NTPC Vidyut Vyapur Nigam Limited, or “NVVN,” a wholly owned subsidiary of NTPC Limited, which is the largest state-owned energy producer in India with 41 GW of power plants located throughout India. NVVN has a long-term credit rating of AA+ on its cash credit limits by Credit Rating Information Services of India Limited, a global ratings firm affiliated with S&P.

The PPA is scheduled to terminate during the first quarter of 2038 and provides for a flat tariff of INR 9.28/kWh (approximately $0.15/kWh) during its term. NVVN is required to establish an irrevocable letter of credit in the name of the developer to secure its payment obligations under the PPA.

 

199


Table of Contents

NSM Suryalabh

Our NSM Suryalabh project is located in the Kalyan Singh ki Sid Village, Tehsil Bap, Jodhpur District, of Rajasthan, India. This 19.1 MW capacity project commenced commercial operations during the first quarter of 2015. This project utilizes fixed tilt technology. In order to comply with local regulations, we have a 49% ownership interest in this project, with our Sponsor holding the remaining 51% ownership interest. The project is part of the Jawaharlal Nehru National Solar Mission.

The counterparty to the PPA is Solar Energy Corporation of India, or “SECI,” a not-for-profit company established by MNRE to facilitate solar energy generation capacity in India. MNRE was established by the Indian Government to facilitate research, development, commercialization and deployment of renewable energy systems on a national level for various applications in rural, urban, industrial and commercial sectors. The PPA is scheduled to terminate 25 years from the project’s COD and provides for a flat tariff of INR 5.45/kWh (approximately $0.09/kWh) during its term with a flat tariff of INR 3.00/KWh (approximately $0.05/KWh) for production 10% above declared capacity factor in a contract year. Additionally, the program also provides for viability gap funding subsidies of INR 261.9 million, 50% payable as early as three months after commissioning and 10% payable every year for five years thereafter, subject to the plant meeting certain requirements. SECI is contractually obligated to establish an irrevocable letter of credit to secure its payment obligations under the PPA. Additionally, SECI is required to hypothecate the revenues it receives under its back-to-back power sale agreement with local utilities to the project.

NSM Sitara

Our NSM Sitara project is located in the Sitamau Village, Mandsaur District, of Madhya Pradesh, India. This 15.2 MW capacity project commenced commercial operations during the first quarter of 2015. This project utilizes tracking technology, which continuously orients the PV panels in the direction of the sun, enabling the project to generate more electricity on a daily basis than a traditional fixed tilt system. In order to comply with the local regulations, we have a 49% ownership interest in this project, with our Sponsor holding the remaining 51% ownership interest. The project is part of the Jawaharlal Nehru National Solar Mission.

The counterparty to the PPA is SECI. The PPA is scheduled to terminate 25 years from the COD and provides for a flat tariff of INR 5.45/kWh (approximately $0.09/kWh) during its term with a flat tariff of INR 3.00/KWh (approximately $0.05/KWh) for production 10% above declared capacity factor in a contract year. Additionally, the program provides for viability gap funding subsidies of INR 560.9 million, 50% payable as early as three months after commissioning and 10% payable every year for five years thereafter, subject to the plant meeting certain requirements. SECI is contractually obligated to establish an irrevocable letter of credit to secure its payment obligations under the PPA. Additionally, SECI is required to hypothecate the revenues it receives under its back-to-back power sale agreement with local utilities to the project.

NSM L’Volta

Our NSM L’Volta project is located in the Sitamau Village, Mandsaur District, of Madhya Pradesh, India. This 12.7 MW capacity project commenced commercial operations during the first quarter of 2015. This project utilizes fixed tilt technology. In order to comply with local regulations, we have a 49% ownership interest in this project, with our Sponsor holding the remaining 51% ownership interest. The project is part of the Jawaharlal Nehru National Solar Mission.

The counterparty to the PPA is SECI. The PPA is scheduled to terminate 25 years from the project’s COD and provides for a flat tariff of INR 5.45/kWh (approximately $0.09/kWh) during its term with a flat tariff of INR 3.00/KWh (approximately $0.05/KWh) for production 10% above declared capacity factor in a contract year.

 

200


Table of Contents

Additionally, the program also provides for viability gap funding subsidies of INR 146.6 million, 50% payable as early as three months after commissioning and 10% payable every year for five years thereafter, subject to the plant meeting certain requirements. SECI is contractually obligated to establish an irrevocable letter of credit to secure its payment obligations under the PPA. Additionally, SECI is required to hypothecate the revenues it receives under its back-to-back power sale agreement with local utilities to the project.

Brakes

Our Brakes project is located in the Munanjipatti Village, Tirunelveli District, of Tamil Nadu, India. This 7.5 MW capacity project commenced commercial operations during the fourth quarter of 2014. This project utilizes tracking technology and is a distributed generation project. The counterparty to the PPA is Brakes India Limited, which is the leading manufacturer of braking systems and ferrous castings in India. Brakes has a long-term credit rating of AA on its cash credit limits by Credit Rating Information Services of India Limited.

We have a 70% equity ownership interest in this project. As a result of a shareholder loan made in favor of our local partner, we have an effective economic interest in this project of 97.5%. The PPA is scheduled to terminate during the fourth quarter of 2029 and provides for a tariff of INR 6.99/kW (approximately $0.11/kWh), which is escalated 2.9% each year on the anniversary of its COD for the next 15 years.

Raj 5

Our Raj 5 project is located in the Rawra Village, Mandsaur District, of Rajasthan, India. This 5.0 MW capacity project commenced commercial operations during the fourth quarter of 2011. This project utilizes fixed tilt technology. We have a 100% ownership interest in this project. The project is part of the Jawaharlal Nehru National Solar Mission.

The counterparty to the PPA is NVVN. The PPA is scheduled to terminate during the fourth quarter of 2036 and provides for a flat tariff of INR 12.39/kWh (approximately $0.20/kWh) during its term. NVVN is required to establish an irrevocable letter of credit to secure its payment obligations under the PPA.

Focal

Our Focal project is located in the Sitamau Village, Mandsaur District, of Madhya Pradesh, India. This 11.3 MW capacity project commenced commercial operations during the second quarter of 2015. This project utilizes tracking technology, whereby the solar photovoltaic panels are directionally tilted and remain in that position through the life of the project. We have a 49% ownership interest in this project.

The counterparty to the PPA is SECI. The PPA is scheduled to terminate 25 years from the project’s COD and provides for a flat tariff of INR 5.45/kWh (approximately $0.09/kWh) during its term, with a flat tariff of INR 3.00/kWh (approximately $0.05/kWh) for production, 10% above declared capacity factor in a contract year. Additionally, the project also provides for viability gap funding subsidies of INR 220 million, 50% payable as early as three months after commissioning and 10% payable every year for five years thereafter, subject to the project meeting certain requirements. SECI is contractually obligated to establish an irrevocable letter of credit to secure its payment obligations under the PPA. Additionally, SECI is required to hypothecate the revenues it receives under its back-to-back power sale agreement with local utilities to the project.

Millenium

Our Millenium project is located in the Dhama Village, Surendranagar District, of Gujarat, India. This 6.9 MW capacity project commenced commercial operations during the first quarter of 2012. This project utilizes tracking technology. In order to comply with local regulations, we have a 74% ownership interest in this project, with our Sponsor indirectly holding the remaining 26% ownership interest.

 

201


Table of Contents

The counterparty to the PPA is Gujarat Urja Vikas Nigam Limited, or “GUVNL,” a holding company that supervises the activities of its six subsidiary companies that are engaged in the business of generation, transmission and distribution of electricity. GUVNL has a long-term credit rating of “A” by ICRA Limited, a credit rating agency affiliated with Moody’s. The PPA is scheduled to terminate 25 years from the commencement of commercial operations and provides for a flat tariff of INR 15/kWh (approximately $0.24/kWh) for the first 12 years of its term and INR 5/kWh ($0.08/kWh) for the remaining 13 years. GUVNL is contractually obligated to establish an irrevocable letter of credit to secure its payment obligations under the PPA.

SE 25

Our SE 25 project is located in the Patan District, of Gujarat, India. This 25.0 MW capacity project commenced commercial operations during the first quarter of 2012. This project utilizes fixed tilt technology. In order to comply with local regulations, we will acquire 100% of equity ownership in the project from our Sponsor (indirectly) during the first quarter of 2017. Prior to the acquisition of the project and pursuant to an intercompany debt instrument in place at the time of this offering, we will have the right to receive cash distributions from the project company.

The counterparty to the PPA is GUVNL. The PPA is scheduled to terminate 25 years from the commencement of commercial operations and provides for a flat tariff of INR 15/kWh (approximately $0.24/kWh) for the first 12 years of its term and INR 5/kWh ($0.08/kWh) for the remaining 13 years. GUVNL is contractually obligated to establish an irrevocable letter of credit to secure its payment obligations under the PPA.

Azure

Our Azure project is located in the Dhama Village, Surendranagar District, of Gujarat, India. This 3.7 MW capacity project commenced commercial operations during the fourth quarter of 2011. This project utilizes fixed tilt technology. In order to comply with local regulations, we have a 74% ownership interest in this project, with our Sponsor indirectly holding the remaining 26% ownership interest.

The counterparty to the PPA is GUVNL. The PPA is scheduled to terminate 25 years from the commencement of commercial operations and provides for a flat tariff of INR 15/kWh (approximately $0.24/kWh) for the first 12 years of its term and INR 5/kWh ($0.08/kWh) for the remaining 13 years. GUVNL is contractually obligated to establish an irrevocable letter of credit to secure its payment obligations under the PPA.

ESP Urja

Our ESP Urja project is located in the Dhama Village, Surendranagar District, of Gujarat, India. This 3.7 MW capacity project commenced commercial operations during the fourth quarter of 2011. This project utilizes fixed tilt technology. In order to comply with local regulations, we have a 74% ownership interest in this project, with our Sponsor indirectly holding the remaining 26% ownership interest.

The counterparty to the PPA is GUVNL. The PPA is scheduled to terminate 25 years from the commercial operations date and provides for a flat tariff of INR 15/kWh (approximately $0.24/kWh) for the first 12 years of its term and INR 5/kWh ($0.08/kWh) for the remaining 13 years. GUVNL is contractually obligated to establish an irrevocable letter of credit to secure its payment obligations under the PPA.

Bora Bora

Our Bora Bora project is located in the Borampally Village, Anantapur District of Andhra Pradesh, India. This 17.8 MW project is expected to commence operations in the second half of 2015. The project will consist of 12 wind turbines of 2.0 MW capacity each manufactured by Gamesa. Our project company has entered into a capacity allocation agreement with New and Renewable Energy Development Corporation of Andhra Pradesh

 

202


Table of Contents

Ltd., the government nodal agency for development of renewable projects in the state of Andhra Pradesh. The capacity allocation agreement entitles the project company to undertake the development of the project at the allocated site and enter into a PPA with the offtakers in accordance with the current state policy. As per the current state policy, the counterparty to the PPA will be the Andhra Pradesh Southern Power Distribution Company Limited, or “APSPDCL,” which is one of the main distribution companies in the state of Andhra Pradesh. APSPDCL has a credit rating of BB+ on its cash credit limits by Credit Rating Information Services of India Limited. The PPA will be signed within the next quarter at our discretion and is expected to provide a flat tariff of approximately $0.08/kWh for 25 years from the COD. Pursuant to an investment agreement, our Sponsor will transfer a 74% equity interest in the project to us at the commencement of commercial operations of this project, which we expect to occur in the second half of 2015. On the one-year anniversary of the COD, our Sponsor will transfer the remaining 26% interest to us.

Bhakrani

Our Bhakrani project is located in the Jaisalmer District, of Rajasthan, India. This 20.0 MW capacity project commenced commercial operations during the second quarter of 2014. This project utilizes Enercon E-53 wind turbines. Upon the completion of the FERSA Transaction, we will have a 100% ownership interest in this project.

The counterparty to the PPA is Jaipur Vidyut Vitran Nigam Limited, or “JVVNL,” which is one of the three utility companies that distribute power in the Indian state of Rajasthan. JVVNL, established in 2002 after a restructuring of the state’s electricity sector, serves 13 districts in Rajasthan. The PPA provides a fixed tariff of INR 5.46/kWh (approximately $0.09/kWh) and is scheduled to expire in 2039. O&M will be provided by a third-party provider, Enercon India Limited, for an interim period, after which affiliates of our Sponsor will assume O&M responsibilities.

Gadag

Our Gadag project is located in the Gadag District, of Karnataka, India. This 31.2 MW capacity project commenced commercial operations during the fourth quarter of 2008. This project utilizes Enercon E-53 wind turbines. Upon the completion of the FERSA Transaction, we will have a 100% ownership interest in this project.

The counterparty to the PPA is Hubli Electricity Supply Company Limited, or “HESCOM,” which is one of the four utility companies that distribute power in the Indian state of Karnataka. HESCOM, established in 2002 after a restructuring of the state’s electricity sector, serves seven districts in Karnataka. The PPA provides a fixed tariff that is renewable after its current term of 20 years, for an additional ten years. The PPA provides a tariff of INR 3.40/kWh (approximately $0.05/kWh) for the first ten years and is determined by HESCOM thereafter. HESCOM is contractually obligated to establish an irrevocable letter of credit to secure its payment obligations under the PPA. O&M will be provided by a third-party provider, Enercon India Limited, for an interim period, after which affiliates of our Sponsor will assume O&M responsibilities.

Hanumanhatti

Our Hanumanhatti project is located in the Belgaum District, of Karnataka, India. This 50.4 MW capacity wind energy project commenced commercial operations in May 2011. This project utilizes Enercon E-53 wind turbines. Upon completion of the FERSA Transaction, we will have a 100% ownership interest in this project.

The counterparty to the PPA is Bangalore Electricity Supply Company Limited, or “BESCOM,” which is one of the four utility companies that distribute power in the Indian state of Karnataka. BESCOM, set up in 2002 after a restructuring of Karnataka’s electricity sector, serves eight districts in Karnataka. The PPA provides a fixed tariff that is renewable after its current term of 20 years for ten additional years. The PPA provides a tariff of INR 3.70/MWh (approximately $0.06/kWh) for the first ten years. Beginning in the eleventh year, the PPA will

 

203


Table of Contents

reflect the CPI-adjusted first year tariff rate and held fixed thereafter. BESCOM is contractually obligated to establish an irrevocable letter of credit to secure its payment obligations under the PPA. O&M will be provided by a third-party provider, Enercon India Limited, for an interim period, after which affiliates of our Sponsor will assume O&M responsibilities.

Our Honduras projects

Cerro de Hula

Our Cerro de Hula project is located near Santa Ana and San Buenaventura, Honduras. This 126.0 MW capacity wind project with 63 wind turbines commenced commercial operations in the fourth quarter of 2011. Upon completion of the GME Transaction, we will have a 100% ownership interest in this project.

The PPA counterparty is the Empresa Nacional de Energia Electrica, a state-owned company. A MIGA insurance package providing 90% coverage is in place covering breach of contract, currency convertibility, war and civil disturbance and expropriation. The 25-year U.S. dollar-denominated PPA provides for a tariff with a base price of $106/MWh, increasing at a fixed rate of 1.5% per year. The PPA also provides for a capacity payment in the amount of $3.99 per kW per month during the next 15 years.

Choluteca

Our Choluteca project is located in Choluteca, Honduras. This 82.0 MW capacity PV project is expected to commence commercial operations in the third quarter of 2015. The project utilizes tracking technology. Upon completion of the GME Transaction and the project reaching COD, we will have 100% ownership interest in this project.

The PPA counterparty is Empresa Nacional de Energia Electrica. A MIGA insurance package providing 90% coverage is in place covering breach of contract, currency convertibility, war and civil disturbance and expropriation. The 20-year U.S. dollar-denominated PPA provides for a tariff with a base price of $154/MWh increased at a fixed rate of 1.5% per year. The PPA also provides for a capacity payment in the amount of $8.92 per kW per month during the next 15 years.

Our China projects

Dunhuang

Our Dunhuang project is located in Dunhuang City, Gansu Province, China. This 18.0 MW capacity project commenced commercial operations during the first quarter of 2013. This project utilizes fixed tilt technology, whereby the solar photovoltaic panels are directionally tilted and remain in the same position through the life of the project. We have a 100% ownership interest in this project. The counterparty to the PPA is Gansu Province Electric Power Company, a wholly owned subsidiary of State Grid Corporation, or “SGCC.” SGCC is the largest state-owned electric utility in China and has a credit rating of Aa3 (Moody’s) and A+ (Fitch). SGCC has a service area covering 26 provinces, autonomous regions and municipalities directly under the jurisdiction of the Chinese government, which is equal to 88% of the national territory.

The PPA provides for a fixed tariff. The tariff consists of two components: a base tariff and a green tariff. Those two components provide for a flat tariff of RMB 1.0/kWh (approximately $0.16/kWh), with the green tariff making up the difference between the base tariff and the RMB 1.0/kWh fixed tariff. The base tariff is calculated by the provincial power company on the basis of the prevailing cost of the desulfurized coal power supply in the province.

 

204


Table of Contents

Hercules

Our Hercules project is located in Inner Mongolia, China. The 148.5 MW capacity project is located across three sites, with 49.5 MW of capacity at each site. The project sites commenced commercial operations between 2008 and 2011. This project utilizes Suzlon wind turbines. We have a 100% ownership interest in this project. The counterparty to the PPA is Inner Mongolia Power (Group) Co., Ltd, which is a state-owned grid company. The Inner Mongolia Power Group services the western Inner Mongolia provincial region.

The PPA is renewed annually and provides for a fixed tariff. The tariff consists of two components: a base tariff and a green tariff. Those two components provide for a flat tariff of RMB 0.552–0.558/kWh ($0.0832–$0.0893/kWh), depending on the applicable site. The green tariff makes up the difference between the base tariff and the fixed tariff. The base tariff is calculated by the provincial power company on the basis of the prevailing cost of the desulfurized coal power supply in the province.

Our Uruguay projects

El Naranjal

Our El Naranjal project is located in the Salto Department of Uruguay. We expect that this 57.4 MW capacity project will commence commercial operations during the second half of 2015. This solar project utilizes tracking technology. Pursuant to an investment agreement, our Sponsor will contribute to us a 100% interest in this project once it reaches COD.

The project has a U.S.-dollar denominated PPA with the National Administration of Power Plants and Electrical Transmissions, or the “UTE,” the state-owned power utility for Uruguay. The PPA expires in the fourth quarter of 2043. The PPA has a base price of $86.60/MWh (as of August 2012), subject to escalation at the U.S. Producer Price Index, and also provides an incentive for the project interconnecting prior to December 31, 2015.

Del Litoral

Our Del Litoral project is located in the Salto Department of Uruguay. We expect that this 17.4 MW capacity project will commence commercial operations during the second half of 2015. This solar project utilizes tracking technology. Pursuant to an investment agreement, our Sponsor will contribute to us a 100% interest in this project once it reaches COD.

The project has a U.S.-dollar denominated PPA with the UTE. The PPA expires during the fourth quarter of 2043. The PPA has a base price of $86.60/MWh (as of August 2012), subject to escalation at the U.S. Producer Price Index, and also provides an incentive for the project interconnecting prior to December 31, 2015.

Alto Cielo

Our Alto Cielo project is located in the Tomás Gomensoro locality, Artigas Department, Uruguay. We expect that this 26.4 MW capacity project will commence commercial operations during the second half of 2015. This solar project utilizes fixed tilt technology. The project is being developed and constructed by an affiliate of Solarpack, a third-party solar power developer. Upon completion of the Solarpack Transaction and the project reaching COD, we will have a 100% ownership interest in the project. O&M will be provided by an affiliate of Solarpack for 15 years.

The project has a U.S.-dollar denominated PPA with the UTE. The PPA expires in the fourth quarter of 2043. The PPA has a base price of $111.00/MWh (as of August 2012), and also provides an incentive for the project interconnecting prior to December 31, 2015. The PPA for this project has no base price escalation.

 

205


Table of Contents

Our South Africa projects

Boshof

Our Boshof project is located in the town of Boshof in the Free State Province of South Africa, approximately 60 km northeast of Kimberley. This project utilizes tracking technology. The 33.6 MW capacity project commenced commercial operations during the fourth quarter of 2014. We have a 51% ownership interest in this project, with our local partners, including Public Investment Corporation, holding the balance 49% ownership interest in this project. The project is part of the REIPPP program, under which a solar project is regulated as an independent power producer and is authorized to produce and sell electricity to Eskom, the country’s largest state-owned power utility, pursuant to a license issued by NERSA.

The counterparty to the PPA is Eskom, which is rated BB+ by S&P. The PPA is scheduled to terminate during the third quarter of 2034 and provides for a tariff of ZAR 2.63/kWh (approximately $0.23/kWh), 23% of which is inflation adjusted for the term of the PPA. The PPA also provides for price escalations after April 2011. The PPA also provides that Eskom will purchase all of the electricity generated by the project, with payments required at the contracted rate for energy deemed delivered if the grid is unavailable beyond a specified period.

Klipheuwel

Our Klipheuwel project is located in the town of Caledon in the Western Cape Province of South Africa. This project consists of nine wind turbines. This 17.6 MW capacity project commenced commercial operations during the second quarter of 2014. Upon completion of the BioTherm Transaction, we will have a 65% ownership interest in this project, with our local partners holding the remaining 35% ownership interest. The terms of the BioTherm Transaction provide that we are entitled to receive economic benefits from this project while we await the closing conditions of the transaction to be satisfied, including the receipt of an approval from the South African Department of Energy. The project is part of the REIPPP program.

The counterparty to the PPA is Eskom. The PPA is scheduled to terminate during the first quarter of 2034 and provides for a tariff of ZAR 1.23/kWh (approximately $0.12/kWh), 100% of which is inflation adjusted for the term of the PPA. The PPA also provides that Eskom will purchase all of the electricity generated by the project, with payments required at the contracted rate for energy deemed delivered if the grid is unavailable beyond a specified period. O&M will be provided by affiliates of the seller and a joint venture of third-party providers (Group Five Construction and Iberdrola Engineering & Construction ZA) for an interim period, after which affiliates of our Sponsor will assume the seller’s portion of O&M responsibilities.

Aries

Our Aries project is located in the town of Kernhardt in the Northern Cape Province of South Africa. This project utilizes fixed tilt technology. This 7.5 MW capacity project commenced commercial operations during the first quarter of 2014. Upon completion of the BioTherm Transaction, we will have a 70% ownership interest in this project with our local partners holding the remaining 30% ownership interest. The terms of the BioTherm Transaction provide that we are entitled to receive economic benefits from this project while we await the closing conditions of the transaction to be satisfied, including the receipt of an approval from the South African Department of Energy. The project is part of the REIPPP program.

The counterparty to the PPA is Eskom. The PPA is scheduled to terminate during the fourth quarter of 2033 and provides for a tariff of ZAR 2.76/kWh (approximately $0.27/kWh), 100% of which is inflation adjusted for the term of the PPA. The PPA also provides that Eskom will purchase all of the electricity generated by the project, with payments required at the contracted rate for energy deemed delivered if the grid is unavailable beyond a specified period. O&M will be provided by affiliates of the seller and a third party provider (Juwi Solar ZA) for an interim period, after which affiliates of our Sponsor will assume O&M responsibilities.

 

206


Table of Contents

Konkoonsies

Our Konkoonsies project is located in the town of Pofadder in the Northern Cape Province of South Africa. This project utilizes fixed tilt technology. This 7.5 MW capacity project commenced commercial operations during the first quarter of 2014. Upon completion of the BioTherm Transaction, we will have a 70% ownership interest in this project with our local partners holding the remaining 30% ownership interest. The terms of the BioTherm Transaction provide that we are entitled to receive economic benefits from this project while we await the closing conditions of the transaction to be satisfied, including the receipt of an approval from the South African Department of Energy. The project is part of the REIPPP program.

The counterparty to the PPA is Eskom. The PPA is scheduled to terminate during the fourth quarter of 2033 and provides for a tariff of ZAR 2.76/kWh (approximately $0.27/kWh), 100% of which is inflation adjusted for the term of the PPA. The PPA also provides that Eskom will purchase all of the electricity generated by the project, with payments required at the contracted rate for energy deemed delivered if the grid is unavailable beyond a specified period. O&M will be provided by affiliates of the seller and a third party provider (Juwi Solar ZA) for an interim period, after which affiliates of our Sponsor will assume O&M responsibilities.

Witkop

Our Witkop project is located in the Polokwane municipality in the Limpopo Province of South Africa. The 16.8 MW capacity project commenced commercial operations during the third quarter of 2014. This project utilizes tracking technology. Upon completion of the Chint-Soutpan/Witkop Transaction and the concurrent transfer to us of our Sponsor’s 9.7% effective ownership interest, we will have a 51% interest in this project with our local partners, including Public Investment Corporation, holding the remaining 49% interest. The project is part of the REIPPP program.

The counterparty to the PPA is Eskom. The PPA is scheduled to terminate during the fourth quarter of 2033 and provides for a tariff of ZAR 2.60/kWh (approximately $0.22/kWh), all of which is inflation adjusted for the term of the PPA. The PPA provides for price escalations after April 2011. The PPA also provides that Eskom will purchase all of the electricity generated by the project, with payments required at the contracted rate if the grid is unavailable beyond a specified period.

Soutpan

Our Soutpan project is located in the Blouberg municipality in the Limpopo Province of northern South Africa, bordering Zimbabwe and Botswana. This 15.8 MW capacity project commenced commercial operations during the third quarter of 2014. This project utilizes tracking technology. Upon completion of the Chint-Soutpan/Witkop Transaction and the concurrent transfer to us of our Sponsor’s 9.7% effective ownership interest, we will have a 51% ownership interest in this project with our local partners, including Public Investment Corporation, holding the remaining 49% interest. The project is part of the REIPPP program.

The counterparty to the PPA is Eskom. The PPA is scheduled to terminate during the third quarter of 2033 and provides for a tariff of ZAR 2.76/kWh (approximately $0.24/kWh), all of which is inflation adjusted for the term of the PPA. The PPA provides for price escalations after April 2011. The PPA also provides that Eskom will purchase all of the electricity generated by the project, with payments required at the contracted rate for energy deemed delivered if the grid is unavailable beyond a specified period.

 

207


Table of Contents

Our Costa Rica projects

PESRL

Our PESRL project is located in Guanacaste, Costa Rica. This 24.0 MW capacity wind project with 58 turbines commenced commercial operations in the fourth quarter of 1996, becoming the first wind park in Latin America. Upon completion of the GME Transaction, we will have a 100% ownership interest in this project.

The PPA counterparty is the Costa Rican Electricity Institute, or “ICE,” a state-owned company, with a credit rating of Ba1 (Moody’s) and BB+ (Fitch). The U.S. dollar-denominated PPA, which expires in 2020, provides for a current tariff of $102/MWh during the high season and $40.8/MWh during the low season.

Orosi

Our Orosi project is located in Guanacaste, Costa Rica. This 50.0 MW capacity wind project with 25 wind turbines is expected to commence commercial operations in the third quarter of 2015. Upon completion of the GME Transaction and the project reaching COD, we will have a 100% ownership interest in this project.

The U.S. dollar-denominated PPA counterparty is ICE. The PPA duration will be 20 years, after which the project will be transferred to ICE. The PPA provides for a base tariff of $121.5/MWh, of which 20% is adjusted for U.S. PPI and adjusted by seasonality (100% from January to May and 40% from June to December).

Our Peru projects

LAP portfolio

The LAP portfolio consists of six operating hydro-electric generating projects located in the Ancash and Junĺn regions of Peru. The projects achieved commercial operations between the first quarter of 2009 and the fourth quarter of 2014. The projects utilize a run-of-river water flow and Pelton and Francis turbine technologies. The LAP portfolio also includes a 48 kilometer, 220 KV transmission line used to evacuate power from one of its projects to the wholesale transmission system. The projects were jointly developed by Latin America Power Perú, S.A.C., a subsidiary of Latin America Power, and GCZ Energĺa, S.A.C. O&M at each project is provided by GCZ Servicios, S.A.C. under existing contracts that expire on the five-year anniversary of the commencement of commercial operations for each project. Upon the completion of the LAP Transaction, we will have a 100% ownership in the LAP portfolio.

RER Contracts

Each of the projects in the LAP portfolio has a U.S.-dollar denominated Renewable Energy Resources (“RER”) contract with the Ministry of Energy and Mines (“MINEM”). MINEM’s obligations are supported by the Government of Peru, which is rated BBB+/A3 by S&P. Each of the PPAs is for 20 years, with pricing (effective May 2015 to April 2016) ranging from $55.6/MWh to $61.0. RER pricing is escalated at US PPI, but the adjustment is only made if and when the PPI index has changed +/- 5% as compared to the last time the PPA price was adjusted.

 

208


Table of Contents

The RER regime compensates generators by providing them a take-or-pay, fixed-price contract for energy and associated capacity. Generators sell their power into the spot market and then collect a premium over the prevailing market price, up to their fixed contract price. On a quarterly basis, an independent system operator reconciles the actual monies collected by RER generators as opposed to their guaranteed contract income. Any difference between the generators and the MINEM is subsequently recovered over the following quarter. If a project delivers less than the amount committed to under the PPA, it will be assessed a penalty for that planning year through a proportional reduction in the premium payment.

Our Nicaragua project

Eolo

Our Eolo project is located in Rivas, Nicaragua. This 44.0 MW capacity wind project with 22 wind turbines commenced commercial operations in the fourth quarter of 2012. Upon completion of the GME Transaction, we will have a 100% ownership interest in this project.

The PPA counterparties are Distribuidora de Electricidad del Norte, S.A., and Distribuidora de Electricidad del Sur, S.A., two privately held distribution concessionaires. A MIGA insurance package providing 90% coverage is in place covering currency convertibility, war and civil disturbance and expropriation. The U.S. dollar-denominated PPA duration is 20 years and provides for a tariff with a base price of $105/MWh, increasing at 3% annually until year 11, 1% in years 12 and 13, 0.5% in years 14 and 15, and rebased to $139.9/MWh in year 16 and onwards.

Our Thailand projects

PP Solar

Our PP Solar project is comprised of three sites located in Amphur Kranuan, Khonkaen Province in Thailand. The project has an aggregate capacity of 3.6 MW. The first two phases commenced commercial operations during the first quarter of 2014, and the third phase commenced commercial operations during the first quarter of 2015. This project is governed by terms stipulated in the Regulations for the Purchase for Power from Very Small Power Producers and the Regulations for Synchronization of Generators with respect to projects producing output less than 10.0 MW. This project has three PPAs, all with the Provincial Electricity Authority, or “PEA”, a government enterprise in the utility sector with the primary responsibilities of generation, procurement, distribution and sale of electricity to public, business and industrial sectors across 74 provinces.

Each of the PPAs is scheduled to terminate during December 2018 and will automatically be extended for another five years on a continual basis until the contract is terminated. PEA may terminate each PPA only if we are in breach of the agreement. We may, however, terminate each PPA unilaterally. Our PP Solar PPAs are supported by a tariff at the Bulk Supply Tariff Rate and a price “adder.” The Bulk Supply Tariff Rate is the rate charged by the Electricity Generating Authority of Thailand, or “EGAT,” to the PEA to deliver power to the EGAT system. The EGAT may determine and change the Bulk Supply Tariff Rate quarterly pursuant to regulations governing the EGAT. The “adder” is determined every four months by the Energy Minister and which currently provides an additional THB 8/kWh in payment for ten years.

WXA

Our WXA projects are comprised of three sites located in Pichit province in Thailand. Each of the projects have a capacity of 6.0 MW, with an aggregate capacity of 17.9 MW. Each of the projects is currently under construction and is expected to achieve commercial operations during the second half of 2015. Pursuant to an investment

 

209


Table of Contents

agreement, our Sponsor will contribute to us a 100% interest in this project once it reaches COD. These projects utilize single-axis tracking technology. The projects are governed by terms stipulated in the Regulations for the Purchase for Power from Very Small Power Producers and the Regulations for Synchronization of Generators with respect to projects producing output less than 10.0 MW. Each of the three projects has a separate PPA with the PEA, a government enterprise in the utility sector with the primary responsibilities of generation, procurement, distribution and sale of electricity to public, business and industrial sectors across 74 provinces. Each of the PPAs is scheduled to terminate in the fourth quarter of 2040 and provides for a fixed tariff of 5.66 THB/kWh (approximately $0.17/kWh) up to a maximum capacity factor of 16%. If the project generates above 16% capacity factor, it is eligible to be paid at the prevailing merchant rate.

NPS Star

Our NPS Star projects are comprised of three sites located in Pichit, Supanburi and Lopburi provinces in Thailand. Each of the projects have a capacity of 6.0 MW, with an aggregate capacity of 17.9 MW. Each of the projects is currently under construction and is expected to achieve commercial operations during the second half of 2015. Pursuant to an investment agreement, our Sponsor will contribute to us a 100% interest in this project once it reaches COD. These projects utilize single-axis tracking technology. The projects are governed by terms stipulated in the Regulations for the Purchase for Power from Very Small Power Producers and the Regulations for Synchronization of Generators with respect to projects producing output less than 10.0 MW. Each of the three projects has a separate PPA with the PEA. Each of the PPAs is scheduled to terminate in the fourth quarter of 2040 and provides for a fixed tariff of 5.66 THB/kWh (approximately $0.17/kWh) up to a maximum capacity factor of 16%. If the project generates above 16% capacity factor, it is eligible to be paid at the prevailing merchant rate.

Our Malaysia projects

Silverstar Pavilion

Our Silverstar Pavilion project is located in Sepang, Malaysia at the Kuala Lumpur International Airport. This 5.1 MW capacity project commenced commercial operations during the fourth quarter of 2013. This product utilizes fixed tilt technology. To comply with local ownership laws, the project’s common equity is held 52% by the local partner and 48% by us. Our economic interest in the project is 51% with the remaining 49% held by the local partner. Provisions of the corporate governance documents provide us with sufficient influence with respect to significant corporate and other operating matters.

The counterparty to the PPA is Malaysia Airports (Sebang) Sdn. Bhd., or “MASSB,” which is a wholly owned subsidiary of Malaysia Airports Holdings Berhad, or “MAHB.” MAHB owns five international and 16 domestic airports and is controlled by the Malaysian government. MAHB’s stock is listed on the main market of Bursa Malaysia and is rated A3 from Moody’s and its senior debt program is rated AAA from RAM (Ratings Malaysia).

The PPA is scheduled to terminate during the fourth quarter of 2034 and provides for a flat tariff of MYR 1.37/kWh (approximately $0.39/kWh) with the payment of penalties in case of any failure to purchase power by the counterparty. The PPA for Silverstar Pavilion provides for adjustments to the feed-in tariff rate on the total solar energy generated in a year if SEDA determines that the project has achieved cost parity, as described below.

Fortune 11

Our Fortune 11 project is located in Sepang, Malaysia at the Kuala Lumpur International Airport. This 4.8 MW capacity project commenced commercial operations during the fourth quarter of 2013. This project utilizes

 

210


Table of Contents

tracking technology. To comply with local ownership laws, the project’s common equity is held 52% by the local partner and 48% by us. We also own redeemable preference shares and shareholder loans such that we have 95% of the economic interest in the project with the local partner having the remaining 5% economic interest. In addition, provisions of the corporate governance documents provide us with sufficient influence with respect to significant corporate and other operating matters.

The counterparty to the PPA is Tenaga Nasional Berhad, or “TNB,” which is Malaysia’s largest utility company and is majority-owned by the Malaysian government. TNB has a credit rating of BBB+ from S&P, Baa1 from Moody’s and AAA from RAM (Ratings Malaysia) for long-term foreign and local debt.

The PPA is scheduled to terminate during the fourth quarter of 2034 and provides for a flat tariff of MYR 0.90/kWh (approximately $0.26/kWh) with a payment of penalties in case of any failure to purchase power by the counterparty. The PPA for Fortune 11 provides for adjustments to the feed-in tariff rate on the total solar energy generated in a year if SEDA determines that the project has achieved “cost parity,” as described below.

Corporate Season

Our Corporate Season project is located at the satellite terminal of the Kuala Lumpur International Airport in Sepang, Malaysia. This 2.5 MW capacity project commenced commercial operations during December 2013. This project utilizes fixed tilt rooftop installation technology. To comply with local ownership laws, the project’s common equity is held 52% by the local partner and 48% by us. We also own redeemable preference shares and shareholder loans such that we have 62% of the economic interest in the project with the local partner having the remaining 38% economic interest. In addition, provisions of the corporate governance documents provide us with sufficient influence with respect to significant corporate and other operating matters.

The counterparty to the PPA is MASSB. The PPA is scheduled to terminate during December 2034 and provides for a flat tariff of MYR 1.14/kWh (approximately $0.33/kWh) with the payment of penalties in case of any failure to purchase power by the counterparty. The PPA for Corporate Season provides for adjustments to the feed-in tariff rate on the total solar energy generated in a year if SEDA determines that the project has achieved cost parity, as described below.

Malaysia contract terms

Each of our three Malaysian projects, Fortune 11, Silverstar Pavilion and Corporate Season, have similar corporate governance structures and arrangements with their offtake purchasers as described below.

Corporate governance. With respect to each of our three Malaysian projects, our arrangements provide us with the right to nominate and appoint a majority of the members of the respective boards of directors (except for Fortune 11 in which we can nominate and appoint all directors), each of which has control over its respective project and most matters relating to its management and operations.

Feed-in tariff adjustments. The PPAs for our Malaysian projects provide for adjustments to the feed-in tariff rate on the total solar energy generated in a year if SEDA determines that the project has achieved “cost parity.” For these purposes, cost parity will occur when the feed-in tariff rate is equal to or less than the displaced costs (i.e., the average cost of generating and supplying 1 kWh from resources other than the renewable resources through the supply line up to the point of interconnection with the renewable energy installation). Once the applicable project is determined to have achieved cost parity, instead of being paid the feed-in tariff rate, the offtake counterparty will pay us a tariff based on the prevailing displaced cost for the remaining duration of the PPA. In addition, if the total solar energy generated in a year exceeds the planned amount for that year, the rate paid for the excess energy may be a price lower than the initial feed-in tariff rate.

 

211


Table of Contents

Call Right and ROFO Projects

We have call rights to acquire projects from our Sponsor and third parties. We also have ROFO rights with our Sponsor and third-party developers. The Support Agreement establishes: (i) a minimum commitment from our Sponsor to provide us with $1.4 billion of FTM CAFD, which will be satisfied either through (x) the option to acquire the identified Call Right Projects, which currently represent an aggregate capacity of approximately 1,637.4 MW, or (y) the option to acquire additional projects from our Sponsor’s development pipeline that will in the future be designated as Call Right Projects; and (ii) a right of first offer on the SunEdison ROFO Projects.

We will have the right to acquire Call Right Projects set forth in the table below at prices to be determined by good faith negotiation between us and our Sponsor. The Support Agreement provides that we will work with our Sponsor to mutually agree on the fair market value, but if we are unable to, we and our Sponsor will engage a third-party advisor to determine the fair market value, after which we have the right (but not the obligation) to acquire such Call Right Project. Until the price for a Call Right Project is mutually agreed to by us and our Sponsor, in the event our Sponsor receives a bona fide offer for a Call Right Project from a third party, we will have the right to match any price offered by such third party and acquire such Call Right Project on the terms our Sponsor could obtain from the third party. After the price for a Call Right Asset has been agreed and until the total aggregate Projected FTM CAFD commitment has been satisfied, our Sponsor may not market, offer or sell that Call Right Asset to any third party without our consent. The Support Agreement will further provide that our Sponsor is required to offer us additional qualifying Call Right Projects from its pipeline on a quarterly basis until we have acquired projects under the Support Agreement that have the specified minimum amount of Projected FTM CAFD. We cannot assure you that we will be offered these Call Right Projects on terms that are favorable to us. See “Certain relationships and related party transactions—Project Support Agreement” for additional information.

We recently executed call right agreements with seven third-party developers pursuant to which we have the right to purchase, at our election, an aggregate of 43 solar, wind and hydro projects located in China with an aggregate capacity of 1,559.7 MW, for a specified period following such projects COD. Twelve of these projects with an aggregate capacity of 322.2 MW have reached COD. The remainder of these projects are expected to achieve their COD at varying times prior to the end of 2017.

Additionally, Renova has granted us ROFO rights with respect to any sale or transfer of any of its development or operating projects for the 25 year period after the date of our agreement with Renova. Prior to selling or transferring any Renova ROFO Project, Renova has agreed to provide us with a written notice and to negotiate with us in good faith, for a period of 45 days, regarding the terms and conditions of a purchase by us of the applicable Renova ROFO Project.

 

212


Table of Contents

The following table provides an overview of the currently identified Call Right Projects, Third-Party Call Right Projects and Renova ROFO Projects:

 

Project Name    Operating
Status
   Net(1)
Capacity
(MW)
     % of
Total
MW
    

Sponsor

Ownership
Interest
(%)

     Commercial
Operation
Date
 

Sponsor Call Rights

                                        

India Projects

                                        

Wind

              

India Project 1(2)

   Operating      199.7         3.7%         100.0         Q4 14   

India Project 2(2)

   Operating      18.0         0.3%         100.0         Q3 12   

India Project 3(2)

   Operating      16.5         0.3%         100.0         Q4 07   

India Project 4(2)

   Operating      8.3         0.2%         100.0         Q3 07   

India Project 5

   Development      170.0         3.2%         100.0         Q4 15   
     

 

 

    

 

 

       

Subtotal

        412.5         7.7%         

Solar

              

India Project 6(2)

   Operating      1.0         0.0%         100.0         Q1 15   

India Project 7(2)

   Development      198.0         3.7%         100.0         Q3 17   

India Project 8(2)

   Development      60.0         1.1%         100.0         Q4 15   

India Project 9(2)

   Development      60.0         1.1%         100.0         Q1 16   

India Project 10(2)

   Development      36.0         0.7%         100.0         Q4 15   

India Project 11(2)

   Development      36.0         0.7%         100.0         Q4 15   

India Project 12(2)

   Development      30.0         0.6%         100.0         Q1 16   

India Project 13(2)

   Development      30.0         0.6%         100.0         Q1 16   

India Project 14(2)

   Development      30.0         0.6%         100.0         Q1 16   

India Project 15(2)

   Development      30.0         0.6%         100.0         Q1 16   

India Project 16(2)

   Development      30.0         0.6%         100.0         Q1 16   

India Project 17(2)

   Development      12.6         0.2%         100.0         Q1 16   

India Project 18(2)

   Development      11.0         0.2%         100.0         Q3 15   

India Project 19(2)

   Development      18.0         0.3%         100.0         Q4 15   

India Project 20(2)

   Development      18.0         0.3%         100.0         Q4 15   

India Project 21(2)

   Development      7.0         0.1%         100.0         Q3 15   

India Project 22

   Development      6.0         0.1%         100.0         Q3 15   

India Project 23(2)

   Development      5.0         0.1%         100.0         Q3 15   

India Project 24

   Development      5.0         0.1%         100.0         Q3 15   

India Project 25(2)

   Development      1.5         0.0%         100.0         Q3 15   

India Project 26(2)

   Development      1.2         0.0%         100.0         Q3 15   
     

 

 

    

 

 

       

Subtotal

        626.3         11.7%         
     

 

 

    

 

 

       

Total India Projects

        1,038.8         19.4%         

Total India Operating Projects

        243.5         4.5%         

Total India Development Projects

        795.3         14.8%         

South Africa Projects

                                        

Solar

              

South Africa Project 1

   Development      51.8         1.0%         60.0         Q2 17   

South Africa Project 2

   Development      51.8         1.0%         60.0         Q3 17   

South Africa Project 3

   Development      51.8         1.0%         60.0         Q2 18   

South Africa Project 4

   Development      46.9         0.9%         60.0         Q3 18   

South Africa Project 5

   Development      37.4         0.7%         60.0         Q3 17   

South Africa Project 6

   Development      34.5         0.6%         60.0         Q3 17   
     

 

 

    

 

 

       

Total South Africa Projects

        274.0         5.1%         

 

213


Table of Contents
Project Name    Operating
Status
   Net(1)
Capacity
(MW)
     % of
Total
MW
    

Sponsor

Ownership
Interest
(%)

     Commercial
Operation
Date
 

Thailand Projects

                                        

Solar

              

Thailand Project 1

   Development      41.0         0.8%         100.0         Q1 16   

Thailand Project 2

   Development      6.0         0.1%         100.0         Q4 16   

Thailand Project 3

   Development      6.0         0.1%         100.0         Q4 16   

Thailand Project 4

   Development      6.0         0.1%         100.0         Q4 16   

Thailand Project 5

   Development      6.0         0.1%         100.0         Q4 16   

Thailand Project 6

   Development      6.0         0.1%         100.0         Q4 16   

Thailand Project 7

   Development      6.0         0.1%         100.0         Q4 16   

Thailand Project 8

   Development      6.0         0.1%         100.0         Q4 16   

Thailand Project 9

   Development      6.0         0.1%         100.0         Q4 16   

Thailand Project 10

   Development      6.0         0.1%         100.0         Q4 16   

Thailand Project 11

   Development      6.0         0.1%         100.0         Q4 16   

Thailand Project 12

   Development      6.0         0.1%         100.0         Q4 16   

Thailand Project 13

   Development      6.0         0.1%         100.0         Q4 16   

Thailand Project 14

   Development      6.0         0.1%         100.0         Q4 16   

Thailand Project 15

   Development      6.0         0.1%         100.0         Q4 16   

Thailand Project 16

   Development      6.0         0.1%         100.0         Q4 16   

Thailand Project 17

   Development      6.0         0.1%         100.0         Q4 16   

Thailand Project 18

   Development      6.0         0.1%         100.0         Q4 16   

Thailand Project 19

   Development      6.0         0.1%         100.0         Q4 16   
     

 

 

    

 

 

       

Total Thailand Projects

        148.9         2.8%         

Latin America (excluding Brazil) Projects

                                        

Wind

              

Latin America Project 1

   Development      80.0         1.5%         100.0         Q3 16   

China Projects

                                        

Solar

              

China Project 1(2)

   Development      50.0         0.9%         100.0         Q2 16   

China Project 2(2)

   Development      18.0         0.3%         60.0         Q4 16   
     

 

 

    

 

 

       

Total China Projects

        68.0         1.3%         

Philippines Projects

                                        

Solar

              

Philippines Project 1

   Development      22.5         0.4%         50.0         Q4 15   

Malaysia Projects

                                        

Solar

              

Malaysia Project 1(2)

   Operating      2.5         0.0%         100.0         Q2 14   

Malaysia Project 2(2)

   Operating      1.0         0.0%         100.0         Q3 14   

Malaysia Project 3(2)

   Operating      1.0         0.0%         100.0         Q3 14   

Malaysia Project 4(2)

   Operating      0.4         0.0%         100.0         Q1 14   

Malaysia Project 5(2)

   Operating      0.4         0.0%         100.0         Q1 14   
     

 

 

    

 

 

       

Total Malaysia Projects

        5.3         0.1%         
     

 

 

    

 

 

       

Total Sponsor Call Rights Projects

          1,637.4         30.5%                     

 

214


Table of Contents
Project Name    Operating
Status
   Net(1)
Capacity
(MW)
     % of
Total
MW
    

Sponsor

Ownership
Interest
(%)

     Commercial
Operation
Date
 
           

Third-Party Call Rights

                                        

China Project

                                        

Wind

              

China Project 3(2)

   Operating      49.5         0.9%         100.0         Q3 13   

China Project 4(2)

   Operating      49.5         0.9%         100.0         Q3 14   

China Project 5(2)

   Operating      48.0         0.9%         97.0         Q3 13   

China Project 6(2)

   Operating      30.0         0.6%         100.0         Q3 14   

China Project 7(2)

   Operating      24.3         0.5%         49.0         Q1 11   

China Project 8(2)

   Operating      24.3         0.5%         49.0         Q2 11   

China Project 9(2)

   Operating      24.3         0.5%         49.0         Q2 11   

China Project 10(2)

   Operating      10.2         0.2%         49.0         Q2 13   

China Project 11(3)

   Development      148.5         2.8%         51.0         Q3 17   

China Project 12(3)

   Development      50.0         0.9%         100.0         Q4 17   

China Project 13(3)

   Development      50.0         0.9%         50.0         Q3 17   

China Project 14(3)

   Development      49.5         0.9%         100.0         Q4 15   

China Project 15(3)

   Development      49.5         0.9%         100.0         Q4 15   

China Project 16(3)

   Development      49.5         0.9%         100.0         Q4 15   

China Project 17(3)

   Development      49.5         0.9%         100.0         Q4 17   

China Project 18(3)

   Development      49.5         0.9%         100.0         Q4 17   

China Project 19(3)

   Development      49.5         0.9%         100.0         Q4 17   

China Project 20(3)

   Development      49.5         0.9%         100.0         Q4 17   

China Project 21(3)

   Development      49.5         0.9%         50.0         Q3 17   

China Project 22(3)

   Development      48.0         0.9%         100.0         Q4 17   

China Project 23(3)

   Development      25.5         0.5%         51.0         Q4 16   

China Project 24(3)

   Development      14.0         0.3%         100.0         Q3 16   

China Project 25(3)

   Development      13.0         0.2%         31.0         Q4 15   
     

 

 

    

 

 

       

Subtotal

        1,005.0         18.7%         

Solar

              

China Project 26(3)

   Development      50.0         0.9%         100.0         Q4 15   

China Project 27(3)

   Development      50.0         0.9%         100.0         Q4 15   

China Project 28(3)

   Development      40.0         0.7%         100.0         Q4 16   

China Project 29(3)

   Development      40.0         0.7%         100.0         Q4 15   

China Project 30(3)

   Development      30.0         0.6%         100.0         Q4 15   

China Project 31(3)

   Development      30.0         0.6%         100.0         Q4 15   

China Project 32(3)

   Development      30.0         0.6%         100.0         Q4 15   

China Project 33(3)

   Development      30.0         0.6%         100.0         Q4 15   

China Project 34(3)

   Development      20.0         0.4%         100.0         Q4 15   

China Project 35(3)

   Development      20.0         0.4%         100.0         Q4 16   

China Project 36(3)

   Development      20.0         0.4%         100.0         Q4 16   

China Project 37(3)

   Development      20.0         0.4%         100.0         Q4 15   

China Project 38(3)

   Development      20.0         0.4%         100.0         Q4 15   
     

 

 

    

 

 

       

Subtotal

        400.0         7.5%         

Hydro

              

China Project 39(2)(4)

   Operating      43.2         0.8%         72.0         Q3 06   

China Project 40(2)(4)

   Operating      38.4         0.7%         80.0         Q2 01   

China Project 41(2)(4)

   Operating      13.0         0.2%         51.0         Q3 98   

China Project 42(2)(4)

   Operating      10.5         0.2%         70.0         Q4 02   

China Project 43(2)

   Operating      6.6         0.1%         100.0         Q2 10   

China Project 44(3)

   Development      25.0         0.5%         100.0         Q4 15   

China Project 45(3)

   Development      18.0         0.3%         100.0         Q4 15   
     

 

 

    

 

 

       

Subtotal

        154.7         2.9%         
     

 

 

    

 

 

       

Total Third Party Call Rights Projects

        1,559.7         29.1%         

Total Third Party Operating Projects

        322.2         6.0%         

Total Third Party Development Projects

          1,237.5         23.1%                     

 

215


Table of Contents
Project Name    Operating
Status
   Net(1)
Capacity
(MW)
     % of
Total
MW
    

Sponsor

Ownership
Interest
(%)

     Commercial
Operation
Date
 
           

Renova Rights ROFO

                                        

Brazil Projects

                                        

Wind

              

A-3 2011(2)

   Operating      218.0         4.1%         100.0         Q2 15   

LER 2010(2)

   Operating      168.0         3.1%         100.0         Q3 14   

A-5 2013(2)

   Development      355.0         6.6%         100.0         Q1 19   

PPA (Cemig)(2)

   Development      338.0         6.3%         50.0         Q3 18   

LGHT2(2)

   Development      203.0         3.8%         100.0         Q3 16   

LGHT1(2)

   Development      201.0         3.7%         100.0         Q3 15   

LER 2013(2)

   Development      159.0         3.0%         100.0         Q3 15   

A-5 2014(2)

   Development      108.0         0.4%         100.0         Q1 19   

Free Market II

   Development      101.4         1.9%         100.0         Q1 17   

LER 2014 EOL(2)

   Development      44.0         0.6%         100.0         Q3 17   

Free Market III

   Development      32.4         2.0%         100.0         Q3 15   

Free Market I

   Development      21.6         0.8%         100.0         Q1 16   

A-5 2012(2)

   Development      19.0         0.4%         100.0         Q1 16   
     

 

 

    

 

 

       

Subtotal

        1,968.4         36.7%         

Solar

              

LER 2014 UFV(2)

   Development      53.0         1.0%         50.0         Q3 17   

Hydro

              

Brasil PCH(5)

   Operating      148.4         2.9%         51.0         Q3 08   
     

 

 

    

 

 

       

Total Renova ROFO Projects

        2,169.8         40.4%         

Total Renova ROFO Operating Projects

        534.4         10.0%         

Total Renova ROFO Development Projects

        1,635.4         30.5%         
     

 

 

    

 

 

       

Total Call Right and ROFO Projects

        5,366.9         100%         
     

 

 

    

 

 

       

 

(1)   Net capacity represents the maximum generating capacity at standard test conditions of a facility multiplied by our expected percentage of economic ownership of such facility, taking into account any redeemable preference shares and shareholder loans that we expect to own. Generating capacity may vary based on a variety of factors discussed elsewhere in this prospectus.
(2)   Project under executed PPA.
(3)   Project has received the approval of the relevant Development and Reform Commission, or “DRC,” in China, which is the threshold approval for development projects. With DRC approval in place, the obtaining of land use rights and connection agreements is routine in nature provided due process is followed.
(4)   Project will take the form of an asset sale by a Chinese State Owned Enterprise, or “SOE,” Sales of assets by SOEs are strictly regulated, including the requirement for a valuation and public bidding process. If there is a prior agreement with an identified purchaser, as is the case on this project with Global, however, it is very rare in practice for third parties to participate in the public bidding process and/or be successful if they do participate.
(5)   The Brazil PCH project is subject to a put/call mechanism, whereby Renova can require global to buy the remaining portion of the project and global can acquire Renova to sell remaining portion of the project.

 

216


Table of Contents

The following charts provide an overview of our currently identified Call Right Projects, Third-Party Call Right Projects and Renova ROFO Projects by geography and technology:

 

LOGO

For a detailed description of the terms of the Support Agreement, see “Certain relationships and related party transactions—Project Support Agreement.”

Competition

Power generation is a capital-intensive business with numerous industry participants. We compete to acquire new projects with a large and diverse group of developers who retain power plant ownership, independent power producers, financial investors and certain utilities. These competitors range in terms of size, geographic focus, financial resources and operating capabilities. We also compete to supply energy to our potential customers with a limited number of utilities and other providers of distributed generation. Based on the strong asset development pipeline and acquisition track record of our Sponsor, we believe that we compete favorably with our competitors based on the following factors in the regions in which we operate. We compete with other developers, independent power producers and financial investors based on our relationship with our Sponsor and our development expertise, pipeline, global footprint and brand reputation. To the extent we re-contract projects upon termination of a PPA, we compete with traditional utilities primarily based on cost of capital, generation located at customer sites, operations and management expertise, price (including predictability of price), green attributes of power, the ease by which customers can switch to electricity generated by our energy systems and our open architecture approach to working within the industry, which facilitates collaboration and project acquisitions.

Competitive conditions within our respective markets may be substantially affected by changes in government incentives and other programs designed to facilitate the development of renewable energy.

Environmental matters

We will be subject to environmental laws and regulations in the jurisdictions in which we own and operate our property. These laws and regulations may require that governmental permits and approvals be obtained for renewable energy projects before construction, during or upon cessation of operations or prior to transfer of ownership or control. While we incur costs in the ordinary course of business to comply with these laws, regulations and permit requirements, we do not expect that the costs of compliance will have a material impact on our business, financial condition or results of operations. We also do not anticipate material capital expenditures for environmental controls for our projects in the next several years. These laws and regulations frequently change and often become more stringent, or subject to more stringent interpretation or enforcement, and therefore future changes could require us to incur materially higher costs.

 

217


Table of Contents

Employees

Pursuant to the Management Services Agreement, our Sponsor has committed to provide us with a team of experienced professionals to serve as our executive officers and other key officers. We expect that certain of these professionals will provide such services to us on a dedicated basis. We do not have any employees. The personnel that carry out these activities are employees of our Sponsor, and their services are provided to us or for our benefit under the Management Services Agreement. For a discussion of the individuals from our Sponsor’s management team that are expected to be involved in our business, see “Management” and “Executive officer compensation.”

Properties

See “—Our portfolio” for a description of our principal properties.

Regulatory matters

Overview

None of the projects included in our initial portfolio or the call right projects is located in the United States. As a result, all of these projects are generally exempt from U.S.-based federal and state regulation of electric utilities, including most provisions of the U.S. Public Utility Holding Company Act and the Federal Power Act. Our solar, wind and hydro-electric projects are subject to various laws and regulations in the countries in which they operate. Set forth below is a brief overview of the principal laws and regulations that are applicable to the projects included in our initial portfolio.

China

Solar and wind energy policies in China are formulated and carried out by various government entities and agencies and also are integrated into the country’s broader regulatory framework for electricity generation and transmission. Additionally, in the case of foreign owners of solar and wind energy assets, the government entities involved in regulating foreign investment in China will also play a key oversight role in certain instances.

The National Energy Administration, or “NEA,” a government entity under the regulation and supervision of the National Development and Reform Commission, or “NDRC,” formulates solar and wind energy policies. The implementation and enforcement of these policies is overseen by provincial, regional and municipal offices of the NDRC and NEA. These local offices are responsible for, among other things, issuing electricity business licenses, overseeing the construction of solar and wind energy projects within their jurisdictions and (subject to variation in practice among different types of projects and different localities) approving changes of ownership of solar or wind energy projects. For instance, pursuant to new guidance issued by the NDRC in October 2014, a solar project which has been filed with the local NEA counterpart cannot be transferred before the solar project begins production without the consent of the applicable NEA counterpart. Any material change made to a solar project, including the change of construction site and construction content, must be submitted to the local counterpart of the NEA for re-filing.

Solar and wind energy projects are also subject to standards and regulations affecting the electricity industry in general, as set out in legislation or otherwise formulated by the NEA, as well as the standards and business practices of China’s state-owned grid companies, State Grid Corporation and the smaller China Southern Power Grid Corporation. The grid companies, through their provincial subsidiaries, play a de facto regulatory role by issuing approvals for the interconnection with the power grids and executing interconnection and dispatch agreements as well as PPAs with the energy project companies. Power purchase agreements with the grid

 

218


Table of Contents

companies are usually short term in duration, typically one year subject to annual extensions. Under China’s Renewable Energy Law, the grid companies are obligated to accept all energy produced by duly licensed and operating solar and wind energy projects. In practice, however, solar and wind energy projects have been subject to curtailment by grid companies due to transmission capacity and other infrastructure constraints.

Solar and wind energy projects owned in whole or in part by foreign entities are also subject to the general foreign investment regulatory regime administered by the Ministry of Commerce, or “MOFCOM,” and State Administration of Foreign Exchange. Foreign investment in the solar and wind power industry is currently listed by MOFCOM as an “encouraged” activity, which means new solar or wind energy projects may be developed by a wholly foreign owned enterprise on the same basis as they may be developed by a domestic enterprise. However, if a foreign investor seeks to acquire a solar or wind project (whether operating or under construction), it must obtain the approval of either the national office of MOFCOM or its regional offices (depending on the total monetary value of the project and structure of the acquisition).

Under current Chinese law, acquisition of a solar or wind energy project by a foreign party does not in itself require approval from State Administration of Foreign Exchange, but any foreign loans issued by a foreign party (including shareholder loans) must be registered with SAFE before they may be disbursed.

Brazil

The National Electric Energy Agency, or the “ANEEL,” and the Energy Research Company are the predominant regulatory bodies governing electric energy distribution in Brazil. These governmental agencies are responsible for enacting rules and regulations related to, among others, granting licenses to enter the electricity generation market, setting tariff rates, regulating the auction process used to award energy production contracts and establishing the incentive structure for producers of renewable energy.

The electricity sector in Brazil is divided into two markets: (i) the regulated market where electric energy is supplied at rates and tariffs set by a government-owned distribution companies, and (ii) the free market, in which any supplier (generators, distributors, self-producers, independent producers, traders of energy, etc.) can directly sell energy to consumers at market rates with the prior approval of the ANEEL.

With respect to the regulated market, the ANEEL established an auction system for awarding contracts for the production of renewable energy. Domestic and foreign companies (solely or in consortium), private equity funds and special purpose vehicles are eligible to bid at auction. In case of a consortium, the consortium parties are jointly liable for all obligations arising from the auction rules and the resulting PPA. If a foreign company prevails at auction, it must incorporate a Brazilian company to enter into the PPA. Bidders are required to deposit a bid bond equal to 1% of the project estimated cost, which must be declared by the bidder and approved by the ANEEL beforehand. This bond is returned after the contract is signed if the bidder wins the auction; otherwise, it is returned immediately following the auction. Auction winners also need to deposit a project performance bond equal to 5% of the investment cost that is released after certain project milestones are completed.

Several penalties are applicable in the event of delay in achieving certain milestones set in the PPA contract and in the ANEEL authorization. Among other default events, the ANEEL has the right to terminate the contract if a delay in achieving milestones exceeds one year.

Brazilian law does not restrict the foreign ownership of electricity generating companies, but a company participating in the electric energy sector must be incorporated under Brazilian law.

 

219


Table of Contents

India

The Electricity Act, 2003, or “Electricity Act,” is the principal legislation that regulates the generation, transmission, distribution, trading and use of electricity in India. The Electricity Act governs the establishment, operation and maintenance of any energy generating company and prescribes technical standards in relation to its connectivity with the Indian power grid. The Electricity Act provides that an energy generating company may establish, operate and maintain a generating facility without obtaining a license under the Electricity Act if it complies with the prescribed technical standards relating to connectivity with the power grid. In addition, an energy generating company is permitted to sell electricity to any distribution or trading licensee and, where permitted by the respective state regulatory commissions, to consumers subject to availing open access to the transmission and distribution systems and payment of applicable charges.

The Electricity Act establishes a two-level regulatory system: (i) the Central Electricity Regulatory Commission, or “CERC,” is responsible for regulating the tariff charged by generating facilities owned by the Indian government and other independent power producers involved in generating or supplying electricity in more than one state, and for regulating the inter-state transmission of electricity, and (ii) State Electricity Regulatory Commissions, or “SERCs,” are responsible for regulating intra-state transmission and supply of electricity within each of their respective states. These commissions are responsible for a variety of functions, including determining tariff levels, granting licenses, settling disputes between the generating companies and the licensees.

The Indian government has established the Ministry of New and Renewable Energy, or “MNRE,” to facilitate on a national level research, development, commercialization and deployment of renewable energy systems for various applications in rural, urban, industrial and commercial sectors. In 2011, the MNRE established the Solar Energy Corporation of India, or “SECI,” as a not-for-profit company to facilitate the development of solar energy generating capacity in India.

In general, feed-in tariffs applicable to solar projects are determined through one of the following procedures under the Electricity Act:

 

 

a “cost plus” method under which the appropriate regulatory commission determines the tariff based on the actual capital cost of the project, normative debt to equity ratios and other parameters prescribed under the multi-year tariff regulations adopted by the commissions; and

 

 

a competitive bidding process in accordance with the guidelines issued by the appropriate regulatory commission.

In the case of wind power projects, feed-in tariffs are determined taking into account capital cost submissions by various stakeholders and certain operation and maintenance costs and have been announced by the SERCs in certain states, such as the States of Andhra Pradesh, Gujarat and Tamil Nadu, pursuant to the applicable policy in the respective states.

South Africa

South Africa has a framework of legislation and regulations governing its energy sector. The Renewable Energy Independent Power Producer Procurement, or “REIPPP,” program is a governmental procurement program that effectively requires solar and wind projects in South Africa to comply with this framework, including the various acts and policies regulating the governmental procurement process generally, the most important of these being the Public Finance Management Act and the Broad-Based Black Economic Empowerment Act, and the various acts and policies regulating South African businesses generally and therefore also independent power producers, such as environmental, health and safety laws.

 

220


Table of Contents

The National Energy Regulator of South Africa, or “NERSA,” is the primary regulator of South Africa’s energy sector and is responsible for regulating electricity, piped-gas and petroleum pipeline industries. Solar and wind projects are governed by the Electricity Regulation Act, which is the primary enabling legislation for the REIPPP program, and by other legislation applicable to water affairs, environmental affairs, agriculture, forestry and fisheries and mineral resources. Under the REIPPP program, a solar or wind project is regulated as an independent power producer and is authorized to produce and sell electricity to Eskom, the country’s largest state-owned power utility, pursuant to a license issued by NERSA. A solar or wind project is not generally subject to regulation as a public utility in the traditional sense and, thus, is exempt from complying with South Africa’s complex system of power producer and procurement rules and regulations that are applicable to Eskom.

Honduras

In May 2014, Honduras passed the Law for the Electric Industry that established a new regulatory framework for the electricity generation market. The market is regulated by three entities: (i) the Ministry (the superior authority in the electricity subsector); (ii) the Electricity Regulatory Commission, a decentralized entity charged with granting operating licenses, defining the methodology for calculating rates, maintaining a public registry of the companies participating in the electricity sector and sanctioning illegal activity; and (iii) the Systems Operator, an entity overseeing all technical aspects of the electricity generation market, including proper coordination of the generation and transmission system and controlling the operations of the national grid.

This law authorizes any company to participate in the electricity generation market with the proper licensing. It guarantees free access to the grid, as all transmission and distribution companies are obligated to permit connection by other companies to their networks. This law also prohibits transmission companies from generating, distributing and commercializing electric energy and distribution companies from generating electric energy, with few exceptions, to be certified by the Electricity Regulatory Commission.

Costa Rica

The Costa Rican Electricity Institute, or “ICE,” controls the generation, transmission, and distribution of electricity in Costa Rica. The Costa Rican “Law to Authorize Private Large-Scale Electricity Generation” (Laws No. 7200 and 7508) and its related legislation, authorizes the private generation of renewable energy in Costa Rica by “limited capacity renewable energy plants.” These laws provide that the private sector may participate in the generation of electricity with the sole purpose of selling power to ICE, including providing for (i) the criteria and process for a private party to be selected as a power supplier for ICE, (ii) the types of projects which fall within the scope of the Law, (iii) the national quota for private electricity generation, (iv) tariffs and (v) the jurisdiction of Costa Rican entities.

Any company incorporated in Costa Rica may apply to supply power to ICE under a competitive public bidding scheme, so long as no foreign person holds more than 65% of share capital of such company.

The renewable energy public bidding scheme is designed to provide power generators with guaranteed payment under long-term PPAs, which are awarded for 20 years to renewable power producers that offer the lowest tariff per kWh for a given technology.

To be authorized to participate in the bidding process, companies must first obtain a “declaration of eligibility” from ICE that confirms that the project meets certain minimum requirements established in the regulation. Depending on whether the investor chooses either a BOO (build, operate, own) or BOT (build, operate, transfer) regime, the plant’s production capacity cannot surpass 20 MW (for BOO projects) or 50 MW (for BOT projects). In its offer to ICE, the prospective participant must establish the tariff at which it will sell power. Once the company has been selected by ICE to supply power, they will negotiate a PPA to formalize the terms of the agreement.

 

221


Table of Contents

Peru

As part of Peru’s plan to attract investment in its electricity industry, Peru instituted the Electric Concessions Law. Peru’s regulatory framework governing the electricity sector provides for: (i) separation between the principal activities of electricity generation, transmission and distribution; (ii) a regime of negotiable prices for generation (power and energy) regarding the supply of electricity to free clients, (consumers whose electricity consumption is over 2,500 KW, or being between 200 KW and 2,500 KW and have chosen to negotiate their generation prices); (iii) regulated prices applicable to the generation of electricity for public consumption; (iv) regulated prices applicable to transmission and distribution; and (v) the private administration of the National Electric Interconnected System.

Peru also enacted a number of decrees to promote the use of renewable energy resources, such as biomass, wind, solar, geothermic, tidal and small hydro-electric (less than 20 MW). Such legislative decrees employ an auction scheme to award guaranteed PPAs to power producers and provide that power plants utilizing renewable energy have priority in the distribution systems.

Uruguay

Uruguay has a deregulated electricity generation market, allowing the private sector access to the wholesale electricity market. The transmission, transformation and distribution of electricity may be provided by either the UTE or by the private sector through a public service contract.

Before becoming an eligible power generator, it is necessary for such entity to obtain an authorization from the Executive Power branch of the national government, as well as a license to participate as generator in the wholesale market. The granting of these licenses is discretional. Additionally, environmental regulations in Uruguay require prospective wind and solar generators to seek permits from the National Environmental Office (to be granted at its discretion) before participating in the wholesale market.

Another governmental entity that participates in the energy sector is the Unidad Reguladora de Servicios de Energĺa y Agua, or “URSEA,” empowered to dictate regulations on generation matters and to make recommendations to the Executive Power. The URSEA issues a special permit if a given energy project interferes with other energy or water projects.

The UTE may directly enter into PPAs with generators or implement bidding processes for the purchase of electricity, and it is expressly authorized to enter into PPAs with generators of renewable energy.

Malaysia

The Malaysian Renewable Energy Act 2011, or “REA,” and its related legislation govern most matters relating to the generation of renewable energy in Malaysia, including specifying (i) the criteria and process for obtaining a feed-in approval and the applicable tariff rates, (ii) the technical and operational requirements of renewable energy projects and (iii) the qualifying criteria for renewable energy sources (which includes solar energy). The Malaysian Sustainable Energy Development Authority Act 2011 established SEDA to advise the Malaysian government on, among other things, all matters relating to renewable energy, including the implementation and management of the feed-in tariff system. SEDA is authorized to grant any feed-in approvals and oversee

almost all matters falling under the scope of the REA and its related legislation. The Minister of Energy, Green Technology and Water has the final authority with respect to certain matters under REA, such as appeals of certain decisions made by SEDA, and decisions on feed-in tariff degression rates.

The Malaysian Electricity Supply Act 1990 generally requires every energy producer in Malaysia to obtain an operating license granted by the Energy Commission of Malaysia with the approval of the Minister of Energy, Green Technology and Water. Except as exempted under any legislation, any solar project that is awarded a

 

222


Table of Contents

feed-in approval under the REA is also required to apply for a license for the generation and supply of electricity. The specific type of renewable energy PPA that is to be used for licensees eligible for feed-in approvals is prescribed by regulation based on the type of renewable energy and the capacity of the proposed renewable energy installation.

Thailand

The Energy Industry Act (2007), or “EIA,” is Thailand’s principal source of legislation governing electricity and the natural gas business. The Ministry of Energy is responsible for the implementation of the EIA, and the Department of Alternative Energy Development and Efficiency is responsible for implementation of alternative energy plans. The EIA established the Energy Regulatory Commission. Operators of solar and wind projects must obtain several licenses from the Energy Regulatory Commission. Royal decrees, regulations and notifications have been published to implement the EIA.

Government solar and wind power purchasers in Thailand include:

 

 

the Electricity Generating Authority of Thailand, which purchases under PPAs from “Small Power Producers” (producers having an installed capacity of less than 90 MW but more than 10 MW); and

 

 

the Provincial Electricity Authority and the Metropolitan Electricity Authority, which purchase under PPAs from “Very Small Power Producers” (producers having an installed capacity of not more than 10 MW).

The forms of PPAs and rules governing land and connections to the power grid and other subjects are prescribed by the applicable authorities.

Wind power projects are often located on public land of various categories and subject to specific restrictions, including limitations on foreign ownership of land and limitations on the amount of area that may be leased and the duration of such lease. Both solar and wind projects are subject to environmental laws, which may require an environmental impact assessment. For example, wind power project sites adjacent to national parks or certain locations specified as watershed areas require an environmental impact assessment.

Nicaragua

The Nicaraguan energy sector is governed by the Electric Industry Law, related regulations and and the rules issued by the Nicaraguan Energy Institute. The governmental department in charge of this sector is the Ministry of Energy and Mines, which grants concessions and licenses to invest and operate in the energy sector.

The concessions for distributing electricity within Nicaragua have been granted in favor of two private companies, Distribuidora de Electricidad del Norte, S.A. and Distribuidora de Electricidad del Sur, S.A. Electricity generators execute PPAs with these companies to distribute produced energy within local electric markets. To transport the energy, generators must execute an interconnection agreement with the National Company for Electric Energy Transmission, a public company that owns the national electric network. The PPA executed between the generators and distributors must be registered before the National Grid, after receiving approval by Ministry of Energy and the Mines and the Nicaraguan Energy Institute.

Parties interested in establishing wind energy projects must obtain the following governmental permits: (i) provisional license to carry out pre-investment studies; (ii) generation license for investment and generation activities and; (iii) environmental authorization that establishes the terms and conditions for environment protection. Items (i) and (ii) above are issued by Ministry of Energy and the Mines, and item (iii) is issued by the Ministry of Environment and Natural Resources. Other governmental permits may apply depending on the location and conditions of the project, such as permits issued by the National Forestry Institute to clear trees, water concessions issued by the Water National Authority or exploitation of road material permit issued by Ministry of Energy and the Mines.

 

223


Table of Contents

Government incentives

Each of the markets that we expect to operate in has established various incentives and financial mechanisms to support the cost and to accelerate the adoption of renewable energy. These incentives help catalyze private sector investments in renewable energy and efficiency measures. Set forth below is a summary of the various programs and incentives that we expect will apply to our business.

China

In recent years, the NDRC has initiated feed-in tariff programs for both solar and wind energy. Under these feed-in tariff programs, eligible solar and wind projects are entitled to receive a special tariff, the amount of which is set by NDRC policy and which may vary based on the type of project (in the case of solar, for example, utility-scale versus distributed generation projects; in the case of wind, onshore versus offshore developments), geographical location of the project and the date on which it commenced construction. Once a solar project qualifies for a particular tariff, the project is entitled under NDRC policy to continue to receive the tariff for a period of 20 years from its COD. The special tariff remains constant, but consists of two components which may themselves change. One component is set to equal the prevailing rate that grid companies pay for base-load, desulphurized coal power (thus it is subject to change, though this base rate is currently determined by policy rather than market pricing and in recent history has not been subject to substantial fluctuations). This base load component is paid directly by the grid companies to the solar or wind energy project. The other component, called the “green component,” makes up the difference between the total special tariff and the prevailing base-load rate.

The “green component” of the tariff is paid from a “renewable energy development fund” administered by China’s Ministry of Finance, which in turn collects a surcharge that the grid companies charge to their end users. Payment of the green component is not made on the same schedule as payment of the base load component. Generally, payments of the base load component are made monthly while payments of the green component are required under law to be paid quarterly, but in practice in some provinces may be made only two or three times per year. Additionally, there is typically a gap, often of longer than one year, between an energy plant’s COD and the date on which it receives its first payment of the green component of the feed-in tariff.

In addition to the feed-in tariff program, the solar industry has also benefited from the “Golden Sun Program” demonstration program that launched in 2009 as a strategy to support and further the development of the technology progress and scale of the national solar industry. Under the Golden Sun Program, the central government provided subsidies to eligible solar projects interconnected to the power grid in an amount of 50% of its total investment and to eligible off-grid solar projects located in remote areas without electricity supply at the amount of 70% of its total investment. Solar projects participating in China’s feed-in tariff program described below were not eligible to participate in the Golden Sun Program. The Golden Sun Program expired in 2013.

Chinese financial institutions may offer preferential loans with a financial interest subsidy to renewable energy development and utilization projects that are listed in the national renewable energy industrial development guidance catalogue and satisfy certain conditions for granting loans.

Finally, under applicable Chinese tax law and regulations, an enterprise engaged in public infrastructure projects approved after January 1, 2008, including solar and wind power projects, that satisfy certain requirements are entitled to a three-year full exemption from the enterprise income tax followed by a three-year 50% exemption commencing from the first year it generates operating income. In addition, wind power projects are entitled to a 50% refund of the value-added tax levied on their electricity sales.

 

224


Table of Contents

Brazil

The main incentives available to encourage the use of renewable energy in Brazil include: (i) tax benefits; (ii) discounted transmission and distribution tariffs; (iii) special public funding provided by the National Bank for Economic and Social Development, or the “NBESD;” and (iv) research and development investment.

Tax benefits. Renewable energy projects may benefit from an exemption of monthly federal income taxes and may also be eligible for the exemption of certain import taxes. For example, the purchase of items needed for the construction of the wind and solar plants are exempted from certain import and value added taxes. Hydro-electric power generators benefit from a special regime for the development of infrastructure, which reduces the Brazilian taxes levied on revenues to a rate of zero if a certain percentage of local product and construction materials are utilized.

Discount on transmission and distribution tariffs. Solar plants that start commercial operation prior to December 31, 2017 benefit from an 80% discount on transmission and distribution tariffs for the first ten years of operation and 50% thereafter. Wind and hydro-electric plants are also eligible for similar discounts.

Special public funding. Subject to certain limitations, the NBESD may finance up to 80% of all renewable energy project investments at reduced rates. Repayment of such loans may only commence once construction of the energy plant has finished and the plant is operative. The NBESD also provides special public funding for manufacturers willing to commence local productions of the supply chain in connection with the renewable energy industry.

Research and development Investment. All hydro-electric energy generators must invest at least 1% of their net revenue in research and development projects.

India

Solar power projects

In 2010, the Indian government launched its flagship solar initiative known as Jawaharlal Nehru National Solar Mission or the “National Solar Mission,” which will remain in operation until 2022. The National Solar Mission establishes a target of 20 GW of installed solar generation capacity by 2022 and stipulates the implementation and achievement of this target in three separate phases.

Phase I of the National Solar Mission focused on promoting the development of grid-connected solar power capacity of 1,000 MW and mandated that NVVN serve as the offtake counterparty to purchase the solar power under 25-year PPAs with solar power producers. NVVN is a wholly owned subsidiary of NTPC Limited, which is 75% owned by the Indian national government and owns and operates 41 GW of power plants located throughout India. NVVN purchases the solar power from a solar project as a trading licensee, thereby minimizing the credit risk to the solar project. The tariff levels for Phase I were determined based on a competitive bidding process subject to a cap determined by the CERC. In order to facilitate the resale of such solar power by NVVN, a “bundling” mechanism was utilized whereby, for each megawatt of installed solar power capacity, an equivalent amount of capacity in megawatts was allocated by the Ministry of Power from NTPC Limited’s coal-based stations, and such bundled power was then sold by NVVN to the state distribution utilities.

In 2013, the Indian government approved the scheme for the development of an additional 750 MW of grid-connected solar power capacity as part of Phase II of the National Solar Mission (2012–2017) and mandated that SECI serve as the offtake counterparty to purchase the solar power under 25-year PPAs with the solar power producers. Under Phase II, the power will be purchased by SECI at a fixed levelized tariff of INR 5.45/kWh, or

 

225


Table of Contents

INR 4.75/kWh in case of projects utilizing accelerated depreciation, for onward sale to state or distribution utilities at INR 5.50/kWh. The solar project is entitled to receive viability funding support in an amount determined through a competitive bidding process. Such payment is made to the solar energy project over a five-year period from the date such solar plant commences operations and is funded by India’s National Clean Energy Fund. The National Clean Energy Fund is financed through a tax of INR 100 per ton of domestic or imported coal used in India.

Various Indian states have implemented policies to promote the generation of solar power. For instance, the State of Gujarat exempts solar project developers from payment of electricity duty on the sale of electricity and payment of cross subsidy surcharges for sale to open access consumers. The State of Rajasthan also exempts the energy consumed by the solar project developer for own use from payment of the electricity duty.

Wind power projects

MNRE provides a generation based incentive implemented through the Indian Renewable Energy Development Agency Limited for grid connected wind power projects (excluding projects undertaking third-party sales) commissioned on or after April 1, 2012. This incentive is currently available until the end of the 12th plan period (2012—2017). Generation based incentives are limited to INR 0.50/kWh of electricity fed into the grid and are available for a maximum period of 10 years with a cap of INR 10 million per MW. The total disbursement in a year to eligible wind power producers cannot exceed one-fourth of the maximum limit of the incentive, i.e., INR 2.5 million per MW during the first four years. Generation based incentives are in addition to the tariff approved by SERCs and available only if the benefit of accelerated depreciation is not utilized by the wind power project.

In addition, state specific policies also provide for various incentives, such as exemption in payment of electricity duty, reduction of VAT, providing land at concessional lease rentals, and reduced wheeling and transmission charges. Additionally, an excise duty exemption is also available on wind operated electricity generators and concessional custom duty is applicable on import of specified components of wind turbines, subject to fulfillment of prescribed conditions.

All renewable energy projects

India’s National Tariff Policy 2006 requires the SERCs to fix a minimum percentage of the electricity that must be purchased by utilities operating in their jurisdiction from renewable energy generators (such as solar projects), taking into account availability of such resources in the region and its impact on retail tariffs and procurement by distribution companies at preferential tariffs. This obligation to purchase electricity from renewable sources is known as a renewable purchase obligation, or “RPO.” This policy was amended in January 2011 to prescribe a minimum solar specific RPO of 0.25% in 2012 to be increased to 3% by 2022. States such as Gujarat, Chattishgarh, Haryana, Madhya Pradesh, Bihar and Goa have fixed solar power RPO requirements at levels above the minimum level prescribed by the National Tariff Policy 2006. The RPO percentage for wind power projects varies from approximately 0.5% to 11.0%, depending on the local renewable resources and the electricity distributed in those states.

In 2010, the CERC implemented regulations designed to facilitate the development of a power market from nonconventional energy sources by issuing transferable and saleable credit certificates. These regulations facilitate fungibility and inter-state transactions of renewable energy by establishing a mechanism through which a market-based instrument can be traded freely and provide a means for fulfilment of renewable purchase obligations by India’s utilities and open access consumers. Although these regulations established the necessary framework, the market for such renewable energy credits has not developed widely and is not liquid. None of our Indian projects is participating in the renewable energy credit certificate programs at this time.

 

226


Table of Contents

The Indian government’s focus on promoting infrastructure development also extends to tax policy, which allows solar power generation companies to claim an exemption from the payment of income tax for up to 10 years within the first 15 years of a project’s operations. However, a minimum alternative tax (generally at approximately 20%) calculated based on book profits is still applicable in respect of such projects. Accelerated tax depreciation is also available to solar and wind power generating companies.

South Africa

In August 2011, South Africa’s Department of Energy, or “SA DOE,” launched the REIPPP program, which requires renewable energy developers to bid on a tariff level and the identified socio-economic development objectives of the SA DOE. The REIPPP program contemplates a total of 6,925 MW will be subject to bidding, which are split into multiple bidding rounds and includes seven renewable energy technologies with a volume of MW attached to each technology. In the first three rounds of REIPPP program, the SA DOE has selected a total of 64 renewable energy projects following three bidding rounds, of which 33 were solar projects and 22 were wind projects. Collectively, these projects represent a combined generating capacity of approximately 3,912 MW, of which approximately 1,482 MW related to solar projects and 1,994 MW related to wind projects.

Each bid is evaluated under the REIPPP program based 70% on amount of the proposed tariff and 30% on the specified economic development criteria, including employment, local content and management control, ownership characteristics, socio-economic spending and smaller enterprise development initiatives. The amount of the feed-in tariff for the particular project is determined based on the bidding process. Each winning bidder under the REIPPP program will:

 

 

enter into a 20-year PPA with Eskom that creates an obligation for Eskom to pay the renewable energy project the agreed tariff for power provided by the project; and

 

 

enter into a 20-year Implementation Agreement with the SA DOE that creates an obligation for the renewable energy project to satisfy its identified economic development objectives.

Under the REIPPP program, the South African government guarantees the payment obligations of Eskom under the PPAs with renewable energy producers in defined circumstances. This guarantee arrangement, along with the support package adopted by the National Treasury on September 14, 2014, has facilitated private sector development as financing sources and investors have been willing to accept sovereign country risk in light of South Africa’s relatively strong international credit standing without requiring political risk insurance, as would be the case in virtually every other African jurisdiction. Based on the sovereign guarantee and support package, we believe that Eskom will be a low risk offtake purchaser with a similar credit profile to our other customers.

Honduras

Individuals or entities that develop and operate renewable energy projects in Honduras will benefit from the following tax incentives: (i) sales tax for the purchase of equipment, materials and services destined or directly related to the necessary infrastructure for the generation of energy with renewable resources; (ii) taxes, fees, tariffs and import duties; (iii) income tax holiday for ten years; and (vi) income tax withholding for payments of services or professional fees of foreign individuals or legal entities for the performance of studies, development, installation, engineering, administration and construction, and monitoring of the energy renewable project.

 

227


Table of Contents

Costa Rica

Pursuant to Article 17 of the “Law to Authorize Private Large-Scale Electricity Generation,” Costa Rica provides renewable energy power generators tax benefits to offset the higher commercial costs associated with renewable energy generation, including custom duties on machinery and equipment for the generation, control, transformation and transmission of power. Renewable energy power producers with renewable energy are also allowed to deduct losses obtained during one tax year within the following three years.

Peru

Similar to the other jurisdictions in which our projects are located, Peru provides renewable energy power generators pricing incentives and tax benefits to offset the higher commercial costs associated with renewable energy generation. Under a number of decrees, Peru adopted a renewable energy auction scheme to provide energy generators with guaranteed payment under long-term PPAs. Under the auction scheme, 20 year PPAs are awarded to renewable energy producers that offer the lowest tariff per kWh for a given technology. The energy producer is to be paid regular monthly rates for the energy produced, according to short term marginal costs paid to all generators in the National Electric Interconnected System. The additional premium over the regular tariff is to be passed on to end-users, incurred in regular connection tolls, which are established annually. The calculated premium at the end of each tariff period will result in a charge in favor of or against the investor, which will be paid in monthly installments throughout the 12 months immediately following the annual liquidation period. Such liquidation will be subject to a 12% monthly interest rate in favor if the investor.

Renewable energy power producers also benefit from accelerated depreciation under Peruvian income tax laws. The special depreciation rate will be no more that 20% per year, which means that the assets can be depreciated in five years. These power producers also may opt for the anticipated recovery of the value added tax, a special tax regime which provides for the return of the value-added tax imposed on the importation and/or local acquisition of intermediate goods, capital assets and construction contracts and services carried out in the pre-commercial operations stage of the renewable energy projects.

Uruguay

The Uruguayan government has declared the promotion and protection of domestic and international investments in renewable energy a national interest. The Investment Act promotes, among other things, power generation from renewable energy sources and the conversion to more energy efficient equipment.

Renewable energy producers are eligible for various tax exemptions, among other benefits, if the energy producer’s revenues generated from eligible activities exceed 75% of such producer’s total income or such energy producer sells electric power in eligible market of forward contracts.

Malaysia

Malaysia’s renewable energy program introduced feed-in tariffs for various renewable energy sources. In order to be entitled to sell renewable energy under the program at the relevant feed-in tariff rate, an application for a feed-in tariff approval has to be made to and be granted by SEDA, the statutory body responsible for managing the implementation of the feed-in tariff mechanism. Any company incorporated in Malaysia may apply for a feed-in tariff approval so long as no foreign person holds, directly or indirectly, more than 49% of voting power or the issued share capital of such company and the company is not an offtake counterparty or its associate.

Upon being issued the feed-in tariff approval, the solar project will, within such period as may be prescribed by SEDA, enter into a PPA with an offtake counterparty, which may be a Malaysian utility or an industrial or

 

228


Table of Contents

commercial user of distributed generation. Under the terms of the PPA, the project sells and delivers the renewable energy generated to the offtake counterparty at a contracted tariff for a fixed number of years (unless otherwise terminated earlier), the duration of which is dictated by the type of renewable energy used for power generation under which the feed-in tariff approval is granted. For solar power generation, the duration is 21 years commencing from the feed-in tariff commencement date. The PPA provides for the payment of a feed-in tariff rate. The feed-in tariff rate is subject to adjustment if SEDA determines that the project has achieved cost parity (i.e., when the feed-in tariff rate is equal to or less than the displaced costs), at which point, the producer is paid a tariff based on the prevailing displaced cost for the remaining duration of the PPA.

Under this arrangement, the offtake counterparty pays the renewable energy generator the feed-in tariff rate for power that is purchased under the PPA and is subsequently reimbursed by Malaysia’s renewable energy fund for the amount such feed-in tariff exceeds the prevailing “displaced costs” of such power. The “displaced cost” measure is established under the REA and is generally equal to the cost a traditional utility would incur to generate an equal amount of power. The subsidized portion of the feed-in tariff is typically well more than half of the total feed-in tariff.

In order to provide funding for the feed-in tariff program for renewable energy, the Malaysian government has stipulated that electricity consumers must contribute a surcharge of a certain percentage (currently 1.6%) of each of their total electricity bill towards the financing of the cost to implement Malaysia’s renewable energy program. The funds collected nationally are deposited into a renewable energy fund that is managed and controlled by SEDA. This fund is further supported by annual national budget contributions as and when required.

In addition to the feed-in tariff program, the Malaysian government has also launched various programs to promote the application and development of green technology in Malaysia. In 2010, a financing program was established to accelerate the expansion of green investments by providing easier access to financing from private and commercial financial institutions. This financing program offers a 60% guarantee of the financing amount and a rebate of 2% on the interest or profit rate charged by the financial institutions. Under this program, funding will be provided for any project that satisfies the requirements for private finance initiatives and meets the green technology project criteria. This financing program is available until December 31, 2015 or upon reaching a total financing approval amount of MYR 3.5 billion, whichever is earlier.

Renewable energy producers are also entitled to apply for tax incentives, such as the investment tax allowance of a certain percentage of qualifying capital expenditures incurred within a period of five years, which can be set-off against 100% of statutory income for each year of assessment. The investment tax allowance is open for applications until December 31, 2015.

Thailand

Solar and wind power projects in Thailand are eligible for promotion (grant of rights, incentives and guarantees) under the Investment Promotion Act (1977). Pursuant to promotion policies announced by the Board of Investment, solar and wind power projects are eligible for tax and non-tax incentives. The tax incentives provide for: (i) an eight-year corporate income tax exemption, accounting for 100% of investment (excluding cost of land and working capital); (ii) an exemption of income tax on dividends during the income tax “holiday”; and (iii) an exemption of import duty on machinery. The non-tax incentives include: (i) the right for foreigners to obtain work permits; (ii) the right of majority-owned Board of Investment promoted projects to own land associated with the project; (iii) the right to remit foreign currency; and (iv) a policy of the government not to pursue nationalization as a form of redress.

 

229


Table of Contents

Specific incentives for solar power projects

In 2009, tariff “adders” were approved for certain categories of alternative energy, including solar projects at a rate of THB 8.00/kWh for ten years from the date of COD of a project. In 2010, both the EGAT and the PEA suspended the acceptance of applications for solar projects due to various considerations, including the number of applications previously submitted, time required to process pending applications and intent to adopt a feed-in tariff system. In July 2010, an adder of THB 8.00/kWh was confirmed for PPAs which had been signed, and an adder of THB 6.50/kWh for projects under review. During the following four years, 284 solar projects under the adder tariff achieved COD, with a total selling capacity of 1,084 MW. There are currently 178 proposed projects awaiting approval for PPAs, subject to confirmation of land rights and transmission line access.

In July 2013, the National Energy Policy Commission approved feed-in tariff rates for solar projects in Thailand. In 2014, two feed-in tariff policies for solar projects were prescribed by the Energy Regulatory Commission:

 

 

For pending PPA applications under the original adder system for both SPPs and VSPPs, a tariff of THB 5.66/kWh for a period of 25 years; and

 

 

For solar PV rooftop projects, a tariff of THB 6.85/kWh for a period of 25 years.

On March 6, 2015, the Energy Regulatory Commission issued a new regulation applicable to projects which are not more than 5 MW and are specifically for government sectors or agricultural cooperatives. A feed-in tariff of THB 5.66/kWh is prescribed for a period of 25 years.

Except for the above described categories, no applications for solar projects in Thailand are currently being accepted. Before any new applications for SPP and VSPP solar projects are accepted, we expect new rules to be announced on the terms and conditions of the feed-in tariff program.

Specific incentives for wind power projects

In August 2009 and January 2010, tariff adders were approved for certain categories of alternative energy, including wind projects, at a rate of THB 4.50/kWh (for projects with total generation capacity less than or equal to 50 kW) and THB 3.50/kWh (for projects with total generation capacity of more than 50 kW) for ten years from the COD of a project. A special adder for the three southernmost provinces of Thailand (Yala, Pattani and Narathiwat) of THB 1.50 was also prescribed.

In March 2011 and April 2011, a special adder of THB 1.50 was issued for four districts in Songkla Province (Jana, Thepa, Nathawi and Saba Yoi).

Nicaragua

According to Law No. 532, the projects categorized and authorized by Ministry of Energy and the Mines as Renewable Energy Generation Projects receive tax and duties exemptions including, (i) custom duties, on machinery, equipment, materials and inputs to be used exclusively in pre-investment activities and constructions works including the construction of the transmission line to transport the energy from the project site National Grid, (ii) value added tax on the machinery, equipment, materials and inputs object of pre-investment and construction activities including the construction of the transmission line, (iii) income tax and definitive minimum payment over the income tax for a period of seven years since the commencement of commercial operation date of the project (iv) municipal taxes over immovable assets, sales, municipal rights during the construction phase of the project for ten years since commencement of commercial operation date of the project; (v) exemption of all taxes regarding the exploitation of the natural resources for five years after the commencement of commercial operation date of the project, and (vi) exoneration of stamp taxes required for the construction or operation of the project for an extension of ten years.

 

230


Table of Contents

Legal proceedings

Except as set forth below, we are not currently a party to any material legal proceedings other than legal proceedings arising in the ordinary course of our business. In the future, we may be party to other various legal proceedings, including administrative and regulatory proceedings, arising in the ordinary course of our business. Although it is not possible to predict the substance or outcome of any of such proceedings, we do not have reason to believe such matters, individually and in the aggregate, will have a material adverse effect on our business, financial condition or results of operations.

Our GUVNL portfolio, which is comprised of the Indian projects SE 25, Azure, ESP Urja and Millenium, is subject to pending litigation with the offtaker, GUVNL. GUVNL seeks the reduction of tariffs set forth in the respective PPAs. The case was instituted by GUVNL against all of the developers, including us, that originally signed PPAs with GUVNL. We prevailed at the first level and the appeal was dismissed at appellate level, and GUVNL has now appealed to the Supreme Court of India. In addition, three of our projects in the GUVNL portfolio (Azure, ESP Urja and Millenium), are subject to pending litigation with GUVNL with respect to certain claims by GUVNL that there had been a change in shareholder structure of the projects after the PPAs were executed. GUVNL claims that such violation of the PPA terms entitles it to terminate the PPAs. The cases are currently pending in front of the Supreme Court of India after the project companies prevailed at the first level and the appeal was dismissed at the appellate level. While we believe we have valid defenses that will succeed on the merits, the outcome of our legal proceedings is difficult to predict and an adverse judgment could have a material adverse impact on our results of operations. See “Risk factors—Risks related to our international operations—We are subject to claims in the ordinary course of business.”

 

231


Table of Contents

Management

We have set forth below a list of names, ages (as of June 1, 2015) and a brief account of the business experience of persons who have been or will be appointed to serve as our executive officers, other key officers and directors prior to the completion of this offering. Each of our executive officers is elected by and serve at the discretion of our Board of Directors until his or her successor is duly elected and qualified. Each of our initial directors will be appointed by our Sponsor and serve annual terms at the discretion of our stockholders until duly removed or his or her successor is duly elected and qualified.

 

Name    Age      Position

Ahmad Chatila

     48       Director and Chairman

Carlos Domenech Zornoza

     45       Director and Chief Executive Officer

Jeremy Avenier

     39       Chief Financial Officer

Ismael Guerrero Arias

     40       President, Head of Origination

Yana Kravtsova

     38       Senior Vice President, General Counsel and Secretary

Martin Truong

     38       Director

Brian Wuebbels

     43       Director

 

Ahmad Chatila, Director and Chairman

Ahmad Chatila serves as Chairman of our board of directors. Mr. Chatila serves as the President, Chief Executive Officer and as a member of the board of directors for SunEdison, positions he has held since March 2009. Prior to SunEdison, Mr. Chatila served as Executive Vice President of the Memory and Imaging Division, and head of global manufacturing for Cypress Semiconductor. Previously, Mr. Chatila served as managing director of Cypress’ Low Power Memory Business Unit. Prior to these roles at Cypress, Mr. Chatila served in sales at Taiwan Semiconductor Manufacturing Co. We believe Mr. Chatila’s extensive leadership experience enables him to play a key role in all matters involving our board of directors and contribute an additional perspective from the energy industry.

Carlos Domenech Zornoza, Director and Chief Executive Officer

Carlos Domenech Zornoza has served as our Chief Executive Officer since February 2015 and as a director since our formation in September 2014. Mr. Domenech also currently serves as the Chief Executive Officer and as a director of TerraForm Power. Prior to that, Mr. Domenech had been with SunEdison for seven years, having most recently served as the Executive Vice President & President of SunEdison Capital from March 2013 to January 2014. After the acquisition of SunEdison by MEMC Electronic Materials, Inc. in November 2009, Mr. Domenech served as the Executive Vice President & President of SunEdison. Before that, Mr. Domenech served as the Chief Financial Officer of SunEdison beginning in September 2007 until he became its Chief Operating Officer in November 2008. Prior to joining SunEdison, Mr. Domenech spent 14 years with General Electric, where he served in a variety of leadership roles, including serving as the Chief Financial Officer of Universal Pictures International Entertainment, then a division of General Electric. We believe Mr. Domenech’s extensive energy industry and leadership experience will enable him to provide essential guidance to our board of directors.

Jeremy Avenier, Chief Financial Officer

Jeremy Avenier has served as our Chief Financial Officer since our formation in September 2014. Mr. Avenier has served as the Chief Financial Officer, Solar Materials of SunEdison since April 16, 2013. Prior to joining SunEdison, Mr. Avenier spent 13 years with General Electric in multiple financial leadership roles across both industrial and capital platforms throughout Europe and the United States. Most recently, Mr. Avenier served as Vice President of Global Finance, Treasurer and Chief Financial Officer of Morpho Detection, a joint venture between General Electric and Safran.

 

232


Table of Contents

Ismael Guerrero Arias, President, Head of Origination

Ismael Guerrero has served as our President, Head of Origination since February 2015. Prior to joining SunEdison, Mr. Guerrero served as Vice President of Global Projects for Canadian Solar since 2010 and led the projects team on development, EPC and projects sales activities. Prior to that, Mr. Guerrero was Director of Operations for Asia at the Global Sustainable Fund based in Shanghai and before that Chief Executive Officer of DCWafers, a wafers manufacturer and project development company in Europe.

Yana Kravtsova, Senior Vice President, General Counsel and Secretary

Yana Kravtsova has served as our Senior Vice President, General Counsel and Secretary since February 2015. Prior to joining SunEdison, Ms. Kravtsova served as Legal Head of Renewable Energy Investments at Google Inc. from August 2011 to January 2015. Prior to that, Ms. Kravtsova was a Legal Vice President at First Wind since March 2010, focusing on the development, construction and financing of wind power projects. Prior to becoming an in-house counsel, Ms. Kravtsova was an attorney at Clifford Chance U.S. LLP, Latham & Watkins LLP and The World Bank Group, handling international project finance, regulatory and corporate matters for energy projects.

Martin Truong, Director

Martin Truong is a member of our board of directors. Mr. Truong has served as SunEdison’s Vice President, General Counsel and Secretary since April of 2013 and was promoted to Senior Vice President in May of 2014. Mr. Truong is also a Director of TerraForm Power. Mr. Truong joined SunEdison in February 2008 and has held various roles of increasing responsibility, most recently serving as SunEdison’s Assistant General Counsel with legal responsibilities for Emerging Markets, Solar Materials and intellectual property licensing and monetization. Mr. Truong’s extensive energy industry and leadership experience enables him to provide valuable guidance to our board of directors.

Brian Wuebbels, Director

Brian Wuebbels is a member of our board of directors. Mr. Wuebbels serves as the Executive Vice President and Chief Financial Officer of SunEdison, positions he has held since May 2012. Mr. Wuebbels is also a Director of TerraForm Power. Mr. Wuebbels has been with SunEdison/MEMC Electronic Materials, Inc. since 2007 and previously held various positions, including Vice President and General Manager—Balance of System Products, Vice President, Solar Wafer Manufacturing, Vice President of Financial Planning and Analysis and Vice President Operations Finance. Before joining MEMC, Mr. Wuebbels served as Vice President and Chief Financial Officer of Honeywell’s Sensing and Controls Business. Prior to that, Mr. Wuebbels spent 10 years at General Electric in various senior finance and operations roles across multiple businesses around the world. We believe Mr. Wuebbels’ extensive leadership and financial expertise enables him to contribute significant managerial, strategic and financial oversight skills to our board of directors.

Controlled company

For purposes of the applicable stock exchange rules, we expect to be a “controlled company.” Controlled companies under those rules are companies of which more than 50% of the voting power for the election of directors is held by an individual, a group or another company. Our Sponsor will continue to control more than 50% of the combined voting power of our common stock upon completion of this offering and, as a result, will have the right to designate a majority of the members of our board of directors for nomination for election and

 

233


Table of Contents

the voting power to elect such directors. Accordingly, we expect to be eligible to, and we intend to, take advantage of certain exemptions from corporate governance requirements provided in the applicable stock exchange rules. Specifically, as a controlled company, we would not be required to have (i) a majority of independent directors, (ii) a nominating and corporate governance committee composed entirely of independent directors, (iii) a compensation committee composed entirely of independent directors nor (iv) an annual performance evaluation of the nominating and corporate governance and compensation committee. We intend to rely on the exceptions with respect to having a majority of independent directors, establishing a compensation committee or nominating committee and annual performance evaluations of such committees. Accordingly, you will not have the same protections afforded to stockholders of companies that are subject to all of the applicable stock exchange rules. The controlled company exemption does not modify the independence requirements for the audit committee, and we intend to comply with the requirements of the Sarbanes-Oxley Act and the applicable NASDAQ Global Select Market rules, which require that our audit committee be composed of at least three members, one of whom will be independent upon the listing of our Class A common stock on the NASDAQ Global Select Market, a majority of whom will be independent within 90 days of the date of this prospectus, and each of whom will be independent within one year of the date of this prospectus. In addition, following this offering, we will have a Corporate Governance and Conflicts Committee comprised of independent directors.

Board composition

Upon the completion of this offering, our board of directors will consist of      members. We plan to appoint              additional directors prior to or in connection with the completion of this offering. We are currently in the process of identifying such additional directors and intend to name such directors in an amendment to the registration statement of which this prospectus is a part.

Our board of directors will be responsible for, among other things, overseeing the conduct of our business, reviewing and, where appropriate, approving our long-term strategic, financial and organizational goals and plans, and reviewing the performance of our chief executive officer and other members of senior management. Following the end of each year, our board of directors will conduct an annual self-evaluation, which includes a review of any areas in which the board of directors or management believes the board of directors can make a better contribution to our corporate governance, as well as a review of the committee structure and an assessment of the board of directors’ compliance with corporate governance principles. In fulfilling the board of directors’ responsibilities, directors have full access to our management and independent advisors.

Our board of directors, as a whole and through its committees, will have responsibility for the oversight of risk management. Our senior management is responsible for assessing and managing our risks on a day-to-day basis. Our audit committee will oversee and review with management our policies with respect to risk assessment and risk management and our significant financial risk exposures and the actions management has taken to limit, monitor or control such exposures. Our board of directors oversees risk related to compensation policies. Our audit committee will report to the full board of directors with respect to these matters, among others.

Committees of the board of directors

We expect that, immediately following this offering, the standing committees of our board of directors will consist of an Audit Committee and a Corporate Governance and Conflicts Committee. Each of the committees will report to the board of directors as they deem appropriate and as the board may request. The expected composition, duties and responsibilities of these committees are summarized below. As a controlled company, we are not required to establish a compensation or nominating committee under the listing rules of the NASDAQ Global Select Market, and we do not intend to establish such committees in connection with the completion of this offering.

 

234


Table of Contents

Audit Committee

The Audit Committee will be responsible for, among other matters: (i) appointing, retaining and evaluating our independent registered public accounting firm and approving all services to be performed by it; (ii) overseeing our independent registered public accounting firm’s qualifications, independence and performance; (iii) overseeing the financial reporting process and discussing with management and our independent registered public accounting firm the interim and annual financial statements that we file with the SEC; (iv) reviewing and monitoring our accounting principles, accounting policies, financial and accounting controls and compliance with legal and regulatory requirements; and (vi) establishing procedures for the confidential anonymous submission of concerns regarding questionable accounting, internal controls or auditing matters.

Immediately following this offering, our Audit Committee will consist of             ,              and             . We believe that             ,              and              qualify as independent directors according to the rules and regulations of the SEC and the NASDAQ Global Select Market with respect to audit committee membership. We also believe that Mr.              qualifies as our “audit committee financial expert,” as such term is defined in Item 401(h) of Regulation S-K. Our board of directors will adopt a written charter for the Audit Committee in connection with this offering, which will be available on our corporate website upon the completion of this offering. The information on our website is not part of this prospectus.

Corporate Governance and Conflicts Committee

Our Corporate Governance and Conflicts Committee will be responsible for, among other matters: (i) overseeing the organization of our board of directors to discharge the board’s duties and responsibilities properly and efficiently; (ii) review the succession plan of our Chief Executive Officer and other senior management; (iii) developing and recommending to our board of directors a set of corporate governance guidelines and principles applicable to us; and (iv) reviewing and approving proposed conflicted transactions between us and an affiliated party (including prior approval with respect to the purchase and sale of certain Call Right Projects, certain SunEdison ROFO Projects and any other material transaction between us and our Sponsor).

Immediately following this offering, our Corporate Governance and Conflicts Committee will consist of             , and             . We believe             ,              and              qualify as independent directors according to the rules and regulations of the SEC and the NASDAQ Global Select Market. Our board of directors will adopt a written charter for the Corporate Governance and Conflicts Committee in connection with this offering, which will be available on our corporate website upon the completion of this offering. The information on our website is not part of this prospectus.

Other committees

Our board of directors may establish other committees as it deems necessary or appropriate from time to time.

Family relationships

There are no family relationships among any of our executive officers.

 

235


Table of Contents

Code of Conduct

Prior to completion of this offering, our board of directors will adopt a Code of Conduct that applies to all of our employees, including our chief executive officer, chief financial officer and principal accounting officer. Our Code of Conduct is available on our website. If we amend or grant a waiver of one or more of the provisions of our Code of Conduct, we intend to satisfy the requirements under Item 5.05 of Form 8-K under the Securities Exchange Act of 1934, as amended, or the “Exchange Act,” regarding the disclosure of amendments to or waivers from provisions of our Code of Conduct that apply to our principal executive officer, financial and accounting officers by posting the required information on our website. Our website is not part of or incorporated into this prospectus.

 

236


Table of Contents

Executive officer compensation

Compensation of our executive officers

We are a newly formed subsidiary of SunEdison consisting of portions of various parts of SunEdison’s business that are being contributed to us in connection with this offering. We have not incurred any cost or liability with respect to compensation of our executive officers prior to our formation. We do not and will not directly employ any of the persons responsible for managing our business, and we currently do not have a compensation committee.

Our officers will manage the day-to-day affairs of our business. Each of our executive officers is an employee of SunEdison. However, many of our executive officers will be dedicated to the operations and management of our business, provided that certain of our executive officers, including our Chief Executive Officer, will also serve as executives of TerraForm Power, our affiliate.

Because our executive officers will remain employees of SunEdison, their compensation will be determined and paid by SunEdison. The ultimate responsibility and authority for compensation-related decisions for our executive officers will reside with the SunEdison compensation committee or the chief executive officer of SunEdison, as applicable, and any such compensation decisions will not be subject to any approvals by our board of directors or any committees thereof. Our executive officers, as well as other employees of SunEdison who provide services to us, may participate in employee benefit plans and arrangements sponsored by SunEdison, including plans that may be established in the future. In addition, certain of our officers and certain employees of SunEdison who provide services to us currently hold grants under SunEdison’s and TerraForm Power’s equity incentive plans and will retain these grants after the completion of this offering. We will not reimburse SunEdison for compensation related expenses attributable to any executive’s or employee’s time dedicated to providing services to us. For details on the amounts we will pay SunEdison following this offering for management services, see “Certain relationships and related party transactions—Management Services Agreement.”

Except as set forth below, we do not currently expect to have any long-term incentive or equity compensation plan in which our executive officers may participate.

Equity incentive awards

Certain of our executive officers have been granted equity incentive awards under the 2014 Incentive Plan in the form of restricted shares. The restricted shares will convert into shares of Class A common stock upon the filing of our amended and restated certification of incorporation in connection with the completion of this offering. The table below sets forth the economic interest that each executive officer will hold in Global LLC following the conversion of the restricted shares into Class A common stock, as well as the number of shares of Class A common stock that each executive will hold upon such conversion, based upon an assumed initial public offering price of $             per share, the midpoint of the price range set forth on the cover page of this prospectus, after deducting underwriting discounts and commissions, the structuring fee and offering expenses payable by us. The number of shares of Class A common stock will be proportionally increased in the event we increase the number of shares being offered hereby and do not use such net proceeds therefrom to repurchase Class B units (and shares of Class B common stock).

 

Name    Economic interest in
Global LLC (%)
     Number of shares of
Class A common stock

Carlos Domenech Zornoza

     0.750%      

Jeremy Avenier

     0.300%      

Ismael Guerrero Arias

     0.375%      

Yana Kravtsova

     0.200%      
  

 

 

Total

     1.625%      

 

 

237


Table of Contents

For each executive, the restricted stock will vest in four equal annual installments commencing on the first anniversary of the completion of this offering, subject to accelerated vesting upon certain events. Under certain circumstances upon a termination of employment, any unvested shares of Class A common stock held by the terminated executive will be forfeited.

IPO Grants

Prior to the completion of this offering, we expect our board of directors to approve a grant of restricted stock units to several persons who have provided or are expected to provide services to us. Although the specific terms of these grants have not been finalized, we expect that these grants will consist of approximately                  restricted shares and                  restricted stock units, or “RSUs,” which are expected to vest in four equal annual installments commencing on the first anniversary of this offering. The RSUs will not entitle the holders to voting rights with respect to matters presented to our stockholders, and holders of the RSUs will not have any right to receive dividends.

TerraForm Global, Inc. 2014 Long-Term Incentive Plan

The 2014 Incentive Plan became effective as of September 29, 2014. The material terms of the 2014 Incentive Plan are summarized below. Certain awards which have been made, or we expect will be made prior to the completion of this offering, under the 2014 Incentive Plan are summarized above.

The purpose of the 2014 Incentive Plan is to enhance the profitability and value of our company for the benefit of our stockholders by enabling us to offer eligible individuals cash and stock-based incentives in order to attract, retain and reward such individuals and strengthen the mutuality of interests between such individuals and our stockholders. Eligibility to participate in the 2014 Incentive Plan is limited to our and our affiliates’ employees (including officers and directors who are employees) and consultants who are designated by our board or a committee of our board which is authorized to administer the plan, in its discretion, as eligible to receive awards under the 2014 Incentive Plan. The 2014 Incentive Plan provides for the grant of non-qualified stock options, incentive stock options (within the meaning of Section 422 of the Code), stock appreciation rights, restricted stock, performance shares, restricted stock units or any other cash or stock based award. The material terms of the 2014 Incentive Plan are as follows:

 

 

Shares subject to the plan.    The maximum aggregate number of shares that may be issued under the 2014 Incentive Plan shall not exceed a number of shares of common stock that represent an aggregate 10% economic interest in Global LLC, or              shares, based on the assumptions set forth in “Summary—The offering—Certain assumptions,” subject to certain adjustments to prevent dilution, of which shares remain available for future issuances. This limitation does not apply to any awards settled in cash. To the extent any stock option or other stock-based award granted under the 2014 Incentive Plan is forfeited, cancelled, terminated, expires or lapses without having been exercised or paid in full, the shares subject to such awards will become available for future grant or sale under the 2014 Incentive Plan; provided that the following shares shall not become available for future grants: (i) shares not issued or delivered as a result of the net settlement of an outstanding stock appreciation right or stock option; (ii) shares used to pay the exercise price or withholding taxes related to an outstanding stock option or stock appreciation right; or (iii) shares repurchased on the open market with the proceeds of a stock option exercise price. The restricted stock issued, subject to outstanding awards or reserved under the 2014 Incentive Plan, will convert at the time of our initial public offering into shares of Class A common stock. As used herein and in the 2014 Incentive Plan, references to “common stock” mean, prior to the completion of this offering, our restricted stock and, following the completion of this offering, our Class A common stock.

 

 

Award limitations.    During the course of any fiscal year, the maximum number of shares subject to any award of stock options, stock appreciation rights, shares of restricted stock or other stock-based awards for

 

238


Table of Contents
 

which the grant of such award or the lapse of the relevant restricted period is subject to the attainment of performance goals, in each case, granted to any participant, shall not exceed 50% of the total share reserve under the 2014 Incentive Plan, provided that the maximum number of shares for all types of awards granted to any participant shall not exceed 50% of the share reserve during any fiscal year. The value of a cash payment to an individual made under an award with respect to a fiscal year shall not exceed $10,000,000.

 

 

Plan administration.    The 2014 Incentive Plan provides that the plan will be administered by the “Committee,” which is defined to include a committee of the directors appointed by the board of directors or, in the absence of such appointment, our board of directors. Our board of directors and/or the Committee has the authority to amend and modify the plan, subject to any shareholder approval required by law or exchange rules. Subject to the terms of our 2014 Incentive Plan, the Committee has the authority to determine the terms, conditions and restrictions, including vesting terms, the number of shares of common stock subject to an award and the performance measures applicable to awards granted under the 2014 Incentive Plan, amend any outstanding awards and construe and interpret the 2014 Incentive Plan and the awards granted thereunder. The Committee also has the ability to delegate its authority to grant awards and/or to execute agreements or other documents on behalf of the board of directors to one or more of our officers (to the extent permitted by applicable law and applicable exchange rules).

 

 

Stock options and stock appreciation rights.    The Committee may grant incentive stock options, non-qualified stock options and stock appreciation rights under our 2014 Incentive Plan, provided that incentive stock options can only be granted to eligible employees. Generally, the exercise price of stock options and stock appreciation rights will be fixed by the Committee and set forth in the award agreement, but in no event will the exercise price be less than 100% of the grant date fair market value of shares of our common stock. The term of a stock option or stock appreciation right may not exceed ten years; provided, however, that an incentive stock option held by an employee who owns more than 10% of all of our classes of stock, or of certain of our affiliates, may not have a term in excess of five years and must have an exercise price of at least 110% of the grant date fair market value of shares of our common stock. Upon a participant’s termination of service for any reason other than cause, death or disability, the participant may exercise his or her option during the time period ending on the earlier of three months after such termination date or the term of the option. Upon a participant’s termination of service for death or disability, the participant (or his or her estate as applicable) may exercise his or her option during the time period ending on the earlier of 12 months after such termination date or the term of option. If a participant is terminated for cause, then all outstanding options (whether or not vested) shall immediately terminate and cease to be exercisable. Subject to the provisions of our 2014 Incentive Plan, the Committee will determine the remaining terms of the stock options and stock appreciation rights.

 

 

Restricted stock and restricted stock units.    The Committee will decide at the time of grant whether an award will be in restricted stock or restricted stock units. The Committee will also determine the number of shares subject to the award, vesting and the nature of any performance targets. Subject to the terms of the award agreement, (i) recipients of restricted stock will have voting rights and will be entitled to receive dividends with respect to their respective shares of restricted stock and (ii) the recipients of restricted stock units will have no voting rights or rights to receive dividends with respect to their respective restricted stock units. The award agreements with respect to the restricted stock granted to our executive officers as described above include voting and dividend rights.

 

 

Performance-based awards .    The Committee will determine the value of any performance-based award, the vesting and nature of the performance measures and whether the performance award is denominated or settled in cash, in common stock or in a combination of both. The performance goals applicable to a particular award will be determined by the Committee in writing prior to the beginning of the applicable performance period or at such later date as permitted under Section 162(m) of the Code and while the

 

239


Table of Contents
 

outcome of the performance goals are substantially uncertain. The performance goals will be objective and will include one or more of the following company-wide, parent, affiliate, subsidiary, division, business unit, corporate group or individual measures: revenue or revenue growth, diversity, economic value added, index comparisons, earnings or net income (before or after taxes), operating margin, peer company comparisons, productivity, profit margin, return on revenue, return on investment, return on capital, sales growth, return on assets, stock price, earnings per share, cash flow, free cash flow, working capital levels, working capital as a percentage of sales, days sales outstanding, months on hand, days payables outstanding, production levels or services levels, market share, costs, debt to equity ratio, net revenue or net revenue growth, gross revenue, base-business net sales, total segment profit, EBITDA, adjusted diluted earnings per share, earnings per share, gross profit, gross profit growth, adjusted gross profit, net profit margin, operating profit margin, adjusted operating profit, earnings or earnings per share before income tax (profit before taxes), net earnings or net earnings per share (profit after tax), compound annual growth in earnings per share, pretax income, expenses, capitalization, liquidity, results of customer satisfaction surveys, quality, safety, cost management, process improvement, inventory, total or net operating asset turnover, operating income, total shareholder return, compound shareholder return, return on equity, return on invested capital, pretax and pre-interest expense return on average invested capital, which may be expressed on a current value basis, or sales growth, marketing, operating or workplan goals. The applicable award agreement may provide for acceleration or adjustments to the performance targets.

 

 

Vesting.    Subject to the limitations set forth in the 2014 Incentive Plan, the Committee will determine the vesting terms (including any performance targets) governing each award at the time of the grant.

 

 

Transferability of awards.    Except as otherwise permitted by the Committee or the 2014 Incentive Plan, the 2014 Incentive Plan does not allow awards to be transferred; provided, however, that (i) certain awards may be transferable by will or by the laws of descent and distribution; (ii) the Committee may determine, in its sole discretion, at the time of grant or thereafter that a non-qualified stock option that is otherwise not transferable is transferable to a family member in whole or in part and in such circumstances, and under such conditions, as specified by the Committee; and (iii) shares subject to awards made pursuant to other stock-based or cash-based awards may not be transferred prior to the date on which the shares are issued, or, if later, the date on which any applicable restriction, performance or deferral period lapses.

 

 

Adjustment for changes in capitalization.    In the event of a dissolution or liquidation of the Company, a sale of substantially all of the assets of the Company (in one or a series of transactions), a merger or consolidation of the Company with or into any other corporation (regardless of whether the Company is the surviving corporation), or a statutory share exchange involving capital stock of the Company, a divestiture, distribution of assets to shareholders (other than ordinary cash dividends), reorganization, recapitalization, reclassification, stock dividend, stock split, reverse stock split, stock combination or exchange, rights offering, spin-off or other relevant change, appropriate adjustments will be made in the number and price of shares subject to each outstanding award, as well as to the share limitations contained in the 2014 Incentive Plan.

 

 

Change in control.    Unless otherwise provided in an award agreement, in the event of a participant’s termination without cause or good reason during the twelve-month period following a “change in control” (as defined in the 2014 Incentive Plan), all options and stock appreciation rights shall become immediately exercisable, and/or the period of restriction shall expire and the award shall vest immediately with respect to 100% of the shares of restricted stock, restricted stock units, and any other award, and/or all performance goals or other vesting criteria will be deemed achieved at 100% target levels and all other terms and conditions will be deemed met as of the date of the participant’s termination. In addition, in the event of a change in control, an award may be treated, to the extent determined by our board of directors to be permitted under Section 409A of the Code, in accordance with one of the following methods as determined by our board of directors in its sole discretion: (i) upon at least 10 days’ advance notice to the affected

 

240


Table of Contents
 

persons, cancel any outstanding awards and pay to the holders thereof, in cash or stock, or any combination thereof, the value of such awards based upon the price per share received or to be received by other shareholders of the Company in the event; or (ii) provide for the assumption of or the issuance of substitute awards that will substantially preserve the otherwise applicable terms of any affected awards previously granted under the 2014 Incentive Plan, as determined by the board of directors in its sole discretion. In the case of any option or stock appreciation right with an exercise price that equals or exceeds the price paid for a share in connection with the change in control, the board of directors may cancel the option or stock appreciation right without the payment of consideration therefor. Except as noted above, the award agreements with respect to the restricted stock granted to our executive officers as described above provides for acceleration of all unvested shares of restricted stock upon a change in control.

 

 

Acceleration.    Notwithstanding the terms of the applicable award agreement, our board of directors has the power to accelerate the time at which an award may first be exercised or the time during which an award, or any part thereof, will vest in accordance with the 2014 Incentive Plan.

 

 

Amendment, modification or termination of the 2014 Incentive Plan.    Our board of directors has the authority to amend, modify, terminate or suspend this 2014 Incentive Plan or amend any or all of the applicable award agreements made pursuant to the 2014 Incentive Plan to the extent permitted by law, subject to any stockholder approval required by law or exchange rules for certain amendments; provided that no termination, suspension or modification of the 2014 Incentive Plan may materially or adversely affect any right acquired by any award recipient prior to such termination, suspension or modification without the consent of the award recipient. Our 2014 Incentive Plan will terminate on the ten-year anniversary of its approval by our board of directors, unless terminated earlier pursuant to the terms of the 2014 Incentive Plan.

Compensation of our directors

The officers of SunEdison who also serve as our directors will not receive additional compensation for their service as one of our directors. Our directors who are not officers or employees of SunEdison will receive compensation as “non-employee directors” as set by our board of directors.

Following the completion of this offering, our directors who are not employees of us or our Sponsor will receive the following fees for their service on our board of directors and its committees:

 

 

$50,000 annual board of directors cash retainer;

 

 

$20,000 additional cash retainer for the chairman of the Audit Committee and $7,500 additional cash retainer for each member of the Audit Committee; and

 

 

$12,500 additional cash retainer for the chairman of the Corporate Governance and Conflicts Committee and $5,000 additional cash retainer for each member of the Corporate Governance and Conflicts Committee.

In addition, following the completion of this offering, we expect that our directors who are not employees of us or our Sponsor will be awarded restricted stock units, or “RSUs,” for shares of common stock on an annual basis (as of the date of the annual stockholder meeting each year) in connection with their board service. Each year, RSUs are to be awarded in an amount such that the number of underlying shares of common stock has a total value of $150,000 on the date the award is granted (rounded to the nearest 100 shares), which vest on the first anniversary of the grant date. For newly elected or appointed outside directors that become directors on a date other than the date of the annual stockholder meeting, such directors would receive RSUs for a pro rata portion of the $150,000 total value.

Each member of our board of directors will be indemnified for their actions associated with being a director to the fullest extent permitted under Delaware law.

 

241


Table of Contents

Security ownership of certain beneficial owners and management

The following table sets forth the beneficial ownership of:

 

 

our Class A common stock held by:

 

   

beneficial owners of 5% or more of our common stock,

   

each of our directors, director nominees and named executive officers, and

   

all of our directors, director nominees and executive officers, as a group; and

 

 

SunEdison Inc.’s common stock held by:

 

   

each of our directors, director nominees and named executive officers, and

   

all of our directors, director nominees and executive officers as a group.

The number of shares of our Class A common stock and percentage of combined voting power before and after completion of this offering is presented after giving effect to the Organizational Transactions and are based on the assumptions set forth in “Summary—The offering—Certain assumptions.”

Beneficial ownership for the purposes of the following table is determined in accordance with the rules and regulations of the SEC. These rules generally provide that a person is the beneficial owner of securities if such person has or shares the power to vote or direct the voting thereof, or to dispose or direct the disposition thereof, or has the right to acquire such powers within 60 days. Percentage of voting power is based on                          shares of our Class A outstanding common stock or              shares of SunEdison Inc.’s outstanding common stock, as applicable, plus any shares with respect to which voting or dispositive power may be acquired within 60 days of the date of this prospectus by a stockholder included in the group for which percentage ownership has been calculated. Except as disclosed in the footnotes to this table and subject to applicable community property laws, we believe that each stockholder identified in the table possesses sole voting and investment power over all shares of common stock shown as beneficially owned by the stockholder. The number of shares of Class A common stock held by our executive officers on account of grants of restricted stock will be proportionally increased in the event we increase the number of shares being offered hereby and do not use such net proceeds therefrom to repurchase Class B units (and shares of Class B common stock). The following table does not reflect any shares of our Class A common stock that directors, officers, employees and certain other persons who are associated with us may purchase in this offering through the reserved share program described under “Underwriting (conflicts of interest)” elsewhere in this prospectus.

Unless otherwise indicated in the table or footnotes below, the address for each beneficial owner is c/o TerraForm Global, Inc., 7550 Wisconsin Avenue, 9th Floor Bethesda, Maryland 20814. For further information regarding material transactions between us and certain of our stockholders, see “Certain relationships and related party transactions.”

 

242


Table of Contents
      TerraForma Global, Inc.      SunEdison, Inc.
     Class A common stock    Voting power        (Parent company)
      Before
offering
   After
offering
   Before
offering
     After  
offering(1)
     Common
stock
   Voting
power

5% Stockholders:

                 

SunEdison(2)

           %         %         

Entities affiliated with Everstream(3)

                 

Entities affiliated with Omega Advisors, Inc.(4)

                 

Entities affiliated with Baron Funds(5)

                 

Directors and Executive Officers:

                 

Ahmad Chatila

                 

Carlos Domenech Zornoza(6)

                 

Jeremy Avenier

                 

Ismael Guerrero Arias

                 

Yana Kravtsova

                 

Martin Truong

                 

Brian Wuebbels

                 

Directors and executive officers as a group (7 persons)

                 

 

 

*   Represents less than one percent.

 

(1)   We intend to use any net proceeds we receive as a result of the underwriters’ option to purchase additional shares of Class A common stock to purchase Class B units (and shares of Class B common stock) held by our Sponsor at a price equal to the initial public offering price less the underwriting discounts and commissions and a pro rata portion of the structuring fee, and immediately cancel such Class B units (and shares of Class B common stock) contemporaneously with Global LLC issuing Class A units to us. SunEdison Holdings Corporation would hold      % of our combined voting power if the underwriters exercise in full their option to purchase additional shares of Class A common stock.

 

(2)   Represents shares of Class A common stock issuable to SunEdison Holdings Corporation, a wholly owned subsidiary of SunEdison, or “SHC.” SHC will not own any shares of Class A common stock immediately following this offering. However, SHC will own              Class B units of Global LLC, which are exchangeable (together with shares of our Class B common stock) for shares of our Class A common stock at any time following this offering. As a result, SHC may be deemed to beneficially own the shares of Class A common stock for which such Class B units are exchangeable. Upon completion of this offering, SHC will own              shares of our Class B common stock, representing all of our outstanding Class B common stock. Each share of our Class B common stock is entitled to 100 votes per share. The Class B common stock held by SHC will represent      % of our combined voting power upon completion of this offering. The principal place of business for SunEdison and SHC is 13736 Riverport Drive, Suite 180, Maryland Heights, Missouri 63043.

 

(3)   Represents                                          shares of Class A common stock held to be directly by Everstream Energy Capital Management LLC, or “Everstream Capital Management,” and/or one or more investment entities it controls or manages, upon exchange of Class D units issued by Global LLC in the Units Private Placements, assuming an initial public offering price of $     per share, which is the midpoint of the price range listed on the cover of this prospectus. Everstream Capital Management is managed by a board of three managers, including Messrs. Peter Lee and Bruce Pflaum. Everstream Energy Capital Management Incentive Vehicle GP, LLC, or “Everstream Incentive GP,” is the general partner of Everstream Incentive LP. Messrs. Lee and Pflaum are the sole members of Everstream Incentive GP and, as a result, may be deemed to have beneficial ownership over such shares. Messrs. Lee and Pflaum disclaim beneficial ownership of the shares of Class A common stock held directly by Everstream Incentive LP and Everstream Capital Management (or such other affiliated investment entity), except to the extent of their pecuniary interest therein. The principal place of business for these entities and Mr. Pflaum is 420 Miller Avenue, Suite 102, Mill Valley, California 94941, and the principal place of business for Mr. Lee is c/o Everstream Energy Capital Management LLC, 350 State Highway 7, Suite 261, Excelsior, Minnesota 55331.

 

(4)   Represents                                          shares of Class A common stock to be held directly by Omega Advisors, Inc., or “Omega,” on account of the Class D units issued by Global LLC to Omega in the Units Private Placements, assuming an initial public offering price of $             per share, which is the midpoint of the price range listed on the cover of this prospectus. Mr. Leon G. Cooperman is the President, CEO and majority stockholder of Omega, and is deemed to control Omega and possess voting and dispositive power with respect to such shares. The principal business office of Omega is 810 Seventh Avenue, 33rd Floor, New York, New York 10019.

 

(5)   Represents                                          shares of Class A common stock to be held directly by Baron Emerging Markets Fund, Baron Opportunity Fund, Baron Fifth Avenue Growth Fund, Baron Energy and Resources Fund, Baron International Growth Fund, Baron Global Advantage Fund, Baron Asset Fund and Baron Partners Fund, on account of the Class D units issued by Global LLC to these Funds in the Units Private Placements and completion of the Class A Common Private Placement, assuming an initial public offering price of $             per share, which is the midpoint of the price range listed on the cover of this prospectus. Each of Baron Capital Group, Inc., BAmco, Inc. and Ronald Baron have shared voting power and shared dispositive power over the shares. The address of Baron Capital Group, Inc., BAmco, Inc. and Mr. Baron is 767 Fifth Avenue, 49 Floor, New York, New York 10153.

 

(6)   Does not include shares of Class A common stock indirectly owned based on Mr. Domenech’s 38.4% limited partnership interest in Everstream Incentive LP, an affiliate of Everstream Capital Management.

 

243


Table of Contents

Certain relationships and related party transactions

The following are summaries of certain provisions of our related party agreements and are qualified in their entirety by reference to all of the provisions of such agreements. Because these descriptions are only summaries of the applicable agreements, they do not necessarily contain all of the information that you may find useful. We therefore urge you to review the agreements in their entirety. Copies of the forms of the agreements have been filed as exhibits to the registration statement of which this prospectus is a part, and are available electronically on the website of the SEC at www.sec.gov.

Private Placements

On May 6, 2015, we raised $175.0 million from the sale to investment vehicles affiliated with Blackstone Alternative Solutions L.L.C., Everstream Opportunities Fund and Altai Capital Master Fund of 50,000, 100,000 and 25,000 Class D units of Global LLC for a cash purchase price of $50.0 million, $100.0 million and $25.0 million, respectively. Concurrently with the closing of this offering, these purchasers will receive on account of such Class D units a number of shares of our Class A common stock equal to the quotient of (x) the original price of such Class D units and (y) 90% of the initial public offering price of Class A common stock. Based on an assumed initial public offering price of $         per share, which is the midpoint of the range listed on the cover of this prospectus, these purchasers will receive an aggregate of                      shares of our Class A common stock on account of their Class D units purchased in the Units Private Placements. Global will receive the same number of newly issued Class A units of Global LLC in connection with the issuance of its Class A common stock on account of the Class D units. Global LLC used the net proceeds from the sale of the Class D units to reduce its borrowings under the Bridge Facility to complete the acquisitions of projects from third parties and to reduce certain project-level indebtedness. Mr. Steven Tesoriere, a member of our Sponsor’s board of directors, is a managing principal of Altai Capital Management, L.P., which is the investment adviser of the associated investment fund that purchased Class D units in the Units Private Placements. In addition, Mr. Carlos Domenech Zornoza, our President and Chief Executive Officer, holds a 38.4% limited partnership interest in Everstream Incentive LP, which is associated with the investment fund that purchased Class D units in the Units Private Placements.

On June 9, 2015, we raised an additional $335.0 million from the sale of an aggregate of 335,000 Class D units of Global LLC to certain investors, including investment vehicles affiliated with Baron Funds, Capricorn Investment Group, GE, Glenview Capital Management, Kingdon Capital Management and Zimmer Partners. Concurrently with the closing of this offering, these purchasers will receive on account of such Class D units a number of shares of our Class A common stock equal to the quotient of (x) the original price of such Class D units and (y) 95% of the initial public offering price of Class A common stock. Based on an assumed initial public offering price of $         per share, which is the midpoint of the range listed on the cover of this prospectus, these purchasers will receive an aggregate of                      shares of our Class A common stock on account of their Class D units purchased in the Units Private Placements. Global will receive the same number of newly issued Class A units of Global LLC in connection with the issuance of its Class A common stock on account of the Class D units. Global LLC used the net proceeds from the sale of the Class D units to complete the acquisitions of projects from third parties and to reduce certain project-level indebtedness.

Concurrently with the execution of the unit purchase agreement, Global LLC entered into a registration rights agreement with the purchasers in the Units Private Placements, pursuant to which Global LLC will procure that such purchasers will be entitled to up to two long-form registrations on Form S-1 and five short-form registrations on Form S-3 (in each case, so long as the aggregate market value of the shares to be registered equals at least $20.0 million, or at least $10.0 million if the shares to be registered constitute all of the registrable securities held by such purchasers in the Units Private Placements), the right to demand a shelf

 

244


Table of Contents

registration statement be filed, and “piggyback” registration rights for shares of Class A common stock acquired pursuant to the Private Placements. All such demands are subject to an initial “Holdback Period” of 180 days following the initial public offering, during which the purchasers in the Units Private Placements may not request that we register the shares of Class A common stock. A demand registration may take any form, including an underwritten offering and a shelf registration, provided that the investors are only entitled to two long-form registrations and five short-form registrations (including takedowns from a resale shelf registration statement).

On June 9, 2015, Baron Funds and Zimmer Partners entered into a stock purchase agreement with Global in which they agreed to purchase $42.5 million and $25.0 million, respectively, of its Class A common stock at a price per share equal to the initial public offering price in a separate private placement transaction. These share purchases are subject to certain customary closing conditions and will be completed concurrently with the closing of this offering. Based on an assumed initial public offering price of $             per share, which is the midpoint of the range listed on the cover of this prospectus, these purchasers will purchase an aggregate of                 shares of our Class A common stock in this concurrent private placement.

We relied upon the “private placement” exemption from the registration requirements of the Securities Act, provided by Section 4(a)(2) thereof in connection with the sale of securities in the Private Placements. In that regard, we obtained representations from each of the purchasers that it was an institutional “accredited investor” as defined in Rule 501(a)(1), (2), (3) or (7) of Regulation D promulgated under the Securities Act or a “qualified institutional buyer” as defined in Rule 144A promulgated under the Securities Act, and that it had such knowledge and experience in financial or business matters that such purchaser was capable of evaluating the merits and risk of an investment in our securities. In addition, the securities to be issued in connection with these transactions will bear a restrictive legend that prohibits their transfer without registration under the Securities Act unless an exemption is available.

Project Support Agreement

Immediately prior to the completion of this offering, Global LLC will enter into the Support Agreement with our Sponsor, pursuant to which our Sponsor will provide Global LLC the opportunity to acquire the Call Right Projects and a right of first offer with respect to the SunEdison ROFO Projects, as described below.

Call Right Projects

Pursuant to the Support Agreement, our Sponsor will provide us and our subsidiaries with the right, but not the obligation, to purchase certain clean energy projects from its project pipeline. We refer to these projects as the Call Right Projects. The Call Right Projects will consist of (i) a list of identified projects and (ii) other projects to be identified in the future that are both (a) located in China, India, Sub-Saharan African (including South Africa), South America (excluding Chile), Central America (excluding Mexico) and the Caribbean (excluding Puerto Rico), Malaysia, Thailand, Philippines, Indonesia or any other countries mutually agreed upon by the parties, or the “Approved Countries,” and (b) subject to a fully executed PPA (or expected to be subject to a fully executed PPA prior to the commencement of COD for such project) with a creditworthy counterparty. The price of the Call Right Projects will be determined by good faith negotiations between us and our Sponsor. The price for any Call Right Project that we determine to purchase will be the fair market value. The Support Agreement provides that we will work with our Sponsor to mutually agree on the fair market value, but if we are unable to agree, we and our Sponsor will engage a third-party advisor to determine the fair market value as described in more detail below.

The Support Agreement requires our Sponsor to add qualifying projects from its development pipeline to the Call Right Project list on a quarterly basis until we have been offered Call Right Projects that have the specified minimum amount of Projected FTM CAFD covered by the Support Agreement. In addition, our Sponsor will be

 

245


Table of Contents

permitted to remove a project from the list of Call Right Projects if it determines, in its reasonable discretion, that the project is unlikely to be successfully completed, with respect to any operating Call Right Project, we have not exercised the call right for an identified project within twelve months. In that case, the Sponsor will be required to replace such project with one or more additional reasonably equivalent projects that have a similar economic profile.

Our Sponsor’s commitment is to offer us Call Right Projects with aggregate Projected FTM CAFD of $1.4 billion through the fifth anniversary of the completion of this offering. If the aggregate amount of Projected FTM CAFD provided by our Sponsor during such period is less than $1.4 billion, our Sponsor has agreed that it will continue to offer sufficient Call Right Projects until the total aggregate Projected FTM CAFD commitment has been satisfied.

The Support Agreement provides that we will work with our Sponsor to mutually agree on the fair market value and Projected FTM CAFD of each Call Right Project. In the case of the Call Right Projects that are added to the list in the future, this process, with respect to the price, will occur within a reasonable time after the new Call Right Project is added to the list of identified Call Right Projects. If we are unable to agree on a price or Projected FTM CAFD for a project within 90 calendar days after it is added to the list (or such shorter period as will still allow Global LLC to timely complete the relevant call right exercise process), we and our Sponsor, upon written notice from either party, will engage a third-party advisor to determine the price or Projected FTM CAFD of such project. We and our Sponsor will each pay 50% of the fees and expenses of any third-party advisor who is retained pursuant to the Support Agreement; provided that if we do not agree to purchase the project in question, we will be responsible for 100% of such fees and expenses. We have agreed to pay cash for each Call Right Project that we acquire, unless we and our Sponsor otherwise mutually agree. In the event our Sponsor receives a bona fide offer for a Call Right Project from a third party prior to the time we provide our Sponsor written notice of exercise of our right to purchase a Call Right Project, our Sponsor must give us notice of such offer in reasonable detail and we will have the right to acquire such Call Right Project on terms substantially similar to those our Sponsor could have obtained from such third party and at a price no less than the price specified in the third-party offer. If we decline to exercise our purchase right, our Sponsor will be permitted to sell the applicable project to a third party. Notwithstanding the foregoing, after the price for a Call Right Project has been agreed or determined and until the total aggregate Projected FTM CAFD commitment has been satisfied, our Sponsor may not market, offer or sell that Call Right Project to any third party without our consent.

We will be permitted to exercise our call right with respect to any Call Right Project identified in the Support Agreement at any time during the applicable call right period for that Call Right Project, which generally will begin on the date of the agreement with respect to identified projects or the date a project is added to the Call Right Project list, and will end 30 days prior to the project’s COD and, with respect to an operating Call Right Project, twelve months after such project is added to the Call Right Project list. If we exercise our option to purchase a Call Right Project under the Support Agreement, our Sponsor will be required to sell us that project on or about the date of its COD or such other date as may be agreed.

SunEdison ROFO Projects

The Support Agreement provides that our Sponsor will grant us a right of first offer with respect to any proposed sale or other transfer of any clean energy project or portfolio of projects developed by our Sponsor during the six-year period following the completion of this offering (other than Call Right Projects) located in any of the Approved Countries. We refer to these projects as the SunEdison ROFO Projects. Our Sponsor will agree to negotiate with us in good faith, for a period of 20 days, to reach an agreement with respect to any proposed sale of a SunEdison ROFO Project for which we have exercised our right of first offer before it may sell or otherwise transfer such SunEdison ROFO Project to a third party. If we and our Sponsor are unable to agree upon terms with respect to a SunEdison ROFO Project, our Sponsor will have the right to sell such project to a third party.

 

246


Table of Contents

Our Sponsor will not be obligated to sell any of the SunEdison ROFO Projects and, therefore, we do not know when, if ever, any SunEdison ROFO Projects will be offered to, or acquired by, us. In addition, in the event that our Sponsor elects to sell SunEdison ROFO Projects, our Sponsor will not be required to accept any offer we make and may choose to sell the projects to a third party (provided that the terms are no less favorable to our Sponsor than those offered to us) or not to sell the projects at all.

Our Sponsor will agree to not offer any of its projects located in the Approved Countries to TerraForm Power, a publicly traded subsidiary of our Sponsor that also owns and operates clean power assets.

Corporate Governance and Conflicts Committee

For as long as our Sponsor has voting control over us, any material action taken by us under the Support Agreement, including any termination or material amendment thereof, the exercise or waiver by us of any material rights thereunder and the material terms and conditions of any material agreement for the purchase and sale of a Call Right Project will require the prior approval of our Corporate Governance and Conflicts Committee.

Termination

We or our Sponsor will have the right to terminate the Support Agreement upon written notice if the other party materially breaches or defaults in the performance of its obligations under the Support Agreement or under any transaction agreement entered into by the parties in connection with any of the Call Right Projects or the SunEdison ROFO Projects, and such breach or default is continuing for 30 days after the breaching party has been given a written notice specifying such default or breach.

Project-level agreements

While projects are under construction, in certain cases affiliates of our Sponsor will enter into EPC contracts with our project-level entities, and after they reach COD, in certain cases affiliates of our Sponsor will provide certain services to our project-level entities.

Under the EPC contracts for projects developed by our Sponsor, the relevant Sponsor affiliates provide liquidated damages to cover delays in project completions, as well as market standard warranties, including performance ratio guaranties for periods that generally range between two and five years depending on the relevant market. The O&M contracts provide for the performance of preventive and corrective maintenance services for fees as defined in such agreements. The applicable Sponsor affiliates also provide a portfolio availability guarantee of 98% as to a majority of the solar photovoltaic projects that we own (on a megawatt basis), and contain related liquidated damage obligations. In certain cases, asset management contracts cover the provision of asset management services to the relevant project-level entity.

For the year ended December 31, 2014, our Sponsor received a total of approximately $159.4 million in compensation under the related EPC contracts and $1.1 million in compensation under the related O&M contracts. See “Management’s discussion and analysis of financial condition and results of operations—Key metrics—Operating metrics—Project availability” for a description of “project availability.”

 

247


Table of Contents

Management Services Agreement

Immediately prior to the completion of this offering, we, Global LLC, Global Operating LLC and our Sponsor will enter into the Management Services Agreement pursuant to which our Sponsor will agree to provide or arrange for other service providers to provide management and administration services to us and our subsidiaries.

Services rendered

Under the Management Services Agreement, our Sponsor or certain of its affiliates will provide or arrange for the provision by an appropriate service provider of the following services:

 

 

causing or supervising the carrying out of all day-to-day management, secretarial, accounting, banking, treasury, administrative, liaison, representative, compliance regulatory and reporting functions and obligations;

 

 

identifying, evaluating and recommending to us acquisitions or dispositions from time to time and, where requested to do so, assisting in negotiating the terms of such acquisitions or dispositions;

 

 

recommending and implementing our business strategy, including potential new markets to enter;

 

 

establishing and maintaining or supervising the establishment and maintenance of books and records;

 

 

recommending and, where requested to do so, assisting in the raising of funds whether by way of debt, equity or otherwise, including the preparation, review or distribution of any prospectus or offering memorandum in respect thereof and assisting with communications support in connection therewith;

 

 

recommending to us suitable candidates to serve on the boards of directors or their equivalents of our subsidiaries;

 

 

monitoring and/or oversight of the applicable accountants, legal counsel and other accounting, financial or legal advisors and technical, commercial, marketing and other independent experts, and managing litigation in which we are sued or commencing litigation after consulting with, and subject to the approval of, the relevant board of directors or its equivalent;

 

 

attending to all matters necessary for any reorganization, bankruptcy proceedings, dissolution or winding up of us, subject to approval by the relevant board of directors or its equivalent;

 

 

supervising the timely calculation and payment of taxes payable, and the filing of all tax returns;

 

 

causing our annual combined financial statements and quarterly interim financial statements and, as applicable, local statutory accounts to be: (i) prepared in accordance with generally accepted accounting principles or other applicable accounting principles for review and audit at least to such extent and with such frequency as may be required by law or regulation; and (ii) submitted to the relevant board of directors or its equivalent for its prior approval;

 

 

making recommendations in relation to and effecting the entry into insurance policies covering our assets, together with other insurances against other risks, including directors’ and officers’ insurance as the relevant service provider and the relevant board of directors or its equivalent may from time to time agree;

 

 

arranging for individuals to carry out the functions of principal executive, accounting and financial officers for purposes of applicable securities laws;

 

 

providing individuals to act as senior officers as agreed from time to time, subject to the approval of the relevant board of directors or its equivalent; and

 

 

providing all such other services as may from time to time be agreed with us that are reasonably related to our day-to-day operations.

 

248


Table of Contents

The services provided by our Sponsor will be subject to the supervision of our Corporate Governance and Conflicts Committee, and our Sponsor will only provide the services requested by the Corporate Governance and Conflicts Committee and will at all times comply with our conflicts of interest policy.

In addition, pursuant to the Management Services Agreement, we will, and will cause our subsidiaries to, use best efforts to have our Sponsor or an affiliate of our Sponsor act as the primary operation and maintenance and asset management counterparty for the projects in our portfolio on terms and conditions that are market standard and otherwise reasonably acceptable to us. The amounts paid by us in respect of such services will not exceed the fair market value of such services (determined as the price that would be applicable between an unrelated service provider and recipient). Notwithstanding the foregoing, with respect to projects located in markets or utilizing technologies where our Sponsor does not provide operation and maintenance services or asset management services, we may engage third parties for such services.

Non-compete

Other than with the approval of our Sponsor, after the effective date of the Management Services Agreement each of Global, Global LLC and Global Operating LLC have agreed that it and its affiliates will not, and will not agree to, directly or indirectly, engage in certain activities competitive with SunEdison’s power project development and construction business. These activities include:

 

 

engaging in, providing financing for or arranging any power generation project development activity;

 

 

acquiring, purchasing, obtaining or investing in any equity or other ownership interest of any other person engaged in the business of developing or constructing power generation projects, or the “Power Development or Construction Business,” except if, in connection with such acquisition, purchase or investment, our Sponsor acquires, purchases or invests in, as applicable, at fair market value, all or the relevant part of such Power Development or Construction Business;

 

 

engaging in any commercial activities, negotiations, planning, exploratory or strategic discussions or other similar activities that relate to, or are otherwise designed to facilitate, finance, induce or otherwise assist any person (other than the Sponsor or its designee) in the development or construction of any power project;

 

 

prior to the project’s construction completion, making any payment to any person (other than the Sponsor or its designee) to facilitate, finance, induce or otherwise assist the construction of a power generation project, except with the prior written consent of the Sponsor; or

 

 

engaging in the business of providing operation and maintenance services or asset management services for power generation projects or assets.

If the Management Services Agreement is terminated, the non-competition provisions will continue to survive indefinitely.

In addition, Global agrees that it will not, and shall cause its affiliates not to, solicit or induce (or attempt to solicit or induce) any employees of SunEdison to terminate his or her employment with SunEdison.

Notwithstanding anything to the contrary in the Management Services Agreement, we will be able to negotiate, structure and sign definitive legal agreements, make milestone payments and finance the acquisition of power development projects provided we do not make any payments in connection with such projects before such projects’ construction completion.

 

249


Table of Contents

Management fee

As consideration for the services provided or arranged for by our Sponsor pursuant to the Management Services Agreement, we will pay our Sponsor a base management fee as follows: (i) 2.5% of Global LLC’s CAFD in each of 2016, 2017 and 2018; and (ii) an amount equal to our Sponsor’s or other service provider’s actual cost for providing services pursuant to the terms of the Management Services Agreement in 2019 and thereafter. We and our Sponsor may agree to adjust the management fee as a result of a change in the scope of services provided under the Management Services Agreement.

We may amend the scope of the services to be provided by our Sponsor under the Management Services Agreement, including reducing the number of our subsidiaries that receive services or otherwise, by providing 180 days’ prior written notice to our Sponsor, provided that the scope of services to be provided by our Sponsor under the Management Services Agreement cannot be increased without our Sponsor’s prior written consent. If the parties are unable to agree on a revised base management fee, we may terminate the agreement after the end of such 180-day period by providing 30 days’ prior written notice to our Sponsor, provided that any decision by us to terminate the Management Services Agreement in such event must be approved by all members of our Corporate Governance and Conflicts Committee.

Reimbursement of expenses and certain taxes

We will be required to pay or reimburse our Sponsor or other service provider for all sales, use, value added, withholding or other similar taxes or customs duties or other governmental charges levied or imposed by reason of the Management Services Agreement or any agreement it contemplates, other than income taxes, corporation taxes, capital gains taxes or other similar taxes payable by our Sponsor or other service provider, which are personal to our Sponsor or other service provider, or to the extent any taxes or other governmental charges relate to the provision of services by our Sponsor or other service provider pursuant to the Management Services Agreement. We will not be required to reimburse our Sponsor or other service provider for any third-party out-of-pocket fees, costs and expenses incurred in the provision of the management and administration services nor will we be required to reimburse our Sponsor for the salaries and other remuneration of its management, personnel or support staff who carry out any services or functions for us or overhead for such persons.

Amendment

Any material amendment, supplement to or waiver of the Management Services Agreement (including any proposed material change to the scope of services to be provided by our Sponsor thereunder and any related change in our Sponsor’s management fee) must be approved by our Corporate Governance and Conflicts Committee.

Termination

The Management Services Agreement will not have a fixed term. However, we will be able to terminate the Management Services Agreement upon 90 days’ prior written notice of termination from us to our Sponsor if any of the following occurs:

 

 

our Sponsor defaults in the performance or observance of any material term, condition or covenant contained in the agreement in a manner that results in material harm to us and the default continues unremedied for a period of 30 days after written notice of the breach is given to our Sponsor;

 

 

our Sponsor engages in any act of fraud, misappropriation of funds or embezzlement against us that results in material harm to us;

 

250


Table of Contents
 

our Sponsor is grossly negligent in the performance of its duties under the agreement and such negligence results in material harm to us;

 

 

certain events relating to the bankruptcy or insolvency of our Sponsor, us, Global LLC or Global Operating LLC; or

 

 

on such date as our Sponsor and its affiliates no longer beneficially hold more than 50% of the voting power of our capital stock.

Except as set forth in this section and above in “—Management fee,” we will not have a right to terminate the Management Services Agreement for any other reason. We will only be able to terminate the Management Services Agreement with the prior approval of all our independent directors.

Our Management Services Agreement will expressly provide that the agreement may not be terminated by us due solely to the poor performance or the under-performance of any of our operations or any of our, or our subsidiaries’ investments made upon the recommendation of our Sponsor or other service provider. Nothing in the Management Services Agreement will limit our right to terminate project-level EPC, O&M or asset management agreements in case of under-performance or breach thereunder.

Our Sponsor will be able to terminate the Management Services Agreement upon 90 days’ prior written notice of termination to us upon the occurrence of the following: (i) we default in the performance or observance of any material term, condition or covenant contained in the agreement in a manner that results in material harm and the default continues unremedied for a period of 30 days after written notice of the breach is given to us; (ii) certain events relating to our bankruptcy or insolvency; or (iii) on such date as our Sponsor and its affiliates no longer beneficially hold more than 50% of the voting power of our capital stock. Our Sponsor will also be able terminate the Management Services Agreement upon the occurrence of certain events relating to our bankruptcy or insolvency.

Indemnification and limitations on liability

Under the Management Services Agreement, our Sponsor will not assume any responsibility other than to provide or arrange for the provision of the services called for thereunder in good faith and will not be responsible for any action that we take in following or declining to follow the advice or recommendations of our Sponsor. The maximum amount of the aggregate liability of our Sponsor or any of its affiliates, or of any director, officer, employee, contractor, agent, advisor or other representative of our Sponsor or any of its affiliates, will be equal to the base management fee previously paid by us in the two most recent calendar years pursuant to the Management Services Agreement (except in 2015, where the cap on liability will be equal to the base management fee for the calendar year 2016). We have also agreed to indemnify each of our Sponsor and other service recipients and their respective affiliates, directors, officers, agents, members, partners, stockholders and employees to the fullest extent permitted by law from and against any claims, liabilities, losses, damages, costs or expenses (including legal fees) incurred by an indemnified person or threatened in connection with our respective businesses, investments and activities or in respect of or arising from the Management Services Agreement or the services provided by our Sponsor, except to the extent that the claims, liabilities, losses, damages, costs or expenses have resulted from the indemnified person’s bad faith, fraud, willful misconduct or gross negligence, or in the case of a criminal matter, action that the indemnified person knew to have been unlawful. In addition, under the Management Services Agreement, the indemnified persons will not be liable to us to the fullest extent permitted by law, except for conduct that involved bad faith, fraud, willful misconduct, gross negligence or in the case of a criminal matter, action that the indemnified person knew to have been unlawful.

 

251


Table of Contents

Repowering Services Agreement

Immediately prior to the completion of this offering, Global, Global LLC and Global Operating LLC, collectively, the “Service Recipients,” will enter into a Repowering Services Agreement with our Sponsor, pursuant to which our Sponsor will be granted a right of first refusal to provide certain services, including (i) repowering power generation projects and related services provided to analyze, design and replace or improve any of the power generation projects through the modification of the relevant energy system or the installation of new components, but excluding any maintenance and (ii) providing such other services as may from time to time be reasonably requested by the Service Recipients related to any such repowerings, collectively, the “Repowering Services.” The Service Recipients must provide written notice to our Sponsor stating their intent to engage a person to provide one or more of the Repowering Services and specify the material terms and conditions, including a fair market value fee to be paid for the Repowering Services to be provided. Upon request of the Sponsor, the Service Recipients must provide a breakdown of the fair market value fee for relevant parts of the Repowering Services and the supply of relevant components as would be standard in the relevant market. Our Sponsor will have 15 business days, or the “ROFR Notice Period,” to respond to such written notice and agree to provide all or a portion of the requested Repowering Services or to supply the relevant components required for the Repowering Services.

If our Sponsor fails to respond to the notice from the Service Recipient within the ROFR Notice Period it will be deemed to have waived its rights to provide, or arrange for the provision of, the Repowering Services. The Service Recipient may then, during the 45-day period following the expiration of the ROFR Notice Period, engage another person to perform the Repowering Services on terms and conditions not more favorable than those specified in the notice provided to our Sponsor. If the Service Recipient does not engage a third party to perform the Repowering Services within such 45-day period, or if the Repowering Services are not commenced within three months from the expiration of the ROFR Notice Period, our Sponsor’s right of first refusal will be deemed to be revived and the provisions of such Repowering Services may not be offered to any third party unless first re-offered to our Sponsor.

Investment Agreements

On December 22, 2014, Global LLC entered into an investment agreement, or the “Investment Agreement,” with our Sponsor pursuant to which our Sponsor agreed to (i) provide support with respect to the interest payment obligations due under the Bridge Facility and (ii) contribute certain enumerated projects to Global LLC. On December 22, 2014, Global LLC, our Sponsor and SunEdison Holdings Corporation entered into a direct agreement with JPMorgan Chase Bank, N.A., the collateral agent under the Bridge Facility, pursuant to which we have assigned all of our rights, title and interest under the Investment Agreement to the collateral agent under the Bridge Facility for the benefit of the lenders.

Our Sponsor has agreed to make all interest payments under the Bridge Facility until all obligations under the credit agreement governing the Bridge Facility have been satisfied. This agreement is subject to termination in the event either (i) the Bridge Facility is repaid in full or (ii) the Sponsor has fulfilled its obligation to contribute all of the projects enumerated in the Investment Agreement, as amended and in effect from time to time.

Immediately prior to the completion of this offering, we will enter into an agreement, or the “Project Investment Agreement,” pursuant to which our Sponsor will agree to contribute to us the Bora Bora wind project in India, the NPS Star and WXA solar projects in Thailand and the Del Litoral and EI Naranjal solar projects in Uruguay, all of which are under construction. The Project Investment Agreement will set forth project contribution deadlines and the projected CAFD associated with each such project. In the event that a specified project cannot be contributed by the applicable contribution deadline, our Sponsor will have the right to contribute a substitute project or projects so long as the aggregate projected CAFD of all projects contributed

 

252


Table of Contents

or scheduled to be contributed pursuant to the Project Investment Agreement equals or exceeds the CAFD threshold provided for in the agreement. We will be responsible for either repaying or arranging the refinancing of any construction financing owed by contributed projects at COD.

Interest Payment Agreement

Immediately prior to the completion of this offering, Global LLC and Global Operating LLC will enter into the Interest Payment Agreement with our Sponsor and SunEdison Holdings Corporation, pursuant to which our Sponsor will agree to pay all of the scheduled interest on the Senior Notes until December 31, 2016 and up to an aggregate amount of $40 million in 2017, $30 million in 2018, $20 million in 2019 and $10 million in 2020, plus any interest due on any payment not remitted when due. Our Sponsor will not be obligated to pay any amounts due under such senior indebtedness in connection with an acceleration of the payment of the principal amount of such indebtedness. Global LLC will be entitled to set off any amounts owing by SunEdison pursuant to the Interest Payment Agreement against any and all sums owed by Global LLC to SunEdison under the distribution provisions of the amended and restated operating agreement of Global LLC, and Global LLC may pay such amounts to Global Operating LLC.

The Interest Payment Agreement terminates upon payment by SunEdison of all amounts owing thereunder. It may, however, be terminated prior to that by mutual written agreement of our Sponsor and Global Operating LLC and will automatically terminate upon the repayment in full of the outstanding principal amount of the Senior Notes or a change of control of us, Global LLC or Global Operating LLC. The agreement may also be terminated at the election of our Sponsor, Global LLC or Global Operating LLC if any of them experiences certain events relating to bankruptcy or insolvency. Any decision by Global LLC or Global Operating LLC to terminate the Interest Payment Agreement must have the prior approval of a majority of the members of our Corporate Governance and Conflicts Committee.

Amended and Restated Operating Agreement of Global LLC

Immediately prior to the completion of this offering, the operating agreement of Global LLC will be amended and restated to authorize three classes of units (the Class A units, the Class B units and the Class B1 units) and to appoint us as the sole managing member of Global LLC. The following is a description of the material terms of Global LLC’s amended and restated operating agreement.

Governance

Global will serve as the sole managing member of Global LLC. As such, Global, and effectively our board of directors, will control the business and affairs of Global LLC and be responsible for the management of its business. No other member of Global LLC, in its capacity as such, will have any authority or right to control the management of Global LLC or to bind it in connection with any matter. Any material amendment, supplement or waiver of the Global LLC operating agreement must be approved by a majority of our Corporate Governance and Conflicts Committee.

 

253


Table of Contents

Amendments

The operating agreement of Global LLC may be amended, supplemented, waived or modified by our written consent, in our sole discretion, without the approval of any other person, however, no amendment may (i) modify the limited liability of any member, or increase the liabilities or obligations of any member, in each case, without the consent of each such affected member or (ii) materially and adversely affect the rights of a holder of Class A units, Class B units or Class B1 units, in their capacity as holders of Class A units, Class B units or Class B1 units, in relation to other classes of equity securities of Global LLC, without the consent of the holders of a majority of such classes of units. So long as we are the managing member, any such material amendment, supplement or waiver must be approved by a majority of our Corporate Governance and Conflicts Committee. Notwithstanding the foregoing, we may, without the written consent of any other member or any other person, amend, supplement, waive or modify any provision of Global LLC’s operating agreement and execute, swear to, acknowledge, deliver, file and record whatever documents may be required in connection therewith, to:

 

 

reflect any amendment, supplement, waiver or modification that we determine is necessary or appropriate in connection with the creation, authorization or issuance of any class of units or other equity securities in Global LLC or other Global LLC securities in accordance with the Global LLC operating agreement;

 

 

reflect the admission, substitution, withdrawal or removal of members in accordance with the Global LLC operating agreement;

 

 

reflect a change in Global LLC’s name, the location of its principal place of business, its registered agent or its registered office;

 

 

reflect a change in Global LLC’s fiscal or taxable year and any other changes that we determine to be necessary or appropriate as a result of a change in Global LLC’s fiscal or taxable year, including a change in the dates on which Global LLC is to make distributions; or

 

 

cure any ambiguity, mistake, defect or inconsistency.

Voting rights

The Class A units, Class B units and Class B1 units will not have any voting rights.

Exchange rights of members; automatic conversion

Global LLC will issue Class A units, which may only be issued to Global, as the sole managing member, and Class B units, which may only be issued and held by our Sponsor or its controlled affiliates. Additionally, we will establish the Class B1 units which may be issued in connection with a reset of incentive distribution levels (see “—Distributions—IDRs—IDR holders’ right to reset incentive distribution levels”), or in connection with acquisitions from our Sponsor or third parties.

Each Class B unit and each Class B1 unit of Global LLC, together with a corresponding number of shares of Class B common stock or Class B1 common stock, as applicable, will be exchangeable at any time for a share of our Class A common stock, subject to equitable adjustments for stock splits, stock dividends and reclassifications in accordance with the terms of the amended and restated operating agreement of Global LLC and any applicable exchange agreement. When a holder surrenders Class B units or Class B1 units of Global LLC and a corresponding number of shares of Class B common stock or Class B1 common stock for shares of our Class A common stock, (i) Global LLC will cancel the Class B units or Class B1 units as applicable, (ii) Global LLC or will issue additional Class A units to us, (iii) we will redeem and cancel a corresponding number of shares of our Class B common stock or Class B1 common stock, as applicable, and (iv) we will issue a corresponding number of shares of Class A common stock to such holder. See “—Exchange Agreement.”

 

254


Table of Contents

Distributions

Global LLC’s amended and restated operating agreement will provide that, distributions by Global LLC will be allocated and made to holders of units:

 

 

of cash in respect of a specific quarter, as described below under the captions “—Distributions during the Subordination Period,” “—Distributions after the Subordination Period” and “—IDRs” in accordance with the respective number of membership units of Global LLC held; and

 

 

in respect of all other distributions (e.g. distributions in respect of a winding-up, liquidation and extraordinary transactions), in accordance with the respective number of membership units of Global LLC held.

Subordination

General

Global LLC’s amended and restated operating agreement will provide that, during the Subordination Period (as described below), the Class A units and Class B1 units (if any) will have the right to receive quarterly distributions in an amount equal to $             per unit, which amount is defined as the “Minimum Quarterly Distribution,” plus any arrearages in the payment of the Minimum Quarterly Distribution on the Class A units and Class B1 units from prior quarters, before any distributions may be made on the Class B units. The Class B units are deemed “subordinated” because for a period of time, referred to as the “Subordination Period,” the Class B units will not be entitled to receive any distributions from Global LLC until the Class A units and Class B1 units have received the Minimum Quarterly Distribution plus any arrearages in the payment of the Minimum Quarterly Distribution from prior quarters. Furthermore, no arrearages will be paid on the Class B units. The practical effect of the subordinated Class B units is to increase the likelihood that during the Subordination Period there will be sufficient CAFD to pay the Minimum Quarterly Distribution on the Class A units and Class B1 units.

The subordination of the Class B units is in addition to the Distribution Forbearance Provisions applicable to the Class B units described below under the caption “—Distribution Forbearance Provisions.”

Subordination Period

The “Subordination Period” means the period beginning on the closing date of this offering and extending until each of the following tests has been met, which will be a minimum three-year period ending no earlier than the beginning of the period for which a distribution is paid for the first quarter of 2018:

 

 

distributions of CAFD on each of the outstanding Class A units, Class B units and Class B1 units equaled or exceeded $             per unit (the annualized Minimum Quarterly Distribution) for each of three non-overlapping, four-quarter periods immediately preceding that date;

 

 

the CAFD generated during each of three non-overlapping, four-quarter periods immediately preceding that date equaled or exceeded the sum of $             per unit (the annualized Minimum Quarterly Distribution) on all of the outstanding Class A units, Class B units and Class B1 units during those periods on a fully diluted basis; and

 

 

there are no arrearages in payment of the Minimum Quarterly Distribution on the Class A units or Class B1 units.

 

255


Table of Contents

Early termination of Subordination Period

Notwithstanding the foregoing, the Subordination Period will automatically terminate when each of the following tests has been met:

 

 

distributions of CAFD on each of the outstanding Class A units, Class B units and Class B1 units equaled or exceeded $             per unit (150.0% of the annualized Minimum Quarterly Distribution) for the four-quarter period immediately preceding that date;

 

 

the CAFD generated during the four-quarter period immediately preceding that date equaled or exceeded the sum of (i) $             per unit (150.0% of the annualized Minimum Quarterly Distribution) on all of the outstanding Class A units, Class B units and Class B1 units during such four-quarter period on a fully diluted basis, and (ii) the corresponding distributions on the IDRs during such four-quarter period; and

 

 

there are no arrearages in payment of the Minimum Quarterly Distributions on the Class A units or Class B1 units.

Distributions during the Subordination Period

If Global LLC makes a distribution of cash in respect of any specific quarter ending before the end of the Subordination Period, its amended and restated operating agreement will require that it make the distribution in the following manner:

 

 

first, to the holders of Class A units and Class B1 units, pro rata, until Global LLC distributes for each Class A unit and Class B1 unit an amount equal to the Minimum Quarterly Distribution for that quarter and any arrearages in payment of the Minimum Quarterly Distribution on such units for any prior quarters;

 

 

second, subject to the Distribution Forbearance Provisions applicable to the Class B units, to the holders of Class B units, pro rata, until Global LLC distributes for each Class B unit an amount equal to the Minimum Quarterly Distribution for that quarter; and

 

 

thereafter, in the manner described in “—IDRs” below.

Distributions after the Subordination Period

When the Subordination Period ends, each outstanding Class B unit will then participate pro rata with the Class A units and Class B1 units in distributions, subject to the Distribution Forbearance Provisions applicable to the Class B units. Once the Subordination Period ends, it does not recommence under any circumstances.

If Global LLC makes distributions of cash in respect of any specific quarter ending after the expiration of the Subordination Period, its amended and restated operating agreement will require that it make the distribution in the following manner:

 

 

first, to all holders of Class A units, Class B1 units and Class B units, pro rata, until Global LLC distributes for each unit an amount equal to the Minimum Quarterly Distribution for that quarter, subject to the Distribution Forbearance Provisions applicable to the Class B units; and

 

 

thereafter, in the manner described in “—IDRs” below.

IDRs

General

IDRs represent the right to receive increasing percentages (15.0%, 25.0% and 50.0%) of Global LLC’s quarterly distributions after the Minimum Quarterly Distribution and the target distribution levels have been achieved. Our Sponsor will hold the IDRs upon completion of this offering, and will be able to transfer the IDRs as described under “—Transferability of IDRs” below.

 

256


Table of Contents

Initial IDR structure

If in respect of any specific quarter:

 

 

Global LLC has made cash distributions to the holders of its Class A units, Class B1 units and, subject to the Distribution Forbearance Provisions, Class B units in an amount equal to the Minimum Quarterly Distribution; and

 

 

Global LLC has distributed cash to holders of Class A units and holders of Class B1 units in an amount necessary to eliminate any arrearages in payment of the Minimum Quarterly Distribution;

then, subject to the Distribution Forbearance Provisions, Global LLC will make additional cash distributions in respect of that specific quarter among holders of its Class A units, Class B units, Class B1 units and the IDRs in the following manner:

 

 

first, to all holders of Class A units, Class B1 units and Class B units, pro rata, until each holder receives a total of $             per unit for that quarter, or the “First Target Distribution” (115.0% of the Minimum Quarterly Distribution);

 

 

second, 85.0% to all holders of Class A units, Class B1 units and Class B units, pro rata, and 15.0% to the holders of the IDRs, until each holder of Class A units, Class B1 units and Class B units receives a total of $             per unit for that quarter, or the “Second Target Distribution” (125.0% of the Minimum Quarterly Distribution);

 

 

third, 75.0% to all holders of Class A units, Class B1 units and Class B units, pro rata, and 25.0% to the holders of the IDRs, until each holder of Class A units, Class B1 units and Class B units receives a total of $             per unit for that quarter, or the “Third Target Distribution” (150.0% of the Minimum Quarterly Distribution); and

 

 

thereafter, 50.0% to all holders of Class A units, Class B1 units and Class B units, pro rata, and 50.0% to the holders of the IDRs.

The Global LLC amended and restated operating agreement prohibits distributions on the IDRs unless CAFD since the closing of this offering exceeds the amount of CAFD distributed as of the date of the determination.

The following table illustrates the percentage allocations of distributions of cash in respect of a specific quarter between the holders of Class A units, Class B units, Class B1 units and the IDRs based on the specified target distribution levels. The amounts set forth under the column heading “Marginal percentage interest in distributions” are the percentage interests of the holders of Class A units, Class B units, Class B1 units and the IDRs in any distributions Global LLC makes up to and including the corresponding amount in the column “Total quarterly distribution per unit.” The percentage interests set forth below assume there are no arrearages on Class A units or Class B1 units and the Distribution Forbearance Provisions applicable to the Class B units have terminated or otherwise do not apply.

 

             Marginal percentage interest in
distributions
 
      Total quarterly distribution per unit     Unitholders      IDR holders  

Minimum Quarterly Distribution

      up to  $          (1)      100.0%         0.0%   

First Target Distribution

   above $                    up to  $          (2)      100.0%         0.0%   

Second Target Distribution

   above $                    up to  $          (3)      85.0%         15.0%   

Third Target Distribution

   above $                    up to  $          (4)      75.0%         25.0%   

Thereafter

   above $                        50.0%         50.0%   

 

  

 

 

    

 

 

   

 

 

    

 

 

 

 

(1)   This amount is equal to the Minimum Quarterly Distribution.

 

(2)   This amount is equal to 115.0% of the Minimum Quarterly Distribution.

 

(3)   This amount is equal to 125.0% of the Minimum Quarterly Distribution.

 

(4)   This amount is equal to 150.0% of the Minimum Quarterly Distribution.

 

257


Table of Contents

IDR holders’ right to reset incentive distribution levels

Our Sponsor, as the holder of the IDRs, has the right after Global LLC has made cash distributions in excess of the Third Target Distribution level (i.e., 75.0% to holders of units and 25.0% to the holder of the IDRs) for four consecutive quarters, to elect to relinquish the right to receive incentive distribution payments based on the initial target distribution levels and to reset, at higher levels, the target distribution levels upon which the incentive distribution payments would be set. See “—Post-reset IDRs” below.

The right to reset the target distribution levels upon which the incentive distributions are based may be exercised at any time after the expiration or termination of the Subordination Period, when Global LLC has made cash distributions in excess of the then-applicable Third Target Distribution level for the prior four consecutive fiscal quarters. At the sole discretion of the holder of the IDRs, the right to reset may be exercised without the approval of the holders of Global LLC units, Global, as manager of Global LLC, or the board of directors (or any committee thereof) of Global.

The reset target distribution levels will be higher than the most recent per unit distribution level and the target distribution levels prior to the reset such that there will be no incentive distributions paid under the reset target distribution levels until cash distributions per Class A unit, Class B1 unit and Class B unit following the reset event increase as described below. Because the reset target distribution levels will be higher than the most recent per unit distribution level prior to the reset, if Global LLC were to issue additional units after the reset and maintain the per unit distribution level, no additional incentive distributions would be payable. By contrast, if there were no such reset and Global LLC were to issue additional units and maintain the per unit distribution level, additional incentive distributions would have to be paid based on the additional number of outstanding units and the percentage interest of the IDRs above the target distribution levels. Thus, the exercise of the reset right would lower our cost of equity capital. Our Sponsor could exercise this reset right in order to facilitate acquisitions or internal growth projects that would otherwise not be sufficiently accretive to cash distributions per unit, taking into account the existing levels of incentive distribution payments being made.

The holders of IDRs will be entitled to cause the target distribution levels to be reset on more than one occasion. There are no restrictions on the ability to exercise their reset right multiple times, but the requirements for exercise must be met each time. Because one of the requirements is that Global LLC make cash distributions in excess of the then-applicable Third Target Distribution for the prior two consecutive fiscal quarters, a minimum of two quarters must elapse between each reset.

In connection with the resetting of the target distribution levels and the corresponding relinquishment by our Sponsor of incentive distribution payments based on the target distribution levels prior to the reset, our Sponsor will be entitled to receive a number of newly issued Global LLC Class B1 units and shares of Class B1 common stock based on the formula described below that takes into account the “cash parity” value of the cash distributions related to the IDRs for the two consecutive quarters immediately prior to the reset event as compared to the cash distribution per unit in such quarters.

The number of Class B1 units and shares of Class B1 common stock to be issued in connection with a resetting of the Minimum Quarterly Distribution amount and the target distribution levels then in effect would equal the quotient determined by dividing (x) the average aggregate amount of cash distributions received in respect of the IDRs during the two consecutive fiscal quarters ended immediately prior to the date of such reset election by (y) the average of the aggregate amount of cash distributed per Class A unit, Class B1 unit and Class B unit during each of these two quarters.

 

258


Table of Contents

Post-reset IDRs

Following a reset election, a baseline Minimum Quarterly Distribution amount will be calculated as an amount equal to the average cash distribution amount per Class A unit, Class B1 unit and Class B unit for the two consecutive fiscal quarters immediately preceding the reset election, which amount we refer to as the “Reset Minimum Quarterly Distribution,” and the target distribution levels will be reset to be correspondingly higher than the Reset Minimum Quarterly Distribution. Following a resetting of the Minimum Quarterly Distribution amount, Global LLC would, subject to the Distribution Forbearance Provisions, make distributions of cash in respect of specific quarters ending after the reset date as follows:

 

 

first, to all holders of Class A units, Class B1 units and Class B units, pro rata, until each holder receives an amount per unit for that quarter equal to 115.0% of the Reset Minimum Quarterly Distribution;

 

 

second, 85.0% to all holders of Class A units, Class B1 units and Class B units, pro rata, and 15.0% to the holders of the IDRs, until each holder of Class A units, Class B1 units and Class B units receives an amount per unit for that quarter equal to 125.0% of the Reset Minimum Quarterly Distribution;

 

 

third, 75.0% to all holders of Class A units, Class B1 units and Class B units, pro rata, and 25.0% to the holders of the IDRs, until each holder of Class A units, Class B1 units and Class B units receives an amount per unit for that quarter equal to 150.0% of the Reset Minimum Quarterly Distribution; and

 

 

thereafter, 50.0% to all holders of Class A units, Class B1 units and Class B units, pro rata, and 50.0% to the holders of the IDRs.

Because a reset election can only occur after the Subordination Period expires, the Reset Minimum Quarterly Distribution will have no significance except as a baseline for the target distribution levels after our Sponsor effectuates an IDR reset.

The following table illustrates the percentage allocation of Global LLC distributions of cash in respect of a specific quarter between the holders of Class A units, Class B1 units, Class B units and the IDRs at various distribution levels (i) pursuant to the distribution provisions of Global LLC’s amended and restated operating agreement that will be in effect at the closing of this offering, as well as (ii) following a hypothetical reset of the target distribution levels based on the assumption that the average distribution amount per common unit during the two quarters immediately preceding the reset election was $            . This illustration assumes the Distribution Forbearance Provisions applicable to the Class B units have terminated or otherwise do not apply.

 

      Quarterly distribution per
Class A unit prior to reset
     Holders of
Class A units
     IDRs holders      Quarterly distribution per
Class A unit following
hypothetical reset
 

Minimum Quarterly Distribution

      up to $             (1)         100.0%         0.0%                     (5)   

First Target Distribution

   above $                    up to $             (2)         100.0%         0.0%                     (6)   

Second Target Distribution

   above $                    up to $             (3)         85.0%         15.0%                     (7)   

Third Target Distribution

   above $                    up to $             (4)         75.0%         25.0%                     (8)   

Thereafter

   above $                         50.0%         50.0%      

 

  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

(1)   This amount is equal to the Minimum Quarterly Distribution.

 

(2)   This amount is equal to 115.0% of the Minimum Quarterly Distribution.

 

(3)   This amount is equal to 125.0% of the Minimum Quarterly Distribution.

 

(4)   This amount is equal to 150.0% of the Minimum Quarterly Distribution.

 

(5)   This amount is equal to the hypothetical Reset Minimum Quarterly Distribution.

 

(6)   This amount is equal to 115.0% of the hypothetical Reset Minimum Quarterly Distribution.

 

(7)   This amount is equal to 125.0% of the hypothetical Reset Minimum Quarterly Distribution.

 

(8)   This amount is equal to 150.0% of the hypothetical Reset Minimum Quarterly Distribution.

 

259


Table of Contents

The following table illustrates the total amount of Global LLC distributions of cash in respect of a specific quarter that would be distributed to holders of Class A units, Class B units, and the IDRs, based on the amount distributed for the quarter immediately prior to the reset. The table assumes that immediately prior to the reset there would be             Class A units outstanding and              Class B units outstanding and the average distribution to each common unit would be $             for the two quarters prior to the reset. This illustration assumes the Distribution Forbearance Provisions applicable to the Class B units have terminated or otherwise do not apply.

 

     Prior to reset  
     Quarterly distribution per unit     Distributions to
holders of units
    Distributions to
holders of IDRs
    Total
distributions
 

Minimum Quarterly Distribution

    up to $                   $                   $                   $                

First Target Distribution

  above $                   up to $                      

Second Target Distribution

  above $                   up to $                      

Third Target Distribution

  above $                   up to $                      

Thereafter

  above $                        
     

 

 

 
      $        $        $     

 

 

The following table illustrates the total amount of Global LLC distributions of cash in respect of a specific quarter that would be distributed to holders of units and the IDRs, with respect to the quarter after the reset occurs. The table reflects that as a result of the reset there would be              Class A units outstanding,              Class B units outstanding and              Class B1 units outstanding and the average distribution to each unit would be $            . The number of Class B1 units to be issued upon the reset was calculated by dividing (i) the amount received in respect of the IDRs for the quarter prior to the reset as shown in the table above, or $            , by (ii) the cash distributed on each unit for the quarter prior to the reset as shown in the table above, or $            . This illustration assumes the Distribution Forbearance Provisions applicable to the Class B units have terminated or otherwise do not apply.

 

     After hypothetical reset  
     Quarterly distribution per unit     Distributions
to holders of
units existing
prior to reset
    Distributions to
holders of new
Class B1 units(1)
    Distributions to
holders of IDRs
    Total
distributions
 

Minimum Quarterly Distribution

    up to $                   $                   $                   $                   $                

First Target Distribution

  above $                   up to $                        

Second Target Distribution

  above $                   up to $                        

Third Target Distribution

  above $                   up to $                        

Thereafter

  above $                          
     

 

 

 
    $        $        $        $     

 

 

 

(1)   Represents distributions in respect of the Class B1 units issued upon the reset.

Transferability of IDRs

Our Sponsor may sell, transfer, exchange, pledge or otherwise dispose of the IDRs to any third party, including our pledging the IDRs as collateral to secure indebtedness. Our Sponsor has granted us a right of first refusal with respect to any proposed sale of IDRs to a third party (other than its controlled affiliates), which we may exercise to purchase the IDRs proposed to be sold on the same terms offered to such third party at any time within 30 days after we receive written notice of the proposed sale and its terms.

 

260


Table of Contents

Adjustment to the Minimum Quarterly Distribution and target distribution levels

If Global LLC combines its common units into fewer common units or subdivides its common units into a greater number of common units, its amended and restated operating agreement will specify that the Minimum Quarterly Distribution and the target distribution levels will be proportionately adjusted.

For example, if a two-for-one split of the common units should occur, the Minimum Quarterly Distribution and the target distribution levels would each be reduced to 50.0% of its initial level. Global LLC will not make any adjustment by reason of the issuance of additional units for cash or property.

In addition, if as a result of a change in law or interpretation thereof, Global LLC or any of its subsidiaries is treated as an association taxable as a corporation or is otherwise subject to additional taxation as an entity for United States federal, state, local or non-U.S. income or withholding tax purposes, Global, as manager of Global LLC, may, in its sole discretion, reduce the Minimum Quarterly Distribution and the target distribution levels for each quarter by multiplying (a) each distribution level times (b) the quotient obtained by dividing (i) CAFD for that quarter by (ii) the sum of CAFD for that quarter, plus our estimate of our additional aggregate liability for the quarter for such income and withholding taxes payable by reason of such change in law or interpretation thereof. To the extent that the actual tax liability differs from the estimated tax liability for any quarter, the difference will be accounted for in distributions with respect to subsequent quarters.

Distribution Forbearance Provisions

During the Distribution Forbearance Period (as defined below) Global LLC’s amended and restated operating agreement will limit distributions of cash in respect of a specific quarter to Class B units as follows:

 

 

the Class B units will not, under any circumstances, be entitled to receive any distributions with respect to the third and fourth quarter of 2015 (i.e., distributions declared on or prior to March 31, 2016); and

 

 

thereafter, until the end of the Distribution Forbearance Period, the Class B units will not be entitled to receive any distributions to the extent the holders of Class A units has not received distributions in an amount equal to the Minimum Quarterly Distribution plus any arrearages in the payment of Minimum Quarterly Distributions from prior quarters.

We refer to the forgoing provisions as the “Distribution Forbearance Provisions.”

The “Distribution Forbearance Period” begins on the date of the closing of this offering and ends on the later of March 31, 2016 or the date that the Completed CAFD Amount exceeds the CAFD Forbearance Threshold.

Any distributions forgone by the holders of Class B units pursuant to the Distribution Forbearance Provisions will not be distributed to holders of other classes of units and will not constitute an arrearage on the Class B units. After the date on which the Distribution Forbearance Period ends, distributions will be made to holders of Class B units in accordance with the respective number of units as described above under “—Distributions During the Subordination Period,” “—Distribution after the Subordination Period” and “—IDRs.”

For purposes of the amended and restated operating agreement:

 

 

“As Delivered CAFD” means, with respect to any of the Contributed Construction Projects (or any substitute project) transferred to us by our Sponsor, the CAFD projected, as of such project’s COD, to be generated by such project in the 12 months after such project’s COD taking into account, among other things, the project finance structure, the as-built system size and the production level and will be determined by mutual agreement between us and our Sponsor;

 

 

“CAFD Forbearance Threshold” means $             million;

 

261


Table of Contents
 

“Closed Acquisition CAFD” with respect to any of the Pending Acquisition (or any substitute project), the CAFD projected, as of the later of such project’s COD or the date we acquire such project, to be generated by such project in the 12 months after such date taking into account, among other things, the project finance structure, the system size and the production level and will be determined by mutual agreement between us and our Sponsor; and

 

 

“Completed CAFD Amount” means the sum of the (a) the As Delivered CAFD (as defined above), as of the first day of such quarter, with respect to the Contributed Construction Projects and any substitute projects contributed by our Sponsor to Global LLC in the event any of the identified projects fails to achieve COD, and (b) the Closed Acquisition CAFD (as defined above), as of the first day of such quarter, with respect to the Pending Acquisitions (and any substitute projects identified by our Sponsor in the event any of the identified Pending Acquisitions is not acquired).

Coordination of Global and Global LLC

At any time Global issues shares of its Class A common stock for cash, the net proceeds therefrom will promptly be transferred to Global LLC and Global LLC will either:

 

 

transfer newly issued Class A units of Global LLC to Global; or

 

 

use such net proceeds to purchase Class B units of Global LLC from our Sponsor, which Class B units will automatically convert into Class A units of Global LLC when transferred to Global.

In the event Global issues shares of Class A common stock that are subject to forfeiture or cancellation (e.g., restricted stock), the corresponding Class A units will be issued subject to similar forfeiture or cancellation provisions.

In the event Global LLC purchases a Class B unit or a Class B1 unit of Global LLC from the holder thereof, Global will automatically redeem and cancel the corresponding share of its Class B common stock or Class B1 common stock, as applicable.

If Global issues other classes or series of equity securities, Global LLC will issue, and Global will use the net proceeds from such issuance of other classes or series of equity security to purchase, an equal amount of units with designations, preferences and other rights and terms that are substantially the same as Global’s newly issued equity securities. If Global elects to redeem or purchase any shares of its Class A common stock (or its equity securities of other classes or series other than shares of its Class B common stock or Class B1 common stock), Global LLC will, immediately prior to such redemption, redeem or purchase an equal number of Class A units (or its units of the corresponding classes or series) held by Global, upon the same terms and for the same price, as the shares of Class A common stock (or equity securities of such other classes or series) so redeemed.

Issuances and transfer of units

Class A units may only be issued to Global, as the sole managing member of Global LLC, and are non-transferable except upon redemption by Global LLC. Class B units may only be issued to our Sponsor and its controlled affiliates. Class B units may not be transferred, except to our Sponsor or to a controlled affiliate of our Sponsor. Our Sponsor may not transfer any Class B units to any person, including a controlled affiliate, unless our Sponsor transfers an equivalent number of shares of our Class B common stock to the same transferee. Any Class B units transferred by our Sponsor to a person other than a controlled affiliate (including in connection with foreclosure on units pledged as collateral) would be exchanged (along with a corresponding number of shares of Class B common stock) into shares of our Class A common stock in connection with such transfer. Class B1 units may not be transferred without our consent, which may be subject to such conditions

 

262


Table of Contents

as we may specify, and any such attempted transfer without our consent will be void ab initio, except our Sponsor may transfer Class B1 units to a controlled affiliate without our consent. Our holders of Class B1 units may not transfer any Class B1 units to any person, including to a controlled affiliate of our Sponsor or with our consent, unless the transferor transfers an equivalent number of shares of our Class B1 common stock to the same transferee. Global may impose additional restrictions on exchange that it determines necessary or advisable so that Global LLC is not treated as a “publicly traded partnership” for United States federal income tax purposes.

Exchange Agreement

We will enter into an exchange agreement pursuant to which our Sponsor (and its controlled affiliates who acquire Class B units or Class B1 units of Global LLC), or any permitted successor holder, may from time to time cause Global LLC to exchange its Class B units or Class B1 units, together with a corresponding number of shares of Class B common stock or Class B1 common stock, as applicable, for shares of our Class A common stock on a one-for-one basis, subject to adjustments for stock splits, stock dividends and reclassifications. The exchange agreement also provides that, subject to certain exceptions, the holder will not have the right to cause Global LLC to exchange Class B units or Class B1 units, together with a corresponding number of shares of Class B common stock or Class B1 common stock, as applicable, if Global LLC determines that such exchange would be prohibited by law or regulation or would violate other agreements to which Global may be subject, and Global may impose additional restrictions on exchange that it determines necessary or advisable so that Global LLC is not treated as a “publicly traded partnership” for United States federal income tax purposes.

When a holder exchanges a Class B unit or Class B1 unit of Global LLC for a share of our Class A common stock, (i) such holder will surrender such Class B unit or Class B1 unit, as applicable, and a corresponding share of our Class B common stock or Class B1 common stock, as applicable, to Global LLC, (ii) we will issue and contribute a share of Class A common stock to Global LLC for delivery of such share by Global LLC to the exchanging holder, (iii) Global LLC will issue a Class A unit to us, (iv) Global LLC will cancel the Class B unit or Class B1 unit, as applicable, and we will cancel the corresponding share of our Class B common stock or Class B1 common stock, as applicable, and (v) Global LLC will deliver the share of Class A common stock it receives to the exchanging holder. As a result, when a holder exchanges its Class B units or Class B1 units for shares of our Class A common stock, our interest in Global LLC will be correspondingly increased. We have reserved for issuance             shares of our Class A common stock, which is the aggregate number of shares of Class A common stock expected to be issued over time upon the exchange of all Class B units and Class B1 units of Global LLC, together with a corresponding number of shares of Class B common stock or Class B1 common stock, as applicable, outstanding immediately after this offering.

Indemnification and exculpation

To the extent permitted by applicable law, Global LLC will indemnify its managing member, our authorized officers and our other employees and agents from and against any losses, liabilities, damages, costs, expenses, fees or penalties incurred in connection with serving in such capacities, provided that the acts or omissions of these indemnified persons are not the result of fraud, willful misconduct or, in the case of a criminal matter, such indemnified person acted with knowledge that its conduct was unlawful.

Such authorized officers and other employees and agents will not be liable to Global LLC, its members or their affiliates for damages incurred as a result of any acts or omissions of these persons, except if the acts or omissions of these exculpated persons are the result of fraud, willful misconduct or, in the case of a criminal matter, such indemnified person acted with knowledge that its conduct was unlawful.

 

263


Table of Contents

Allocation of taxable income, gain, loss and deduction

Each member’s share of taxable income, gains, losses, and deductions will be determined under Global LLC’s amended and restated operating agreement. In the event a member contributes appreciated or depreciated property to Global LLC, the items of income, gain, loss, and deduction attributable to that property will be allocated among the members under Section 704(c) of the Code, using the remedial method (as defined in United States Treasury regulations Section 1.704-3(d)), to account for the difference between the tax basis and fair market value of such property. Global LLC’s amended and restated operating agreement provides that the managing member cannot elect to use a method other than the remedial method to eliminate these book-tax disparities without the consent of our Corporate Governance and Conflicts Committee.

Registration Rights Agreement

We plan to enter into the SunEdison Registration Rights Agreement pursuant to which our Sponsor and its affiliates will be entitled to an unlimited number of demand registration rights, the right to demand that a shelf registration statement be filed, and “piggyback” registration rights, for shares of our Class A common stock that are issuable upon exchange of Class B units and Class B1 units of Global LLC that it owns. The right to sell shares of our Class A common stock pursuant to the SunEdison Registration Rights Agreement will be made subject to a lock-up agreement between our Sponsor and the underwriters in this offering which, unless waived by J.P. Morgan Securities LLC, Barclays Capital Inc., Citigroup Global Markets Inc. and Morgan Stanley & Co. LLC, will prevent our Sponsor from exercising this right until 180 days after the date of this prospectus.

Procedures for review, approval and ratification of related-person transactions; conflicts of interest

Our board of directors will adopt a Corporate Governance and Conflicts Committee Charter in connection with the completion of this offering that will provide that our board of directors or its authorized committee will periodically review all related-person transactions that are required to be disclosed under SEC rules and, when appropriate, initially authorize or ratify all such transactions. See “Management—Committees of the board of directors—Corporate Governance and Conflicts Committee.” In the event that our board of directors or its authorized committee considers ratification of a related-person transaction and determines not to so ratify, the Corporate Governance and Conflicts Committee Charter will provide that our management will make all reasonable efforts to cancel or annul the transaction.

The Corporate Governance and Conflicts Committee Charter will provide that, in determining whether to recommend the initial approval or ratification of a related-person transaction, our board of directors or its authorized committee should consider all of the relevant facts and circumstances available, including (if applicable) but not limited to: (i) whether there is an appropriate business justification for the transaction; (ii) the benefits that accrue to us as a result of the transaction; (iii) the terms available to unrelated third parties entering into similar transactions; (iv) the impact of the transaction on director independence (in the event the related person is a director, an immediate family member of a director or an entity in which a director or an immediate family member of a director is a partner, stockholder, member or executive officer); (v) the availability of other sources for comparable products or services; (vi) whether it is a single transaction or a series of ongoing, related transactions; and (vii) whether entering into the transaction would be consistent with the code of business conduct and ethics.

 

264


Table of Contents

Our organizational and ownership structure and strategy involve a number of relationships that may give rise to conflicts of interest between us and our stockholders on the one hand, and SunEdison, on the other hand. In particular, conflicts of interest could arise, among other reasons, because:

 

 

in originating and recommending acquisition opportunities (except with respect to the Call Right Projects and the SunEdison ROFO Projects), our Sponsor has significant discretion to determine the suitability of opportunities for us and to allocate such opportunities to us or to itself or third parties;

 

 

there may be circumstances in which our Sponsor will determine that an acquisition opportunity is not suitable for us because of the fit with our acquisition strategy or limits arising due to regulatory or tax considerations or limits on our financial capacity or because our Sponsor is entitled to pursue the acquisition on its own behalf rather than offering us the opportunity to make the acquisition;

 

 

where our Sponsor has made an acquisition, it may transfer the asset to us at a later date after such asset has been developed or we have obtained sufficient financing;

 

 

our relationship with our Sponsor involves a number of arrangements pursuant to which our Sponsor provides various services, access to financing arrangements and originates acquisition opportunities, and circumstances may arise in which these arrangements will need to be amended or new arrangements will need to be entered into;

 

 

subject to the call right described in “—Project Support Agreement—Call Right Projects” and the right of first offer described in “—Project Support Agreement—SunEdison ROFO Projects,” our Sponsor is permitted to pursue other business activities and provide services to third parties that compete directly with our business and activities without providing us with an opportunity to participate, which could result in the allocation of our Sponsor’s resources, personnel and acquisition opportunities to others who compete with us;

 

 

our Sponsor does not owe Global or our stockholders any fiduciary duties, which may limit our recourse against it;

 

 

the liability of our Sponsor is limited under our arrangements with it, and we have agreed to indemnify our Sponsor against claims, liabilities, losses, damages, costs or expenses which it may face in connection with those arrangements, which may lead it to assume greater risks when making decisions than it otherwise would if such decisions were being made solely for its own account, or may give rise to legal claims for indemnification that are adverse to the interests of our stockholders;

 

 

our Sponsor or a SunEdison sponsored consortium may want to acquire or dispose of the same asset as we do;

 

 

we may be, directly or indirectly, purchasing an asset from, or selling an asset to, our Sponsor;

 

 

there may be circumstances where we are acquiring different assets as part of the same transaction with our Sponsor;

 

 

our Sponsor will have the ability to designate a majority of the board of directors of Global and, therefore, it will continue to control Global and could cause Global to cause Global LLC to make distributions to its members, including our Sponsor, based on our Sponsor’s interests; and

 

 

other conflicting transactions involving us and our Sponsor.

The Corporate Governance and Conflicts Committee Charter described above will be adopted in connection with the completion of this offering, and as a result the transactions described above (including the Organizational Transactions) were not reviewed under such charter.

 

265


Table of Contents

Description of certain indebtedness

The following are summaries of certain provisions of our principal financing agreements and are qualified in their entirety by reference to all of the provisions of such agreements. Because these descriptions are only summaries of the applicable agreements, they do not necessarily contain all of the information that you may find useful. We therefore urge you to review the agreements in their entirety. Copies of the forms of the agreements have been filed as exhibits to the registration statement of which this prospectus is a part. See “Where you can find more information.”

Bridge Facility

Global LLC, and certain of our domestic subsidiaries, as guarantors, entered into the $150.0 million Bridge Facility on December 22, 2014, with JPMorgan Chase Bank, N.A. or “JPM,” as Administrative Agent, Collateral Agent, and Documentation Agent. See “Underwriting (conflicts of interest).” On May 6, 2015, the Bridge Facility was amended to increase the aggregate principal commitment to $450.0 million of which $87.5 million was subsequently prepaid with a portion of the net proceeds from the Units Private Placements. On June 5, 2015, the Bridge Facility was further amended to increase the aggregate principal amount of bridge commitments to $550.0 million, and all $100.0 million in additional commitments were drawn in full on such date. The borrowings under the Bridge Facility will be used for the acquisition of certain clean energy projects and to repay certain of the project-level indebtedness incurred by projects included in our initial portfolio. We intend to repay the outstanding borrowings under the Bridge Facility in connection with this offering. Borrowings that remain outstanding after completion of this offering, if any, will be refinanced under long-term debt financing.

The material terms of the Bridge Facility are summarized below.

Maturity and amortization

The Bridge Facility consists of a term loan maturing in December 2016. The principal amount of loans under the Bridge Facility is payable in consecutive semiannual installments on June 22, 2015, December 22, 2015, and June 22, 2016, in each case, in an amount equal to 0.50% of the original principal balance of the loans funded prior to such payment, with the remaining balance payable on the maturity date.

Interest rate

Provided that Global LLC is in compliance with the terms of the Bridge Facility all outstanding loans under the Bridge Facility will bear interest at a rate per annum equal to, at Global LLC’s option, either (a) a base rate plus 7.00% or (b) a reserve adjusted eurodollar rate plus 8.00%. The foregoing rates will increase by 0.25% on August 20, 2015 and will increase by an additional 0.25% every 90 days thereafter.

The reserve adjusted eurodollar rate is subject to a “floor” of 1.00% and the base rate is subject to a “floor” of 2.00%.

Securities demand

If loans under the Bridge Facility are not repaid by December 22, 2015, JPM and/or the majority lenders have the right to direct Global LLC to borrow loans or issue senior debt securities, in each case, on terms and conditions determined by JPM and/or the majority lenders, as applicable, in their sole discretion, and to use the proceeds to repay the loans.

 

266


Table of Contents

Prepayments

Loans under the Bridge Facility may be prepaid in whole or in part without premium or penalty. The Bridge Facility requires Global LLC to prepay outstanding loans in certain circumstances, including, subject to certain exceptions:

 

 

an amount equal to 100% of the net cash proceeds from the sale or other disposition of any of Global LLC’s or its subsidiaries’ (other than non-recourse subsidiaries’) property or assets;

 

 

an amount equal to 100% of the net cash proceeds of insurance paid on account of any loss of any of Global LLC’s or its subsidiaries’ (other than non-recourse subsidiaries’) property or assets;

 

 

except with respect to the net cash proceeds of the Units Private Placements, an amount equal to 100% of the net cash proceeds received from the issuance of equity securities of Global LLC to any entity other than SunEdison and its wholly-owned subsidiaries;

 

 

an amount equal to 100% of the net cash proceeds received by Global LLC or its subsidiaries (other than nonrecourse subsidiaries) from the incurrence of indebtedness by Global LLC or its subsidiaries (other than certain indebtedness permitted to be incurred under the Bridge Facility) net of underwriting discounts and commissions and other reasonable costs and expenses associated therewith; and

 

 

an amount equal to 100% of excess operating cash flow.

Representations and warranties

The Bridge Facility contains customary representations and warranties, including representations and warranties related to: organization, requisite power and authority; qualification; equity interests and ownership; due authorization; no conflict; governmental consents; binding obligation; historical financial statements; projections; no material adverse effect; no restricted junior payments; no adverse proceedings; payment of taxes; properties; environmental matters; no defaults; material contracts; governmental regulations; federal reserve regulations; Exchange Act; employee matters; employee benefit plans; certain fees; solvency; compliance with statutes; disclosure; anti-corruption laws and statutes; energy regulatory matters; and local law matters.

Covenants

The Bridge Facility contains customary affirmative covenants, including covenants related to: financial statements and other reports; existence; payment of taxes and claims; maintenance of properties; insurance; books and records; inspections; lenders meetings; compliance with laws; environmental matters; subsidiaries; additional material real estate assets; further assurances; cash management systems; ratings; energy regulatory status; post-closing obligations; and local law matters. The Bridge Facility also contains customary negative covenants that restrict our ability to take certain actions, including covenants related to: indebtedness; liens; negative pledges; restricted junior payments; restrictions on subsidiary distributions; investments; financial covenants; fundamental changes; dispositions of assets; acquisitions; disposal of subsidiary interests; sales and lease-backs; transactions with shareholders and affiliates; conduct of business; permitted activities of project holdcos; amendments or waivers of organizational documents and certain material contracts; fiscal year; use of proceeds; and local law matters. The Bridge Facility permits the acquisition of assets or equity interests of any person upon satisfaction of, among other things, lender due diligence, an 80% loan to value condition and a pro forma debt service coverage ratio condition. Compliance with a minimum debt service coverage ratio will be tested quarterly, beginning with the quarter ending June 30, 2015.

 

267


Table of Contents

Collateral

Loans under the Bridge Facility and each guarantee are secured by first priority security interests in (i) all of Global LLC’s and each guarantor’s assets, (ii) 100% of the capital stock of each of Global LLC’s domestic subsidiaries and (iii) all intercompany debt. Notwithstanding the foregoing, the collateral excludes the capital stock of nonrecourse subsidiaries.

Events of default

The Bridge Facility includes customary events of default, including payment defaults, breach of covenants, breach of representations or warranties, cross-defaults and cross-acceleration, certain bankruptcy and insolvency events, certain ERISA-related events, changes in control or ownership (including this offering), invalidity of any loan document and failure to acquire certain clean energy projects (or substitutes thereof) by certain dates and within certain pre-agreed project CAFD and enterprise value requirements.

Revolving credit facility

In connection with this offering, we anticipate that Global Operating LLC will enter into the Revolver, which is expected to provide for a revolving line of credit of approximately $         million. The Revolver will include borrowing capacity available for letters of credit and for incremental commitments of up to $         million. We expect that Global LLC will be a guarantor under the Revolver. The Revolver is expected to contain certain financial covenants, including maximum borrower leverage ratio and minimum borrower debt service coverage ratio. In general, Global Operating LLC expects that the Revolver will contain covenants that are customary for this type of financing, including limitations on indebtedness, liens, investments and restricted payments; provided, however, that we expect that each of Global Operating LLC and Global LLC will be permitted to pay distributions to unitholders out of available cash so long as no default or event of default under the Revolver shall have occurred and be continuing at the time of such distribution or would result therefrom and it is in compliance with its financial covenants. In connection with the Revolver, Global Operating LLC expects that Global LLC will be required to pledge 100% of the equity in Global Operating LLC as collateral to the lenders. Foreclosure upon such equity pledge would result in a substantial loss of value to us. See “Risk factors—Risks related to our business—If our subsidiaries default on their obligations under their project-level indebtedness, this may constitute an event of default under our Revolver, and we may be required to make payments to lenders to avoid such default or to prevent foreclosure on the collateral securing the project-level debt. If we are unable to or decide not to make such payments, we would lose certain of our renewable energy projects upon foreclosure.” Global Operating LLC expects that the Revolver will contain events of default that are customary for this type of financing. Global Operating LLC is still in preliminary discussions with potential arrangers and lenders with respect to the terms of the Revolver. The actual terms of the Revolver will depend on the results of negotiations with lenders. We expect that affiliates of certain of the underwriters will participate as arrangers and/or lenders under the Revolver.

Senior Notes

In connection with this offering, we intend to complete the sale of $         million of Senior Notes issued by Global Operating LLC in a private offering exempt from the registration requirements of the Securities Act to persons reasonably believed to be qualified institutional buyers in accordance with Rule 144A under the Securities Act and to persons outside of the United States pursuant to Regulation S under the Securities Act. The Senior Notes will bear interest at a fixed rate and be payable in cash semiannually. The Senior Notes will be general unsecured senior obligations of Global Operating LLC, guaranteed by Global LLC and will mature on the         anniversary of their issue date. Global will not guarantee the Senior Notes. The Senior Notes will be subject to customary redemption rights for high yield debt securities.

 

268


Table of Contents

The terms of the Senior Notes will be governed under an indenture between Global LLC, Global Operating LLC and a trustee. The indenture will provide that upon the occurrence of a change of control, as defined therein, Global Operating LLC must offer to repurchase the Senior Notes at 101% of the applicable principal amount, plus accrued and unpaid interest and additional interest, if any, to the repurchase date. The indenture will also contain customary negative covenants, subject to a number of important exceptions and qualifications, applicable to Global LLC, Global Operating LLC and its restricted subsidiaries, including, without limitation, covenants related to: indebtedness, disqualified stock and preferred stock; dividends and distributions to stockholders and parent entities; repurchase and redemption of capital stock; investments; transactions with affiliates; liens; mergers, consolidations and transfers of substantially all assets; transfer or sale of assets, including capital stock of subsidiaries; and prepayment, redemption or repurchase of indebtedness subordinated to the Senior Notes. The indenture will also provide for customary events of default which, if any of them occurs, would permit or require the principal of and accrued interest on the Senior Notes to become or to be declared due and payable. Global Operating LLC is still in preliminary discussions with potential initial purchasers with respect to the terms of the Senior Notes. The actual terms of the Senior Notes will depend on the results of negotiations with such initial purchasers and market conditions when such are issued. We expect that affiliates of certain of the underwriters will participate as initial purchasers of the Senior Notes.

Project-level financing arrangements

As summarized below, we have outstanding project-specific non-recourse financing that is backed by certain of our renewable energy system assets, including liens on such assets in favor of the applicable lenders. The shares or other equity interests of the project-level entities have also generally been pledged as security under such financing arrangements. These financing arrangements generally include customary covenants, such as restrictive covenants that limit the ability of the project-level entities to make cash distributions to their parent companies and ultimately to us if certain financial ratios are not met.

Our Brazil projects

Bahia

The Bahia project is financed with a BRL-denominated term loan from the Brazilian Development Bank, which had an outstanding principal amount of approximately BRL 279.4 million (approximately $85.1 million) as of March 31, 2015. The term loan matures in the second quarter of 2029. The term loan bears interest at a variable rate equal to the sum of the TJLP plus 2.18% per annum. As of March 31, 2015, the effective interest rate on the term loan was approximately 7.68% per annum. The Bahia project is also financed by a sub-loan, which has an outstanding principal amount of approximately BRL 2.5 million (approximately $0.8 million). The sub-loan matures in the second quarter of 2029. The sub-loan bears variable interest equal to the TJLP with a two-year grace period for interest payments and a six-year grace period for principal payments. The term loan contains various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios. We expect to repay this project-level indebtedness with the proceeds from this offering.

ESPRA

The ESPRA project is financed with a BRL-denominated term loan from Bank of the Northeast of Brazil, which had an outstanding principal amount of approximately BRL 95.2 million (approximately $29.0 million) as of March 31, 2015. The term loan matures in the second quarter of 2026. The term loan bears interest rate at the fixed rate of 9.5% per annum (which can be reduced to 8.08% due to the 15.0% timely payment bonus). The

 

269


Table of Contents

term loan contains various customary restrictive covenants, including covenants restricting the payment of distributions. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios. We expect to repay this project-level indebtedness with the proceeds from this offering.

Salvador

The Salvador project is financed with a BRL-denominated term loan from the Brazilian Development Bank, which had an outstanding principal amount of approximately BRL 571.1 million (approximately $173.9 million) as of March 31, 2015. The term loan matures in the second quarter of 2029. The term loan bears interest at a variable rate equal to the sum of the Brazil Long-Term Interest Rate, or “TJLP,” plus 1.92% per annum. As of March 31, 2015, the effective interest rate on the term loan was approximately 7.42% per annum. The Salvador project is also financed by a sub-loan, which has an outstanding principal amount of approximately BRL 4.1 million (approximately $1.2 million). The sub-loan matures in the second quarter of 2019. The sub-loan bears variable interest equal to the TJLP with a two-year grace period for interest payments and a six-year grace period for principal payments. The term loan contains various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios. We expect to repay this project-level indebtedness with the proceeds from this offering.

Our India projects

NSM 24

The NSM 24 project is financed with an INR-denominated term loan by a syndicate of International Finance Corporation and PTC India Financial Services Limited, which had an outstanding principal amount of approximately INR 1.6 billion (approximately $26.0 million) as of March 31, 2015. The term loan matures in the second quarter of 2028. Approximately INR 624 million (approximately $9.8 million) of the term loan is provided by International Finance Corporation and bears interest at a variable rate equal to a fixed base rate plus a fixed spread of 4.5% per annum. As of March 31, 2015 the interest rate for this portion of the debt was 12.0% per annum. The remaining approximately INR 1.0 billion (approximately $16 million) is provided by PTC India Financial Services Limited and bears interest at a variable rate, which consists of the applicable lenders’ benchmark reference rate plus a spread, and as of March 31, 2015 the effective interest rate was 12.75% per annum. As of March 31, 2015, the effective interest rate on the portion of the term loan denominated in INR was 12.75% per annum. The term loan contains various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios. We expect to repay this project-level indebtedness with the proceeds from this offering.

NSM Suryalabh

The NSM Suryalabh project is financed with an INR-denominated term loan from Rabobank International and Rabo India Finance Limited, which had an outstanding principal amount of approximately INR 1.8 billion (approximately $29.4 million) as of March 31, 2015. The short-term construction loan matures in the second quarter of 2016. The loan bears interest at a variable rate equal to the sum of a base rate, which is published by the Reserve Bank of India, and a spread which on the date of execution was 2.75% per annum and is reset annually. As of March 31, 2015, the effective interest rate on the term loan was 12.5% per annum. Interest

 

270


Table of Contents

payments are made on a monthly basis, and the principal amount is payable in a single installment upon maturity. The short-term construction loan may be replaced with a long-term senior debt upon maturity. The short-term construction loan contains various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios. We expect to repay this project-level indebtedness with the proceeds from this offering.

NSM Sitara

The NSM Sitara project is financed with an INR-denominated term loan from L&T Infrastructure Finance Company Limited, which had an outstanding principal amount of approximately INR 1.5 billion (approximately $23.6 million) as of March 31, 2015. Tranche A of the term loan matures in the second quarter of 2029 and tranche B matures on the earlier of March 31, 2017 or the date of receipt of the viability gap funding. Both tranches bear interest at a variable rate. The term loan bears interest at the lender’s prime lending rate (which was 15.75% per annum on the date of execution of the credit agreement) minus 2.75% per annum. The interest rate is indexed to the prime lending rate on a fully floating basis. As of March 31, 2015, the effective interest rate on the term loan was 13.0% per annum. The lender has a right to reset the spread on an annual basis. The term loan contains various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios. We expect to repay this project-level indebtedness with the proceeds from this offering.

NSM L’Volta

The NSM L’Volta project is financed with an INR-denominated term loan from L&T Infrastructure Finance Company Limited, which had an outstanding principal amount of approximately INR 1.0 billion (approximately $16.0 million) as of March 31, 2015. Tranche A of the term loan matures in the second quarter of 2029 and tranche B matures on the earlier of March 31, 2017 or the date of receipt of the viability gap funding. Both tranches bear interest at a variable rate equal to the lender’s prime lending rate (which was 15.75% per annum on the date of execution of the credit agreement) minus 3% per annum before COD and the lender’s prime lending rate minus 3.25% post COD. The interest rate is indexed to the prime lending rate on a fully floating basis. As of March 31, 2015, the effective interest rate was 12.75% per annum. The lender has a right to reset the spread on an annual basis. Interest and principal amortization payments are made on a monthly basis with respect to Tranche A. The term loan contains various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios. We expect to repay this project-level indebtedness with the proceeds from this offering.

Brakes

The Brakes project is financed with an INR-denominated term loan from L&T Infrastructure Finance Company Limited, which had an outstanding principal amount of approximately INR 354.0 million (approximately $5.7 million) as of March 31, 2015. The term loan matures on December 31, 2029 and bears interest at a variable rate equal to the sum of the lender’s prime lending rate (which was 15.75% on the date of execution) minus a spread of 3%. The spread is reset on a yearly basis starting on the anniversary of the first borrowing. As of March 31, 2015, the effective interest rate on the the term loan was 12.75% per annum. Interest and principal amortization payments are made on a monthly basis. The term loan contains various customary

 

271


Table of Contents

restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios. We expect to repay this project-level indebtedness with the proceeds from this offering.

Raj 5

The Raj 5 project is financed with an INR-denominated term loan from IDFC Limited, which had an outstanding principal amount of approximately INR 376.3 million (approximately $6.0 million) as of March 31, 2015. The term loan matures in the second quarter of 2026 and bears interest at a variable rate equal to the sum of the 2 year IDFC benchmark interest rate on date of disbursement and a 2.50% per annum spread. As of March 31, 2015, the effective interest rate on the term loan was 12.0%. This rate will reset in 2016, and every second year thereafter. Interest payments are made monthly while principal amortization payments are made on a quarterly basis. The term loan contains various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios. We expect to repay this project-level indebtedness with the proceeds from this offering.

Focal

The Focal project is financed with an INR-denominated term loan from L&T Infrastructure Finance Co., which had an outstanding principal amount of approximately INR 696.2 million (approximately $11.1 million) as of March 31, 2015. The term loan has three tranches. The first tranche matures in March 2016, the second tranche matures in December 2030 and the third tranche matures in December 2033. The term loan bears interest at a variable rate equal to the difference of a base rate, the L&T Infra Prime Lending Rate, and a spread of 3.35% per annum post-COD. As of March 31, 2015, the effective interest rate on the term loan was 12.75% per annum. Interest payments are made on a monthly basis. The principal amount on the first tranche is payable in a single installment upon maturity. The principal amount for the second and third tranches amortize on a monthly basis after an 18-month moratorium. The term loan contains various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios. We expect to repay this project-level indebtedness with the proceeds from this offering.

Millenium

The Millenium project is financed with an INR-denominated term loan from L&T Infrastructure Finance Company Limited, which had an outstanding principal amount of approximately INR 855.7 million (approximately $13.7 million) as of March 31, 2015. The term loan matures on March 1, 2026 and bears interest at a variable rate equal to the sum of the lender’s prime lending rate minus a spread of 2.75%. The spread is reset on a yearly basis starting on the anniversary of the first borrowing. As of March 31, 2015, the effective interest rate on the term loan was 13.00% per annum. Interest and principal amortization payments are made on a monthly basis. The term loan contains various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios. We expect to repay this project-level indebtedness with the proceeds from this offering.

 

272


Table of Contents

SE 25

The SE 25 project is financed with an INR-denominated term loan from Aditya Birla Finance Limited, or “ABFL,” which had an outstanding principal amount of approximately INR 2.5 billion (approximately $40.2 million) as of March 31, 2015. During the quarter ended March 31, 2015, ABFL novated a portion of their outstanding term loan aggregating approximately INR 1.26 billion (approximately $20.1 million) to Axis Bank Limited. The term loan matures on June 30, 2029 and bears interest at a variable rate equal to the sum of ICICI base rate plus a spread of 2.40%. The spread is reset on a yearly basis starting on the anniversary of the first borrowing. As of March 31, 2015, the effective interest rate on the term loan was 12.4% per annum. Principal amortization payments are made quarterly and interest payments are made on a monthly basis. The term loan contains various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios. We expect to repay this project-level indebtedness with the proceeds from the Bridge Facility.

Azure

The Azure project is financed with a U.S. dollar-denominated term loan from Overseas Private Investment Corporation, an agency of the United States of America, or “OPIC,” which had an outstanding principal amount of approximately $10.7 million as of March 31, 2015. The term loan matures on September 15, 2026 and bears fixed interest at a rate of 4.70% per annum. Interest and principal amortization payments are made on a quarterly basis. The term loan contains various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios. We expect to repay this project-level indebtedness with the proceeds from this offering.

ESP Urja

The ESP Urja project is financed with a U.S. dollar-denominated term loan from OPIC, which had an outstanding principal amount of approximately $10.4 million as of March 31, 2015. The term loan matures on December 31, 2026 and bears fixed interest at a rate of 4.54% per annum. Interest and principal amortization payments are made on a quarterly basis. The term loan contains various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios. We expect to repay this project-level indebtedness with the proceeds from this offering.

Bhakrani

The Bhakrani project is financed with an INR-denominated term loan from Indian Renewable Energy Development Agency, or “IREDA,” which had an outstanding principal amount of approximately INR 732.0 million (approximately $11.7 million) as of March 31, 2015. The term loan matures in January 2026 and bears fixed interest at a rate of 12.25% per annum. Interest and principal payments are made on a quarterly basis. The term loan contains various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios. We expect to repay this project-level indebtedness with the proceeds from this offering.

 

273


Table of Contents

Gadag

The Gadag project is financed with an INR-denominated term loan from IREDA, which had an outstanding principal amount of approximately INR 396.2 million (approximately $6.3 million) as of March 31, 2015. The term loan matures in March 2018 and bears fixed interest at a rate of 12.50% per annum. Interest and principal payments are made on a quarterly basis. The term loan contains various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios. We expect to repay this project-level indebtedness with the proceeds from this offering.

Hanumanhatti

The Hanumanhatti project is financed with an INR-denominated term loan from IREDA, which had an outstanding principal amount of approximately INR 1.4 billion (approximately $22.2 million) as of March 31, 2015. The term loan matures in January 2024 and bears fixed interest at a rate of 12.25% per annum. Interest and principal payments are made on a quarterly basis. The term loan contains various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios. We expect to repay this project-level indebtedness with the proceeds from this offering.

Our Honduras projects

Cerro de Hula

The Cerro de Hula project is financed with two U.S. dollar-denominated credit facilities, which had an outstanding principal amount of approximately $229.8 million as of March 31, 2015. The first facility is with the Export-Import Bank of the United States, or “Ex-Im,” and had an outstanding principal amount of approximately $164.1 million as of March 31, 2015. The second facility is with the Central American Bank for Economic Integration, or “CABEI,” and had an outstanding principal amount of approximately $65.7 million as of March 31, 2015. The Ex-Im facility has two tranches. The first tranche matures in the first quarter of 2029 and bears interest at a fixed rate of 7.0% per annum. The second tranche matures in the third quarter of 2031 and bears fixed interest at a rate of 3.72% per annum. The CABEI facility has two tranches. The first tranche matures in the third quarter of 2025 and bears interest at a variable rate equal to the sum of the LIBOR plus 5.75% per annum. The second tranche matures in the third quarter of 2028 and bears variable interest rate of LIBOR plus 5.75% per annum. The credit facilities contain various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios.

Choluteca

The Choluteca project is financed with several U.S. dollar-denominated senior credit facilities, which had an outstanding principal amount of approximately $126.0 million as of March 31, 2015. The project also has two U.S. dollar-denominated subordinated credit facilities, which had an outstanding principal amount of approximately $20.0 million as of March 31, 2015. The senior credit facilities mature in the second quarter of 2031 and bear interest at a variable rate equal to the sum of the LIBOR plus a weighted average of 5.10% per annum. The subordinated credit facilities both mature in the second quarter of 2031 and bear interest at a

 

274


Table of Contents

variable rate equal to the sum of the LIBOR plus a weighted average of 7.20% per annum. The credit facilities contain various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios.

Our China projects

Dunhuang

The Dunhuang project is financed with construction financing from Shanghai Electrical Power Design, which had an outstanding principle amount of approximately CNY 126 million (approximately $20.3 million) as of March 31, 2015. The construction financing matures in December 2016. The construction financing bears fixed interest at a rate of 8% per annum. The construction financing contains various customary restrictive covenants, including covenants restricting the payment of distributions. We will use the proceeds from this offering to repay the outstanding amounts due under the construction financing.

Hercules

The Hercules project is financed with CNY-denominated term loans from China Minsheng Bank, or “Minsheng,” and Standard Chartered Bank, or “Standard.” The Minsheng term loan had an outstanding principal amount of approximately CNY 199.9 million (approximately $32.2 million) as of March 31, 2015, matures in May 2021 and bears interest at 110% of the People’s Bank of China’s five-year loan rate (currently 6.765% per annum). The Standard term loan had an outstanding principal amount of approximately CNY 225.4 million (approximately $36.3 million) as of March 31 2015, matures in July 2015 and bears interest at the one- to three-year CNY benchmark loan rate plus an additional 30% of such rate per annum (currently at 7.8% per annum). Interest payments are made in six-month intervals, and the principal amount is payable in a single installment upon maturity. Both term loans contain various customary restrictive covenants, including covenants restricting the payment of distributions. We will use the proceeds from the Bridge Facility to repay the outstanding amounts due under the Minsheng term loan and the Standard term loan.

Our South Africa projects

Boshof

The Boshof project is financed with a fully swapped term loan from Overseas Private Investment Corporation, which had an outstanding principal amount of approximately $185.0 million as of March 31, 2015. The term loan matures in the third quarter of 2031 and, as of March 31, 2015, after adjusting for the related swap agreement, bears interest at a fixed rate of 13.03% per annum. Interest and principal amortization payments are made on a quarterly basis. The term loan is denominated in U.S. dollars and 100% of the U.S. dollar exposure is hedged. The term loan contains various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios.

 

275


Table of Contents

Klipheuwel

The Klipheuwel project is financed with a ZAR-denominated syndicated credit facility, which had an outstanding principal amount of term loans issued under the credit facility of approximately ZAR 480.3 million (approximately $39.6 million) as of March 31, 2015. Standard Bank of South Africa, or “Standard Bank,” holds approximately ZAR 336.2 million (approximately $27.7 million) and Industrial Development Corporation of South Africa Limited, or “Industrial Development,” holds approximately ZAR 144.1 million (approximately $11.9 million) of the loans issued. The term loans mature in December 2028. The Standard Bank term loan bears interest at a variable rate equal to the sum of the Johannesburg Interbank Agreed Rate, or “JIBAR,” plus a margin of 4.05% per annum. The Industrial Development term loan bears interest at a fixed rate of 7.7% plus a margin of 3.9% per annum. Interest payments on the term loans are made on a quarterly basis and principal payments are made on a bi-annual basis. The credit agreement governing the credit facility contains various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios.

Aries and Konkoonsies

The Aries and Konkoonsies projects are jointly financed with a ZAR-denominated syndicated credit facility, which had an outstanding principal amount of term loans issued under the credit facility of approximately ZAR 442.5 million (approximately $36.5 million) as of March 31, 2015. Nedbank of South Africa Limited, or “Nedbank,” holds approximately ZAR 220.9 million (approximately $18.2 million) and Industrial Development holds approximately ZAR 221.6 million (approximately $18.3 million) of the loans issued. The term loans mature in December 2028. The Nedbank term loan bears interest at a variable rate equal to the sum of the JIBAR plus a margin of 3.9% per annum. The Industrial Development term loan bears interest at a fixed rate of 7.7% plus a margin of 3.8% per annum. Interest payments on the term loans are made on a quarterly basis and principal payments are made on a bi-annual basis. The credit agreement governing the credit facility contains various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios.

Witkop

The Witkop project is financed with a ZAR-denominated term loan from the Standard Bank of South Africa Limited, which had an outstanding principal amount of ZAR 1.0 billion ($85.4 million) as of March 31, 2015. The loan was disbursed in three tranches. The term loan matures on August 26, 2030 and bears interest at a variable rate. The interest rate for the Senior Term A Facility and the Senior Term C Facility is the sum of the base rate, the three-month JIBAR, plus a spread of 4.15% post COD. The interest rate for the Senior Term B Facility is the sum of a fixed 7.58% base rate (during operating period) plus a spread of 4.10% post COD. As of March 31, 2015, the average interest rate for all three tranches of the term loan was 10.37% per annum. Interest and principal payments are made on a semiannual basis. The interest rate on the term loan is 100% hedged for the first 5 years, 78% hedged for the next 5 years and 12% hedged for the remaining years. This represents an economic hedge and no hedge accounting is applied. The term loan contains various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios.

 

276


Table of Contents

Soutpan

The Soutpan project is financed with a ZAR-denominated term loan from the Standard Bank of South Africa Limited, which had an outstanding principal amount of ZAR 927.7 million ($76.5 million ) as of March 31, 2015. The loan is disbursed in three tranches. The term loan matures on March 31, 2031, and bears interest at a variable rate. The interest rate for the Senior Term A Facility and the Senior Term C Facility is the sum of the base rate, the three-month JIBAR, plus a spread of 4.15% and for the Senior Term B Facility is the sum of the fixed base rate (5% during construction period and 7.5% during operating period) plus a spread of 4.15% post COD. As of March 31, 2015, the average interest rate of all three tranches of the term loan was 10.38% per annum. Interest and principal payments are made on a semiannual basis. The loan is denominated in ZAR. The interest rate is 100% hedged for the first 5 years, 78% hedged for the next 5 years and 12% hedged for the remaining years. This represents an economic hedge and no hedge accounting is applied. The term loan contains various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios.

Our Costa Rica projects

Orosi

The Orosi project is financed with three U.S. dollar-denominated syndicated credit facilities, which had an outstanding principal amount of approximately $78.3 million as of March 31, 2015. The first facility matures in the fourth quarter of 2031 and the second and third facilities mature in the fourth quarter of 2028. The first facility had an outstanding principal amount of approximately $52.0 million as of March 31, 2015 and bears fixed interest at a rate of 3.94% per annum. The second facility had an outstanding principal amount of approximately $12.0 million as of March 31, 2015 and bears interest at a variable rate equal to the sum of the LIBOR plus 4.00% per annum. The third facility had an outstanding principal amount of approximately $14.2 million as of March 31, 2015 and bears interest at a variable rate equal to the sum of the LIBOR plus 4.00% per annum. The project also has approximately $18.7 million in intercompany debt. The syndicated credit facilities contain various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios. We expect to repay this project-level indebtedness with the proceeds from this offering.

Our Peru projects

Junín

The Junin project is financed with a U.S. dollar-denominated syndicated credit facility, which had an outstanding principal amount of approximately $60.9 million as of March 31, 2015. The credit facility has term loans issued in three tranches. The first tranche matures in April 2026 and the second and third tranches mature in April 2028. The first tranche had an outstanding principal amount of approximately $16.6 million as of March 31, 2015 and bears fixed interest at a rate of 8.5% per annum. The second tranche had an outstanding principal amount of approximately $22.2 million as of March 31, 2015 and bears fixed interest at a rate of 8.7% per annum. The third tranche had an outstanding principal amount of approximately $22.2 million as of March 31, 2015 and bears interest at a variable rate equal to the three-month LIBOR plus 6.00% per annum. The term loans contain various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios. We expect to repay this project-level indebtedness with the proceeds from this offering.

 

277


Table of Contents

HSC

The HSC project is financed with a U.S. dollar-denominated senior credit facility with Banco Internacional del Perú, S.A.A., which had an outstanding principal amount of approximately $24.5 million as of March 31, 2015. The term loans issued under the senior credit facility mature in November 2022 and bear fixed interest at a rate of 7.3% per annum. Interest and principal payments are made monthly. The term loans contain various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios. We expect to repay this project-level indebtedness with the proceeds from this offering.

Our Nicaragua project

Eolo

The Eolo project is financed with U.S. dollar-denominated loans issued under senior and subordinated credit facilities, which had an outstanding principal amount of $85.7 million as of March 31, 2015. The credit facilities mature in the first quarter of 2027. The first senior credit facility had an outstanding principal amount of $26.2 million as of March 31, 2015 and bears fixed interest at a rate of 7.28% per annum. The second senior credit facility had an outstanding principal amount of $24.8 million as of March 31, 2015 and bears fixed interest at a rate of 7.21% per annum. The third senior credit facility had an outstanding principal amount of $23.4 million as of March 31, 2015 and bears fixed interest at a rate of 8.17% per annum. The subordinated credit facility had an outstanding principal amount of $11.2 million as of March 31, 2015 and bears fixed interest at a rate of 12.50% per annum. The credit facilities contain various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios.

Our Thailand project

PP Solar

The PP Solar project is financed with a THB-denominated term loan from the Siam Commercial Bank Public Company, which had an outstanding principal amount of approximately THB 224.2 million (approximately $6.9 million) as of March 31, 2015. The term loan matures in the first quarter of 2024 and bears interest at a variable rate equal to a base rate minus 2%. The project consists of three construction phases of approximately 1.2 MW each. The Company has entered into an interest rate swap for the first two phases with all of the base rate swapped to a fixed rate of 6.47%. The loan for the third phase has not yet been swapped. As of March 31, 2015, the effective interest rate on the term loan was 4.75% per annum. Interest and principal amortization payments are made on a quarterly basis. The term loan contains various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios. We expect to repay this project-level indebtedness with the proceeds from this offering.

 

278


Table of Contents

Our Malaysia projects

Silverstar Pavilion

The Silverstar Pavilion project currently has an outstanding shareholder loan (51% of which is owed to us). As of March 31, 2015, the outstanding principal amount under the shareholder loan was approximately $5.8 million with a fixed interest rate of 4% per annum. The shareholder loan matures in May 2033.

Fortune 11

The Fortune 11 project is financed with a term loan with an outstanding principal amount under the term loan of approximately MYR 33.4 million (approximately $9.4 million) as of March 31, 2015. The term loan matures in the third quarter of 2028 and bears interest at a variable rate based on the three-month KLIBOR plus a credit spread, which increases over time, and a statutory reserve cost. As of March 31, 2015, the interest rate on the term loan was approximately 6.28%. The credit spread is 2.2% for the first two years, 2.6% for the next three years, 2.9% for the next five years and 3.2% for the last five years. The statutory reserve cost varies between 0.15% and 0.2%. We have entered into an interest rate swap agreement, which limits our interest rate risk with respect to the term loan. The swap agreement swaps the three-month KLIBOR floating base rate to a fixed interest cost of 4.4% on the majority of the principal. Interest and principal amortization payments are made on a quarterly basis. The term loan contains various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios. We expect to repay this project-level indebtedness with the proceeds from this offering.

The project currently has an outstanding shareholder loan (95% of which is owed to us). As of March 31, 2015, the outstanding principal amount under the shareholder loan was approximately $2.6 million with a fixed interest rate of 4% per annum. The shareholder loan matures in March 2033.

Corporate Season

The Corporate Season project is financed with a term loan that matures in the fourth quarter of 2028. As of March 31, 2015, the outstanding principal amount under the term loan was approximately MYR 26.4 million (approximately $7.1 million). The interest on the term loan is based on the three-month KLIBOR plus a credit spread that increases over time and a statutory reserve cost. The project is also eligible for debt financing benefits regarding renewable energy incentives from the local government in the form of: (i) a 2% interest rate rebate and (ii) a credit guarantee from the Credit Guarantee Corporation of Malaysia (which costs 0.5% increase in interest rate). As of March 31, 2015, the interest rate was approximately 6.58%. The credit spread is 1.9% for the first two years, 2.3% for the next three years, 2.6% for the next five years and 2.9% for the last five years. The statutory reserve cost varies between 0.15% and 0.2%. Interest and principal amortization payments are made on a quarterly basis. The term loan contains various customary restrictive covenants, including covenants restricting the payment of distributions and requiring maintenance of certain financial ratios. See “—Summary of financial and distribution covenants” for additional information regarding particular financial maintenance and restricted payment ratios.

The project currently has an outstanding shareholder loan (62% of which is owed to us). As of March 31, 2015, the outstanding principal amount under the shareholder loan was approximately $1.3 million with a fixed interest rate of 4% per annum. The shareholder loan matures in May 2033.

 

279


Table of Contents

Summary of financial and distribution covenants

The following table summarizes the principle financial ratios that govern distributions from our project entities or that the project entities are required to maintain.

 

Project    Distribution requirements(1)    Financial maintenance
covenants
   Cash sweep trigger

Salvador

  

1.30x debt service coverage 3x monthly O&M and debt service costs

  

1.30x debt service coverage

  

N/A

Bahia

  

1.30x debt service coverage 3x monthly O&M and debt service costs

Distributions prohibited until January 2018

  

1.30x debt service coverage

  

N/A

ESPRA

  

Prior consent

  

N/A

  

N/A

NSM Suryalabh

   1.10x debt service coverage(2)    1.10x debt service coverage    N/A

NSM Sitara

   1.10x debt service coverage(2)   

1.10x debt service coverage

1.20x fixed asset coverage

   N/A

NSM L’Volta

   1.10x debt service coverage(2)   

1.10x debt service coverage

1.20x fixed asset coverage

   N/A

NSM 24

  

1.30x debt service coverage(2)

65:35 debt to equity(3)

   1.30x debt service coverage(2)    N/A

Brakes

   1.10x debt service coverage(2)   

1.05x debt service coverage

2x debt to equity(3)

   cash sweep imposed if debt service coverage ratio is less than 1.10x, or the off-taker defaults on its obligations under the PPA

Raj 5

  

1.15x debt service coverage(2)

2x debt to equity(3)

  

1.15x debt service coverage

2x debt to equity(3)

   N/A

Focal

  

Dividend payments must be made from retained earnings

3x debt to equity

1.10x debt service coverage(2)

1.20x fixed asset coverage

  

3x debt to equity

1.10x debt service coverage

1.20x fixed asset coverage

   cash sweep imposed if debt service coverage ratio is above 1.20x on March 31, annually

Millenium

  

1.10x debt service coverage

1.20x fixed asset coverage

  

1.10x debt service coverage

1.20x fixed asset coverage

   cash sweep imposed if debt service coverage ratio is above 1.25x, tested annually

SE 25

   1.15x debt service coverage    1.15x debt service coverage    cash sweep imposed if debt service coverage ratio is above 1.20x

Azure

  

3x indebtedness to tangible net worth

1.30x current assets to current liabilities

1.30x debt service coverage

  

3x, indebtedness to tangible net worth

1.30x current assets to current liabilities

1.15x debt service coverage

   cash sweep imposed if debt service coverage ratio less than 1.20x

 

280


Table of Contents
Project    Distribution requirements(1)    Financial maintenance
covenants
   Cash sweep trigger

ESP Urja

  

3x indebtedness to tangible net worth

1.30x current assets to current liabilities

1.30x debt service coverage

  

3x indebtedness to tangible net worth

1.30x current assets to current liabilities

1.15x debt service coverage

   cash sweep imposed if debt service coverage ratio is less than 1.20x

Bhakrani

  

N/A

  

2x quarterly interest and principal reserve account

   N/A

Gadag

  

N/A

  

2x quarterly interest and principal reserve account

   N/A

Hanumanhatti

  

N/A

  

2x quarterly interest and principal reserve account

   N/A

Junĺn

   1.35x debt service coverage 1.35x forecasted debt service coverage    1.25x debt service coverage 7.50x debt to EBITDA    N/A

HSC

  

1.4x debt service coverage 2x liabilities to assets

5x debt to EBITDA

   1.40x debt service coverage 2x liabilities to assets 5x debt to EBITDA    N/A

Fortune 11

  

1.15x debt service coverage

1.20x loan life coverage(4)

4x debt to equity

  

1.15x debt service coverage

1.20x loan life coverage(4)

4x debt to equity

   cash sweep imposed if for two consecutive quarters less than all of the distribution financial ratio requirements are satisfied

Corporate Season

  

1.15x debt service coverage

1.20x loan life coverage(4)

4x debt to equity

  

1.15x debt service coverage

1.20x loan life coverage(4)

4x debt to equity

   cash sweep imposed if for two consecutive quarters less than all of the distribution financial ratio requirements are satisfied

Boshof

  

1.10x quarterly debt service coverage

1.15x debt service coverage

1.15x forecasted debt service coverage

  

1.05x debt service coverage

1.05x forecasted debt service coverage

3x debt to equity

  

N/A

Aries

  

1.20x debt service coverage

1.20x forecasted debt service coverage

1.25x loan life coverage(5)

  

1.10x debt service coverage

1.10x forecasted debt service coverage

1.10x loan life coverage(5)

  

N/A

Konkoonsies

  

1.20x debt service coverage

1.20x forecasted debt service coverage

1.25x loan life coverage

  

1.10x debt service coverage

1.10x forecasted debt service coverage

1.10x loan life coverage

  

N/A

 

281


Table of Contents
Project    Distribution requirements(1)    Financial maintenance
covenants
   Cash sweep trigger

Klipheuwel

  

1.20x debt service coverage

1.20x forecasted debt service coverage

1.20x loan life coverage

1.35x project life coverage(6)

  

1.10x debt service coverage

1.10x forecasted debt service coverage

1.15x loan life coverage

1.30x project life coverage(6)

  

N/A

Witkop

  

1.25x forecast debt service coverage

1.25x debt service coverage

1.30x loan life coverage(4)

1.40x project life coverage(6)

  

1.10x forecast debt service coverage

1.10x debt service coverage

1.20x loan life coverage(4)

1.35x project life coverage(6)

3x debt to equity

   cash sweep applied in reverse order of maturity from 11th year to bring down the loan tenure from 17 to 15 years

Soutpan

  

1.25x forecast debt service coverage

1.25x debt service coverage

1.30x loan life coverage(4)

1.40x project life coverage(6)

  

1.10x forecast debt service coverage

1.10x debt service coverage

1.20x loan life coverage(4)

1.35x project life coverage(6)

3x debt to equity

   cash sweep applied in reverse order of maturity from 11th year to bring down the loan tenure from 17 to 15 years

PP Solar

   1.15x debt service coverage   

1.05x debt service coverage

3x debt to equity

   N/A

Orosi

  

1.25x debt service coverage

1.30x forecasted debt service coverage

3x debt to equity

  

1.25x debt service coverage 1.30x forecasted debt service coverage

3x debt to equity

   N/A

Cerro de Hula

  

1.25x debt service coverage

1.25x forecasted debt service

4.55x debt to equity until 2021

3x debt to equity 2021 onward

  

1.25x debt service coverage

$48.0 million minimum share capital

   N/A

Eolo

  

1.20x senior debt service coverage

1.15x total debt service coverage

1.30x forecasted debt service coverage

1.15x forecasted total debt service coverage

2.33x debt to equity

  

1.20x senior debt service coverage ratio

1.15x total debt service coverage ratio

70:30 financial debt to net worth ratio

   N/A

Choluteca

  

1.30x senior debt service coverage

1.30x forecasted senior debt service coverage

3x debt to equity

  

1.20x senior debt service coverage

1.15x total debt service coverage

2.33x debt to equity

   Two consecutive periods of debt service coverage below 1.30x

 

(1)   Ratio calculations exclude the principal amount and interest expense payable to related shareholder loans.

 

282


Table of Contents
(2)   Lender consent is required for all distributions regardless of whether the covenants are otherwise satisfied.

 

(3)   Calculated on original equity capital investment.

 

(4)   Loan life coverage ratio is the ratio of the net present value of projected cash debt service payments to the outstanding principal amount of total debt.

 

(5)   Loan life coverage ratio is the ratio of the net present value of projected cash available for debt service payments through the final maturity date to the outstanding principal amount of total debt.

 

(6)   Project life coverage ratio is the ratio of the net present value of projected cash available for debt service payments through the PPA termination date to the outstanding principal amount of total debt.

 

283


Table of Contents

Description of capital stock

The following is a description of the material terms of our amended and restated certificate of incorporation and our amended and restated bylaws, as each will be in effect upon completion of the offering. The following description may not contain all of the information that is important to you. To understand them fully, you should read our amended and restated certificate of incorporation and our amended and restated bylaws, forms of which have been or will be filed with the SEC as exhibits to our registration statement of which this prospectus is a part. See “Where you can find more information.”

Authorized capitalization

We currently have three classes of authorized common stock: 500,000 shares of Class A common stock, 500,000 shares of Class B common stock, and 100,000 shares of Class C common stock. Effective upon the filing of our amended and restated certificate of incorporation prior to the completion of this offering, we will effect a             -for-one stock split of the outstanding shares of our Class A common stock and a             -for-one stock split of the outstanding shares of our Class B common stock, and our outstanding Class C common stock will be converted into shares of our Class A common stock on a             -for-one basis. All of the shares of Class A common stock held by our Sponsor will be retired for no consideration immediately prior to the filing of such amended and restated certificate of incorporation.

Upon completion of this offering and based on the assumptions set forth in “Summary—The offering—Certain assumptions,” our authorized capital stock will consist of             shares of Class A common stock, par value $0.01 per share, of which             shares will be issued and outstanding,             shares of Class B common stock, par value $0.01 per share, of which             shares will be issued and outstanding,             shares of Class B1 common stock, par value $0.01 per share, none of which will be issued and outstanding, and             shares of preferred stock, par value $0.01 per share, none of which will be issued and outstanding. In addition, upon completion of this offering, (i) an aggregate of             shares of our Class A common stock will be reserved for future issuance under the 2014 Incentive Plan, as described in “Executive officer compensation—Equity incentive awards—TerraForm Global, Inc. 2014 Long-Term Incentive Plan,” and (ii) an aggregate of             shares of our Class A common stock will be reserved for issuance upon the exchange of Class B units. Unless our board of directors determines otherwise, we will issue all shares of our capital stock in uncertificated form.

Class A common stock

Voting rights

Each share of Class A common stock and Class B1 common stock entitles the holder to one vote with respect to each matter presented to our stockholders on which the holders of Class A common stock or Class B1 common stock, as applicable, are entitled to vote. Holders of shares of our Class A common stock, Class B common stock and Class B1 common stock vote together as a single class on all matters presented to our stockholders for their vote or approval, except as otherwise required by applicable law. Holders of our Class A common stock and Class B1 common stock will not have cumulative voting rights. Except in respect of matters relating to the election and removal of directors on our board of directors and as otherwise provided in our amended and restated certificate of incorporation or required by law, all matters to be voted on by holders of our Class A common stock, Class B common stock and Class B1 common stock must be approved by a majority, on a combined basis, of the votes cast by holders of such shares present in person or by proxy at the meeting and entitled to vote on the subject matter. In the case of election of directors, all matters to be voted on by our stockholders must be approved by a plurality of the votes entitled to be cast by all shares of our common stock on a combined basis.

 

284


Table of Contents

Dividend rights

Subject to preferences that may be applicable to any then outstanding preferred stock, the holders of our outstanding shares of Class A common stock are entitled to receive dividends, if any, as may be declared from time to time by our board of directors out of legally available funds. Dividends upon our Class A common stock may be declared by our board of directors at any regular or special meeting, and may be paid in cash, in property or in shares of capital stock. Before payment of any dividend, there may be set aside out of any of our funds available for dividends, such sums as the board of directors deems proper as reserves to meet contingencies, or for equalizing dividends, or for repairing or maintaining any of our property or for any proper purpose, and the board of directors may modify or abolish any such reserve. Furthermore because we are a holding company, our ability to pay dividends on our Class A common stock is limited by restrictions on the ability of our subsidiaries to pay dividends or make other distributions to us, including restrictions under the terms of the agreements governing our indebtedness. See “Description of certain indebtedness” and “Cash dividend policy.”

Liquidation rights

In the event of any voluntary or involuntary liquidation, dissolution or winding up of our affairs, holders of our Class A common stock would be entitled to share ratably in our assets that are legally available for distribution to stockholders after payment of our debts and other liabilities and the liquidation preference of any of our outstanding shares of preferred stock, subject only to the right of the holders of shares of our Class B common stock and Class B1 common stock to receive payment for the par value of their shares in connection with our liquidation.

Other rights

Holders of our Class A common stock have no preemptive, conversion or other rights to subscribe for additional shares. All outstanding shares are, and all shares offered by this prospectus will be, when sold, validly issued, fully paid and non-assessable. The rights, preferences and privileges of the holders of our Class A common stock are subject to, and may be adversely affected by, the rights of the holders of shares of any series of our preferred stock that we may designate and issue in the future.

Listing

We have applied to list our Class A common stock on the NASDAQ Global Select Market under the symbol “GLBL.”

Transfer agent and registrar

The transfer agent and registrar for our Class A common stock is Computershare Trust Company, N.A. The transfer agent’s address is 250 Royall Street, Canton, Massachusetts 02021.

Class B common stock

Voting rights

Each share of Class B common stock entitles the holder to 100 votes on matters presented to our stockholders generally. Holders of shares of our Class A common stock, Class B common stock and Class B1 common stock vote together as a single class on all matters presented to our stockholders for their vote or approval, except as otherwise required by applicable law. Holders of our Class B common stock will not have cumulative voting rights. Except in respect of matters relating to the election and removal of directors on our board of directors

 

285


Table of Contents

and as otherwise provided in our amended and restated certificate of incorporation or required by law, all matters to be voted on by holders of our Class A common stock, Class B common stock and Class B1 common stock must be approved by a majority, on a combined basis, of such shares present in person or by proxy at the meeting and entitled to vote on the subject matter representing a majority, on a combined basis of votes. In the case of election of directors, all matters to be voted on by our stockholders must be approved by a plurality of the votes entitled to be cast by all shares of our common stock on a combined basis.

Dividend and liquidation rights

Holders of our Class B common stock do not have any right to receive dividends other than dividends payable solely in shares of Class B common stock in the event of payment of a dividend in shares of common stock payable to holders of our Class A common stock, or to receive a distribution upon our liquidation or winding up except for their right to receive payment for the par value of their shares of Class B common stock in connection with our liquidation.

Mandatory redemption

Shares of Class B common stock are subject to redemption at a price per share equal to par value upon the exchange of Class B units of Global LLC for shares of our Class A common stock. Shares of Class B common stock so redeemed are automatically cancelled and are not available to be reissued. See “Certain relationships and related party transactions—Amended and Restated Operating Agreement of Global LLC—Exchange Agreement.”

Transfer restrictions

Shares of Class B common stock may not be transferred, except to our Sponsor or to a controlled affiliate of our Sponsor so long as an equivalent number of Class B units are transferred to the same person.

Director designation rights

Our amended and restated certificate of incorporation will provide that our Sponsor, as the holder of our Class B common stock, will be entitled to elect up to                  directors to our board of directors. See “—Antitakeover effects of Delaware law and our certificate of incorporation and bylaws—Meetings and elections of directors—Director designation rights.”

Class B1 common stock

Voting rights

Each share of Class B1 common stock entitles the holder to one vote on matters presented to our stockholders generally. Holders of shares of our Class A common stock, Class B common stock and Class B1 common stock vote together as a single class on all matters presented to our stockholders for their vote or approval, except as otherwise required by applicable law. Holders of our Class B1 common stock will not have cumulative voting rights. Except in respect of matters relating to the election and removal of directors on our board of directors and as otherwise provided in our amended and restated certificate of incorporation or as required by law, all matters to be voted on by holders of our Class A common stock, Class B common stock and Class B1 common must be approved by a majority, on a combined basis, of votes by holders of such shares present in person or by proxy at the meeting and entitled to vote on the subject matter representing a majority, on a combined basis of votes. In the case of election of directors, all matters to be voted on by our stockholders must be approved by a plurality of the votes entitled to be cast by all shares of our common stock on a combined basis.

 

286


Table of Contents

Dividend and liquidation rights

Holders of our Class B1 common stock do not have any right to receive dividends other than dividends payable solely in shares of Class B1 common stock in the event of payment of a dividend in shares of common stock payable to holders of our Class A common stock, or to receive a distribution upon our liquidation or winding up except for their right to receive payment for the par value of their shares of Class B1 common stock in connection with our liquidation.

Mandatory redemption

Shares of Class B1 common stock are subject to redemption at a price per share equal to par value upon the exchange of Class B1 units of Global LLC for shares of our Class A common stock. Shares of Class B1 common stock so redeemed are automatically cancelled and are available to be reissued. See “Certain relationships and related party transactions—Amended and Restated Operating Agreement of Global LLC—Exchange Agreement.”

Transfer restrictions

Shares of Class B1 common stock may not be transferred without our consent. Additionally, shares of Class B1 common stock may only be transferred if an equivalent number of Class B1 units, which generally may not be transferred without our consent, are transferred to the same transferee. See “Certain relationships and related party transactions—Amended and Restated Operating Agreement of Global LLC—Issuance and transfer of units.”

Authorized but unissued capital stock

Delaware law does not require stockholder approval for any issuance of authorized shares. However, the listing requirements of the NASDAQ Global Select Market, which would apply so long as the shares of Class A common stock remain listed on the NASDAQ Global Select Market, require stockholder approval of certain issuances equal to or exceeding 20% of the then outstanding voting power or the then outstanding number of shares of Class A common stock. These additional shares may be used for a variety of corporate purposes, including future public offerings, to raise additional capital or to facilitate acquisitions.

One of the effects of the existence of unissued and unreserved common stock or preferred stock may be to enable our board of directors to issue shares to persons friendly to current management, which issuance could render more difficult or discourage an attempt to obtain control of our company by means of a merger, tender offer, proxy contest or otherwise, and thereby protect the continuity of our management and possibly deprive the stockholders of opportunities to sell their shares at prices higher than prevailing market prices.

Preferred stock

Our amended and restated certificate of incorporation will authorize our board of directors to provide for the issuance of shares of preferred stock in one or more series and to fix the preferences, powers and relative, participating, optional or other special rights, and qualifications, limitations or restrictions thereof, including the dividend rate, conversion rights, voting rights, redemption rights and liquidation preference and to fix the number of shares to be included in any such series without any further vote or action by our stockholders. Any preferred stock so issued may rank senior to our common stock with respect to the payment of dividends or amounts upon liquidation, dissolution or winding up, or both. The issuance of preferred stock may have the effect of delaying, deferring or preventing a change in control of our company without further action by the stockholders and may adversely affect the voting and other rights of the holders of common stock. The issuance of preferred stock with voting and conversion rights may adversely affect the voting power of the holders of common stock, including the loss of voting control to others. At present, we have no plans to issue any preferred stock.

 

287


Table of Contents

Corporate opportunity

As permitted under the DGCL, in our amended and restated certificate of incorporation, we will renounce any interest or expectancy in, or any offer of an opportunity to participate in, specified business opportunities that are presented to us or one or more of our officers, directors or stockholders. In recognition that our directors and officers may serve as (i) directors and/or officers of SunEdison and its affiliates or (ii) as directors, officers and/or employees of other businesses engaged in designing, developing, providing services to, managing, owning or investing in power generation facilities, or “Dual Role Persons,” our amended and restated certificate of incorporation will provide for the allocation of certain corporate opportunities between us and the Dual Role Persons. Specifically, none of the Dual Role Persons will have any duty to refrain from engaging directly or indirectly in the same or similar business activities or lines of business that we do. In the event that a Dual Role Person acquires knowledge of a potential transaction or matter outside of his or her capacity as a director of Global which may be a corporate opportunity, we will not have any expectancy in such corporate opportunity, and the Dual Role Person will not have any duty to present such corporate opportunity to us and may pursue or acquire such corporate opportunity for himself/herself or direct such opportunity to another person. A corporate opportunity that a Dual Role Person acquires knowledge of will not belong to us unless the corporate opportunity at issue is expressly offered in writing to such person solely in his or her capacity as a director or officer of ours. In addition, even if a business opportunity is presented to a Dual Role Person, the following corporate opportunities will not belong to us: (1) those we are not financially able, contractually permitted or legally able to undertake; (2) those not in our line of business; (3) those of no practical advantage to us; and (4) those in which we have no interest or reasonable expectancy. Except with respect to Dual Role Persons, the corporate opportunity doctrine applies as construed pursuant to applicable Delaware laws, without limitation.

Antitakeover effects of Delaware law and our certificate of incorporation and bylaws

In addition to the disproportionate voting rights that SunEdison will have following this offering as a result of its ownership of our Class B common stock, some provisions of Delaware law contain, and our amended and restated certificate of incorporation and our amended and restated bylaws described below will contain, a number of provisions which may have the effect of encouraging persons considering unsolicited tender offers or other unilateral takeover proposals to negotiate with our board of directors rather than pursue non-negotiated takeover attempts, which we believe may result in an improvement of the terms of any such acquisition in favor of our stockholders. However, they will also give our board of directors the power to discourage acquisitions that some stockholders may favor.

Undesignated preferred stock

The ability to authorize undesignated preferred stock will make it possible for our board of directors to issue preferred stock with superior voting, special approval, dividend or other rights or preferences on a discriminatory basis that could impede the success of any attempt to acquire us. These and other provisions may have the effect of deferring, delaying or discouraging hostile takeovers, or changes in control or management of our company.

Meetings and elections of directors

Special meetings of stockholders.     Our amended and restated certificate of incorporation will provide that a special meeting of stockholders may be called only by our board of directors by a resolution adopted by the affirmative vote of a majority of the total number of directors then in office.

 

288


Table of Contents

Stockholder action by written consent.     Pursuant to Section 228 of the DGCL, any action required to be taken at any annual or special meeting of our stockholders may be taken without a meeting, without prior notice and without a vote if a consent or consents in writing, setting forth the action so taken, is signed by the holders of outstanding stock having not less than the minimum number of votes that would be necessary to authorize or take such action at a meeting at which all shares of our stock entitled to vote thereon were present and voted, unless our amended and restated certificate of incorporation provides otherwise. Our amended and restated certificate of incorporation will provide that any action required or permitted to be taken by our stockholders may be effected by written consent by such stockholders until such time as our Sponsor ceases to directly or indirectly beneficially own 50% or more of the combined voting power of our common stock. Upon our Sponsor ceasing to directly or indirectly beneficially own 50% or more of the combined voting power of our common stock, our stockholders will not be permitted to take action by written consent.

Election and powers of chairman; board meetings.     Our amended and restated certificate of incorporation will provide that the Chairman of our board of directors will be elected by our stockholders. Pursuant to our amended and restated bylaws, the Chairman (or his or her designee) will have the right to call special meetings of our board of directors, establish the agenda for meetings of our board of directors and adjourn meetings of our board of directors. In addition, matters to be addressed or voted upon at any meeting of our board of directors shall be set forth in a notice of meeting delivered to each director in accordance with our amended and restated bylaws (unless such notice is waived) or brought before our board at such meeting by the Chairman. The provisions regarding election of our Chairman by our stockholders and our Chairman’s right to call special meetings of the board, establish the agenda and adjourn meetings of the board of directors will remain in effect until such time as our Sponsor ceases to directly or indirectly beneficially own 50% or more of the combined voting power of our common stock.

Director designation rights.     Our amended and restated certificate of incorporation will provide that our Sponsor, as the holder of our Class B common stock, will be entitled to elect up to                  directors to our board of directors, which directors will be in addition to any other directors, officers or other affiliates of our Sponsor who (a) may be serving as directors upon the completion of this offering, (b) are subsequently appointed by our board to fill any vacancies or (c) are elected by our stockholders. We refer to directors elected to our board by our Sponsor pursuant to the foregoing provision as “Sponsor Designated Directors.” A director will be deemed to be a Sponsor Designated Director only if specifically identified as such in writing by our Sponsor at the time of his or her appointment to our board or at any time thereafter. Our Sponsor will have the right to remove and replace any Sponsor Designated Director at any time and for any reason, and to fill any vacancies otherwise resulting in such director positions. The provisions regarding the designation of directors by our Sponsor will terminate as of the date that our Sponsor ceases to directly or indirectly beneficially own shares representing 50% or more of the combined voting power of our common stock, unless required to be terminated earlier pursuant to applicable law or the rules of the national securities exchange on which any of our securities are listed. Any Sponsor Designated Director in office at the time of termination of the director designation provisions in our amended and restated certificate of incorporation will continue to hold office until the next annual meeting of stockholders and until his or her successor is duly elected and qualified or until his or her earlier death, resignation or removal.

Vacancies.    Any vacancy occurring on our board of directors and any newly created directorship may be filled only by a majority of the directors remaining in office (even if less than a quorum), subject to the rights of holders of any series of preferred stock and the director designation rights of our Sponsor.

Amendments

Amendments of certificate of incorporation.    The provisions described above under “—Meetings and elections of directors—Special meetings of stockholders,” “—Meetings and elections of directors—Stockholder action by

 

289


Table of Contents

written consent” and “—Meetings and elections of directors—Vacancies” may be amended only by the affirmative vote of holders of at least two-thirds of the combined voting power of outstanding shares of our capital stock entitled to vote in the election of directors, voting together as a single class.

Amendment of bylaws.    Our board of directors will have the power to make, alter, amend, change or repeal our bylaws or adopt new bylaws by the affirmative vote of a majority of the total number of directors then in office.

Notice provisions relating to stockholder proposals and nominees

Our amended and restated bylaws will also impose some procedural requirements on stockholders who wish to make nominations in the election of directors or propose any other business to be brought before an annual or special meeting of stockholders.

Specifically, a stockholder may (i) bring a proposal before an annual meeting of stockholders, (ii) nominate a candidate for election to our board of directors at an annual meeting of stockholders, or (iii) nominate a candidate for election to our board of directors at a special meeting of stockholders that has been called for the purpose of electing directors, only if such stockholder delivers timely notice to our corporate secretary. The notice must be in writing and must include certain information and comply with the delivery requirements as set forth in the bylaws.

To be timely, a stockholder’s notice must be received at our principal executive offices:

 

 

in the case of a nomination or other business in connection with an annual meeting of stockholders, not later than the close of business on the 90th day nor earlier than the close of business on the 120th day prior to the first anniversary of the previous year’s annual meeting of stockholders; provided, however, that if the date of the annual meeting is advanced more than 30 days before or delayed more than 70 days after the first anniversary of the preceding year’s annual meeting, notice by the stockholder must be delivered not earlier than the close of business on the 120th day prior to such annual meeting and not later than the close of business on the later of the 90th day prior to such annual meeting or the 10th day following the day on which public announcement of the date of such meeting is first made by us; or

 

 

in the case of a nomination in connection with a special meeting of stockholders, not earlier than the 120th day prior to such special meeting and not later than the close of business on the later of the 90th day before such special meeting or the 10th day following the day on which public announcement of the date of such meeting is first made by us.

With respect to special meetings of stockholders, our amended and restated bylaws will provide that only such business shall be conducted as shall have been stated in the notice of the meeting.

Delaware antitakeover law

We have opted out of Section 203 of the DGCL. However, our amended and restated certificate of incorporation will provide that in the event our Sponsor and its affiliates cease to beneficially own at least 5% of the total voting power of all the then outstanding shares of our capital stock, we will automatically become subject to Section 203 of the DGCL. Section 203 provides that, subject to certain exceptions specified in the law, a Delaware corporation shall not engage in certain “business combinations” with any “interested stockholder” for a three-year period following the time that the stockholder became an interested stockholder unless:

 

 

prior to such time, our board of directors approved either the business combination or the transaction that resulted in the stockholder becoming an interested stockholder;

 

290


Table of Contents
 

upon consummation of the transaction that resulted in the stockholder becoming an interested stockholder, the interested stockholder owned at least 85% of the voting stock outstanding at the time the transaction commenced, excluding certain shares; or

 

 

at or subsequent to that time, the business combination is approved by our board of directors and by the affirmative vote of holders of at least 66 2/3% of the outstanding voting stock that is not owned by the interested stockholder.

Generally, a “business combination” includes a merger, asset or stock sale or other transaction resulting in a financial benefit to the interested stockholder. Subject to certain exceptions, an “interested stockholder” is a person who, together with that person’s affiliates and associates, owns, or within the previous three years did own, 15% or more of our voting stock.

Under certain circumstances, Section 203 makes it more difficult for a person who would be an “interested stockholder” to effect various business combinations with a corporation for a three-year period. The provisions of Section 203 may encourage companies interested in acquiring us to negotiate in advance with our board of directors because the stockholder approval requirement would be avoided if our board of directors approves either the business combination or the transaction that results in the stockholder becoming an interested stockholder. These provisions also may make it more difficult to accomplish transactions that stockholders may otherwise deem to be in their best interests.

Removal of directors

Our amended and restated certificate of incorporation will provide that, if any director (other than a Sponsor Designated Director) who, at the time of his or her most recent election or appointment to a term on our board of directors was an employee of our company or our Sponsor or any of our or its subsidiaries, ceases to be employed by us or our Sponsor or any of our or its subsidiaries during such term as director, such director shall no longer be qualified to be a director and shall immediately cease to be a director without any further action unless otherwise determined by our board of directors. In addition, our amended and restated certificate of incorporation will provide, in accordance with the DGCL and subject to our Sponsor’s director designation rights and any special voting rights of any series of preferred stock that we may issue in the future, that stockholders may remove directors, with or without cause, by a majority vote.

Amendments

Any amendments to our amended and restated certificate of incorporation, subject to the rights of holders of our preferred stock, regarding the provisions thereof summarized under “—Corporate opportunity” or “—Antitakeover effects of Delaware law and our certificate of incorporation and bylaws” will require the affirmative vote of at least 66 2/3% of the voting power of all shares of our common stock then outstanding.

 

291


Table of Contents

Shares eligible for future sale

Future sales of substantial amounts of our Class A common stock in the public market, or the perception that such sales may occur, could adversely affect the prevailing market price of our Class A common stock. No prediction can be made as to the effect, if any, that future sales of shares, or the availability of shares for future sales, will have on the market price of our Class A common stock prevailing from time to time. The number of shares available for future sale in the public market is subject to legal and contractual restrictions, some of which are described below. The expiration of these restrictions will permit sales of substantial amounts of our Class A common stock in the public market, or could create the perception that these sales may occur, which could adversely affect the prevailing market price of our Class A common stock. These factors could also make it more difficult for us to raise funds through future offerings of our Class A common stock.

Sale of restricted shares

Prior to this offering, there has been no public market for our Class A common stock. Future sales of our Class A common stock in the public market, or the availability of such shares for sale in the public market, could adversely affect market prices prevailing from time to time. As described below, only a limited number of shares, other than shares sold in this offering, will be available for sale shortly after this offering due to contractual and legal restrictions on resale. Nevertheless, sales of a substantial number of shares of our Class A common stock in the public market after such restrictions lapse, or the perception that those sales may occur, could adversely affect the prevailing market price at such time and our ability to raise equity-related capital at a time and price we deem appropriate.

Upon the completion of this offering, we will have issued and outstanding an aggregate of             shares of Class A common stock (or             shares of Class A common stock if the underwriters exercise in full their option to purchase additional shares of Class A common stock). All of the shares of Class A common stock to be sold in this offering will be freely tradable without restriction or further registration under the Securities Act, except for any such shares which may be held or acquired by an “affiliate” of ours, as that term is defined in Rule 144 promulgated under the Securities Act, or “Rule 144,” which shares will be subject to the volume limitations and other restrictions of Rule 144 described below. The remaining shares of our Class A common stock that will be outstanding upon completion of this offering will be “restricted securities,” as that phrase is defined in Rule 144, and may be resold only after registration under the Securities Act or pursuant to an exemption from such registration, including, among others, the exemptions provided by Rule 144 under the Securities Act, which rules are summarized below. These remaining shares of our Class A common stock that will be outstanding upon completion of this offering will be available for sale in the public market after the expiration of the lock-up agreements described below, taking into account the provisions of Rule 144 under the Securities Act. See “—Lock-up agreements.”

Following this offering, at any time and from time to time, our Sponsor may exchange Class B units or Class B1 units, as applicable, of Global LLC, together with a corresponding number of shares of Class B common stock or Class B1 common stock, as applicable, for shares of our Class A common stock on a one-for-one basis, subject to adjustments for stock splits, stock dividends and reclassifications. Upon completion of this offering, our Sponsor will hold              Class B units of Global LLC, all of which will be exchangeable at any time, if exchanged together with a corresponding number of shares of Class B common stock, for shares of our Class A common stock. See “Certain relationships and related party transactions—Amended and Restated Operating Agreement of Global LLC—Exchange Agreement.” The shares of Class A common stock we issue upon such exchanges would be “restricted securities” as defined in Rule 144 described below. However, upon the completion of this offering, we intend to enter into a registration rights agreement with our Sponsor that will require us to register under the Securities Act shares of our Class A common stock issued in such an exchange. See “—Registration rights.”

 

292


Table of Contents

Rule 144

The shares of our Class A common stock being sold in this offering will generally be freely tradable without restriction or further registration under the Securities Act, except that any shares of our Class A common stock held by an “affiliate” of ours may not be resold publicly except in compliance with the registration requirements of the Securities Act or under an exemption under Rule 144 or otherwise. Rule 144 permits our Class A common stock that has been acquired by a person who is an affiliate of ours, or has been an affiliate of ours within the past six months, to be sold into the market in an amount that does not exceed, during any three-month period, the greater of:

 

 

1% of the total number of shares of our Class A common stock outstanding which will equal approximately             shares after this offering; or

 

 

the average weekly reported trading volume of our Class A common stock on the NASDAQ Global Select Market for the four calendar weeks prior to the sale.

Such sales are also subject to specific manner-of-sale provisions, a six-month holding period requirement for restricted securities, notice requirements and the availability of current public information about us.

Rule 144 also provides that a person who is not deemed to have been an affiliate of ours at any time during the six months preceding a sale, and who has for at least six months beneficially owned shares of our Class A common stock that are restricted securities, will be entitled to freely sell such shares of our Class A common stock subject only to the availability of current public information about us. A person who is not deemed to have been an affiliate of ours at any time during the six months preceding a sale, and who has for at least one year beneficially owned shares of our Class A common stock that are restricted securities, will be entitled to freely sell such shares of Class A common stock under Rule 144 without regard to the public information requirements of Rule 144.

Lock-up agreements

We and each of our officers, directors and our Sponsor have agreed with the underwriters, subject to certain exceptions, not to dispose of or hedge any of the shares of our Class A common stock or securities (including Global LLC units) convertible into or exchangeable for, or that represent the right to receive, shares of our Class A common stock during the period from the date of this prospectus continuing through the date that is 180 days after the date of this prospectus, except in connection with this offering or with the prior written consent of J.P. Morgan Securities LLC, Barclays Capital Inc., Citigroup Global Markets Inc. and Morgan Stanley & Co. LLC as representatives of the underwriters in this offering. See “Underwriting (conflicts of interest).”

The restrictions in the immediately preceding paragraph do not apply to:

 

 

our entry into any agreement providing for the issuance of shares of our Class A common stock or securities convertible into or exchangeable for shares of our Class A common stock to any seller (or its affiliates) in connection with our acquisition of energy projects (or equity interests therein), or the issuance of any such securities to the seller (or its affiliates) pursuant to any such agreement, in an aggregate number of shares not to exceed 15% of the total number of shares of our Class A common stock issued and outstanding following the completion of this offering (including any additional shares if the underwriters exercise their 30-day option to purchase additional shares), so long as any recipient of such securities is subject to the same lock-up restrictions described above;

 

293


Table of Contents
 

our Sponsor’s pledge of our or Global LLC’s equity securities as collateral under the Sponsor Credit Agreement, or the transferring of such pledged shares or other securities in the event the lenders under the Sponsor Credit Agreement exercise their right to foreclose on such pledged securities, so long as any recipient of such securities is subject to the same lock-up restrictions described above; and

 

 

certain other transfers, including, but not limited to, transfers of shares of our Class A common stock or securities convertible into or exchangeable for shares of our Class A common stock (i) acquired in open market transactions after the completion of this offering, (ii) pursuant to a bona fide third-party tender offer, merger, consolidation or other similar transaction, (iii) pursuant to our equity incentive or employee benefit plans and (iv) in certain other transactions not involving a disposition for value.

In addition, each of the investors in the Private Placements has agreed with the underwriters, subject to certain exceptions, not to dispose of any of their common stock or securities convertible into or exchangeable for shares of common stock received in the Private Placements during the period from the date of this prospectus continuing through the date 180 days after the date of this prospectus, except with the prior written consent of J.P. Morgan Securities LLC, Barclays Capital Inc., Citigroup Global Markets Inc. and Morgan Stanley & Co. LLC.

The restrictions in the immediately preceding paragraph do not apply to:

 

 

any hedging transaction, including any short sale (whether or not against the box) or any purchase, sale or grant of any right (including, without limitation, any put or call option) with respect to any security that includes, relates to or derives any significant part of its value from the Class A common stock; and

 

 

certain other transfers, including, but not limited to, transfers of shares of our Class A common stock or securities convertible into or exchangeable for shares of our Class A common stock pursuant to a bona fide third-party tender offer, merger, consolidation or other similar transaction and in certain other transactions not involving a disposition for value.

Registration rights

Upon completion of this offering, our Sponsor, the purchasers in the Private Placements and certain of its affiliates will be entitled to various rights with respect to the registration of shares under the Securities Act. Registration of these shares under the Securities Act would result in these shares becoming fully tradable under the Securities Act immediately upon the effectiveness of the registration, except for shares held by affiliates. See “Certain relationships and related party transactions—Registration Rights Agreement” and “—Private Placement.” Shares covered by a registration statement will be eligible for sales in the public market upon the expiration or release from the terms of the lock-up agreement referred to above.

 

294


Table of Contents

Material United States federal income tax consequences to non-U.S. holders

The following is a general summary of material United States federal income and estate tax consequences to non-U.S. holders, as defined below, of the purchase, ownership and disposition of shares of our Class A common stock as of the date of this prospectus. This summary deals only with shares of common stock purchased in this offering that are held as capital assets (generally, property held for investment) by a non-U.S. holder.

For purposes of this discussion, a “non-U.S. holder” means a beneficial owner of shares of our Class A common stock that is, for United States federal income tax purposes, an individual, corporation, estate or trust, but is not any of the following:

 

 

an individual who is a citizen or resident of the United States;

 

 

a corporation (or any other entity treated as a corporation for United States federal income tax purposes) created or organized under the laws of the United States, any state thereof or the District of Columbia;

 

 

an estate the income of which is subject to United States federal income taxation regardless of its source; or

 

 

a trust if it (1) is subject to the primary supervision of a court within the United States and one or more United States persons have the authority to control all substantial decisions of the trust or (2) has a valid election in effect under applicable United States Treasury regulations to be treated as a United States person for United States federal income tax purposes.

If any entity or arrangement treated as a partnership for United States federal income tax purposes holds shares of our Class A common stock, the tax treatment of a partner in such partnership generally will depend upon the status of the partner and the activities of the partner and the partnership. If you are a partner of a partnership considering an investment in shares of our Class A common stock, you should consult your own tax advisors.

This summary is based upon the Code, applicable United States Treasury regulations, rulings and other administrative pronouncements, and judicial decisions, all as of the date of this prospectus. Those authorities are subject to different interpretations and may be changed, perhaps retroactively, so as to result in United States federal income tax consequences different from those summarized below. We cannot assure you that a change in law will not alter significantly the tax considerations described in this summary.

This summary does not address all aspects of United States federal income and estate taxes and does not deal with foreign, state, local, alternative minimum or other tax considerations that may be relevant to non-U.S. holders in light of their particular circumstances. In addition, this summary does not represent a detailed description of the United States federal income and estate tax consequences applicable to you if you are subject to special treatment under the United States federal income tax laws (including if you are a United States expatriate, financial institution, insurance company, tax-exempt organization, dealer in securities, broker, “controlled foreign corporation,” “passive foreign investment company,” a partnership or other pass-through entity for United States federal income tax purposes (or an investor in such a pass-through entity), a person who acquired shares of our Class A common stock as compensation or otherwise in connection with the performance of services, or a person who has acquired shares of our Class A common stock as part of a straddle, hedge, conversion transaction or other integrated investment).

We have not sought and will not seek any rulings from the IRS regarding the matters discussed below. There can be no assurance that the IRS will not take positions concerning the tax consequences of the ownership or disposition of shares of our Class A common stock that differ from those discussed below.

 

295


Table of Contents

If you are considering the purchase of shares of our Class A common stock, you should consult your own tax advisors concerning the particular United States federal income and estate tax consequences to you of the ownership and disposition of shares of our Class A common stock, as well as the consequences to you arising under other United States federal tax laws and the laws of any other applicable taxing jurisdiction and any applicable tax treaty in light of your particular circumstances.

Distributions

We intend to pay cash distributions on shares of our Class A common stock for the foreseeable future, as outlined above under “Cash dividend policy.” In general, distributions of cash or other property in respect of shares of our Class A common stock will constitute dividends for United States federal income tax purposes to the extent paid from our current or accumulated earnings and profits, as determined under United States federal income tax principles. To the extent any such distributions exceed both our current and accumulated earnings and profits, they will first be treated as a return of capital reducing your tax basis in our Class A common stock (determined on a share-by-share basis), but not below zero, and then will be treated as gain from the sale of stock as described below under “—Gain on disposition of shares of Class A common stock.”

Dividends paid to a non-U.S. holder generally will be subject to a United States federal withholding tax at a 30% rate, or such lower rate as may be specified by an applicable income tax treaty. United States federal withholding tax may be imposed on the gross amount of a distribution, due to the difficulty of determining whether we have sufficient earnings and profits to cause the distribution to be a dividend for United States federal income tax purposes.

However, dividends that are effectively connected with the conduct of a trade or business within the United States by a non-U.S. holder generally will not be subject to such withholding tax, provided certain certification and disclosure requirements are satisfied (including the provision of a properly completed IRS Form W-8 ECI or other applicable form). Instead, unless an applicable income tax treaty provides otherwise, such dividends will generally be subject to United States federal income tax on a net income basis in the same manner as if the non-U.S. holder were a United States person as defined under the Code. A corporate non-U.S. holder may be subject to an additional “branch profits tax” at a rate of 30% on its earnings and profits (subject to adjustments) that are effectively connected with its conduct of a United States trade or business (unless an applicable income tax treaty provides otherwise).

A non-U.S. holder of shares of our Class A common stock who wishes to claim the benefit of an applicable treaty rate for dividends will be required (a) to complete IRS Form W-8BEN or W-8BEN-E (or other applicable form) and certify under penalty of perjury that such holder is not a United States person as defined under the Code and is eligible for treaty benefits or (b) if shares of our Class A common stock are held through certain foreign intermediaries, satisfy the relevant certification requirements of applicable United States Treasury regulations. A non-U.S. holder who provides us, our paying agent or other applicable withholding agent with an IRS Form W-8BEN, W-8BEN-E, W-8ECI or other form must update the form or submit a new form, as applicable, if such previously delivered form expires or if there is a change in circumstances that makes any information on such form incorrect. Special certification and other requirements apply to certain non-U.S. holders that are pass-through entities rather than corporations or individuals.

It is possible that a distribution made to a non-U.S. holder may be subject to over-withholding because, for example, at the time of the distribution we or the relevant withholding agent may not be able to determine how much of the distribution constitutes dividends or the proper documentation establishing the benefits of any applicable treaty has not been properly supplied. If there is any over-withholding on distributions made to a non-U.S. holder, such non-U.S. holder may obtain a refund of the over-withheld amount by timely filing an

 

296


Table of Contents

appropriate claim for refund with the IRS. Non-U.S. holders should consult their tax advisors regarding the applicable withholding tax rules and the possibility of obtaining a refund of any over-withheld amounts.

Gain on disposition of shares of Class A common stock

Subject to the discussion below on backup withholding and FATCA withholding, any gain realized by a non-U.S. holder on the sale, exchange or other disposition of shares of our Class A common stock generally will not be subject to United States federal income tax unless:

 

 

the gain is effectively connected with a trade or business of the non-U.S. holder in the United States (and, if required by an applicable income tax treaty, is attributable to a United States permanent establishment);

 

 

the non-U.S. holder is an individual who is present in the United States for 183 days or more in the taxable year of that disposition, and certain other conditions are met; or

 

 

we are or have been a United States real property holding corporation, or “USRPHC,” for United States federal income tax purposes at any time during the shorter of the five-year period ending on the date of the disposition or the period that the non-U.S. holder held shares of our Class A common stock, or the applicable period.

In the case of a non-U.S. holder described in the first bullet point above, any gain generally will be subject to United States federal income tax on a net income basis in the same manner as if the non-U.S. holder were a United States person as defined under the Code (unless an applicable income tax treaty provides otherwise), and a non-U.S. holder that is a foreign corporation may also be subject to the branch profits tax at a rate of 30% on its effectively connected earnings and profits (subject to adjustments), unless an applicable income tax treaty provides otherwise. Except as otherwise provided by an applicable income tax treaty, an individual non-U.S. holder described in the second bullet point above will be subject to a flat 30% tax on any gain derived from the disposition, which may be offset by certain United States source capital losses. We are not currently, and, although no assurance can be given, do not anticipate becoming, a USRPHC.

Information reporting and backup withholding

We must report annually to the IRS and to you the amount of dividends paid to you and the amount of tax, if any, withheld with respect to such dividends. The IRS may make this information available to the tax authorities in the country in which you are resident.

In addition, you may be subject to information reporting requirements and backup withholding with respect to dividends paid on, and the proceeds of disposition of, shares of our Class A common stock, unless, generally, you certify under penalties of perjury (usually on IRS Form W-8BEN or IRS Form W-8BEN-E) that you are not a United States person or you otherwise establish an exemption. Additional rules relating to information reporting requirements and backup withholding with respect to payments of the proceeds from the disposition of shares of our Class A common stock are as follows:

 

 

If the proceeds are paid to or through the United States office of a broker, the proceeds generally will be subject to backup withholding and information reporting, unless you certify under penalties of perjury (usually on IRS Form W-8BEN or IRS Form W-8BEN-E) that you are not a United States person or you otherwise establish an exemption.

 

 

If the proceeds are paid to or through a non-U.S. office of a broker that is not a United States person and is not a foreign person with certain specified United States connections, a “U.S.-related person,” information reporting and backup withholding generally will not apply.

 

297


Table of Contents
 

If the proceeds are paid to or through a non-U.S. office of a broker that is a United States person or a U.S.-related person, the proceeds generally will be subject to information reporting (but not to backup withholding), unless you certify under penalties of perjury (usually on IRS Form W-8BEN or IRS Form W-8BEN-E) that you are not a United States person or you otherwise establish an exemption.

Backup withholding is not an additional tax. Any amounts withheld under the backup withholding rules may be allowed as a refund or a credit against your United States federal income tax liability, provided the required information is timely furnished by you to the IRS.

Legislation affecting taxation of common stock held by or through foreign entities

Legislation enacted in 2010, known as the Foreign Account Tax Compliance Act, or “FATCA,” generally imposes a withholding tax of 30% on dividend income from our Class A common stock and on the gross proceeds of a sale or other disposition of our Class A common stock, if the payments are made to certain foreign entities, unless certain diligence, reporting, withholding and certification obligations and requirements are met. Payments subject to withholding under FATCA include dividends on Class A common stock and, after December 31, 2016, payments of gross proceeds from a sale or other disposition of Class A common stock.

In the absence of an applicable exemption, the withholding under FATCA described above generally applies to payments of dividends or gross proceeds made to (i) a “foreign financial institution” (as a beneficial owner or an intermediary), unless such institution enters into an agreement with the United States government to collect and provide to the United States tax authorities substantial information regarding United States account holders of such institution (which would include certain equity and debt holders of such institution, as well as certain account holders that are foreign entities with United States owners) and (ii) a foreign entity acting as a beneficial owner or an intermediary that is not a “foreign financial institution,” unless such entity makes a certification identifying its substantial United States owners (as defined for this purpose) or makes a certification that such foreign entity does not have any substantial United States owners. Withholding under FATCA generally will not be reduced or limited by bilateral income tax treaties. However, a non-U.S. holder may be exempt from FATCA withholding under an applicable intergovernmental agreement between the United States and a foreign government relating to the implementation of FATCA, provided that the non-U.S. holder and the foreign government comply with the terms of the agreement. Under certain circumstances, a non-U.S. holder of our Class A common stock might be eligible for refunds or credits of such withholding taxes, and a non-U.S. holder might be required to file a United States federal income tax return to claim such refunds or credits.

Non-U.S. holders should consult their own tax advisors regarding the implications of this legislation on their investment in our Class A common stock.

United States federal estate tax

Shares of our Class A common stock that are owned (or deemed to be owned) at the time of death by an individual who is not a citizen or resident of the United States (as specifically defined for United States federal estate tax purposes) will be includable in such non-U.S. holder’s gross estate for United States federal estate tax purposes, unless an applicable estate tax treaty provides otherwise, and therefore may be subject to United States federal estate tax.

POTENTIAL PURCHASERS OF OUR CLASS A COMMON STOCK ARE URGED TO CONSULT THEIR OWN TAX ADVISORS TO DETERMINE THE UNITED STATES FEDERAL, STATE, LOCAL AND NON-U.S. INCOME, ESTATE AND OTHER TAX AND TAX TREATY CONSIDERATIONS OF PURCHASING, OWNING AND DISPOSING OF OUR CLASS A COMMON STOCK.

 

298


Table of Contents

Underwriting (conflicts of interest)

We are offering the shares of our Class A common stock described in this prospectus through a number of underwriters. J.P. Morgan Securities LLC, Barclays Capital Inc., Citigroup Global Markets Inc. and Morgan Stanley & Co. LLC are acting as representatives of the underwriters. We have entered into an underwriting agreement with the underwriters. Subject to the terms and conditions of the underwriting agreement, we have agreed to sell to the underwriters, and each underwriter has severally agreed to purchase, at the public offering price less the underwriting discounts and commissions and the structuring fee set forth on the cover page of this prospectus, the number of shares listed next to its name in the following table:

 

Name    Number of shares

J.P. Morgan Securities LLC

  

Barclays Capital Inc.

  

Citigroup Global Markets Inc.

  

Morgan Stanley & Co. LLC

  

Goldman, Sachs & Co.

  

Merrill Lynch, Pierce, Fenner & Smith

                     Incorporated

  

Deutsche Bank Securities Inc.

  
  

 

Total

  

 

  

 

The underwriters are committed to purchase all the shares offered by us if they purchase any shares. The underwriting agreement also provides that if an underwriter defaults, the purchase commitments of non-defaulting underwriters may also be increased or the offering may be terminated.

The underwriters propose to offer the shares directly to the public at the initial public offering price set forth on the cover page of this prospectus and to certain dealers at that price less a concession not in excess of $             per share. After the initial public offering of the shares, the offering price and other selling terms may be changed by the underwriters. Sales of shares made outside of the United States may be made by affiliates of the underwriters. The underwriters have informed us that they do not expect to sell more than 5% of the shares of Class A common stock in the aggregate to accounts over which they exercise discretionary authority. The offering of the shares by the underwriters is subject to receipt and acceptance and subject to the underwriters’ right to reject any order in whole or in part.

The underwriters have an option to buy up to                  additional shares of Class A common stock from us to cover sales of shares by the underwriters which exceed the number of shares specified in the table above. The underwriters have 30 days from the date of this prospectus to exercise this option to purchase additional shares. If any shares are purchased with this option to purchase additional shares, the underwriters will purchase shares in approximately the same proportion as shown in the table above. If any additional shares are purchased, the underwriters will offer the additional shares on the same terms as those on which the shares are being offered.

 

299


Table of Contents

The underwriting fee is equal to the public offering price per share less the amount paid by the underwriters to us per share. The underwriting fee is $         per share. The following table shows the per share and total underwriting discounts and commissions to be paid to the underwriters assuming both no exercise and full exercise of the underwriters’ option to purchase additional shares.

 

      Without
option
exercise
     With full
option
exercise
 

Per Share

   $                    $                

Total

   $                    $                

 

  

 

 

    

 

 

 

We will also pay J.P. Morgan Securities LLC and Barclays Capital Inc. a structuring fee equal to             % of the gross proceeds of this offering for the evaluation, analysis and structuring of our company. We estimate that the total expenses of this offering, including registration, filing and listing fees, printing fees and legal and accounting expenses, but excluding the underwriting discounts and commissions and the structuring fee, will be approximately $        .

A prospectus in electronic format may be made available on the websites maintained by one or more underwriters, or selling group members, if any, participating in the offering. The underwriters may agree to allocate a number of shares to underwriters and selling group members for sale to their online brokerage account holders. Internet distributions will be allocated by the representatives to underwriters and selling group members that may make Internet distributions on the same basis as other allocations.

We and each of our officers, directors and our Sponsor have agreed with the underwriters, subject to certain exceptions, not to dispose of or hedge any of their common stock or securities convertible into or exchangeable for shares of common stock during the period from the date of this prospectus continuing through the date 180 days after the date of this prospectus, except with the prior written consent of J.P. Morgan Securities LLC, Barclays Capital Inc., Citigroup Global Markets Inc. and Morgan Stanley & Co. LLC.

The restrictions in the immediately preceding paragraph do not apply to:

 

 

our entry into any agreement providing for the issuance of shares of our Class A common stock or securities convertible into or exchangeable for shares of our Class A common stock to any seller (or its affiliates) in connection with our acquisition of energy projects (or equity interests therein), or the issuance of any such securities to the seller (or its affiliates) pursuant to any such agreement, in an aggregate number of shares not to exceed 15% of the total number of shares of our Class A common stock issued and outstanding following the completion of this offering (including any additional shares if the underwriters exercise their 30-day option to purchase additional shares), so long as any recipient of such securities is subject to the same lock-up restrictions described above;

 

 

our Sponsor’s pledge of our or Global LLC’s equity securities as collateral under the Sponsor Credit Agreement, or the transferring of such pledged shares or other securities in the event the lenders under the Sponsor Credit Agreement exercise their right to foreclose on such pledged securities, so long as any recipient of such securities is subject to the same lock-up restrictions described above; and

 

 

certain other transfers, including, but not limited to, transfers of shares of our Class A common stock or securities convertible into or exchangeable for shares of our Class A common stock (i) acquired in open market transactions after the completion of this offering, (ii) pursuant to a bona fide third-party tender offer, merger, consolidation or other similar transaction, (iii) pursuant to our equity incentive or employee benefit plans and (iv) in certain other transactions not involving a disposition for value.

 

300


Table of Contents

In addition, each of the investors in the Private Placements has agreed with the underwriters, subject to certain exceptions, not to dispose of any of their common stock or securities convertible into or exchangeable for shares of common stock received in the Private Placements during the period from the date of this prospectus continuing through the date 180 days after the date of this prospectus, except with the prior written consent of J.P. Morgan Securities LLC, Barclays Capital Inc., Citigroup Global Markets Inc. and Morgan Stanley & Co. LLC.

The restrictions in the immediately preceding paragraph do not apply to:

 

 

any hedging transaction, including any short sale (whether or not against the box) or any purchase, sale or grant of any right (including, without limitation, any put or call option) with respect to any security that includes, relates to or derives any significant part of its value from the Class A common stock; and

 

 

certain other transfers, including, but not limited to, transfers of shares of our Class A common stock or securities convertible into or exchangeable for shares of our Class A common stock pursuant to a bona fide third-party tender offer, merger, consolidation or other similar transaction and in certain other transactions not involving a disposition for value.

We have agreed to indemnify the several underwriters against certain liabilities, including liabilities under the Securities Act.

We have applied to list our Class A common stock on the NASDAQ Global Select Market under the symbol “GLBL.”

At our request, the underwriters have reserved up to 5% of the shares for sale at the initial public offering price to persons who are directors, officers or employees, or who are otherwise associated with us through a directed share program. The number of shares available for sale to the general public will be reduced by the number of directed shares purchased by participants in the program. Except for certain of our officers, directors and employees who have entered into lock-up agreements, each person buying shares through the directed share program has agreed that, for a period of 180 days from the date of this prospectus, he or she will not, without the prior written consent of J.P. Morgan Securities LLC, Barclays Capital Inc., Citigroup Global Markets Inc. and Morgan Stanley & Co. LLC dispose of or hedge any shares or any securities convertible into or exchangeable for our common stock with respect to shares purchased in the program. Any directed shares not purchased will be offered by the underwriters to the general public on the same basis as all other shares offered. We have agreed to indemnify the several underwriters against certain liabilities and expenses, including liabilities under the Securities Act, in connection with the sales of the directed shares.

In connection with this offering, the underwriters may engage in stabilizing transactions, which involves making bids for, purchasing and selling shares in the open market for the purpose of preventing or retarding a decline in the market price of the Class A common stock while this offering is in progress. These stabilizing transactions may include making short sales of the Class A common stock, which involves the sale by the underwriters of a greater number of shares than they are required to purchase in this offering, and purchasing shares on the open market to cover positions created by short sales. Short sales may be “covered” shorts, which are short positions in an amount not greater than the underwriters’ option to purchase additional shares referred to above, or may be “naked” shorts, which are short positions in excess of that amount. The underwriters may close out any covered short position either by exercising their option to purchase additional shares, in whole or in part, or by purchasing shares in the open market. In making this determination, the underwriters will consider, among other things, the price of shares available for purchase in the open market compared to the price at which the underwriters may purchase shares through the option to purchase additional shares. A naked short position is more likely to be created if the underwriters are concerned that there may be downward pressure on the price of the Class A common stock in the open market that could adversely affect investors who purchase in this offering. To the extent that the underwriters create a naked short position, they will purchase shares in the open market to cover the position.

 

301


Table of Contents

The underwriters have advised us that, pursuant to Regulation M of the Securities Act, they may also engage in other activities that stabilize, maintain or otherwise affect the price of the Class A common stock, including the imposition of penalty bids. This means that if the representatives of the underwriters purchase Class A common stock in the open market in stabilizing transactions or to cover short sales, the representative can require the underwriters that sold those shares as part of this offering to repay the underwriting discount received by them.

These activities may have the effect of raising or maintaining the market price of the Class A common stock or preventing or retarding a decline in the market price of the Class A common stock, and, as a result, the price of the Class A common stock may be higher than the price that otherwise might exist in the open market. If the underwriters commence these activities, they may discontinue them at any time. The underwriters may carry out these transactions on the NASDAQ Global Select Market, in the over-the-counter market or otherwise.

Prior to this offering, there has been no public market for our Class A common stock. The initial public offering price will be determined by negotiations between us and the representatives of the underwriters. In determining the initial public offering price, we and the representatives of the underwriters expect to consider a number of factors including:

 

 

the information set forth in this prospectus and otherwise available to the representatives;

 

 

our prospects and the history and prospects for the industry in which we compete;

 

 

an assessment of our management;

 

 

our prospects for future earnings;

 

 

the general condition of the securities markets at the time of this offering;

 

 

the recent market prices of, and demand for, publicly traded common stock of generally comparable companies; and

 

 

other factors deemed relevant by the underwriters and us.

Neither we nor the underwriters can assure investors that an active trading market will develop for our shares, or that the shares will trade in the public market at or above the initial public offering price.

The underwriters and their respective affiliates are full service financial institutions engaged in various activities, which may include sales and trading, commercial and investment banking, advisory, investment management, investment research, principal investment, tax equity financing, hedging, market making, brokerage and other financial and non-financial activities and services. Certain of the underwriters and their respective affiliates have provided, and may in the future provide, a variety of these services to us and to persons and entities with relationships with us, for which they received or will receive customary fees and expenses. In particular, J.P. Morgan Securities LLC and/or its affiliates acted as arranger of, and is the administrative agent under, our Bridge Facility. Affiliates of J.P. Morgan Securities LLC, Barclays Capital Inc., Citigroup Global Markets Inc., Morgan Stanley & Co. LLC, Goldman, Sachs & Co., Merrill Lynch, Pierce, Fenner & Smith Incorporated and Deutsche Bank Securities Inc. are lenders under the Bridge Facility and, accordingly will receive a portion of the net proceeds from this offering. In addition, J.P. Morgan Securities LLC, Barclays Capital Inc., Citigroup Global Markets Inc., Morgan Stanley & Co. LLC, Goldman, Sachs & Co., Merrill Lynch, Pierce, Fenner & Smith Incorporated and Deutsche Bank Securities Inc. acted as placement agents in connection with various of the Private Placements.

In the ordinary course of their various business activities, the underwriters and their respective affiliates, officers, directors and employees may purchase, sell or hold a broad array of investments and actively trade

 

302


Table of Contents

securities, derivatives, loans, commodities, currencies, credit default swaps and other financial instruments for their own account and for the accounts of their customers, and such investment and trading activities may involve or relate to our assets, securities and/or instruments (directly, as collateral securing other obligations or otherwise) and/or the assets, securities and/or instruments of persons and entities with relationships with us. The underwriters and their respective affiliates may also communicate independent investment recommendations, market color or trading ideas and/or publish or express independent research views in respect of such assets, securities or instruments and may at any time hold, or recommend to clients that they should acquire, long and/or short positions in such assets, securities and instruments.

Conflicts of interest

As described in “Use of proceeds,” a portion of the net proceeds from this offering will be used to repay amounts outstanding under our Bridge Facility. Because affiliates of J.P. Morgan Securities LLC, Barclays Capital Inc., Citigroup Global Markets Inc. and Morgan Stanley & Co. LLC. will receive more than 5% of the net proceeds of this offering upon repayment of the Bridge Facility, each of J.P. Morgan Securities LLC, Barclays Capital Inc., Citigroup Global Markets Inc. and Morgan Stanley & Co. LLC. is deemed to have a conflict of interest under FINRA Rule 5121. Accordingly, this offering will be conducted in compliance with FINRA Rule 5121, which requires, among other things, that a “qualified independent underwriter” participate in the preparation of, and exercise the usual standards of “due diligence” with respect to, the registration statement and this prospectus.              has agreed to act as the qualified independent underwriter for this offering and to undertake the legal responsibilities and liabilities of an underwriter under the Securities Act, specifically including those inherent in Section 11 of the Securities Act. Pursuant to FINRA Rule 5121,              will not confirm any sales to any account over which it exercises discretionary authority without the specific written approval of the account holder.

Selling restrictions

Other than in the United States, no action has been taken by us or the underwriters that would permit a public offering of the securities offered by this prospectus in any jurisdiction where action for that purpose is required. The securities offered by this prospectus may not be offered or sold, directly or indirectly, nor may this prospectus or any other offering material or advertisements in connection with the offer and sale of any such securities be distributed or published in any jurisdiction, except under circumstances that will result in compliance with the applicable rules and regulations of that jurisdiction. Persons into whose possession this prospectus comes are advised to inform themselves about and to observe any restrictions relating to the offering and the distribution of this prospectus. This prospectus does not constitute an offer to sell or a solicitation of an offer to buy any securities offered by this prospectus in any jurisdiction in which such an offer or a solicitation is unlawful.

Notice to prospective investors in the European Economic Area

In relation to each Member State of the European Economic Area (each, a “Relevant Member State”), no offer of shares may be made to the public in that Relevant Member State other than:

 

A.   to any legal entity which is a qualified investor as defined in the Prospectus Directive;

 

B.   to fewer than 100 or, if the Relevant Member State has implemented the relevant provision of the 2010 PD Amending Directive, 150, natural or legal persons (other than qualified investors as defined in the Prospectus Directive), as permitted under the Prospectus Directive, subject to obtaining the prior consent of the representatives; or

 

C.   in any other circumstances falling within Article 3(2) of the Prospectus Directive,

 

303


Table of Contents

provided that no such offer of shares shall require the Company or the representatives to publish a prospectus pursuant to Article 3 of the Prospectus Directive or supplement a prospectus pursuant to Article 16 of the Prospectus Directive.

Each person in a Relevant Member State who initially acquires any shares or to whom any offer is made will be deemed to have represented, acknowledged and agreed that it is a “qualified investor” within the meaning of the law in that Relevant Member State implementing Article 2(1)(e) of the Prospectus Directive. In the case of any shares being offered to a financial intermediary as that term is used in Article 3(2) of the Prospectus Directive, each such financial intermediary will be deemed to have represented, acknowledged and agreed that the shares acquired by it in the offer have not been acquired on a non-discretionary basis on behalf of, nor have they been acquired with a view to their offer or resale to, persons in circumstances which may give rise to an offer of any shares to the public other than their offer or resale in a Relevant Member State to qualified investors as so defined or in circumstances in which the prior consent of the representatives has been obtained to each such proposed offer or resale.

The Company, the representatives and their affiliates will rely upon the truth and accuracy of the foregoing representations, acknowledgements and agreements.

This prospectus has been prepared on the basis that any offer of shares in any Relevant Member State will be made pursuant to an exemption under the Prospectus Directive from the requirement to publish a prospectus for offers of shares. Accordingly any person making or intending to make an offer in that Relevant Member State of shares which are the subject of the offering contemplated in this prospectus may only do so in circumstances in which no obligation arises for the Company or any of the underwriters to publish a prospectus pursuant to Article 3 of the Prospectus Directive in relation to such offer. Neither the Company nor the underwriters have authorized, nor do they authorize, the making of any offer of shares in circumstances in which an obligation arises for the Company or the underwriters to publish a prospectus for such offer.

For the purpose of the above provisions, the expression “an offer to the public” in relation to any shares in any Relevant Member State means the communication in any form and by any means of sufficient information on the terms of the offer and the shares to be offered so as to enable an investor to decide to purchase or subscribe the shares, as the same may be varied in the Relevant Member State by any measure implementing the Prospectus Directive in the Relevant Member State and the expression “Prospectus Directive” means Directive 2003/71/EC (including the 2010 PD Amending Directive, to the extent implemented in the Relevant Member States) and includes any relevant implementing measure in the Relevant Member State and the expression “2010 PD Amending Directive” means Directive 2010/73/EU.

Notice to prospective investors in the United Kingdom

In addition, in the United Kingdom, this document is being distributed only to, and is directed only at, and any offer subsequently made may only be directed at persons who are “qualified investors” (as defined in the Prospectus Directive) (i) who have professional experience in matters relating to investments falling within Article 19 (5) of the Financial Services and Markets Act 2000 (Financial Promotion) Order 2005, as amended (the “Order”) and/or (ii) who are high net worth companies (or persons to whom it may otherwise be lawfully communicated) falling within Article 49(2)(a) to (d) of the Order (all such persons together being referred to as “relevant persons”).

Any person in the United Kingdom that is not a relevant person should not act or rely on the information included in this document or use it as basis for taking any action. In the United Kingdom, any investment or investment activity that this document relates to may be made or taken exclusively by relevant persons. Any person in the United Kingdom that is not a relevant person should not act or rely on this document or any of its contents.

 

304


Table of Contents

Notice to prospective investors in Switzerland

The shares may not be publicly offered in Switzerland and will not be listed on the SIX Swiss Exchange, or “SIX,” or on any other stock exchange or regulated trading facility in Switzerland. This document does not constitute a prospectus within the meaning of, and has been prepared without regard to the disclosure standards for issuance prospectuses under art. 652a or art. 1156 of the Swiss Code of Obligations or the disclosure standards for listing prospectuses under art. 27 ff. of the SIX Listing Rules or the listing rules of any other stock exchange or regulated trading facility in Switzerland. Neither this document nor any other offering or marketing material relating to the shares or the offering may be publicly distributed or otherwise made publicly available in Switzerland.

Neither this document nor any other offering or marketing material relating to the offering, the Company or the shares have been or will be filed with or approved by any Swiss regulatory authority. In particular, this document will not be filed with, and the offer of shares will not be supervised by, the Swiss Financial Market Supervisory Authority FINMA, and the offer of shares has not been and will not be authorized under the Swiss Federal Act on Collective Investment Schemes, or the “CISA.” The investor protection afforded to acquirers of interests in collective investment schemes under the CISA does not extend to acquirers of shares.

Notice to prospective investors in Japan

The securities have not been and will not be registered under the Financial Instruments and Exchange Act. Accordingly, the securities may not be offered or sold, directly or indirectly, in Japan or to, or for the benefit of, any resident of Japan (which term as used herein means any person resident in Japan, including any corporation or other entity organized under the laws of Japan), or to others for re-offering or resale, directly or indirectly, in Japan or to or for the benefit of a resident of Japan, except pursuant to an exemption from the registration requirements of, and otherwise in compliance with, the Financial Instruments and Exchange Act and any other applicable laws, regulations and ministerial guidelines of Japan.

Notice to prospective investors in Hong Kong

The securities have not been offered or sold and will not be offered or sold in Hong Kong, by means of any document, other than (a) to “professional investors” as defined in the Securities and Futures Ordinance (Cap. 571) of Hong Kong and any rules made under that Ordinance; or (b) in other circumstances which do not result in the document being a “prospectus” as defined in the Companies Ordinance (Cap. 32) of Hong Kong or which do not constitute an offer to the public within the meaning of that Ordinance. No advertisement, invitation or document relating to the securities has been or may be issued or has been or may be in the possession of any person for the purposes of issue, whether in Hong Kong or elsewhere, which is directed at, or the contents of which are likely to be accessed or read by, the public of Hong Kong (except if permitted to do so under the securities laws of Hong Kong) other than with respect to securities which are or are intended to be disposed of only to persons outside Hong Kong or only to “professional investors” as defined in the Securities and Futures Ordinance and any rules made under that Ordinance.

Notice to prospective investors in Singapore

This prospectus has not been registered as a prospectus with the Monetary Authority of Singapore. Accordingly, this prospectus and any other document or material in connection with the offer or sale, or invitation for subscription or purchase, of shares may not be circulated or distributed, nor may the shares be offered or sold, or be made the subject of an invitation for subscription or purchase, whether directly or indirectly, to persons in Singapore other than (i) to an institutional investor under Section 274 of the Securities and Futures Act, Chapter

 

305


Table of Contents

289 of Singapore (the “SFA”), (ii) to a relevant person pursuant to Section 275(1), or any person pursuant to Section 275(1A), and in accordance with the conditions specified in Section 275, of the SFA, or (iii) otherwise pursuant to, and in accordance with the conditions of, any other applicable provision of the SFA.

Where the shares are subscribed or purchased under Section 275 of the SFA by a relevant person which is:

 

(a)   a corporation (which is not an accredited investor (as defined in Section 4A of the SFA)) the sole business of which is to hold investments and the entire share capital of which is owned by one or more individuals, each of whom is an accredited investor; or

 

(b)   a trust (where the trustee is not an accredited investor) whose sole purpose is to hold investments and each beneficiary of the trust is an individual who is an accredited investor,

securities (as defined in Section 239(1) of the SFA) of that corporation or the beneficiaries’ rights and interest (howsoever described) in that trust shall not be transferred within six months after that corporation or that trust has acquired the shares pursuant to an offer made under Section 275 of the SFA except:

 

(a)   to an institutional investor or to a relevant person defined in Section 275(2) of the SFA, or to any person arising from an offer referred to in Section 275(1A) or Section 276(4)(i)(B) of the SFA;

 

(b)   where no consideration is or will be given for the transfer;

 

(c)   where the transfer is by operation of law;

 

(d)   as specified in Section 276(7) of the SFA; or

 

(e)   as specified in Regulation 32 of the Securities and Futures (Offers of Investments) (Shares and Debentures) Regulations 2005 of Singapore.

Notice to prospective investors in Brazil

The offer and sale of our common stock will not be carried out by any means that would constitute a public offering in Brazil under Law No. 6,385, of December 7, 1976, as amended, and under CVM Rule (Instrução) No. 400, of December 29, 2003, as amended. The offer and sale of our common stock has not been and will not be registered with the Comissão de Valores Mobiliários in Brazil. Any representation to the contrary is untruthful and unlawful. Any public offering or distribution, as defined under Brazilian laws and regulations, in Brazil is not legal without such prior registration. Documents relating to the offering of our common stock, as well as information contained therein, may not be supplied to the public in Brazil, as the offering of common stock is not a public offering of securities in Brazil, nor may they be used in connection with any offer for sale of our common stock to the public in Brazil.

Any offer of our common stock is addressed to the addressee personally, upon such addressee’s request and for its sole benefit, and is not to be transmitted to anyone else, to be relied upon by anyone else or for any other purpose either quoted or referred to in any other public or private document or to be filed with anyone without the underwriters’ prior, express and written consent.

 

306


Table of Contents

Notice to prospective investors in Chile

The shares of our Class A common stock are not registered in the Securities Registry (Registro de Valores) or subject to the control of the Chilean Securities and Exchange Commission (Superintendencia de Valores y Seguros de Chile). This prospectus and other offering materials relating to the offer of the shares of our Class A common stock do not constitute a public offer of, or an invitation to subscribe for or purchase, the shares of our Class A common stock in the Republic of Chile, other than to individually identified purchasers pursuant to a private offering within the meaning of Article 4 of the Chilean Securities Market Act (Ley de Mercado de Valores) (an offer that is not “addressed to the public at large or to a certain sector or specific group of the public”).

 

307


Table of Contents

Legal matters

The validity of the Class A common stock offered hereby will be passed upon for us by Kirkland & Ellis LLP (a partnership that includes professional corporations), Chicago, Illinois. Kirkland & Ellis LLP has from time to time represented and may continue to represent our Sponsor and some of its affiliates in connection with various legal matters. The underwriters have been represented by Latham & Watkins LLP, New York, New York.

Experts

The combined financial statements of SunEdison Emerging Markets Co. (Predecessor) as of December 31, 2014 and 2013, and for each of the years in the two-year period ended December 31, 2014, have been included in the registration statement in reliance upon the reports of KPMG LLP, an independent registered public accounting firm, appearing elsewhere herein, and upon the authority of said firm as experts in accounting and auditing.

The combined financial statements of BioTherm Energy Projects as of December 31, 2014 and 2013 and for each of the two years in the period ending December 31, 2014 included in this prospectus and in the registration statement have been so included in reliance on the report of BDO South Africa, Inc., independent accountants, appearing elsewhere herein and in the registration statement, given on the authority of said firm as experts in auditing and accounting.

The financial statements of SEI Solar Power Private Limited as of December 31, 2014 and 2013, and for each of the years in the two-year period ended December 31, 2014, have been included in the registration statement in reliance upon the reports of KPMG, an independent registered public accounting firm, appearing elsewhere herein, and upon the authority of said firm as experts in accounting and auditing.

The combined financial statements of Honiton Energy XIL Holdings Limited and Honiton Energy BAV Holdings Limited as of December 31, 2014 and 2013 and for the years then ended have been included in the registration statement in reliance upon the report of KPMG Huazhen LLP (English name previously translated as KPMG Huazhen (SGP)), independent auditors, appearing elsewhere herein, and upon the authority of said firm as experts in accounting and auditing.

The combined financial statements of Renova Energy Projects I as of December 31, 2014 and 2013 and January 1, 2013 and for the years ended December 31, 2014 and 2013, included in this Prospectus have been audited by Deloitte Touche Tohmatsu Auditores Independentes, independent auditors, as stated in their report appearing herein (which report expresses an unqualified opinion on those combined financial statements and includes explanatory paragraphs referring to (1) the combined, carve-out basis of presentation of the financial statements and (2) assumptions underlying the depreciation rates used for property, plant and equipment), are included in reliance upon the report of such firm given upon their authority as experts in accounting and auditing.

The combined financial statements of Core Energy (RF) Proprietary Limited and Erika Energy (RF) Proprietary Limited as of December 31, 2014 and 2013, and for each of the years then ended, have been included herein and in the registration statement in reliance upon the report of KPMG Inc., independent auditor, appearing elsewhere herein, and upon the authority of said firm as experts in accounting and auditing.

The combined financial statements of EN Renewable Energy Limited, EN Wind Power Private Limited and Generacion Eolica India Limited as of December 31, 2014 and 2013, and for each of the years in the two-year period ended December 31, 2014, have been included in the registration statement in reliance upon the reports of KPMG, an independent registered public accounting firm, appearing elsewhere herein, and upon the authority of said firm as experts in accounting and auditing.

 

308


Table of Contents

The financial statements of Hidroeléctrica Santa Cruz S.A.C and Empresa de Generación Eléctrica de Junĺn S.A.C. as of December 31, 2014 and 2013, and for each of the two years in the period ended December 31, 2014, appearing in this registration statement have been audited by Paredes, Zaldĺvar, Burga & Asociados, independent auditors, as set forth in their report thereon appearing elsewhere herein, and are included in reliance upon such report given on the authority of such firm as experts in accounting and auditing.

The separate financial statements of Energía Eólica de Honduras, S.A., Eolo de Nicaragua, S.A., Inversiones Eólicas de Orosí Dos, S.A. and Plantas Eólicas, S.R.L. as of December 31, 2014 and 2013, and for each of the two years in the period ended December 31, 2014, appearing in this registration statement have been audited by Ernst & Young S.A., independent auditors, as set forth in their report thereon appearing elsewhere herein, and are included in reliance upon such report given on the authority of such firm as experts in accounting and auditing.

 

309


Table of Contents

Where you can find more information

We have filed with the SEC a registration statement on Form S-1 under the Securities Act that registers the shares of our Class A common stock to be sold in this offering. The registration statement, including the attached exhibits, contains additional relevant information about us and our Class A common stock. The rules and regulations of the SEC allow us to omit from this document certain information included in the registration statement.

You may read and copy the reports and other information we file with the SEC at the SEC’s Public Reference Room at 100 F Street, N.E., Room 1580, Washington, D.C. 20549. You may also obtain copies of this information by mail from the public reference section of the SEC, 100 F Street, N.E., Washington, D.C. 20549, at prescribed rates. You may obtain information regarding the operation of the public reference room by calling 1-800-SEC-0330. The SEC also maintains a website that contains reports, proxy statements and other information about issuers, like us, who file electronically with the SEC. The address of that website is http://www.sec.gov. This reference to the SEC’s website is an inactive textual reference only and is not a hyperlink.

Upon completion of this offering, we will become subject to the reporting, proxy and information requirements of the Exchange Act, and as a result will be required to file periodic reports, proxy statements and other information with the SEC. These periodic reports, proxy statements and other information will be available for inspection and copying at the SEC’s public reference room and the website of the SEC referred to above, as well as on our website, www.             .com. This reference to our website is an inactive textual reference only and is not a hyperlink. The contents of our website are not part of this prospectus, and you should not consider the contents of our website in making an investment decision with respect to our Class A common stock.

 

310


Table of Contents

Index to financial statements

SunEdison Emerging Markets Co. (Predecessor) unaudited combined financial statements

 

Combined statements of operations for the quarter ended March 31, 2015 and 2014

     F-8   

Combined statements of comprehensive loss for the quarter ended March 31, 2015 and 2014

     F-9   

Combined balance sheets as of March 31, 2015 and December 31, 2014

     F-10   

Combined statements of equity for the the quarter March 31, 2015 and 2014

     F-11   

Combined statements of cash flows for the quarter March 31, 2015 and 2014

     F-12   

Notes to combined financial statements

     F-13   

SEI Solar Power Private Limited unaudited financial statements (Chint – NSM24)

 

Statement of income (unaudited) for the quarter ended March 31, 2015 and 2014

     F-27   

Balance sheets (unaudited) as of March 31, 2015 and December 31, 2014

     F-28   

Statement of cash flows (unaudited) for the quarter ended March 31, 2015 and 2014

     F-29   

Statements of changes in equity

     F-30   

Notes to financial statements

     F-31   

BioTherm Energy Projects unaudited combined interim financial statements (BioTherm Transaction)

 

Combined balance sheets as at March 31, 2015 and December 31, 2014

     F-40   

Combined statements of income and comprehensive loss for the three months ended March 31, 2015 and 2014

     F-41   

Combined statements of changes in shareholder’s net investment for the three months ended March  31, 2015 and 2014

     F-42   

Combined statements of cash flows for the three months ended March 31, 2015 and 2014

     F-43   

Notes to the combined financial statements

     F-44   

Honiton Energy XIL Holdings Limited and Honiton Energy BAV Holdings Limited unaudited condensed combined financial statements (Hercules Transaction)

 

Unaudited condensed combined balance sheets as of March 31, 2015 and December 31, 2014

     F-55   

Unaudited condensed combined statements of comprehensive income (loss) for the three months ended March  31, 2015 and 2014

     F-56   

Unaudited condensed combined statements of changes in shareholder’s deficit for the three months ended March 31, 2015 and 2014

     F-57   

Unaudited condensed combined statements of cash flows

     F-58   

Notes to the unaudited condensed combined financial statements

     F-59   

 

F-1


Table of Contents

Renova Energy Projects I unaudited condensed combined interim financial statements (Renova Transaction)

 

Condensed Combined balance sheets as of March 31, 2015 and December 31, 2014

     F-64   

Condensed Combined Income Statements for the three-month periods ended March 31, 2015 and 2014

     F-66   

Condensed Combined Statements of Comprehensive Income for the three-month periods ended March  31, 2015 and 2014

     F-67   

Condensed Combined Statements of Changes in Parent’s Net Investment for the three-month periods ended March 31, 2015 and 2014

     F-68   

Condensed combined statements of cash flows for the three-month periods ended March 31, 2015 and 2014

     F-69   

Notes to the Unaudited Condensed Combined Interim Financial Statements

     F-70   

Core Energy (RF) Proprietary Limited and Erika Energy (RF) Proprietary Limited unaudited combined financial statements (Chint –Soutpan and Witkop)

 

Combined balance sheets as of March 31, 2015 and December 31, 2014

     F-87   

Combined statements of operations and comprehensive income for the quarters ended March 31, 2015 and 2014

     F-88   

Combined statements of invested equity for the quarters ended March 31, 2015 and 2014

     F-89   

Combined statements of cash flows for the quarters ended March 31, 2015 and 2014

     F-90   

Notes to the combined financial statements

     F-91   

EN Renewable Energy Limited, EN Wind Power Private Limited and Generacion Eolica India Limited unaudited combined financial statements (FERSA Transaction)

 

Combined statements of income (unaudited) for the three months ended March 31, 2015 and 2014

     F-106   

Combined balance sheets (unaudited) as of March 31, 2015 and December 31, 2014

     F-107   

Combined statements of equity (unaudited)

     F-108   

Combined statements of cash flows (unaudited) as of March 31, 2015 and 2014

     F-109   

Notes to the combined financial statements (unaudited)

     F-110   

Empresa de Generación Eléctrica de Junĺn S.A.C. unaudited interim financial statements (LAP Transaction)

 

Interim statements of financial position as of March 31, 2015 and December 31, 2014

     F-121   

Interim statements of comprehensive income for the three months ended March 31, 2015 and 2014

     F-122   

Interim statements of changes in equity for the three months ended March 31, 2015 and 2014

     F-123   

Interim statements of cash flows for the three months ended March 31, 2015 and 2014

     F-124   

Notes to the interim financial statements

     F-125   

 

F-2


Table of Contents

Hidroelectrica Santa Cruz S.A.C. unaudited interim financial statements (LAP Transaction)

 

Interim statements of financial position as of March 31, 2015 and December 31, 2014

     F-132   

Interim statements of comprehensive income for the three months ended March 31, 2015 and 2014

     F-133   

Interim statements of changes in equity for the three months ended March 31, 2015 and 2014

     F-134   

Interim statements of cash flows for the three months ended March 31, 2015 and 2014

     F-135   

Notes to the interim financial statements

     F-136   
Plantas Eolicas, S.R.L. (A costa Rican Entity) unaudited interim financial statements (GME Transaction)   

Interim condensed statements of financial position as of March 31, 2015 and December  31, 2014 and 2013

     F-143   

Interim condensed statements of comprehensive income for the three-month periods ended March  31, 2015 and 2014

     F-144   

Interim condensed statements of changes in equity for the three-month periods ended March 31, 2015 and 2014

     F-145   

Interim condensed statements of cash flows for the three-month periods ended March 31, 2015 and 2014

     F-146   

Notes to interim condensed financial statements

     F-147   
Energia Eolica de Honduras, S.A. (A Honduran Entity) unaudited interim financial statements (GME Transaction)   

Interim condensed statements of financial position as of March 31, 2015 and December 31, 2014 and 2013

     F-152   

Interim condensed statements of comprehensive income for the three-month periods ended March  31, 2015 and 2014

     F-153   

Interim condensed statements of changes in equity for the three-month periods ended March 31, 2015 and 2014

     F-154   

Interim condensed statements of cash flows for the three month-periods ended March 31, 2015 and 2014

     F-155   

Notes to the interim condensed financial statements

     F-156   
Eolo de Nicaragua, S.A. (A Nicaraguan Entity) unaudited interim financial statements (GME Transaction)   

Interim condensed statements of financial position as of March 31, 2015 and December 31, 2014 and 2013

     F-167   

Interim condensed statements of comprehensive income for the three-month periods ended March  31, 2015 and 2014

     F-168   

Interim condensed statements of changes in equity for the three-month periods ended March 31, 2015 and 2014

     F-169   

 

F-3


Table of Contents

Interim condensed statements of cash flows for the three-month periods ended March 31, 2015 and 2014

     F-170   

Notes to the interim condensed financial statements

     F-171   
Inversiones Eolicas de Orosi Dos, S.A. (A Costa Rican Entity) unaudited interim financial statements (GME Transaction)    

Interim condensed statements of financial position as of March 31, 2015 and December 31, 2014 and 2013

     F-180   

Interim condensed statements of comprehensive income for the three-month periods ended March 31, 2015 and 2014

     F-181   

Interim condensed statements of changes in equity for the three-month periods ended March 31, 2015 and 2014

     F-182   

Interim condensed statements of cash flows for the three-month periods ended March 31, 2015 and 2014

     F-183   

Notes to the interim financial statements

     F-184   

SunEdison Emerging Markets Co. (Predecessor) audited combined financial statements

 

Report of independent registered public accounting firm

     F-194   

Combined statements of operations for the years ended December 31, 2014 and 2013

     F-195   

Combined statements of comprehensive loss for the years ended December 31, 2014 and 2013

     F-196   

Combined balance sheets as of December 31, 2014 and 2013

     F-197   

Combined statements of equity for the years ended December 31, 2014 and 2013

     F-198   

Combined statements of cash flows for the years ended December 31, 2014 and 2013

     F-199   

Notes to combined financial statements

     F-200   

SEI Solar Power Private Limited audited financial statements (Chint – NSM24)

 

Independent Auditors’ Report

     F-220   

Statement of operations for the years ended December 31, 2014 and 2013

     F-221   

Balance sheets as of December 31, 2014 and 2013

     F-222   

Statement of cash flows for the years ended December 31, 2014 and 2013

     F-223   

Statements of changes in equity for the years ended December 31, 2014 and 2013

     F-224   

Notes to financial statements

     F-225   

BioTherm Energy Projects audited combined financial statements (BioTherm Transaction)

 

Report of independent auditor

     F-234   

Combined balance sheets as of December 31, 2014 and 2013

     F-235   

Combined statements of income and comprehensive loss for the years ended December 31, 2014 and 2013

     F-236   

 

F-4


Table of Contents

Combined statements of changes in shareholder’s net investment for the years ended December 31, 2014 and 2013

     F-237   

Combined statements of cash flows for the years ended December 31, 2014 and 2013

     F-238   

Notes to the combined financial statements

     F-239   

Honiton Energy XIL Holdings Limited and Honiton Energy BAV Holdings Limited audited combined financial statements (Hercules Transaction)

 

Independent auditors’ report

     F-253   

Combined balance sheets as of December 31, 2014 and 2013

     F-255   

Combined statements of comprehensive loss for the years ended December 31, 2014 and 2013

     F-255   

Combined statements of changes in stockholder’s deficit for the years ended December 31, 2014 and 2013

     F-256   

Combined statements of cash flows

     F-257   

Notes to the combined financial statements

     F-258   

Renova Energy Projects I audited combined financial statements (Renova Transaction)

 

Independent auditors’ report

     F-270   

Combined balance sheets as of December 31, 2014 and 2013

     F-272   

Combined income statements for the years ended December 31, 2014 and 2013

     F-274   

Combined statements of comprehensive income for the years ended December 31, 2014 and 2013

     F-275   

Combined statements of changes to Parent’s net investment for the years ended December 31, 2014 and 2013

     F-276   

Combined statements of cash flows for the years ended December 31, 2014 and 2013.

     F-277   

Notes to the combined financial statements

     F-278   

Core Energy (RF) Proprietary Limited and Erika Energy (RF) Proprietary Limited audited combined financial statements (Chint –Soutpan and Witkop)

 

Independent auditor’s report

     F-302   

Combined balance sheets as of December 31, 2014 and 2013

     F-303   

Combined statements of operations and comprehensive income for the years ended December 31, 2014 and 2013

     F-304   

Combined statements of invested equity for the years ended December 31, 2014 and 2013

     F-305   

Combined statements of cash flows for the years ended December 31, 2014 and 2013.

     F-306   

Notes to the combined financial statements

     F-307   

EN Renewable Energy Limited, EN Wind Power Private Limited and Generacion Eolica India Limited audited combined financial statements (FERSA Transaction)

 

Independent auditor’s report

     F-323   

Combined statements of income for the years ended December 31, 2014 and 2013

     F-324   

 

F-5


Table of Contents

Combined balance sheets as of December 31, 2014 and 2013

     F-325   

Combined statements of cash flows for the years ended December 31, 2014 and 2013

     F-326   

Combined statements of equity

     F-327   

Notes to the combined financial statements

     F-328   

Empresa de Generación Eléctrica de Junĺn S.A.C. audited financial statements (LAP Transaction)

 

Independent auditor’s report

     F-339   

Statements of financial position as at December 31, 2014 and 2013

     F-340   

Statements of comprehensive income for the years ended December 31, 2014 and 2013

     F-341   

Statements of changes in equity for the years ended December 31, 2014 and 2013

     F-342   

Statements of cash flows for the years ended December 31, 2014 and 2013

     F-343   

Notes to the financial statements

     F-344   

Hidroeléctrica Santa Cruz S.A.C. audited financial statements (LAP Transaction)

 

Independent auditor’s report

     F-373   

Statements of financial position as at December 31, 2014 and 2013

     F-375   

Statements of comprehensive income for the years ended December 31, 2014 and 2013

     F-376   

Statements of changes in equity for the years ended December 31, 2014 and 2013

     F-377   

Statements of cash flows for the years ended December 31, 2014 and 2013

     F-378   

Notes to the financial statements

     F-379   
Plantas Eolicas, S.R.L. (A Costa Rican Entity) audited financial statements
(GME Transaction)
   

Independent auditor’s report

     F-413   

Statements of financial position as of December 31, 2014 and 2013

     F-415   

Statements of comprehensive income for the years ended December 31, 2014 and 2013

     F-416   

Statements of changes in equity for the years ended December 31, 2014 and 2013

     F-417   

Statements of cash flows for the years ended December 31, 2014 and 2013

     F-418   

Notes to the financial statements

     F-419   
Energia Eolica de Honduras, S.A. (A Honduran Entity) audited financial statements
(GME Transaction)
  

Independent auditor’s report

     F-438   

Statements of financial position as of December 31, 2014 and 2013

     F-440   

Statements of comprehensive income for the years ended December 31, 2014 and 2013

     F-441   

Statements of changes in equity for the years ended December 31, 2014 and 2013

     F-442   

Statements of cash flows for the years ended December 31, 2014 and 2013

     F-443   

Notes to the financial statements

     F-444   

 

F-6


Table of Contents
Eolo de Nicaragua, S.A. (A Nicaraguan Entity) audited financial statements
(GME Transaction)
   

Independent auditor’s report

     F-475   

Statements of financial position as of December 31, 2014 and 2013

     F-477   

Statements of comprehensive income for the years ended December 31, 2014 and 2013

     F-478   

Statements of changes in equity for the years ended December 31, 2014 and 2013

     F-479   

Statements of cash flows for the years ended December 31, 2014 and 2013

     F-480   

Notes to the financial statements

     F-481   
Inversiones Eolicas de Orosi Dos, S.A. (A Costa Rican Entity) audited financial statements (GME Transaction)    

Independent auditor’s report

     F-509   

Statements of financial position as of December 31, 2014 and 2013

     F-510   

Statements of comprehensive income for the years ended December 31, 2014 and 2013

     F-511   

Statements of changes in equity for the years ended December 31, 2014 and 2013

     F-512   

Statements of cash flows for the years ended December 31, 2014 and 2013

     F-513   

Notes to the financial statements

     F-514   

 

F-7


Table of Contents

SunEdison Emerging Markets Co. (Predecessor)

Combined statements of operations (unaudited)

 

      For the three months ended
March 31,
 

In thousands

               2015                 2014  

Revenue

   $ 17,806      $ 8,826   

Operating costs and expenses:

    

Cost of operations

     358        441   

Cost of operations—affiliate

     964        725   

General and administrative

     4,486        574   

General and administrative—affiliate

     2,967        3,856   

Depreciation and accretion

     2,735        1,735   
  

 

 

   

 

 

 

Total operating costs and expenses

     11,510        7,331   
  

 

 

   

 

 

 

Operating income

     6,296        1,495   

Other expense (income):

    

Interest expense

     16,821        3,903   

Other income, net

     (418     (1,642
  

 

 

   

 

 

 

Total other expenses, net

     16,403        2,261   
  

 

 

   

 

 

 

Loss before income tax expense

     (10,107     (766

Income tax expense

     1,118        438   
  

 

 

   

 

 

 

Net loss

   $ (11,225   $ (1,204
  

 

 

   

 

 

 

See accompanying notes to combined financial statements.

 

F-8


Table of Contents

SunEdison Emerging Markets Co. (Predecessor)

Combined statements of comprehensive income (loss) (unaudited)

 

      For the three months ended March 31,  
In thousands                2015                 2014  

 

  

 

 

   

 

 

 

Net loss

   $ (11,225   $ (1,204

Other comprehensive income (loss):

    

Net foreign currency translation adjustments

     4,477        12,055   

Loss on hedging instruments

     (103     (13,147
  

 

 

   

 

 

 

Total comprehensive income (loss)

   $ (6,851   $ (2,296
  

 

 

   

 

 

 

See accompanying notes to combined financial statements.

 

F-9


Table of Contents

SunEdison Emerging Markets Co. (Predecessor)

Combined balance sheets (unaudited)

 

      As of
March 31,
    As of
December 31,
 

In thousands

   2015     2014  

Assets

    

Current assets:

    

Cash and cash equivalents

   $ 136,358      $ 150,146   

Cash committed for construction projects

     34,281        42,416   

Restricted cash

     20,472        22,083   

Accounts receivable, net

     12,603        11,728   

Due from parent and affiliates

     747        864   

Deferred financing costs

     5,263        4,457   

Deferred tax assets

     83        197   

Other current assets

     1,840        2,775   
  

 

 

   

 

 

 

Total current assets

     211,647        234,666   

Property and equipment, net

     415,537        386,079   

Due from parent and affiliates

     140        138   

Deferred financing costs, net

     6,199        11,487   

Restricted cash, long term

     22,292        21,312   

Deferred tax assets

     98        1,384   

Other assets

     29,775        18,390   
  

 

 

   

 

 

 

Total assets

   $ 685,688      $ 673,456   
  

 

 

   

 

 

 

Liabilities and Equity

    

Current liabilities:

    

Current portion of long-term debt

   $ 39,957      $ 31,542   

Accounts payable

     1,093        9,894   

Accrued expenses and other current liabilities

     2,102        2,326   

Deferred tax liabilities

     259        1,384   

Due to parent and affiliates

     34,314        47,266   
  

 

 

   

 

 

 

Total current liabilities

     77,725        92,412   

Other liabilities:

    

Long-term debt, less current portion

     517,800        492,569   

Asset retirement obligations and other long term liabilities

     40,312        36,830   

Deferred tax liabilities

     2,856        2,881   
  

 

 

   

 

 

 

Total liabilities

     638,693        624,692   

Equity:

    

Net parent investment

     69,142        75,285   

Accumulated other comprehensive loss

     (22,147     (26,521
  

 

 

   

 

 

 

Total equity

     46,995        48,764   
  

 

 

   

 

 

 

Total liabilities and equity

   $ 685,688      $ 673,456   
  

 

 

   

 

 

 

See accompanying notes to combined financial statements.

 

F-10


Table of Contents

SunEdison Emerging Markets Co. (Predecessor)

Combined statements of equity (unaudited)

 

In thousands

   Net parent
investment
    Accumulated
other
comprehensive
loss
    Total equity  

Balance at December 31, 2014

   $ 75,285      $ (26,521   $ 48,764   
  

 

 

   

 

 

   

 

 

 

Net loss

     (11,225            (11,225

Contributions from parent and affiliates, net

     5,082               5,082   

Other comprehensive income

            4,374        4,374   
  

 

 

   

 

 

   

 

 

 

Balance at March 31, 2015

   $ 69,142      $ (22,147     $46,995   
  

 

 

   

 

 

   

 

 

 

See accompanying notes to combined financial statements.

 

F-11


Table of Contents

SunEdison Emerging Markets Co. (Predecessor)

Combined statements of cash flows

 

      For the three month ended
March
 

In thousands

   2015     2014  

Cash flows from operating activities:

    

Net loss

   $ (11,225   $ (1,204

Adjustments to reconcile net loss to net cash used in operating activities:

    

Amortization of deferred financing costs

     465        57   

Depreciation and accretion

     2,735        1,735   

Change in fair value of interest rate swaps

     594        (1,356

Deferred taxes

     970        486   

Changes in assets and liabilities:

    

Accounts receivable, net

     (1,037     (1,758

Other current assets

     (17     (10,474

Accounts payable and other current liabilities

     (4,760     1,971   

Due to parent and affiliates

     11,595        23,234   

Other assets and liabilities, net

     2,054        11,871   
  

 

 

   

 

 

 

Net cash provided by operating activities

     1,374        24,562   
  

 

 

   

 

 

 

Cash flows from investing activities:

    

Capital expenditures

     (60,050     (36,105

Change in cash committed for construction

     7,734        (38,990

Change in restricted cash

     819        10,670   

Change in loans due from parent and affiliates

     (137     (495

Investment in third party

     (860       
  

 

 

   

 

 

 

Net cash used in investing activities

     (52,494     (64,920
  

 

 

   

 

 

 

Cash flows from financing activities:

    

Proceeds from system debt financing

     40,392        38,037   

Repayments on system debt financing

     (3,607     (1,497

Net parent investment

     2,916        13,270   

Payment of deferred financing costs

     (1,752     (1,681
  

 

 

   

 

 

 

Net cash provided by financing activities

     37,949        48,130   

Effect of exchange rate changes on cash and cash equivalents

     (617     (2,396
  

 

 

   

 

 

 

Net (decrease) increase in cash and cash equivalents

     (13,788     5,376   

Cash and cash equivalents at beginning of period

     150,146        3,148   
  

 

 

   

 

 

 

Cash and cash equivalents at end of period

   $ 136,358      $ 8,524   
  

 

 

   

 

 

 

See accompanying notes to combined financial statements.

 

F-12


Table of Contents

SunEdison Emerging Markets Co. (Predecessor)

Notes to combined financial statements (unaudited)

(Amounts in thousands)

1. Nature of operations

The accompanying interim combined financial statements of SunEdison Emerging Markets Co. (the “Company” or “we”) have been prepared in connection with the proposed initial public offering of Class A common stock of TerraForm Global, Inc., (“TerraForm Global”) formerly known as SunEdison Emerging Markets Yield, Inc. TerraForm Global was formed as a Delaware corporation on September 12, 2014 and is a wholly owned subsidiary of SunEdison, Inc. The Company represents the assets that TerraForm Global intends to acquire from SunEdison, Inc. (the “Parent”) concurrently with the closing of the proposed initial public offering of Class A common stock of the Corporation (the “Offering”), and therefore, the combined financial statements of the Company are viewed as the Predecessor of TerraForm Global, Inc. Currently, the assets to be acquired include solar energy generation systems owned by project entities located in China, India, Malaysia, South Africa, Uruguay and Thailand and the related long-term contractual arrangements to sell the solar energy generated to third parties. The project entities in China, India, South Africa, Uruguay and Thailand are majority-owned subsidiaries of the Parent. The project entities in Malaysia are 48% owned by a subsidiary of the Parent and 52% owned by an investor unrelated to the Parent. Each of the project entities is controlled either through voting or variable interests and therefore is consolidated by the Parent.

The Company has the following projects in operation and under construction as of March 31, 2015:

 

Project Name    Stage of Development
as of March 31, 2015
     Commercial Operation
Date (1)
     Country      Plant Capacity in MW (2)  

 

  

 

 

    

 

 

    

 

 

    

 

 

 

Bora Bora

     Under Construction         Q4 2015         India         17.8   

SE 25

     In Operation         Q1 2012         India         25.0   

NSM Suryalabh

     In Operation         Q1 2015         India         19.1   

NSM Sitara

     In Operation         Q1 2015         India         15.2   

NSM L'Volta

     In Operation         Q1 2015         India         12.7   

Focal

     Under Construction         Q2 2015         India         11.3   

Brakes

     In Operation         Q4 2014         India         7.5   

Millenium

     In Operation         Q1 2012         India         6.9   

Raj 5

     In Operation         Q4 2011         India         5.0   

ESP Urja

     In Operation         Q4 2011         India         3.7   

Azure

     In Operation         Q4 2011         India         3.7   

Dunhuang

     In Operation         Q4 2012         China         18.0   

El Naranjal

     Under Construction         Q4 2015         Uruguay         57.4   

Del Litoral

     Under Construction         Q4 2015         Uruguay         17.4   

Boshof

     In Operation         Q4 2014         South Africa         33.6   

NPS Star 1-3

     Under Construction         Q3 2015         Thailand         17.9   

WXA 1-3

     Under Construction         Q3 2015         Thailand         17.9   

PP Solar

     In Operation         Q1 2015         Thailand         3.6   

Silverstar Pavilion

     In Operation         Q4 2013         Malaysia         5.1   

Fortune 11

     In Operation         Q4 2013         Malaysia         4.8   

Corporate Season

     In Operation         Q4 2013         Malaysia         2.5   
           

 

 

 

Total

              306.1   
           

 

 

 

 

  

 

 

    

 

 

    

 

 

    

 

 

 

 

F-13


Table of Contents
(1)   Represents the actual or anticipated commercial operation date, as applicable, unless otherwise indicated.

 

(2)   Nameplate capacity represents the maximum generating capacity at standard test conditions of a facility multiplied by our percentage of economic ownership of that facility after taking into account any redeemable preference shares and shareholder loans that we hold. For more information about our projects, including information related to our economic ownership, see “Business—Our portfolio—Initial portfolio.” For projects referenced herein that have not yet achieved their commercial operation date, the figures reflect expected final capacity.

Basis of presentation

The Company has presented interim combined financial statements for the three months ended March 31, 2015 and 2014 and as of March 31, 2015 and December 31, 2014. The interim Company’s combined financial statements have been prepared in accordance with U.S. generally accepted accounting principles (“U.S. GAAP”). The Financial Accounting Standards Board (“FASB”) Accounting Standards Codification (“ASC”) is the source of authoritative U.S. GAAP to be applied by nongovernmental entities. In addition, the rules and interpretative releases of the United States Securities and Exchange Commission (“SEC”) under authority of federal securities laws are also sources of authoritative U.S. GAAP for SEC registrants. The accounting policies followed in the preparation of the interim combined financial statements are consistent in all material respects with those presented in Note 1 to the combined financial statements for the years ended December 31, 2014 and 2013.

The Company currently operates as part of the Parent. The interim combined financial statements were prepared using the Parent’s historical basis in certain assets and liabilities, and include all revenues, expenses, assets, and liabilities attributed to the assets to be acquired. The historical interim combined financial statements also include allocations of certain corporate expenses of the Parent. Management believes the assumptions and methodology underlying the allocation of the Parent’s corporate expenses reasonably reflect all of the costs of doing business of the Company. However, such expenses may not be indicative of the actual level of expense that would have been incurred by the Company if it had operated as an independent, publicly traded company during the periods prior to the Offering or of the costs expected to be incurred in the future.

The interim combined balance sheets do not separately present certain of the Parent’s assets or liabilities where management deemed it inappropriate due to the underlying nature of those assets and liabilities. The Parent performs financing, cash management, treasury and other services for the Company on a centralized basis. Changes in the net parent investment account in the combined balance sheets related to these activities have been considered cash receipts and payments for purposes of the combined statements of cash flows and are reflected in financing activities. Changes in the net parent investment account resulting from Parent contributions of assets and liabilities have been considered non-cash financing activities for purposes of the combined statements of cash flows.

These interim combined financial statements and related notes to the combined financial statements are presented on a consistent basis for all periods presented. All significant intercompany transactions and balances have been eliminated in the combined financial statements.

For further information, including the Company’s significant accounting policies, refer to the audited financial statements and the notes thereto as of December 31, 2014 and 2013 and for the years ended December 31, 2014 and 2013, included in our registration on Form S-1.

 

F-14


Table of Contents

New accounting standards

In July 2013, the FASB issued ASU 2013-11, Income Taxes (Topic 740) Presentation of an Unrecognized Tax Benefit When a Net Operating Loss Carryforward, a Similar Tax Loss, or a Tax Credit Carryforward Exists, or ASU No. 2013-11. The amendments of ASU 2013-11, which were adopted on January 1, 2014, require an entity to present an unrecognized tax benefit, or a portion of an unrecognized tax benefit, as a reduction of a deferred tax asset for a net operating loss, or NOL, a similar tax loss or tax credit carryforward rather than a liability when the uncertain tax position would reduce the NOL or other carryforward under the tax law of the applicable jurisdiction and the entity intends to use the deferred tax asset for that purpose. The adoption of this guidance did not result in any material impact to our combined financial statements.

In May 2014, the FASB issued ASU 2014-09, Revenue from Contracts with Customers, which requires an entity to recognize the amount of revenue to which it expects to be entitled for the transfer of promised goods or services to customers. ASU 2014-09 will replace most existing revenue recognition guidance in U.S. GAAP when it becomes effective. ASU 2014-09 is effective for us on January 1, 2017. Early application is not permitted. A delay in the effective date is currently being considered by the FASB, which we expect will result in at least a one year deferral. ASU 2014-09 permits the use of either a retrospective or cumulative effect transition method. We have not determined which transition method we will adopt, and we are currently evaluating the impact that ASU 2014-09 will have on our combined financial statements and related disclosures upon adoption.

In August 2014, the FASB issued ASU 2014-15, Disclosure of Uncertainties about an Entity’s Ability to Continue as a Going Concern, which describes how an entity should assess its ability to meet obligations and sets rules for how this information should be disclosed in the financial statements. The standard provides accounting guidance that will be used along with existing auditing standards. The new standard applies to all entities for the first annual period ending after December 15, 2016, and interim periods thereafter. Management has evaluated the guidance and concluded that the adoption of this guidance will not result in any material impact to our combined financial statements.

In January 2015, the FASB issued ASU 2015-01, Income Statement-Extraordinary and Unusual Items (Subtopic 225-20): Simplifying Income Statement Presentation by Eliminating the Concept of Extraordinary Items. ASU No. 2015-01 eliminates from GAAP the concept of extraordinary items. An entity will no longer be required to (1) segregate an extraordinary item from the results of ordinary operations; (2) separately present an extraordinary item on its income statement, net of tax, after income from continuing operations; and (3) disclose income taxes and earnings-per-share data applicable to an extraordinary item. ASU 2015-01 will be effective for fiscal years beginning after December 15, 2015. An entity may apply the amendments prospectively or retrospectively to all prior periods presented in the financial statements. Early adoption is permitted provided that the guidance is applied from the beginning of the fiscal year of adoption. Management does not believe that the adoption of ASU 2015-01 will have a material effect on our Financial Statements.

In February 2015, the FASB issued ASU 2015-02, Consolidation (Topic 810): Amendments to the Consolidation Analysis. ASU 2015-02 amended the process that a reporting entity must perform to determine whether it should consolidate certain types of legal entities. ASU No. 2015-02 is effective for annual periods ending after December 15, 2015, and for annual periods and interim periods thereafter with early adoption permitted. Management does not believe that the adoption of ASU No. 2015-02 will have a material effect on our Financial Statements.

In April 2015, the FASB issued ASU 2015-03, Interest-Imputation of Interest, which requires debt issuance costs to be presented as a direct deduction from the carrying amount of the related liability. The new standard is effective for annual periods ending after December 31, 2015. Early adoption is permitted. Management does not believe that the adoption of this guidance will have a material impact on our Financial Statements.

 

F-15


Table of Contents

2. Property and equipment

Property and equipment consists of the following (in thousands):

 

      March 31,
2015
    December 31,
2014
 

Land

   $ 2,771      $ 2,739   

Solar energy systems

     313,524        306,203   
  

 

 

 

Total property and equipment, at cost

     316,295        308,942   

Less accumulated depreciation

     (18,360     (15,804
  

 

 

 

Total property and equipment in service, net

     297,935        293,138   

Construction in progress—solar energy systems

     117,602        92,941   
  

 

 

 

Total property and equipment, net

   $ 415,537      $ 386,079   
  

 

 

 

Depreciation expense was $2,676 and $1,675 for the three months ended March 31, 2015 and 2014, respectively.

3. Asset retirement obligations and other liabilities

Activity in asset retirement obligations is as follows (in thousands):

 

      March 31,
2015
    December 31,
2014
 

Balance at the beginning of the period

   $ 5,049      $ 2,553   

Additional obligation

            2,930   

Accretion expense

     59        243   

Effect of exchange rate changes on asset retirement obligations

     (49     (677
  

 

 

   

 

 

 

Balance at the end of the period

   $ 5,059      $ 5,049   
  

 

 

 

Other liabilities of $35,253 and $31,781 at March 31, 2015 and December 31, 2014, respectively, consists primarily of the non-current portion of a payable due to a contractor due December 2016 and bearing interest at 13%.

4. Debt

Debt consists of the following (in thousands):

 

     As of March 31, 2015     As of December 31, 2014  
    Total principal     Current     Long-term     Total principal     Current     Long-term  

Term debt

  $ 407,757      $ 38,457      $ 369,300      $ 374,111      $ 30,042      $ 344,069   

Bridge Credit Facility

    150,000        1,500        148,500        150,000        1,500        148,500   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total

  $ 557,757      $ 39,957      $ 517,800      $ 524,111      $ 31,542      $ 492,569   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

The fair value of our outstanding debt obligations as of March 31, 2015 and December 31, 2014 approximates carrying value due to the variable rate nature of these obligations.

 

F-16


Table of Contents

Term debt

Our solar energy systems for which we have long-term debt obligations are included in separate legal entities. We typically finance our solar energy projects through project entity specific debt secured by the project entity’s assets (primarily the solar energy systems) with no recourse to the Parent. Typically, these financing arrangements provide for a credit facility used for construction, which upon completion is converted into term debt. As of March 31, 2015, we had $407,757 of project entity specific debt that is secured by the total assets of the Company. The Company had undrawn commitments under the credit facilities of $13,446 as of March 31, 2015.

Term debt for India consists of variable rate loans with interest rates that are variously tied to the two-year Infrastructure Development Finance Company (“IDFC”) benchmark rate, the L&T Infrastructure benchmark rate, the Overseas Private Investment Corporation note interest rate, L&T prime lending rate, ICICI base rate plus spread and the Rabo India Finance rate. The interest rates on the term debt as of March 31, 2015 range from 12.00% to 13.00% and mature between 2016 and 2030. Principal and interest is due and payable in arrears monthly or quarterly and on the maturity dates of the credit facilities.

Term debt for China consists of a fixed rate loan with interest at 5.6%. Principal and interest is due and payable on the maturity date of the term debt, which is July 2015.

Term debt for Malaysia consists of variable rate loans with interest rates that are tied to the Kuala Lumpur Interbank Offered Rate (“KLIBOR”). The interest rates on the term debt as of March 31, 2015 range from 4.39% to 5.83% and mature in 2028. Principal and interest is due and payable in arrears at the end of each fiscal quarter or on the maturity date of the credit facilities.

Term debt for South Africa consists of a variable loan with interest tied to the three-month London Interbank Offered Rate (“LIBOR”). The interest rate on the term debt as of March 31, 2015 is 13.03% and matures in 2031. Principal and interest is due and payable in arrears at the end of each fiscal quarter and on the maturity date of the credit facility.

Term debt for Thailand consists of a variable loan with interest tied to the Minimum Lending Rate (“MLR”). The interest rate on the term debt as of March 31, 2015 is 6.47% and matures in 2023. Principal and interest is due and payable in arrears at the end of each fiscal quarter and on the maturity date of the credit facility.

The term debt agreements contain certain representations, covenants and warranties of the borrower including limitations on business activities, guarantees, environmental issues, project maintenance standards, and a minimum debt service coverage ratio requirement.

Bridge Term Loan

On December 22, 2014, SunEdison Emerging Markets Yield, LLC entered into a credit and guaranty agreement with JPMorgan Chase Bank, N.A., as administrative agent (the “Bridge Facility”). The Bridge Facility did not amend, restate, or otherwise modify any existing credit arrangements.

The Bridge Facility has a term ending in December 2016. The total amount of the Bridge Facility is $150,000 which was drawn in full as of March 31, 2015. The Company incurred $7,028 in deferred financing costs which are being amortized over the expected term of the loan. The purpose of the Bridge Facility is to fund the acquisition of projects from third party developers and to repay certain of the project-level indebtedness incurred by projects included in our initial portfolio. Our obligations under the Bridge Facility and the guaranty obligations of our subsidiaries were secured by first priority liens on and security interests in substantially all present and future assets of the Company and the subsidiary guarantors.

 

F-17


Table of Contents

Interest under the Bridge Facility has variable interest rate options based on either base rate loans or eurodollar loans at the Company’s election. The interest rate payable under base rate is based upon an adjusted base rate equal to the greater of (a) the base rate (prime rate) in effect on such day, (b) the federal funds effective rate in effect on such day plus 0.50% and (c) the eurodollar rate for a eurodollar loan with a one month interest period plus the difference between the applicable margin for eurodollar rate loans and the applicable margin for base rate loans. The interest rate increases by 0.50% on May 22, 2015 and will increase by 0.25% every ninety days thereafter through the date of maturity. The interest rate was 8.5% as of December 31, 2014. The interest rate payable under eurodollar loans will be based upon the published LIBOR rate, plus 7.50% applicable margin.

The Bridge Facility agreement contains certain representations, covenants and warranties including limitations on business activities, guarantees, and quarterly debt coverage reporting including a minimum debt service coverage ratio requirement.

Maturities

The aggregate amounts of payments on long-term debt due after March 31, 2015 are as follows (in thousands):

 

      2015      2016      2017      2018      2019      Thereafter      Total  

Maturities of long-term debt

   $ 23,664       $ 167,604       $ 19,450       $ 18,435       $ 21,652       $ 306,952       $ 557,757   

5. Income taxes

Our income tax balances are determined and reported using a “Separate Return” method. Use of the separate return method may result in differences when comparing amounts allocated to the Company’s carved out tax provisions to the historical consolidated provision of the parent. Deferred tax assets and liabilities are recognized for the future tax consequences attributable to differences between the financial statement carrying amounts of existing assets and liabilities and their respective tax bases and operating loss carry forwards.

We record income tax expense each quarter using our best estimate of our full year’s effective tax rate. Tax expense for the three months ended March 31, 2015 and 2014 was $1,118 and $438, respectively. We regularly review our deferred tax assets for realizability, taking into consideration all available evidence, both positive and negative, including cumulative losses, projected future pre-tax and taxable income (losses), the expected timing of the reversal of existing temporary differences and the expected impact of tax planning strategies. Our total deferred tax liabilities, net of deferred tax assets, as of March 31, 2015 and December 31, 2014 were $2,934 and $2,684, respectively. We are subject to income taxes in the United States and multiple foreign jurisdictions and are subject to income tax audits in these jurisdictions. We believe our tax positions are in compliance with applicable tax laws and regulations. We believe that our liabilities for unrecognized tax benefits, including related interest, are adequate in relation to the potential for additional tax assessments.

 

F-18


Table of Contents

6. Derivative instruments

A summary of all interest rate and currency swap instruments outstanding as of March 31, 2015 is as follows:

 

Type of instrument

  Notional amount
in local currency
(in millions)
    Notional currency   Interest rate     Variable rate   Termination date  

Interest rate swap #1 - Economic Hedge

    89.7      Malaysian Ringgit     4.3%      KLIBOR     March 31, 2028   

Interest rate swap #2(1)

    35.7      Malaysian Ringgit     4.4%      KLIBOR     March 31, 2028   

Interest rate swap #3 - Economic Hedge

    173.0      Thai Baht     6.5%      MLR - 2.0%     December 31, 2023   

Interest rate swap #4 - Cash Flow Hedge

    1,856.0      South African
Rand
    13.0%      JIBAR SAFEX
+ 4.4%
    September 30, 2031   

Currency swap - Cash Flow Hedge

    1,856.0      South African
Rand
   
 
JIBAR SAFEX
+4.4%
  
  
  LIBOR +
2.2%
    September 30, 2031   

 

(1)   Cash Flow Hedge and Economic Hedge as of March 31, 2015 and December 31, 2014, respectively.

Derivative instruments, which are not designated as hedging instruments, consist of:

 

            Assets (liabilities or equity) fair
value
 

In thousands

  

Balance sheet classification

   As of March 31,
2015
     As of December 31,
2014
 

Interest rate swaps

   Accrued expenses and other current liabilities    $ 213       $ 486   
            For the three-months ended
March 31,
 

In thousands

  

Statement of operations classification

   2015      2014  

Interest rate swaps

   Interest expense (income)    $ 594       $ 705   

As of March 31, 2015, we are party to three interest rate swap instruments that are accounted for as economic hedges. These instruments are used to hedge floating rate debt and are not accounted for as cash flow hedges. Under the interest rate swap agreements, we pay the fixed rate and the financial institution counterparties to the agreements pay us a floating interest rate above. The amount recorded in the combined balance sheet, as provided in the table above, represents the estimated fair value of the net amount that we would settle on March 31, 2015 and December 31, 2014 if the agreements were transferred to other third parties or canceled by us. Because these interest rate and currency swaps are deemed economic hedges and not accounted for as hedging instruments, the changes in fair value are recognized in interest expense within the combined statements of operations.

As of March 31, 2015, we are party to an interest rate swap and two currency swaps accounted for using hedge accounting. These instruments are used to hedge the interest rate of variable rate debt denominated in U.S. dollars. The amount recorded in the combined balance sheet represents the estimated fair value of the net amount that we would settle on March 31, 2015, if the agreements were transferred to other third parties or canceled by us. We recorded a gain of $273 and a loss of $64 for the three months ended March 31, 2015 and 2014, respectively, for the effective portion of these cash flow hedges. These were recorded to accumulated other comprehensive income (loss). There was no material ineffectiveness recorded for the three months ended March 31, 2015 and 2014, respectively.

 

F-19


Table of Contents

Derivative instruments, which are designated as hedging instruments, consist of:

 

            Assets (liabilities or equity)
fair value
 

In thousands

  

Balance sheet classification

   As of March 31,
2015
    As of December 31,
2014
 

Interest rate swaps

   Other long term assets and accumulated other comprehensive income    $ (5,063   $ (4,780

 

            As of March 31,  

In thousands

  

Statement of operations classification

   2015      2014  

Cross currency swaps

   Other long term assets and accumulated other comprehensive income    $ 26,305       $ 18,183   

The Company has netted these hedging instruments and they are included in other assets on the combined balance sheet.

7. Stock-based compensation

In September 2014 and in connection with the formation of SunEdison Emerging Markets Yield, Inc., the Company granted restricted stock awards and restricted stock units to various Company employees (“Participants”) under a new SunEdison Emerging Markets Yield, Inc. 2014 Equity Incentive Plan. The fair value of each Participant’s grant was determined by using the percentage of shares granted multiplied by the overall fair value of SunEdison’s equity in the Company. The restricted stock will convert into shares of Class A common stock upon the filing of our amended and restated certification of incorporation in connection the completion of the proposed initial public offering of Class A common stock of the Corporation (the “Offering”). There were 31,350 shares issued representing a 3.135% interest in the equity of SunEdison Emerging Markets Yield, Inc. issued at a total value of $683 thousand.

In March 2015, there were 35,250 additional shares issued representing an additional 3.525% interest in the equity of TerraForm Global as of the effective date of this offering with a total value of $1.3 million.

In estimating the fair value of the restricted stock, the primary valuation considerations were an enterprise value determined from an discounted cash flow of income-based approach, using a present value of after-tax probability weighted equity cash flow of those projects we intend to include in the Offering, in a projection period extending through December 2024 and a lack of marketability discount of 10%. The discount model used the following assumptions: a time to liquidity event of 7 months; a discount rate of 13%; and volatility of 40% over the time to a liquidity event. Estimates of the volatility of our common stock were based on available information on the volatility of our Sponsor and the common stock of comparable publicly traded companies.

After the restricted stock converts to Class A common stock, 25% of the Class A common stock will vest on the first through fourth anniversary of the date of the initial public offering, subject to accelerated vesting upon certain events. Upon a termination of employment for any reason, any unvested shares of Class A common stock held by the terminated executive will be forfeited. As of March 31, 2015, no stock compensation expense has been recorded.

 

F-20


Table of Contents

8. Related parties

Corporate allocations

Amounts were allocated from our Parent for general corporate overhead costs attributable to the operations of the Company. These amounts were $2,967 and $3,856 for the three months ended March 31, 2015 and 2014, respectively, and are included in general and administrative—affiliates in the accompanying combined statements of operations. The general corporate overhead expenses incurred by the Parent include costs from certain corporate and shared services functions provided by the Parent. The amounts reflected include (i) charges that were incurred by the Parent that were specifically identified as being attributable to the Company and (ii) an allocation of applicable remaining general corporate overhead costs based on the proportional level of effort attributable to the operation of the Company’s solar energy systems. These costs include legal, accounting, tax, treasury, information technology, insurance, employee benefit costs, communications, human resources, and procurement. Corporate costs that were specifically identifiable to a particular operation of the Parent have been allocated to that operation, including the Company. Where specific identification of charges to a particular operation of the Parent was not practicable, an allocation was applied to all remaining general corporate overhead costs. The allocation methodology for all remaining corporate overhead costs is based on management’s estimate of the proportional level of effort devoted by corporate resources that is attributable to each of the Company’s operations. The cost allocations have been determined on a basis considered to be a reasonable reflection of all costs of doing business by the Company. The amounts that would have been or will be incurred on a stand-alone basis could differ from the amounts allocated due to economies of scale, management judgment, or other factors.

Operations and maintenance

Operations and maintenance services are provided to the Company by affiliates of the Parent pursuant to contractual agreements. Costs incurred for these services were $964 and $725 for the three months ended March 31, 2015 and 2014, respectively. Related amounts were reported as cost of operations-affiliate in the combined statements of operations and were reflected in operating activities in the combined statements of cash flows.

Parent and affiliates

Certain of our expenses are paid by affiliates of the Parent and are reimbursed by the Company to the same, or other affiliates of the Parent. Additionally, directly attributable costs for construction of solar energy systems incurred by the Parent are charged to the Company. As of March 31, 2015 and December 31, 2014, the Company owed the Parent and affiliates $29,474 and $22,026, respectively. Depending on the nature of the activity, amounts are either reflected in operating activities or as a non-cash addition to property and equipment included in due to parent and affiliates.

The Company advanced working capital loans to an affiliate company as of March 31, 2015 and December 31, 2014. The affiliate owed the Company $140 and $138 as of March 31, 2015 and December 31, 2014, respectively. Related amounts were reflected in investing activities and in additions to property and equipment included in due to Parent and affiliates in the combined statements of cash flows.

Additionally, the Parent provided contributions to the Company in the form of shareholder loans. Related amounts have been recognized as net parent investment as there is no expectation for the Company to repay the Parent for the contributions. These contributions totaled $1,218 and $(6,635) for the three months ended March 31, 2015 and 2014, respectively.

 

F-21


Table of Contents

Transactions with third party investor

On behalf of the Company, the Parent has entered into various transactions with an investor in certain Company projects whom is unrelated to the Parent (“Third Party Investor”). The Third Party Investor has purchased minority interests in various Company projects from the Parent in the form of preference share capital and a shareholder loan. As of March 31, 2015, the outstanding balance of the preference share capital is $3,298 and the balance of the shareholder loan is $3,135 million. As of December 31, 2014, the outstanding balance of the preference share capital is $3,298 million and the balance of the shareholder loan is $3,298 million.

For a separate project company, the Company issued 8% non-cumulative redeemable preference shares and allotted to an affiliate on June 15, 2013. The shares will be redeemed by the project company after 15 years from the date of allotment. The preference shares carry a preferential right as to dividend over equity shareholders. Subject to the provision of the articles of association of the project company, the preference shareholders shall be entitled to transfer the whole or part of the shares held by them subject to any restrictions or approvals of the board of directors of the project company. These shares carry a dividend of 8% on a non-cumulative basis. In the event of liquidation, preference shareholders have a preferential right over equity shareholders to be repaid to the extent of capital paid-up and dividend in arrears on such shares. The Company has classified the preference shares within non-current liabilities, based on the mandatorily redeemable nature of the shares.

10. Commitments and contingencies

Real property agreements

Certain of the solar energy system assets are located on property that the Company leases under operating leases. Rental expense was $62 and $16 in the three months ending March 2015 and 2014, respectively. The total future commitments under operating leases as of March 31, 2015 were $4,524, none of which is cancellable. Our operating lease obligations as of March 31, 2015 were as follows:

 

In thousands

  2015     2016     2017     2018     2019     Thereafter     Total  

Operating Leases

  $   127        183        183        183        199        3,649      $ 4,524   

Minimum rent payments under operating leases are recognized as a rental expense on a straight-line basis over the term of the lease.

Additionally, certain of our operating leases contain clauses that provide additional contingent rent based on the related solar energy systems generating energy greater than certain specified target amounts. We recognize contingent rent expense when payment is considered probable. There was no contingent rent expense for the three months ending March 31, 2015 and 2014, respectively.

Legal proceedings

From time to time, we are notified of possible claims or assessments arising in the normal course of business operations. Management continually evaluates such matters with legal counsel and believes that, although the ultimate outcome is not presently determinable, these matters will not result in a material adverse impact on our financial position or operations.

The Company is subject to litigation with the offtaker, Gujarat Urja Vikas Nigam Ltd (GUNVL), for certain projects in India, who is seeking a reduction of tariff set forth in the PPA. GUVNL also claims that there has been a violation of the PPA terms on account of a change in shareholders since execution of the PPA and as such GUNVL is entitled to terminate the PPA. The Company successfully defended each case at the initial hearing but

 

F-22


Table of Contents

GUNVL has appealed to the Supreme Court on both matters. The cases are currently pending in front of the Supreme Court of India. The Company plans to vigorously defend each case and believes that an unfavorable outcome is remote; as such a liability has not been recorded in relation to these contingencies.

11. Segment information

The Company is engaged in one reportable segment that operates a portfolio of solar energy generation assets. The Company operates as a single reportable segment based on a “management” approach. This approach designates the internal reporting used by management for making decisions and assessing performance as the source of the reportable segments.

Revenue for the three months ended March 31, 2015 and 2014 were from customers located in China, India, Malaysia, South Africa, and Thailand. Customers include commercial and industrial entities, which principally include large utility companies and government-controlled entities. Revenue to specific customers exceeding 10% of total revenue for the three months ended March 31, 2015 and 2014 were as follows:

 

      For the three
months ended
March 31, 2015
     For the three
months ended
March 31, 2014
 

In thousands, except for percentages

   Revenue      Percent      Revenue      Percent  

Customer A

   $ 8,770         49%         2,898         33%   

Customer B

   $ 2,705         15%         1,279         14%   

Customer C

   $         —%         1,166         13%   

Accounts receivable

At March 31, 2015, the Company had a customer which represented 29% of total accounts receivable outstanding at that date. At December 31, 2014, the Company had four customers which represented 75% of total accounts receivable outstanding at that date.

Property and equipment, net

 

In thousands

   As of March 31,
2015
     As of December 31,
2014
 

China

   $ 25,214         25,465   

India

     221,928         186,782   

Malaysia

     42,314         45,328   

South Africa

     116,672         121,285   

Thailand

     9,149         6,959   

Uraguay

     260         260   
  

 

 

 

Total

   $ 415,537         386,079   
  

 

 

 

 

F-23


Table of Contents

Revenues

 

In thousands

   For the
three months
ended
March 31, 2015
     For the
three months
ended
March 31, 2014
 

China

   $ 741       $ 878   

India

     5,486         5,710   

Malaysia

     2,345         2,202   

South Africa

     8,770           

Thailand

     464         36   
  

 

 

 

Total

   $ 17,806       $ 8,826   
  

 

 

 

13. Subsequent events

Subsequent events have been evaluated through June 17, 2015, the date the combined financial statements were available to be issued.

BioTherm Transaction

In April 2015, Global signed agreements to acquire equity interests in the BioTherm projects (70% of Aries, 70% of Konkoonsies and 65% of Klipheuwel), all of which are located in South Africa. These projects have a combined capacity of 32.6 MW based on our ownership percentages. The aggregate consideration paid for ownership in these projects from BioTherm and other minority investors is expected to be approximately $63.4 million, comprised of cash of approximately $55.2 million and shares of our Class A common stock with a value of approximately $8.2 million, in addition to the foregoing, Global has agreed to pay BioTherm approximately $20.5 million in additional cash consideration for certain rights and services.

Chint-NSM Transaction

On June 9, 2015, Global acquired a 51% equity interest in NSM 24 from a subsidiary of Chint Solar (Zhejiang) Co., Ltd. pursuant to a share purchase agreement executed on May 6, 2015. NSM 24 is an operating solar energy system located in India with a capacity of 23.4 MW. The aggregate consideration paid for the acquisition of this interest was $9.1 million. Concurrently, our Sponsor contributed its equity investment (49% equity interest) in NSM 24 to us, which was revalued to fair value of $8.7 million at the time of the acquisition.

Chint-Soutpan/Witkop Transaction

In April 2015, our Sponsor agreed to acquire an additional 41.3% equity interest in each of Soutpan and Witkop presently owned by a subsidiary of Chint Solar (Zhejiang) Co., Ltd. Soutpan is an operating solar energy system located in South Africa with a capacity of 15.8 MW. Witkop is an operating solar energy system located in South Africa with a net capacity of 16.8 MW. The aggregate consideration expected to be paid for the acquisition of these interests is $38.7 million in cash. Our Sponsor will transfer its resulting aggregate 51% interest in each of Soutpan and Witkop to us as part of the Formation Transactions.

Hercules Transaction

On May 14, 2015, Global acquired two wholly owned subsidiaries of Honiton Energy Cayman Limited located in China pursuant to a share purchase agreement. The Hercules Transaction consists of three wind sites with a combined 148.5 MW of capacity. The aggregate consideration paid for the 100% equity interests was $105.3 million in cash.

 

F-24


Table of Contents

FERSA Transaction

In May 2015, Global signed an agreement to acquire from FERSA the wind projects Bhakrani, Gadag and Hanumanhatti located in India, representing 101.6 MW of capacity in the aggregate. The aggregate consideration expected to be paid for the 100% equity interests is $33.1 million in cash. This acquisition is expected to close concurrently with this offering.

LAP Transaction

In May 2015, our Sponsor agreed to acquire six hydro-electric projects controlled by LAP, which are expected to be transferred to us in connection with this offering. The projects are located in Peru, representing capacity of 72.5 MW in the aggregate. The aggregate consideration expected to be paid for the 100% equity interest in the six projects is $103.1 million in cash.

Renova Transaction

In May 2015, Global signed an agreement with Renova to acquire three wind and hydro-electric projects, including the Renova ROFO Projects. The projects are located in Brazil and have capacity of 336.2 MW in the aggregate. The aggregate cash consideration payable for this acquisition is expected to be $527.8 million. The Renova Transaction is expected to close concurrently with this offering.

GME Transaction

In June 2015, Global signed an agreement with GME to acquire four wind projects. The projects are located in Honduras, Costa Rica and Nicaragua, representing capacity of 326.0 MW in the aggregate. The aggregate consideration paid for this acquisition is expected to be $326.4 million, comprised of cash of $315.9 million and shares of Class A common stock of Global with a value of $10.5 million. The GME Transaction is expected to close concurrently with this offering. We expect the acquisition of an 82.0 MW solar project that is part of the GME Transaction will be completed when the project achieves COD, which is expected to occur in the second half of 2015.

Solarpack Transaction

In April 2015, Global signed an agreement for the acquisition from Solarpack Corporación Tecnológica, S.L. of the 26.4 MW capacity Alto Cielo solar project located in Uruguay. The Solarpack Transaction has not been included in these pro forma financial statements as it is not material as compared to our historical combined financial statements. We expect the Solarpack Transaction will be completed when the project achieves COD, which is expected to occur in the second half of 2015.

Private Placements

On May 6, 2015, we raised $175 million from the sale to investment vehicles affiliated with the Blackstone Group, Everstream Opportunities Fund and Altai Capital Master Fund, and of Class D units of TerraForm Global LLC for a cash purchase price of $50 million, $100 million and $25 million, respectively. On June 9, 2015, TerraForm Global raised an additional $335.0 million from the sale to investment vehicles associated with Baron Funds, Capricorn Investment Group, GE, Glenview Capital Management, Kingdom Capital Management, and Zimmer Partners. TerraForm Global LLC expects to use the net proceeds to reduce its borrowings under the Bridge Facility, to complete the acquisitions of projects from third parties and to reduce certain project-level indebtedness.

 

F-25


Table of Contents

Bridge Facility

On May 6, 2015, the Bridge Facility was amended to increase the aggregate principal amount of bridge commitments to $450 million, of which $87.5 million was subsequently repaid with a portion of the proceeds from the Private Placement, through the addition of Barclays Bank PLC, Citibank, N.A. and Morgan Stanley Senior Funding, Inc. as lenders in the Bridge Facility. On June 5, 2015, the Bridge Facility was further amended to increase the aggregate commitment to $550.0 million. The purpose of the Bridge Facility is to fund the acquisition of certain clean energy projects and to repay certain of the project level indebtedness incurred by projects included in our initial portfolio. TerraForm Global LLC’s obligations under the Bridge Facility are secured by first priority liens on and security interests in substantially all present and future assets of TerraForm Global LLC and certain of its domestic subsidiaries, as guarantors, under the Bridge Facility.

 

F-26


Table of Contents

SEI Solar Power Private Limited

Statements of income (unaudited)

 

      INR      INR  

For the quarters ended

   31 March 2015      31 March 2014  

Revenue

     87,520,971         85,197,536   
  

 

 

    

 

 

 

Operating expenses:

     

Cost of operations

     6,480,349         6,805,620   

General and administrative

     1,855,118         2,544,233   

Depreciation (note 3)

     18,174,159         18,174,159   
  

 

 

    

 

 

 

Total operating costs and expenses

     26,509,626         27,524,012   
  

 

 

    

 

 

 

Operating income

     61,011,345         57,673,524   
  

 

 

    

 

 

 

Other expenses:

     

Interest expense

     51,177,230         49,458,372   
  

 

 

    

 

 

 

Total other expenses

     51,177,230         49,458,372   

Income before income taxes

     9,834,115         8,215,152   

Income tax expense (note 5)

     7,843,405         8,074,313   
  

 

 

    

 

 

 

Net income

     1,990,710         140,839   
  

 

 

    

 

 

 

See accompanying notes to financial statements.

 

 

F-27


Table of Contents

SEI Solar Power Private Limited

Balance sheets (unaudited)

 

      INR     INR  

 

   As of 31 March
             2015
    As of 31 December
             2014
 

Assets

    

Current assets:

    

Cash and cash equivalents

     574,215        574,215   

Restricted cash

     451,016,278        463,203,240   

Accounts receivable, net

     60,477,863        26,556,557   

Deferred financing costs

     3,434,922        3,434,922   

Other current assets

     1,671,733        2,414,720   
  

 

 

   

 

 

 

Total current assets

     517,175,011        496,183,654   

Property and equipment, net (note 3)

     2,138,119,549        2,156,293,708   

Restricted cash

     134,700,000        134,700,000   

Deferred financing costs

     42,741,965        43,600,695   

Other assets

     57,947        57,947   
  

 

 

   

 

 

 

Total assets

     2,832,794,472        2,830,836,004   
  

 

 

   

 

 

 

Liabilities and equity

    

Current liabilities:

    

Current portion of long-term debt (note 4)

     81,604,640        80,803,640   

Accounts payable

     897,749        1,485,355   

Due to related parties

     285,637,166        286,181,602   

Accrued expenses and other current liabilities

     43,387,013        38,382,618   
  

 

 

   

 

 

 

Total current liabilities

     411,526,568        406,853,215   

Long-term debt, less current portion (note 4)

     1,540,070,564        1,552,619,564   

Deferred tax liabilities (note 5)

     59,857,446        52,014,041   
  

 

 

   

 

 

 

Total non-current liabilities

     1,599,928,010        1,604,633,605   

Equity;

    

Common stock, INR 10 par value
Authorised shares 15,000,000, issued and outstanding 7,883,900 equity shares (note 6)

     78,839,000        78,839,000   

Additional paid in capital

     884,449,278        884,449,278   

Accumulated deficit

     (141,948,384     (143,939,094
  

 

 

   

 

 

 

Total equity

     821,339,894        819,349,184   
  

 

 

   

 

 

 

Total liabilities and equity

     2,832,794,472        2,830,836,004   
  

 

 

   

 

 

 

See accompanying notes to financial statements.

 

F-28


Table of Contents

SEI Solar Power Private Limited

Statements of cash flows (unaudited)

 

      INR     INR  

For the quarters ended

   31 March
2015
    31 March
2014
 

Cash flows from operating activities:

    

Net income

     1,990,710        140,839   

Adjustments to reconcile net income to net cash used in operating activities:

    

Depreciation

     18,174,159        18,174,159   

Amortization of deferred financing costs

     858,730        871,057   

Deferred taxes

     7,843,405        8,074,313   

Changes in assets and liabilities:

    

Accounts receivable

     (33,921,306     (5,209,671

Restricted cash

     12,238,086        (29,714,897

Other current assets

     742,987        1,744,422   

Accounts payable

     (587,606     833,560   

Accrued expenses and other current liabilities

     5,004,395        20,761,457   

Due to related parties

     (544,436     7,842,336   
  

 

 

   

 

 

 

Net cash provided by operating activities

     11,799,124        23,517,575   
  

 

 

   

 

 

 

Cash flows from investing activities:

    

Capital expenditures

            (336,098,195

Change in restricted cash

     (51,124     (210,410
  

 

 

   

 

 

 

Net cash used in investing activities

     (51,124     (336,308,605
  

 

 

   

 

 

 

Cash flows from financing activities:

    

Principal payments on long-term debt

     (11,748,000     (1,091,496,000

Proceeds from long-term debt

            1,402,134,477   

Payment of deferred financing costs

            (1,124,598
  

 

 

   

 

 

 

Net cash (used in) provided by financing activities

     (11,748,000     309,513,879   
  

 

 

   

 

 

 

Net increase (decrease) in cash and cash equivalents

            (3,277,151

Cash and cash equivalents at beginning of quarter

     574,215        4,483,962   
  

 

 

   

 

 

 

Cash and cash equivalents at end of quarter

     574,215        1,206,811   
  

 

 

   

 

 

 

Supplemental disclosures of cash flow information:

    

Cash paid for interest

     31,487,534        29,969,455   

Cash paid for Income taxes

              

See accompanying notes to financial statements.

 

F-29


Table of Contents

SEI Solar Power Private Limited

Statements of changes in equity (unaudited)

 

     Common stock     Additional
paid in capital
    Accumulated
deficit
    Total equity  
    Shares     Amount        

Balance as at December 31, 2013

    6,313,776        63,137,760        900,150,518        (144,525,236     818,763,042   

Issue of common stock

    1,570,124        15,701,240        (15,701,240     —          —     

Net income

      —          —          140,839        140,839   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Balance at March 31, 2014

    7,883,900        78,839,000        884,449,278        (144,384,397     818,903,881   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Balance as at December 31, 2014

    7,883,900        78,839,000        884,449,278        (143,939,094     819,349,184   

Net income

      —          —          1,990,710        1,990,710   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Balance at March 31, 2015

    7,883,900        78,839,000        884,449,278        (141,948,384     821,339,894   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

See accompanying notes to financial statements.

 

F-30


Table of Contents

SEI Solar Power Private Limited

Notes to financial statements (unaudited)

(Amounts in INR)

1. Nature of operations

SEI Solar Power Private Limited (the “Company”) is domiciled in India and was formed for the purpose of developing, constructing, owning and operating a utility-scale photovoltaic solar energy project with a capacity of 23.9 megawatts (MW) located in Rajasthan, India.

As at March 31, 2015, Astroenergy Solar Korea Co. Ltd. holds 51% of total shares and SunEdison Energy Holding (Singapore) Pte. Ltd. holds the remaining 49% of total shares in SEI Solar Power Private Limited. Commercial operations commenced on February 11, 2013.

Basis of presentation

The Company has presented financial statements as of March 31, 2015 and December 31, 2014 and for the quarters ended March 31, 2015 and 2014. The Company’s financial statements have been prepared in accordance with U.S. generally accepted accounting principles (“U.S. GAAP”). The Financial Accounting Standards Board (“FASB”) Accounting Standards Codification (“ASC”) is the source of authoritative U.S. GAAP to be applied by non-governmental entities.

The financial statements are presented in Indian rupees (‘INR’), except when otherwise indicated.

2. Summary of significant accounting policies

Use of estimates

In preparing our financial statements, we use estimates and assumptions that may affect reported amounts and disclosures. Estimates are used when accounting for depreciation, impairment, contingencies, accrued liabilities and income taxes, among others. These estimates and assumptions are based on current facts, historical experience and various other factors that we believe to be reasonable under the circumstances, the results of which form the basis for making judgments about the carrying values of assets and liabilities and the recording of revenue, costs and expenses that are not readily apparent from other sources. To the extent there are material differences between the estimates and actual results, our future results of operations would be affected.

Cash and cash equivalents

Cash and cash equivalents include all cash balances and money market funds with original maturity periods of three months or less when purchased.

Restricted cash

Restricted cash consists of balance in banks and financial institutions that are restricted from use in operations pursuant to the requirements of certain debt agreements. These funds are used to pay for capital expenditure, current operating expenses and current debt service payments in accordance with the restrictions in the debt agreements.

 

F-31


Table of Contents

Accounts receivable and allowance for doubtful accounts

Accounts receivable are reported in the balance sheets at the invoiced amounts adjusted for any write-offs and an allowance for doubtful accounts. We establish an allowance for doubtful accounts to adjust our receivables to amounts considered to be ultimately collectible. Our allowance is based on a variety of factors, including the length of time receivables are past due, significant one-time events, the financial health of our customers and historical experience. There was no allowance for doubtful accounts included in accounts receivable as of March 31, 2015 or December 31, 2014. Unbilled receivables was INR 32,798,407 and INR 26,556,557 as of March 31, 2015 and December 31, 2014, respectively.

Property and equipment

Property and equipment consists of land, solar energy systems and construction in progress and is stated at cost. Expenditures for major additions and improvements are capitalized and minor replacements, maintenance and repairs are charged to expense as incurred. When property and equipment is retired, or otherwise disposed of, the cost and accumulated depreciation is removed from the accounts and any resulting gain or loss is included in the results of operations for the respective period. Depreciation of property and equipment is recognized using the straight-line method over the estimated useful lives of the solar energy systems which is thirty years. Land owned by the Company is not depreciated. Land has an unlimited useful life.

An item of property and equipment initially recognized is derecognized upon disposal or when no future economic benefits are expected from its use or disposal. Any gain or loss arising on de-recognition of the asset (calculated as the difference between the net disposal proceeds and the carrying amount of the asset) is included in the Statements of income when the asset is derecognized. For the periods presented, the Company did not recognize any gain or loss on de-recognition of assets. All repair and maintenance costs that do not meet capitalization criteria are recognized in the Statements of Income as incurred. The assets’ residual values, useful lives and methods of depreciation are reviewed at each financial year-end and adjusted prospectively, if appropriate.

Capitalized interest

Interest expense consisting of amortization of deferred financing costs and amounts incurred on funds borrowed to finance construction of solar energy systems is capitalized until the system is ready for its intended use. No interest was capitalized during the period.

Deferred financing costs

Financing costs incurred in connection with obtaining construction and term financing are deferred and amortized over the maturities of the respective financing arrangements. Amortization of deferred financing costs is capitalized during construction and recorded as interest expense in the financial statements of income following commencement of commercial operation.

There was no deferred financial cost that was capitalised during the period. Amortization of deferred financing costs was recorded as interest expense and totalled INR 858,730 and INR 871,058 during the quarters ended March 31, 2015 and 2014, respectively.

Impairment of long-lived assets

Long-lived assets that are held and used are reviewed for impairment whenever events or changes in circumstances indicate carrying values may not be recoverable. An impairment loss is recognized if the total

 

F-32


Table of Contents

future estimated undiscounted cash flows expected from an asset are less than its carrying value. An impairment charge is measured as the difference between an asset’s carrying amount and fair value with the difference recorded in operating costs and expenses in the statement of income. Fair values are determined by a variety of valuation methods, including appraisals, sales prices of similar assets and present value techniques. There were no impairments recognized during the quarters ended March 31, 2015 and 2014.

Revenue recognition

The Company’s revenues are obtained through the sale of energy pursuant to terms of a power purchase agreement (“PPA”) or other contractual arrangements which has a remaining life of 22 years as of March 31, 2015. The PPA is accounted for as operating leases, has no minimum lease payments and all of the rental income under these lease is recorded as income when the electricity is delivered. The contingent rental income recognized in the quarters ended March 31, 2015 and 2014 was INR 87,520,971 and INR 85,197,536 respectively.

Income taxes

The income tax balances are determined and reported in accordance with FASB ASC 740 (“ASC 740”), Income Taxes. Income taxes are accounted for under the asset and liability method. Deferred tax assets and liabilities are recognized for the future tax consequences attributable to differences between the financial statement carrying amounts of existing assets and liabilities and their respective tax bases and operating loss and tax credit carry forwards.

Deferred tax assets and liabilities are measured using enacted tax rates expected to apply to taxable income in the years in which those temporary differences are expected to be recovered or settled. We ignore the future originating temporary differences and schedule the existing temporary differences when they originate and reverse on a first-in-first-out basis when determining the tax rate expected to apply for purposes of measuring deferred taxes. The effect on deferred tax assets and liabilities of a change in tax rate is recognized in operations in the period that includes the enactment date. Valuation allowances are established when management determines that it is more likely than not that some portion, or all of the deferred tax asset, will not be realized.

Deferred income taxes arise primarily because of differences in the bases of assets or liabilities between financial statement accounting and tax accounting which are known as temporary differences. We record the tax effect of these temporary differences as deferred tax assets (generally items that can be used as a tax deduction or credit in future periods) and deferred tax liabilities (generally items for which we receive a tax deduction, but have not yet been recorded in the statement of income).

The Company intends to account for dividend distribution tax in equity in the year in which a dividend is declared.

We regularly review our deferred tax assets for realizability, taking into consideration all available evidence, both positive and negative, including historical pre-tax and taxable income, projected future pre-tax and taxable income and the expected timing of the reversals of existing temporary differences. In arriving at these judgments, the weight given to the potential effect of all positive and negative evidence is commensurate with the extent to which it can be objectively verified.

We believe our tax positions are in compliance with applicable tax laws and regulations. Tax benefits are recognized only for tax positions that are more likely than not to be sustained upon examination by tax authorities. The amount recognized is measured as the largest amount of benefit that is greater than 50 percent likely to be realized upon settlement. We believe that our liabilities for unrecognized tax benefits, including related interest, are adequate in relation to the potential for additional tax assessments. There is a

 

F-33


Table of Contents

risk, however, that the amounts ultimately paid upon resolution of audits could be materially different from the amounts previously included in our income tax expense and, therefore, could have a material impact on our tax provision, net income and cash flows.

Contingencies

We are involved in conditions, situations or circumstances in the ordinary course of business with possible gain or loss contingencies that will ultimately be resolved when one or more future events occur or fail to occur. If some amount within a range of loss appears at the time to be a better estimate than any other amount within the range, that amount will be accrued. When no amount within the range is a better estimate than any other amount, however, the minimum amount in the range will be accrued. We continually evaluate uncertainties associated with loss contingencies and record a charge equal to at least the minimum estimated liability for a loss contingency when both of the following conditions are met: (i) information available prior to issuance of the financial statements indicates that it is probable that an asset had been impaired or a liability had been incurred at the date of the financial statements; and (ii) the loss or range of loss can be reasonably estimated. Legal costs are expensed when incurred. Gain contingencies are not recorded until realized or realizable.

Fair Value measurements

Fair value accounting guidance establishes a hierarchy for inputs used in measuring fair value that maximizes the use of observable inputs and minimizes the use of unobservable inputs by requiring that the most observable inputs be used when available. Observable inputs are inputs that market participants would use in pricing the asset or liability, and are based on market data obtained from sources independent of us. Unobservable inputs reflect assumptions market participants would use in pricing the asset or liability based on the best information available in the circumstances. The hierarchy is broken down into three levels based on the reliability of inputs as follows:

 

 

Level 1—Valuations based on quoted prices in active markets for identical assets or liabilities that we have the ability to access. Valuation adjustments and block discounts are not applied to Level 1 instruments. Because valuations are based on quoted prices that are readily and regularly available in an active market, valuation of these instruments does not entail a significant degree of judgment.

 

 

Level 2—Valuations based on quoted prices in markets that are not active or for which all significant inputs are observable, either directly or indirectly. Valuations for Level 2 are prepared on an individual instrument basis using data obtained from recent transactions for identical securities in inactive markets or pricing data from similar instruments in active and inactive markets.

 

 

Level 3—Valuations based on inputs that are unobservable and significant to the overall fair value measurement.

For cash and cash equivalents, restricted cash, accounts receivable, accounts payable, accrued expenses and other current liabilities, the carrying amount approximates fair value because of the short term maturity of the instruments. See Note 4 for disclosures related to the fair value of our long-term debt.

Accounting pronouncements issued but not yet effective

The following accounting standards have been issued but are not yet effective for nor have been adopted by the Company.

 

F-34


Table of Contents

ASU No. 2014-09, Revenue from Contracts with Customers (Topic 606)

In May 2014, the FASB issued ASU No. 2014-09, Revenue from Contracts with Customers, which requires an entity to recognize the amount of revenue to which it expects to be entitled for the transfer of promised goods or services to customers. ASU 2014-09 will replace most existing revenue recognition guidance in U.S. GAAP when it becomes effective. ASU 2014-09 is effective for us on January 1, 2017. Early application is not permitted. The standard permits the use of either a retrospective or cumulative effect transition method. We have not determined which transition method we will adopt, and we are currently evaluating the impact that ASU 2014-09 will have on our financial statements and related disclosures upon adoption.

ASU No. 2014-15, Subtopic 205-40, Presentation of Financial Statements—Going Concern (Topic 718)

In August 2014, the FASB issued ASU No. 2014-15, Presentation of Financial Statements—Going Concern (Subtopic 205-40): Disclosure of Uncertainties about an Entity’s Ability to Continue as a Going Concern, which requires management to evaluate, at each annual and interim reporting period, whether there are conditions or events that raise substantial doubt about the entity’s ability to continue as a going concern within one year after the date the financial statements are issued and to provide related disclosures. ASU 2014-15 is effective for us for our fiscal year ending December 31, 2016 and for interim periods thereafter. We are currently evaluating the impact of this standard on our financial statements.

3. Property and equipment

Property and equipment consists of the following:

 

      As of  
In INR    March 31, 2015     December 31, 2014  

Land (Refer note 8)

     69,308,894        69,308,894   

Solar energy systems

     2,227,362,376        2,227,362,376   
  

 

 

   

 

 

 

Total property and equipment, at cost

     2,296,671,270        2,296,671,270   

Less accumulated depreciation

     (158,551,721     (140,377,562
  

 

 

   

 

 

 

Total property and equipment, net

     2,138,119,549        2,156,293,708   
  

 

 

   

 

 

 

Depreciation expense was INR 18,174,159 for both the quarters ended March 31, 2015 and 2014 respectively.

4. Debt

Debt consists of the following:

 

     As of March 31, 2015     As of December 31, 2014  

in INR

  Total principal     Current     Long-term     Total principal     Current     Long-term  

International Finance Corporation

    624,163,204        31,408,640        592,754,564        624,163,204        31,408,640        592,754,564   

PTC India Financial Services Limited

    997,512,000        50,196,000        947,316,000        1,009,260,000        49,395,000        959,865,000   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total

    1,621,675,204        81,604,640        1,540,070,564        1,633,423,204        80,803,640        1,552,619,564   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Our solar energy projects for which we have long-term debt obligations are included in these financial statements. We typically finance our solar energy projects through specific debt secured by the entity’s assets including movable and immovable properties, both present and future and share capital. Typically, these financing arrangements provide for a credit facility used for a construction, which upon completion is converted into term debt.

 

F-35


Table of Contents

As at March 31, 2015 term debt includes the below:

 

 

Local currency loan availed from International Finance Corporation, Mumbai branch, India is repayable in 29 half yearly installments commencing from April 15, 2014. The loan carries an interest rate equal to the Rupee Based Fixed rate on the date of each disbursement and the relevant spread (currently at 12.15% and 12.41% per annum). The unutilised balances of the Company’s credit facilities are subject to annual commitment fee of 0.5% per annum. There are no undrawn credit facilities as at March 31, 2015 and as at December 31, 2014.

 

 

Local currency loan availed from PTC India Financial Services Limited is repayable in 59 quarterly installments commencing from October 15, 2013. The loan carries an interest rate equal to the Rupee Based Fixed rate on the date of each disbursement and the relevant spread (currently at 12.75% per annum).

The Company did not comply with a covenant in connection with the loan availed from International Finance Corporation which required that the project financial completion date be met on or before 1 April 2015. The Company obtained an extension for a period of 180 days from April 1, 2015. It is probable that the Company will meet the requirements within the grace period and accordingly, the outstanding loan balances have been continued to be classified as non-current to the extent not repayable within one year.

The term debt agreements contain certain representations, covenants and warranties of the borrower including limitations on business activities, guarantees and environmental issues requirements. The fair value of the outstanding debt obligations approximates carrying value.

The term loans are secured by substantially all of the Company’s assets.

Maturities

The aggregate amounts of payments on long-term debt due after March 31, 2015 are as follows:

 

     2015-16     2016-17     2017-18     2018-19     2019-20     Thereafter     Total  

in INR

             

Maturities of debt

    81,604,640        86,813,448        91,260,920        98,967,330        105,912,406        1,157,116,460        1,621,675,204   

5. Income taxes

Income taxes

Income tax expense consists of the following:

 

      Current      Deferred      Total  

Quarter ended March 31, 2015:

             7,843,405         7,843,405   

Quarter ended March 31, 2014:

             8,074,313         8,074,313   

 

F-36


Table of Contents

Tax rate reconciliation

The applicable Indian statutory tax rate for the tax years ended 2015 and 2014 is 34.61%.

Income tax expense differed from the amounts computed by applying the statutory Indian income tax rate of 34.61% to profit before income taxes.

 

      As of March 31,  
     2015      2014  

Current tax

               

Income tax at Indian statutory rate

     34.61%         34.61%   

Increase (reduction) in income taxes:

     

Impact of tax holidays

     45.15%         63.27%   

Others

             0.43%   
  

 

 

    

 

 

 

Effective tax rate

     79.76%         98.31%   
  

 

 

    

 

 

 

Significant component of deferred taxes

The significant components of deferred tax assets and liabilities attributable to income from operations for the quarters ended March 31, 2015 and 2014 are as follows:

 

      As of March 31,     As of December 31,  
     2015     2014  

Deferred tax assets / liabilities

    

Deferred tax liabilities:

    

Plant and equipment, principally due to differences in depreciation

     59,857,446        52,014,041   

Deferred tax assets:

    

Land, due to indexation benefits in tax

     3,227,940        3,227,940   

Less: valuation allowance

     (3,227,940     (3,227,940

Net deferred tax liabilities

     59,857,446        52,014,041   

The Company has unabsorbed depreciation for Indian income tax purposes of INR 219,734,540 as at March 31, 2015 and INR 204,880,652 as at December 31, 2014 and which are available to offset future taxable income, if any, over an indefinite period. In addition, the Company has a net operating loss carryforward of INR 128,772,265 as at March 31, 2015 and December 31, 2014 which is available to offset future taxable income, if any, until the tax year ended March 31, 2021.

The Company has a tax holiday which expires 15 years from the date of commissioning of the solar energy system and is available for a 10 year period starting from the date on which the project entity starts claiming the holiday. The Company expects the tax holiday to apply from April 1, 2017 through March 31, 2027. The tax holiday provides for a zero percent tax rate during the years it applies. The Company had a net expense as a result of the tax holiday due to the origination of taxable temporary differences expected to reverse after the expiration of the tax holiday, while the related deductions are expected to be utilized during the tax holiday period and provide no tax benefit.

There is no change in valuation allowance during the quarters ended March 31, 2015 and 2014.

The 2015 and 2014 tax years remain open to examination by tax authorities. The Company does not have any unrecognized tax benefits.

 

F-37


Table of Contents

6. Equity

Common stock

Holders of common stock are entitled to one vote per share, and to receive dividends and, upon liquidation or dissolution, are entitled to receive all assets available for distribution to stockholders. The holders have no preemptive or other subscription rights and there are no redemption or sinking fund provisions with respect to such shares.

Securities premium received and share application money received are included as part of additional paid in capital.

7. Related parties

Astronergy Solar Korea Co. Ltd is the parent company whose ultimate parent company is Chint Group Corp., China.

Operations and maintenance

Operations and maintenance services are provided to the Company by an affiliate pursuant to contractual agreements. Costs incurred for these services were INR 6,326,965 and INR 6,083,620 for the quarters ended March 31, 2015 and 2014 respectively. Related amounts were reported as cost of operations in the statements of income and were reflected in operating activities in the statements of cash flows.

Parent and affiliates

As of March 31, 2015 and December 31, 2014, the Company owed affiliates INR 285,637,166 and INR 286,181,602 respectively. Depending on the nature of the activity, amounts are either reflected in operating activities or as a non-cash addition to property and equipment included in due to affiliates.

8. Commitments and contingencies

Legal proceedings

There are certain pending litigations relating to the appropriateness of title of certain portions of land held by the Company, on which the solar energy systems are installed, since the date of purchase of the said land. The Company believes that there are no irregularities in its ownership title and based on the opinion of its legal counsel believes that the likelihood of an unfavourable outcome of its ownership of the said land is not probable. In addition, the Company believes that no further settlement or any significant additional liability is expected on account of such disputes pending resolution.

Apart from this case from time to time, we are notified of possible claims or assessments arising in the normal course of business operations. Management continually evaluates such matters with legal counsel and believes that, although the ultimate outcome is not presently determinable, these matters will not result in a material adverse impact on our financial position or operations.

Commitment

The Company has entered into a Power Purchase Agreement (‘PPA’) with NTPC Vidyut Vyapar Nigam Limited, (‘NVVNL’) on January 27, 2012 for implementation of a 23.9 MW Solar Photovoltaic Power Generation Unit (‘Project’) in the State of Rajasthan under which it has a commitment to sell electricity for a period of 25 years. If the minimum prescribed units of electricity is not generated and supplied, the Company is liable to pay compensation in accordance with the power purchase agreement.

 

F-38


Table of Contents

9. Segment information

The Company is engaged in one reportable segment that operates a portfolio of solar energy generation assets. The Company operates as a single reportable segment based on a “management” approach. This approach designates the internal reporting used by management for making decisions and assessing performance as the source of the reportable segments.

Revenue for the quarters ended March 31, 2015 and 2014 was earned from one customer located in India namely, NTPC Vidyut Vyapar Nigam Limited.

10. Subsequent events

The Company has evaluated subsequent events from the balance sheet date through June 9, 2015, the date the financial statements were available to be issued, and determined that there are no items to disclose.

 

F-39


Table of Contents

BioTherm Energy Projects

As at 31 March 2015 and 31 December 2014

Combined balance sheets

 

In US dollars

   2015      2014  

Assets

     

Current Assets

     

Cash and cash equivalents

     24,574,985         22,069,224   

Accounts receivable

     4,370,498         5,283,000   

Prepaids and other current assets

     3,437,792         3,642,203   
  

 

 

    

 

 

 

Total current assets

     32,383,275         30,994,427   

Property, plant and equipment, net

     79,781,061         88,939,623   

Intangible asset, net

     3,806,641      

Deferred tax asset

     13,677,216         10,196,474   
  

 

 

    

 

 

 

Total Assets

     129,648,193         130,130,524   
  

 

 

    

 

 

 

Liabilities and Shareholder’s Net Investment

  

Current Liabilities

  

Shareholders escrow account

     37,049         38,479   

Borrowings, current portion

     2,039,709         2,143,403   

Accounts payable

     3,581,877         3,689,723   

Other accrued liabilities

     2,415,381         2,717,927   

Distribution payable

     8,288,057           
  

 

 

    

 

 

 

Total current liabilities

     16,362,073         8,589,532   

Borrowings, long-term

     74,095,051         77,861,867   

Deferred tax liability

     14,785,850         11,179,933   

Asset retirement obligations

     408,035         420,820   

Derivative financial instrument—Swap

     912,263         544,261   
  

 

 

    

 

 

 

Total Liabilities

     106,563,272         98,596,413   
  

 

 

    

 

 

 

Commitments and contingencies (Note 14)

  

Shareholder’s Net Investment

  

Shareholder’s net investment

     23,084,921         31,534,111   
  

 

 

    

 

 

 

Total Liabilities and Shareholder’s Net Investment

     129,648,193         130,130,524   
  

 

 

    

 

 

 

The notes form an integral part of these combined financial statements

 

F-40


Table of Contents

BioTherm Energy Projects

For the periods ended 31 March 2015 and 2014

Combined statements of income and comprehensive loss

 

In US dollars

   2015     2014  

Revenue

     6,161,527        3,185,312   

Operating expenses

    

Operations management fee—related party

     (88,956     (91,108

Operations management fee

     (306,296       

Plant operating costs—related party

     (284,101     (234,338

Plant operating costs

     (20,644     (188

General and administrative costs—related party

     (161,446     (95,845

General and administrative costs

     (316,513     (311,801

Depreciation and amortization

     (1,303,332     (847,366 )  
  

 

 

   

 

 

 

Income before other income and expenses

     3,680,239        1,604,666   

Other income and expenses

    

Interest income

     282,959        90,022   

Interest expense

     (2,168,107     (1,199,440
  

 

 

   

 

 

 

Income before income taxes

     1,795,091        495,248   

Income tax (expense) benefit/(expense)

     (570,155     (185,011
  

 

 

   

 

 

 

Net income for the period

     1,224,936        310,237   

Other comprehensive income/(loss):

    

Foreign currency translation adjustments

     (631,349     (48,780

Effects of cash flow hedges

     (511,114     359,901   

Income tax relating to items that may be reclassified

     143,112        (100,772
  

 

 

   

 

 

 

Total other comprehensive (loss)/income

     (999,351     210,349   
  

 

 

   

 

 

 

Comprehensive (loss)/income for the period

     225,585        520,586   
  

 

 

   

 

 

 

The notes form an integral part of these combined financial statements

 

F-41


Table of Contents

BioTherm Energy Projects

For the periods ended 31 March 2015 and 2014

Combined statements of changes in shareholder’s net investment

 

In US dollars

   2015     2014  

Total shareholders net investment

    

Balance at 1 January

     31,534,111        27,278,365   

Net income for the period

     1,224,936        310,237   

Other comprehensive (loss)/income for the period

     (999,351     210,349   

Net contributions from members

            3,075,678   

Net distributions to members

     (8,674,776       
  

 

 

   

 

 

 

Balance at 31 March

     23,084,921        30,874,629   
  

 

 

   

 

 

 

The notes form an integral part of these combined financial statements

 

F-42


Table of Contents

BioTherm Energy Projects

For the periods ended 31 March 2015 and 2014

Combined statements of cash flows

 

In US dollars

   2015     2014  

Cash flows used in operating activities

    

Net income for the period

     1,224,936        310,237   

Adjustments to reconcile net income for the period to net cash used in operating activities

    

Depreciation and amortization

     1,303,332        847,366   

Accretion of asset retirement obligation

     7,744          

Deferred tax

     570,155        185,011   

Changes in operating assets and liabilities Accounts receivable

     912,502        (1,536,989

Prepaids and other assets

     204,411        (121,232

Accounts payable

     (107,846     (2,157,840

Other accrued liabilities

     (302,546     113,979   
  

 

 

   

 

 

 

Net cash used in operating activities

     3,812,688        (2,359,468
  

 

 

   

 

 

 

Cash flows used in investing activities

    

Capital expenditures

            (7,469,534

Delayed liquidate damages received recorded as a reduction to capital expenditure

            2,023,007   
  

 

 

   

 

 

 

Net cash used in investing activities

            (5,446,527
  

 

 

   

 

 

 

Cash flows provided by financing activities

    

Net contributions from members

            3,075,678   

Proceeds from borrowings

            8,514,513   
  

 

 

   

 

 

 

Net cash provided by financing activities

            11,590,191   
  

 

 

   

 

 

 

Effect of exchange rate movement on cash balances

     (1,306,927     (722,793

Net (decrease)/increase in cash and cash equivalents

     3,812,688        3,784,194   

Cash and Cash Equivalents, beginning of the period

     22,069,224        17,372,573   
  

 

 

   

 

 

 

Cash and Cash Equivalents, end of the period

     24,574,985        20,433,974   
  

 

 

   

 

 

 

Supplemental Disclosure of Cash Flow Information:

    

Cash paid for interest

     2,160,364        1,199,440   

Cash received for interest

     282,959        90,022   

Supplemental Disclosures of non-cash investing and financing activities:

    

Delay liquidation damages receivable recorded as reduction to PPE

            2,023,007   

Distribution to members

     8,228,057          

The notes form an integral part of these combined financial statements

 

F-43


Table of Contents

BioTherm Energy Projects

Notes to the combined financial statements

1. Organization and nature of business

BioTherm Energy Projects (the “Company”) consists of Klipheuwel-Dassiefontein Wind Energy Facility (RF) Proprietary Limited, Sevenstones 159 (RF) Proprietary Limited and Limarco 77 (RF) Proprietary Limited. These Companies are privately owned companies, registered in South Africa, incorporated in 2011 and are all under common control of BTSA Netherlands Cooperatie U.A. (“BTSA”), a Company incorporated in The Netherlands.

The Companies are engaged in electricity generation at the 27MW Klipheuwel-Dassiefontein Wind Energy Facility near Caledon in the Western Cape, South Africa, a 10MW Solar PV Energy Facility near Kenhardt in the Northern Cape, South Africa and a 10MW Konkoonsies Solar PV Energy Facility near Pofadder in the Northern Cape, South Africa. The Company has a contract with Eskom Holdings SOC Limited a South African state owned entity for the supply of electricity.

2. Summary of significant accounting policies

Basis of preparation

The accompanying financial statements are prepared in conformity with generally accepted accounting principles in the United States of America (“U.S. GAAP”). Such combined financial statements have been prepared for inclusion in a filing with the United States Securities and Exchange Commission by TerraForm Global, Inc due to the purchase and sale agreement for purposes of the proposed acquisition of the three entities by a subsidiary of TerraForm Global, Inc.

Throughout the periods presented in the combined financial statements, the Company did not exist as a combined, legally constituted entity. The combined financial statements have therefore been derived from the financial statements of Klipheuwel-Dassiefontein Wind Energy Facility (RF) Proprietary Limited, Sevenstones 159 (RF) Proprietary Limited and Limarco 77 (RF) Proprietary Limited to represent the financial position and performance of the Company on a combined basis throughout those periods in accordance with accounting principles generally accepted in the United States of America.

Management of Klipheuwel-Dassiefontein Wind Energy Facility (RF) Proprietary Limited, Sevenstones 159 (RF) Proprietary Limited and Limarco 77 (RF) Proprietary Limited believe the assumptions underlying the combined financial statements are reasonable based on the scope of the purchase and sale agreement and the entities forming the Company being under common control and management throughout the entire periods covered by the combined financial statements.

Outstanding inter-entity balances, transactions, and cash flows between entities comprising the Company have been eliminated.

BTSA Netherlands Cooperatie U.A. provides executive management services to the Company and charges a management fee to the Company for these services, the fees are considered to be a reasonable reflection of all costs of doing business by the Company. For the periods ended 31 March 2015 and 2014, the Company paid management fees of $0.07M and NIL, respectively. Management of BTSA determined that it was not practicable to determine an estimate of this fee that would have been incurred had the Company operated as an unaffiliated entity. The combined financial statements included herein may not necessarily represent what the Company’s results, financial position and cash flows would have been had it been a stand-alone entity during the periods presented, or what the Company’s results, financial position and cash flows may be in the future.

 

F-44


Table of Contents

The accompanying financial data as of 31 March 2015 and for the three month periods ended 31 March 2015 and 2014 has been prepared by the Company, without audit, pursuant to the rules and regulations of the U.S. Securities and Exchange Commission (SEC). Certain information and footnote disclosures normally included in financial statements prepared in accordance with generally accepted accounting principles in the United States (GAAP) have been condensed or omitted pursuant to such rules and regulations. The 31 December 2014 Consolidated Balance Sheet was derived from audited financial statements, but does not include all disclosures required by accounting principles generally accepted in the United States. However, the Company believes that the disclosures are adequate to make the information presented not misleading. These Consolidated Financial Statements should be read in conjunction with the Consolidated Financial Statements and the notes thereto included in the Company’s financial statements for the years ended 31 December 2014 and 2013.

In the opinion of management, all adjustments (which include normal recurring adjustments, except as disclosed herein) necessary to present fairly the combined balance sheet as of 31 March 2015; the results of operations and statements of comprehensive income and cash flows for the three months ended 31 March 2015 and 31 March 2014; and the statements changes in shareholders’ net investment for the three months ended 31 March 2015 and 31 March 2014, as applicable, have been made. The results of operations for the three months ended 31 March 2015 are not necessarily indicative of the operating results for the full fiscal year or any future periods.

Change in Accounting Principle

Effective 1 January 2015, we were required to adopt guidance concerning service concession arrangements. The amendment applies to an operating entity of a service concession arrangement entered into with a public-sector entity grantor when the arrangement meets certain conditions. The amendments specify that such an arrangement may not be accounted for as a lease nor should the infrastructure used in a service concession arrangement be recognized as property, plant and equipment by the operating entity. Instead, the operating entity should refer to other guidance to account for the arrangement. We adopted this guidance using a modified retrospective approach which requires the cumulative effect of applying this guidance to arrangements existing at the beginning of the period of adoption be recognized as an adjustment to retained earnings. As a result, the costs associated with the building of the substations qualify for recognition as an intangible asset. And the costs have been reclassified from Property, plant and equipment, as previously reported, to Intangible asset. The application has had no impact on the amount of the deprecation / amortization charge and thus no impact on opening retained earnings.

The following tables present the pro-forma amounts as of 31 March 2015 under the prior accounting method, the effect on those amounts of the change in account principle, and amounts as reported in the Company’s Combined Financial Statements:

Combined balance sheet

 

In US Dollar

   2015  
     Previous
Accounting
Method
     Effect of
Change in
Accounting
Principle
    As Reported  

Assets

       

Property, plant and equipment, net

     83,587,702         (3,806,641     79,781,061   

Intangible asset, net

             3,806,641        3,806,641   

 

F-45


Table of Contents

3. Property, plant and equipment, net

Property, plant and equipment consist of the following:

 

In US dollar

   2015     2014  

Wind Energy Facility

     41,276,373        43,784,220   

Solar Energy Facility

     44,079,017        45,689,053   

Substation

            4,239,816   
  

 

 

   

 

 

 

Total property, plant and equipment, at cost

     85,355,390        93,713,089   

Less accumulated depreciation

     (6,383,392     (5,177,697

Effect of movements in exchange rates

     809,063        404,231   
  

 

 

   

 

 

 

Total property, plant and equipment, net

     79,781,061        88,939,623   
  

 

 

   

 

 

 

Depreciation expense was $1.3M and $0.8M for the periods ended 31 March 2015 and 2014 respectively.

A special notarial bond and a general notarial bond has been registered over the Company’s present and future movable property for an amount of $88.2M plus an additional amount of $17.6M, as security for the $81.0M first ranking debt. Refer to Note 7 for further details.

4. Intangible asset, net

Intangible asset consist of the following:

 

In US dollar

   2015     2014

Substation

     4,034,701     
  

 

 

   

 

Total intangible asset, at cost

     4,034,701     

Less accumulated amortization

     (239,080  

Effect of movements in exchange rates

     11,020     
  

 

 

   

 

Total intangible asset, net

     3,806,641     
  

 

 

   

 

Amortization expense was $0.1M and NIL for the periods ended 31 March 2015 and 2014 respectively.

5. Deferred tax

Deferred tax assets and liabilities are non-current and are attributable to the following:

 

In US dollar

   2015     2014  

Deferred tax assets

    

Tax losses

     13,307,532        10,078,644   

Cash flow hedge

     255,434          

Asset retirement obligation

     114,250        117,830   
  

 

 

   

 

 

 

Total deferred tax assets

     13,677,216        10,196,474   

Deferred tax liabilities

    

Property, plant and equipment

     (14,716,383     (11,073,009

Prepayments

     (69,467     (106,924
  

 

 

   

 

 

 

Total deferred tax liabilities

     (14,785,850     (11,179,933
  

 

 

   

 

 

 

Total net deferred tax (liability)/asset

     (1,108,634     (983,459
  

 

 

   

 

 

 

 

F-46


Table of Contents

The ultimate realization of deferred tax assets is dependent upon the generation of future taxable income during the periods in which those temporary differences become deductible. Management considers the scheduled reversal of deferred tax liabilities (including the impact of available carryback and carryforward periods), projected future taxable income and tax planning strategies in making this assessment. Based upon the level of historical taxable income and projections for future taxable income over the periods in which the deferred tax assets are deductible, management believes it is more likely than not that the Company will realize the benefits of these deductible differences and carryforwards and no valuation allowance was considered necessary by management as of 31 March 2015 and 31 December 2014.

The estimated tax losses available for set off against future taxable income is $46.7M as of 31 March 2015 (31 December 2014: $32.3M), these losses will not expire. We believe that it is more likely than not, based on our projections of future taxable income that we will generate sufficient taxable income to realize the benefits of the deferred tax asset.

6. Derivative financial instrument—Swap

 

In US dollar

   2015      2014  

Held at fair value

     

Nedbank of South Africa Limited

     224,681         53,069   

The Standard Bank of South Africa Limited

     687,582         491,192   
  

 

 

    

 

 

 

Derivative financial liability

     912,263         544,261   

The Company has entered into an interest rate swap with Nedbank of South Africa Limited to pay fixed interest as follows:

Effective date: 16 November 2012

Notional amount at 31 March 2015: $13,600,064.

The rate was fixed as follows:

(i) For the period from and including 31 December 2013 up to and excluding 31 December 2018, 7.20%

(ii) For the period from and including 31 December 2018 up to and excluding 31 December 2025, 9.00%.

The Company has entered into an interest rate swap with Standard Bank of South Africa Limited to pay fixed interest as follows:

Effective date: 16 November 2012

Notional amount at 31 March 2015: $26,204,151.

The rate was fixed as follows:

(i) For the period from and including 31 January 2014 up to and excluding 31 December 2018, 7.40%

(ii) For the period from and including 31 December 2018 up to and excluding 31 December 2028, 9.50%

 

F-47


Table of Contents

The Company has designated the swap as a cash flow hedge and has satisfied itself as to the economic relationship between the swap and the variability in cash flows from borrowings.

 

In US dollar

   2015      2014  

Fair value hierarchy

     

Level 2

     912,263         544,261   
  

 

 

    

 

 

 

The hierarchy categorizes the inputs used in valuation techniques into three levels. The hierarchy gives the highest priority to (unadjusted) quoted prices in active markets for identical assets or liabilities and the lowest priority to unobservable inputs.

Level 1 inputs are quoted prices in active markets for identical assets or liabilities that the entity can access at the measurement date.

Level 2 inputs are inputs other than quoted market prices included within Level 1 that are observable for the asset or liability, either directly or indirectly.

Level 3 inputs are unobservable inputs for the asset or liability.

 

In US dollar

   2015      2014  

Reconciliation of hedging reserve

  

Opening balance

     544,261         (433,985

Effects of cashflow hedges

     368,002         978,246   
  

 

 

    

 

 

 
     912,263         544 261   
  

 

 

    

 

 

 

7. Accounts receivable

 

In US dollar

   2015      2014  

Trade receivables

     4,370,498         5,283,000   
  

 

 

    

 

 

 

Concentrations

The Company’s trade receivables is due solely from Eskom Holdings SOC Limited at 31 March 2015 and 31 December 2014.

Credit quality of trade receivables

Trade receivables are generally collected within 30 to 60 days which represents normal terms. Trade receivables are amounts due from Eskom Holdings SOC Limited, for the sale of electricity. The carrying value of trade receivables recorded in the financial statements represents the maximum exposure to credit risk.

 

F-48


Table of Contents

8. Borrowings

 

In US dollar

   2015      2014  

The Standard Bank of South Africa Limited

     

Klipheuwel-Dassiefontein Wind Energy Facility (RF) Proprietary Limited has a senior loan facility of $28.5 million with The Standard Bank of South Africa Limited which was entered into on 5 November 2012. The loan bears interest at JIBAR plus a margin of 4.05% and the capital is repayable in bi-annual instalments which commenced on 31 December 2014. Interest is paid quarterly while capital is repaid bi- annually. The loan matures on 31 December 2028.

     27,738,844         29,149,021   

Nedbank of South Africa Limited

     

Sevenstones 159 (RF) Proprietary Limited and Limarco 77 (RF) (Proprietary Limited) have senior loan facilities totaling $20.2 million with The Nedbank of South Africa Limited which was entered into on 5 November 2012. The loan bears interest at JIBAR plus a margin of 3.9% and the capital is repayable in bi-annual instalments which commenced on 30 September 2014, future instalments to occur at June and December. Interest is paid quarterly while capital is repaid bi- annually. The loan matures on 31 December 2028.

     18,227,460         19,154,100   

Industrial Development Corporation of South Africa Limited

     

Klipheuwel-Dassiefontein Wind Energy Facility (RF) Proprietary Limited has a senior loan facility of $12.2 million with Industrial Development Corporation of South Africa Limited which was entered into on 5 November 2012. The loan bears interest at a fixed rate of 7.7% plus a margin of 3.9% and the capital is repayable in bi-annual instalments which commenced on 31 December 2014. Interest is paid quarterly while capital is repaid bi-annually. The loan matures on 31 December 2028.

     11,888,076         12,492,437   

Industrial Development Corporation of South Africa Limited

     

Sevenstones 159 (RF) Proprietary Limited and Limarco 77 (RF) (Proprietary Limited) have senior loan facilities of $20.2 million with Industrial Development Corporation of South Africa Limited which was entered into on 5 November 2012. The loan bears interest at a fixed rate of 7.7% plus a margin of 3.8% and the capital is repayable in bi-annual instalments which commenced on 30 September 2014. Interest is paid quarterly while capital is repaid bi-annually. The loan matures on 31 December 2028.

     18,280,380         19,209,712   
  

 

 

    

 

 

 
     76,134,760         80,005,270   
  

 

 

    

 

 

 

 

In US dollar

   2015  

Payments due by period

  

Less than 1 year

     2,039,709   

1-2 years

     2,184,415   

2-3 yeas

     2,661,124   

3-4 years

     3,114,962   

4-5 years

     3,170,532   

After 5 years

     62,964,018   
  

 

 

 
     76,134,760   
  

 

 

 

 

F-49


Table of Contents

Security in favor of Senior Lenders

Security over the $81.0M (maximum amount) first ranking debt to be funded through the Facility Agreement and entered into between the Company and The Standard Bank of South Limited, Nedbank of South Africa Limited and the Industrial Development Corporation of South Africa Limited is as follows:

 

 

A special notarial bond and a general notarial bond registered over the entity’s present and future movable property for an amount of $88.2M plus an additional amount of $17.6M.

 

 

A mortgage bond registered as a first mortgage over the entity’s rights, title and interest in and to the notarial leases over the leased properties and notarial servitude over the servitude property.

 

 

The cession of all of the entity’s secured property, other than restricted property, to the Debt Guarantor as collateral security for the due, proper and punctual payment and performance of the secured obligations by the Companies.

Our facilities agreement with Nedbank of South Africa, Standard Bank of South Africa Limited and the Industrial Development Corporation of South Africa Limited, requires that following ratios are complied with on any Measurement Date:

 

 

The Historic Debt Service Cover Ratio and the Projected Debt Service Cover Ratio exceeds 1.20:1

 

 

The Loan Life Cover Ratio exceeds 1.20:1

 

 

The Project Life Cover Ratio exceeds 1.35:1

If the Debt Service Cover Ratio is between 1.21:1 and 1.30:1 during the first two years from scheduled commercial operation date (“COD”), the Company will be permitted to make distributions equal to 50% of the amount available for distribution (excess cash after funding of the debt service reserve account, the maintenance reserve account and in compliance with South African Companies Act) to the shareholders of the Company and the remaining 50% shall either be transferred to the Debt Service Reserve Account or be used to repay the Facility.

If the Debt Service Cover Ratio exceeds 1.30:1 during the first two years from scheduled COD date, the Company will be permitted to make a distribution equal to 100% of the amount available for distribution.

The first Scheduled Measurement Date relating to the above ratios was 31 December 2014, where all ratios were in compliance, if the ratio is not met then a distribution would not be permissible. Thereafter measurements will be performed bi-annually at each debt repayment date.

 

In US dollar

   2015      2014  

Non-current liabilities

     

At amortized cost

     74,095,051         77,861,867   
  

 

 

    

 

 

 

Current liabilities

     

At amortized cost

     2,039,709         2,143,403   
  

 

 

    

 

 

 
     76,134,760         80,005,270   
  

 

 

    

 

 

 

 

F-50


Table of Contents

9. Asset retirement obligation

 

In US dollar

   2015     2014  

Opening balance

     420,820        -   

Capitalized in property, plant and equipment

            402,934   

Accretion

     7,744        17,886   

Effect of movement in exchange rates

     (20,529       
  

 

 

   

 

 

 
     408,035        420,820   
  

 

 

   

 

 

 

An asset retirement obligation was recorded due to a contractual obligation to remove all structures and other improvements from the leased property in such a manner that normal farming operations can be conducted on the property. The major parts of the carrying amount of the obligation relate to disposal of tower sections; removal of rebar; grid interface material recovery and MV cable extraction. The Company determined the obligations, based on detailed estimates, adjusted for factors that an outside third-party would consider (i.e. inflation, overhead and profit), escalated to the estimated closure dates and then discounted using a credit-adjusted risk-free interest rate of 13%. The Company has the obligation to remove the wind turbines and related equipment from the property at the end of the lease period. The remaining lease period is 23 years at 31 March 2015. The accretion of the liability and the amortization of the property and equipment will be recognized over the estimated lives of the assets.

10. Accounts payable

 

In US dollar

   2015      2014  

Trade payables

     3,581,877         3,689,723   
  

 

 

    

 

 

 

Trade payables are obligations to pay for goods or services that have been acquired in the ordinary course of business from suppliers.

Trade payables relating to the Engineer, Procure and Construct (“EPC”) contractor amounting to $3.5M and $3.7M will only be paid upon final completion of the project and are included in trade payables at 31 March 2015 and 31 December 2014 respectively.

11. Distribution payable

 

In US Dollar

   2015     2014  

Net distributions to members

     8,674,775          

Effect of movement in exchange rates

     (386,718       
  

 

 

   

 

 

 

Distribution payable

     8,288,057          

A dividend was declared to the shareholders of the Company in March 2015 by Klipheuwel-Dassifontien Wind Energy Facility USD4.9M, Sevenstones 159 USD1.7M and Limarco 77 USD1.7M.

12. Revenue

 

In US dollar

   2015      2014  

Sale of electricity

     6,161,527         3,185,312   
  

 

 

    

 

 

 

Revenue is generated from the sale of electricity in South Africa to Eskom Holdings SOC Limited. The Company has Power Purchase Agreements with Eskom Holdings SOC Limited, backed by the Government of the Republic of South Africa, each for a period of 20 years after the scheduled Commercial Operation Date.

 

F-51


Table of Contents

13. Interest income

 

In US dollar

   2015      2014  

Interest on bank balances

     282,959         90,022   
  

 

 

    

 

 

 

14. Interest expense

 

In US dollar

   2015      2014  

Interest on borrowings

     2,076,130         1,114,457   

Interest on bank balances

     84,233         84,983   

Asset accretion obligation

     7,744           
  

 

 

    

 

 

 
     2,168,107         1,199,440   
  

 

 

    

 

 

 

15. Taxation

 

In US dollar

   2015      2014  

Major components of the tax expense

     

Deferred tax

     

Reversing temporary differences

     570,155         185,011   
  

 

 

    

 

 

 

Reconciliation of tax expense to statutory tax rate

     

Income before income taxes

     1,795,091         495,248   

Tax at the applicable tax rate of 28% (2014: 28%)

     502,625         138,670   

Tax effect of adjustments on taxable income

     

Non-deductible expenses

     67,530         46,341   
  

 

 

    

 

 

 

Tax expense

     570,155         185,011   
  

 

 

    

 

 

 

16. Commitments and contingencies

Contingent asset

The Company is involved in renewable energy and its business, of generating electricity from wind and solar power, has been certified in terms of the Clean Development Mechanism (CDM). The process allows for the reduction in carbon emissions to be converted to carbon credits after a verification process. The Certified Emission Reductions (CER’s) can be sold in the open market, no asset has been recorded during the periods 31 March 2015 and 31 December 2014 as the number of CERs have not been quantified.

17. Operating lease

At the reporting date, the Company has commitments for future notarial and servitude lease payments over three land leases for the remaining term of the leases of 23 years as of 31 March 2015 amounting to:

 

 

the greater of $9,997per turbine per year or 2% of gross revenue on the Klipheuwel-Dassiefontein Wind Energy Facility

 

 

0.5% of gross revenue on the Aries Solar PV Energy Facility

 

 

$17,062 per annum on the Konkoonsies Solar PV Energy Facility

 

F-52


Table of Contents

The annual minimum payment amount of $9,997 and $17,062 increases annually with South African Inflation (31 March 2015: 5.3%). The lease period can be renewed for a further 25 years at the end of the lease

18. Related parties

 

In US dollar

   2015      2014  

Related party transactions

     

Administration fees paid to related parties

     

Friedshelf 1293 (RF) Proprietary Limited

     96,430         95,845   
  

 

 

    

 

 

 

BioTherm Operations and Maintenance (RF) Proprietary Limited

     373,056         325,446   
  

 

 

    

 

 

 

BTSA Netherlands Cooperatie U.A. (Netherlands)

     65,016           
  

 

 

    

 

 

 

Friedshelf 1293 (RF) Proprietary Limited a fellow subsidiary Company provides administrative services to the Company which includes submission of all compliance documentation as per the facility agreement, ensure that the companies are in compliance with all regulations and orders, and tax and accounting functions including maintenance of records, procurement of audit services and reporting. The term of the agreement extends to the expiration of the initial term of the Power Purchase Agreement being 20 years, however early termination may occur subject to notice. The fee charged is a fixed fee escalated annually at South African Inflation rate. The fee in 2015 was $0.05M, $0.02M and $0.02m for Klipheuwel-Dassiefontein Wind Energy Facility (RF) Proprietary Limited, Sevenstones 159 (RF) Proprietary Limited and Limarco 77 (RF) Proprietary Limited respectively and is recorded in the general and administrative costs in the Statement of Income and Comprehensive Loss.

BioTherm Operations and Maintenance (RF) Proprietary Limited a fellow subsidiary Company provides operations and maintenance services to the energy facilities. These services mainly include the supervision of the operations and maintenance activities at the facilities and supervision of service providers. The term is five years from the commercial operations date being 07 May 2014 for Klipheuwel-Dassiefontein Wind Energy Facility (RF) Proprietary Limited. The fee charged is a fixed fee escalated annually at South African Inflation rate, the fee incurred in 2015 was $0.1M and is recorded in operations management fee in the Statement of Income and Comprehensive Loss.

In addition BioTherm Operations and Maintenance (RF) Proprietary Limited provides construction management services which includes review of engineering and construction related documents and formulate an implementation strategy with overall contract management of the construction process. The agreement will terminate at the Final Completion date of the construction of the facility, this is the date that all work and all other obligations under the EPC Contract are fully and completely performed in accordance with the terms of the EPC Contract. The fee charged is a fixed fee escalated annually at South African Inflation rate. The fee in 2015 was $0.2M and $0.1M for Klipheuwel-Dassiefontein Wind Energy Facility (RF) Proprietary Limited and Limarco 77 (RF) Proprietary Limited respectively and is recorded in plant operating costs in the Statement of Income and Comprehensive Loss.+

BTSA Netherlands Cooperatie U.A. the majority shareholder provides executive management services through policy and decision making and representation on the board in addition to finance and administration support. The agreement may be terminated at any point by mutual consent and will terminate automatically on the day that BTSA ceases to be an equity shareholder in the Company (which will terminate on sale of the Company – see Note 17). The fee charged is a fixed fee escalated annually at South African Inflation rate. The fee in 2015 was $0.03M, $0.02M and $0.02m for Klipheuwel-Dassiefontein Wind Energy Facility (RF) Proprietary Limited, Sevenstones 159 (RF) Proprietary Limited and Limarco 77 (RF) Proprietary Limited respectively and is recorded in the general and administrative costs in the Statement of Income and Comprehensive Loss.

 

F-53


Table of Contents

19. Subsequent events

The company has evaluated subsequent events through 11 June 2015, the date the combined financial statements were available to be issued, in April 2015, TerraForm Global signed purchase and sale agreements to acquire equity interests in the BioTherm projects (Aries, Konkoonsies and Klipheuwel), all of which are located in South Africa. These projects have a combined capacity of 47.0 MW. The aggregate consideration paid for the majority interest (BioTherm and other minority interest) for this acquisition is expected to be $63.4 million, comprised of cash of $55.2 million and shares of Class A common stock of TerraForm Global with a value of $8.2 million.

No other subsequent events were identified during this period that would have a material impact on the combined financial statements.

 

F-54


Table of Contents

Honiton Energy XIL Holdings Limited and Honiton Energy BAV Holdings Limited

Unaudited condensed combined balance sheets

(Amounts in thousands)

 

      December 31,     March 31,  
      2014     2015  

ASSETS:

     US$        US$   

Current assets

    

Cash

     4,366        4,475   

Restricted cash

     4,584        5,589   

Accounts receivable, net of allowance for doubtful accounts

     14,008        16,356   

Notes receivable

     4,300        3,663   

Amounts due from related parties

     4,032        4,041   

Prepayments and other current assets

     2,853        2,874   
  

 

 

 

Total current assets

     34,143        36,998   
  

 

 

 

Property, plant and equipment, net

     208,838        204,285   

Other non-current assets

     4,303        3,936   
  

 

 

 

Total assets

     247,284        245,219   
  

 

 

 

LIABILITIES AND SHAREHOLDER’S DEFICIT:

    

Current portion of long-term bank loans

     41,514        40,543   

Accounts payable

     11,436        11,035   

Amounts due to related parties

     180,765        178,244   

Accrued expenses and other current liabilities

     1,606        1,402   
  

 

 

 

Total current liabilities

     235,321        231,224   
  

 

 

 

Long-term bank loans, excluding current portion

     28,096        27,990   

Other non-current liabilities

     15,211        14,930   
  

 

 

 

Total liabilities

     278,628        274,144   
  

 

 

 

Shareholder’s deficit

    

Share capital

              

Additional paid-in capital

     8,918        8,918   

Accumulated deficit

     (60,049     (58,193

Accumulated other comprehensive income

     19,787        20,350   
  

 

 

 

Total shareholder’s deficit

     (31,344     (28,925
  

 

 

 

Commitments and contingencies (note 10)

              

Total liabilities and shareholder’s deficit

     247,284        245,219   

 

 

The accompanying notes are an integral part of these unaudited condensed combined financial statements.

 

F-55


Table of Contents

Honiton Energy XIL Holdings Limited and Honiton Energy BAV Holdings Limited

Unaudited condensed combined statements of comprehensive income (loss)

(Amounts in thousands)

 

     

Three months ended March 31,

 
        2014           2015  
     US$      US$  

Revenues

     5,685         6,192   

Cost of revenues

     (3,877      (4,077
  

 

 

 

Gross profit

     1,808         2,115   

General and administrative expenses

     (373      (321
  

 

 

 

Operating income

     1,435         1,794   

Interest income

     17         18   

Interest expense

     (2,690      (2,435

Foreign currency exchange gain (loss), net

     (1,135      2,468   
  

 

 

 

Income (loss) before income taxes

     (2,373      1,845   

Income tax benefit

     11         11   
  

 

 

 

Net income (loss)

     (2,362      1,856   

Foreign currency translation adjustments, net of nil income taxes

     (1,735      563   
  

 

 

 

Comprehensive income (loss)

     (4,097      2,419   

 

 

 

 

The accompanying notes are an integral part of these unaudited condensed combined financial statements.

 

F-56


Table of Contents

Honiton Energy XIL Holdings Limited and Honiton Energy BAV Holdings Limited

Unaudited condensed combined statement of changes in shareholder’s deficit

(Amounts in thousands)

 

      Share
capital
     Additional
paid-in
capital
     Accumulated
deficit
    Accumulated
other
comprehensive
income
     Total
shareholder’s
deficit
 
     US$      US$      US$     US$      US$  

Balance at December 31, 2014

             8,918         (60,049     19,787         (31,344

Net income

                     1,856                1,856   

Foreign currency translation adjustments, net of nil income taxes

                            563         563   
  

 

 

 

Balance at March 31, 2015

             8,918         (58,193     20,350         (28,925

 

 

 

 

 

The accompanying notes are an integral part of these unaudited condensed combined financial statements.

 

F-57


Table of Contents

Honiton Energy XIL Holdings Limited and Honiton Energy BAV Holdings Limited

Unaudited condensed combined statements of cash flows

(Amounts in thousands)

 

     

Three months ended March 31,

 
        2014          2015  
     US$     US$  

Cash flows generated from operating activities

     1,833        910   
  

 

 

 

Cash flows from investing activities:

    

Purchase of property, plant and equipment

     (158     (1
  

 

 

 

Net cash used in investing activities

     (158     (1
  

 

 

 

Cash flows from financing activities:

    

Repayment of bank loans

     (816     (816
  

 

 

 

Net cash used in financing activities

     (816     (816

Effect of foreign currency exchange rate changes on cash

     42        16   
  

 

 

 

Net increase in cash

     901        109   

Cash at beginning of year

     5,233        4,366   
  

 

 

 

Cash at end of year

     6,134        4,475   
  

 

 

 

Supplemental disclosure of cash flow information:

    

Interest paid

     (1,520     (1,271

 

 

 

 

The accompanying notes are an integral part of these unaudited condensed combined financial statements.

 

F-58


Table of Contents

Honiton Energy XIL Holdings Limited and Honiton Energy BAV Holdings Limited

Notes to the unaudited condensed combined financial statements

(Amounts in thousands)

1 Basis of presentation and significant concentrations and risks

a) Basis of presentation

The accompanying unaudited condensed combined financial statements have been prepared in accordance with U.S. generally accepted accounting principles (“US GAAP”). Certain information and footnote disclosures normally included in financial statements prepared in accordance with U.S. GAAP have been condensed or omitted. The condensed combined balance sheet as of December 31, 2014 was derived from the audited combined financial statements of the Combined Entity. The accompanying unaudited condensed combined financial statements should be read in conjunction with the combined balance sheet of the Combined Entity as of December 31, 2014, and the related combined statements of comprehensive loss, changes in shareholder’s deficit and cash flows for the year then ended.

In the opinion of the management, all adjustments (which include normal recurring adjustments) necessary to present a fair statement of the financial position as of March 31, 2015, and the results of operations and cash flows for the three months ended March 31, 2014 and 2015, have been made.

The accompanying unaudited condensed combined financial statements were prepared on a going concern basis, which contemplates the realization of assets and the satisfaction of liabilities in the normal course of business. The realization of assets and the satisfaction of liabilities in the normal course of business are dependent on, among other things, the Combined Entity’s ability to operate profitably, to generate cash flows from operations, and the Combined Entity’s ability to pursue alternative financing arrangements to support its working capital requirements.

As of March 31, 2015, the Combined Entity had a shareholder’s deficit of US$28,925. The Combined Entity mainly relies on the cash provided by operating activities, bank loans and advances from related parties to finance its investing activities and working capital requirements. In particular, the amount due to related parties in the amount of US$178,244 as of March 31, 2015 is due on demand, and US$40,543 of bank loan will mature in July 2015.

Honiton Energy Caymans Limited (“HECL”), the shareholder of the Combined Entity, has provided a letter of financial support to the Combined Entity including the conversion of the US$177,870 due to HECL as of March 31, 2015 into the share capital of Honiton Energy (Xilinguole) Co. Ltd. and Honiton Energy (Baotou) Co. Ltd, as necessary.

On May 5, 2015, HECL entered into a share purchase agreement to sell all of its equity interests in Honiton XIL and Honiton BAV to a subsidiary of TerraForm Global, Inc. (“Acquirer”). In connection with the proposed acquisition of the Combined Entity, the Acquirer has provided a letter to HECL stating that the Acquirer will take necessary actions to cause the Combined Entity to make payment when the bank loan matures.

Taking into consideration the commitments of HECL and the Acquirer to provide the Combined Entity the necessary financial support, management believes the Combined Entity will be able to meet its commitments and liabilities when they fall due for a period extending at least one year beyond the date of the financial statements.

 

F-59


Table of Contents

b) Revenue concentration

The Combined Entity derives all its revenues from its sole customer, Inner Mongolia Power (Group) Co., Ltd., for the wind power dispatched in Inner Mongolia. The Combined Entity expects revenues from the customer to continue to represent a substantial portion of its revenue in the future. Any factors adversely affecting the wind power industry in the PRC or the business operation of the customer will have a material effect on the Combined Entity’s business, financial position and results of operations.

2 Cash and restricted cash

Cash consists of the following:

 

     December 31,      March 31,  
     2014      2015  
    US$      US$  

RMB denominated bank deposits with financial institutions in the PRC

    4,300         4,138   

US dollar denominated bank deposits with financial institutions in HK SAR

    60         327   

Great Britain Pound denominated bank deposits with financial institutions in HK SAR

            4   

US dollar denominated bank deposits with financial institutions in the PRC

    6         6   
 

 

 

 

Total

    4,366         4,475   

 

 

Cash deposits in bank that are restricted as to withdrawal or usage for up to 12 months are reported as restricted cash in the condensed combined balance sheets and excluded from cash in the condensed combined statements of cash flows. Cash deposits that are restricted for period beyond 12 months from the balance sheet date are included in other non-current assets in the condensed combined balance sheets. Cash deposits that are pledged as collateral for long-term bank loans are reported as restricted cash and amounted to US$3,251 and US$4,262 as of December 31, 2014 and March 31, 2015, respectively (note 8). Cash deposits totaling US$1,718 were restricted due to the arbitration and lawsuit as of March 31, 2015 (note 10), of which US$1,327 is included in restricted cash and US$391 is included in other non-current assets.

3 Property, plant and equipment, net

Property, plant and equipment consist of the following:

 

      December 31,     March 31,  
      2014     2015  
     US$     US$  

Machinery and equipment

     271,371        270,362   

Buildings

     3,282        3,270   

Equipment and furniture

     311        310   

Vehicles

     294        275   
  

 

 

   

 

 

 
     275,258        274,217   

Less: Accumulated depreciation

     (66,420     (69,932
  

 

 

   

 

 

 

Property, plant and equipment, net

     208,838        204,285   

 

 

Depreciation expense for property, plant and equipment was US$3,737 and US$3,779 for the three months ended March 31, 2014 and 2015 respectively. As of December 31, 2014 and March 31, 2015, the Combined Entity has pledged property, plant and equipment with a total net amount of US$205,965 and US$201,481, respectively, to secure bank borrowings.

 

F-60


Table of Contents

4 Government grants

For the three months ended March 31, 2014 and 2015, US$214 representing the amortization of government grant of US$16,715 related to the equipment purchased in prior years was credited against depreciation expense which is included in cost of revenues in the condensed combined statements of comprehensive income (loss). As of March 31, 2015, the balance of unamortized government grant was US$12,999, of which the current portion of US$856 was included in accrued expenses and other current liabilities, and the non-current portion US$12,143 was included in other non-current liabilities in the condensed combined balance sheets, respectively.

5 Income taxes

The effective income tax rates for the three months ended March 31, 2014 and 2015 were 1% and -1%, respectively. The effective income tax rates for the three months ended March 31, 2014 and 2015 differ from the PRC statutory income tax rate of 25% primarily due to the combined effect of the valuation allowance on the deferred tax assets of the PRC operating entities and the Hong Kong entities not subject to income tax.

6 Bank loans

Long-term bank loans consist of the following:

 

      December 31,     March 31,  
      2014     2015  
     US$     US$  

Long-term bank loans:

    

Loans from Standard Chartered Bank

     37,265        36,310   

Loans from Minsheng Bank

     32,345        32,223   
  

 

 

   

 

 

 
     69,610        68,533   

Less: current portion

     (41,514     (40,543
  

 

 

   

 

 

 

Total long-term bank loans, excluding current portion

     28,096        27,990   

 

 

As of March 31, 2015, there was no unpaid interest to China Minsheng Bank. The principal of US$4 million, US$5 million, US$5 million, US$5 million, US$5 million, US$6 million, and US$2 million will be repaid in 2015, 2016, 2017, 2018, 2019, 2020 and 2021, respectively.

In March 2011, Honiton Baotou and Honiton Xilinguole entered into an 12-month RMB362 million (US$59 million) loan agreement with Standard Chartered Bank at a floating interest rate of the one-to three-year RMB benchmark loan rates as published by PBOC plus an additional surcharge of 15%-70% of the interest rate per annum. As Honiton Baotou and Honiton Xilinguole failed to repay the loan on the original maturity date, the outstanding loan principal and interest of RMB283 million (US$46 million) was extended to July 2015 and the interest rate was based on the one-to three-year Renminbi benchmark loan rates plus an additional surcharge of 30% of the interest rate per annum. The loan is pledged by bank accounts of HECL, property, plant and equipment, land use rights and beneficial rights of insurance of the Bailimiao wind farm Phase II and Xiwu wind farm Phase I, the 100% paid-in capital of Honiton Xilinguole, the 100% issued shares of Honiton XIL and Honiton BAV. The outstanding loan balance was US$36 million as of March 31, 2015.

 

F-61


Table of Contents

7 Related party transactions

As of and for the three months ended March 31, 2015, the Combined Entity had related party transactions and balances with 1) Honiton Energy Caymans Limited (“HECL”, the immediate parent company of the Combined Entity) 2) Honiton Energy Barbados Ltd., which is a wholly owned subsidiary of HECL, and 3) Windco Cayman Holdings Limited, which is the shareholder of HECL. The significant related party transactions are summarized as follows:

 

              Three months ended March 31,  
              2014      2015  
            US$      US$  

Interest expenses incurred for the shareholder’s loans

     (a      1,163         1,163   

Expenses paid by the Combined Entity on behalf of HECL

     (b              111   

Balances with related parties as of March 31, 2015 are as follows:

 

             December 31,      March 31,  
             2014      2015  
           US$      US$  

Amounts due from related parties:

       

Honiton Energy Caymans Limited

     (b     4,025         4,034   

Honiton Energy Barbados Ltd.

       7         7   
    

 

 

 

Total amounts due from related parties

       4,032         4,041   
    

 

 

 

Amounts due to related parties:

       

Honiton Energy Caymans Limited

     (a )(b)      180,389         177,870   

Windco Cayman Holdings Limited

       376         374   
    

 

 

 

Total amounts due to related parties

       180,765         178,244   

 

 

 

(a)   HECL provided interest-free loans of US$8,500 and interest-bearing loans of US$31,407 at the rate of 15% to the Combined Entity before January 1, 2014. All of the loans are unsecured and unguaranteed. The loans are due and payable on demand. The interest expenses incurred by the Combined Entity were US$1,163 for the three months ended March 31, 2014 and 2015.

 

(b)   During the three months ended March 31, 2015, the Combined Entity paid professional service expenses in the amount of US$111 on behalf of HECL.

8 Commitments and contingencies

Operating lease commitments

Future minimum lease payments under non-cancellable operating lease agreements for office premises as of March 31, 2015 and 2014 were as follows:

 

      March 31,      March 31,  
      2014      2015  
     US$      US$  

Nine months ending December 31, 2014

     44           

2015/ nine months ending December 31, 2015

     59         50   

2016

     50         51   

Thereafter

               
  

 

 

    

 

 

 

Total

     153         101   

 

 

 

F-62


Table of Contents

Rental expenses incurred under operating leases for the three months ended March 31, 2014 and 2015 were US$14 and US$16 respectively.

Legal Proceedings

The Combined Entity is the party in one arbitration and the defendant in one lawsuit with one vendor who is the wind turbine and maintenance service provider to the Combined Entity. The vendor filed the arbitration and lawsuit against Honiton Baotou and Honiton Xilingguole in the PRC on August 21, 2014 and January 23, 2015, respectively, seeking claims in the amount of US$1,327 and US$10,683 for the provision of maintenance service and sales of wind turbine and relevant interests, respectively. The arbitration and lawsuit are in preliminary stage and US$1,060 and US$8,367 was accrued based on management’s best estimate of the probable outcomes as of March 31, 2015. In addition, cash in bank in the amount of US$1,718 was restricted for the arbitration and lawsuit as of March 31, 2015. On January 14, 2015, Honiton Baotou filed a claim against the vendor in the arbitration, seeking a claim in the amount of US$1,092 for the overpaid maintenance service fee and relevant interests. Each of Honiton Baotou and Honiton Xilingguole filed an arbitration against this vendor on March 9, 2015, seeking claims in the amount of US$2,288 and US$1,062 for the undelivered spare parts and relevant interests, respectively.

9 Subsequent events

On May 5, 2015, Honiton Energy Caymans Limited entered into share purchase agreements to sell its interests in the Combined Entity to a subsidiary of TerraForm Global, Inc., an indirect subsidiary of SunEdison, Inc., for US$105 million in cash, subject to adjustment upon the closing of the share purchase. According to the share purchase agreement, the purchase price shall be reduced by an amount equal to the aggregate of all Leakage Amounts.

Management has considered subsequent events through June 9, 2015, which was the date the condensed combined financial statements were available to be issued.

 

F-63


Table of Contents

Renova Energy Projects I

Condensed combined balance sheets as of March 31, 2015 and

December 31, 2014 (Unaudited)

 

Amounts in thousands of Brazilian Reais—R$    Note      March 31,
2015
     December 31,
2014
 

ASSETS

        

CURRENT

        

Cash and cash equivalents

     4         23,455         34,109   

Short-term investments

     4         36,784         24,477   

Trade receivables

     5         21,258         22,475   

Prepaid and recoverable taxes

     12         955         3,037   

Energy balance—CCEE/Eletrobras

     6         1,381         199   

Prepaid and other current assets

        1,973         2,299   
     

 

 

 

Total current assets

        85,806         86,596   
     

 

 

 

NONCURRENT ASSETS

        

Property, plant and equipment

     7         1,375,053         1,388,090   

Restricted deposits

     9         171,019         160,488   

Energy balance—CCEE/Eletrobras

     6         6,423         1,824   

Prepaid and recoverable taxes

     12         1,856         2,211   

Other assets

        35         35   
     

 

 

 

Total noncurrent assets

        1,554,386         1,552,648   
     

 

 

 

TOTAL ASSETS

        1,640,192         1,639,244   

 

 

 

 

The accompanying notes are an integral part of these condensed combined interim financial statements.

 

F-64


Table of Contents

Renova Energy Projects I

Condensed combined balance sheets as of March 31, 2015 and

December 31, 2014 (Unaudited)—(Continued)

 

Amounts in thousands of Brazilian Reais—R$

   Note      March 31,
2015
     December 31,
2014
 

LIABILITIES AND PARENT’S NET INVESTMENT

        

CURRENT LIABILITIES

        

Trade payables

        16,425         18,460   

Borrowings—current portion

     8         70,149         70,071   

Taxes payable

     11         5,301         6,594   

Energy balance—CCEE/Eletrobras

     6         23,335         22,339   

Commitments for social and environmental costs

     13         3,808         3,685   

Other accounts payable

        46         35   
     

 

 

 

Total current liabilities

        119,064         121,184   
     

 

 

 

NONCURRENT LIABILITIES

        

Borrowings

     8         876,141         893,046   

Energy balance—CCEE/Eletrobras

     6         15,758         13,397   

Commitments for social and environmental costs

     13         2,296         2,222   
     

 

 

 

Total noncurrent liabilities

        894,195         908,665   
     

 

 

 

PARENT’S NET INVESTMENT

     14         626,933         609,395   
     

 

 

 

TOTAL LIABILITIES AND PARENT’S NET INVESTMENT

        1,640,192         1,639,244   

 

 

 

 

The accompanying notes are an integral part of these condensed combined interim financial statements.

 

F-65


Table of Contents

Renova Energy Projects I

Condensed combined income statements for the three-month periods ended March 31, 2015 and 2014 (Unaudited)

 

              Three month
period ended March 31,
 
Amounts in thousands of Brazilian Reais—R$    Note      2015     2014  

NET REVENUE

     15         59,485        53,601   

COST OF SERVICES PROVIDED

       

Depreciation

        (16,782     (16,942

Operating costs

        (3,181     (3,402

Charges for use of distribution system

        (3,262     (2,343
     

 

 

 
     16         (23,225     (22,687
     

 

 

 

GROSS PROFIT

        36,260        30,914   

General and administrative expenses

        (4,790     (5,065

Other operating income, net

               93   
     

 

 

 
     16         (4,790     (4,972
     

 

 

 

OPERATING INCOME

        31,470        25,942   

FINANCE INCOME (EXPENSES)

       

Finance income

     17         5,563        4,332   

Finance expenses

     17         (19,065     (18,786
     

 

 

 
     17         (13,502     (14,454
     

 

 

 

INCOME BEFORE INCOME AND SOCIAL CONTRIBUTION TAXES

        17,968        11,488   

Income and social contribution taxes

     10         (3,849     (2,996
     

 

 

 

NET INCOME

        14,119        8,492   

 

 

 

The accompanying notes are an integral part of these condensed combined interim financial statements.

 

F-66


Table of Contents

Renova Energy Projects I

Condensed combined statements of comprehensive income for the three-month periods ended March 31, 2015 and 2014 (Unaudited)

 

 

      Three month period
ended March 31,
 
Amounts in thousands of Brazilian Reais—R$    2015      2014  

Net Income

     14,119         8,492   

Other comprehensive income

               
  

 

 

 

TOTAL COMPREHENSIVE INCOME

     14,119         8,492   

 

 

 

 

 

The accompanying notes are an integral part of these condensed combined interim financial statements.

 

F-67


Table of Contents

Renova Energy Projects I

Condensed combined statements of changes in parent’s net investment for the three-month periods ended March 31, 2015 and 2014 (Unaudited)

 

Amounts in thousands of Brazilian Reais—R$    Parent’s net
investment
 

AT JANUARY 1, 2014

     624,958   

Net Income

     8,492   

Dividends

     (16,830

Others transfers from parent, net

     3,134   
  

 

 

 

AT MARCH 31, 2014

     619,754   
  

 

 

 

AT JANUARY 1, 2015

     609,395   
  

 

 

 

Net Income

     14,119   

Others transfers from parent, net

     3,419   
  

 

 

 

AT MARCH 31, 2015

     626,933   

 

 

 

 

The accompanying notes are an integral part of these condensed combined interim financial statements.

 

F-68


Table of Contents

Renova Energy Projects I

Condensed combined statements of cash flows for the three-month periods ended March 31, 2015 and 2014 (Unaudited)

 

              Three month
period ended March 31,
 
Amounts in thousands of Brazilian Reais—R$    Note      2015     2014  

CASH FLOWS FROM OPERATING ACTIVITIES

       

Net Income

        14,119        8,492   

Adjustments to reconcile Net Income to cash provided by operating activities:

       

Depreciation

     7, 16         16,869        16,972   

Interest on borrowings

     8, 17         17,537        17,535   

Debt issuance costs

     8         155        153   

Interest on short-term investments and restricted deposits

     17         (5,563     (4,332

(Increase) decrease in operating assets:

       

Trade receivables

        1,217        (1,991

Prepaid and recoverable taxes

        2,437        70   

Other assets

        326        607   

Increase (decrease) in operating liabilities:

       

Trade payables

        (2,035     (221

Taxes payable

        628        2,009   

Energy balance—CCEE/Eletrobras, net

        (2,424     3,524   

Other payables

        208        1   

Other cash flows from operating activities:

       

Income and social contribution taxes paid

        (1,921     (1,722

Interest paid on borrowings

     8         (17,490     (17,770
     

 

 

 

Net cash provided by operating activities

        24,063        23,327   
     

 

 

 

CASH FLOWS FROM INVESTING ACTIVITIES

       

Short-term investments

        (6,744     16,293   

Restricted deposits

        (10,531     (9,109

Purchase of property, plant and equipment

        (3,832       
     

 

 

 

Net cash (used in) provided by investing activities

        (21,107     7,184   
     

 

 

 

CASH FLOWS FROM FINANCING ACTIVITIES

       

Payments on borrowings

     8         (17,029     (16,668

Others transfers from parent, net

        3,419        3,134   

Payment of dividends

     14                (16,830
     

 

 

 

Net cash used in financing activities

        (13,610     (30,364
     

 

 

 

(DECREASE) INCREASE IN CASH AND CASH EQUIVALENTS

        (10,654     147   
     

 

 

 

Cash and cash equivalents at beginning of period

     4         34,109        20,799   

Cash and cash equivalents at end of period

     4         23,455        20,946   
     

 

 

 

(DECREASE) INCREASE IN CASH AND CASH EQUIVALENTS

              (10,654     147   

The accompanying notes are an integral part of these condensed combined interim financial statements.

 

F-69


Table of Contents

Renova Energy Projects I

Notes to the unaudited condensed combined interim financial statements

(Thousands of Brazilian Reais – R$, unless otherwise stated)

1. Organization and description of business

Renova Energy Projects I (the “Group” or the “Company”) comprises the operating assets, liabilities and operating activities of Energética Serra do Prata S.A. (“Espra”), Salvador Eólica Participações S.A. (“Salvador”), Bahia Eólica Participações S.A. (“Bahia”), all indirect-wholly-owned Brazilian subsidiaries of Renova Energia S.A. (“Renova” or “Parent”), a Brazilian listed company engaged in the development, implementation and operation of projects for the generation of energy from renewable sources, including wind, small hydroelectric power plants (“SHPPs”) and solar, and in the sale of power and related activities.

The Group is engaged in the construction and operation of renewable energy generation projects, through SHPPs and wind energy facilities, all located in Brazil, and conducts its operations through various wholly-owned project companies under authorizations granted to them: 30 years from 2003 in the case of small hydroeletric power plants and 35 years from 2010 in the case of wind energy facilities.

Small Hydroelectric Power Plants—Through Espra, the Group sells electric energy generated from its Serra da Prata Hydroelectric Complex, consisting of three SHPPs located in the State of Bahia which began operations in 2008. All energy generated from the complex is sold under long-term power purchase agreements (“PPAs”) with Eletrobras—Centrais Elétricas Brasileiras S.A., under the Brazilian Alternative Electric Power Source Incentive Program (Programa de Incentivo às Fontes Alternativas de Energia Elétrica—PROINFA). The PPAs have an original term of 20 years through 2028 and include a fixed price per megawatt hour, adjusted annually for inflation based on the change in the Brazilian General Market Price Index—IGPM.

Wind Energy Facilities—Through Bahia and Salvador, the Group sells electric energy generated from its 14 wind energy facilities located in the State of Bahia which began operations in 2012. All energy generated from the complexes are sold under long-term PPAs with the Câmara de Comercialização de Energia Elétrica—CCEE (Electric Power Trade Chamber), under PROINFA. The PPAs have an original term of 20 years through 2032 and include a fixed price per megawatt hour, adjusted annually for inflation based on the change in the Brazilian Consumer Price Index—IPC-A.

The Group´s operating assets, consisting of its SHPPs and wind energy generation facilities, are held through the following wholly-owned project companies:

Centrais Eólicas Candiba S.A.

Centrais Eólicas Igaporã S.A.

Centrais Eólicas Ilhéus S.A.

Centrais Eólicas Licínio de Almeida S.A.

Centrais Eólicas Pindaí S.A.

Centrais Eólicas Alvorada S.A.

Centrais Eólicas Guanambi S.A.

Centrais Eólicas Nossa Senhora Conceição S.A.

Centrais Eólicas Pajeú do Vento S.A.

Centrais Eólicas Planaltina S.A.

Centrais Eólicas Porto Seguro S.A.

 

F-70


Table of Contents

Centrais Eólicas Rio Verde S.A.

Centrais Eólicas Serra do Salto S.A.

Centrais Eólicas Guirapá S.A.

The Group presented negative working capital for March 31, 2015 which, based on the Company´s analysis, will be solved by its own operation. The negative working capital is reducing monthly.

2. Basis of presentation

The unaudited condensed combined interim financial statements for the three-month periods ended March 31, 2015 and 2014 have been prepared in accordance with International Accounting Standard 34 “Interim Financial Reporting” (‘IAS 34’) and are presented on a condensed basis as permitted by IAS 34. Therefore, they do not include all disclosures that would otherwise be required in a full set of financial statements. They should be ready in conjunction with the Group’s combined financial statements as of and for the years ended December 31, 2014 and 2013.

The Group has applied the same accounting policies, presentation and methods of calculation as those followed in the preparation of the Group’s combined financial statements as of and for the years ended December 31, 2014 and 2013, which were prepared in accordance with International Financial Reporting Standards (“IFRS”) as issued by the International Accounting Standards Board. The Group also follows the guidance in the Accounting Manual for the Brazilian Electricity Industry and standards established by the Brazilian National Agency for Electric Energy (Agência Nacional de Energia Elétrica – ANEEL) Renova and its affiliated entities, together with the cost allocations, is included in note 14 to the condensed combined interim financial statements.

The condensed combined interim financial statements with respect to the Group is reflected in the individual legal entities that comprise the Group, which were all under the common control and management of Renova for all periods presented. These condensed combined interim financial statements have been prepared from the accounting records of Renova and reflect the cash flows, revenues, expenses, assets, and liabilities of these individual legal entities. All transactions and balances between the individual legal entities within the Group have been eliminated in combination.

Because the separate legal entities that comprise the Group were not and are not held by a single legal entity, Parent’s net investment is shown in lieu of shareholders’ equity in these condensed combined interim financial statements. Parent’s net investment represents the cumulative net investment by Renova in the Group through that date. The impact of transactions between the Group and Renova that were not historically settled in cash, including certain intercompany loans, are also included in Parent’s net investment (see note 14).

During the periods presented, the Group functioned as part of the larger group of companies controlled by Renova, and accordingly, Renova performed certain operating and corporate overhead functions for the Group. These functions include, but are not limited to, executive oversight, legal, finance, human resources, information technology, internal audit, financial reporting, tax planning and investor relations. The costs of such services have been allocated to the Group based on the most relevant allocation method to the service provided, primarily based on relative percentage of revenue, installed capacity or headcount. Management believes such allocations are reasonable; however, they may not be indicative of the actual expense that would have been incurred had the Group been operating as a separate entity apart from Renova. The cost allocated for these functions is included in general and administrative expenses in the combined income statements for the historical periods presented. A complete discussion of the Group’s relationship with Renova and its affiliated entities, together with the cost allocations, is included in note 14 to the condensed combined interim financial statements.

 

F-71


Table of Contents

As the Group did not operate as a stand-alone entity in the past, this unaudited condensed combined interim financial statements may not be indicative of the Group’s future performance and does not necessarily reflect what its combined results of operations, financial position and cash flows would have been had the Group operated as a separate entity apart from Renova during the periods presented.

The condensed combined interim financial statements is presented in thousands of Brazilian Reais (R$), unless otherwise stated

Management of the Group authorized the issuance of these condensed combined interim financial statements on June 10, 2015.

3. Summary of significant accounting policies

The accounting policies adopted in the preparation of the condensed combined interim financial statements are consistent with those followed in the preparation of the Group’s combined financial statements as of and for the years ended December 31, 2014 and 2013, except for the adoption of new standards and interpretations effective as of January 1, 2015, none of which had a material impact on the condensed combined interim financial statements of the Group.

The preparation of the condensed combined interim financial statements requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the end of the reporting period, and the reported amounts of revenue and expenses during the reporting period. Actual results could vary from these estimates. The estimates and underlying assumptions are reviewed on an ongoing basis. Revisions to accounting estimates are recognized in the period in which the estimate is revised if the revision affects only that period or in the period of the revision and future periods if the revision affects both current and future periods.

4. Cash and cash equivalents and short-term investments

 

      March 31,
2015
     December 31,
2014
 

Cash

     19         1   

Banks accounts

     18,392         34,108   

Short-term investments

     41,828         24,477   
  

 

 

 

Total

     60,239         58,586   
  

 

 

 

Stated as:

     

Cash and cash equivalents

     23,455         34,109   

Short-term investments

     36,784         24,477   
  

 

 

 

Total

     60,239         58,586   

 

 

The Group invests its excess unrestricted cash in short-term investments, which are generally fixed-income instruments and investments funds that earn interest at rates ranging from 90% to 102% of the CDI rate (Brazilian Interbank Certificate of Deposit rate).

For further discussion regarding the Group’s exposure to interest rate risk and a sensitivity analysis of financial assets and liabilities, see note 18.

 

F-72


Table of Contents

5. Trade receivables

As of March 31, 2015 and December 31, 2014, balances are comprised of receivables with average collection periods of 24 to 30 days, for which losses on collection are not expected.

 

      March 31,
2015
     December 31,
2014
 

Câmera de Comercialização de Energia Elétrica—CCEE

     17,732         17,731   

Centrais Elétricas Brasileiras—Eletrobras

     3,526         4,744   
  

 

 

 

Total

     21,258         22,475   

 

 

6. Energy balance—CCEE/eletrobras

 

      Accounts  
     Receivables      Payables  
      March 31,
2015
     December 31,
2014
     March 31,
2015
     December 31,
2014
 

Câmera de Comercialização de Energia Elétrica—CCEE

     7,804         2,023         17,525         14,562   

Centrais Elétricas Brasileiras—Eletrobras

                     21,568         21,174   
  

 

 

 

Total

     7,804         2,023         39,093         35,736   

 

 

 

      Changes in accounts receivables  
      January 1,
2014
     Addition      December 31,
2014
     Addition      March 31,
2015
 

CCEE

             2,023         2,023         5,781         7,804   
  

 

 

 

Total accounts receivable

             2,023         2,023         5,781         7,804   

 

 

 

      Changes in accounts payables  
      January 1,
2014
     Provision      Payment     December 31,
2014
     Provision      Payment     March 31,
2015
 

CCEE

     13,901         2,752         (2,091     14,562         2,963                17,525   

Eletrobras

     2,060         21,174         (2,060     21,174         3,160         (2,766     21,568   
  

 

 

 

Total accounts payable

     15,961         23,926         (4,151     35,736         6,123         (2,766     39,093   

 

 

 

F-73


Table of Contents

7. Property, plant and equipment

 

     March 31, 2105     December 31, 2014  
     Historical
cost
    Accumulated
depreciation
   

Net

value

    Historical
Cost
    Accumulated
depreciation
   

Net

value

 

Small hydroelectric power plants

           

Land

    595               595        595               595   

Reservoirs, dams and watermains

    95,797        (15,026     80,771        95,797        (14,474     81,323   

Buildings, civil works and improvements

    46,336        (8,427     37,909        46,336        (8,101     38,235   

Machinery and equipment

    65,005        (13,585     51,420        65,005        (13,104     51,901   

Other

    434        (348     86        434        (336     98   
 

 

 

 

Total

    208,167        (37,386     170,781        208,167        (36,015     172,152   

Wind energy facilities

           

Buildings, civil works and improvements

    83,065        (8,825     74,240        83,065        (8,020     75,045   

Machinery and equipment

    1,275,478        (156,215     1,119,263        1,275,478        (141,543     1,133,935   

Other

    11,491        (722     10,769        7,659        (701     6,958   
 

 

 

 

Total

    1,370,034        (165,762     1,204,272        1,366,202        (150,264     1,215,938   
 

 

 

 

Total property, plant and equipment

    1,578,201        (203,148     1,375,053        1,574,369        (186,279     1,388,090   

 

 

 

F-74


Table of Contents

Changes in the balances of property, plant and equipment are as follows:

 

      January 1,
2014
    Additions     December 31,
2014
    Additions     March 31,
2015
 

Historical Cost

          

Small hydroelectric power plants

          

Land

     595               595               595   

Reservoirs, dams and watermains

     95,797               95,797               95,797   

Buildings, civil works and improvements

     46,336               46,336               46,336   

Machinery and equipment

     65,005               65,005               65,005   

Other

     434               434               434   
  

 

 

 

Subtotal

     208,167               208,167               208,167   

Wind energy facilities

          

Buildings, civil works and improvements

     83,065               83,065               83,065   

Machinery and equipment

     1,264,920        10,558        1,275,478               1,275,478   

Other

     7,538        121        7,659        3,832        11,491   
  

 

 

 

Subtotal

     1,355,523        10,679        1,366,202               1,370,034   
  

 

 

 

Total—historical cost

     1,563,690        10,679        1,574,369        3,832        1,578,201   
  

 

 

 

Accumulated Depreciation :

          

Small hydroelectric power plants

          

Reservoirs, dams and watermains

     (12,231     (2,243     (14,474     (552     (15,026

Buildings, civil works and improvements

     (6,844     (1,257     (8,101     (326     (8,427

Machinery and equipment

     (11,085     (2,019     (13,104     (481     (13,585

Other

     (278     (58     (336     (12     (348
  

 

 

 

Subtotal

     (30,438     (5,577     (36,015     (1,371     (37,386

Wind energy facilities

          

Buildings, civil works and improvements

     (4,329     (3,691     (8,020     (805     (8,825

Machinery and equipment

     (82,987     (58,556     (141,543     (14,672     (156,215

Other

     (352     (349     (701     (21     (722
  

 

 

 

Subtotal

     (87,668     (62,596     (150,264     (15,498     (165,762
  

 

 

 

Total—accumulated depreciation

     (118,106     (68,173     (186,279     (16,869     (203,148
  

 

 

 

Total property, plant and equipment—net

     1,445,584        (57,494     1,388,090        (16,869     1,375,053   

 

 

The Group has evaluated whether there were indicators of impairment of its assets that would require an impairment test at March 31, 2015 and December 31, 2014. The evaluation was based on external and internal information sources, taking into account variations in interest rates, changes in market conditions and other factors. The result of the assessment indicated no triggers of impairment of these assets in any of the reporting periods and therefore no impairment losses were recognized.

Property, plant and equipment are depreciated on a straight-line basis over the estimated economic useful life of each component from the date the asset is placed in service and ready for its intended use. The estimated useful lives used in the determination of the depreciation rates consider the manuals and guides of ANEEL, which approximate the useful lives of these assets.

 

F-75


Table of Contents

For the SHPPs, the Group considers these rates appropriate since, based on a legal assessment of the prevailing legislation and management’s assessment of ANEEL Permission Resolution granting a license to operate as an independent power generator, the Group will be indemnified for the residual value of the assets upon termination of these licenses, if not renewed. Management considers the renewal of operating licenses probable. As the regulatory agency issues new information or decisions, the current depreciation rates for such assets may be changed.

8. Borrowings

The Group´s small hydroelectric and wind energy generating facilities are owned and operated in separate legal entities for which the costs of development and construction have been financed by borrowings with Brazilian development banks through project entity specific debt secured by the project entity assets with no recourse to the Parent. The outstanding balances under these financing arrangements at March 31, 2015 and December 31, 2014 are summarized as follows:

 

           March 31, 2015     December 31, 2014  
    

 

  Current     Noncurrent     Current     Noncurrent  
      Interest rate Debt cost   Interest     Principal     Total     Principal     Interest     Principal     Total     Principal  

BNDES

   TJLP + from
1,92% to 2,18% p.a.
    2,646        60,658        63,304        789,849        2,625        60,625        63,250        805,114   

BNDES (Sub loans)

   TJLP     17        1,525        1,542        5,051        14        1,527        1,541        5,419   

BNB

   8,08% p.a.     23        5,897        5,920        89,311               5,897        5,897        90,738   
    

 

 

 

Borrowing subtotal

       2,686        68,080        70,766        884,211        2,639        68,049        70,688        901,271   
    

 

 

 

(-) Debt issuance costs

              (617     (617     (8,070            (617     (617     (8,225
    

 

 

 

Total

       2,686        67,463        70,149        876,141        2,639        67,432        70,071        893,046   

 

 

BNDES Agreements—The Group´s wind energy generation projects have been financed through the Brazilian National Development Bank (Banco Nacional de Desenvolvimento Econômico e Social—BNDES) in the total amount of R$ 893,457. Borrowings accrue interest at variable rates based on the Long-term Interest Rate (Taxa de Juros de Longo Prazo—TJLP) as offered by BNDES plus a credit spread ranging from 1.92% for subsidiary entities of Salvador and 2.18% for subsidiary entities of Bahia. For the period ended March 31, 2015 and December 31, 2014, TJLP was 5.5% Principal and interest are payable monthly from May 2013, with final maturity in 2029.

The project are also financed by sub-loans with BNDES, which have an outstanding principal amount of R$6,593. The sub-loans bear variable interest at TJLP rate, and mature in 2019 and 2029 for Bahia and Salvador respectively.

Borrowings under the BNDES financing agreements are secured by a pledge of the shares of all subsidiaries of Bahia and Salvador, substantially all the operating assets of the operating subsidiaries, and rights to receivables and cash collections on the future sales of electricity under the subsidiaries’ PPAs. Additionally, these agreements require that the subsidiaries maintain funds in restricted deposit accounts as collateral and guarantee for the related borrowings.

These agreements contain customary representations, covenants and warranties of the borrower including limitations on business activities, guarantees, environmental matters, and project maintenance standards. Additionally, the agreements require the maintenance of a minimum debt service coverage ratio, as defined in the agreements, of 1.3:1. At March 31, 2015 the Group was in compliance with all related covenants under the individual financing agreements.

BNB Agreements—The Group´s small hydroelectric energy generation projects have been financed through the Bank of the Northeast of Brazil (Banco do Nordeste do Brasil—BNB) for a total amount of R$120,096. Borrowings under the agreements are subject to fixed rate interest of 9.5% per annum (which can be reduced to 8.08% due to a 15% timely payment bonus), with principal and interest payable monthly with final maturity in 2026.

 

F-76


Table of Contents

Borrowings under the BNB financing agreements are secured by a pledge of the shares of all subsidiaries of Espra, substantially all the operating assets of the operating subsidiaries, and rights to receivables and cash collections on the future sales of electricity under the subsidiaries’ PPAs. Additionally, these agreements require that the subsidiaries maintain funds in a restricted deposit account as collateral and guarantee for the related borrowings (see note 9).

These agreements contain customary representations, covenants and warranties of the borrower including limitations on business activities, guarantees, environmental matters, and project maintenance standards. At March 31, 2015 the Group was in compliance with all related covenants under the individual financing agreements.

Changes in borrowings—The following table presents the changes in borrowing for the three-month period ended March 31, 2015 and for the year ended December 31, 2014:

 

      Principal     Interest     Total  

At January 1, 2014

     1,019,981        2,635        1,022,616   

Proceeds from borrowings

     7,313               7,313   

Accrued interest

            69,725        69,725   

Interest paid

            (69,721     (69,721

Repayment on borrowings

     (67,433            (67,433

Appropriation of debt issuance costs

     617               617   
  

 

 

 

At December 31, 2014

     960,478        2,639        963,117   
  

 

 

 

Accrued interest

            17,537        17,537   

Interest paid

            (17,490     (17,490

Repayment on borrowings

     (17,029            (17,029

Appropriation of debt issuance costs

     155               155   
  

 

 

 

At March 31, 2015

     943,604        2,686        946,290   

 

 

Scheduled maturities of borrowings recorded in noncurrent liabilities—Scheduled future maturities of obligations under long-term borrowings at March 31, 2015 are as follows:

 

Maturity year        

2016

     51,267   

2017

     68,693   

2018

     69,116   

2019

     68,930   

2020

     68,522   

After 2020

     557,683   
  

 

 

 

Total

     884,211   
  

 

 

 

Debt issuance costs

     (8,070
  

 

 

 

Total borrowings—non current

     876,141   

 

 

 

F-77


Table of Contents

9. Restricted deposits

The composition of restricted deposits is summarized as follows:

 

      Interest rate      Noncurrent  
Institution       March 31,
2015
     December 31,
2014
 

Citibank

     94% to 98% CDI         157,731         147,556   

Banco do Nordeste

     97% CDI         13,288         12,932   
     

 

 

 

Total

        171,019         160,488   

 

 

As described further at note 8, certain of the Group´s borrowing agreements require that the Group maintain funds in restricted deposit accounts as collateral and guarantee for the related borrowings.

Citibank—The Group entities maintain restricted deposit accounts for collections made from the sale of generated electricity as collateral for related borrowings with the Brazilian National Development Bank (Banco Nacional de Desenvolvimento Econômico Social—BNDES). Funds in these accounts are invested in low risk, highly-liquid, shorter-term investments that earn interest rates ranging from 94% to 98% of the CDI rate. Funds from these accounts are restricted for the payment of installments on the related borrowings and for other obligations related to the operation and maintenance of the wind generating facilities.

Banco do Nordeste—Espra maintains a restricted deposit account at Banco do Nordeste do Brasil S.A. (“BNB”), whose purpose is to guarantee the repayment of borrowings obtained for the construction of small hydroelectric generating plants. Funds in this account are invested in low risk, highly-liquid, shorter-term investments that earn interest at 97% of the CDI rate. Funds are restricted until the full repayment of the related borrowings, expected to occur in 2026.

10. Income and social contribution taxes

Reconciliation of Effective Tax Rate—The Group´s effective tax rate differs from the amount that would arise using the combined statutory tax rate of 34% applicable for Brazilian entities as follows:

 

      March 31,
2015
    March 31,
2014
 

Income before income tax and social contribution

     17,968        11,488   

Combined income tax and social contribution rate

     34%        34%   
  

 

 

 

Income tax and social contribution at statutory rate

     (6,109     (3,906

Effect of subsidiaries taxed under the deemed profit regime

     3,550        1,833   

Allocation of expense from Parent

     (1,029     (999

Other permanent differences

     (261     76   
  

 

 

 

Income and social contribution tax expense

     (3,849     (2,996
  

 

 

 

Current

     (3,575     (3,121

Deferred

     (274     125   
  

 

 

 

Income and social contribution tax expense

     (3,849     (2,996

 

 

Given the deemed profit election at the Group´s operating project companies, no related tax impacts, current or deferred, have been recorded for the allocation of expenses from Parent in the condensed combined interim financial statements.

 

F-78


Table of Contents

11. Taxes payable

The composition of taxes payable is as follows:

 

      March 31,
2015
     December 31,
2014
 

Income and social contribution taxes (IRPJ and CSLL)

     3,815         4,843   

Federal sales taxes (PIS and COFINS)

     1,226         1,425   

Other taxes

     260         326   
  

 

 

 

Total

     5,301         6,594   

 

 

12. Prepaid and recoverable taxes

The balances of prepaid and recoverable taxes consist of the following:

 

      March 31,
2015
     December 31,
2014
 

Income and social contribution taxes (IRPJ and CSLL)

     1,179         3,266   

Federal sales tax (PIS and COFINS)

     1,173         1,254   

Others

     459         728   
  

 

 

 

Total

     2,811         5,248   
  

 

 

 

Current

     955         3,037   

Noncurrent

     1,856         2,211   
  

 

 

 

Total

     2,811         5,248   

 

 

13. Commitments for social and enviromental costs

The Group provides for commitments for social and environmental costs in current and noncurrent liabilities, and capitalizes such costs in fixed assets over the projects’ construction periods. After plant startup, such costs are reviewed and are added or deducted from the cost of the related fixed asset in the period that it is adjusted.

 

      January 1,
2014
     Addition      Payment     Interest      December 31,
2014
     Interest      March 31,
2015
 

Commitment for social and environmental costs

     2,017         5,073         (2,020     837         5,907         197         6,104   

Classified as:

                   

Current

     2,017                 3,685            3,808   

Non current

                     2,222            2,296   
  

 

 

            

 

 

       

 

 

 

Total

     2,017                 5,907            6,104   

 

 

14. Parent’s net investment and related party transactions

The separate legal entities that comprise the Group are not held by a single legal entity. As such, Parent’s net investment is shown in lieu of shareholders’ equity in this condensed combined interim financial statements. Parent’s net investment represents the cumulative net investment by Renova in the Group through that date. The impact of transactions between the Group and Renova that were not historically settled in cash, including certain intercompany loans, are also included in Parent’s net investment.

 

F-79


Table of Contents

The following summarizes the Group´s transactions with its parent Renova.

Allocated expenses from Parent—As discussed in note 2, during the periods presented, the Group functioned as part of the larger group of companies controlled by Renova, and accordingly, Renova performed certain operating and corporate overhead functions for the Group. These functions include, but are not limited to, executive oversight, legal, finance, human resources, internal audit, financial reporting, tax planning, and investor relations. The costs of such services have been allocated to the Group based on the most relevant allocation method for the service provided, primarily based on relative percentage of revenue, installed capacity or headcount. Management believes such allocations are reasonable; however, they may not be indicative of the actual expense that would have been incurred had the Group been operating as a separate entity apart from Renova. Total corporate expenses that were allocated to the Group and recorded in general and administrative expenses in the combined income statements were R$3,058 and R$3,134 for the three month period ended at 3/31/2015 and 3/31/2014, respectively.

Intercompany loans and balances—Periodically the Group and Renova enter into intercompany loans based on the Group´s working capital needs and available cash positions. These intercompany loans generally bear interest at TJLP plus a credit spread. Outstanding intercompany loans payable and receivable, including accrued interest are reflected as part of Parent´s net investment. At March 31, 2015 and December 31, 2014, the outstanding balances of loans payable by the Group to Renova were R$2,077 and R$1,683, respectively.

Dividends—The Group companies are all incorporated as Brazilian corporations (sociedades anônimas—S.A.) in accordance with Brazilian corporate law. Based on the law and their articles of incorporation, the Group companies are required to pay mandatory dividends based on net income, if any, after allocations to legal reserves on profits and compensation of accumulated losses, if any. Additional distributions may be made, but are restricted under the terms of the project company borrowing agreements. Any such additional dividends must be approved by the applicable financial institution. During the three month period ended at 3/31/2015 the Company has not paid dividends (3/31/14, R$ 16,830).

Guarantees—Renova has issued nonconvertible debentures, which are collateralized by the pledge of its shares in Enerbras and a collateral assignment of assets and certain rights to dividends distributed by Espra, Bahia and Salvador, which are deposited in a restricted accounts.

Transactions with other related parties included the following:

Director´s and key management remuneration expense—Remuneration expense of directors and other key management personnel of Renova of R$1,946 and R$ 754, were allocated to the Group in 2015 and 2014, respectively.

15. Net revenue

 

      March 31,
2015
    March 31,
2014
 

Power generation

  

Electric power su pply—Eletrobras

     5,763        5,682   

Electric power supply—CCEE

     55,969        49,937   
  

 

 

 

Gross revenue

     61,732        55,619   
  

 

 

 

Less: Federal sales taxes

  

COFINS

     (1,846     (1,658

PIS

     (401     (360
  

 

 

 

Total deductions

     (2,247     (2,018
  

 

 

 

Net revenue

     59,485        53,601   

 

 

 

F-80


Table of Contents

16. Costs and expenses by nature

 

      March 31, 2015     March 31, 2014  
      Cost of
services
provided
    Expenses     Cost of
services
provided
    Expenses  

Distribution system fee

     (3,134            (2,320       

Inspection fee

     (128            (25       

Depreciation (*)

     (16,782     (87     (16,942     (30

Third-party services

     (2,469     (1,587     (2,053     (2,839

Personnel expenses

            (1,444     (1     (883

Rentals

     (485     (71     (542     (77

Insurance

            (13     (790     (1

Other (expenses) income, net

     (227     (1,588     (14     (1,142
  

 

 

 

Total

     (23,225     (4,790     (22,687     (4,972

 

 

 

(*)   Includes R$94 and R$36 for 2015 and 2014, respectively, as allocated from Parent (note 14).

17. Finance income (expenses)

 

      March 31,
2015
    March 31,
2014
 

Finance income

    

Income from short-term investments and restricted deposits

     5,563        4,332   
  

 

 

 
     5,563        4,332   
  

 

 

 

Finance expenses

    

Interest on borrowings

     (17,537     (17,535

Financing and guarantee fees, expenses, taxes and others

     (1,528     (1,251
  

 

 

 
     (19,065     (18,786
  

 

 

 

Finance expense—net

     (13,502     (14,454

 

 

 

F-81


Table of Contents

18. Financial instruments and risk management

The Group conducts transactions with financial instruments. These financial instruments are managed through operating strategies that aim at liquidity, profitability and security.

The risks associated with these operations are managed according to the practices defined by management of the Group and Renova, including the monitoring of the levels of exposure of each market risk and estimated future cash flows. These practices also determine that the information is updated in the Group´s operating systems, as well as the information and operation of the transactions with counterparties.

Categories of financial instruments—The following table summarizes the Group´s financial instruments by classification and related carrying amounts as recorded in the combined balance sheets at March 31, 2015 and December 31, 2014.

 

     March 31, 2015     December 31, 2014  
     Loans and
receivables
    Fair value
through
profit or
loss
    Held to
maturity
    Other at
amortized
cost
    Total     Loans and
receivables
    Fair value
through
profit or
loss
    Held to
maturity
    Other at
amortized
cost
    Total  

Financial assets

                   

Current

                   

Short-term Investments

           36,784                      36,784               24,477                      24,477   

Trade receivables

    21,258                             21,258        22,475                             22,475   

Noncurrent

                   

Restricted deposits

                  171,019               171,019                      160,488               160,488   

Financial liabilities

                   

Current

                   

Trade payables

                         16,425        16,425                             18,460        18,460   

Borrowings

                         70,149        70,149                             70,071        70,071   

Noncurrent

                   

Borrowings

                         876,141        876,141                             893,046        893,046   

 

F-82


Table of Contents

Fair value of financial instruments—The Group is exposed to the risks of changes in the fair value of its financial assets and liabilities. The following table summarizes the fair values and the carrying amounts of the Group´s financial assets and liabilities at March 31, 2015 and December 31, 2014. All fair value presented below are classified as level two.

 

      Fair value      Carrying amount  
      March 31,
2015
     December 31,
2014
     March 31,
2015
     December 31,
2014
 

Financial assets

           

Current

           

Short-terms investments

     36,784         24,477         36,784         24,477   

Trade receivables

     21,258         22,475         21,258         22,475   

Noncurrent

           

Restricted deposits

     171,019         160,488         171,019         160,488   

Financial liabilities

           

Current

           

Trade payables

     16,425         18,460         16,425         18,460   

Borrowings

     70,766         70,688         70,149         70,071   

Noncurrent

           

Borrowings

     884,211         901,271         876,141         893,046   

 

 

Fair value measurement—The fair values of the financial assets and liabilities are defined as the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date. Methods and assumptions used in the estimation of fair value are based on available market information and methodologies applied consistently for all periods presented. Significant judgment is required to understand the market information and estimate the fair value. The use of different market methodologies or assumptions may have a material effect on the estimated fair values.

The fair values of short-term investments, restricted deposits, and trade receivables and payables approximate their carrying values due to their short-term nature and as they have characteristics similar to those that would be obtained had these financial instruments been traded in the market.

The fair values for the Group´s financial assets and liabilities that are measured at fair value in the condensed combined interim financial statements, are classified based on the following fair value hierarchy depending on the inputs used in the valuation methods applied:

Level 1—Use of quoted prices (unadjusted) in active markets for identical instruments. A financial instrument is considered as quoted in an active market if the quoted prices are immediately and regularly available from a stock exchange or organized over-the-counter market, by operators, brokers or market association, by entities whose purpose is to disclose the prices by regulatory agencies, and if these prices represent market transactions regularly carried out between market participants in orderly transactions.

Level 2—Use of inputs other than quoted prices included in Level 1 that are observable for the instrument, either directly (that is, as prices) or indirectly (that is, derived from prices). In relation to financial instruments not traded in an active market, the fair value must be determined based on the valuation/pricing methodology.

Level 3—Use of inputs that are not based on observable market data (non-observable inputs).

 

F-83


Table of Contents

The classification of financial instruments that are measured at fair value in the condensed combined interim financial statements by fair value hierarchy level is as follows :

 

      March 31,
2015
     Fair value as of
March 31, 2015
Description       Level 1    Level 2      Level 3

Assets

           

Short-term investments

     36,784            36,784      

 

Market risk—The market risk reflects the possibility of monetary losses due to the changes in variables that impact the prices and rates traded in the market. These fluctuations basically impact all sectors and, therefore, represent financial risk factors.

The Group´s principal market risk exposure is to interest rate risk, specifically variable rate CDI interest received on the Group´s short term investments and restricted deposits and to the TJLP rate on borrowings with BNDES.

Furthermore, the Group´s borrowings are concentrated with BNB and BNDES. The contractual rules applicable to financial liabilities represent risks related to these exposures.

The following table details the sensitivity of the expected variation of 10% of the exposure to the rates of interest on financial assets and liabilities as of March 31, 2015. This percentage is the average rate sensitivity used to internally present risks to key management personnel and corresponds to management’s assessment of the possible changes in these rates.

 

      Risk      Impact on
income and
equity
 

Financial assets

     

Short-term investments

     CDI decrease         (396

Restricted deposits

     CDI decrease         (1,842

Financial liabilities

     

Borrowings

     TJLP increase         (4,633

 

 

Liquidity risk—Liquidity risk is the risk associated with the Group’s ability to meet its obligations underlying its financial liabilities.

Cash flow from operating activities provides the funds to service financial liabilities on a day-to-day basis. The Group enters into borrowings solely to leverage its operating capacity. This assumption is confirmed based on the characteristics of the Group’s borrowings.

 

F-84


Table of Contents

The table below sets out details of the obligations assumed by the Group according to the contractual maturities of its financial liabilities as of March 31, 2015, taking into account principal and interest, based on the undiscounted cash flows, considering the earliest date on which the Group may have to settle the respective obligation:

 

Financial instruments    Note      Weighted
average
interest
rate
     Less than
1 month
     1 month to
3 months
     3 months
to 1 year
     1 year
to 5 years
     Over
5 years
     Total  

Borrowings

     8         7,02%         5,867         11,735         52,813         348,532         535,410         954,357   

 

 

Credit risk—Credit risk is the risk of financial loss to the Group that a counterparty will not meet its obligations under a financial instrument or customer contract. The Company is exposed to credit risk from its operating activities (principally, trade receivables) and its investing activities, including deposits with banks and financial institutions, and other financial instruments.

 

              Carrying amount  
            Combined  
      Note      3/31/15      12/31/14  

Financial assets

        

Current

        

Short-term investments

     4         36,784         24,477   

Trade receivables

     5         21,258         22,475   

 

 

Short-term investments—Credit risk from balances with banks and financial institutions is managed by the Group’s treasury department in accordance with the Group’s policy. Investments of surplus funds are made only with approved counterparties and within credit limits assigned to each counterparty.

Trade receivables—In the power sector, the operations carried out are directed to the regulatory agency that maintains the active information on the positions of produced and consumed power. Based on this structure, planning is made to operate the system without interferences or interruptions. Power is sold through auctions, agreements, among others.

Derivative transactions—No transactions with derivative financial instruments were conducted in the periods reported.

Capital management—The objectives of the Group in managing its capital are to ensure that the Group is always capable of providing return to its shareholders and benefits to other stakeholders, and maintains an adequate capital structure to reduce this cost.

 

      Combined  
      March 31,
2015
    December 31,
2014
 

Borrowings

     946,290        963,117   

Less: Cash and cash equivalents and, short-term investments and restricted deposits

     (231,258     (219,074

Net debt

     715,032        744,043   

Parent’s Net investment

     626,933        609,395   

Financial leverage ratio—%

     114%        122%   

 

 

 

F-85


Table of Contents

Other operational risks

Risk of shortage of wind—This risk results from the shortage of wind due to natural factors, which is reduced because the “wind deposits” in Brazil are one of the best in the world, as in addition to high speed, wind is considered stable, different from certain regions in Asia and the United States, which are subject to cyclones, typhoons and other natural factors.

Hydrological risksThe power supplied through the National Interconnected System (SIN) is mostly generated by hydroelectric power plants. As the SIN operates through an optimized shipment system, centralized at the National Electric System Operator (ONS), each hydroelectric power plant, including those owned by the Group, is exposed to the existing hydrological conditions, both in the region where it operates and other Brazilian regions.

When the hydrological conditions are unfavorable, together with the obligation of delivering the contracted power, the Group could be exposed to the power spot market, which would affect its future financial results. However, the Company’s total hydroelectric power generation capacity is part of the Energy Relocation Mechanism (MRE), which partly mitigates the hydrological risk by spreading it across all the plants included in the MRE.

19. SUBSEQUENT EVENTS

On May 6, 2015 the board of directors of Renova approved a planned share contribution agreement to be entered into with TerraForm Global, Inc. (“TerraForm Global”), an indirect subsidiary of SunEdison, Inc., whereby Renova will contribute all of its interests in the Group’s project companies for shares in TerraForm Global and/or cash. The transaction will be conditioned on applicable regulatory and third party approvals, as well as the successful completion of TerraForm Global’s planned underwritten initial public offering of shares to be registered in the United States of America.

Management has considered subsequent events through June 10, 2015, the date these combined financial statements were authorized to be issued.

 

F-86


Table of Contents

Core Energy (RF) Proprietary Limited and Erika Energy (RF) Proprietary Limited

Unaudited combined balance sheets

As at March 31, 2015 and December 31, 2014

 

Figures in ZAR ‘000    Note(s)          March 31, 2015      December 31, 2014  

ASSETS

           

Current assets

           

Cash and cash equivalents

   3         112,358         147,764   

Restricted cash

   4         130,156         128,251   

Accounts receivable

   5         81,126         73,582   

Deferred financing costs, net

   7         150         150   

Deferred income tax

   16         5,485         14,685   

Prepaid expenses

           6,687         7,699   
        

 

 

    

 

 

 

Total current assets

           335,962         372,131   
 

Non-current assets

             

Property, plant and equipment, net

   6         2,213,612         2,241,486   

Deferred financing costs, net

   7         1,435         1,472   
        

 

 

    

 

 

 

Total non-current assets

           2,215,047         2,242,958   
        

 

 

    

 

 

 

Total assets

           2,551,009         2,615,089   
        

 

 

    

 

 

 
 

LIABILITIES AND INVESTED EQUITY

             
 

Current liabilities

             

Current portion of long-term debt

   9         13,750         72,598   

Value-added tax (VAT) payable

           1,417         3,680   

Accruals

   11         6,529         54,496   

Accounts payable

   12         124         7,451   

Accounts payable—related parties

   12         66,463         16,598   

Derivatives

   8         12,276         18,763   

Income tax payable

           2,790         2,790   
        

 

 

    

 

 

 

Total current liabilities

           103,349         176,376   
 

Non-current liabilities

             

Long-term debt

   9         1,919,630         1,927,306   

Loans from shareholders—related parties

   10         366,387         361,792   

Deferred income tax

   16         13,571         25,733   

Asset retirement obligation

   13         45,139         43,991   
        

 

 

    

 

 

 

Total non-current liabilities

           2,344,727         2,358,822   
        

 

 

    

 

 

 

Total liabilities

           2,448,076         2,535,198   
        

 

 

    

 

 

 
 

Invested equity

             

Invested equity

           102,933         79,891   
        

 

 

    

 

 

 

Total liabilities and invested equity

           2,551,009         2,615,089   

 

  

 

  

 

  

 

 

    

 

 

 

Commitments and contingencies have been discussed in detail in note 18.

See accompanying notes to combined financial statements.

 

F-87


Table of Contents

Core Energy (RF) Proprietary Limited and Erika Energy (RF) Proprietary Limited

Unaudited combined statements of Operations and comprehensive income

For the three months ended March 31, 2015 and 2014

 

Figures in ZAR ‘000    Note(s)    March 31, 2015      March 31, 2014  

Power energy revenue

   14      109,186           

Cost of operations

        (8,445        

Depreciation

   6      (18,799        

Accretion of asset retirement obligation

   13      (1,148      (677

Operating costs and expenses

        (28,392      (677
     

 

 

 

Gross profit/(loss)

        80,794         (677

General and administrative expenses

        (2,621      (435
     

 

 

 

Operating income/(loss)

        78,173         (1,112

Other income

   15      6,925         8,579   

Other expenses

   15      (71,506      (16,809

Gain on derivatives

   8      6,487         17,592   

Net other (expense)/income

        (58,094      9,362   
     

 

 

 

Profit before income tax

        20,079         8,250   

Income tax benefit

   16      2,963           
     

 

 

 

Net income

        23,042         8,250   
     

 

 

 

Other comprehensive income

                  
     

 

 

 

Total comprehensive income

        23,042         8,250   

 

 

 

See accompanying notes to combined financial statements.

 

F-88


Table of Contents

Core Energy (RF) Proprietary Limited and Erika Energy (RF) Proprietary Limited

Unaudited combined statement of invested equity

For the three months ended March 31, 2015

 

Figures in ZAR’000    Invested equity  

Balance at January 1, 2015

     79,891   

Total comprehensive income

     23,042   
  

 

 

 

Balance at March 31, 2015

     102,933   

 

 

 

 

 

See accompanying notes to combined financial statements.

 

F-89


Table of Contents

Core Energy (RF) Proprietary Limited and Erika Energy (RF) Proprietary Limited

Unaudited combined statements of cash flows

For the three months ended March 31, 2015 and 2014

 

Figures in ZAR ‘000    March 31, 2015      March 31, 2014  

Cash flows from/(used in) operating activities:

     

Net profit

     23,042         8,250   

Adjustments to reconcile net loss to net cash provided by (used in) operating activities

     

Fair value (gain) on interest rate swap

     (6,487      (17,592

Depreciation expense

     18,799           

Accretion expense

     1,148         677   

Amortization of debt issuance costs

             33   

Amortization of debt discount

     694         620   

Amortization of commitment fees

             857   

Income tax benefit

     (2,963        

Changes in operating assets and liabilities

     

Accounts and other receivables

     (6,785      3,122   

Accounts and other payables

     6,270         (62,022
     (515      (58,900
  

 

 

 

Net cash earned from/(used in) operating activities:

     33,718         (66,055
  

 

 

 

Cash flows from/(used in) investing activities:

     

Purchase of property, plant and equipment

             (576,367

Borrowing costs capitalized

             (27,649

Change in restricted cash

     (1,905      317,832   
  

 

 

 

Net cash used in investing activities

     (1,905      (286,184
  

 

 

 

Cash flows from financing activities

     

Proceeds from long-term loans

             316,679   

Repayment of long term loans and interest

     (67,219        

Proceeds from shareholder loans

             35,560   
  

 

 

 

Net cash provided/(used in) by financing activities

     (67,219      352,239   
  

 

 

 

Net (decrease) in cash and cash equivalents

     (35,406        

Cash and cash equivalents at beginning of quarter

     147,764           
  

 

 

 

Cash and cash equivalents at end of quarter

     112,358           
  

 

 

 

Schedule of non-cash activities

     

Additions to property, plant and equipment from capitalized interest

             27,649   

Additions to property, plant and equipment related to asset retirement obligation (ARO)

             9,431   

 

 

See accompanying notes to combined financial statements.

 

F-90


Table of Contents

Core Energy (RF) Proprietary Limited and Erika Energy (RF) Proprietary Limited

Notes to the unaudited combined financial statements

For the three months ended March 31, 2015

1. Nature of operations

The Operating Entities (the “Operating Entities”) comprise Core Energy (RF) Proprietary Limited (“Core”) and Erika Energy (RF) Proprietary Limited (“Erika”). The Operating Entities are not a single stand-alone legal entity, but are a combination of entities that are under common control of SunEdison Green Power Renewable Energy Southern Africa Proprietary Limited (“SEGP Renewable Energy Southern Africa (Pty) Ltd”).

Basis of presentation

The accompanying unaudited combined financial statements have been prepared in accordance with U.S. generally accepted accounting principles (“U.S. GAAP”). The following notes should be read in conjunction with the accounting policies and other disclosures as set forth in the notes to the Operating Entities’ combined financial statements for the year ended December 31, 2014. Interim results are not necessarily indicative of results for a full year.

In the opinion of management, the accompanying unaudited combined financial statements contain all material adjustments consisting of normal and recurring accruals necessary to present fairly the Operating Entities’ unaudited combined financial position as of March 31, 2015, and the results of operations, comprehensive income and cash flows for the three months ended March 31, 2015, and 2014. During the three months ended March 31, 2015 and 2014, there were no material transactions among the combined entities that required elimination. The Operating Entities’ functional and presentation currency is the South African Rand (“ZAR”).

2. Summary of significant accounting policies

Use of estimates

In preparing the unaudited combined financial statements, the Operating Entities used estimates and assumptions that affect the reported amounts of assets and liabilities at the date of the combined financial statements. Such estimates also affect the reported amounts of revenues, expenses and cash flows during the reporting period. Actual results may differ from estimates under different assumptions or conditions.

Revenue

Power purchase agreements

Substantially all of the Operating Entities’ revenues are obtained through the sale of energy to Eskom pursuant to terms of the PPAs. Concentration risk does exist as the Operating Entities transact with only one customer, namely Eskom. This concentration risk cannot be mitigated due to the limitations of the energy market within South Africa. All PPAs are accounted for as operating leases, have no minimum lease payments and all of the rental income under these leases are contingent rental recorded as income when the electricity is delivered.

Leases

The land on which the solar energy systems are situated is leased under operating lease agreements with a lease term of 25 years. Rentals applicable to operating leases, where substantially all of the benefits and risks

 

F-91


Table of Contents

of ownership remain with the lessor are charged to the statement of operations and comprehensive income on a straight-line basis over the period of the lease.

Income taxes

In general, the Operating Entities record income tax expense (benefit) each quarter based on the best estimate as to the full year’s effective tax rate. This estimated tax expense (benefit) is reported based on a pro-ration of the actual income earned in the period divided by the full year forecasted income (loss). There are certain items, however, which are given discrete period treatment, and the tax effects of those items are reported in the quarter that such events arise. Items that give rise to discrete recognition include (but are not limited to) finalizing tax authority examinations, changes in statutory tax rates and expiration of a statute of limitations.

The process for calculating income tax expense (benefit) includes estimating current taxes due and assessing temporary differences between the recognition of assets and liabilities for tax and financial statement reporting purposes. The Operating Entities regularly review their deferred tax assets for realizability, taking into consideration all available evidence, both positive and negative, including cumulative losses, projected future pre-tax and taxable income (losses), the expected timing of the reversals of existing temporary differences and the expected impact of tax planning strategies.

The Operating Entities are subject to income taxes in South Africa and from time to time, they are subject to income tax audits in these jurisdictions. The Operating Entities believe that our tax return positions are fully supported, but tax authorities may challenge certain positions, which may not be fully sustained. Determining the income tax expense for these potential assessments and recording the related assets and liabilities requires significant judgments and estimates. Tax benefits are recognized only for tax positions that are more likely than not to be sustained upon examination by tax authorities. The Operating Entities review their liabilities quarterly, and may adjust such liabilities due to proposed assessments by tax authorities, changes in facts and circumstances or issuance of new regulations.

Cash and cash equivalents

Cash and cash equivalents comprise of all cash balances.

Restricted cash

Restricted cash consists of cash on deposit in financial institutions that are restricted from use in operations pursuant to requirements of certain debt agreements. These funds are reserved for current debt service payments in accordance with the restrictions in the debt agreements.

Accounts receivable

Accounts receivable are reported on the combined balance sheet at the invoiced amounts adjusted for any write-offs and the allowance for doubtful accounts. Management establishes an allowance for doubtful accounts to adjust the receivables to amounts considered to be ultimately collectible. The allowance is based on a variety of factors, including the length of time receivables are past due, significant one-time events, the financial health of customers, and historical experience.

Property, plant and equipment

Property, plant and equipment consists of solar energy systems and is stated at cost less accumulated depreciation. Expenditures for major additions and improvements are capitalized, and maintenance and repairs

 

F-92


Table of Contents

are charged to expense as incurred. When property, plant and equipment is retired or otherwise disposed of, the cost and accumulated depreciation is removed from the accounts, and any resulting gain or loss is included in the results of operations for the respective period. Depreciation of property, plant and equipment is recognized using the straight-line method over the estimated useful lives of the solar energy systems of thirty years.

Borrowings

Borrowings consist of long-term debt facilities entered into by the Operating Entities. The loans are recorded at amortized cost.

Impairment of long-lived assets

Long-lived assets that are held and used are reviewed for impairment whenever events or changes in circumstances indicate carrying values may not be recoverable. Whenever an impairment indicator exists of the total future estimate of undiscounted cash flows expected from an asset being less than its carrying value an impairment calculation is performed. If such an impairment indicator exists, an impairment charge is measured as the difference between an asset’s carrying amount and fair value with the difference recorded in operating costs and expenses in the statement of operations and comprehensive income. Fair values are determined by a variety of valuation methods including appraisals, sales prices of similar assets, and present value techniques. There were no impairments recognized during the three months ended March 31, 2015 and 2014.

Deferred financing costs

Deferred financing costs consist of debt issuance costs and commitment fees incurred by the Operating Entities and are directly attributable to the long-term debt facilities.

Debt issuance costs

Financing costs incurred in connection with obtaining construction and term financing are deferred and amortized over the maturities of the respective financing arrangements using the effective-interest method. The amortization of debt issuance costs is recorded in other expenses.

Commitment fees

Fees associated with commitment facilities that are not revolving lines of credit are deferred and amortized on a straight-line basis over the commitment period. The commitment period, as defined in the loan agreements, terminates at the earlier of actual COD, 140 days after scheduled COD, or the date of the full draw of the committed facility. For each of these loans, the commitment period expired at 140 days after scheduled COD. Amortization of commitment fees is recorded in other expenses. As of December 31, 2014, these fees have been fully amortized.

Derivatives

All derivative instruments are recorded on the combined balance sheet at fair value. As hedge accounting has not been applied, the movement in derivatives is reported directly in earnings.

 

F-93


Table of Contents

Asset retirement obligation

The Operating Entities’ asset retirement obligations relate to leased land upon which the solar energy systems were constructed. The Operating Entities are required to restore the leased land to an agreed-upon condition from the date construction of the asset commences. This would involve dismantling property, plant and equipment constructed on the leased land, and restoring the land to its pre-construction condition. The Operating Entities are required to record the present value of the estimated obligations as the solar energy systems are constructed. At the same time, a corresponding asset was capitalized to the solar energy systems’ cost. The asset retirement obligations will be accreted to their future value over the terms of the land leases, and the amounts capitalized through COD will be depreciated over the remainder of the same term.

Commitments and contingencies

The Operating Entities are involved in litigation and claims in the ordinary course of business with possible gain or loss contingencies that will ultimately be resolved when one or more future events occur or fail to occur. If some amount within a range of loss appears at the time to be a better estimate than any other amount within the range, that amount will be accrued. When no amount within the range is a better estimate than any other amount, the minimum amount in the range will be accrued. Management continually evaluates uncertainties associated with loss contingencies and record a charge equal to at least the minimum estimate liability for a loss contingency when both of the following conditions are met: (i) information available prior to issuance of the financial statements indicates that it is probable than an asset had been impaired or a liability had been incurred at the date of the financial statements; and (ii) the loss or range of loss can be reasonably estimated. Legal costs are expensed when incurred. Gain contingencies are not recorded until realized or realizable.

Commitments related to projects, consist of amounts contracted for but not yet incurred.

Fair value measurement

Management performs fair value measurements in accordance with ASC 820. ASC 820 defines fair value as the price that would be received from selling an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date. When determining the fair value measurements for assets and liabilities required to be recorded at their fair values, management considers the principal or most advantageous market in which it would transact and consider assumptions that market participants would use when pricing the assets or liabilities, such as inherent risk, transfer restrictions and risk of non-performance.

ASC 820 establishes a fair value hierarchy that requires an entity to maximize the use of observable inputs and minimize the use of unobservable inputs when measuring fair value. An asset’s or a liability’s categorization within the fair value hierarchy is based upon the lowest level of input that is significant to the fair value measurement. ASC 820 establishes three levels of inputs that may be used to measure fair value:

 

 

Level 1: quoted prices in active markets for identical assets or liabilities;

 

 

Level 2: inputs other than Level 1 that are observable, either directly or indirectly, such as quoted prices in active markets for similar assets or liabilities, quoted prices for identical or similar assets or liabilities in markets that are not active, or other inputs that are observable or can be corroborated by observable market data for substantially the full term of the assets or liabilities; or

 

 

Level 3: unobservable inputs that are supported by little or no market activity and that are significant to the fair values of the assets or liabilities.

 

F-94


Table of Contents

The Operating Entities’ interest rate swaps are classified as Level 2 since all significant inputs are observable for similar instruments. The fair value is determined based on observable market prices for interest rates. The fair value of interest rate swaps at the end of the reporting period is determined by discounting the future cash flows using the curves at the end of the reporting period and the credit risk inherent in the contract. There were no transfers between Level 1, Level 2 and Level 3 financial instruments during the year ended December 31, 2014 and for the three months ended March 31, 2015 and 2014.

The Operating Entities maintain various financial instruments recorded at cost in the December 31, 2014 and March 31, 2015 combined balance sheets that are not required to be recorded at fair value. For these instruments, the Operating Entities used the following methods and assumptions to estimate the fair value:

 

 

Cash and cash equivalents, restricted cash, accounts receivable and accounts payable, the carrying amount approximates fair value because of the short-term maturity of the instruments.

 

 

Long-term debt fair value is based on the amount of future cash flows associated with each debt instrument discounted at the current borrowing rate for similar debt instruments of comparable terms. As at March 31, 2015, the fair value of the Operating Entities’ long-term debt with unrelated parties is approximately 7.7% greater than its carrying value. At December 31, 2014, the fair value was approximately 8.0% greater than its carrying amount.

 

 

Given that the shareholder loan agreements do not contain a fixed or determinable repayment schedule, the amortized cost carrying value of loans from shareholders is deemed to approximate fair value.

3. Cash and cash equivalents

Cash and cash equivalents consist of:

 

Figures in ZAR ‘000    March 31,
2015
     December 31,
2014
 

Bank balances

     112,358         147,764   

 

 

The full value of cash and cash equivalents has been pledged as collateral against the long-term debt of the Operating Entities.

4. Restricted cash

Restricted cash consists of:

 

Figures in ZAR ‘000    March 31,
2015
     December 31,
2014
 

Restricted cash

     130,156         128,251   

 

 

In terms of the relevant loan agreements, the Operating Entities were required to maintain separate bank accounts with minimum balances to at least fully cover all scheduled debt repayments due in the immediate six month period. Refer to note 9 for further details on these loans.

The full value of restricted cash has been pledged as collateral against the long-term debt of the Operating Entities.

 

F-95


Table of Contents

5. Accounts receivable

Accounts receivable consist of:

 

Figures in ZAR ‘000    March 31,
2015
     December 31,
2014
 

Trade debtors

     81,126         73,582   

 

 

The Operating Entities’ sole trade debtor, Eskom, is a state owned entity. The PPA also makes provision in the event that Eskom defaults on payment, the South African Department of Energy will settle the outstanding debt. As the amounts owing by Eskom have been guaranteed by a governmental agency, all amounts owing by Eskom are considered fully recoverable. Further, no allowance for doubtful accounts has been recognized as no default indicator has been identified.

None of the receivables are past due or impaired.

The full value of accounts receivable has been pledged as collateral against the long-term debt of the Operating Entities.

6. Property, plant and equipment

Property, plant and equipment, net, consists of the following:

 

Figures in ZAR ‘000    March 31,
2015
    December 31,
2014
 

Solar energy systems

     2,261,735        2,270,811   

Less: accumulated depreciation—solar energy systems

     (48,123     (29,325
  

 

 

 

Property, plant and equipment, net

     2,213,612        2,241,486   

 

 

The Operating Entities recorded depreciation expense related to property, plant and equipment of R18 798 827 for the three months ended March 31, 2015. No depreciation expense was recognized for the three months ended March 31, 2014.

Included in the balance of solar energy systems is capitalized interest on expenditures directly attributable to the construction of the solar energy systems of R115 407 221 as at March 31, 2015 and at December 31, 2014.

Also included in the balance of solar energy systems is an asset relating to the ARO, which is depreciated over the remaining term of the land lease. No additional amounts were capitalized as at March 31, 2015. R41 284 442 was capitalized as at December 31, 2014.

The full value of the solar energy systems has been pledged as collateral against the long-term debt of the Operating Entities. The fair value of the property, plant and equipment is considered to approximate its carrying amount for the three months ended March 31, 2015 and for the year ended December 31, 2014.

7. Deferred financing costs

Debt issuance costs, comprising legal fees, which were incurred by both Core and Erika in establishing their loan facilities with the Standard Bank of South Africa Limited (“Standard Bank”), have been deferred on the balance sheet and are amortized based on the effective interest rate over the period of the loan.

The Operating Entities are also required to pay to an agent (for onward distribution to the relevant lenders) a commitment fee for the facility during a specified availability period. The commitment fee is calculated daily during the defined availability period and is payable quarterly in arrears on March 31, June 30, September 30

 

F-96


Table of Contents

and December 31 of each year. If any portion of the available commitment under the facility is canceled, the commitment fee is payable on any canceled amount at the time the cancelation is effective. Commitment fees are deferred and amortized on a straight-line basis during the availability period.

As at March 31, 2015 and December 31, 2014, deferred financing costs consist of:

 

Figures in ZAR ‘000    March 31,
2015
     December 31,
2014
 

Current

     150         150   

Non-current

     1,435         1,472   
  

 

 

 
     1,585         1,622   

 

 

Amortization of debt issuance costs amounted to R37 050 and R33 279 for the three months ended March 31, 2015 and 2014 respectively. Amortization of commitment fees amounted to Rnil and R856 860 for the three months ended March 31, 2015 and 2014 respectively.

8. Derivatives

As part of the Operating Entities’ risk management strategy, Core and Erika separately entered into interest rate swaps to mitigate interest rate exposure. Interest rate swap agreements are utilized in order to economically hedge the variability of Operating Entities’ expected future cash interest payments, and are not utilized for speculative purposes.

These swap agreements were initiated in November 2012, concurrent with the inception of the term loan facilities with Standard Bank. Because these hedges are deemed economic hedges and not accounted for under hedge accounting, the changes in fair value are recorded in operations.

The fair value of interest rate swaps at the end of the reporting period is determined by discounting the future cash flows using the curves at the end of the reporting period and the credit risk inherent in the contract.

For the periods presented, derivative transactions consisted of the following:

 

            Notional amount     Fair value at  
Figures in ZAR ‘000   Balance sheet
classification
   

March 31,

2015

   

December 31,
2014

    March 31,
2015
    December 31,
2014
 

Derivative not designated as a hedge

         

Interest rate swap

    Current liabilities—Derivatives        1,715,262        1,721,081        (12,276     (18,763

 

 

 

              Notional amount      Fair value
movements
 
Figures in ZAR ’000    Statement of operations
and comprehensive
income classification
     March 31,
2015
     March 31,
2014
     March 31,
2015
     March 31,
2014
 

Derivative not designated as a hedge

              

Interest rate swap

     Gain on derivatives         1,715,262         2,458,546         6,487         17,592   

 

 

The notional amount represents the exposure at the reporting date which varies based on changes in the loan profile.

 

F-97


Table of Contents

The Operating Entities’ interest rate swaps have the following maturities:

 

Figures in ZAR ‘000    Notional amount      Maturity date  

Derivative not designated as a hedge

     

As at December 31, 2014

     

Interest rate swap

     804,814         March 28, 2024   

Interest rate swap

     916,267         March 28, 2024   

As at March 31, 2015

     

Interest rate swap

     803,599         March 28, 2024   

Interest rate swap

     911,663         March 28, 2024   

 

 

Under the interest rate swap agreement, the Operating Entities pay a fixed rate and the counterparty to the agreement pays the Operating Entities a floating interest rate. The amount recorded in the combined balance sheet represents the estimated fair value of the net amount that the Operating Entities would receive or pay in order to exit the agreement as at March 31, 2015 and December 31, 2014, respectively, if the agreements were transferred to other third parties or canceled by the Operating Entities.

9. Long-term debt

Debt consists of the following as at March 31, 2015 and December 31, 2014:

 

      March 31, 2015     December 31, 2014  
Figures in ZAR ‘000    Total     Current     Non-current     Total     Current     Non-current  

Term loan

     1,963,075        16,561        1,946,514        1,969,703        14,816        1,954,887   

Accrued Interest

                          60,590        60,590          

Debt discount

     (29,695     (2,811     (26,884     (30,389     (2,808     (27,581
  

 

 

 

Total

     1,933,380        13,750        1,919,630        1,999,904        72,598        1,927,306   

 

 

On November 2, 2012, Core entered into a facility agreement with Standard Bank, which provided for a term loan facility with a limit of R1 056 million. The term loan facility bears interest at a rate of three month JIBAR plus a variable spread per annum, which represents liquidity and other risks, and matures in 2031. At March 31, 2015, the balance outstanding under the term loan facility was R1 035 million. At December 31, 2014, the balance outstanding under the term loan facility was R1 073 million. The average interest rate for the three months ended March 31, 2015 was 10.37% and for the year ended December 31, 2014 10.03%.

On November 2, 2012, Erika entered into a facility agreement with Standard Bank, which provided for a term loan facility with a limit of R956 million. The term loan facility bears interest at a rate of three month JIBAR plus a variable spread per annum, which represents liquidity and other risks, and matures in 2031. At March 31, 2015, the balance outstanding under the term loan facility was R928 million. At December 31, 2014, the balance outstanding under the term loan facility was R958 million. The average interest rate for the three months ended March 31, 2015 was 10.38% and for the year ended December 31, 2014 9.95%.

The fair value of the Operating Entities’ long-term debt was determined using inputs classified as Level 2 and a discounted cash flow approach using market rates for similar debt instruments, with consideration for non-performance risk. The estimated fair value of outstanding debt obligations was R2 081 774 996 at March 31, 2015 and R2 159 419 065 as at December 31, 2014, respectively.

 

F-98


Table of Contents

The combined aggregate amount of maturities for all long-term borrowings is as follows:

 

Contractual cash obligations    ZAR ‘000  

2015

     16,561   

2016

     21,018   

2017

     37,385   

2018

     51,606   

2019

     66,088   

Thereafter

     1,770,417   
  

 

 

 

Total

     1,963,075   

 

 

A structuring and underwriting fee to the lender was incurred by Core and Erika as part of the establishment of this facility. The original aggregate amount of the structuring and underwriting fee amounted to R33 867 285 which has been amortized by R694 477 to R29 604 606 as at March 31, 2015. This fee paid to the lender is recorded as a direct reduction of the carrying amount of the debt.

The carrying value of cash and cash equivalents, restricted cash, accounts receivable and property, plant and equipment have been pledged as collateral against the long-term borrowings of the Operating Entities. Refer to note 3, 4, 5 and 6 for details.

10. Loans from shareholders—related parties

Loans from shareholders represent additional funding provided by shareholders of the Operating Entities, which were initially obtained to fund a portion of the Engineering Procurement Contract.

The loans from shareholders bear an interest rate of 13% from the COD. Prior to the COD, no interest was levied on the shareholder loans. The loans are unsecured and are subordinated to the long-term third party debt. Repayment, under the terms of the agreements, will occur only when certain future profitability targets of the Operating Entities are met.

Refer to the table below for a listing of the shareholder loans for Core and Erika, respectively.

Core

 

              Outstanding amount  
Figures in ZAR ‘000    %
shareholding
     March 31,
2015
     December 31,
2014
 

SEGP Renewable Energy Southern Africa Proprietary Limited

     51         83,534         83,169   

Public Investment Corporation (SOC) Limited

     39         63,879         63,600   

Kurisani Witkop Proprietary Limited

     10         16,379         16,308   
  

 

 

 
        163,792         163,077   

 

 

 

F-99


Table of Contents

Erika

 

              Outstanding amount  
Figures in ZAR ‘000    %
shareholding
     March 31,
2015
     December 31,
2014
 

SEGP Renewable Energy Southern Africa Proprietary Limited

     51         103,324         101,345   

Public Investment Corporation (SOC) Limited

     24         48,622         47,692   

Izingwe International Fund Proprietary Limited

     15         30,389         29,807   

Kurisani Witkop Proprietary Limited

     10         20,260         19,871   
  

 

 

 
        202,595         198,715   
  

 

 

 
        366,387         361,792   

 

 

11. Accruals

Accruals comprise:

 

Figures in ZAR ‘000    March 31,
2015
     December 31,
2014
 

Audit Fees

     868           

Legal Fees

     700           

Development fees

             54,496   

Other

     4,961           
  

 

 

 
     6,529         54,496   

 

 

12. Accounts payable

Accounts payable comprise:

 

Figures in ZAR ‘000    March 31,
2015
     December 31,
2014
 

Trade creditors

     124         7,451   

Related parties:

     

SEGP Solar Power Southern Africa Proprietary Limited

     4,674         3,240   

SunEdison Energy Southern Africa Proprietary Limited

     60,885         13,358   

SunEdison Engineering Southern Africa Property Limited

     904           
  

 

 

 
     66,587         24,049   

 

 

13. Asset retirement obligation

The Operating Entities recognized liabilities for asset retirement obligations (“AROs”) for their solar energy systems, from the date that construction commenced. The ARO liability is estimated based on the size of the project and the estimated cost of dismantling, and is accreted over the remainder of the lease term of the land using a credit-adjusted risk-free rate of 10.4% for the three months ended March 31, 2015 and for the year ended December 31, 2014.

 

F-100


Table of Contents

The asset retirement obligations for the three months ended March 31, 2015 and for the year ended December 31, 2014 are as follows:

 

Figures in ZAR ‘000    March 31,
2015
     December 31,
2014
 

Balance at the beginning of the period

     43,991         14,671   

Recognition of liability

             26,613   

Accretion expense

     1,148         2,707   
  

 

 

    

 

 

 

Balance at the end of the period

     45,139         43 991   

 

 

The fair value of the ARO was estimated based on techniques that made use of third party data and management judgment.

The Operating Entities do not have any assets that are legally restricted for the purpose of settling the asset retirement obligations as at March 31, 2015 and December 31, 2014.

14. Power energy revenue

The Operating Entities entered into PPAs with Eskom, a state owned entity. In accordance with the PPAs, the counterparty acquires the full output generated by the plant on an “as available” basis.

 

Figures in ZAR ‘000    March 31,
2015
     March 31,
2014
 

Revenue earned from power sales

     109,186           

 

 

As the quantity to be sold under the PPAs is based on the power plants’ actual output on an “as available basis”, the Operating Entities considered all payments as contingent rent (i.e. contingent on generation).

The cost, accumulated depreciation and carrying amount of the property, plant and equipment used as part of the PPAs, for the year ended December 31, 2014 and for the three months ended March 31, 2015, has been disclosed in note 6.

15. Other income/(expenses)

 

Figures in ZAR ‘000    March 31,
2015
    March 31,
2014
 

Other Income

    

Interest income earned on cash and cash equivalents

     3,901        8,579   

Other refunds

     3,024          
  

 

 

 
     6,925        8,579   

Other Expenses

    

Interest expense on long-term debt

     (57,388     (44,458

Interest expense on shareholder loans—related parties

     (14,118       

Less: capitalized interest

            27,649   
  

 

 

 
     (71,506     (16,809
  

 

 

 

Total

     (64,581     (8,230

 

 

The interest expense was capitalized at a rate of 10.05% for Core, and 10.59% for Erika in 2014 based on the effective interest rate for each instrument. There was no interest expense capitalized in 2015.

 

F-101


Table of Contents

16. Income taxes

Income tax expense (benefit) for the three months ended March 31, 2015 and 2014 consists of the following:

 

Figures in ZAR ‘000    March 31,
2015
    March 31,
2014
 

Current

              

Deferred

     42,939          

Benefits of operating loss carryforwards

     (45,902       
  

 

 

 
     (2,963       

 

 

Effective tax rate

In general, we record income tax expense (benefit) each quarter based on our best estimate as to the full year’s effective tax rate.

The significant reconciling items have been noted below:

 

%    March 31,
2015
    March 31,
2014
 

Income tax on SA statutory rate

     28        28   

Permanent items

     (4.4     (58.9

Change in valuation allowance

     (2.2     30.9   

Change in prior period amounts

     (36.2       
  

 

 

 

Effective benefit rate

     14.8          

 

 

Deferred taxes

Deferred income taxes for the Operating Entities’ taxable project entities reflect the tax effects of temporary differences between the carrying amounts of assets and liabilities for financial reporting purposes and the amounts used for income tax purposes.

 

F-102


Table of Contents

Significant components of the Operating Entities’ deferred tax assets and liabilities at March 31, 2015 and December 31, 2014 are as follows:

 

Figures in ZAR ‘000    March 31,
2015
    December 31,
2014
 

Deferred tax assets

    

Current

     5,922        14,685   

Non-current

     364,830        319,782   
  

 

 

 
     370,752        334,467   
  

 

 

 

Deferred tax assets consist of the following:

    

—net operating losses and tax credit carryforwards

     342,026        296,123   

—pre-trade expenditures

     22,804        22,804   

—accrued expenses

     2,204        15,259   

—asset retirement obligation reserve

     12,639        13,075   

—interest rate swap

     3,437          

—commitment charges

     281        281   

—valuation allowance

     (12,639     (13,075
  

 

 

 
     370,752        334,467   
  

 

 

 

Deferred tax liabilities

    

Current

     (437       

Non-current

     (378,401     (345,515
  

 

 

 
     (378,838     (345,515
  

 

 

 

Deferred tax liabilities consist of the following:

    

—property, plant and equipment

     (378,401     (345,515

—other

     (437       
  

 

 

 
     (378,838     (345,515

 

 

In assessing the realization of deferred tax assets, management considers whether it is more likely than not that some portion or all of the deferred tax assets will not be realized. The ultimate realization of deferred tax assets is dependent upon the scheduled reversal of deferred tax liabilities and generation of future taxable income during the periods in which the deferred tax assets become deductible. During the three months ended March 31, 2015, a valuation allowance was recognized on the tax effect of the Asset Retirement Obligation, as there is insufficient evidence to suggest there will be sufficient taxable income during the periods in which certain of the deferred tax assets will be realized.

The operating loss carryforward period is indefinite, subject to certain conditions.

As at March 31, 2015 and December 31, 2014, the Operating Entities have identified no uncertain tax positions, for which a reserve under ASC 740-10 would be required.

 

F-103


Table of Contents

17. Fair value measurement

The fair value of the Operating Entities’ long-term debt was determined using inputs classified as Level 2 and a discounted cash flow approach using market rates for similar debt instruments. The carrying amount and estimated fair value of the Operating Entities’ long-term debt as at March 31, 2015 and December 31, 2014 are as follows:

 

      As at March 31, 2015      As at December 31, 2014  
Figures in ZAR ‘000    Carrying amount      Fair value      Carrying amount      Fair value  

Liabilities:

           

Long-term debt, including current portion

     1,933,380         2,081,775         1,999,904         2,159,419   

 

 

Recurring fair value measurements

The following table summarizes the financial instruments measured at fair value on a recurring basis classified in the fair value hierarchy (Level 1, 2 or 3) based on the inputs used for valuation in the accompanying combined balance sheet:

 

      As at March 31, 2015      As at December 31, 2014  
Figures in ZAR ‘000    Level 1      Level 2      Level 3      Total      Level 1      Level 2      Level 3      Total  

Liabilities

                       

Interest rate swaps

             12,276                 12,276                 18,763                 18,763   
  

 

 

 

Total Derivative Liabilities

             12,276                 12,276                 18,763                 18,763   

 

 

18. Commitments and contingencies

From time to time, management is notified of possible litigation or claims arising in the normal course of business operations. Management continually evaluates such matters with legal counsel and believes that, although the ultimate outcome is not presently determinable, these matters will not result in a material adverse impact on the financial position or operations.

Operating lease

The Operating Entities are obligated under certain long-term noncancelable operating leases related to land for its solar energy systems. Certain of these lease agreements contain renewal options. Below is a summary of the Operating Entities’ future minimum lease commitments as at March 31, 2015:

 

Contractual cash obligations    ZAR  

2015

     486,780   

2016

     511,119   

2017

     536,675   

2018

     563,509   

2019

     591,684   

Thereafter

     16,987,545   
  

 

 

 

Total

     19,677,312   

 

 

Total rental expense was R241 637 and R241 637 for the three months ended March 31, 2015 and 2014, respectively.

 

F-104


Table of Contents

Core fully prepaid the land lease pursuant to the Witkop Solar Plant for R6 278 362 at inception. Erika prepaid three years of the land lease pursuant to the Soutpan Solar Plant for R1 200 000 at inception of the lease.

19. Related parties

The following parties are considered related parties of the Operating Entities:

 

Name of related party    Nature of Relationship    Type of transactions involved in

SunEdison Green Power Southern Africa Proprietary Limited

   Contractual    Engineering Procurement Contract

SEGP Solar Power Southern Africa Proprietary Limited

   Contractual    Operations and Maintenance Contract

SunEdison Energy Southern Africa Proprietary Limited

   Contractual    Service Level Agreement

SEGP Renewable Energy Southern Africa Proprietary Limited

   Shareholder    Shareholder loan

Public Investment Corporation

   Shareholder    Shareholder loan

Kurisani Witkop Proprietary Limited

   Shareholder    Shareholder loan

Izingwe International Fund Proprietary Limited

   Shareholder    Shareholder loan

 

Various related parties have provided services to the Operating Entities during the years presented. The expenses incurred by the Operating Entities have been described below:

 

Figures in ZAR ‘000    March 31,
2015
     March 31,
2014
 

SunEdison Green Power Southern Africa Proprietary Limited:

     

The Operating Entities entered into a contractual arrangement with this entity, a member of the SunEdison Group, for the construction of the solar energy systems

             358,668   

SunEdison Energy Southern Africa Proprietary Limited:

     

The Operating Entities entered into a contractual arrangement with this entity, a member of the SunEdison Group, for the provision of general administration services

     

Management Service Agreement fees incurred by the Operating Entities

     1,658           

SEGP Solar Power Southern Africa Proprietary Limited:

     

The Operating Entities entered into a contractual arrangement for the operations and maintenance for the plant

     5,534           

 

 

Refer to note 10 for details on loans provided by shareholders to the Operating Entities.

20. Subsequent events

For the combined financial statements as at March 31, 2015, management has evaluated subsequent events through June 17, 2015, the date the combined financial statements were available to be issued.

Management is not aware of any other material event which occurred after the reporting date and up to the date of this report.

 

F-105


Table of Contents

EN Renewable Energy Limited, EN Wind Power Private Limited and Generacion Eolica India Limited

Combined Statements of Income (Unaudited)

All figures in Indian Rupees (INR)

 

              Three months ended March 31,  
      Note      2015     2014  

Revenue

        95,493,277        69,325,961   

Operating costs and expenses:

       

Cost of operations

        (28,630,273     (18,924,002

General and administrative

        (5,998,668     (5,245,827

Depreciation and accretion

        (54,633,353     (41,514,178

Other operating income

        9,794,597        7,397,700   
     

 

 

 

Total operating costs and expenses, net

        (79,467,697     (58,286,307
     

 

 

 

Operating income

        16,025,580        (11,039,654

Other income (expense):

       

Interest expense

        (80,198,238     (63,711,147

Interest income

        8,864,587        11,530,631   

Other income (expense), net

        (15,022     (57,210
     

 

 

 

Total other expenses, net

        (71,348,673     (52,237,726
     

 

 

 

Loss before income tax expense

        (55,323,093     (41,198,072

Income tax credit

     8         33,520,822        53,846,979   
     

 

 

 

Net income/(loss)

        (21,802,271     12,648,907   

 

 

See accompanying notes to combined financial statements.

 

F-106


Table of Contents

EN Renewable Energy Limited, EN Wind Power Private Limited and Generacion Eolica India Limited

Combined Balance Sheets (Unaudited)

All figures in Indian Rupees (INR)

 

            As of March 31,      As of December 31,  
      Note    2015      2014  

Assets

        

Current assets:

        

Cash and cash equivalents

        9,766,393         567,041   

Restricted cash

        18,136,545         16,899,836   

Accounts receivable

        59,846,468         85,616,649   

Deferred financing costs

        6,187,500         6,187,500   

Other current assets

   4      68,160,749         108,131,397   
     

 

 

 

Total current assets

        162,097,655         217,402,423   

Property and equipment, net

   3      4,183,995,274         4,236,467,624   

Restricted cash

        345,536,489         363,044,948   

Deferred financing costs

        35,484,657         37,031,532   

Other assets

   4      109,215,473         103,648,051   
     

 

 

 

Total assets

        4,836,329,548         4,957,594,578   
     

 

 

 

Liabilities and Equity

        

Current liabilities:

        

Current portion of long-term debt

   6      307,483,294         305,180,720   

Accounts payable

        18,986,463         18,935,893   

Accrued expenses and other current liabilities

   7      5,349,053         952,435   

Due to related parties

   9      5,882,026         6,412,042   
     

 

 

 

Total current liabilities

        337,700,836         331,481,090   

Other liabilities:

        

Long-term debt, less current portion

   6      2,211,473,250         2,290,071,004   

Asset retirement obligations

   5      95,115,905         92,929,601   

Deferred tax liabilities

   8      170,069,839         199,340,895   
     

 

 

 

Total liabilities

        2,814,359,830         2,913,822,590   

Equity:

        

Net parent investment

        1,812,588,687         1,812,588,687   

Accumulated other comprehensive income (loss)

        209,381,031         231,183,302   
     

 

 

 

Total equity

        2,021,969,718         2,043,771,989   

Total liabilities and equity

        4,836,329,548         4,957,594,579   

 

 

See accompanying notes to combined financial statements.

 

F-107


Table of Contents

EN Renewable Energy Limited, EN Wind Power Private Limited and Generacion Eolica India Limited

Combined statements of equity (Unaudited)

All figures in Indian Rupees (INR)

 

      Net parent
investment
     Accumulated other
comprehensive
income (loss)
    Total equity  

Balance at December 31, 2013

     1,840,418,377         221,962,986        2,062,381,363   
  

 

 

 

Net income

             12,648,907        12,648,907   
  

 

 

 

Balance at March 31, 2014

     1,840,418,377         234,611,893        2,075,030,270   
  

 

 

 

Balance at December 31, 2014

     1,812,588,687         231,183,302        2,043,771,989   
  

 

 

 

Net income

             (21,802,271     (21,802,271
  

 

 

 

Balance at March 31, 2015

     1,812,588,687         209,381,031        2,021,969,718   

 

 

 

 

See accompanying notes to combined financial statements.

 

F-108


Table of Contents

EN Renewable Energy Limited, EN Wind Power Private Limited and Generacion Eolica India Limited

Combined statements of cash flows (Unaudited)

All figures in Indian Rupees (INR)

 

      Three months ended March 31,  
      2015     2014  

Cash flows from operating activities:

    

Net Income

     (21,802,271     12,648,907   

Adjustments to reconcile net income to net cash used in operating

activities:

    

Depreciation and accretion

     54,633,353        41,514,178   

Amortization of deferred financing costs

     1,546,875        1,287,854   

Deferred taxes

     (29,271,056     (53,221,523

Changes in assets and liabilities:

    

Accounts receivable

     25,770,181        9,733,606   

Other current assets

     39,995,950        42,395,213   

Other non-current assets

     (5,567,422     (33,463,564

Accounts payable and other current liabilities

     4,447,188        159,074,430   

Due to related parties

     (530,016     (8,004,659
  

 

 

   

 

 

 

Net cash provided by operating activities

     69,222,782        171,964,442   

Cash flows from investing activities:

    

Capital expenditures

            (141,896,493

Change in restricted cash

     (1,236,709     11,394,760   
  

 

 

   

 

 

 

Net cash used in investing activities

     (1,236,709     (130,501,733

Cash flows from financing activities:

    

Principal payments on long-term debt

     (76,295,180     (63,257,180

Change in restricted cash

     17,508,459        11,300,000   

Payment of deferred financing costs

            (6,049,157
  

 

 

   

 

 

 

Net cash used in financing activities

     (58,786,721     (58,006,337
  

 

 

   

 

 

 

Net (decrease)/ increase in cash and cash equivalents

     9,199,352        (16,543,628

Cash and cash equivalents at beginning of period

     567,041        58,633,513   
  

 

 

   

 

 

 

Cash and cash equivalents at end of period

     9,766,393        42,089,885   
  

 

 

   

 

 

 

Supplemental disclosures of cash flow information:

    

Cash paid for interest (net of capitalization)

     78,651,363        98,833,784   

Income taxes paid

            16,036,000   

Schedule of non-cash investing activities:

    

Additions to asset retirement obligation

            13,878,087   

 

 

See accompanying notes to combined financial statements.

 

F-109


Table of Contents

EN Renewable Energy Limited, EN Wind Power Private Limited and Generacion Eolica India Limited

Notes to combined financial statements (Unaudited)

All figures in Indian Rupees (INR)

1. Nature of operations

EN Renewable Energy Limited (‘ENRE’), EN Wind Power Private Limited (‘ENWP’) and Generacion Eolica India Limited (‘GEI’) (Together ‘the Companies’) are domiciled in India and were formed for the purpose of developing, constructing, owning and operating are engaged in wind power generation businesses. A State Government Power Distribution Companies (‘Discom’) in India has entered into Power Purchase Agreements (‘PPA’) with each of the above mentioned Companies and all the electricity generated by the Companies is purchased by such Discoms.

Fersa Energia Renovables S.A, Spain (‘FERSA’) holds 100% of the total shares in the Companies either directly or through Fersa India Private Limited, its wholly owned subsidiary.

Basis of presentation

These financial statements represent combined financial statements of ENRE, ENWP and GEI as of March 31, 2015 and for the three-month periods ended March 31, 2015 and 2014. The combined financial statements have been prepared in accordance with U.S. generally accepted accounting principles (“U.S. GAAP”). The Financial Accounting Standards Board (“FASB”) Accounting Standards Codification (“ASC”) is the source of authoritative U.S. GAAP to be applied by non-governmental entities.

These combined financial statements are presented in Indian Rupees (‘INR’) except as otherwise indicated. Transaction gains and losses that arise from exchange rate fluctuations on transactions and balances denominated in a currency other than the functional currency are generally included in the statements of income as incurred.

The combined financial statements have been prepared using the Companies’ historical basis for assets and liabilities, and include all revenues, expenses, assets, and liabilities attributed to these assets.

All significant inter-company transactions and balances have been eliminated in the combined financial statements.

2. Summary of significant accounting policies

Use of estimates

In preparing the combined financial statements, we use estimates and assumptions that may affect reported amounts and disclosures. Estimates are used when accounting for depreciation, leases, asset retirement obligations, contingencies, impairments, accrued liabilities and income taxes, among others. These estimates and assumptions are based on current facts, historical experience and various other factors that we believe to be reasonable under the circumstances, the results of which form the basis for making judgments about the carrying values of assets and liabilities and the recording of revenue, costs and expenses that are not readily apparent from other sources. To the extent there are material differences between the estimates and actual results, our future results of operations would be affected.

 

F-110


Table of Contents

Cash and cash equivalents

Cash and cash equivalents include all cash balances and the bank deposits with original maturity periods of three months or less.

Restricted cash

Restricted cash consists of cash on balance in banks and financial institutions that are restricted from use in operations pursuant to requirements of certain debt agreements. These funds are used to pay for current operating expenses and current debt service requirements in accordance with the restrictions in the debt agreements.

Accounts receivable

Accounts receivable are reported on the combined balance sheets at the invoiced amounts adjusted for any write-offs and an allowance for doubtful accounts. We establish an allowance for doubtful accounts to adjust our receivables to amounts considered to be ultimately collectible. Our allowance is based on a variety of factors, including the length of time receivables are past due, significant one-time events, the financial health of our customers and historical experience. There was no allowance for doubtful accounts as of March 31, 2015. Unbilled receivables included in account receivables were INR 31,540,486 and INR 36,860,640 as of March 31, 2015 and December 31, 2014 respectively.

Property and equipment

Property and equipment consists of wind energy systems and construction in progress and is stated at cost. Expenditures for major additions and improvements are capitalized and minor replacements, maintenance and repairs are charged to expense as incurred. When property and equipment is retired, or otherwise disposed of, the cost and accumulated depreciation is removed from the accounts and any resulting gain or loss is included in the results of operations for the respective period. Depreciation of property and equipment is recognized using the straight-line method over the estimated useful lives of the wind energy systems, which is the lesser of twenty five years or the term of the underlying non-renewable real property lease to which the assets are affixed. The useful lives of property and equipment are as under:

 

      Useful Lives  

Wind Energy Systems

     25 years   

Other equipment

     6 years   

Computers and Computer Software

     6 years   

Office equipment

     15 years   

 

 

Capitalized interest

Interest incurred on funds borrowed to finance construction of wind energy systems is capitalized until the system is ready for its intended use. There was no interest capitalized during the three–month periods ended March 31, 2015 and 2014, respectively.

Deferred financing costs

Financing costs incurred in connection with obtaining construction and term financing are deferred and amortized using the straight-line method over the period in which the term financing is expected to be outstanding. Amortization of deferred financing costs related to the term loans is recorded as interest expense in the combined statements of income.

 

F-111


Table of Contents

Amortization of deferred financing costs recorded as interest expense was INR 1,546,875 and INR 1,287,854 during the three-month periods ended March 31, 2015 and 2014, respectively.

Impairment of long-lived assets

Long-lived assets that are held and used are reviewed for impairment whenever events or changes in circumstances indicate carrying values may not be recoverable. An impairment loss is recognized if the total future estimated undiscounted cash flows expected from an asset are less than its carrying value. An impairment charge is measured as the difference between an asset’s carrying amount and fair value with the difference recorded in operating costs and expenses in the statement of Income. Fair values are determined by a variety of valuation methods, including appraisals, sales prices of similar assets and present value techniques. There were no impairments recognized during the three-month periods ended March 31, 2015 and the year ended December 31, 2014.

Asset retirement obligations

The Companies operate under real property operating lease agreements that include a requirement for the removal of the wind energy systems at the end of the term of the agreement. Asset retirement obligations are recognized at fair value in the period in which they are incurred and the carrying amount of the related long-lived asset is correspondingly increased. Over time, the liability is accreted to its expected future value. The corresponding asset capitalized at inception is depreciated over the useful life of the wind energy system.

Revenue recognition

Power purchase agreements

The Companies’ revenues are obtained through the sale of energy pursuant to terms of power purchase agreements (“PPAs”) or other contractual arrangements which have remaining lives of 15-25 years as of March 31, 2015. All PPAs are accounted for as operating leases, have no minimum lease payments and all of the rental income under these leases is recorded as income when the electricity is delivered. The contingent rental income recognized in the three-month periods ended March 31, 2015 and 2014 was INR 95,493,277 and INR 69,325,961 respectively.

Grants

For certain owned wind energy systems, we receive certified emissions rights (CERs) under the Clean Development Mechanism of United Nations Framework Convention on Climate Change. CERs are generated as our wind energy systems generate electricity. CER is recognized as revenue at the time we have transferred a CER pursuant to an executed contract relating to the sale of the CERs to a third party. Also, one of the Power Purchase Agreement provides for sharing of CER revenue with the Power Purchaser. In this case, the Power Purchaser’s share of CER revenue has been netted off against total CER revenue.

The Companies are also eligible to receive generation based incentives (‘GBI’) based on Kwh of electricity fed to Discoms. For GBIs, production from our operated systems is certified by a third party and, once verified, revenue is recognized based on the terms of the contract and the fulfillment of all revenue recognition criteria. Income received pursuant to the GBI scheme is recorded as ‘Other operating income’.

 

F-112


Table of Contents

Income taxes

Our income tax balances are determined and reported in accordance with FASB ASC 740 (“ASC 740”), Income Taxes. Our income tax balances are determined and reported using a “separate return” method. Under the separate return method, income tax amounts have been computed as if the Companies filed separate tax returns.

Deferred tax assets and liabilities are recognized for the future tax consequences attributable to differences between the financial statement carrying amounts of existing assets and liabilities and their respective tax bases and operating loss carry forwards and tax credit carry forwards. Deferred income taxes arise primarily because of differences in the bases of assets or liabilities between financial statement accounting and tax accounting which are known as temporary differences. We record the tax effect of these temporary differences as deferred tax assets (generally items that can be used as a tax deduction or credit in future periods) and deferred tax liabilities (generally items for which we receive a tax deduction, but have not yet been recorded in the combined statement of Income).

Deferred tax assets and liabilities are measured using enacted tax rates expected to apply to taxable income in the years in which those temporary differences are expected to be recovered or settled. We ignore future originating temporary differences and schedule existing temporary differences to reverse on a first-in-first-out basis when determining the tax rate expected to apply for purposes of measuring deferred taxes. The effect on deferred tax assets and liabilities of a change in tax rate is recognized in operations in the period that includes the enactment date.

We regularly review our deferred tax assets for realizability, taking into consideration all available evidence, both positive and negative, including historical pre-tax and taxable income, projected future pre-tax and taxable income and the expected timing of the reversals of existing temporary differences. In arriving at these judgments, the weight given to the potential effect of all positive and negative evidence is commensurate with the extent to which it can be objectively verified.

Valuation allowances are established when management determines that it is more likely than not that some portion, or all of the deferred tax asset, will not be realized.

The Companies intend to account for dividend distribution tax in equity in the year in which a dividend is declared.

We believe our tax positions are in compliance with applicable tax laws and regulations. Tax benefits are recognized only for tax positions that are more likely than not to be sustained upon examination by tax authorities. The amount recognized is measured as the largest amount of benefit that is greater than 50 percent likely to be realized upon settlement. We believe that our income tax accrued liabilities, including related interest, are adequate in relation to the potential for additional tax assessments. There is a risk, however, that the amounts ultimately paid upon resolution of audits could be materially different from the amounts previously included in our income tax expense and, therefore, could have a material impact on our tax provision, net income and cash flows.

Contingencies

We are involved in conditions, situations or circumstances in the ordinary course of business with possible gain or loss contingencies that will ultimately be resolved when one or more future events occur or fail to occur. If some amount within a range of loss appears at the time to be a better estimate than any other amount within the range, that amount will be accrued. When no amount within the range is a better estimate than any other

 

F-113


Table of Contents

amount, however, the minimum amount in the range will be accrued. We continually evaluate uncertainties associated with loss contingencies and record a charge equal to at least the minimum estimated liability for a loss contingency when both of the following conditions are met: (i) information available prior to issuance of the financial statements indicates that it is probable that an asset had been impaired or a liability had been incurred at the date of the financial statements; and (ii) the loss or range of loss can be reasonably estimated. Legal costs are expensed when incurred. Gain contingencies are not recorded until realized or realizable.

Fair value measurements

Fair value accounting guidance establishes a hierarchy for inputs used in measuring fair value that maximizes the use of observable inputs and minimizes the use of unobservable inputs by requiring that the most observable inputs be used when available. Observable inputs are inputs that market participants would use in pricing the asset or liability, and are based on market data obtained from sources independent of us. Unobservable inputs reflect assumptions market participants would use in pricing the asset or liability based on the best information available in the circumstances. The hierarchy is broken down into three levels based on the reliability of inputs as follows:

 

 

Level 1—Valuations based on quoted prices in active markets for identical assets or liabilities that we have the ability to access. Valuation adjustments and block discounts are not applied to Level 1 instruments. Because valuations are based on quoted prices that are readily and regularly available in an active market, valuation of these instruments does not entail a significant degree of judgment.

 

 

Level 2—Valuations based on quoted prices in markets that are not active or for which all significant inputs are observable, either directly or indirectly. Valuations for Level 2 are prepared on an individual instrument basis using data obtained from recent transactions for identical securities in inactive markets or pricing data from similar instruments in active and inactive markets.

 

 

Level 3—Valuations based on inputs that are unobservable and significant to the overall fair value measurement.

We maintain various financial instruments recorded at cost in the March 31, 2015 and 2014 combined balance sheets that are not required to be recorded at fair value. For cash and cash equivalents, restricted cash, accounts receivable, accounts payable, and accrued liabilities, the carrying amount approximates fair value because of the short-term maturity of the instruments. For due to related parties and debt, the carrying amount approximates fair value based on comparable market interest rates for similar instruments.

New accounting standards

In May 2014, the FASB issued ASU No. 2014-09, Revenue from Contracts with Customers, which requires an entity to recognize the amount of revenue to which it expects to be entitled for the transfer of promised goods or services to customers. ASU 2014-09 will replace most existing revenue recognition guidance in U.S. GAAP when it becomes effective. ASU 2014-09 is effective for us on January 1, 2017. Early application is not permitted. The standard permits the use of either a retrospective or cumulative effect transition method. We have not determined which transition method we will adopt, and we are currently evaluating the impact that ASU 2014-09 will have on our financial statements and related disclosures upon adoption.

In August 2014, the FASB issued ASU No. 2014-15, Presentation of Financial Statements—Going Concern (Subtopic 205-40): Disclosure of Uncertainties about an Entity’s Ability to Continue as a Going Concern, which requires management to evaluate, at each annual and interim reporting period, whether there are conditions or events that raise substantial doubt about the entity’s ability to continue as a going concern within one year after the date the financial statements are issued and to provide related disclosures. ASU 2014-15 is effective

 

F-114


Table of Contents

for us for our fiscal year ending December 31, 2016 and for interim periods thereafter. We are currently evaluating the impact of this standard on our financial statements.

In March 2015, the FASB issued ASU No. 2015-03, Interest—Imputation of Interest (Subtopic 835-30):, which requires that debt issuance costs related to a recognized debt liability be presented in the balance sheet as a direct deduction from the carrying amount of that debt liability, consistent with debt discounts. ASU 2015-03 is effective for us for our fiscal year starting December 31, 2015 and for interim periods within those fiscal years. We are currently evaluating the impact of this standard on our financial statements.

3. Property and equipment

Property and equipment consists of the following:

 

      As of March 31,     As of December 31,  
      2015     2014  

Wind energy systems

     5,148,439,380        5,148,439,380   

Office equipment and computers

     343,634        368,934   

Other equipment

     5,185,840        5,185,840   

Less: Accumulated depreciation

     (969,973,580     (917,526,530

Add: Construction in progress

              
  

 

 

 

Property and equipment, net

     4,183,995,274        4,236,467,624   

 

 

Depreciation expense was INR 52,447,050 and INR 39,864,903 for the three-month periods ended March 31, 2015 and 2014, respectively.

4. Other Assets

Other assets consist of the following:

 

      As of March 31, 2015      As of December 31, 2014  
      Current      Non-Current      Current      Non-Current  

Advance recoverable from Supplier

     907,261                 2,077,261           

GBI Receivables

     29,382,445                 62,953,045           

Prepaid Land—lease rent

     5,390,366         99,132,813         5,390,366         100,461,944   

Capital Advance

             1,300,000                   

Deposits with banks

                     9,000,000           

Advance tax

     16,562,388         8,357,660         18,231,097           

Prepaid Expenses

     6,205,916                           

Others

     9,712,373         425,000         10,479,628         3,186,107   
  

 

 

 
     68,160,749         109,215,473         108,131,397         103,648,051   

 

 

 

F-115


Table of Contents

5. Asset retirement obligations

Activity in asset retirement obligations for the periods ended March 31, 2015 and 2014 is as follows:

 

      As of March 31,      As of December 31,  
      2015      2014  

Balance at the beginning of the period

     92,929,601         71,257,279   

Additional obligation

             13,878,087   

Accretion

     2,186,304         7,794,235   
  

 

 

 

Balance at the end of the period

     95,115,905         92,929,601   

 

 

6. Debt

Debt consists of the following:

 

      As of March 31,      As of December 31,  
      2015      2014  

Current

     307,483,294         305,180,720   

Long term

     2,211,473,250         2,290,071,004   
  

 

 

 

Total Principal

     2,518,956,544         2,595,251,724   

 

 

ENRE

ENRE executed a loan agreement on March 19, 2010 with the Indian Renewable Energy Development Agency Limited (‘IREDA’).

The sanctioned term loan from IREDA was for INR 1,860,000,000, carried a rate of interest of 11.6% and required repayment of principal in 48 installments from September 30, 2011 to June 30, 2023. The loan amount borrowed, rate of interest and repayment of principal was revised to INR 1,842,059,000, 12.25% and 48 installments from March 31, 2012 to December 31, 2023, respectively. The term loan is secured by a mortgage and hypothecation of all existing and future immoveable and movable assets of ENRE and is further secured through a trust and retention account, bank guarantee and pledge of equity in ENRE.

ENWP

ENWP executed a rupee loan agreement on June 21, 2012 (and as amended/modified from time to time) with IREDA.

The term loan sanctioned from IREDA is for INR 745,000,000, carries a rate of interest of 12.25% and requires quarterly repayment of principal in 44 installments from March 31, 2015 to December 31, 2025. The term loan is secured by a mortgage and hypothecation of all existing and future immoveable and movable assets of ENWP and is further secured through a trust and retention account and pledge of equity in ENWP.

GEI

GEI executed a loan agreement on January 29, 2008 with IREDA.

The sanctioned term loan from IREDA was for INR 1,186,500,000, carried a rate of interest of 10.25% and required repayment of principal in 40 installments from March 31, 2009 to December 31, 2018. The rate of

 

F-116


Table of Contents

interest and repayment of principal was revised to 12.50% and 25 installments from December 31, 2012 to December 31, 2018 respectively. The term loan is secured by a mortgage and hypothecation of all existing and future immoveable and movable assets of GEI and is further secured through a trust and retention account, bank guarantee and pledge of equity in GEI.

Maturities

The aggregate amounts of payments on long-term debt due after March 31, 2015 are as follows:

 

Year   2015-16     2016-17     2017-18     2018-19     2019-20     Thereafter  

Maturities of long-term debt

    307,483,294        316,253,016        321,839,016        297,286,016        223,627,016        1,052,468,198   

 

 

The debt arrangements contain certain representations, covenants and warranties of the borrower companies including limitations on business activities, guarantees, project maintenance standards, debt equity ratios and minimum debt service reserve requirements. The debt service reserve money is required to be maintained out of the cash flows generated from the project, which shall be funded through the receivables from business operations.

7. Accrued Expenses and Other Current Liabilities

Accrued expenses and other liabilities consist of the following:

 

      As at March 31,      As at December 31,  
      2015      2014  

Payable to employees

     72,820         79,133   

Accrued expenses

     5,276,233         873,302   
  

 

 

 
     5,349,053         952,435   

 

 

8. Income taxes

Income tax balances are determined and reported herein under the “separate return” method.

Income tax credit consists of the following:

 

      Current      Deferred      Total  

Period ended March 31, 2015

     4,249,766         29,271,056         33,520,822   

Period ended March 31, 2014

     625,456         53,221,523         53,846,979   

 

 

 

F-117


Table of Contents

Tax rate reconciliation

The applicable Indian statutory tax rate for the tax quarter ended 2015 is 34.61%. Income tax credit differed from the amounts computed by applying the statutory Indian income tax rate of 34.61% to profit/(loss) before income taxes.

 

      For the quarter ended
March 31,
 
      2015  

Income tax at Indian statutory rate

     34.61%   

Increase (reduction) in income taxes:

  

Impact of valuation allowance

     1.37%   

Impact of tax holidays

     24.72%   

Effective tax benefit rate

     60.70%   

 

 

Significant components of deferred taxes

The significant component of deferred tax assets and liabilities for the quarter ended March 31, 2015 and year ended December 31, 2014 are as follows:

 

      As of March 31,      As of December 31,  
      2015      2014  

Deferred tax assets:

     

Asset retirement obligations

     32,919,614         32,162,935   

Total deferred tax assets

     32,919,614         32,162,935   

Deferred tax liabilities:

     

Property and equipment

     170,069,839         199,340,895   
  

 

 

 

Total deferred tax liabilities

     170,069,839         199,340,895   
  

 

 

 

Valuation allowance

     32,919,614         32,162,935   
  

 

 

 

Net deferred tax liabilities

     170,069,839         199,340,895   

 

 

The Companies have unabsorbed depreciation for Indian income tax purposes of INR 689,407,664 as at March 31, 2015 and INR 592,181,412 as at March 31, 2014 which are available to offset future taxable income, if any, over an indefinite period. The Companies have a minimum alternate tax credit of INR 34,576,107 as at March 31, 2015 which are available to offset future taxes expire during the period from March 31, 2019 and March 31, 2022. The minimum alternate tax rate is 19.05%. A deferred tax asset has not been recognized since the amounts are forecasted to be utilized during the Companies’ tax holiday periods and have no overall impact.

The Companies have a tax holiday which expires 15 years from the date of commissioning of the wind energy system and is available for a 10 year period starting from the date on which the project entity starts claiming the holiday. The tax holiday provides for a zero percent tax rate during the years it applies. The 10 year tax holiday periods apply from March 31, 2012, March 31, 2015 and March 31, 2018 for GEI, ENRE and ENWP, respectively. The tax holiday ends on March 31, 2022, March 31, 2025 and March 31, 2028 for GEI, ENRE and ENWP, respectively.

The change in valuation allowance is INR 756,680 during the quarter ended March 31, 2015.

The 2014 and 2013 tax years remain open to examination by tax authorities.

 

F-118


Table of Contents

The Companies have recognized tax benefits only for tax positions that are more likely than not to be sustained upon examination by tax authorities. As of March 31, 2015 and 2014, the total unrecognized tax benefits amounted to INR 13,900,766 and INR 13,900,766, respectively, towards tax benefits and deductibility of expenses which result in a reduction of unabsorbed depreciation carryforwards. These unrecognized tax benefits, if recognised, would affect the effective tax rate. Given the expectation that the carryforwards would be expected to be utilized during the tax holiday periods, the unrecognized tax benefits would have no overall impact.

9. Related parties

Management and Technical Fees

The Companies entered into a Technical and Management Services Agreement with FERSA Spain and FERSA India, whereby above entities will provide technical and management services such as provision of financial services, advising and supporting on day to day operational issues and provision and coordination of legal and tax advice, primarily on a cost-reimbursement basis, plus a 7.5% fee on arm length’s basis. Costs incurred for these services were INR 7,312,483 and INR 2,668,220 for the three-month periods ended March 31, 2015 and 2014, respectively. Related amounts were reported as cost of operations in the combined statements of income and were reflected in operating activities in the combined statements of cash flows. Amounts payable to FERSA (included in ‘Due to related parties’) in respect of the above management and technical fees is INR 5,882,026 and INR 6,412,042 as at March 31, 2015 and December 31, 2014, respectively.

Net parent investment

Net parent investment account represents common stock and additional paid in capital of ENRE, GEI and ENWP, net of intercompany investments.

Holders of common stock are entitled to one vote per share, and to receive dividends and, upon liquidation or dissolution, are entitled to receive all assets available for distribution to stockholders. The holders have no preemptive or other subscription rights and there are no redemption or sinking fund provisions with respect to such shares.

10. Commitments and contingencies

From time to time, the Companies have become involved in claims and legal matters arising in the ordinary course of business. Management is not currently aware of any matters that will have a material adverse effect on the financial position, results of operations, or cash flows of the Companies.

Contingency

There are certain pending matters relating to the sub-lease of /rights in certain portions of lands for one of the projects in which the lessor holds lease rights. The sub-lease is subject approvals from certain government authorities. The project company believes that there are no irregularities in its right to use the land and based on the opinion of its legal counsel believes that the likelihood of an unfavourable outcome of its lease rights of the said land is not probable. In addition, the Company believes that no further settlement or any significant additional liability is expected on account of such matters pending resolution.

 

F-119


Table of Contents

Operating Lease

The Companies have entered into operating lease for Registered Office of the Companies. Rent expense, included in General and Administrative Expenses in the combined statements of Income, was INR 486,000 and INR 445,500 for the three-month periods ended March 31, 2015 and 2014, respectively.

The future minimum payments related to these leases as of March 31, 2015, are as follows:

 

      Amount  

2015-16

     682,400   

Thereafter

       

 

 

Purchase Commitments

ENWP has entered an into an agreement with Wind World (India) Limited (‘WWIL’), whereas the WWIL will install an online WEG monitoring mechanism at all WEG commissioned which will help ENWP to view the daily information from their own location.

ENWP had open commitments of INR 1,300,000 and INR 522,379 as at March 31, 2015 and December 31, 2014 respectively.

11. Segment information

The Companies are engaged in one reportable segment that operates a portfolio of wind energy generation assets. The Companies operate as a single reportable segment based on a “management” approach. This approach designates the internal reporting used by management for making decisions and assessing performance as the source of the reportable segments. The Companies’ chief operating decision maker (the “CODM”), its Board of Directors manages the Companies’ operation.

Revenue for the periods ended March 31, 2015 and 2014 were from customers located in India. Customers include government controlled public electricity distribution entities. Revenue to specific customers exceeding 10% of total revenue for the periods ended March 31, 2015 and 2014 were as follows:

 

Customer Name    For the three-month periods ended March 31,  
     2015      2014  
      Revenue      Percent      Revenue      Percent  

Customer 1

     42,360,018         44%         43,327,006         62%   

Customer 2

     24,449,036         26%         25,997,961         38%   

Customer 3

     28,684,223         30%                 0%   

 

 

All property, plant and equipment of the Companies are located in India.

12. Subsequent events

For the combined financial statements as of and for the periods ended March 31, 2015 and 2014, we have evaluated subsequent events through June 9, 2015, the date the combined financial statements were available to be issued and determined that no subsequent events had occurred that would require additional disclosures.

 

F-120


Table of Contents

Empresa de Generación Eléctrica de Junín S.A.C.

Interim statement of financial position

As of March 31, 2015 (unaudited) and December 31, 2014 (audited)

 

      Note    March 31,
2015
S/.(000)
     December 31,
2014
S/.(000)
 

Assets

        

Current assets

        

Cash and cash equivalents

   3      5,613         4,973   

Trade accounts receivable

   4      11,312         3,539   

Accounts receivable from related parties

   11(b)      102         95   

Other accounts receivable

   5      1,814         506   

Other assets

        44           
  

 

 

 

Total current assets

        18,885         9,113   
  

 

 

 

Non-current assets

        

Other accounts receivable

   5      24,240         17,752   

Property, plant and equipment

   6      240,441         245,487   

Intangible assets, net

        23         25   
  

 

 

 

Total non-current assets

        264,704         263,264   
  

 

 

 

Total assets

        283,589         272,377   
  

 

 

 

Liabilities and equity

        

Current liabilities

        

Loans and borrowings

   7      1,109         1,674   

Trade accounts payable

        203         557   

Accounts payable to related parties

   11(b)      1,636         9,866   

Other accounts payable

        760         243   
  

 

 

 

Total current liabilities

        3,708         12,340   
  

 

 

 

Non-current liabilities

        

Accounts payable to related parties

   11(b)      864         5,897   

Loans and borrowings

   7      207,044         178,988   

Deferred taxes

   9(a)      2,931         337   
  

 

 

 

Total non-current liabilities

        210,839         185,222   
  

 

 

 

Total liabilities

        214,547         197,562   
  

 

 

 

Equity

        

Share capital

        53,475         53,475   

Additional capital

        37,413         37,413   

Accumulated losses

        (21,846)         (16,073)   
  

 

 

 

Total equity

        69,042         74,815   
  

 

 

 

Total liability and equity

        283,589         272,377   

 

 

 

F-121


Table of Contents

Empresa de Generación Eléctrica de Junín S.A.C.

Interim statement of comprehensive income (unaudited)

For the three-month periods ended March 31, 2015 and 2014

 

      Note   March 31,
2015
S/.(000)
    March 31,
2014
S/.(000)
 

Revenue

      

Energy sales

   1     10,609          

Power sales

       657          
    

 

 

 
       11,266          

Cost of sales

   8     (2,786       
    

 

 

 

Gross profit

       8,480          

Operating expenses

      

Administrative expenses

       (737     (213
    

 

 

 

Operating profit (loss)

       7,743        (213

Financial income

              7   

Financial expenses

       (4,023     (31

Exchange losses, net

       (6,899     (449
    

 

 

 

Loss before income tax

       (3,179     (686

Income tax

   9(b)     (2,594       
    

 

 

 

Net loss

       (5,773     (686
    

 

 

 

Other comprehensive income

                
    

 

 

 

Total comprehensive income of the period

       (5,773     (686

 

 

 

F-122


Table of Contents

Empresa de Generación Eléctrica de Junín S.A.C.

Interim statement of changes in equity (unaudited)

For the three-month periods ended March 31, 2015 and 2014

 

      Share
capital
S/.(000)
     Additional
capital
S/.(000)
     Accumulated
losses
S/.(000)
    Total
S/.(000)
 

As of January 1, 2014

     42,379         29,646         (4,585     67,440   

Net loss for the period

                     (686     (686

Capital contribution

     2,226         1,558                3,784   
  

 

 

 

As of March 31, 2014

     44,605         31,204         (5,271     70,538   
  

 

 

 

As of January 1, 2015

     53,475         37,413         (16,073     74,815   

Net loss for the period

                     (5,773     (5,773
  

 

 

 

As of March 31, 2015

     53,475         37,413         (21,846     69,042   

 

 

 

F-123


Table of Contents

Empresa de Generación Eléctrica de Junín S.A.C.

Interim statement of cash flows (unaudited)

For the three-month period ended March 31, 2015 and 2014

 

      March 31,
2015
S/.(000)
    March 31,
2014
S/.(000)
 

Operating activities

    

Collections from customers

     3,496          

Payments to suppliers

     (2,425     (217

Payments of taxes, interest and other, net

     (5,026     (4,929
  

 

 

 

Net cash flow used in operating activities

     (3,955     (5,146
  

 

 

 

Investing activities

    

Restricted funds

     (6,862       

Purchase of property, plant and equipment

     (8,242     (29,148

Purchase of intangible assets

            (418
  

 

 

 

Net cash used in investing activities

     (15,104     (29,566
  

 

 

 

Financing activities

    

Proceeds from borrowings

     27,401        46,208   

Repayment of borrowings

     (2,715     (8,762

Repayment of borrowings from related parties

     (4,987       

Capital contribution

            3,784   
  

 

 

 

Net cash flows from financing activities

     19,699        41,230   
  

 

 

 

Net increase in cash and cash equivalents for the period

     640        6,518   

Cash and cash equivalents at beginning of period

     4,973        15,827   
  

 

 

 

Cash and cash equivalents at end of the period

     5,613        22,345   

 

 

 

F-124


Table of Contents

Empresa de Generación Eléctrica de Junín S.A.C.

Notes to the interim financial statements

As of March 31, 2015 and December 31, 2014

 

1.   Identification and business activity

 

  (a)   Identification

Empresa de Generación Eléctrica de Junín S.A.C. (hereafter “the Company”) is a Peruvian entity incorporated on December 14, 2009, in the city of Lima by Latin America Power Perú S.A.C. (a subsidiary of Latin America Power Holding B.V., domiciled in the Netherlands) and GCZ Energía

S.A.C., which respectively hold 70 percent and 30 percent of the voting shares of the Company’s capital stock.

 

  (b)   Business activity

The Company is dedicated to the generation and sale of electricity to local private and state-owned companies, as well as to engineering activities, and actions related to its business activity. Its legal domicile is Av. del Pinar N° 152, Oficina N° 508, Santiago de Surco, Lima, Peru.

Through Ministerial Resolution N° 072-2012-MEM/DM dated February 16, 2012, the Peruvian State via the Ministry of Energy and Mines (hereafter “MEM”) awarded the Company the definite concession to develop electric generation activities at the Runatullo III Hydroelectric Plant, located in the Mariscal Castilla and Comas districts, province of Concepción, department of Junín. Also, through Ministerial Resolution N° 114-2012-MEM/DM, dated March 2, 2012, the Peruvian State via MEM awarded the Company the definite concession to develop electric generation activities at the Runatullo III Hydroelectric Plant, located in the Mariscal Castilla and Comas districts, province of Concepción, department of Junín, and also approved the subscription of the Concession Contract between the Peruvian State, represented by MEM, and the Company, which took place on September 30, 2011.

On September 30, 2011, the Company was awarded the Tender on Electricity Supply through renewable energy resources (hereafter “RER”) called by the Supervising Agency of Investments in Energy and Mining (OSINERGMIN), which, among other RER generating projects, selected the Runatullo III Hydroelectric Plant as supplier of electricity for the National Interconnected Electric System (SEIN under its Spanish acronym) for a 20-year term. The Company committed to start commercial operations at the Runatullo III Hydroelectric Plant, at the latest, on December 15, 2014. As a consequence, the Company and the Peruvian State entered into the corresponding supply contract. The construction of these Plants was performed by its related party GCZ Ingenieros S.A.C.

On December 12, 2013, the Company was awarded the Tender on Electricity Supply through RER called by OSINERGMIN, which among other RER generating projects, selected the Runatullo II Hydroelectric Plant as supplier of electricity for the SEIN for a 20-year period maturity, which establish that, through the mechanism of RER Auctions, the Company receives a fixed fee per megawatt established for each hydroelectric plant. The Company committed to start commercial operations at the Runatullo II Hydroelectric Plant, at the latest, on December 15, 2014. As consequence, the Company and the Peruvian State subscribed the corresponding supply contract.

In November 2014, the Company started operations at the Runatullo III Hydroelectric Plant, which has 20.2 MW of installed capacity.

 

F-125


Table of Contents

In December 2014, the Company started operations at Runatullo II Hydroelectric Plant, which is located all along the Runatullo River located at 6 Km in the department of Junin, which has 19.1 MW of installed capacity.

 

2.   Basis of preparation and changes to accounting policies

 

  2.1   Basis of preparation—

The interim financial statements for the three months ended 31 March 2015 have been prepared in accordance with IAS 34 Interim Financial Reporting.

The interim financial statements do not include all the information and disclosures required in the annual financial statements, and should be read in conjunction with the annual financial statements as at 31 December 2014.

 

  2.2   New standards, interpretations and amendments adopted by the Company

The accounting policies adopted in the preparation of the interim financial statements are consistent with those followed in the preparation of the annual financial statements for the year ended 31 December 2014. The Company has not early adopted any standard, interpretation or amendment that has been issued but is not yet effective.

 

3.   Cash and cash equivalents

 

  (a)   Following is the composition of this caption:

 

      March 31,
2015
S/.(000)
     December 31,
2014
S/.(000)
 

Current accounts(b)

     4,025         895   

Trust fund account(c)

     1,588         4,078   
  

 

 

 
     5,613         4,973   

 

 

 

  (b)   As of March 31, 2015 and December 31, 2014, the Company keeps current accounts in local banks, denominated in local and foreign currency, which are unrestricted and do not bear interest.

 

  (c)   As of March 31, 2015 and December 31, 2014, this balance corresponds to disbursements received from the syndicated loan the Company has with Banco Internacional del Perú S.A.A., the Corporación Andina de Fomento (CAF) and the Corporación Financiera de Desarrollo S.A. (COFIDE), which become available according to the execution and advances of construction works of Runatullo II and Runatullo III Hydroelectric Plants. This account is managed by La Fiduciaria S.A., as indicated by the trust agreement. As of the date of this report, these balances were entirely used for the finalization of the plants’ construction.

 

4.   Trade accounts receivable

 

  (a)   Following is the composition of this caption:

 

      March 31,
2015
S/.(000)
     December 31,
2014
S/.(000)
 

Trade accounts receivable(b)

     1,642         1,109   

Accrued income(c)

     9,670         2,430   
  

 

 

 
     11,312         3,539   

 

 

 

  (b)   Trade accounts receivable correspond mainly to the estimation performed by Management of accounts receivable from energy delivered but not billed in the month. These accounts receivable are billed on the first days of the following month and are denominated in Nuevos Soles.

 

F-126


Table of Contents
       As of March 31, 2015 and December 31, 2014, the aging of the balance of accounts receivable is mainly comprised by non-past due balances shorter than 30 days.

 

  (c)   Corresponds to unbilled sales of energy delivered into the current month. These sales are invoiced within the billing cycle of the following month.

 

  (d)   No provision for doubtful accounts as of March 31, 2015 and December 31, 2014 was recorded as management assessed that there were no significant risks of default.

 

5.   Other accounts receivable

 

  (a)   Following is the composition of this caption:

 

      March 31,
2015
S/.(000)
     December 31,
2014
S/.(000)
 

Value Added Tax credit(b)

     17,633         18,227   

Restricted funds(c)

     6,862           

Advances to suppliers

     1,472         7   

Advance payment of Income Tax

     57           

Other accounts receivable

     30         24   
  

 

 

 
     26,054         18,258   
  

 

 

 

Current

     1,814         506   

Non-current

     24,240         17,752   
  

 

 

 
     26,054         18,258   

 

 

 

  (b)   During 2015 and 2014, this caption corresponds mainly to the Value Added Tax – VAT credit as result of purchases and acquisitions from suppliers for the construction of the Runatullo II and Runatullo III Hydroelectric Plants. Said VAT credit will be applied to the tax payable in the medium-term.

 

  (c)   Corresponds to the fiduciary reserve deposit made as result of the loan with Banco Internacional del Perú S.A.A., see note 7(a). As of March 31, 2015 the deposits is equivalent to two installments of the aforementioned loan, according to the maturity schedule.

 

6.   Property, plant and equipment

 

  (a)   Following is the movement and composition of the caption at the date of the financial statements:

 

      Cost
S/.(000)
     Accumulated
depreciation
S/.(000)
     Net book value
S/.(000)
 

As of March 31, 2015

        

Balance as of January 1, 2015

     245,703         (216      245,487   

Additions

     13         (1,335      (1,322

Reclassfication(d)

     (3,724              (3,724
  

 

 

 

Balance as of March 31, 2015

     241,992         (1,551      240,441   
  

 

 

 

As of December 31, 2014

        

Balance as of January 1, 2014

     147,816                 147,816   

Additions(b)

     86,978         (216      86,762   

Interest capitalization(c)

     10,909                 10,909   
  

 

 

 

Balance as of December 31, 2014

     245,703         (216      245,487   

 

 

 

  (b)   As of December 31, 2014, additions correspond to civil works, electromechanic works and transmission lines that are part of the construction and development of the Runatullo II and Runatullo III Hydroelectric Plants.

 

F-127


Table of Contents
  (c)   The Company ended the construction of Runatullo III Hidroelectric plant in November 2014 and Runatullo II Hidroelectric plant in December 2014. These constructions are financed by Banco Internacional del Perú S.A.A.

 

       The amount of borrowing costs capitalized during the year ended December 31, 2014 was S/.10,909,000. The rate used to determine the amount of borrowing cost eligible for capitalization was 8.06 percent which is the average effective interest rate of the specific borrowings.

 

  (d)   Corresponds to the reclassification of the financial commissions for structuring the loans, to the account “Loans and borrowings”, see note 7.

 

7.   Loans and borrowings

 

  (a)   Following is the composition of this caption:

 

     Annual
interest
rate
    Maturity     Currency     Guarantee     March 31,
2015
S/.(000)
    December 31,
2014
S/.(000)
 

Loans(b)

           

Banco Internacional del Perú S.A.A.(b)

    8.5%        April 2026      US$          Property        52,339        48,710   

Banco Internacional del Perú S.A.A.(b)

    8.7%        April 2028      US$          Property        69,992        65,139   

Banco Internacional del Perú S.A.A.(b)

   
 
3 month
Libor + 6%
  
  
    April 2028      US$          Property        69,992        65,139   

Banco BTG Pactual S.A. – Cayman Branch(c)

    9%        December 2019      US$          Property        18,583          

Banco Internacional del Perú S.A.A.

    6.8%               S/.        Property        1,109        1,674   
         

 

 

 
            212,015        180,662   
         

 

 

 

Structuring fees

            (3,862       
         

 

 

 

Total

            208,153        180,662   
         

 

 

 

Maturities

           

Current portion

            1,109        1,674   

Non-current portion

            207,044        178,988   
         

 

 

 

Total

            208,153        180,662   

 

 

In order to comply with the financial obligations above mentioned, the Company constituted a trust fund with La Fiduciaria.

 

  (b)   On March 16, 2015, the Company received the last disbursement of the syndicated loan for US$2,218,000 (equivalent to S/. 6,873,000), that was used to pay obligations with the suppliers involved in the construction of the Hydroelectric Plants.

 

  (c)   Corresponds to the commercial loan for US$6,000,000 (equivalent to S/.18,378,000) obtained on February 5, 2015, that was used to start commercial operations of the Runatullo II and III Hydroelectric Plant.

 

F-128


Table of Contents

8. Cost of sales

Following is the composition of this caption:

 

      For the three months ended 31 March  
      2015
S/.(000)
     2014
S/.(000)
 

Depreciation, note 6

     1,335           

Operating and maintenance cost

     550           

Insurance

     387           

Taxes

     130           

Amortization of intangible assets

     2           

Other

     382           
  

 

 

 
     2,786           

 

 

 

9.   Income tax

 

  (a)   Following is the composition of the deferred income tax:

 

      March 31,
2015
S/.(000)
     December 31,
2014
S/.(000)
 

Difference of book and tax depreciation rates

     (2,853      (321

Amortization of capitalized interest

     (89      (16

Other

     11           
  

 

 

 

Deferred income tax liability, net

     (2,931      (4,469

 

 

 

  (b)   The Company calculates the income tax expense of the period using the tax rate that would be applicable to the expected total annual earnings. The major components of income tax expense in the interim statement of comprehensive income are:

 

      For the three months ended 31 March  
      2015
S/.(000)
     2014
S/.(000)
 

Current income tax expense

               

Deferred income tax expense

     (2,594        
  

 

 

 
     (2,594        

 

 

 

10.   Contingencies

There are no significant trials or lawsuits pending resolution against the Company as of March 31, 2015 and December 31, 2014.

 

F-129


Table of Contents
11.   Transactions with related entities

 

  (a)   During the three months ended March 31, 2015 and 2014, the Company performed the following transactions with related entities, which were performed under market conditions:

 

      For the three months ended 31 March  
      2015
S/.(000)
     2014
S/.(000)
 

Services received

     

GCZ Servicios S.A.C.

     977         130   

GCZ Ingenieros S.A.C.

     169         253   

GCZ Desarrollo y Gestión S.A.C.

             62   
  

 

 

 
     1,146         445   

 

 

 

  (b)   As consequence of these and other minor transactions, the Company held the following accounts receivable and accounts payable with related entities as of March 31, 2015 and December 31, 2014:

 

     

March 31,

2015
S/.(000)

    

December 31,

2014
S/.(000)

 

Accounts receivable

     

Current

     

GCZ Ingenieros S.A.C.

     100         32   
  

 

 

 

Advances to suppliers

     

GCZ Ingenieros S.A.C.

             61   

GCZ Desarrollo y Gestión S.A.C.

     2         2   
  

 

 

 
     2         63   
  

 

 

 

Total

     102         95   
  

 

 

 

Accounts payable

     

GCZ Ingenieros S.A.C.

     1,636         9,344   

GCZ Servicios S.A.C.

             452   

GCZ Construcción S.A.C.

             29   

GCZ Desarrollo y Gestión S.A.C.

             21   
  

 

 

 
     1,636         9,846   
  

 

 

 

Loans payable

     

Current

     

EGE Junín Tulumayo IV S.A.C.

             10   

EGE Junín Tulumayo V S.A.C.

             10   

Latin America Power Perú S.A.C.

     864         5,897   
  

 

 

 
     864         5,917   
  

 

 

 

Total

     2,500         15,763   

 

 

 

F-130


Table of Contents
     

March 31,

2015
S/.(000)

    

December 31,

2014
S/.(000)

 

Maturities:

     

Current

     1,636         9,866   

Non-current

     864         5,897   
  

 

 

 

Total

     2,500         15,763   

 

 

 

12.   Information on fair value of financial instruments

Following is shown a comparison by category of carrying amounts and fair values of financial instruments of the Company presented in the financial statements:

 

      Book value      Fair value  
     

March 31,

2015

S/.(000)

    

December 31,

2014

S/.(000)

    

March 31,

2015

S/.(000)

    

December 31,

2014

S/.(000)

 

Financial liabilities

           

Loans and borrowings:

           

Fixed rate loans

     208,153         180,662         244,265         209,524   
  

 

 

 

Total

     208,153         180,662         244,265         209,524   

 

 

Management estimates that there are no significant differences between the book value and the fair value of the other Company’s financial instruments as of March 2015 and December 31, 2014.

 

13.   Subsequent events

Between April 1, 2015, and the issuance date of the present financial statements (May 30, 2015), there have not been any significant subsequent events of financial-accounting nature that could affect the interpretation of the present financial statements.

 

F-131


Table of Contents

Hidroeléctrica Santa Cruz S.A.C.

Interim statement of financial position

As of March 31, 2015 (unaudited) and December 31, 2014 (audited)

 

      Note   

March 31,

2015

S/.(000)

    

December 31,

2014

S/.(000)

 

Assets

        

Current assets

        

Cash and cash equivalents

   3      1,555         1,406   

Trade accounts receivable

   4      5,898         2,566   

Other accounts receivable

   5      756         3,702   

Accounts receivable from related parties

   12(b)      3           

Prepaid expenses and other

        754         375   
  

 

 

 

Total current assets

        8,966         8,049   
  

 

 

 

Non-current assets

        

Other accounts receivable

   5      7,613         5,121   

Property, plant and equipment

   6      153,637         154,482   

Intangible assets, net

        2,228         2,280   
  

 

 

 

Total non-current assets

        163,478         161,883   
  

 

 

 

Total assets

        172,444         169,932   
  

 

 

 

Liabilities and equity

        

Current liabilities

        

Loans and borrowings

   7      8,617         8,263   

Trade accounts payable

        123         304   

Accounts payable to related parties

   12(b)      282         5   

Other accounts payable

        765         471   

Derivative financial instruments

   8      11,254         8,722   
  

 

 

 

Total current liabilities

        21,041         17,765   
  

 

 

 

Non-current liabilities

        

Loans and borrowings

   7      112,303         112,129   

Deferred taxes

   10(a)      5,148         4,469   
  

 

 

 

Total non-current liabilities

        117,451         116,598   
  

 

 

 

Total liabilities

        138,492         134,363   
  

 

 

 

Equity

        

Share capital

        31,238         31,238   

Legal reserve

        6,248         6,248   

Other reserves

        4,198         4,198   

Accumulated losses

        (7,732)         (6,115)   
  

 

 

 

Total equity

        33,952         35,569   
  

 

 

 

Total liability and equity

        172,444         169,932   

 

 

 

F-132


Table of Contents

Hidroeléctrica Santa Cruz S.A.C.

Interim statement of comprehensive income (unaudited)

For the three-month periods ended March 31, 2015 and 2014

 

      Note  

March 31,

2015

S/.(000)

   

March 31,

2014

S/.(000)

 

Revenue

      

Energy sales

   1     10,089        7,549   

Power sales

       336        411   

Other operating income

       57        123   
    

 

 

 
       10,482        8,083   

Cost of sales

   9     (2,306     (2,242
    

 

 

 

Gross profit

       8,176        5,841   

Operating expenses

      

Administrative expenses

       (499     (415
    

 

 

 

Operating profit

       7,677        5,426   

Financial income

              2   

Financial expenses

       (4,858     (9,787

Exchange losses, net

       (3,433     (508
    

 

 

 

Loss before income tax

       (614     (4,867

Income tax

   10(b)     (679     (786
    

 

 

 

Net loss

       (1,293     (5,653
    

 

 

 

Other comprehensive income

                
    

 

 

 

Total comprehensive income for the period

       (1,293     (5,653

 

 

 

F-133


Table of Contents

Hidroeléctrica Santa Cruz S.A.C.

Interim statement of changes in equity (unaudited)

For the three-month periods ended March 31, 2015 and 2014

 

     

Share

capital

S/.(000)

    

Legal

reserve

S/.(000)

    

Other

reserves

S/.(000)

    

Accumulated

losses

S/.(000)

   

Total

S/.(000)

 

As of January 1, 2014

     31,238         6,248         4,198         3,746        45,430   

Net loss for the period

                             (5,653     (5,653

Dividend distribution

                             (983     (983
  

 

 

 

At March 31, 2014

     31,238         6,248         4,198         (2,890     38,794   
  

 

 

 

As of January 1, 2015

     31,238         6,248         4,198         (6,115     35,569   

Net loss for the period

                             (1,293     (1,293

Dividend distribution, note 12(c)

                             (324     (324
  

 

 

 

As of March 31, 2015

     31,238         6,248         4,198         (7,732     33,952   

 

 

 

 

F-134


Table of Contents

Hidroeléctrica Santa Cruz S.A.C.

Interim statement of cash flows (unaudited)

For the three-month period ended March 31, 2015 and 2014

 

     

March 31,

2015

S/.(000)

   

March 31,

2014

S/.(000)

 

Operating activities

    

Collections from customers

     7,136        6,604   

Payments to suppliers

     (1,774     (1,380

Payments of taxes, interest and other, net

     (2,209     (2,849
  

 

 

 

Net cash flow from operating activities

     3,153        2,375   
  

 

 

 

Investing activities

    

Restricted funds

     (62     (8

Purchase of property, plant and equipment

     (562     (313
  

 

 

 

Net cash used in investing activities

     (624     (321
  

 

 

 

Financing activities

    

Repayment of borrowings

     (2,056     (1,801

Dividends paid

     (324     (983
  

 

 

 

Net cash flows used in financing activities

     (2,380     (2,784
  

 

 

 

Net increase (decrease) in cash and cash equivalents for the period

     149        (730

Cash and cash equivalents at beginning of the period

     1,406        2,980   
  

 

 

 

Cash and cash equivalents at the end of the period

     1,555        2,250   

 

 

 

F-135


Table of Contents

Hidroeléctrica Santa Cruz S.A.C.

Notes to the interim financial statements

As of March 31, 2015 (unaudited) and December 31, 2014 (audited)

 

1.   Identification and business activity

 

  (a)   Identification

Hidroeléctrica Santa Cruz S.A.C. (hereafter “the Company”) is a Peruvian entity incorporated on December 21, 2006, in the city of Lima, subsidiary of Latin America Power Perú S.A.C. (a Subsidiary of Latin America Power Holding B.V., domiciled in the Netherlands), which holds 65.7 percent of the voting shares of the Company’s capital stock (a 30.54 percent direct participation, and a 35.16 percent indirect participation through HSC Holding S.A.C.).

 

  (b)   Business activity

The Company is dedicated to the generation and sale of electricity to local private and state-owned companies, as well as to engineering activities, and actions related to its business activity. Its legal domicile is Av. del Pinar N° 152, Oficina N° 508, Santiago de Surco, Lima, Peru.

As of March 31, 2015 and 2014, the Company is developing the Santa Cruz III Hydroelectric Plant, which is located all along the Santa Cruz River (Caraz, department of Áncash). Said plant will have 2.8 MW of generation capacity. Construction started in January 2015 and commercial operations are estimated to start by July 2016.

On January 12, 2012, and February 15, 2012, the Company started the commercial operations of Group 1 and Group 2, respectively, of the Huasahuasi I Hydroelectric Plant, which has 10.0 MW of generation capacity. Said plant is located in the basins of the Huasahuasi and Huacuas rivers, Huasahuasi district, province of Tarma, department of Junín.

On April 18, 2012, and May 5, 2012, the Company started the commercial operations of Group 1 and Group 2, respectively, of the Huasahuasi II Hydroelectric Plant, which has 10.0 MW of generation capacity. Said plant is located in the basins of the Huasahuasi and Huacuas rivers, Huasahuasi district, province of Tarma, department of Junín.

In 2010, the Company started operations of the Santa Cruz II Hydroelectric Plant, which has 7.4 MW of generation capacity.

In 2009, the Company started operations of the Santa Cruz I Hydroelectric Plant, which is located on the Santa Cruz River (15 km north of the city of Caraz, department of Áncash), which has 6.0 MW of generation capacity.

In 2008, the Company entered the Regime of Investment Promotion on Electricity Generation by Using Renewable Energy Resources (hereafter “RER”), through which the Company supplies the

National Interconnected Electric System (“SEIN” under its Spanish acronym) with energy generated by its four hydroelectric plants that are currently operating. For this purpose, the Company and the Peruvian government signed RER contracts, which have a 20-year period maturity, which establish that, through the mechanism of RER Auctions, the Company receives a fixed fee, adjusted for WPSSOP3500 rate (finished goods less food and energy), per megawatt established for each hydroelectric plant.

 

F-136


Table of Contents
2.   Basis of preparation and changes to accounting policies

 

  2.1   Basis of preparation—

The interim financial statements for the three months ended 31 March 2015 have been prepared in accordance with IAS 34 Interim Financial Reporting.

The interim financial statements do not include all the information and disclosures required in the annual financial statements, and should be read in conjunction with the annual financial statements as at 31 December 2014.

 

  2.2   New standards, interpretations and amendments adopted by the Company

The accounting policies adopted in the preparation of the interim financial statements are consistent with those followed in the preparation of the annual financial statements for the year ended 31 December 2014. The Company has not early adopted any standard, interpretation or amendment that has been issued but is not yet effective.

 

3.   Cash and cash equivalents

 

  (a)   Following is the composition of this caption:

 

      March 31,
2015
S/.(000)
     December 31,
2014
S/.(000)
 

Current accounts(b)

     688         625   

Trust fund account(c)

     867         781   
  

 

 

 
     1,555         1,406   

 

 

 

  (b)   As of December 31, 2014 and 2013, the Company keeps current accounts in local banks, denominated in local and foreign currency, are unrestricted and do not bear interest.

 

  (c)   Correspond to the “collections bank account” which include collections from customers of the Company which are deposited in an account in local and foreign currency in a local bank, according to the Trust Agreement subscribed with La Fiduciaria . These balances are freely available.

 

4.   Trade accounts receivable

 

  (a)   Following is the composition of this caption:

 

      March 31,
2015
S/.(000)
     December 31,
2014
S/.(000)
 

Trade accounts receivable(b)

     3,262         2,084   

Accrued income for RER auctions(c)

     2,650         482   
  

 

 

 
     5,912         2,566   

Less:

     

Provision for doubtful accounts receivable

     (14        
  

 

 

 
     5,898         2,566   

 

 

 

  (b)   Trade accounts receivable correspond mainly to the estimation performed by Management of accounts receivable from energy delivered but not billed in the month. These accounts receivable are billed on the first days of the following month and are denominated in Nuevos Soles.

 

       As of March 31, 2015 and December 31, 2014, the aging of the balance of accounts receivable is mainly comprised by non-past due balances shorter than 30 days.

 

F-137


Table of Contents
  (c)   Corresponds to unbilled sales of energy delivered into the current month. These sales are invoiced within the billing cycle of the following month.

 

5.   Other accounts receivable

 

  (a)   Following is the composition of this caption:

 

      March 31,
2015
S/.(000)
     December 31,
2014
S/.(000)
 

Value Added Tax credit(b)

     5,304         5,820   

Restricted funds(c)

     1,669         1,608   

Advance payment of Income Tax

     640         640   

Other accounts receivable

     756         755   
  

 

 

 
     8,369         8,823   
  

 

 

 

Current

     756         3,702   

Non-current

     7,613         5,121   
  

 

 

 
     8,369         8,823   
  

 

 

 

 

  (b)   During 2015 and 2014, the Value Added Tax – VAT credit was generated by purchases and acquisitions from suppliers for the development of electricity generation activities, which will be recovered in the medium term.

 

  (c)   Corresponds to the fiduciary reserve deposits made as result of the loan with Banco Internacional del Perú S.A.A., note 7(a). As of March 31, 2015 and December 31, 2014, the deposits are equivalent to two installments of the aforementioned loan, according to the maturity schedule.

 

6.   Property, plant and equipment

 

  (a)   Following is the movement and composition of the caption at the date of the financial statements:

 

     

Cost

S/.(000)

    

Accumulated
depreciation

S/.(000)

    

Net book
value

S/.(000)

 

As of March 31, 2015

        

Balance as of January 1, 2015

     166,425         (11,943      154,482   

Additions(b)

     637         (892      (256

Reclassification(c)

     (589              (589
  

 

 

 

Balance as of March 31, 2015

     166,473         (12,836      153,637   
  

 

 

 

As of December 31, 2014

        

Balance as of January 1, 2014

     165,195         (8,222      156,973   

Additions(b)

     1,230         (3,721      (2,491
  

 

 

 

Balance as of December 31, 2014

     166,425         (11,943      154,482   

 

 

 

  (b)   As of March 31, 2015 and December 31, 2014, additions correspond mainly to complementary civil works performed at the Santa Cruz II and Huasahuasi II Hydroelectric Plants.

 

  (c)   Corresponds to the reclassification of the financial commissions for structuring the loans, to the account “Loans and borrowings”, see note 7.

 

F-138


Table of Contents
7.   Loans and borrowings

 

  (a)   Following is the composition of this caption:

 

                                        Total  
            Currency     Guarantee    

Fixed

annual
interest

rate

    Maturities     March 31,
2015
S/.(000)
    December 31,
2014
S/.(000)
 

Loans

             

Banco Internacional del Perú S.A.A.(b)

    US$          Property        7.30%        November 2022        77,251        75,862   

Structuring fees

              (437       
           

 

 

 
              76,814        75,862   
           

 

 

 

Finance leases

             

BBVA Banco Continental

    Leasing        S/.        Equipment        7.35%        June 2019        6,182        6,414   

BBVA Banco Continental

    Leasing        S/.        Property        7.35%        June 2019        3,350        3,476   

BBVA Banco Continental

    Leasing      US$          Property        7.00%        February 2023        7,614        7,493   

BBVA Banco Continental

    Leaseback        S/.        Equipment        7.20%        March 2023        13,449        13,737   

BBVA Banco Continental

    Leaseback        S/.        Property        7.20%        April 2023        2,657        2,718   

BBVA Banco Continental

    Leaseback      US$          Equipment        6.90%        March 2023        6,885        6,776   

BBVA Banco Continental

    Leaseback      US$          Property        6.90%        April 2023        3,969        3,916   
           

 

 

 
              44,106        44,530   
           

 

 

 

Total

              120,920        120,392   
           

 

 

 

Maturities

             

Current portion

              8,617        8,263   

Non-current portion

              112,303        112,129   
           

 

 

 

Total

              120,920        120,392   

 

 

In order to comply with the financial obligations above mentioned, the Company constituted a trust fund with La Fiduciaria.

 

  (b)   Corresponds to the commercial loan for US$28,000,000 (equivalent to S/.83,692,000) that was used for the construction and to start commercial operations of the Huasahuasi I and II Hydroelectric Plants, that was granted between 2010 and 2012.

 

F-139


Table of Contents
8.   Derivative financial instruments

As of March 31, 2015 and December 31, 2014 the Company has contracted cross currency interest swaps with BBVA Banco Continental in order to manage the interest rate risk. The detail of such instruments is as follows:

 

                    Nominal amount            Fair value  
Description   Beginning
date
    

Maturity

date

    US$(000)     S/.(000)    

Exchange

rate

   

March 31,

2015

S/.(000)

   

December 31,

2014

S/.(000)

 

Swap agreement – BBVA Banco Continental

    26/10/2010         30/07/2019        6,060        16,878        2.785        3,024        2,249   

Swap agreement – BBVA Banco Continental

    15/03/2013         15/03/2023        6,982        18,048        2.585        6,846        5,380   

Swap agreement – BBVA Banco Continental

    09/04/2013         10/04/2023        1,383        3,551        2.567        1,384        1,093   
      

 

 

     

 

 

 

Total

         14,425        38,477          11,254        8,722   

 

 

Effects of the accounting of derivative financial instruments held by the Company are presented in the “Financial expenses” caption of the statements of comprehensive income.

 

9.   Cost of sales

 

  Following   is the composition of this caption:

 

      For the three months ended 31 March  
      2015
S/.(000)
     2014
S/.(000)
 

Depreciation

     892         927   

Operating and maintenance cost

     660         593   

Insurance

     295         339   

Taxes

     204         191   

Amortization of intangible asset

     52         52   

Maintenance of fixed assets

     8           

Other

     195         140   
  

 

 

 
     2,306         2,242   

 

 

 

F-140


Table of Contents
10.   Income tax

 

  (a)   Following is the composition of the deferred income tax:

 

      March 31,
2015
S/.(000)
     December 31,
2014
S/.(000)
 

Tax losses

     1,770         1,770   

Exchange difference loss considered for tax purposes as cost of plant and equipment

     2,008         2,031   

Difference of book and tax depreciation rates

     (8,297      (7,679

Amortization of capitalized interest

     (633      (591

Other

     4           
  

 

 

 

Deferred income tax liability, net

     (5,148      (4,469

 

 

 

  (b)   The Company calculates the income tax expense of the period using the tax rate that would be applicable to the expected total annual earnings. The major components of income tax expense in the interim statement of comprehensive income are:

 

      For the three months ended 31 March  
      2015
S/.(000)
     2014
S/.(000)
 

Current income tax expense

               

Deferred income tax expense

     (679      (786

 

 

 

11.   Contingencies

There are no significant trials or lawsuits pending resolution against the Company as of March 31, 2015 and December 31, 2014.

 

12.   Transactions with related entities

 

  (a)   During the three months ended March 31, 2015 and 2014, the Company performed the following transactions with related entities, which were performed under market conditions:

 

      For the three months ended 31 March  
      2015
S/.(000)
     2014
S/.(000)
 

Services received

     

GCZ Servicios S.A.C.

     896         734   

GCZ Fabricaciones S.A.C.

     637         263   
  

 

 

 
     1,533         997   

 

 

 

F-141


Table of Contents
  (b)   As a consequence of these and other minor transactions, the Company held the following accounts receivable and accounts payable with related entities as of March 31, 2015 and December 31, 2014:

 

      March 31,
2015
S/.(000)
     December 31,
2014
S/.(000)
 

Accounts receivable

     

GCZ Desarrollo y Gestión S.A.C.

     3           
  

 

 

 

Accounts payable

     

GCZ Servicios S.A.C.

     119         5   

GCZ Fabricaciones S.A.C.

     163           
  

 

 

 
     282         5   

 

 

The balances of accounts receivable and accounts payable have current maturity.

 

  (c)   During March 2015, the Company paid dividends in advance to its shareholders, the detail is as follows:

 

      S/.(000)  

Latin America Power Perú S.A.C.

     153   

GCZ Energía S.A.C.

     97   

Manuel Montori

     74   
  

 

 

 
     324   

 

 

 

13.   Information on fair value of financial instruments

Following is shown a comparison by category of carrying amounts and fair values of financial instruments of the Company presented in the financial statements:

 

      Book value      Fair value  
      March 31,
2015
S/.(000)
     December 31,
2014
S/.(000)
     March 31,
2015
S/.(000)
     December 31,
2014
S/.(000)
 

Financial liabilities

           

Loans and borrowings:

           

Fixed rate loans

     120,920         120,392         141,188         140,482   
  

 

 

 

Total

     120,920         120,392         141,188         140,482   

 

 

Management estimates that there are no significant differences between the book value and the fair value of the other Company’s financial instruments as of March 2015 and December 31, 2014.

 

14.   Subsequent events

Between April 1, 2015, and the issuance date of the present financial statements (May 30, 2015), there have not been any significant subsequent events of financial-accounting nature that could affect the interpretation of the present financial statements.

 

F-142


Table of Contents

Plantas Eólicas, S.R.L.

(A Costa Rican Entity)

Interim condensed statements of financial position

As of March 31, 2015 and December 31, 2014 and 2013

 

            March 31,
2015
     December 31,
2014
     December 31,
2013
 
(expressed in US dollars)    Notes    (Unaudited)      (Audited)
restated
(note 2.2)
     (Audited)
restated
(note 2.2)
 

ASSETS

           

Current assets:

           

Cash

   4    $ 847,166       $ 815,424       $ 341,813   

Accounts and notes receivable

   5      2,325,738         747,502         639,071   

Spare parts inventory

        682,225         732,524         695,859   

Prepaid expenses

        30,434         67,185         71,931   

Income tax paid

                        112,682   
     

 

 

 

Total current assets

        3,885,563         2,362,635         1,861,356   

Non-current assets:

           

Property, plant and equipment

   6      1,058,724         977,754         1,027,168   

Other financial assets

        13,418         11,857         14,660   
     

 

 

 

Total assets

      $ 4,957,705       $ 3,352,246       $ 2,903,184   
     

 

 

 

LIABILITIES AND EQUITY

           

Current liabilities:

           

Accounts payable and accrued expenses

      $ 236,077       $ 185,009       $ 104,326   

Accounts payable to related parties

   7      98,611         72,280         83,545   

Income tax payable

        494,657         291,090           
     

 

 

 
        829,345         548,379         187,871   

Non-current liabilities:

           

Deferred income tax, net

        53,499         63,306         55,302   

Decommissioning provision

        586,984         571,448         527,563   
     

 

 

 

Total liabilities

        1,469,828         1,183,133         770,736   
     

 

 

 

Equity:

           

Capital quotas

        376,881         376,881         376,881   

Legal reserve

        37,504         37,504         37,504   

Retained earnings

        3,073,492         1,754,728         1,718,063   
     

 

 

 

Total equity

        3,487,877         2,169,113         2,132,448   
     

 

 

 

Total liabilities and equity

      $ 4,957,705       $ 3,352,246       $ 2,903,184   

 

 

 

The accompanying notes are part of the interim condensed financial statements.

 

F-143


Table of Contents

Plantas Eólicas, S.R.L.

(A Costa Rican Entity)

Interim condensed statements of comprehensive income

For the three-month periods ended March 31, 2015 and 2014

 

          March 31,
2015
    March 31,
2014
 
(expressed in US dollars)   Notes   (Unaudited)     (Unaudited)  

Income:

     

Sale of electric power and capacity charge

    $ 2,540,612      $ 2,797,199   
   

 

 

 

Operating costs and expenses:

     

Cost of operations

      511,888        472,465   

Administrative expenses

      281,784        304,992   

Depreciation of non-financial assets

      4,702        56,694   
   

 

 

 

Total operating costs and expenses

      798,374        834,151   
   

 

 

 

Operating income

      1,742,238        1,963,048   

Other income (expenses):

     

Interest income

      3,776        1,231   

Finance costs from decommissioning provision

      (7,229     (7,287

Gain on sale of land

      125,464          

Other operating (expenses) income, net

      (8,167     1,721   

Exchange rate differences

      15,606        73,994   
   

 

 

 

Income before income tax

      1,871,688        2,032,707   

Income tax

  8     (552,924     (658,111
   

 

 

 

Total comprehensive income

    $ 1,318,764      $ 1,374,596   

 

 

 

The accompanying notes are part of the interim condensed financial statements.

 

F-144


Table of Contents

Plantas Eólicas, S.R.L.

(A Costa Rican Entity)

Interim condensed statements of changes in equity

For the three-month periods ended March 31, 2015 and 2014

 

      Capital
quotas
     Legal
reserve
     Retained
earnings
     Total
equity
 
(expressed in US dollars)                   

Restated

(note 2.2)

     Restated
(note 2.2)
 

For the three-month period ended March 31, 2014:

           

As of January 1, 2014 (audited)

   $ 376,881       $ 37,504       $ 1,718,063       $ 2,132,448   

Comprehensive income

                     1,374,596         1,374,596   
  

 

 

 

As of March 31, 2014 (unaudited)

   $ 376,881       $ 37,504       $ 3,092,659       $ 3,507,044   
  

 

 

 

For the three-month period ended March 31, 2015:

           

As of January 1, 2015 (audited)

   $ 376,881       $ 37,504       $ 1,754,728       $ 2,169,113   

Comprehensive income

                     1,318,764         1,318,764   
  

 

 

 

As of March 31, 2015 (unaudited)

   $ 376,881       $ 37,504       $ 3,073,492       $ 3,487,877   

 

 

The accompanying notes are part of the interim condensed financial statements.

 

F-145


Table of Contents

Plantas Eólicas, S.R.L.

(A Costa Rican Entity)

Interim condensed statements of cash flows

For the three-month periods ended March 31, 2015 and 2014

 

      March 31,
2015
    March 31,
2014
 
(expressed in US dollars)    (Unaudited)     (Unaudited)  

Operating activities:

    

Income before income tax

   $ 1,871,688      $ 2,032,707   

Adjustments to reconcile income before income tax to cash flows from operating activities:

    

Depreciation expense

     4,702        56,694   

Gain on sale of land

     (125,464       

Loss on disposal of property, plant and equipment

            129,856   

Finance cost from provisions

     7,229        7,287   

Decommissioning provision

     8,307        4,889   

Interest income

     (3,776     (1,231
  

 

 

 
     1,762,686        2,230,202   

Changes in operating assets and liabilities:

    

Accounts receivable

     (1,432,857     (1,387,810

Spare parts inventory

     50,299        41,388   

Prepaid expenses

     36,751        41,287   

Other financial assets

     (1,561     909   

Accounts payable and accrued expenses

     3,832        16,787   

Accounts payable with related parties

     26,331        (52,539

Income tax paid

     (311,928     (29,966
  

 

 

 

Net cash provided by operating activities

     133,553        860,258   
  

 

 

 

Investing activities:

    

Additions to property, plant and equipment

     (105,587     (78,200

Interest received

     3,776        1,231   
  

 

 

 

Net cash used in investing activities

     (101,811     (76,969
  

 

 

 

Net increase in cash

     31,742        783,289   

Cash at beginning of year

     815,424        341,813   
  

 

 

 

Cash at end of year

   $ 847,166      $ 1,125,102   

 

  

 

 

   

 

 

 

The accompanying notes are part of the interim condensed financial statements.

 

F-146


Table of Contents

Plantas Eólicas, S.R.L.

(A Costa Rican Entity)

Notes to interim condensed financial statements

March 31, 2015

(expressed in US dollars)

1. Corporate information

Plantas Eólicas, S.R.L. (“Plantas Eólicas” or “the Company”) was incorporated in accordance with the laws of the Republic of Costa Rica on November 9, 1990 for a ninety-nine-year term. Its legal address is in the city of Tilarán, Guanacaste Costa Rica. The Company is a wholly-owned subsidiary of Inversiones Eólicas de Costa Rica, S.A., which in turn is controlled by Globeleq Mesoamerica (Wind) Limited (“GME Wind”) an entity domiciled in Bermuda and Orosí’s ultimate parent is Actis Infrastructure Fund 2LP. The ultimate parent of Plantas Eólicas is Actis Infrastructure Fund 2LP.

The Company’s main activity is the generation of electricity from its 23 megawatt (MW) wind electric power generating plant located in Guanacaste, Costa Rica. All the electricity generated by the plant is sold to Instituto Costarricense de Electricidad (“ICE”).

The Company does not have traded debt or equity in the public markets. The accompanying financial statements have been prepared for use in a securities filing in connection with the acquisition of the Company as explained in Note 9.

2. Basis of preparation of the financial statements and accounting policies

The accompanying restated interim condensed financial statements have been prepared for use in a securities filing in connection with the acquisition of the Company as explained in Note 10. They have also been restated for the correction of certain errors as explained in Note 2.2. The Company’s Chief Executive Officer as of December 31, 2014 and 2013.

2.1 Basis of preparation

The interim condensed financial statements for the three-month period ended March 31, 2015 have been prepared in accordance with IAS 34 Interim Financial Reporting, an accounting standard of the International Financial Reporting Standards (IFRS) as issued by the International Accounting Standards Board.

The Company’s interim condensed financial statements as of March 31, 2015 were approved for issuance by the Company’s Chief Executive Officer and Chief Financial Officer on June 13, 2015. The accompanying interim condensed financial statements have been prepared for use in a securities filing in connection with the acquisition of the Company as explained in Note 9. They have also been restated as of December 31, 2014 and 2013 and for the three-month period ended March 31, 2014.

2.2 Restatement of interim condensed financial statements

During its preparation of the accompanying interim condensed financial statements for the purpose aforementioned described, the Company identified certain accounting errors that are being retrospectively corrected herein. They are explained as follows:

 

 

The Company has identified the need for a decommissioning provision in the accompanying financial statements given obligations that it believes exist under IAS 37 Provisions, Contingent Liabilities and Contingent Assets.

 

F-147


Table of Contents
 

The Company has determined residual values for its wind turbines which resulted in a change in the depreciation expense.

 

 

The aforementioned matters have an impact on deferred income tax.

 

 

Certain accounting disclosures have been expanded from those previously presented.

These corrections have impacted the accompanying interim condensed financial statements as follows (amounts in US dollars):

 

      Balance as of the
year ended
December 31,
2014
as previously
reported
     Retrospective
adjustments
     Balance as of the
year ended
December  31,
2014
as restated
 

Statement of financial position:

        

Current assets

     2,362,635                 2,362,635   

Non-current assets

     338,532         651,079         989,611   
  

 

 

 

Total assets

     2,701,167         651,079         3,352,246   
  

 

 

 

Current liabilities

     548,379                 548,379   

Non-current liabilities

             634,754         634,754   
  

 

 

 

Total liabilities

     548,379         634,754         1,183,133   
  

 

 

 

Equity

     2,152,788         16,325         2,169,113   

 

 

2.3 New standards, interpretations and amendments thereof, adopted by the Company

The accounting policies applied by the Company in the preparation of these interim condensed financial statements are consistent with those applied in the preparation of its annual financial statements for the year ended December 31, 2014.

3. Seasonality of operations

The Company’s revenue depends on the wind power, which is normally stronger during the dry season, which in Costa Rica occurs from December through April. Due to the seasonal nature of this business and the difference in the rates, higher revenues and operating profits are usually expected from January to May (higher rates and winds) in comparison with the remaining period of the year. This information is provided to allow for a proper appreciation of the results, however Management have concluded that it does not meet the definition of “highly seasonal” as considered by IAS 34 Interim Financial Reporting.

4. Cash

 

      March 31
2015
     December 31
2014
 

Cash in banks and on hand:

     

Banks

   $ 846,231       $ 814,500   

Petty cash

     935         924   
  

 

 

 
   $ 847,166       $ 815,424   

 

 

Cash deposited in bank accounts earns interest based on daily rates determined by the corresponding banks. As of March 31, 2015 (December 31, 2014), there were no restrictions on the use of cash balances.

 

F-148


Table of Contents

5. Accounts and notes receivable

 

     

March 31

2015

    

December 31

2014

 

Instituto Costarricense de Electricidad (ICE)

   $ 1,960,188       $ 668,459   

Advance payments to Suppliers

     219,835         78,916   

Related parties (note 7)

     145,665           

Others

     50         127   
  

 

 

 
   $ 2,325,738       $ 747,502   

 

 

The outstanding balances due from ICE correspond to trade receivables for the sale of electric power. Terms of these accounts receivable extend to 30 days from the corresponding invoice issue dates; are not subject to early-payment discounts, and do not generate interest except for late charges.

As of March 31, 2015 and December 31, 2014, receivable balances were not past due. Based on the collection analysis performed by Management, it has been determined that no impairment existed as of those dates.

6. Property, plant and equipment

 

     Land     Buildings     Machinery and
equipment
    Furniture and
equipment
    Vehicles     Work in
process
    Total  

Cost:

             

As of December 31, 2013

  $ 206,697      $ 360,976      $ 7,994,133      $ 139,285      $ 228,632      $      $ 8,929,723   

Additions

           1,865        131,088        20,449        37,036               190,438   

Retirements

                  (3,010     (8,390     (30,000            (41,400
 

 

 

 

As of December 31, 2014

    206,697        362,841        8,122,211        151,344        235,668               9,078,761   

Additions

                  97,028        8,098               461        105,587   

Retirements

    (19,915                                        (19,915
 

 

 

 

As of March 31, 2015

  $ 186,782      $ 362,841      $ 8,219,239      $ 159,442      $ 235,668      $ 461      $ 9,164,433   
 

 

 

 

Accumulated depreciation:

             

As of December 31, 2013

  $      $ 330,870      $ 7,221,534      $ 121,519      $ 228,632      $      $ 7,902,555   

Depreciation

           30,154        188,803        19,044        1,851               239,852   

Retirements

                  (3,010     (8,390     (30,000            (41,400
 

 

 

 

As of December 31, 2014

           361,024        7,407,327        132,173        200,483               8,101,007   

Depreciation

           47        3,031        698        926               4,702   

Retirements

                                                
 

 

 

 

As of March 31, 2015

  $      $ 361,071      $ 7,410,358      $ 132,871      $ 201,409      $      $ 8,105,709   
 

 

 

 

Carrying amounts:

             

As of December 31, 2013

  $ 206,697      $ 30,106      $ 772,599      $ 17,766      $      $      $ 1,027,168   
 

 

 

 

As of December 31, 2014

  $ 206,697      $ 1,817      $ 714,884      $ 19,171      $ 35,185      $      $ 977,754   
 

 

 

 

As of March 31, 2015

  $ 186,782      $ 1,770      $ 808,881      $ 26,571      $ 34,259      $ 461      $ 1,058,724   

 

 

The Company has recognized a decommissioning provision related to its wind farm.

 

F-149


Table of Contents

7. Balances and transactions with related parties

The related parties with whom the Company maintains balances and performs transactions are entities under the common control of Globeleq Mesoamerica Energy (Wind) Limited. A breakdown of these balances and the respective terms and conditions is as follows:

 

     

March 31

2015

    

December 31

2014

 

Notes receivable:

     

Alisios Holdings, S.A. (note 5)

   $ 145,665       $   
  

 

 

 

Account payable:

     

CR Operaciones y Mantenimiento, S.A.

   $ 98,611       $ 72,280   

 

 

The maturity term for the balance payable extends up to 30 days from the corresponding invoices’ issue dates, and is not subject to interest or discounts for early-payment.

Transactions performed with related parties are summarized below:

 

      March 31
2015
     March 31
2014
 

Sale of land:

     

Alisios Holdings, S.A.

   $ 145,665       $   
  

 

 

 

Plant operation expenses:

     

CR Operaciones y Mantenimiento, S.A.

   $ 280,764       $ 224,806   
  

 

 

 

Administrative expenses:

     

TCR Holdings, S.A.

   $ 210,000       $ 210,000   

 

 

The Company financed the sale of land to Alisios Holdings, S.A. through the issuance of a note receivable in US dollars at an annual interest rate of 6.21% and with a maturity date of January 19, 2016, with principal and interest to be paid in a single payment on that date.

Plant operation expenses correspond to billings from the related party which operates and provides maintenance to the plant.

Administrative expenses correspond to payments for accounting, financial, logistical, market, human resources, IT and engineering services.

 

F-150


Table of Contents

8. Income tax and deferred income tax

The Company calculates the period income tax expense using the tax rate that would be applicable to the expected total annual earnings. The major components of income tax expense in the interim condensed statement of comprehensive income are:

 

      For the three months ended  
     

March 31,

2015

   

March 31,

2014

 

Current income tax expense

   $ 562,731      $ 658,111   

Deferred income tax expense relating to origination and reversal of temporary differences

     (9,807       
  

 

 

 

Income tax expense recognized in statement of comprehensive income

   $ 552,924      $ 658,111   

 

 

9. Subsequent events

On June 12, 2015, a Stock Purchase Agreement (SPA) was signed between Globeleq Holdings (Americas Renewables) Limited and Mesoamerica Power Limited as sellers and an affiliate of SunEdison as purchaser, for the sale of a 100% interest in the Company’s upstream shareholder, Globeleq Mesoamerica Energy (Wind) Limited. The SPA is subject to various conditions, not all of which have been met as of the date of these financial statements. There is no guarantee that such transaction will be consummated.

 

F-151


Table of Contents

Energía Eólica de Honduras, S.A.

(A Honduran Entity)

Interim condensed statements of financial position

As of March 31, 2015 and December 31, 2014 and 2013

(expressed in US dollars)

 

           March  31,
2015
    December 31,
2014
    December 31,
2013
 
         (Unaudited)     (Audited)     (Audited)  
      Notes   Restated (Note 2.2)  

ASSETS

        

Current assets:

        

Cash

   4   $ 2,188,654      $ 4,468,345      $ 3,135,050   

Restricted cash

   4     12,095,233        15,197,262        14,944,204   

Accounts receivable

   5     12,539,329        12,396,177        5,878,148   

Spare parts inventory

       3,036,273        3,030,477        2,273,008   

Prepaid expenses and other current assets

       488,336        235,671        493,743   
    

 

 

 

Total current assets

       30,347,825        35,327,932        26,724,153   

Non-current assets:

        

Restricted cash

   4     25,703,953        18,171,075        18,188,292   

Accounts receivable

   5     1,719,343        2,430,661        3,107,508   

Intangible assets

   8     13,237,413        13,389,592        10,532,819   

Property, plant and equipment

   7     225,369,615        228,513,011        194,561,410   

Deferred finance costs

                     1,277,712   

Derivative financial instruments

   10     722,699        826,034        2,118,788   

Deferred income tax, net

   17     232,940        182,916        317   

Other financial assets

       13,618        13,797        14,967   
    

 

 

 

Total assets

     $ 297,347,406      $ 298,855,018      $ 256,525,966   
    

 

 

 

LIABILITIES AND EQUITY

        

Current liabilities:

        

Notes and loans payable

   9   $ 10,836,479      $ 10,303,543      $ 8,481,330   

Accrued interest payable

   9     1,610,268        5,987,891        5,377,002   

Accounts payable and accrued expenses

       5,550,089        9,254,830        655,260   
    

 

 

 

Total current liabilities

       17,996,836        25,546,264        14,513,592   

Non-current liabilities:

        

Long-term notes and loans payable

   9     210,411,359        206,686,501        183,099,772   

Derivative financial instruments

   10     4,806,153        4,536,571        5,093,068   

Decommissioning and restoration provisions

       829,155        792,588        467,971   
    

 

 

 

Total liabilities

       234,043,503        237,561,924        203,174,403   
    

 

 

 

Equity:

        

Share capital

       48,000,856        48,000,856        48,000,856   

Contributed capital

       2,465,909        2,465,909          

Legal reserve

       679,873        679,873        248,692   

Other equity components

       (3,827,535     (3,548,591     (3,412,977

Retained earnings

       15,984,800        13,695,047        8,514,992   
    

 

 

 

Total equity

       63,303,903        61,293,094        53,351,563   
    

 

 

 

Total liabilities and equity

     $ 297,347,406      $ 298,855,018      $ 256,525,966   

 

 

The accompanying notes are part of the interim condensed financial statements.

 

F-152


Table of Contents

Energía Eólica de Honduras, S.A.

(A Honduran Entity)

Interim condensed statements of comprehensive income

For the three-month periods ended March 31, 2015 and 2014

(expressed in US dollars)

 

            March  31,
2015
    March  31,
2014
 
          (Unaudited)     (Unaudited)  
      Notes    Restated (Note 2.2)  

Income:

       

Sale of electric power and capacity

      $ 20,027,786      $ 14,161,686   

Operating costs and expenses:

       

Cost of operations

        2,610,200        1,830,444   

General and administrative

        65,539        74,058   

Depreciation and amortization of non-financial assets

        3,352,505        2,680,114   
     

 

 

 

Total operating costs and expenses

        6,028,244        4,584,616   
     

 

 

 

Operating income

        13,999,542        9,577,070   

Other income (expenses):

       

Interest income

        8,760        18,757   

Finance costs from loans and notes payable

        (4,669,177     (3,959,311

Finance costs from decommissioning and restoration provisions

        (20,638     (10,202

Change in fair value of derivative financial instruments

   10      (117,635     (228,072

Exchange rate differences

        (145,511     170,258   

Other income, net

        191,388        2,728   
     

 

 

 

Total other income (expenses)

        (4,752,813     (4,005,842

Income before income tax

        9,246,729        5,571,228   

Income tax

   11      50,024        78,480   
     

 

 

 

Net income

        9,296,753        5,649,708   

Other comprehensive income to be reclassified to profit or loss in subsequent periods:

       

Net movement on cash flow hedge

   10      (278,944     (401,184

Income tax effect

                 
     

 

 

 

Other comprehensive income net of income tax

        (278,944     (401,184
     

 

 

 

Total comprehensive income

      $ 9,017,809      $ 5,248,524   

 

 

The accompanying notes are part of the interim condensed financial statements.

 

F-153


Table of Contents

Energía Eólica de Honduras, S.A.

(A Honduran Entity)

Interim condensed statements of changes in equity

For the three-month periods ended March 31, 2015 and 2014

(expressed in US dollars)

 

            Share capital      Contributed
capital
     Legal
reserve
     Hedging
reserve
    Retained
earnings
    Total
equity
 
      Notes               Restated (Note 2.2)  

For the three-month period ended March 31,2014:

                  

As of January 1, 2014 (audited)

      $ 48,000,856       $       $ 248,692       $ (3,412,977   $ 8,514,992      $ 53,351,563   

Comprehensive income

                                       5,649,708        5,649,708   

Other comprehensive income

                                (401,184            (401,184
     

 

 

 

Total comprehensive income

                                (401,184     5,649,708        5,248,524   
     

 

 

 

Dividends

                                       (3,821,205     (3,821,205
     

 

 

 

As of March 31, 2014 (unaudited)

      $ 48,000,856       $       $ 248,692       $ (3,814,161   $ 10,343,495      $ 54,778,882   
     

 

 

 

For the three-month period ended March 31,2015:

                  

As of January 1, 2015 (audited)

      $ 48,000,856       $ 2,465,909       $ 679,873       $ (3,548,591   $ 13,695,047      $ 61,293,094   

Comprehensive income

                                       9,296,753        9,296,753   

Other comprehensive income

                                (278,944            (278,944
     

 

 

 

Total comprehensive income

                                (278,944     9,296,753        9,017,809   
     

 

 

 

Dividends

                                       (7,007,000     (7,007,000
     

 

 

 

As of March 31, 2015 (unaudited)

      $ 48,000,856       $ 2,465,909       $ 679,873       $ (3,827,535   $ 15,984,800      $ 63,303,903   

 

 

The accompanying notes are part of the interim condensed financial statements.

 

F-154


Table of Contents

Energía Eólica de Honduras, S.A.

(A Honduran Entity)

Interim condensed statements of cash flows

For the three-month periods ended March 31, 2015 and 2014

(expressed in US dollars)

 

          March  31,
2015
    March  31,
2014
 
        (Unaudited)     (Unaudited)  
     Notes   Restated (Note 2.2)  

Operating activities:

     

Income before income tax

    $ 9,246,729      $ 5,571,228   

Adjustments to reconcile income before income tax to cash flows from operating activities:

     

Finance costs from notes and loans payable

      4,669,177        3,959,311   

Change fair value of derivative financial instruments

  10     117,635        228,072   

Depreciation expense

      3,199,671        2,527,280   

Amortization expense

      152,833        154,688   

Financing costs from provisions

      20,638        (10,202

Decommissioning and restoration provisions

      15,930        36,188   

Loss on sale and disposal of productive asset

      1,695        1,596   

Interest income

      (8,760     (18,757
   

 

 

 
      17,415,548        12,449,404   

Changes in operating assets and liabilities:

     

Accounts receivable

      568,166        2,148,018   

Spare parts inventory

      (5,796     (6,774

Prepaid expenses

      (252,665     (138,988

Other financial assets

      179        16   

Accrued expenses and other accounts payable

      (3,704,741     (432,066
   

 

 

 

Net cash provided by operating activities

      14,020,691        14,019,610   
   

 

 

 

Investing activities:

     

Additions to property, plant and equipment

      (57,970     (2,887,447

Additions to intangible assets

      (654     (18,044

Interest received

      8,760        18,757   
   

 

 

 

Net cash used in investing activities

      (49,864     (2,886,734
   

 

 

 

Financing activities:

     

(Increase) decrease in restricted cash accounts designated for financing activities

      (4,430,849     3,047,625   

New loans

      8,855,251        5,684,579   

Loan settlements

      (5,011,836     (4,502,078

Interest paid

      (8,656,084     (8,922,912

Dividends

      (7,007,000     (3,821,205
   

 

 

 

Net cash used in financing activities

      (16,250,518     (8,513,991
   

 

 

 

Net (decrease) increase in cash

      (2,279,691     2,618,885   

Cash at beginning of period

      4,468,345        3,135,050   
   

 

 

 

Cash at end of period

    $ 2,188,654      $ 5,753,935   

 

 

The accompanying notes are part of the interim condensed financial statements.

 

F-155


Table of Contents

Energía Eólica de Honduras, S.A.

(A Honduran Entity)

Notes to interim condensed financial statements

March 31, 2015

(amounts expressed in US dollars)

 

1.   Corporate information

Energía Eólica de Honduras, S.A. (“Energía Eólica” or “the Company”) was organized as a corporation on June 10, 2005 under the laws of the Republic of Honduras, where the Company is domiciled. As of December 31, 2014 the Company is a 99.9% subsidiary of Globeleq Mesoamerica Energy (Wind) Limited (“GME Wind”), a company incorporated in Bermuda, and Energía Eólica’s ultimate parent company is Actis Infrastructure Fund 2LP.

The Company’s main activity is the operation of a 126 megawatt wind park called “Cerro de Hula” and the sale of energy to the Honduran National Electric Energy Company (ENEE) through the power purchase agreement signed between the parties. Energy sales began in October 2011. This activity is regulated by Honduras electricity law No. 158-94 of November 1994 (Honduran Law – Electricity Sub-sector).

On October 1, 2008 Energía Eólica entered into a 20-year power purchase agreement (“PPA”) with the Honduran National Electric Energy Company (“ENEE”) to operate a 102 megawatt wind park (“Cerro de Hula Project” or “the Project”). The Company was granted the “commercial operation” status (as defined in the PPA) by ENEE on December 21, 2011. On December 20, 2012, the PPA was amended to contemplate that: a) the Company would increase the wind park’s capacity by 24 megawatts to reach a total of 126 megawatts, and b) the PPA’s term would increase from 20 to 25 years starting on December 21, 2011 and ending on December 2036. Construction of the 24 megawatt expansion (“the Project Expansion”) began on November 22, 2013. Acceptance of compliance by ENEE with the Project Expansion’s technical requirements was granted on November 13, 2014. The Project Expansion started generating power in November 2014.

The Project was registered as a Clean Development Mechanism (CDM) Project under the United Nations Framework Convention on Climate Change on April 24, 2012 and for a 10 years crediting period, from April 24, 2012 through April 23, 2022. The Project is therefore eligible to issue Certified Emission Reductions (CERs) starting on April 24, 2012.

The Company does not have traded debt or equity in the public markets. The accompanying financial statements have been prepared for use in a securities filing in connection with the acquisition of the Company as explained in Note 13.

 

2.   Basis of preparation of the financial statements and accounting policies

The Company’s interim condensed financial statements as of March 31, 2015 were first approved for issuance by the Company’s Chief Executive Officer and Chief Financial Officer on April 8, 2015, and were subsequently approved by the Company’s shareholders. The accompanying restated interim condensed financial statements have been prepared for use in a securities filing in connection with the acquisition of the Company as explained in Note 13. They have also been restated for the correction of certain errors as explained in Note 2.2. The Company’s Chief Executive Officer and Chief Financial Officer approved these financial restated statements for issuance on June 13, 2015 and subsequent events have been considered through that later date.

 

F-156


Table of Contents
  2.1   Basis of preparation

The interim condensed financial statements for the three-month period ended March 31, 2015 have been prepared in accordance with IAS 34 Interim Financial Reporting, an accounting standard of the International Financial Reporting Standards (IFRS) as issued by the International Accounting Standards Board.

These financial statements are condensed and accordingly do not include all disclosures required by the IFRS for a full set of financial statements. They should be read in conjunction with the Company’s financial statements as of and for the year ended December 31, 2014. The results for the quarter ended March 31, 2015 are not necessarily indicative of results that should be expected for the full year ending December 31, 2015.

 

  2.2   Restatement of interim condensed financial statements

During its preparation of the accompanying restated financial statements for the purpose aforementioned described, the Company identified certain accounting errors that are being retrospectively corrected herein. They are explained as follows:

 

   

The Company previously accounted for restricted cash as a component of cash in its statement of cash flows. It has corrected that classification to now exclude those amounts. The Company also modified the current versus non-current classification of restricted cash its statement of financial position to correspond with contractual terms.

 

   

The Company has identified the need for a decommissioning provision in the accompanying financial statements given obligations that it believes exist under IAS 37 Provisions, Contingent Liabilities and Contingent Assets.

 

   

The Company has determined residual values for its wind turbines which resulted in a change in the depreciation expense.

 

   

The aforementioned matters have an impact on deferred income tax.

 

   

Certain accounting disclosures have been expanded from those previously presented.

 

F-157


Table of Contents

These corrections have impacted the accompanying interim condensed financial statements as follows (amounts in US dollars):

 

     Balance as of
or for the
three-month
period ended
March 31, 2015
as previously
reported
    Retrospective
adjustments
    Balance as of
or for the
three-month
period ended
March 31, 2015
as restated
    Balance for
the three-
month period
ended
March 31,
2014 as
previously
reported
    Retrospective
adjustments
    Balance for
the three-
month
period ended
March 31,
2014 as
restated
    Balance as of
the year ended
December 31,
2014 as
previously
reported
    Retrospective
adjustments
    Balance as of
the year ended
December 31,
2014 as
restated
 

Statement of financial position:

                 

Current assets

    56,051,778        (25,703,953     30,347,825                             53,499,007        (18,171,075     35,327,932   

Non-current assets

    239,485,233        27,514,348        266,999,581                             243,673,148        19,853,938        263,527,086   
 

 

 

 

Total assets

    295,537,011        1,810,395        297,347,406                             297,172,155        1,682,863        298,855,018   
 

 

 

 

Current liabilities

    17,967,353        29,483        17,996,836                             25,521,153        25,111        25,546,264   

Non-current liabilities

    215,324,876        721,791        216,046,667                             211,338,658        677,002        212,015,660   
 

 

 

 

Total liabilities

    233,292,229        751,274        234,043,503                             236,859,811        702,113        237,561,924   
 

 

 

 

Equity

    62,244,782        1,059,121        63,303,903                             60,312,344        980,750        61,293,094   
 

 

 

 

Statement of comprehensive income:

                 

Revenues

    20,207,349        (179,563     20,027,786        14,104,611        57,075        14,161,686         

Operating expenses

    10,997,189        (216,132     10,781,057        8,585,357        5,101        8,590,458         
 

 

 

       

Income before income taxes

    9,210,160        36,569        9,246,729        5,519,254        51,974        5,571,228         

Income taxes

    8,222        41,802        50,024        47,490        30,990        78,480         
 

 

 

       

Comprehensive income

    9,218,382        78,371        9,296,753        5,566,744        82,964        5,649,708         
 

 

 

       

Statement of cash flows:

                 

Cash flows from operating activities

    13,965,389        55,302        14,020,691        14,970,065        (950,455     14,019,610         

Cash flows from investing activities

    5,437        (55,301     (49,864     (3,893,478     1,006,744        (2,886,734      

Cash flows from financing activities

    (11,819,668     (4,430,850     (16,250,518     (11,561,616     3,047,625        (8,513,991      

Cash at beginning of year

    37,836,682        (33,368,337     4,468,345        36,267,546        (33,132,496     3,135,050         
 

 

 

       

Cash at end of year

    39,987,840        (37,799,186     2,188,654        35,782,517        (30,028,582     5,753,935         
 

 

 

       

 

F-158


Table of Contents
  2.3   New standards, interpretations and amendments thereof, adopted by the Company

The accounting policies applied by the Company in the preparation of these interim condensed financial statements are consistent with those applied in the preparation of its annual financial statements for the year ended December 31, 2014.

 

3.   Seasonality of operations

The Company’s revenue depends on the wind power, which is normally stronger during the dry season, which in Honduras occurs from November through March. Due to the seasonal nature of this business, higher revenues and operating profits are usually expected in the first quarter and in the first half of the year in comparison with the remaining period of the year. This information is provided to allow for a proper appreciation of the results, however Management have concluded that it does not meet the definition of “highly seasonal” as considered by IAS 34 Interim Financial Reporting.

 

4.   Cash

 

     

March 31

2015

    

December 31

2014

 

Unrestricted cash:

     

Banks

   $ 2,185,952       $ 4,463,157   

Petty cash

     2,702         5,188   
  

 

 

 
   $ 2,188,654       $ 4,468,345   
  

 

 

 

Restricted cash in bank:

     

Current

   $ 12,095,233       $ 15,197,262   

Non-current

     25,703,953         18,171,075   
  

 

 

 
   $ 37,799,186       $ 33,368,337   

 

 

Cash deposited in bank accounts earns interest based on daily rates determined by the corresponding banks.

As of March 31, 2015, cash in the amount of US$37,799,186 (December 31, 2014: US$33,368,337) is restricted under the loan agreement between Energía Eólica, Export – Import bank of the United States (Ex-Im) and the Central American Bank for Economic Integration (CABEI) (Note 9). Under the terms of its debt agreements, the Company has a series of restricted bank accounts both “on-shore” in Honduras, and also off-shore. Cash receipts from operations are initially deposited directly into these restricted accounts and then based on contractually agreed provisions are allocated into a series of sub-accounts, restricted for specific operational and other purposes including, but not limited to, construction, debt service, major maintenance, insurance, and shareholders distributions. Except as expressly provided in those debt agreements, the restricted bank accounts are under the control of a trustee and the Company has the right to withdraw or transfer funds only as expressly provided in those debt agreements.

 

F-159


Table of Contents
5.   Accounts receivable

 

     

March 31

2015

   

December 31

2014

 

Empresa Nacional de Energía Eléctrica (ENEE)

   $ 11,778,468      $ 12,293,184   

Value added taxes (VAT) related to the Project’s construction

     1,719,343        2,430,661   

Banco Financiera Comercial Hondureña S.A.(FICOHSA)

     676,042          

Crane rental services receivable

     55,511        25,947   

Intercompany accounts receivable (Note 6)

     10,024          

Others

     19,284        77,046   
  

 

 

 
   $ 14,258,672      $ 14,826,838   

Less non-current portion (VAT)

     (1,719,343     (2,430,661
  

 

 

 
   $ 12,539,329      $ 12,396,177   

 

 

The outstanding balances due from ENEE correspond to trade receivables for the sale of electric power. Terms of these accounts receivable extend to 18 days for ENEE from the corresponding invoice issue date; are not subject to early-payment discounts, and do not generate interest except for late charges.

The outstanding balance of VAT relates to funds reimbursed to the main Project’s subcontractors, Gamesa and Iberdrola, who were obligated to pay VAT on the acquisition of certain equipment and materials during the construction phase of the Project. Nonetheless, the Company was exempted from such VAT. The VAT receivable is denominated in Lempiras. The Honduran Tax Authority has been recognizing the Company’s right to such VAT, however its reimbursement depends on the timing of the review of the documentation by the Tax Authority. Reimbursement of such amounts occurs through credit notes issued by the Tax Authority. Those credit notes can be traded in the local market, although normally with a discount ranging from 15% to 20%. The Company believes that such VAT is fully recoverable in credit notes from the Tax Authority. VAT balances as presented above reflect the anticipated discount that will be realized upon collection.

The balance with FICOHSA corresponds to VAT credits sold and full collection of this balance took place in May 2015.

 

6.   Balances and transactions with related parties

The related parties with whom the Company maintains balances and performs transactions are entities under the common control of the parent company, Globeleq Mesoamerica Energy (Wind), Limited. A breakdown of these balances and the respective terms and conditions is as follows:

 

     

March 31,

2015

    

December 31,

2014

 

Accounts receivable:

     

Administración Energías Renovables, S.A. (note 5)

   $ 10,024       $   

 

 

Maturity terms for accounts receivable and payable extend up to 30 days from the corresponding invoices’ issue dates, and are not subject to any discounts for early-payment.

 

F-160


Table of Contents

A breakdown of transactions performed with related parties is summarized below:

 

     

March 31,

2015

    

March 31,

2014

 

Professional services expenses:

     

Administración de Energías Renovables, S.A.

   $ 198,502       $ 208,206   

TCR Holdings, S.A.

     56           
  

 

 

 
   $ 198,558       $ 208,206   

 

 

 

F-161


Table of Contents
7.   Property, plant and equipment

 

     Land     Buildings and
improvements
   

Machinery and

equipment

    Major spare
parts
   

Furniture

and

equipment

    Vehicles    

Construction

in progress

    Total  

Cost:

               

As of January 1, 2014

  $ 1,412,665      $ 21,653,975      $ 178,422,044      $ 3,383,159      $ 448,848      $ 3,882,735      $ 7,749,649      $ 216,953,075   

Additions and reclassifications

    170,979        5,437,002        45,216,253        1,016,036        219,062        67,707        (7,711,228     44,415,811   

Retirements

                  (163            (4,569     (19,000            (23,732
 

 

 

 

As of December 31, 2014

    1,583,644        27,090,977        223,638,134        4,399,195        663,341        3,931,442        38,421        261,345,154   

Additions

                  20,301               4,470               33,199        57,970   

Retirements

                                (10,199                   (10,199
 

 

 

 

As of March 31, 2015

  $ 1,583,644      $ 27,090,977      $ 223,658,435      $ 4,399,195      $ 657,612      $ 3,931,442      $ 71,620      $ 261,392,925   
 

 

 

 

Accumulated depreciation:

               

As of January 1, 2014

  $      $ 2,328,318      $ 19,460,153             $ 82,016      $ 521,178             $ 22,391,665   

Depreciation

           1,105,145        9,003,892               58,472        292,679               10,460,188   

Retirements

                  (164            (2,141     (17,405            (19,710
 

 

 

 

As of December 31, 2014

           3,433,463        28,463,881               138,347        796,452               32,832,143   

Depreciation

           339,453        2,772,747               14,567        72,904               3,199,671   

Retirements

                                (8,504                   (8,504
 

 

 

 

As of March 31, 2015

  $      $ 3,772,916      $ 31,236,628      $      $ 144,410      $ 869,356      $      $ 36,023,310   
 

 

 

 

Carrying amounts:

               

As of January 1, 2014

  $ 1,412,665      $ 19,325,657      $ 158,961,891      $ 3,383,159      $ 366,832      $ 3,361,557      $ 7,749,649      $ 194,561,410   
 

 

 

 

As of December 31, 2014

  $ 1,583,644      $ 23,657,514      $ 195,174,253      $ 4,399,195      $ 524,994      $ 3,134,990      $ 38,421      $ 228,513,011   
 

 

 

 

As of March 31, 2015

  $ 1,583,644      $ 23,318,061      $ 192,421,807      $ 4,399,195      $ 513,202      $ 3,062,086      $ 71,620      $ 225,369,615   

 

 

The Company’s property, plant and equipment is pledged as fiduciary guarantee under the third party borrowing arrangements (note 9). Construction in progress as of January 1, 2014 was mainly comprised by advancements to subcontractors (principally Gamesa and Iberdrola) for the construction of the Project Expansion (note 1).

The Company has recognized decommissioning and restoration provisions related to its wind park.

 

F-162


Table of Contents
8.   Intangible assets

 

     

Connectivity

rights (a)

     Development
costs (b)
     Software      Total  

Cost:

           

As of January 1, 2014

   $ 11,309,448       $ 549,350       $ 29,509       $ 11,888,307   

Additions

     3,343,309                 18,045         3,361,354   
  

 

 

 

As of December 31, 2014

     14,652,757         549,350         47,554         15,249,661   

Additions

                     655         655   
  

 

 

 

As of March 31, 2015

   $ 14,652,757       $ 549,350       $ 48,209       $ 15,250,316   
  

 

 

 

Accumulated amortization:

           

As of January 1, 2014

   $ 1,272,229       $ 61,886       $ 21,373       $ 1,355,488   

Additions

     436,778         44,000         23,803         504,581   
  

 

 

 

As of December 31, 2014

     1,709,007         105,886         45,176         1,860,069   

Additions

     135,945         14,572         2,317         152,834   
  

 

 

 

As of March 31, 2015

   $ 1,844,952       $ 120,458       $ 47,493       $ 2,012,903   
  

 

 

 

Carrying amounts:

           

As of January 1, 2014

   $ 10,037,219       $ 487,464       $ 8,136       $ 10,532,819   
  

 

 

 

As of December 31, 2014

   $ 12,943,750       $ 443,464       $ 2,378       $ 13,389,592   
  

 

 

 

As of March 31, 2015

   $ 12,807,805       $ 428,892       $ 716       $ 13,237,413   

 

 

 

  a)   Under the PPA terms with ENEE, the Company had to build, at its own cost, the high voltage section of the electrical substations on behalf of ENEE. Because Energía Eólica has to transfer ownership of such section to ENEE, the corresponding construction costs were considered as a right to operate the wind project and therefore recognized as an intangible asset.

 

  b)   Corresponds to certain costs incurred in relation to wind projects in development phase.

 

9.   Notes and loans payable

 

      Interest rate      Maturity date      March 31,
2015
    December 31,
2014
 

Export-Import Bank of the United States

     7% fixed         February 2029       $ 138,241,125      $ 141,632,725   

Central American Bank for Economic Integration (CABEI)

    
 
Libor 6 months
+ 5.75% (*)
  
  
     August 2025         46,260,781        47,587,689   

Export-Import Bank of the United States

    
 
3.72 % fixed
(**)
  
  
     August 2031         25,846,897        23,091,223   

Central American Bank for Economic Integration (CABEI)

    
 
Libor 6 months
+ 5.75% (*)
  
  
     August 2028         19,488,609        13,682,358   
        

 

 

 

Principal

           229,837,412        225,993,995   

Less—Deferred borrowing costs

           (8,589,574     (9,003,951
        

 

 

 
           221,247,838        216,990,044   

Less—Maturity of one year or less

           (10,836,479     (10,303,543
        

 

 

 

Principal

         $ 210,411,359      $ 206,686,501   

 

 

 

F-163


Table of Contents
  (*)   CABEI’s rate will change to Libor 6 months + 6.10% after November 2023.

 

  (**)   Ex-Im’s rate will increase to 6.72% after the Project Commercial Operation Date as defined in the loan documents.

As of March 31, 2015 accrued interest and fees on notes and loans payable amount to US$1,610,268 (December 31, 2014: US$5,987,891).

 

10.   Fair value of derivative instruments

The Company uses interest rate swaps and interest rate caps to hedge its variable interest rate exposure on a portion of the Company’s loans with CABEI (Note 9). Under the interest rate swaps/caps agreements the Company receives a fixed rate of interest and pays interest at a variable rate on the notional amounts. These derivative financial instruments have been designated as hedging instruments and have been assessed to be highly effective as of the financial statements dates. The effects of the above derivative instruments in the Company’s financial statements are summarized as follows:

 

      March 31,
2015
    

December 31,

2014

 

Statements of Financial Position:

     

Assets:

     

Cap agreement of November 2010

   $ 406,229       $ 484,884   

Cap agreement of December 2013

     316,470         341,150   
  

 

 

 
   $ 722,699       $ 826,034   
  

 

 

 

Liabilities:

     

Swap agreement of November 2010

   $ 3,757,091       $ 3,148,111   

Swap agreement of December 2013

     1,049,062         1,388,460   
  

 

 

 
   $ 4,806,153       $ 4,536,571   

 

 

 

      March 31,
2015
   

March 31,

2014

 

Statements of Comprehensive Income – gain / (loss):

    

Change in fair value of derivative instruments – Profit and loss:

    

Cap agreement of November 2010

   $ (78,655   $ (304,065

Cap agreement of December 2013

     (24,680     57,239   
  

 

 

 
   $ (103,335   $ (246,826
  

 

 

 

Statements of Comprehensive Income – gain / (loss):

    

Ineffectiveness of derivative instruments – Profit and loss:

    

Swap agreement of November 2010

   $ (4,266   $ 1,204   

Swap agreement of December 2013

     (10,034     17,550   
  

 

 

 
   $ (14,300   $ 18,754   
  

 

 

 

Change in intrinsic value of derivative instruments – Other comprehensive income:

    

Cap agreement of November 2010

   $      $ (91,160

Cap agreement of December 2013

            (209,976

Swap agreement of November 2010

     (87,905     201,143   

Swap agreement of December 2013

     (205,339     (282,437

Ineffectiveness recycled to profit or loss

     14,300        (18,754
  

 

 

 
   $ (278,944   $ (401,184

 

 

 

F-164


Table of Contents

The main characteristics of the derivative instruments are as follows:

 

      Swap Transactions      Cap Transactions  
      November 2010      December 2013      November 2010      December 2013  

Effective date

     29-Nov-2010         25-Feb-2014         25-Feb-2018         25-Feb-2021   

Termination date

     25-Feb-2018         25-Feb-2021         25-Aug-2025         25-Aug-2028   

Current notional amount

   US$ 49,133,387       US$ 19,410,815                   

Maximum notional amount

   US$ 56,732,737       US$ 19,410,815       US$ 39,289,122       US$ 11,652,389   

Fixed interest rate

     3.63%         3.36%         4.75%         3.36%   

Variable interest rate

    
 
US Libor-
6 months
 
  
    
 
US Libor-
6 months
 
  
    
 
US Libor-
6 months
 
  
    
 
US Libor-
6 months
 
  

 

 

 

11.   Income tax and deferred income tax

The Company was granted a corporate income tax holiday of 10 years starting on the date of commercial operations, which was 21 December 2011.

The Company calculates the period income tax expense using the tax rate that would be applicable to the expected total annual earnings. The major components of income tax expense in the interim condensed statement of comprehensive income are:

 

       For the three months ended  
     

March 31,

2015

    

March 31,

2014

 

Current income tax expense

   $       $   

Deferred income tax expense relating to origination and reversal of temporary differences

     50,024         78,480   
  

 

 

    

 

 

 

Income tax expense recognized in statement of comprehensive income

   $ 50,024       $ 78,480   

 

 

 

12.   Fair value of financial instruments

The Company’s main financial instruments are comprised of cash, notes and accounts receivable, notes and loans payable, accounts payable and accrued expenses. Management believes that the carrying amounts of cash, accounts receivable, and accounts payable approach their fair market value due to their short-term nature. The carrying amount of notes receivable from related parties approximates fair value as the notes were initially recorded at the estimated discounted cash flows.

In evaluating the fair value of loans payable at fixed rates the Company has considered the country risks, market conditions existing both at the date of the loans and those at the statement of financial position dates, and that there are not a significant number of comparable financings in its market. As of March 31, 2015 and December 31, 2014 the fair value of the loans, taking into account current market interest rates, are the following:

 

      Carrying amount      (Level 3) Fair value  
     

March 31,

2015

    

December 31,

2014

    

March 31,

2015

    

December 31,

2014

 

Ex-Im 1

   $ 138,241,125       $ 141,632,725       $ 139,862,371       $ 143,339,434   

CABEI 1

     46,260,781         47,587,689         46,847,155         48,216,146   

Ex-Im 2

     25,846,897         23,091,223         26,632,261         23,891,784   

CABEI 2

     19,488,609         13,682,358         19,790,308         13,920,137   
  

 

 

 
   $ 229,837,412       $ 225,993,995       $ 233,132,095       $ 229,367,501   

 

 

 

F-165


Table of Contents
13.   Subsequent events

On June 12, 2015, a Stock Purchase Agreement (SPA) was signed between Globeleq Holdings (Americas Renewables) Limited and Mesoamerica Power Limited as sellers and an affiliate of SunEdison as purchaser, for the sale of a 100% interest in the Company’s upstream shareholder, Globeleq Mesoamerica Energy (Wind) Limited. The SPA is subject to various conditions, not all of which have been met as of the date of these financial statements. There is no guarantee that such transaction will be consummated.

 

F-166


Table of Contents

Eolo de Nicaragua, S.A.

(A Nicaraguan Entity)

Interim condensed statements of financial position

As of March 31, 2015 and December 31, 2014 and 2013

(expressed in US dollars)

 

      Notes   

March 31,

2015
(Unaudited)

     December  31,
2014
(Audited)
    December  31,
2013
(Audited)
 
           Restated (Note 2.2)  
         

ASSETS

          

Current assets:

          

Cash

   4    $ 1,225,473       $ 961,156      $ 4,088,961   

Restricted cash

   4      3,690,099         5,202,845        6,988,114   

Accounts receivable

   5      6,335,356         5,133,648        3,946,370   

Accounts receivable from related parties

                       997   

Spare parts inventory

        385,139         375,912        406,909   

Prepaid expenses and other current assets

        103,938         552,628        1,568,770   
     

 

 

 

Total current assets

        11,740,005         12,226,189        17,000,071   

Non-current assets:

          

Restricted cash

   4      7,564,726         5,373,044        4,879,867   

Held-to-maturity investments

                       40,226   

Prepaid expenses

                       334,373   

Notes and accounts receivable with related parties

   5      3,300,000         3,395,540        3,216,257   

Guarantee deposits

        532,711         538,591        497,547   

Property, plant and equipment

   7      70,589,006         71,520,238        75,193,168   

Intangible assets

   8      3,132,629         3,177,481        3,358,681   

Other financial assets

        1,560         1,560        1,560   
     

 

 

 

Total assets

      $ 96,860,637       $ 96,232,643      $ 104,521,750   
     

 

 

 

LIABILITIES AND EQUITY

          

Current liabilities:

          

Notes and loans payable

   9    $ 4,749,390       $ 4,395,670      $ 2,740,993   

Accounts payable

        726,584         684,174        265,987   

Accrued expenses and other accounts payable

        449,914         404,109        1,333,138   

Accrued interest payable

   9      292,375         318,268        342,403   
     

 

 

 

Total current liabilities

        6,218,263         5,802,221        4,682,521   

Non-current liabilities:

          

Long-term notes and loans payable

   9      77,469,427         79,440,447        83,388,144   

Deferred income tax, net

        2,874,020         2,568,436        1,352,757   

Decommissioning provision

        334,569         319,728        238,184   
     

 

 

 

Total liabilities

        86,896,279         88,130,832        89,661,606   
     

 

 

 

Equity:

          

Share capital

        3,000         3,000        3,000   

Contributed capital

        7,942,084         9,942,084        22,758,446   

Retained earnings (deficit)

        2,019,274         (1,843,273     (7,901,302
     

 

 

 

Total equity

        9,964,358         8,101,811        14,860,144   
     

 

 

 

Total liabilities and equity

      $ 96,860,637       $ 96,232,643      $ 104,521,750   

 

 

The accompanying notes are part of the interim condensed financial statements.

 

F-167


Table of Contents

Eolo de Nicaragua, S.A.

(A Nicaraguan Entity)

Interim condensed statements of comprehensive income

For the three-month periods ended March 31, 2015 and 2014

(expressed in US dollars)

 

      Notes   

March 31,

2015
(Unaudited)

   

March 31,

2014
(Unaudited)
Restated
(Note 2.2)

 
       

Income:

       

Sale of electric power and capacity

      $ 8,451,479      $ 8,086,793   

Operating costs and expense:

       

Costs of operations

        1,194,336        1,020,733   

General and administrative

        79,498        77,601   

Depreciation and amortization of non-financial assets

        1,007,177        1,013,147   
     

 

 

 

Total operating costs and expense

        2,281,011        2,111,481   
     

 

 

 

Operating income

        6,170,468        5,975,312   

Other income (expenses):

       

Interest income

        52,403        51,729   

Finance costs from loans and notes payable

        (1,962,552     (2,021,735

Finance costs from decommissioning provision

        (6,371     (5,490

Exchange rate differences

        (48,508     (68,420

Other expenses, net

        (37,309     (35,255
     

 

 

 

Total other income (expenses)

        (2,002,337     (2,079,171
     

 

 

 

Income before income tax

        4,168,131        3,896,141   

Income tax

   10      (305,584     (303,128
     

 

 

 

Total comprehensive income

      $ 3,862,547      $ 3,593,013   

 

 

The accompanying notes are part of the interim condensed financial statements.

 

F-168


Table of Contents

Eolo de Nicaragua S.A.

(A Nicaraguan Entity)

Interim condensed statements of changes in equity

For the three-month periods ended March 31, 2015 and 2014

(expressed in US dollars)

 

      Share
capital
     Contributed
capital
    Retained
earnings
(deficit)
    Total
equity
 
          Restated (Note 2.2)  
         

For the three-month period ended March 31, 2014:

         

As of January 1, 2014 (audited)

   $ 3,000       $ 22,758,446      $ (7,901,302   $ 14,860,144   

Comprehensive income

                    3,593,013        3,593,013   
  

 

 

 

As of March 31, 2014 (unaudited)

   $ 3,000       $ 22,758,446      $ (4,308,289   $ 18,453,157   
  

 

 

 

For the three-month period ended March 31, 2015:

         

As of January 1, 2015 (audited)

   $ 3,000       $ 9,942,084      $ (1,843,273   $ 8,101,811   

Comprehensive income

                    3,862,547        3,862,547   

Capital withdrawn

             (2,000,000            (2,000,000
  

 

 

 

As of March 31, 2015 (unaudited)

   $ 3,000       $ 7,942,084      $ 2,019,274      $ 9,964,358   

 

 

The accompanying notes are part of the interim condensed financial statements.

 

F-169


Table of Contents

Eolo de Nicaragua, S.A.

(A Nicaraguan Entity)

Interim condensed statements of cash flows

For the three-month periods ended March 31, 2015 and 2014

(expressed in US dollars)

 

     

March 31,

2015
(Unaudited)

   

March 31,

2014
(Unaudited)
Restated

(Note 2.2)

 

Operating activities:

    

Income before income tax

   $ 4,168,131      $ 3,896,141   

Adjustments to reconcile income before income tax to cash flows from operating activities:

    

Financing costs from loans and notes payable

     1,962,552        2,021,735   

Depreciation expense

     962,328        966,175   

Amortization expense

     44,852        46,972   

Interest income

     (52,403     (51,729

Finance costs from provision

     48,508        5,490   

Decommissioning provision

     (33,667     178,742   
  

 

 

 
     7,100,301        7,063,526   

Changes in operating assets and liabilities:

    

Notes and accounts receivable

     (1,201,708     (1,821,565

Accounts receivable from related parties

     95,540        (44,842

Spare parts inventory

     (9,227     (7,468

Prepaid expenses

     448,690        532,600   

Guarantee deposits

     5,880        33   

Accounts payable

     42,410        30,754   

Accrued expenses

     45,805        (1,083,118
  

 

 

 

Net cash provided by operating activities

     6,527,691        4,669,920   
  

 

 

 

Investing activities:

    

Additions to property, plant and equipment

     (31,096     (57,121

Interest received

     52,403        51,729   

Proceeds from held-to-maturity investments

            40,226   
  

 

 

 

Net cash provided by investing activities

     21,307        34,834   
  

 

 

 

Financing activities:

    

Increase in restricted cash accounts designated for financing activities

     (678,936     (2,284,948

Loan settlements

     (1,758,269     (1,096,393

Capital withdrawn

     (2,000,000       

Borrowing cost paid

     (1,847,476     (1,943,772
  

 

 

 

Net cash used in financing activities

     (6,284,681     (5,325,113
  

 

 

 

Net increase (decrease) in cash

     264,317        (620,359

Cash at beginning of period

     961,156        1,588,468   
  

 

 

 

Cash at end of period

   $ 1,225,473      $ 968,109   

 

 

The accompanying notes are part of the interim condensed financial statements.

 

F-170


Table of Contents

Eolo de Nicaragua, S.A.

(A Nicaraguan Entity)

Notes to interim condensed financial statements

March 31, 2015

(amounts expressed in US dollars)

 

1. Corporate information

Eolo de Nicaragua, S.A. (“Eolo” or “the Company”) was organized as a corporation on July 1, 2008 under the laws of the Republic of Nicaragua. Eolo is domiciled in Rivas, Nicaragua. The Company is a wholly-owned subsidiary of Globeleq Mesoamerica Energy (Wind) Limited (“GME Wind”), a company incorporated in Bermuda, and Eolo’s ultimate parent company is Actis Infrastructure Fund 2LP.

The Company’s main activity is the generation of electricity from its 44 megawatt wind electric power-generating park located in Rivas, Nicaragua (“the Project”). This activity is regulated by Nicaraguan Law No. 272 of June 23, 1998. Eolo was granted the commercial operation status on December 1, 2012 by the Instituto Nicaragüense de Energía. Energy sales began in December 2012.

The Company has entered into two power purchase agreements (PPAs) with Distribuidora de Electricidad del Sur, S.A. (Dissur) and Distribuidora de Electricidad del Norte, S.A. (Disnorte) to sell the Project’s energy.

The Project was registered as a Clean Development Mechanism (CDM) project under the United Nations Framework Convention on Climate Change on June 18, 2012 and for a crediting period from January 1, 2013 through December 31, 2019. The Project is therefore eligible for Certified Emission Reductions (CERs) starting on January 1, 2013.

The Company does not have traded debt or equity in the public markets. The accompanying financial statements have been prepared for use in a securities filing in connection with the acquisition of the Company as explained in Note 13.

 

2. Basis of preparation of the interim condensed financial statements and accounting policies

The Company’s interim condensed financial statements as of March 31, 2015 were approved for issuance by the Company’s Chief Executive Officer and Chief Financial Officer on June 13, 2015. The accompanying interim condensed financial statements have been prepared for use in a securities filing in connection with the acquisition of the Company as explained in Note 13. They have also been restated as of December 31, 2014 and 2013 and for the three-month period ended March 31, 2014.

 

  2.1   Basis of preparation

The interim condensed financial statements for the three-month period ended March 31, 2015 have been prepared in accordance with IAS 34 Interim Financial Reporting, an accounting standard of the International Financial Reporting Standards (IFRS) as issued by the International Accounting Standards Board.

These financial statements are condensed and accordingly do not include all disclosures required by the IFRS for a full set of financial statements. They should be read in conjunction with the Company’s financial statements as of and for the year ended December 31, 2014. The results for the quarter ended March 31, 2015 are not necessarily indicative of results that should be expected for the full year ending December 31, 2015.

 

F-171


Table of Contents
  2.2   Restatement of interim condensed financial statements

During its preparation of the accompanying restated interim condensed financial statements for the purpose aforementioned described, the Company identified certain accounting errors that are being retrospectively corrected herein. They are explained as follows:

 

   

The Company previously accounted for restricted cash as a component of cash in its statement of cash flows. It has corrected that classification to now exclude those amounts. The Company also modified the current versus non-current classification of restricted cash to correspond with contractual terms.

 

   

The Company has identified the need for a decommissioning provision in the accompanying financial statements given obligations that it believes exist under IAS 37 Provisions, Contingent Liabilities and Contingent Assets.

 

   

The Company has determined residual values for its wind turbines which resulted in a change in the depreciation expense.

 

   

The aforementioned matters have an impact on deferred income tax.

 

   

Certain accounting disclosures have been expanded from those previously presented.

These corrections have impacted the accompanying financial statements as follows (amounts in US dollars):

 

      Balance as of the
year ended
December 31, 2014
as previously
reported
     Retrospective
adjustments
    Balance as of the
year ended
December 31, 2014
as restated
 

Statement of financial position:

       

Current assets

     18,137,824         (5,911,635     12,226,189   

Non-current assets

     77,568,202         6,438,252        84,006,454   
  

 

 

 

Total assets

     95,706,026         526,617        96,232,643   
  

 

 

 

Current liabilities

     5,802,221                5,802,221   

Non-current liabilities

     81,949,449         379,162        82,328,611   
  

 

 

 

Total liabilities

     87,751,670         379,162        88,130,832   
  

 

 

 

Equity

     7,954,356         147,455        8,101,811   

 

 

 

F-172


Table of Contents
      Balance for the
three-month  period
ended March 31,
2014 as previously
reported
    Retrospective
adjustments
    Balance for the
three-month  period
ended March 31,
2014 as restated
 

Statement of comprehensive income:

      

Revenues

     8,086,793               8,086,793   

Operating expenses

     4,215,015        (24,363     4,190,652   
  

 

 

 

Income before income taxes

     3,871,778        24,363        3,896,141   

Income taxes

     (301,078     (2,050     (303,128
  

 

 

 

Comprehensive income

     3,570,700        22,313        3,593,013   
  

 

 

 

Statement of cash flows:

      

Cash flows from operating activities

     4,669,103        817        4,669,920   

Cash flows from investing activities

     (4,575     39,409        34,834   

Cash flows from financing activities

     (3,040,165     (2,284,948     (5,325,113

Cash at beginning of year

     15,997,118        (14,408,650     1,588,468   
  

 

 

 

Cash at end of year

     17,621,481        (16,653,372     968,109   

 

 

 

  2.3   New standards, interpretations and amendments thereof, adopted by the Company

The accounting policies applied by the Company in the preparation of these interim condensed financial statements are consistent with those applied in the preparation of its annual financial statements for the year ended December 31, 2014.

 

3. Seasonality of operations

The Company’s revenue depends on the wind power, which is normally stronger during the dry season, which in Nicaragua occurs from November through March. Due to the seasonal nature of this business, higher revenues and operating profits are usually expected in the first quarter and in the first half of the year in comparison with the remaining period of the year. This information is provided to allow for a proper appreciation of the results, however Management has concluded that it does not meet the definition of “highly seasonal” as considered by IAS 34 Interim Financial Reporting.

 

4. Cash

 

     

March 31,

2015

    

December 31,

2014

 

Unrestricted cash:

     

Banks

   $ 1,223,109       $ 961,156   

Petty cash

     2,364           
  

 

 

 
   $ 1,225,473       $ 961,156   
  

 

 

 

Restricted cash in banks:

     

Current

   $ 3,690,099       $ 5,202,845   

Non-current

     7,564,726         5,373,044   
  

 

 

 
   $ 11,254,825       $ 10,575,889   

 

 

 

F-173


Table of Contents

Cash deposited in bank accounts earns interest based on daily rates determined by the corresponding banks.

As of March 31, 2015, US$11,254,825 in cash (December 31, 2014: US$ US$10,575,889) is restricted under the financing documents between Eolo and the Lenders (Note 9). Under the terms of its debt agreements, the Company has a series of restricted bank accounts both “on-shore” in Nicaragua, and also off-shore. Cash receipts from operations are initially deposited directly into these restricted accounts and then based on contractually agreed provisions are allocated into a series of sub-accounts, restricted for specific operational and other purposes including, but not limited to, construction, debt service, major maintenance, insurance, and shareholders distributions. Except as expressly provided in those debt agreements, the restricted bank accounts are under the control of a trustee and the Company has the right to withdraw or transfer funds only as expressly provided in those debt agreements.

 

5. Accounts and notes receivable

 

     

March 31,

2015

   

December 31,

2014

 

Accounts and notes receivable with related parties (Note 6)

   $ 3,441,228      $ 3,395,541   

Distribuidora de Electricidad del Sur, S.A. (Dissur)

     3,021,904        2,488,061   

Distribuidora de Electricidad del Norte, S.A. (Disnorte)

     3,021,904        2,488,061   

Advance payments to vendors

     128,081        148,618   

Other receivables

     22,239        8,907   
  

 

 

 
     9,635,356        8,529,188   

Less non-current balances with related parties

     (3,300,000     (3,395,540
  

 

 

 
   $ 6,335,356      $ 5,133,648   

 

 

The outstanding balances due from Dissur and Disnorte correspond to trade receivables for the sale of electric power. Terms of these accounts receivable extend to 30 days from the corresponding invoice’s issue dates; are not subject to early-payment discounts, and do not generate interest except for late charges. As of March 31, 2015 and December 31, 2014 receivable balances were not past due. Based on the collection analysis performed by Management, it has been determined that no impairment existed as of those dates.

 

6. Balances and transactions with related parties

The related parties with whom the Company maintains balances and performs transactions are entities under the common control of the parent Company, Globeleq Mesoamerica Energy (Wind) Limited. A breakdown of these balances and the respective terms and conditions is as follows:

 

     

March 31,

2015

    

December 31,

2014

 

Notes receivable

   $ 3,300,000       $ 3,271,157   

Accounts receivable

     124,384         124,384   

Accrued interest on notes receivable

     16,844           
  

 

 

 
   $ 3,441,228       $ 3,395,541   

 

 

 

F-174


Table of Contents

The note receivable from Globeleq Mesoamerica Energy (Wind) Limited originated on May 23, 2012. The note bears interest at a 6.21% fixed annual interest rate which is due for payment on a semi-annual basis on March 1, and September 1. The note is unsecured and full collection of principal shall occur no later than December 1, 2032.

A breakdown of transactions performed with related parties is summarized below:

 

      Three-month period
ended
 
     

March 31,

2015

    

March 31,

2014

 

Globeleq Mesoamerica Energy (Wind) Limite-:

     

Finance income from note receivable

   $ 45,688       $ 45,839   
  

 

 

 

Administración de Energías Renovables, S.A. (“AER”):

     

Professional services related to the construction of the Project (capitalized under property, plant and equipment in 2013) (*)

   $ 152,487       $ 150,000   

 

 

 

  (*)   The Company and AER, a related party under common control, entered into a Management Services Agreement on March 1, 2012 whereby Eolo engaged AER to perform certain management activities such as preparing and maintaining the accounting records, treasury, tax and legal matters, among others. The Agreement is for an indefinite period unless terminated by a party upon written notice to the other party.

 

7. Property, plant and equipment

 

     Buildings    

Machinery
and

equipment

   

Major

spare
parts

   

Furniture

and

equipment

    Vehicles     Work in
progress
    Total  

Cost:

             

As of January 1, 2014

  $ 10,254,429      $ 68,011,076      $ 895,712      $ 124,693      $ 95,674      $      $ 79,381,584   

Additions

           114,508               10,988               60,000        185,496   

Retirements

           (10,751                                 (10,751
 

 

 

 

As of December 31, 2014

    10,254,429        68,114,833        895,712        135,681        95,674        60,000        79,556,329   

Additions

           9,020               772        21,304               31,096   
 

 

 

 

As of March 31, 2015

  $ 10,254,429      $ 68,123,853      $ 895,712      $ 136,453      $ 116,978      $ 60,000      $ 79,587,425   
 

 

 

 

Accumulated depreciation:

             

As of January 1, 2014

  $ 552,030      $ 3,561,210      $      $ 55,273      $ 19,903      $      $ 4,188,416   

Depreciation

    512,721        3,299,017               27,318        12,222               3,851,278   

Retirements

           (3,603                                 (3,603
 

 

 

 

As of December 31, 2014

    1,064,751        6,856,624               82,591        32,125               8,036,091   

Depreciation

    128,180        826,250               4,604        3,294               962,328   
 

 

 

 

As of March 31, 2015

  $ 1,192,931      $ 7,682,874      $      $ 87,195      $ 35,419      $      $ 8,998,419   
 

 

 

 

Carrying amounts:

             

As of January 1, 2014

  $ 9,702,399      $ 64,449,866      $ 895,712      $ 69,420      $ 75,771      $      $ 75,193,168   
 

 

 

 

As of December 31, 2014

  $ 9,189,678      $ 61,258,209      $ 895,712      $ 53,090      $ 63,549      $ 60,000      $ 71,520,238   
 

 

 

 

As of March 31, 2015

  $ 9,061,498      $ 60,440,979      $ 895,712      $ 49,258      $ 81,559      $ 60,000      $ 70,589,006   
 

 

 

 

 

F-175


Table of Contents

The agreement with Empresa Nacional de Transmisión Eléctrica of Nicaragua (Enatrel), the Nicaraguan public transmission company, contemplates the transfer of certain components of the substation to Enatrel, who will reimburse Eolo for the cost of such components. As of March 31, 2015, Eolo had communicated to Enatrel that the costs associated with the elements to be transferred are US$3,215,684. Enatrel, however, has not notified Eolo of the acceptance of this amount. Eolo will continue to classify the substation as property, plant and equipment until an agreement between the two parties is reached because the substation is being used in its own operations.

The Company has recognized a decommissioning provision related to its wind farm.

 

8. Intangible assets

 

      Development
costs a/
     Land usufruct
rights b/
     Software
c/
     Total  

Cost:

           

As of January 1, 2014

   $ 2,668,578       $ 900,000       $ 13,942       $ 3,582,520   

Additions

                     3,220         3,220   
  

 

 

 

As of December 31, 2014 and March 31, 2015

   $ 2,668,578       $ 900,000       $ 17,162       $ 3,585,740   
  

 

 

 

Accumulated amortization:

           

As of January 1, 2014

   $ 144,548       $ 71,250       $ 8,042       $ 223,840   

Amortization

     133,429         45,000         5,990         184,419   
  

 

 

 

As of December 31, 2014

     277,977         116,250         14,032         408,259   

Amortization

     33,357         11,250         245         44,852   
  

 

 

 

As of March 31, 2015

   $ 311,334       $ 127,500       $ 14,277       $ 453,111   
  

 

 

 

Carrying amounts:

           

As of January 1, 2014

   $ 2,524,030       $ 828,750       $ 5,900       $ 3,358,680   
  

 

 

 

As of December 31, 2014

   $ 2,390,601       $ 783,750       $ 3,130       $ 3,177,481   
  

 

 

 

As of March 31, 2015

   $ 2,357,244       $ 772,500       $ 2,885       $ 3,132,629   

 

 

 

  a/   Project development costs mainly include a fee of US$2,500,000 paid in 2012 to Globeleq Mesoamerica Energy (Wind) Limited, EOLO’s parent company, for certain services such as the negotiation of the letter of agreement with Gamesa Eólica, S.L. (the wind park’s constructor), negotiation of the non-recourse project finance with lenders, and the negotiation of the political risk insurance policy for the Project. Amortization of development costs began in December 2012 when the Project started selling energy and the amortization period is 20 years based on the PPA term.

 

  b/   Land usufruct rights relate to the land where the Project is located and are amortized over a 20-year period.

 

  c/   Software is amortized over a two-year period.

 

F-176


Table of Contents
9. Notes and loans payable

To finance the development, construction and completion of the Project, the Company entered into four loan arrangements on April 20, 2012 for a total aggregate principal amount of up to US$91,500,000. Notes and loans payable are denominated in US dollars and were as follows:

 

      Interest rates prevailing at                 
     

March 31,

2015

     December 31,
2014
    

March 31,

2015

   

December 31,

2014

 

Nederlandse Financierings-Maatschappij Voor Ontwikkelingslanden N.V. (FMO Senior)

     7.28%         7.28%       $ 26,220,799      $ 26,758,615   

Société de Promotion et de Participation pour la Coopération Économique (PROPARCO)

     7.21%         7.21%         24,816,111        25,325,117   

Deutsche Investitions-und Entwicklungsgesellschaft MBH (DEG)

     8.17%         8.17%         23,411,428        23,891,620   

Nederlandse Financierings-Maatschappij Voor Ontwikkelingslanden N.V. (FMO Subordinated)

     12.50%         12.50%         11,240,540        11,471,796   
        

 

 

 

Principal

           85,688,878        87,447,148   

Less – Deferred borrowing costs

           (3,470,061     (3,611,031
        

 

 

 
           82,218,817        83,836,117   

Less – Maturity of one year or less

           (4,749,390     (4,395,670
        

 

 

 

Principal

         $ 77,469,427      $ 79,440,447   

 

 

FMO acted as the “Lead Arranger” in the Project financing. The provisions of the loans are included in the “Common Terms Agreement”, the “Master Account Agreement”, the “Equity Contribution and Share Retention Agreement”, and the four “Loan Agreements”. The loan documents establish affirmative, negative and financial covenants for the Company.

The loans are secured by the Project and all its assets, with Citibank, N.A. acting as offshore security trustee and Banco de America Central, S.A. (BAC) acting as onshore security trustee.

As of March 31, 2015 accrued interest and fees payable on the loan agreements amount to US$292,375 (December 31, 2014: US$ 318,268).

Refer to a discussion of restricted cash conditions under the credit agreement as explained in Note 3 above.

 

10. Income tax and deferred income tax

Eolo was granted a seven-year exemption on corporate income taxes starting on November 12, 2012.

The Company calculates the period income tax expense using the tax rate that would be applicable to the expected total annual earnings. The major components of income tax expense in the interim condensed statement of comprehensive income are:

 

      For the three months ended  
     

March 31,

2015

    

March 31,

2014

 

Current income tax expense

   $       $   

Deferred income tax expense relating to origination and reversal of temporary differences

     305,584         303,128   
  

 

 

    

 

 

 

Income tax expense recognized in statement of comprehensive income

   $ 305,584       $ 303,128   

 

 

 

F-177


Table of Contents
11. Fair value of financial instruments

The Company’s main financial instruments are comprised of cash, notes and accounts receivable, notes and loans payable, accounts payable and accrued expenses. Management believes that the carrying amounts of cash, accounts receivable, and accounts payable approach their fair market value due to their short-term nature. The carrying amount of notes receivable from related parties approximates fair value as the notes were initially recorded at the estimated discounted cash flows.

In evaluating the fair value of loans payable at fixed rates the Company has considered the country risks, market conditions existing both at the date of the loans and those at the statement of financial position dates, and that there are not a significant number of comparable financings in its market. As of March 31, 2015 and December 31, 2014 the fair value of the loans, taking into account current market interest rates, are the following:

 

      Carrying amount      (Level 3)
Fair value
 
     

March 31,

2015

    

December 31,

2014

    

March 31,

2015

    

December 31,

2014

 

FMO

   $ 26,220,799       $ 26,758,615       $ 25,772,249       $ 26,296,130   

DEG

     23,411,428         23,891,620         24,059,281         24,559,599   

Proparco

     24,816,111         25,325,117         24,304,190         24,797,292   

FMO subordinated

     11,240,540         11,471,796         11,966,454         12,218,673   
  

 

 

 
   $ 85,688,878       $ 87,447,148       $ 86,102,174       $ 87,871,694   

 

 
           
      Carrying amount      (Level 3)
Fair value
 
     

March 31,

2015

    

December 31,

2014

    

March 31,

2015

    

December 31,

2014

 

Loan to GME

   $ 3,300,000       $ 3,395,540       $ 3,424,098       $ 3,399,090   

 

 

Fair value hierarchy

The Company uses the following hierarchy for determining and disclosing the fair value of its financial instruments by valuation technique:

 

  -   Level 1: Quoted (unadjusted) prices in active markets for identical assets or liabilities.

 

  -   Level 2: Techniques that use inputs different from quoted prices that are observable for the asset or liability, whether directly or indirectly.

 

  -   Level 3: Techniques that use inputs that have a significant effect on the recorded fair value that are not based on observable market data.

The inputs used in the fair value disclosure of loans payable are categorized within Level 3 of the fair value hierarchy.

 

12. Contingencies

In January 2014 Eolo was notified by the Municipality of Rivas, Nicaragua, of a tax assessment of property taxes on land and equipment corresponding to the 2013 fiscal period. The property taxes claimed by the Municipality amount to a total of US$137,321. Eolo has responded that it must not bear those taxes because

 

F-178


Table of Contents

it does not own the lands (the lands on which the wind farm operates is leased) and its equipment does not fall under the “fixtures” definition of the tax law on which the property taxes are levied. On May 28, 2014, Eolo filed a lawsuit against the Municipality of Rivas at the Contentious Administrative Court. This process is expected to take between one or two years. In the meantime, the Municipality is precluded from enforcing the tax assessment because Eolo rendered a guarantee of US$14,739 as part of the contentious process. The Company, after consultation with its legal advisors, considers that there are strong arguments to revert the tax assessment claimed and avoid payment. Therefore, the financial statements as of March 31, 2015 do not contain a provision for this matter.

 

13. Subsequent events

On June 12, 2015, a Stock Purchase Agreement (SPA) was signed between Globeleq Holdings (Americas Renewables) Limited and Mesoamerica Power Limited as sellers and an affiliate of SunEdison as purchaser, for the sale of a 100% interest in the Company’s upstream shareholder, Globeleq Mesoamerica Energy (Wind) Limited. The SPA is subject to various conditions, not all of which have been met as of the date of these financial statements. There is no guarantee that such transaction will be consummated.

 

F-179


Table of Contents

Inversiones Eólicas de Orosí Dos, S.A.

(A Costa Rican Entity)

Interim Condensed Statements of Financial Position

As of March 31, 2015 and December 31, 2014 and 2013

 

 

(expressed in US dollars)

            March 31
2015
    December 31
2014
    December 31
2013
 
      Notes      (Unaudited)     (Audited)
Restated
(Note 2.2)
    (Audited)
Restated
(Note 2.2)
 

ASSETS

         

Current assets:

         

Cash

     3       $ 3,465,415      $ 6,314,132      $ 5,696,826   

Restricted cash

     3         39,886        228,323          

Accounts receivable

     4         8,612,025        17,364        20,457   

Prepaid expenses

        13,579        3,950          

Prepaid sales tax

     5         1,469,651        409,626          
     

 

 

   

 

 

   

 

 

 

Total current assets

        13,600,556        6,973,395        5,717,283   

Non-current assets:

         

Prepaid sales tax

     5         5,820,435        6,743,445          

Intangible assets

     6         111,458,753        99,506,733        18,945,663   

Project equipment

        427,398        437,595        94,659   

Derivative financial instruments

     7         321,288        426,296          

Deferred income tax, net

     10         1,667,756        1,529,119        1,597,423   

Deferred finance costs

                      2,354,062   

Other assets

        3,336        25,660        7,369   
     

 

 

   

 

 

   

 

 

 

Total assets

      $ 133,299,522      $ 115,642,243      $ 28,716,459   
     

 

 

   

 

 

   

 

 

 

LIABILITIES AND EQUITY

         

Current liabilities:

         

Notes and loans payable

     9       $ 2,385,239      $ 2,385,238      $ 130,000   

Accounts payable

        123,231        123,044        305,939   

Deferred revenue

     4         2,910,769                 

Restoration provision

        2,603,417        46,959          

Accrued expenses and other accounts payable

        18,327,442        10,991,136        229,976   

Accrued interest payable

     9         1,680,651        693,229          

Income tax payable

        1,664,387                 
     

 

 

   

 

 

   

 

 

 

Total current liabilities

        29,695,136        14,239,606        665,915   

Non-current liabilities:

         

Restoration provision

        623,841        187,834          

Notes and loans payable

     9         89,027,595        88,634,232        3,414,600   
     

 

 

   

 

 

   

 

 

 

Total liabilities

        119,346,572        103,061,672        4,080,515   

Equity:

         

Share capital

        20        20        20   

Contributed capital

        17,687,469        17,687,469        29,425,953   

Deficit

        (3,734,539     (5,106,918     (4,790,029
     

 

 

   

 

 

   

 

 

 

Total equity

        13,952,950        12,580,571        24,635,944   
     

 

 

   

 

 

   

 

 

 

Total liabilities and equity

      $ 133,299,522      $ 115,642,243      $ 28,716,459   
     

 

 

   

 

 

   

 

 

 

The accompanying notes are part of the interim condensed financial statements.

 

F-180


Table of Contents

Inversiones Eólicas de Orosĺ Dos, S.A.

(A Costa Rican Entity)

Interim Condensed Statements of Comprehensive Income

For the three-month periods ended March 31, 2015 and 2014

 

 

(expressed in US dollars)

            March 31
2015
    March 31
2014
 
      Notes      (Unaudited)
Restated
(Note 2.2)
    (Unaudited)  

Revenues:

       

Construction revenue

     6       $ 11,952,020      $ 1,266,760   

Net revenue from availability liquidated damage

     4         5,689,232          
     

 

 

   

 

 

 

Total revenues

        17,641,252        1,266,760   

Construction costs

        (11,859,515     (1,256,955
     

 

 

   

 

 

 

Gross margin

        5,781,737        9,805   

Operating costs and expenses:

       

General and administrative

        250,804        324,602   

Penalty from ICE

     4         2,552,938          

Depreciation and amortization of non-financial assets

        14,573        7,540   
     

 

 

   

 

 

 

Total operating costs and expenses

        2,818,315        332,142   
     

 

 

   

 

 

 

Income loss

        2,963,422        (322,337

Other income (expenses):

       

Interest income

        218        231   

Finance cost

        (874     (1,336

Finance cost from provisions

        (4,985       

Change in fair value of derivative financial instruments

     7         (105,008       

Exchange rate differences, net

        75,231        90   

Other income (expenses), net

        (29,875       
     

 

 

   

 

 

 

Income (loss) before income tax

        2,898,129        (323,352

Deferred income tax

        (1,525,750     (68,292
     

 

 

   

 

 

 

Total comprehensive income (loss)

      $ 1,372,379      $ (391,644
     

 

 

   

 

 

 

The accompanying notes are part of the interim condensed financial statements.

 

F-181


Table of Contents

Inversiones Eólicas de Orosĺ Dos, S.A.

(A Costa Rican Entity)

Interim Condensed Statements of Changes in Equity

For the three-month periods ended March 31, 2015 and 2014

 

 

(expressed in US dollars)

     Share
capital
     Contributed
capital
     Deficit     Total equity  
                            

Restated

(Note 2.2)

 

For the three-month period ended March 31, 2014:

          

As of January 1, 2014 (audited)

   $ 20       $ 29,425,953       $ (4,790,029   $ 24,635,944   

Comprenhensive loss

                     (391,644     (391,644

Contribuited capital

             200,000                200,000   
  

 

 

    

 

 

    

 

 

   

 

 

 

As of March 31, 2014 (unaudited)

   $ 20       $ 29,625,953       $ (5,181,673   $ 24,444,300   
  

 

 

    

 

 

    

 

 

   

 

 

 

For the three-month period ended March 31, 2015:

          

As of January 1, 2015 (audited)

   $ 20       $ 17,687,469       $ (5,106,918   $ 12,580,571   

Comprenhensive Income

                     1,372,379        1,372,379   
  

 

 

    

 

 

    

 

 

   

 

 

 

As of March 31, 2015 (unaudited)

   $ 20       $ 17,687,469       $ (3,734,539   $ 13,952,950   
  

 

 

    

 

 

    

 

 

   

 

 

 

 

 

The accompanying notes are part of the interim condensed financial statements.

 

F-182


Table of Contents

Inversiones Eólicas de Orosĺ Dos, S.A.

(A Costa Rican Entity)

Interim Condensed Statements of Cash Flows

For the three-month periods ended March 31, 2015 and 2014

 

 

(expressed in US dollars)

            March 31
2015
    March 31
2014
 
      Notes     

(Unaudited)
Restated

(Note 2.2)

    (Unaudited)
Restated
(Note 2.2)
 

Operating activities:

       

Income (loss) before income tax

      $ 2,898,129      $ (323,352

Adjustments to reconcile income (loss) before income tax to cash flows from operating activities:

       

Depreciation and amortization expense

        14,573        7,540   

Finance costs

        874        (1,336

Finance cost from provisions

        4,985          

Change in fair value of derivative financial instruments

     6         105,008          

Loss on disposal of project equipment

        188          

Interest income

        (218     (231
     

 

 

   

 

 

 
        3,023,539        (317,379

Changes in operating assets and liabilities:

       

Accounts receivable

        (5,683,892     (35,904

Accounts receivable with related parties

               (13,900

Prepaid expenses

        (9,629     (6,861

Prepaid sales tax

        (137,015       

Other assets

        22,324        (1,318

Accounts payable

        187        (89,736

Accrued interest payable

        987,422          

Accrued expenses and other accounts payable

        7,336,306        (78,407

Increase provisions

        2,987,480          
     

 

 

   

 

 

 

Net cash provided by (used in) operating activities

        8,526,722        (543,505
     

 

 

   

 

 

 

Investing activities:

       

Additions to intangible assets

        (11,952,020     (1,266,760

Purchase of financial instrument

               (1,249,116

Additions to project equipment

        (4,563     (360,012

Interest income received

        218        231   
     

 

 

   

 

 

 

Net cash used in investing activities

        (11,956,365     (2,875,657
     

 

 

   

 

 

 

Financing activities:

       

Decrease (increase) in restricted cash accounts designated for financing activities

        188,437        (2,051,271

New Loans

        407,780          

Contributed capital

               200,000   

Financing costs paid

               (378,211

Interest paid

        (15,291     1,336   
     

 

 

   

 

 

 

Net cash provided by (used in) financing activities

        580,926        (2,228,146
     

 

 

   

 

 

 

Net decrease in cash

        (2,848,717     (5,647,308

Cash at beginning of year

        6,314,132        5,696,826   
     

 

 

   

 

 

 

Cash at end of year

      $ 3,465,415      $ 49,518   
     

 

 

   

 

 

 

The accompanying notes are part of the interim condensed financial statements.

 

F-183


Table of Contents

Inversiones Eólicas de Orosĺ Dos, S.A.

(A Costa Rican Entity)

Notes to Interim Condensed Financial Statements

March 31, 2015

 

 

(expressed in US dollars)

 

1. Corporate information

Inversiones Eólicas de Orosí Dos, S.A. (“Orosí” or “the Company”) was organized as a corporation on August 13 2008 under the laws of the Republic of Costa Rica. Orosí is domiciled in Quebrada Grande de Liberia, Guanacaste, Costa Rica. The Company is a 100% owned subsidiary of Inversiones Eólicas de Costa Rica, S.A., which in turn is controlled by Globeleq Mesoamerica (Wind) Limited (“GME Wind”) an entity domiciled in Bermuda and Orosí’s ultimate parent is Actis Infrastructure Fund 2LP.

The Company’s main activity relates to the construction and future operation of a 50 megawatt wind farm (“the Project”) in the province of Guanacaste, Costa Rica. On August 1 2013 Orosí entered into a Power Purchase Agreement (PPA) with Instituto Costarricense de Electricidad (“ICE”) to build, operate and transfer the wind farm, which is comprised of 25 wind turbine generators of 2 megawatts each. Orosí began the Project’s construction in December 2013 and it is expected that energy generation will start during the third quarter of 2015. The approximate total investment in the construction of the Project is US$119 million, and it is being financed with the Company’s own capital and through third-party borrowings.

As previously indicated, the PPA with ICE was agreed under the build-operate-transfer (BOT) modality with the following significant terms:

 

   

The purpose of the PPA is for Orosí to undertake the financing, construction, operation, and maintenance of the wind park. The wind park has to be transferred to ICE free of any and all encumbrances at the end of the PPA period.

 

   

The PPA period is 20 years, which enter into effect upon notice from ICE of the “Order to Proceed” (a term defined in the PPA), which happened on October 24, 2013.

 

   

Orosí will generate power under the operational and quality standards established by ICE in the PPA, and has to deliver all power generated to ICE, with the exception of that which is required to supply the power plant’s own needs.

 

   

The initial tariff is established in the PPA and a portion is adjusted for inflation on a semi-annual basis.

On November 22, 2013 the Company signed a turnkey Engineering, Procurement and Construction agreement (“EPC”) with Gamesa Wind US LLC (“Gamesa”) by which Gamesa, as the main subcontractor, committed to design, engineer, manufacture, procure, install, start-up, construct and test the wind farm. The total EPC price is US$97,220,640, including subsequent change orders for a net amount of USD$1,500,000. The EPC contract includes design-defect and performance warranties in favor of Orosí which are supported by a stand-by letter of credit for US$14,358,096.

The Company does not have traded debt or equity in the public markets. The accompanying financial statements have been prepared for use in a securities filing in connection with the acquisition of the Company as explained in Note 12.

 

F-184


Table of Contents
2. Basis of preparation of the financial statements and accounting policies

The Company’s interim condensed financial statements as of March 31, 2015 were first approved for issuance by the Company’ Chief Executive Officer and Chief Financial Officer on April 8, 2015, and were subsequently approved by the Company’s shareholders. The accompanying restated interim condensed financial statements have been prepared for use in a securities filing in connection with the acquisition of the Company as explained in Note 12. They have also been restated for the correction of certain errors as explained in Note 2.2. The Company’s Chief Executive Officer and Chief Financial Officer approved these financial restated statements for issuance on June 13, 2015 and subsequent events have been considered through that later date.

 

2.1 Basis of preparation

The interim condensed financial statements for the three-month period ended March 31, 2015 have been prepared in accordance with IAS 34 Interim Financial Reporting, an accounting standard of the International Financial Reporting Standards (IFRS) as issued by the International Accounting Standards Board.

These financial statements are condensed and accordingly do not include all disclosures required by the IFRS for a full set of financial statements. They should be read in conjunction with the Company’s financial statements as of and for the year ended December 31, 2014. The results for the quarter ended March 31, 2015 are not necessarily indicative of results that should be expected for the full year ending December 31, 2015.

 

2.2 Restatement of interim condensed financial statements

During its preparation of the accompanying interim condensed financial statements for the purpose aforementioned described, the Company identified certain accounting errors that are being retrospectively corrected herein. They are explained as follows:

 

   

The Company previously accounted for restricted cash as a component of cash in its statement of cash flow. It has corrected that classification to now exclude those amounts. The Company also modified the current versus non-current classification of restricted cash to comfort with contractual terms.

 

   

The Company has identified the need for a decommissioning and restoration provision in the accompanying financial statements given legal obligations that it believes exist under IAS 37 Provisions, Contingent Liabilities and Contingent Assets.

 

   

The Company has determined residual values for its wind turbines which resulted in a change in the depreciation expense.

 

   

The aforementioned matters have an impact on deferred income taxes.

 

   

Certain accounting disclosures have been expanded from those previously presented

 

F-185


Table of Contents

These corrections have impacted the accompanying interim condensed financial statements as follows (amounts in US dollars):

 

     

Balance as

of or for the
three-month
period

ended March 31,
2015 as
previously
reported

    Retrospective
adjustments
   

Balance as

of or for the
three-month
period

ended March 31,
2015 as
restated

    Balance as of
the year
ended
December 31,
2014 as
previously
reported
     Retrospective
adjustments
    Balance as of
the year
ended
December 31,
2014 as
restated
 

Statement of financial position:

             

Current assets

     4,895,358        8,705,198        13,600,556        8,186,361         (1,212,966     6,973,395   

Non-current assets

     117,448,817        2,250,149        119,698,966        107,150,651         1,518,197        108,668,848   
  

 

 

 

Total assets

     122,344,175        10,955,347        133,299,522        115,337,012         305,231        115,642,243   
  

 

 

 

Current liabilities

     20,836,563        9,731,804        29,695,136        14,192,647         46,959        14,239,606   

Non-current liabilities

     89,462,137        189,299        89,651,436        88,634,232         187,834        88,822,066   
  

 

 

 

Total liabilities

     110,298,700        9,921,103        119,346,572        102,826,879         234,793        103,061,672   
  

 

 

 

Equity

     12,045,475        1,034,244        13,952,950        12,510,133         70,438        12,580,571   
  

 

 

 

Statement of comprehensive income:

             

Revenues

     10,258,916        7,395,439        11,952,020          

Operating expenses

     (10,505,199     4,251,027        (9,053,891       
  

 

 

        

Income before income taxes

     (246,283     3,144,412        2,628,129          

Income taxes

     (218,375     (2,180,606     (1,525,750       
  

 

 

        

Comprehensive income

     (464,658     963,806        1,372,379          
  

 

 

        

Statement of cash flows:

             

Cash flows from operating activities

     6,833,618        1,693,104        8,526,722          

Cash flows from investing activities

     (10,263,261     (1,693,104     (11,956,365       

Cash flows from financing activities

     392,489        188,437        580,926          

Cash at beginning of year

     6,542,455        (228,323     6,314,132          
  

 

 

        

Cash at end of year

     3,505,301        (39,886     3,465,415          
  

 

 

        

 

F-186


Table of Contents
2.3 New standards, interpretations and amendments thereof, adopted by the Company

The accounting policies applied by the Company in the preparation of these interim condensed financial statements are consistent with those applied in the preparation of its annual financial statements for the year ended December 31, 2014.

 

3. Cash

 

      March 31
2015
     December 31
2014
 

Banks

   $ 3,463,368       $ 6,312,107   

Petty cash

     2,047         2,025   
  

 

 

 
   $ 3,465,415       $ 6,314,132   
  

 

 

 

Restricted cash in banks

   $ 39,886       $ 228,323   
  

 

 

 

Cash deposited in bank accounts earns interest based on daily rates determined by the corresponding banks.

Cash balance for US$39,886 as of March 31, 2015 (2014: US$228,323) is restricted under the financing documents between Orosi and the Lenders (Note 9). Under the terms of its debt agreements, the Company has a series of restricted bank accounts both “on-shore” in Costa Rica, and also off-shore. Cash receipts from operations are initially deposited directly into these restricted accounts and then based on contractually agreed provisions are allocated into a series of sub-accounts, restricted for specific operational and other purposes including, but not limited to, construction, debt service, major maintenance, insurance, and shareholders distributions. Except as expressly provided in those debt agreements, the restricted bank accounts are under the control of a trustee and the Company has the right to withdraw or transfer funds only as expressly provided in those debt agreements.

 

4. Account receivable

 

      2015      2014  

Gamesa Wind US LLC

   $ 8,600,000       $   

Others

     12,026         17,364   
  

 

 

 
   $ 8,612,026       $ 17,364   
  

 

 

 

The outstanding balances due from Gamesa Wind US LLC correspond to trade receivables for delays in the construction schedule. During 2014, Orosí negotiated a Letter Agreement with Gamesa which allowed Orosí to invoice US$8,600,000 for “delay liquidated damages” per article 8 of the EPC, while at the same time agreeing to pay Gamesa $2,000,000 associated with various change orders. Orosí received the full amount of the liquidated damages during April and May 2015. Given the agreement that the Company had in place with Gamesa prior to March 31, 2015, the Company has recorded a receivable from Gamesa for $8,600,000 as of March 31, 2015, revenue related to availability liquidated damages of $5,689,232 representing amounts attributable to delays though March 31, 2015, and deferred income of $2,910,769 related to subsequent periods to March 31, 2015.

The final liquidated damages could reach up to approximately US$9,700,000, equivalent to 10% of the EPC value, which is subject to change due to potential change orders. It is now estimated that the park will start commercial operations during the third quarter of 2015. The dates agreed with Instituto Costarricense de Electricidad (ICE) for the partial and total start of operations are May 12 and June 2, 2015.

 

F-187


Table of Contents

Orosí could therefore be exposed to fines per article 4.9.1 of the PPA contract with ICE for approximately US$2,550,000. Based on information available as of the date of these financial statements, management believes that such fines are probable in nature and they have thus accrued in the accompanying March 31, 2015 statement of financial position.

 

5. Prepaid sales tax

As of March 31, 2015, the Company reflects an asset for an amount of US$7,290,086 (2014: US$7,153,071) in its financial statements which is related to sales taxes paid. Out of this balance, US$7,022,301 relates to taxes for the import of the generation equipment for the Project. The Company filed a request with the Ministry of Treasury to obtain exempt purchase orders for the import of the equipment necessary for the Project’s construction. This request, however, was denied. This application, however, was denied. Orosi was therefore forced to pay all of the sales taxes for the imports.

On February 12, 2015 the Company filed a claim against the State of Costa Rica through an ordinary process that would allow for the recovery of these taxes plus interest. In the meantime, the Company will use the taxes paid as tax credits to be offset against taxes collected from the sale of energy. Because the Company believes that it is probable that it will ultimate recover such prepaid sales tax amounts, it has reflected these amounts as a prepaid amount in its financial statements and not as an incremental component of the project construction.

 

6. Intangible assets

The Company accounts for the construction of the wind park under the intangible asset model contemplated in IFRIC 12 Service Concession Arrangements, an interpretation from International Financial Reporting Standards. Construction of the wind park began in December 2013. The intangible asset balance as of March 31, 2015 and December 31, 2014 is as follows:

 

     

March 31

2015

     December 31
2014
 

Construction revenue during 2015

   $ 11,952,020       $   

Construction revenue during 2014

     94,519,373         94,754,166   

Construction revenue during 2013

     4,752,567         4,752,567   

Restoration Obligation during 2014

     234,793           
  

 

 

    

 

 

 
   $ 111,458,753       $ 99,506,733   
  

 

 

    

 

 

 

Construction costs in the three-month period ended March 31, 2015 associated to revenue amount to a total of US$10,179,515 (March 31, 2014: US$ 1,256,955).

As of March 31, 2015 the Company accrues a liability for construction costs of US$17,027,880 (December 31, 2014: US$10,846,303) over completed construction work for which the sub-contractor Gamesa has not yet billed the Company as of that date.

Management has estimated the overall percentage of completion of the Project to be 98% as of March 31, 2015 (December 31, 2014: 90%). It is also expected that the Project will begin operations in early July 2015.

Finance costs of US$3,809,800 were capitalized in the three months period ended March 31, 2015 (December 2014: US$2,259,121) with respect to the Project construction based on an average effective interest rate of 6.50% (December 2014: 6.18%) of the corresponding loans obtained to finance construction.

 

F-188


Table of Contents
7. Fair value of derivative instrument

The Company uses interest rate cap to hedge its variable interest rate exposure on a portion of the Company’s loan with BICSA (note 9). Under the interest rate cap agreement contracted by the Company on February 11, 2014, it receives a fixed interest rate and pays interest at a variable rate on the notional amounts. This derivative financial instrument has been designated as a hedging instrument and has been assessed to be highly effective as of the date of the financial statements. As of March 31, 2015 the fair value of the interest rate cap amounts to US$321,288 (December 31, 2014 US$426,296) and the change in fair value was a loss for US$105,008.

The main characteristics of the cap agreement are as follows:

 

Effective date

   25-Apr-2014

Termination date

   25-Oct-2028

Maximum notional amount

   US$19,526,000

Fixed cap interest rate

   Between 2.50% and 4.75%

Variable interest rate

   US Libor - BBA - 6 months

 

8. Balances and transactions with related parties

The related parties with whom the Company maintains balances and performs transactions are entities under the common control of the parent company, Globeleq Mesoamerica Energy (Wind) Limited. A breakdown of these account payable balances and the respective terms and conditions is as follows:

 

      2015      2014  

Notes and loans payable:

     

Administración de Energías Renovables, S.A.

   $ 18,630,539       $ 18,222,757   
  

 

 

 

Accounts payable:

     

Plantas Eólicas, Limited

   $       $ 252   
  

 

 

 

Maturity terms for accounts payable to related parties extend up to 30 days from the corresponding invoices’ issue dates, and are not subject to any discounts for early-payment.

A breakdown of transactions performed with related parties is summarized below:

 

      2015      2014  

Various construction costs capitalized to the Project:

     

TCR Holdings, S.A. a/

   $ 240,000       $ 1,169,785   
  

 

 

 

CR Operaciones y Mantenimientos, S.A. b/

   $ 26,961       $ 72,387   
  

 

 

 

Administración de Energías Renovables, S.A. c/

   $         $ 71,429   
  

 

 

 

Energía Eólica de Honduras, S.A.

     4,469      
  

 

 

 

Finance costs:

     

Administración de Energías Renovables, S.A. (Note 11)

   $         $ 720,368   
  

 

 

 

Professional services — expense:

     

TCR Holdings, S.A. a/

   $       $ 600,000   
  

 

 

 

 

  a/  

The Company and TCR Holdings, S.A. entered into a Management Services Agreement whereby Orosí engaged TCR to perform the following services: engineering, technical support, construction

 

F-189


Table of Contents
 

supervision, project management, bookkeeping, treasury, and tax and legal matters, among others. As consideration for the services, the agreement contemplated a monthly fee (plus expenses) of US$50,000 which will increase to US$80,000 after the Financial Closing, and will be reduced after the Project’s Commercial Operation to US$50,000. The Agreement is for an indefinite period unless it is terminated by either party upon written notice to the other party.

 

  b/   The Company and CR Operaciones y Mantenimientos, S.A. entered into an Inspection Contract on May 22, 2014 for the installation of wind turbines.

 

  c/   The Company paid to the subsidiary Administración de Energías Renovables, S.A. certain reimbursable expenses related with the construction of the Project.

Compensation to key management personnel

The Company does not directly incur compensation for key personnel because TCR Holdings, S.A. provides the required management services.

 

9. Notes and loans payable

Notes and loans payable correspond to financing obtained for the purchase of land and easements where the Project is located and for construction costs. A summary of the notes and loans payable is presented below:

 

     Interest rate    

Maturity

date

   

March

2015

   

December

2014

 

Construction (*):

       

Export-Import Bank of the United

    3.94%(**)        October 2031      $ 52,016,373      $ 52,016,373   

States (“Ex-Im”)

       

Banco Internacional de Costa

    Libor+4% (**)        October 2028        12,090,000        12,090,000   

Rica, S.A. (BICSA)

       

Nederlandse Financierings-Maatschappij Voor Ontwikkelingslanden N.V. (FMO)

    Libor+4% (**)        October 2028        14,249,869        14,249,869   

Subordinated loan with related party:

       

Administración de Energías Renovables, S.A.

    11% fixed        April 2033        18,630,539        18,222,758   

Purchase of land and easements:

       

Hermanos Ocampo

Fernández, S.A.

           July 2015        130,000        130,000   
     

 

 

   

 

 

 

Principal

        97,116,781        96,709,000   

Less–Deferred borrowing costs

        (5,703,947     (5,689,530
     

 

 

   

 

 

 
        91,412,834        91,019,470   

Less – Maturity of one year or less

        (2,385,239     (2,385,238
     

 

 

   

 

 

 

Long-term notes and payables

      $ 89,027,595      $ 88,634,232   
     

 

 

   

 

 

 

 

  (*)   The total available principal for the financing of the construction is US$109,147,375, comprised as follows: US$61,147,375 from Ex-Im, US$20,000,000 from BICSA, and US$28,000,000 from FMO. As of December 31, 2013, the Company had not made any withdrawals from these credit facilities.

 

  (**)   Interest rate during the construction phase of the Project.

 

F-190


Table of Contents

The provisions of the construction loans are included in the “Common Terms Agreement”, the “Master Security and Account Agreement”, the “Equity Contribution and Share Retention Agreement”, the “Intercreditor Agreement”, the “Security Trust Agreement”, and the three “Loan Agreements”. The loan documents establish affirmative, negative and certain financial covenants for the Company.

The loans for the financing of construction are secured by the Project and all its assets, with Banco BCT, S.A. acting as security trustee and onshore Account Bank. Loans for the purchase of land are secured by a mortgage on said land. These liens were specifically permitted by the grantor of the BOT (ICE), who retains residual interest through its ability to step into the loans or pay them off to maintain control of the Project in the event that the Company defaults on such obligations.

On September 2, 2014 the Company entered into an unsecured subordinated loan agreement with a related party, Administración de Energías Renovables, S.A. Debt payments, including principal and interest, will be made in April and October of each year, from 2015 up to April 2033.

As of March 31, 2015 accrued interest on notes and loans payable amounts to US$1,680,651 (December 31, 2014: US$693,229).

 

10. Income tax and deferred income tax

The Company calculates the period income tax expense using the tax rate that would be applicable to the expected total annual earnings. The major components of income tax expense in the interim condensed statement of comprehensive income are:

 

     For the three months
ended
 
     

March 31,

2015

   

March 31,

2014

 

Current income tax expense

   $      $   

Deferred income tax expense relating to origination and reversal of temporary differences

     (1,525,750     (68,292
  

 

 

   

 

 

 

Income tax expense recognized in statement of comprehensive income

   $ (1,525,750   $ (68,292
  

 

 

   

 

 

 

 

F-191


Table of Contents
11. Fair value of financial instruments

The Company’s main financial instruments are comprised of cash, notes and accounts receivable, notes and loans payable, accounts payable and accrued expenses. Management believes that the carrying amounts of cash, accounts receivable, and accounts payable approach their fair market value due to their short-term nature. The carrying amount of notes receivable from related parties approximates fair value as the notes were initially recorded at the estimated discounted cash flows.

In evaluating the fair value of loans payable at fixed rates the Company has considered the country risks, market conditions existing both at the date of the loans and those at the statement of financial position dates, and that there are not a significant number of comparable financings in its market. As of March 31, 2015 and December 31, 2014 the fair value of the loans, taking into account current market interest rates, are the following:

 

     Carrying amount      (Level 3)
Fair value
 
     

March 31,

2015

    

December 31,

2014

    

March 31,

2015

    

December 31,

2014

 

Ex—Im

   $ 52,016,373       $ 52,016,373       $ 53,886,895       $ 53,886,895   

FMO

     14,249,869         14,249,869         14,552,632         14,552,632   

BICSA

     12,090,000         12,090,000         12,041,195         12,041,195   

Administración Energías Renovables, S.A.

     18,630,539         18,630,539         18,630,539         18,630,539   

Hermanos Ocampo Fernández, S.A.

     130,000         130,000         130,000         130,000   
  

 

 

 

Total

   $ 97,116,751       $ 97,116,781       $ 99,241,261       $ 99,241,261   
  

 

 

 

 

     Carrying amount      (Level 3)
Fair value
 
     

March 31,

2015

    

December 31,

2014

    

March 31,

2015

    

December 31,

2014

 

Loan to GME

   $                        $                        $                        $                    
  

 

 

 

 

  Fair   value hierarchy

The Company uses the following hierarchy for determining and disclosing the fair value of its financial instruments by valuation technique:

 

   

Level 1: Quoted (unadjusted) prices in active markets for identical assets or liabilities.

 

   

Level 2: Techniques that use inputs different from quoted prices that are observable for the asset or liability, whether directly or indirectly.

 

   

Level 3: Techniques that use inputs that have a significant effect on the recorded fair value that are not based on observable market data.

The inputs used in the fair value disclosure of loans payable are categorized within Level 3 of the fair value hierarchy.

 

F-192


Table of Contents
12. Subsequent events

On June 12, 2015, a Stock Purchase Agreement (SPA) was signed between Globeleq Holdings (Americas Renewables) Limited and Mesoamerica Power Limited as sellers and an affiliate of SunEdison as purchaser, for the sale of a 100% interest in the Company’s upstream shareholder, Globeleq Mesoamerica Energy (Wind) Limited. The SPA is subject to various conditions, not all of which have been met as of the date of these financial statements. There is no guarantee that such transaction will be consummated.

 

F-193


Table of Contents

Report of independent registered public accounting firm

To SunEdison Emerging Markets Co. (Predecessor):

We have audited the accompanying combined balance sheets of SunEdison Emerging Markets Co. (Predecessor) (a solar energy generation asset business of SunEdison, Inc.) (the Company) as of December 31, 2014 and 2013, and the related combined statements of operations, comprehensive loss, equity, and cash flows for each of the years in the two-year period ended December 31, 2014. These combined financial statements are the responsibility of the Company’s management. Our responsibility is to express an opinion on these combined financial statements based on our audits.

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements. An audit also includes assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.

In our opinion, the combined financial statements referred to above present fairly, in all material respects, the financial position of SunEdison Emerging Markets Co. (Predecessor) as of December 31, 2014 and 2013, and the results of their operations and their cash flows for each of the years in the two-year period ended December 31, 2014, in conformity with U.S. generally accepted accounting principles.

/s/ KPMG LLP

San Francisco, California

June 17, 2015

 

F-194


Table of Contents

SunEdison Emerging Markets Co. (Predecessor)

Combined statements of operations

 

      For the year ended
December 31,
 
In thousands    2014     2013  

 

  

 

 

   

 

 

 

Revenue

   $ 39,449      $ 22,196   

Operating costs and expenses:

    

Cost of operations

     1,999        355   

Cost of operations—affiliate

     2,257        1,311   

General and administrative

     1,349        1,047   

General and administrative—affiliate

     10,850        4,790   

Depreciation and accretion

     7,167        4,785   
  

 

 

   

 

 

 

Total operating costs and expenses

     23,622        12,288   
  

 

 

   

 

 

 

Operating income

     15,827        9,908   

Other expense (income):

    

Interest expense

     24,294        11,812   

Other (income) expense, net

     (5,128     2,024   
  

 

 

   

 

 

 

Total other expenses, net

     19,166        13,836   
  

 

 

   

 

 

 

Loss before income tax expense (benefit)

     (3,339     (3,928

Income tax expense (benefit)

     1,700        (1,651
  

 

 

   

 

 

 

Net loss

   $ (5,039   $ (2,277
  

 

 

   

 

 

 

See accompanying notes to combined financial statements.

 

F-195


Table of Contents

SunEdison Emerging Markets Co. (Predecessor)

Combined statements of comprehensive loss

 

      For the year ended December 31,  
In thousands                2014                 2013  

 

  

 

 

   

 

 

 

Net loss

   $ (5,039   $ (2,277

Other comprehensive loss:

    

Net foreign currency translation adjustments

     (8,167     (5,161

(Loss) gain on hedging instruments

     (12,903     2,762   
  

 

 

   

 

 

 

Total comprehensive loss

   $ (26,109   $ (4,676
  

 

 

   

 

 

 

See accompanying notes to combined financial statements.

 

F-196


Table of Contents

SunEdison Emerging Markets Co. (Predecessor)

Combined balance sheets

 

      As of December 31,  
In thousands    2014     2013  

 

  

 

 

   

 

 

 

Assets

    

Current assets:

    

Cash and cash equivalents

   $ 150,146      $ 3,148   

Cash commited for construction projects

     42,416        2,120   

Restricted cash

     22,083        37,014   

Accounts receivable, net

     11,728        4,578   

Due from parent and affiliates

     864        696   

Deferred financing costs

     4,457        1,259   

Deferred tax assets

     197        971   

Other current assets

     2,775        2,676   
  

 

 

   

 

 

 

Total current assets

     234,666        52,462   

Property and equipment, net

     386,079        210,017   

Due from parent and affiliates

     138        152   

Deferred financing costs

     11,487        5,447   

Restricted cash

     21,312        8,145   

Deferred tax assets

     1,384          

Other assets

     18,390        14,888   
  

 

 

   

 

 

 

Total assets

   $ 673,456      $ 291,111   
  

 

 

   

 

 

 

Liabilities and Equity

    

Current liabilities:

    

Current portion of long-term debt

   $ 31,542      $ 29,495   

Accounts payable

     9,894        886   

Accrued expenses and other current liabilities

     2,326        1,938   

Deferred tax liabilities

     1,384        89   

Due to parent and affiliates

     47,266        24,633   
  

 

 

   

 

 

 

Total current liabilities

     92,412        57,041   

Other liabilities:

    

Long-term debt, less current portion

     492,569        115,925   

Asset retirement obligations and other liabilities

     36,830        40,051   

Deferred tax liabilities

     2,881        8,393   
  

 

 

   

 

 

 

Total liabilities

     624,692        221,410   

Equity:

    

Net parent investment

     75,285        75,152   

Accumulated other comprehensive loss

     (26,521     (5,451
  

 

 

   

 

 

 

Total equity

     48,764        69,701   
  

 

 

   

 

 

 

Total liabilities and equity

   $ 673,456      $ 291,111   
  

 

 

   

 

 

 

See accompanying notes to combined financial statements.

 

F-197


Table of Contents

SunEdison Emerging Markets Co. (Predecessor)

Combined statements of equity

 

                                                                                

In thousands

   Net parent
investment
    Accumulated
other
comprehensive
loss
    Total equity  

Balance at December 31, 2012

   $ 35,749      $ (3,052   $ 32,697   
  

 

 

   

 

 

   

 

 

 

Net loss

     (2,277            (2,277

Contributions from parent and affiliates, net

     41,680               41,680   

Other comprehensive loss

            (2,399     (2,399
  

 

 

   

 

 

   

 

 

 

Balance at December 31, 2013

   $ 75,152      $ (5,451   $ 69,701   
  

 

 

   

 

 

   

 

 

 

Net loss

     (5,039            (5,039

Contributions from parent and affiliates, net

     5,172               5,172   

Other comprehensive loss

            (21,070     (21,070
  

 

 

   

 

 

   

 

 

 

Balance at December 31, 2014

   $ 75,285      $ (26,521   $ 48,764   
  

 

 

   

 

 

   

 

 

 

See accompanying notes to combined financial statements.

 

F-198


Table of Contents

SunEdison Emerging Markets Co. (Predecessor)

Combined statements of cash flows

 

      For the year ended
December 31,
 

In thousands

   2014     2013  

Cash flows from operating activities:

    

Net loss

   $ (5,039   $ (2,277

Adjustments to reconcile net loss to net cash used in operating activities:

    

Amortization of deferred financing costs

     1,140        772   

Depreciation and accretion

     7,167        4,785   

Change in fair value of interest rate swaps

     705        (158

Deferred taxes

     1,461        (1,956

Changes in assets and liabilities:

    

Accounts receivable, net

     (7,533     (2,766

Other current assets

     (656     (3,518

Accounts payable and other current liabilities

     65        (336

Due to parent and affiliates

     23,327        (15,746

Other assets and liabilities, net

     (5,577     4,228   
  

 

 

   

 

 

 

Net cash provided by (used in) operating activities

     15,060        (16,972
  

 

 

   

 

 

 

Cash flows from investing activities:

    

Capital expenditures

     (190,267     (60,312

Change in cash committed for construction

     (40,305     (2,120

Change in restricted cash

     (1,509     (38,776

Change in loans due from parent and affiliates

     228        (745
  

 

 

   

 

 

 

Net cash used in investing activities

     (231,853     (101,953
  

 

 

   

 

 

 

Cash flows from financing activities:

    

Proceeds from system debt financing

     224,023        89,025   

Repayments on system debt financing

     (8,693     (4,922

Proceeds from Bridge Facility

     150,000          

Proceeds from loans with parent and affiliates

     3,951        2,580   

Net parent investment

     5,930        48,066   

Payment of deferred financing costs

     (9,692     (16,110
  

 

 

   

 

 

 

Net cash provided by financing activities

     365,519        118,639   

Effect of exchange rate changes on cash and cash equivalents

     (1,728     (576
  

 

 

   

 

 

 

Net increase (decrease) in cash and cash equivalents

     146,998        (862

Cash and cash equivalents at beginning of period

     3,148        4,010   
  

 

 

   

 

 

 

Cash and cash equivalents at end of period

   $ 150,146      $ 3,148   
  

 

 

   

 

 

 

Supplemental disclosures of cash flow information:

    

Cash paid for interest

   $ 22,754      $ 8,784   

Schedule of non-cash investing activities:

    

Additions to asset retirement obligations

   $ 2,930      $ 1,733   

Additions to property and equipment included in due to parent and affiliates

     2,100        14,801   

Additions to property and equipment as a result of contributions from shareholders

            586   

Amortization of deferred financing cost capitalized during construction

     161        43   

See accompanying notes to combined financial statements.

 

F-199


Table of Contents

SunEdison Emerging Markets Co. (Predecessor)

Notes to combined financial statements

(Amounts in thousands)

1. Nature of operations

The accompanying combined financial statements of SunEdison Emerging Markets Co. (the “Company” or “we”) have been prepared in connection with the proposed initial public offering of Class A common stock of TerraForm Global, Inc., (“TerraForm Global”) formerly known as SunEdison Emerging Markets Yield, Inc. TerraForm Global was formed as a Delaware corporation on September 12, 2014 and is a wholly owned subsidiary of SunEdison, Inc. The Company represents the assets that TerraForm Global intends to acquire from SunEdison, Inc. (the “Parent”) concurrently with the closing of the Offering, and therefore, the combined financial statements of the Company are viewed as the Predecessor of TerraForm Global, Inc. Currently, the assets to be acquired include solar energy generation systems owned by project entities located in China, India, Malaysia, South Africa, Uruguay and Thailand and the related long-term contractual arrangements to sell the solar energy generated to third parties. The project entities in China, India, South Africa, Uruguay and Thailand are majority-owned subsidiaries of the Parent. The project entities in Malaysia are 48% owned by a subsidiary of the Parent and 52% owned by an investor unrelated to the Parent. Each of the project entities is controlled either through voting or variable interests and therefore is consolidated by the Parent.

The Company has the following projects in operation and under construction as of December 31, 2014:

 

Project Name    Stage of Development as
of December 31, 2014
     Commercial Operation
Date
(1)
     Country      Plant Capacity in MW (2)  

 

  

 

 

    

 

 

    

 

 

    

 

 

 

Bora Bora

     Under Construction         Q4 2015         India         17.8   

SE 25

     In Operation         Q1 2012         India         25.0   

NSM Suryalabh

     Under Construction         Q1 2015         India         19.1   

NSM Sitara

     Under Construction         Q1 2015         India         15.2   

NSM L’Volta

     Under Construction         Q1 2015         India         12.7   

Focal

     Under Construction         Q2 2015         India         11.3   

Brakes

     In Operation         Q4 2014         India         7.5   

Millenium

     In Operation         Q1 2012         India         6.9   

Raj 5

     In Operation         Q4 2011         India         5.0   

ESP Urja

     In Operation         Q4 2011         India         3.7   

Azure

     In Operation         Q4 2011         India         3.7   

Dunhuang

     In Operation         Q4 2012         China         18.0   

El Naranjal

     Under Construction         Q4 2015         Uruguay         57.4   

Del Litoral

     Under Construction         Q4 2015         Uruguay         17.4   

Boshof

     In Operation         Q4 2014         South Africa         33.6   

NPS Star 1-3

     Under Construction         Q3 2015         Thailand         17.9   

WXA 1-3

     Under Construction         Q3 2015         Thailand         17.9   

PP Solar

     Under Construction         Q1 2015         Thailand         3.6   

Silverstar Pavilion

     In Operation         Q4 2013         Malaysia         5.1   

Fortune 11

     In Operation         Q4 2013         Malaysia         4.8   

Corporate Season

     In Operation         Q4 2013         Malaysia         2.5   
           

 

 

 

Total

              306.1   
           

 

 

 

 

  

 

 

    

 

 

    

 

 

    

 

 

 
(1)   Represents the actual or anticipated commercial operation date, as applicable, unless otherwise indicated.
(2)   Nameplate capacity represents the maximum generating capacity at standard test conditions of a facility multiplied by our percentage of economic ownership of that facility after taking into account any redeemable preference shares and shareholder loans that we hold. For more information about our projects, including information related to our economic ownership, see “Business—Our portfolio—Initial portfolio.” For projects referenced herein that have not yet achieved their commercial operation date, the figures reflect expected final capacity.

 

F-200


Table of Contents

Basis of presentation

The Company has presented combined financial statements as of and for the years ended December 31, 2014 and 2013. The Company’s combined financial statements have been prepared in accordance with U.S. generally accepted accounting principles (“U.S. GAAP”). The Financial Accounting Standards Board (“FASB”) Accounting Standards Codification (“ASC”) is the source of authoritative U.S. GAAP to be applied by nongovernmental entities. In addition, the rules and interpretative releases of the United States Securities and Exchange Commission (“SEC”) under authority of federal securities laws are also sources of authoritative U.S. GAAP for SEC registrants.

The Company currently operates as part of the Parent. The combined financial statements were prepared using the Parent’s historical basis in certain assets and liabilities, and include all revenues, expenses, assets, and liabilities attributed to the assets to be acquired. The historical combined financial statements also include allocations of certain corporate expenses of the Parent. Management believes the assumptions and methodology underlying the allocation of the Parent’s corporate expenses reasonably reflect all of the costs of doing business of the Company. However, such expenses may not be indicative of the actual level of expense that would have been incurred by the Company if it had operated as an independent, publicly traded company during the periods prior to the Offering or of the costs expected to be incurred in the future.

The combined balance sheets do not separately present certain of the Parent’s assets or liabilities where management deemed it inappropriate due to the underlying nature of those assets and liabilities. The Parent performs financing, cash management, treasury and other services for the Company on a centralized basis. Changes in the net parent investment account in the combined balance sheets related to these activities have been considered cash receipts and payments for purposes of the combined statements of cash flows and are reflected in financing activities. Changes in the net parent investment account resulting from Parent contributions of assets and liabilities have been considered non-cash financing activities for purposes of the combined statements of cash flows.

These combined financial statements and related notes to the combined financial statements are presented on a consistent basis for all periods presented. All significant intercompany transactions and balances have been eliminated in the combined financial statements.

2. Summary of significant accounting policies

Use of estimates

In preparing our combined financial statements, we use estimates and assumptions that may affect reported amounts and disclosures. Estimates are used when accounting for depreciation, leases, derivatives, asset retirement obligations, contingencies, impairments, accrued liabilities and income taxes, among others. These estimates and assumptions are based on current facts, historical experience and various other factors that we believe to be reasonable under the circumstances, the results of which form the basis for making judgments about the carrying values of assets and liabilities and the recording of revenue, costs and expenses that are not readily apparent from other sources. To the extent there are material differences between the estimates and actual results, our future results of operations would be affected.

Cash and cash equivalents

Cash and cash equivalents include all cash balances and money market funds with original maturity periods of three months or less when purchased.

 

F-201


Table of Contents

Cash committed for construction projects

Cash committed for construction projects includes loan proceeds deposited into project company bank accounts in the normal course of business for general use only in the operations of the project company to build the solar energy systems. The loan proceeds cannot be used by other project companies or for general corporate purposes. In certain instances, withdrawal of such funds may only occur after certain milestones or expenditures during construction have been incurred and approved by the lender in accordance with the normal terms of the debt agreement. Approvals for the disbursement of such funds are typically received based on support for the qualified expenditures related to the project and no default of the loan.

Restricted cash

Restricted cash consists of cash in financial institutions that is restricted from use in operations pursuant to requirements of certain debt agreements. These funds are used to pay for capital expenditures, current operating expenses and current debt service payments in accordance with the restrictions in the debt agreements. Restricted cash with maturity periods greater than one year is reported in non-current assets in the combined balance sheets.

Accounts receivable

Accounts receivable are reported in the combined balance sheets at the invoiced amounts adjusted for any write-offs and an allowance for doubtful accounts. We establish an allowance for doubtful accounts to adjust our receivables to amounts considered to be ultimately collectible. Our allowance is based on a variety of factors, including the length of time receivables are past due, significant one-time events, the financial health of our customers and historical experience. The allowance for doubtful accounts was $27 and $0 as of December 31, 2014 and December 31, 2013, respectively. Unbilled receivables included in accounts receivable were $2,037 and $2,562 as of December 31, 2014 and 2013, respectively.

Property and equipment

Property and equipment consists of land, solar energy systems and construction in progress and is stated at cost. Expenditures for major additions and improvements are capitalized and minor replacements, maintenance and repairs are charged to expense as incurred. When property and equipment is retired, or otherwise disposed of, the cost and accumulated depreciation is removed from the accounts and any resulting gain or loss is included in the results of operations for the respective period. Depreciation of property and equipment is recognized using the straight-line method over the estimated useful lives of the solar energy systems, which is the lesser of thirty years or the term of the underlying non-renewable real property lease to which the assets are affixed.

We operate under solar power services agreements with some customers that include a requirement for the removal of the solar energy systems at the end of the term of the agreement. In addition, we could have certain legal obligations for asset retirements related to disposing of materials in the event of closure, abandonment or sale of certain of our manufacturing facilities. Asset retirement obligations are recognized at fair value in the period in which they are incurred and the carrying amount of the related long-lived asset is correspondingly increased. Over time, the liability is accreted to its expected future value. The corresponding asset capitalized at inception is depreciated over the useful life of the solar energy project to which the asset relates.

 

F-202


Table of Contents

Capitalized interest

Interest expense consisting of amortization of deferred financing costs and amounts incurred on funds borrowed to finance construction of solar energy systems is capitalized until the system is ready for its intended use. The amount of interest capitalized was $1,629 and $634 during the years ended December 31, 2014 and 2013, respectively.

Deferred financing costs

Financing costs incurred in connection with obtaining construction and term financing are deferred and amortized over the maturities of the respective financing arrangements. Deferred financing costs related to the Company’s Bridge Facility have been capitalized and amortized using the straight-line method over the period in which the Bridge Facility is expected to be outstanding. Amortization is recorded as interest expense in the combined statements of operations.

Deferred financing costs related to construction loans is amortized using the straight-line method due to the revolving nature of these financing agreements. Upon completion of construction, construction loans are converted into term loans and deferred financing costs related to term loans are amortized using the effective interest rate method. Amortization of deferred financing costs is capitalized during construction and recorded as interest expense in the combined statements of operations following commencement of commercial operation.

Amortization of deferred financing costs was recorded as interest expense and totalled $1,140 and $772 during the years ended December 31, 2014 and 2013, respectively.

Impairment of long-lived assets

Long-lived assets that are held and used are reviewed for impairment whenever events or changes in circumstances indicate carrying values may not be recoverable. An impairment loss is recognized if the total future estimated undiscounted cash flows expected from an asset are less than its carrying value. An impairment charge is measured as the difference between an asset’s carrying amount and fair value with the difference recorded in operating costs and expenses in the statement of operations. Fair values are determined by a variety of valuation methods, including appraisals, sales prices of similar assets and present value techniques. There were no impairments recognized during the years ended December 31, 2014 and 2013.

Revenue recognition

The Company’s revenues are obtained through the sale of energy pursuant to terms of power purchase agreements (“PPAs”) or other contractual arrangements which have remaining lives of 15-25 years as of December 31, 2014. All PPAs are accounted for as operating leases, have no minimum lease payments and all of the rental income under these leases is recorded as income when the electricity is delivered. The contingent rental income recognized in the years ended December 31, 2014 and 2013 was $39,449 and $22,196, respectively.

Income taxes

Our income tax balances are determined and reported using a “separate return” method. Income taxes as presented herein allocate current and deferred income taxes of the Parent to us in a manner that is systematic, rational and consistent with the asset and liability method. The sum of the amounts allocated to the Company’s carve-out tax provisions may not equal the historical consolidated provision. Under the separate return

 

F-203


Table of Contents

method, deferred tax assets and liabilities are recognized for the future tax consequences attributable to differences between the financial statement carrying amounts of existing assets and liabilities and their respective tax bases and operating loss carry forwards.

Deferred tax assets and liabilities are measured using enacted tax rates expected to apply to taxable income in the years in which those temporary differences are expected to be recovered or settled. The effect on deferred tax assets and liabilities of a change in tax rate is recognized in operations in the period that includes the enactment date. Valuation allowances are established when management determines that it is more likely than not that some portion, or all of the deferred tax asset, will not be realized. The financial effect of changes in tax laws or rates is accounted for in the period of enactment.

Deferred income taxes arise primarily because of differences in the bases of assets or liabilities between financial statement accounting and tax accounting which are known as temporary differences. We record the tax effect of these temporary differences as deferred tax assets (generally items that can be used as a tax deduction or credit in future periods) and deferred tax liabilities (generally items for which we receive a tax deduction, but have not yet been recorded in the combined statement of operations).

We regularly review our deferred tax assets for realizability, taking into consideration all available evidence, both positive and negative, including historical pre-tax and taxable income, projected future pre-tax and taxable income and the expected timing of the reversals of existing temporary differences. In arriving at these judgments, the weight given to the potential effect of all positive and negative evidence is commensurate with the extent to which it can be objectively verified.

We believe our tax positions are in compliance with applicable tax laws and regulations. Tax benefits are recognized only for tax positions that are more likely than not to be sustained upon examination by tax authorities. The amount recognized is measured as the largest amount of benefit that is greater than 50 percent likely to be realized upon ultimate settlement. We believe that our liabilities for unrecognized tax benefits, including related interest, are adequate in relation to the potential for additional tax assessments. There is a risk, however, that the amounts ultimately paid upon resolution of audits could be materially different from the amounts previously included in our income tax expense and, therefore, could have a material impact on our tax provision, net income and cash flows.

Contingencies

We are involved in conditions, situations or circumstances in the ordinary course of business with possible gain or loss contingencies that will ultimately be resolved when one or more future events occur or fail to occur. If some amount within a range of loss appears at the time to be a better estimate than any other amount within the range, that amount will be accrued. When no amount within the range is a better estimate than any other amount, however, the minimum amount in the range will be accrued. We continually evaluate uncertainties associated with loss contingencies and record a charge equal to at least the minimum estimated liability for a loss contingency when both of the following conditions are met: (i) information available prior to issuance of the financial statements indicates that it is probable that an asset had been impaired or a liability had been incurred at the date of the financial statements; and (ii) the loss or range of loss can be reasonably estimated. Legal costs are expensed when incurred. Gain contingencies are not recorded until realized or realizable.

Fair value measurements

Fair value accounting guidance establishes a hierarchy for inputs used in measuring fair value that maximizes the use of observable inputs and minimizes the use of unobservable inputs by requiring that the most observable inputs be used when available. Observable inputs are inputs that market participants would use in

 

F-204


Table of Contents

pricing the asset or liability, and are based on market data obtained from sources independent of us. Unobservable inputs reflect assumptions market participants would use in pricing the asset or liability based on the best information available in the circumstances. The hierarchy is broken down into three levels based on the reliability of inputs as follows:

 

 

Level 1—Valuations based on quoted prices in active markets for identical assets or liabilities that we have the ability to access. Valuation adjustments and block discounts are not applied to Level 1 instruments. Because valuations are based on quoted prices that are readily and regularly available in an active market, valuation of these instruments does not entail a significant degree of judgment.

 

 

Level 2—Valuations based on quoted prices in markets that are not active or for which all significant inputs are observable, either directly or indirectly. Valuations for Level 2 are prepared on an individual instrument basis using data obtained from recent transactions for identical securities in inactive markets or pricing data from similar instruments in active and inactive markets.

 

 

Level 3—Valuations based on inputs that are unobservable and significant to the overall fair value measurement.

For cash and cash equivalents, cash committed for construction projects, restricted cash, accounts receivable, accounts payable, and accrued liabilities, the carrying amount approximates fair value because of the short-term maturity of the instruments. For due to parent and affiliates, the carrying amount approximates fair value based on comparable market interest rates for similar instruments. See Note 5 for disclosures related to the fair value of our long-term debt and Note 7 for disclosures related to the fair value of derivative instruments.

Foreign currency

We determine the functional currency of each entity based on a number of factors, including the predominant currency for the entity’s sales and expenditures and the entity’s borrowings. When an entity’s local currency is considered its functional currency, we translate its financial statements to U.S. Dollars as follows:

 

 

Assets and liabilities using exchange rates in effect at the balance sheet date; and

 

 

Statement of operations accounts at weighted average exchange rates for the period.

Adjustments from the translation process are presented in accumulated other comprehensive income (loss) in total equity.

Transaction gains and losses that arise from exchange rate fluctuations on transactions and balances denominated in a currency other than the functional currency are generally included in the results of operations as incurred. Foreign currency transaction (gains) or losses are included in other (income) expense, net in the combined statements of operations and totaled $(4,039) and $2,247 during the years ended December 31, 2014 and 2013, respectively.

Comprehensive income and loss

Comprehensive income and loss represents a measure of all changes in equity that result from recognized transactions and other economic events other than transactions with owners in their capacity as owners.

Derivative financial instruments and hedging activities

All derivative instruments are recognized in the combined balance sheet at fair value. Derivatives not designated for hedge accounting and used to hedge foreign-currency-denominated balance sheet items are reported directly in earnings along with offsetting transaction gains and losses on the items being hedged.

 

F-205


Table of Contents

Derivatives used to hedge foreign-currency denominated cash flows and floating rate debt may be accounted for as cash flow hedges, as deemed appropriate. Gains and losses on derivatives designated as cash flow hedges are recorded in other comprehensive income (loss) and reclassified to earnings in a manner that matches the timing of the earnings impact of the hedged transactions. The ineffective portion of all hedges, if any, is recognized currently in earnings. The effective portion of the hedge will be recorded in the same manner as foreign currency translation adjustment in other comprehensive (loss) income. When the hedge position is dissolved and we recognize a gain or loss in other income (expense), the associated hedge gain or loss in other comprehensive income (loss) will be reclassified to other income (expense).

New accounting standards

In July 2013, the FASB issued ASU 2013-11, Income Taxes (Topic 740) Presentation of an Unrecognized Tax Benefit When a Net Operating Loss Carryforward, a Similar Tax Loss, or a Tax Credit Carryforward Exists, or ASU No. 2013-11. The amendments of ASU 2013-11, which were adopted on January 1, 2014, require an entity to present an unrecognized tax benefit, or a portion of an unrecognized tax benefit, as a reduction of a deferred tax asset for a net operating loss, or NOL, a similar tax loss or tax credit carryforward rather than a liability when the uncertain tax position would reduce the NOL or other carryforward under the tax law of the applicable jurisdiction and the entity intends to use the deferred tax asset for that purpose. The adoption of this guidance did not result in any material impact to our combined financial statements.

In May 2014, the FASB issued ASU 2014-09, Revenue from Contracts with Customers, which requires an entity to recognize the amount of revenue to which it expects to be entitled for the transfer of promised goods or services to customers. ASU 2014-09 will replace most existing revenue recognition guidance in U.S. GAAP when it becomes effective. ASU 2014-09 is effective for us on January 1, 2017. Early application is not permitted. A delay in the effective date is currently being considered by the FASB, which we expect will result in at least a one year deferral. ASU 2014-09 permits the use of either a retrospective or cumulative effect transition method. We have not determined which transition method we will adopt, and we are currently evaluating the impact that ASU 2014-09 will have on our combined financial statements and related disclosures upon adoption.

In August 2014, the FASB issued ASU 2014-15, Disclosure of Uncertainties about an Entity’s Ability to Continue as a Going Concern, which describes how an entity should assess its ability to meet obligations and sets rules for how this information should be disclosed in the financial statements. ASU 2014-15 provides accounting guidance that will be used along with existing auditing standards. ASU 2014-15 applies to all entities for the first annual period ending after December 15, 2016, and interim periods thereafter. Management has evaluated the guidance and concluded that the adoption of this guidance will not result in any material impact to our combined financial statements.

In January 2015, the FASB issued ASU 2015-01, Income Statement-Extraordinary and Unusual Items (Subtopic 225-20): Simplifying Income Statement Presentation by Eliminating the Concept of Extraordinary Items. ASU 2015-01 eliminates from GAAP the concept of extraordinary items. An entity will no longer be required to (1) segregate an extraordinary item from the results of ordinary operations; (2) separately present an extraordinary item on its income statement, net of tax, after income from continuing operations; and (3) disclose income taxes and earnings-per-share data applicable to an extraordinary item. ASU 2015-01 will be effective for fiscal years beginning after December 15, 2015. An entity may apply the amendments prospectively or retrospectively to all prior periods presented in the financial statements. Early adoption is permitted provided that the guidance is applied from the beginning of the fiscal year of adoption. Management does not believe that the adoption of ASU No. 2015-01 will have a material effect on our combined financial statements.

In February 2015, the FASB issued ASU No. 2015-02, Consolidation (Topic 810): Amendments to the Consolidation Analysis. ASU No. 2015-02 amended the process that a reporting entity must perform to determine whether it

 

F-206


Table of Contents

should consolidate certain types of legal entities. ASU No. 2015-02 is effective for annual periods ending after December 15, 2015, and for annual periods and interim periods thereafter with early adoption permitted. Management does not believe that the adoption of ASU No. 2015-02 will have a material effect on our financial Statements.

In April 2015, the FASB issued ASU 2015-03, Interest-Imputation of Interest, which requires debt issuance costs to be presented as a direct deduction from the carrying amount of the related liability. The new standard is effective for annual periods beginning after December 31, 2015. Early adoption is permitted. Management does not believe that the adoption of this guidance will have a material impact on our financial statements.

3. Property and equipment

Property and equipment consists of the following (in thousands):

 

      As of December 31,  

 

   2014     2013  

Land

   $ 2,739      $ 713   

Solar energy systems

     306,203        184,387   
  

 

 

   

 

 

 

Total property and equipment, at cost

   $ 308,942      $ 185,100   

Less accumulated depreciation

     (15,804     (8,530
  

 

 

   

 

 

 

Total property and equipment in service, net

   $ 293,138      $ 176,570   

Construction in progress - solar energy systems

     92,941        33,447   
  

 

 

   

 

 

 

Total property and equipment, net

   $ 386,079      $ 210,017   
  

 

 

   

 

 

 

Depreciation expense was $6,924 and $4,672 for the years ended December 31, 2014 and 2013, respectively.

4. Asset retirement obligations and other liabilities

Activity in asset retirement obligations for the years ended December 31, 2014 and 2013 is as follows (in thousands):

 

      As of December 31,  

 

         2014           2013  

Balance at the beginning of the year

   $ 2,553      $ 992   

Additional obligation

     2,930        1,733   

Accretion expense

     243        113   

Effect of exchange rate changes on asset retirement obligations

     (677     (285
  

 

 

   

 

 

 

Balance at the end of the year

   $   5,049      $   2,553   
  

 

 

   

 

 

 

Other liabilities of $31,781 and $37,498 as of December 31, 2014 and 2013, respectively, consist of the non-current portion of a payable to a contractor due December 2016 and bearing interest at 13%.

5. Debt

Debt consists of the following (in thousands):

 

    As of December 31, 2014     As of December 31, 2013  

 

  Total Principal     Current     Long-Term     Total Principal     Current     Long-Term  

Term debt

  $ 374,111      $ 30,042      $ 344,069      $ 145,420      $ 29,495      $ 115,925   

Bridge Facility

    150,000        1,500        148,500                        
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total

  $ 524,111      $ 31,542      $ 492,569      $ 145,420      $ 29,495      $ 115,925   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

F-207


Table of Contents

The fair value of our outstanding debt obligations as of December 31, 2014 and 2013 approximates carrying value due to the variable rate nature of these obligations.

Term debt

Our solar energy systems for which we have long-term debt obligations are included in separate legal entities. We typically finance our solar energy projects through project entity specific debt secured by the project entity’s assets (primarily the solar energy systems) with no recourse to the Parent. Typically, these financing arrangements provide for a credit facility used for a construction, which upon completion is converted into term debt. As of December 31, 2014, we had $374,111 of project entity specific debt that is secured by the total assets of the Company. The Company had undrawn commitments under the credit facilities of $26,378 as of December 31, 2014.

Term debt for India consists of variable rate loans with interest rates that are variously tied to the two-year Infrastructure Development Finance Company (“IDFC”) benchmark rate, the L&T Infrastructure benchmark rate, the Overseas Private Investment Corporation note interest rate, L&T prime lending rate, ICICI base rate and the Rabo India Finance rate. The interest rates on the term debt as of December 31, 2014 range from 12.00% to 13.00% and mature between 2016 and 2030. Principal and interest is due and payable in arrears monthly or quarterly and on the maturity dates of the credit facilities.

In 2014, the Company refinanced $34.6 million of India term debt with a new variable rate term loan in the amount of $42.6 million. The refinancing resulted in net proceeds of $8.0 million which was used to repay other existing indebtedness to the parent company. Deferred financing costs relating to the original debt of $0.6 million was included in interest expense in 2014.

Term debt for Malaysia consists of variable rate loans with interest rates that are tied to the Kuala Lumpur Interbank Offered Rate (“KLIBOR”). The interest rates on the term debt as of December 31, 2014 range from 4.39% to 5.83% and mature in 2028. Principal and interest is due and payable in arrears at the end of each fiscal quarter or on the maturity date of the credit facilities.

Term debt for South Africa consists of a variable loan with interest tied to the three-month London Interbank Offered Rate (“LIBOR”). The interest rate on the term debt as of December 31, 2014 is 13.03% and matures in 2031. Principal and interest is due and payable in arrears at the end of each fiscal quarter and on the maturity date of the credit facility.

Term debt for Thailand consists of a variable loan with interest tied to the Minimum Lending Rate (“MLR”). The interest rate on the term debt as of December 31, 2014 is 6.47% and matures in 2023. Principal and interest is due and payable in arrears at the end of each fiscal quarter and on the maturity date of the credit facility.

The term debt agreements contain certain representations, covenants and warranties of the borrower including limitations on business activities, guarantees, environmental issues, project maintenance standards, and a minimum debt service coverage ratio requirement.

Bridge Facility

On December 22, 2014, SunEdison Emerging Markets Yield, LLC entered into a credit and guaranty agreement with JPMorgan Chase Bank, N.A., as administrative agent (the “Bridge Facility”). The Bridge Facility did not amend, restate, or otherwise modify any existing credit arrangements.

The Bridge Facility has a term ending in December 2016. The total amount of the Bridge Facility is $150,000 which was drawn in full as of December 31, 2014. The Company incurred $7,028 in deferred financing costs

 

F-208


Table of Contents

which are being amortized over the expected term of the loan. The purpose of the Bridge Facility is to fund the acquisition of projects from third party developers and to repay certain of the project-level indebtedness incurred by projects included in our initial portfolio. Our obligations under the Bridge Facility and the guaranty obligations of our subsidiaries were secured by first priority liens on and security interests in substantially all present and future assets of the Company and the subsidiary guarantors.

Interest under the Bridge Facility has variable interest rate options based on either base rate loans or eurodollar loans at the Company’s election. The interest rate payable under base rate is based upon an adjusted base rate (equal to the greater of (a) the base rate (prime rate) in effect on such day, (b) the federal funds effective rate in effect on such day plus 0.50% and (c) the eurodollar rate for a eurodollar loan with a one month interest period plus the difference between the applicable margin for eurodollar rate loans and the applicable margin for base rate loans). The interest rate increases by 0.50% on May 22, 2015 and will increase by 0.25% every ninety days thereafter through the date of maturity. The interest rate was 8.5% as of December 31, 2014. The interest rate payable under eurodollar loans will be based upon the published LIBOR rate, plus the applicable margin (totaling 7.50% as of December 31, 2014).

The Bridge Facility agreement contains certain representations, covenants and warranties including limitations on business activities, guarantees, and quarterly debt coverage reporting including a minimum debt service coverage ratio requirement.

Maturities

The aggregate amounts of payments on long-term debt due after December 31, 2014 are as follows (in thousands):

 

In thousands

  2015     2016     2017     2018     2019     Thereafter     Total  

Maturities of long-term debt

  $ 31,542      $ 167,112      $ 18,308      $ 17,205      $ 20,343      $ 269,601      $ 524,111   

 

F-209


Table of Contents

6. Income taxes

Income tax balances are determined and reported using a “separate return” method. Use of the separate return method may result in differences when comparing amounts allocated to the Company’s carve-out tax provision to historical consolidated provision of the Parent. Deferred tax assets and liabilities are recognized for the future tax consequences attributable to differences between the financial statement carrying amounts of existing assets and liabilities and their respective tax basis and operating loss carryforward.

Income tax expense (benefit) consists of the following (in thousands):

 

      Current      Deferred     Total  

Year ended December 31, 2014:

       

India

   $ 239       $ 823        1,062   

Malaysia

             282        282   

South Africa

             235        235   

China

             121        121   
  

 

 

    

 

 

   

 

 

 

Total

   $ 239       $ 1,461      $ 1,700   
  

 

 

    

 

 

   

 

 

 

Year ended December 31, 2013:

       

United States

   $       $ (1,866   $ (1,866

India

     305         (40     265   

Malaysia

             97        97   

South Africa

             (268     (268

China

             121        121   
  

 

 

 

Total

   $ 305       $ (1,956   $ (1,651
  

 

 

 

Effective tax rate

Income tax (benefit) expense differed from the amounts computed by applying the statutory United States federal income tax rate of 35% to loss before income taxes. Effects from the rate differential are shown as a component of the rate reconciliation.

 

      For the year ended
December 31,
 
     2014      2013  

Income tax at US federal rate

     (35.0)%         (35.0)%   

Branch income

     (26.1)             (37.7)       

Foreign rate differential

     9.8              13.3        

Impact of tax holiday

     (6.3)             (12.9)        

Non-deductible expenses

     37.2              6.1        

Change in valuation allowance

     62.6              54.8        

Foreign taxes

     11.4              (33.6)       

Other

     (2.7)             3.0        
  

 

 

 

Effective tax expense (benefit) rate

     50.9%         (42.0)%   
  

 

 

 

 

F-210


Table of Contents

The branch income line item represents pre-tax income or loss generated in foreign pass-through entities, inclusive of permanent differences, multiplied by the U.S. statutory rate. This line item reflects the double taxation of foreign income or loss which will occur as a result of such income or loss being subject to tax both in the foreign jurisdiction to which the entity relates as well as the U.S. The U.S. statutory rate, rather than the local foreign rate, is applied to this income or loss so that the impact of the rate differential between the U.S. statutory rate and the various foreign rates can be separately shown in the line item “Foreign rate differential”.

The foreign taxes line item represents the future U.S. tax implications associated with foreign tax expense or benefit generated in each foreign jurisdiction. To the extent a foreign jurisdiction generates tax expense, that expense is generally expected to result in U.S. tax deductions in the future. To the extent a foreign jurisdiction recognizes a tax benefit, that benefit is generally expected to result in an increase to U.S. taxable income in the future.

Deferred taxes

The tax effects of the major items recorded as deferred tax assets and liabilities are (in thousands):

 

      As of December 31,  
     2014     2013  

Deferred tax assets:

    

Net operating loss carryforwards

   $ 38,901      $ 9,359   

Asset retirement obligations

     644        332   

Deferred foreign taxes

     940        1,320   

Mark to market hedging

     3,452        —     

Unrealized currency gain/loss

     164        1,627   
  

 

 

   

 

 

 

Total deferred tax assets

     44,101        12,638   
  

 

 

   

 

 

 

Deferred tax liabilities:

    

Property and equipment

     (36,136     (12,578

Mark to market hedging

     —          (5,110

Unrealized currency gain/loss

     (1,384     —     
  

 

 

   

 

 

 

Total deferred tax liabilities

     (37,520     (17,688
  

 

 

 

Valuation allowance

     (9,265     (2,461
  

 

 

 

Net deferred tax liabilities

   $ (2,684   $ (7,511
  

 

 

 

Net operating loss carryforwards represent tax benefits measured assuming that the Company had been a stand alone operating company since January 1, 2012. We believe that it is more likely than not that we will not generate sufficient taxable income to realize the deferred tax assets associated with net operating losses and have recorded a valuation allowance against net deferred tax assets not supported by the reversal of existing taxable temporary differences. Additionally, the 2014 and 2013 tax years remain open to examination by the relevant tax authorities.

At December 31, 2014, we have net operating loss carryforwards for U.S. income tax purposes of $39,745 which are available to offset future taxable income, if any, over a twenty year period. We have net operating loss carryforwards for Malaysian income tax purposes of $21,276 which are available to offset future taxable income, if any, over an indefinite period. We have net operating loss carryforwards for South African income tax purposes of $62,619 which are available to offset future taxable income, if any, over an indefinite period. We have net operating loss carryforwards for Indian income tax purposes of $2,974 which are available to offset future taxable income, if any, over an indefinite period to the extent of unabsorbed tax depreciation. Any other

 

F-211


Table of Contents

carryforwards in India are available for an 8 year period from the period in which they were generated. China has net operating loss carryforwards for income tax purposes of $5,541 which are available to offset future taxable income over a five-year period.

In India, where we had pretax income of $711 in 2014 and $2,045 in 2013, we have a 100% rate reduction tax holiday which expires 15 years from the date of commissioning of the solar energy system and is available for a 10 year period starting from the date on which the project entity starts claiming the holiday. The tax holiday is effective through March 31, 2026.

In Malaysia, where we had pretax income of $154 in 2014 and a pretax loss of $1,570 in 2013, we have a tax holiday for all three project entities allowing for accelerated tax depreciation on qualified solar assets placed in service.

In Thailand, where we had pretax losses of $407 in 2014 and $468 in 2013, we have a 100% rate reduction tax holiday for the first eight years, and a 50% rate reduction for the next five years. The tax holiday is effective through 2026.

In South Africa, where we had pretax income of $106 in 2014 and a pretax loss of $1,562 in 2013, we have a tax holiday allowing for accelerated tax depreciation on qualified solar assets placed in service.

In China, where we had a pretax loss of $3,059 and $2,373 in 2014 and 2013, respectively, we have a 100% rate reduction tax holiday for the first three years, and a 50% rate reduction for the next three years. The tax holiday is effective through 2018.

Primarily due to cumulative losses, we determined that it was more likely than not that certain net operating losses and other deferred tax assets would not be realized in the future. As a result, the valuation allowance against deferred tax assets was increased by $6,804 during 2014.

The Company has no uncertain tax positions for 2013 and 2014. It is the Company’s policy to include any penalties or interest associated with uncertain tax positions in income tax expense.

7. Derivative instruments

A summary of all interest rate and currency swap instruments outstanding as of December 31, 2014 and 2013 is as follows:

 

Type of instrument

  Notional amount
in local currency
(in millions)
    Notional currency   Interest rate     Variable rate   Termination date  

Interest rate swap #1 - Economic Hedge

    89.7      Malaysian Ringgit     4.3%      KLIBOR     March 31, 2028   

Interest rate swap #2 - Economic Hedge

    35.7      Malaysian Ringgit     4.4%      KLIBOR     March 31, 2028   

Interest rate swap #3 - Economic Hedge

    173.0      Thai Baht     6.5%      MLR -2.0%     December 31, 2023   

Interest rate swap #4 - Cash Flow Hedge

    1,856.0      South African
Rand
    13.0%      JIBAR SAFEX

+ 4.4%

    September 30, 2031  

Currency swap -
Cash Flow Hedge

    1,856.0      South African
Rand
   
 
JIBAR SAFEX
+ 4.4%
  
  
  LIBOR +
2.2%
    September 30, 2031   

 

F-212


Table of Contents

Derivative instruments, which are not designated as hedging instruments, consist of:

 

          Assets (liabilities or equity)
fair value
 
     As of December 31,  

In thousands

  

Balance sheet classification

   2014      2013  

Interest rate swaps

   Accrued expenses and other current liabilities    $ 486       $ 313   

 

   
     As of December 31,  

In thousands

  

Statement of operations classification

   2014      2013  

Interest rate swaps

   Interest expense (income)    $ 705       $ (158

As of December 31, 2014 and 2013, we are party to three interest rate swap instruments that are accounted for as economic hedges. These instruments are used to hedge floating rate debt and are not accounted for as cash flow hedges. Under the interest rate swap agreements, we pay the fixed rate and the financial institution counterparties to the agreements pay us a floating interest rate above. The amount recorded in the combined balance sheet, as provided in the table above, represents the estimated fair value of the net amount that we would settle on December 31, 2014 and 2013 if the agreements were transferred to other third parties or canceled by us. Because these interest rate and currency swaps are deemed economic hedges and not accounted for as hedging instruments, the changes in fair value are recognized in interest expense within the combined statements of operations.

As of December 31, 2014, we are party to an interest rate swap and two currency swaps accounted for using hedge accounting. These instruments are used to hedge the interest rate of variable rate debt denominated in U.S. dollars. The amount recorded in the combined balance sheet represents the estimated fair value of the net amount that we would settle on December 31, 2014, if the agreements were transferred to other third parties or canceled by us. We recorded a loss of $12,903 and a gain of $2,762 for the effective portion of these cash flow hedges for the year ended December 31, 2014, and 2013 respectively. These were recorded to accumulated other comprehensive income (loss). There was no material ineffectiveness recorded for the years ended December 31, 2014 and 2013, respectively.

Derivative instruments, which are designated as hedging instruments, consist of:

 

          Assets (Liabilities or Equity)
Fair Value
 
     As of December 31,  

In thousands

  

Balance Sheet Classification

   2014     2013  

Interest rate swap

   Other long term assets and accumulated other comprehensive income    $ (4,780   $ 3,669   

Cross currency swaps

   Other long term assets and accumulated other comprehensive income    $ 18,183      $ 5,589   

The Company has netted these hedging instruments and they are included in other assets on the combined balance sheet.

 

F-213


Table of Contents

8. Stock-based compensation

In September 2014, and in connection with the formation of TerraForm Global Inc., the Company granted restricted stock awards and restricted stock units to various Company employees (“Participants”) under a new TerraForm Global 2014 Equity Incentive Plan. The fair value of each Participant’s grant was determined by using the percentage of shares granted multiplied by the overall fair value of SunEdison’s equity in the Company. The restricted stock will convert into shares of Class A common stock upon the filing of our amended and restated certification of incorporation in connection the completion of the proposed initial public offering of Class A common stock of TerraForm Global. There were 31,350 shares issued representing a 3.135% interest in the equity of TerraForm Global issued at a total value of $683.

In estimating the fair value of the restricted stock, the primary valuation considerations were an enterprise value determined from an discounted cash flow of income-based approach, using a present value of after-tax probability weighted equity cash flow of those projects we intend to include in the Offering, in a projection period extending through December 2024 and a lack of marketability discount of 10%. The discount model used the following assumptions: a time to liquidity event of 7 months; a discount rate of 13%; and volatility of 40% over the time to a liquidity event. Estimates of the volatility of our common stock were based on available information on the volatility of our Sponsor and the common stock of comparable publicly traded companies.

After the restricted stock converts to Class A common stock, 25% of the Class A common stock will vest on the first through fourth anniversary of the date of the initial public offering, subject to accelerated vesting upon certain events. Upon a termination of employment for any reason, any unvested shares of Class A common stock held by the terminated executive will be forfeited. For the year ending December 31, 2014 no stock compensation expense was recorded.

9. Related parties

Corporate allocations

Amounts were allocated from our Parent for general corporate overhead costs attributable to the operations of the Company. These amounts were $10,850 and $4,790 for the years ended December 31, 2014 and 2013, respectively, and are included in general and administrative-affiliates in the accompanying combined statements of operations. The general corporate overhead expenses incurred by the Parent include costs from certain corporate and shared services functions provided by the Parent. The amounts reflected include (i) charges that were incurred by the Parent that were specifically identified as being attributable to the Company and (ii) an allocation of applicable remaining general corporate overhead costs based on the proportional level of effort attributable to the operation of the Company’s solar energy systems. These costs include legal, accounting, tax, treasury, information technology, insurance, employee benefit costs, communications, human resources, and procurement. Corporate costs that were specifically identifiable to a particular operation of the Parent have been allocated to that operation, including the Company. Where specific identification of charges to a particular operation of the Parent was not practicable, an allocation was applied to all remaining general corporate overhead costs. The allocation methodology for all remaining corporate overhead costs is based on management’s estimate of the proportional level of effort devoted by corporate resources that is attributable to each of the Company’s operations. The cost allocations have been determined on a basis considered to be a reasonable reflection of all costs of doing business by the Company. The amounts that would have been or will be incurred on a stand-alone basis could differ from the amounts allocated due to economies of scale, management judgment, or other factors.

 

F-214


Table of Contents

Operations and maintenance

Operations and maintenance services are provided to the Company by affiliates of the Parent pursuant to contractual agreements. Costs incurred for these services were $2,257 and $1,311 for the years ended December 31, 2014 and 2013, respectively. Related amounts were reported as cost of operations—affiliate in the combined statements of operations and were reflected in operating activities in the combined statements of cash flows.

Parent and affiliates

Certain of our expenses are paid by affiliates of the Parent and are reimbursed by the Company to the same, or other affiliates of the Parent. Additionally, directly attributable costs for construction of solar energy systems incurred by the Parent are charged to the Company. As of December 31, 2014 and 2013, the Company owed the Parent and affiliates $47,266 and $24,633 respectively. Depending on the nature of the activity, amounts are either reflected in operating activities or as a non-cash addition to property and equipment included in due to parent and affiliates.

The Company advanced working capital loans to an affiliate company as of 2014 and 2013. The affiliate owed the Company $138 and $152 as of December 31, 2014 and 2013, respectively. Related amounts were reflected in investing activities and in additions to property and equipment included in due to Parent and affiliates in the combined statements of cash flows.

Additionally, the Parent provided contributions to the Company in the form of shareholder loans. Related amounts have been recognized as net parent investment as there is no expectation for the Company to repay the Parent for the contributions. These contributions totaled $4,893 and $44,017 for the years ended December 31, 2014 and 2013, respectively.

Transactions with third party investor

On behalf of the Company, the Parent has entered into various transactions with an investor in certain Company projects whom is unrelated to the Parent (“Third Party Investor”). In 2013, the Parent provided the Third Party Investor with a 5% interest in certain of the Company’s projects in the form of $115 of preference shares and $471 in shareholder loans in exchange for the Third Party Investor’s consulting and management services. In the same agreement, the Parent agreed to pay the Third Party Investor fees based on the projects achieving specific milestones such as executing a PPA and achieving commissioning and interconnection. The Parent paid $342 of such fees to the Third Party Investor in the year ended December 31, 2013. Each of these amounts have been capitalized as property and equipment, net, as each represent costs for the Third Party Investor’s services to prepare the solar energy systems for their intended use.

Additionally, in 2013, the Third Party Investor purchased a 44% interest in one of the Company’s projects from the Parent in the form of preference share capital and a shareholder loan. As of December 31, 2014, the total value of the preference share capital and loans amounted to $724 and $3,298, respectively. During the year ended December 31, 2014, the related project entity repaid the Third Party Investor $188 in shareholder loan principal payments.

Also, during 2014, the Third Party Investor acquired a 38% interest in one of the Company’s project entities in the form of shareholder loans. The shareholder loans consisted of $337 of Tranche A shareholder loans and $553 of Tranche B shareholder loans. The interest rate on the Tranche A shareholder loans is 4% while the Tranche B shareholder loans are interest-free. Due to the economic nature of the shareholder loans, the

 

F-215


Table of Contents

Tranche A shareholder loans are included in amounts due to parent and affiliates, and the Tranche B shareholder loans are included in net parent investment in the combined balance sheets. Tranche A of the shareholder loans are also reflected in financing activities in the combined statements of cash flows. Subsequently, during the year ended December 31, 2014, the related project entity repaid the Third Party Investor $253 in Tranche A shareholder loan principal payments.

For a separate project company, the Company issued 8% non-cumulative redeemable preference shares and allotted to an affiliate on June 15, 2013. The shares will be redeemed by the project company after 15 years from the date of allotment. The preference shares carry a preferential right as to dividend over equity shareholders. Subject to the provision of the articles of association of the project company, the preference shareholders shall be entitled to transfer the whole or part of the shares held by them subject to any restrictions or approvals of the board of directors of the project company. These shares carry a dividend of 8% on a non-cumulative basis. In the event of liquidation, preference shareholders have a preferential right over equity shareholders to be repaid to the extent of capital paid-up and dividend in arrears on such shares. The Company has classified the preference shares within non-current liabilities, based on the mandatorily redeemable nature of the shares.

10. Commitments and contingencies

Real property agreements

Certain of the solar energy system assets are located on property that the Company leases under operating leases. Rental expense was $247 and $65 in 2014 and 2013, respectively. The total future commitments under operating leases as of December 31, 2014 were $4,566, none of which is cancellable. Our operating lease obligations as of December 31, 2014 were as follows (in thousands):

 

 

  2015     2016     2017     2018     2019     Thereafter     Total  

Operating leases

  $ 169      $ 183      $ 183      $ 183      $ 199      $ 3,649      $ 4,566   

Minimum rent payments under operating leases are recognized as a rental expense on a straight-line basis over the term of the lease.

Additionally, certain of our operating leases contain clauses that provide additional contingent rent based on the related solar energy systems generating energy greater than certain specified target amounts. We recognize contingent rent expense when payment is considered probable. The contingent rent expense recognized during the year ended December 31, 2013 was $9. There was no contingent rent expense for 2014.

Legal proceedings

From time to time, we are notified of possible claims or assessments arising in the normal course of business operations. Management continually evaluates such matters with legal counsel and believes that, although the ultimate outcome is not presently determinable, these matters will not result in a material adverse impact on our financial position or operations.

The Company is subject to litigation with the offtaker, Gujarat Urja Vikas Nigam Ltd (GUNVL), for certain projects in India, who is seeking a reduction of tariff set forth in the PPA. GUVNL also claims that there has been a violation of the PPA terms on account of a change in shareholders since execution of the PPA and as such GUNVL is entitled to terminate the PPA. The Company successfully defended each case at the initial hearing but GUNVL has appealed to the Supreme Court on both matters. The cases are currently pending in front of the Supreme Court of India. The Company plans to vigorously defend each case and believes that an unfavorable outcome is remote; as such a liability has not been recorded in relation to these contingencies.

 

F-216


Table of Contents

11. Segment information

The Company is engaged in one reportable segment that operates a portfolio of solar energy generation assets. The Company operates as a single reportable segment based on a “management” approach. This approach designates the internal reporting used by management for making decisions and assessing performance as the source of the reportable segments.

Revenues for the years ended December 31, 2014 and 2013 were from customers located in India, Malaysia, South Africa and Thailand. Customers include commercial and industrial entities, which principally include large utility companies and government-controlled entities. Revenue to specific customers exceeding 10% of total revenue for the years ended December 31, 2014 and 2013 were as follows (in thousands, except percentages):

 

      For the year ended December 31,  
     2014      2013  

 

   Revenue      Percent      Revenue      Percent  

Customer A

   $ 9,657         24%       $ 10,187         46%   

Customer B

   $ 7,152         18%       $         —%   

Customer C

   $ 5,034         13%       $         —%   

Customer D

   $ 4,535         11%       $ 4,419         20%   

Accounts Receivable

At December 31, 2014, the Company had four customers which represented 75% of total accounts receivable outstanding at that date. At December 31, 2013, the Company had three customers which represented 66% of total accounts receivable outstanding at that date.

Property and equipment, net

 

      As of December 31,  

In thousands

   2014      2013  

China

   $ 25,465       $ 26,953   

India

     186,782         98,363   

Malaysia

     45,328         50,148   

South Africa

     121,285         28,534   

Thailand

     6,959         6,019   

Uruguay

     260           
  

 

 

    

 

 

 

Total

   $ 386,079       $ 210,017   
  

 

 

    

 

 

 

Revenues

 

      For the year ended
December 31,
 

In thousands

   2014      2013  

China

   $ 2,423       $ 929   

India

     19,767         20,382   

Malaysia

     8,882         885   

South Africa

     7,152           

Thailand

     1,225           
  

 

 

    

 

 

 

Total

   $ 39,449       $ 22,196   
  

 

 

    

 

 

 

 

F-217


Table of Contents

12. Subsequent Events

Subsequent events have been evaluated through June 17, 2015, the date the combined financial statements were available to be issued.

BioTherm Transaction

In April 2015, TerraForm Global signed purchase and sale agreements to acquire equity interests in the Biotherm projects (70% of Aries, 70% of Konkoonsies and 65% of Klipheuwel), all of which are located in South Africa. These projects have a combined capacity of 32.6 MW based on our ownership percentages. The aggregate consideration paid for the ownership in these projects from BioTherm and other minority investors is expected to be $63.4 million, comprised of cash of $55.2 million and shares of Class A common stock of TerraForm Global with a value of $8.2 million. In addition to the foregoing, TerraForm Global has agreed to pay BioTherm approximately $20.5 million in additional cash consideration for certain rights and service contracts.

Chint-NSM Transaction

On June 9, 2015, TerraForm Global acquired a 51% equity interest in NSM 24 from a subsidiary of Chint Solar (Zhejiang) Co., Ltd. pursuant to a share purchase agreement executed on May 6, 2015. NSM 24 is an operating solar energy system located in India with a nameplate capacity of 23.1 MW. The aggregate consideration paid for the acquisition of this interest was $9.1 million. Prior to this acquisition, the parent contributed its equity investment (49% equity interest) in NSM 24 to TerraForm Global.

Chint-Soutpan/Witkop Transaction

In April 2015, our parent agreed to acquire an additional 41.3% equity interest in each of Soutpan and Witkop from a subsidiary of Chint Solar (Zhejiang) Co., Ltd. Soutpan is an operating solar energy system located in South Africa with a capacity of 15.8 MW. Witkop is an operating solar energy system located in South Africa with a net capacity of 16.8 MW. The aggregate consideration expected to be paid for the acquisition of these interests is $38.7 million in cash. Our Parent will transfer its resulting aggregate 51% interest in each of Soutpan and Witkop to TerraForm Global.

Hercules Transaction

In May 2015, TerraForm Global acquired the two wholly owned subsidiaries of Honiton Energy Cayman Limited located in China pursuant to a share purchase agreement. Hercules consists of three wind sites with 148.5 MW of net capacity. The aggregate consideration paid for the 100% equity interests is $105.3 million in cash.

FERSA Transaction

In May 2015, TerraForm Global signed an agreement to acquire from FERSA the wind projects Bhakrani, Ghadag and Hanumanhatti located in India, representing 101.6 MW of net capacity in the aggregate. The aggregate consideration expected to be paid for the 100% equity interests is $33.1 million in cash.

LAP Transaction

In May 2015, our Sponsor agreed to acquire six hydro-electric projects controlled by LAP, which are expected to be transferred to TerraForm Global in connection with this offering. The projects are located in Peru, representing net capacity of 72.5 MW in the aggregate. The aggregate consideration expected to be paid for the 100% equity interest in the six projects is $103.1 million in cash.

 

F-218


Table of Contents

Renova Transaction

In May 2015, TerraForm Global signed a sale and purchase agreement with Renova to acquire three wind and hydro-electric projects. The projects are located in Brazil and have nameplate capacity of 336.2 MW in the aggregate. The aggregate cash consideration paid for this acquisition is expected to be $528.0 million.

GME Transaction

In June 2015, TerraForm Global signed an agreement with GME to acquire four wind projects. The projects are located in Honduras, Costa Rica and Nicaragua, representing net capacity of 326.0 MW in the aggregate. The aggregate consideration paid for this acquisition is expected to be $326.4 million, comprised of cash of $315.9 million and shares of Class A common stock of Global with a value of $10.5 million. The GME Transaction is expected to close concurrently with this offering.

Solarpack Transaction

In April 2015, TerraForm Global signed an agreement for the acquisition from Solarpack Corporación Tecnológica, S.L. of the 26.4 MW capacity Alto Cielo solar project located in Uruguay. We expect the Solarpack Transaction will be completed when the project achieves COD, which is expected to occur in the second half of 2015.

Private Placements.

On May 6, 2015, we raised $175 million from the sale to investment vehicles affiliated with the Blackstone Group, Everstream Opportunities Fund and Altai Capital Master Fund, and of Class D units of TerraForm Global LLC for a cash purchase price of $50 million, $100 million and $25 million, respectively. On June 9, 2015, TerraForm Global raised an additional $335.0 million from the sale to investment vehicles associated with Baron Funds, Capricorn Investment Group, GE, Glenview Capital Management, Kingdom Capital Management, and Zimmer Partners. TerraForm Global LLC expects to use the net proceeds to reduce its borrowings under the Bridge Facility, to complete the acquisitions of projects from third parties and to reduce certain project-level indebtedness. On June 9, 2015, Baron Funds and Zimmer Partners entered into a stock purchase agreement with Global in which they agreed to purchase $42.5 million and $25.0 million, respectively, of its Class A common stock at a price per share equal to the initial public offering price in a separate private placement transaction.

Bridge Facility

On May 6, 2015, the Bridge Facility was amended to increase the aggregate principal amount of bridge commitments to $450 million, of which $87.5 million was subsequently prepaid with a portion of the proceeds from the Private Placement, through the addition of Barclays Bank PLC, Citibank, N.A. and Morgan Stanley Senior Funding, Inc. as lenders in the Bridge Facility. On June 5, 2015, the Bridge Facility was further amended to increase the aggregate commitment to $550.0 million. The purpose of the Bridge Facility is to fund the acquisition of certain clean energy projects and to repay certain of the project level indebtedness incurred by projects included in our initial portfolio. TerraForm Global LLC’s obligations under the Bridge Facility are secured by first priority liens on and security interests in substantially all present and future assets of TerraForm Global LLC and certain of its domestic subsidiaries, as guarantors, under the Bridge Facility.

 

F-219


Table of Contents

Independent Auditors’ Report

The Board of Directors

SEI Solar Power Private limited

Report on the Financial Statements

We have audited the accompanying financial statements of SEI Solar Power Private Limited, which comprise the balance sheets as of December 31, 2014 and 2013, and the related statements of income, changes in equity, and cash flows for the years then ended, and the related notes to the financial statements.

Management’s Responsibility for the Financial Statements

Management is responsible for the preparation and fair presentation of these financial statements in accordance with U.S. generally accepted accounting principles; this includes the design, implementation, and maintenance of internal control relevant to the preparation and fair presentation of financial statements that are free from material misstatement, whether due to fraud or error.

Auditors’ Responsibility

Our responsibility is to express an opinion on these financial statements based on our audits. We conducted our audits in accordance with auditing standards generally accepted in the United States of America. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free from material misstatement.

An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the financial statements. The procedures selected depend on the auditors’ judgment, including the assessment of the risks of material misstatement of the financial statements, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the entity’s preparation and fair presentation of the financial statements in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity’s internal control. Accordingly, we express no such opinion. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluating the overall presentation of the financial statements.

We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion.

Opinion

In our opinion, the financial statements referred to above present fairly in all material respects, the financial position of SEI Solar Power Private limited as of December 31, 2014 and 2013, and the results of its operations and its cash flows for the years then ended in accordance with U.S. generally accepted accounting principles.

/s/ KPMG

KPMG

Gurgaon

April 3, 2015

 

F-220


Table of Contents

SEI Solar Power Private Limited

Statements of operations

 

      INR      INR  

For the year ended

   31 December 2014      31 December 2013  

Revenue

     360,452,144         316,481,557   
  

 

 

    

 

 

 

Operating expenses:

     

Cost of operations

     25,014,033         19,681,214   

General and administrative

     10,917,158         86,063,124   

Depreciation (note 3)

     74,365,472         66,012,090   
  

 

 

    

 

 

 

Total operating costs and expenses

     110,296,663         171,756,428   
  

 

 

    

 

 

 

Operating income

     250,155,481         144,725,129   
  

 

 

    

 

 

 

Other expenses:

     

Interest expense

     215,965,873         139,398,035   
  

 

 

    

 

 

 

Total other expenses

     215,965,873         139,398,035   

Income before income taxes

     34,189,608         5,327,094   

Income tax expense (note 5)

     33,603,466         18,410,575   
  

 

 

    

 

 

 

Net income / (loss)

     586,142         (13,083,481
  

 

 

    

 

 

 

See accompanying notes to financial statements.

 

F-221


Table of Contents

SEI Solar Power Private Limited

Balance sheets

 

      INR     INR  

 

   As of 31 December
             2014
    As of 31 December
             2013
 

Assets

    

Current assets:

    

Cash and cash equivalents

     574,215        4,483,962   

Restricted cash

     463,203,240        448,401,163   

Accounts receivable, net

     26,556,557        26,430,656   

Deferred financing costs

     3,434,922        3,484,240   

Other current assets

     2,414,720        4,143,804   
  

 

 

   

 

 

 

Total current assets

     496,183,654        486,943,825   

Property and equipment, net (note 3)

     2,156,293,708        2,230,650,573   

Restricted cash

     134,700,000        134,700,000   

Deferred financing costs

     43,600,695        46,005,950   

Other assets

     57,947        57,947   
  

 

 

   

 

 

 

Total assets

     2,830,836,004        2,898,358,295   
  

 

 

   

 

 

 

Liabilities and equity

    

Current liabilities:

    

Current portion of long-term debt (note 4)

     80,803,640        1,112,105,751   

Accounts payable

     1,485,355        1,316,464   

Due to related parties

     286,181,602        638,795,302   

Accrued expenses and other current liabilities

     38,382,618        18,938,434   
  

 

 

   

 

 

 

Total current liabilities

     406,853,215        1,771,155,951   

Long-term debt, less current portion (note 4)

     1,552,619,564        290,028,727   

Deferred tax liabilities (note 5)

     52,014,041        18,410,575   
  

 

 

   

 

 

 

Total non-current liabilities

     1,604,633,605        308,439,302   

Equity;

    

Common stock, INR 10 par value
Authorised shares 15,000,000, issued and outstanding 7,883,900 equity shares in 2014 and 6,313,776 equity shares in 2013 (note 6)

     78,839,000        63,137,760   

Additional paid in capital

     884,449,278        900,150,518   

Accumulated deficit

     (143,939,094     (144,525,236
  

 

 

   

 

 

 

Total equity

     819,349,184        818,763,042   
  

 

 

   

 

 

 

Total liabilities and equity

     2,830,836,004        2,898,358,295   
  

 

 

   

 

 

 

See accompanying notes to financial statements.

 

F-222


Table of Contents

SEI Solar Power Private Limited

Statements of cash flows

 

      INR     INR  

For the year ended

   31 December
2014
    31 December
2013
 

Cash flows from operating activities:

    

Net income(loss)

     586,142        (13,083,481

Adjustments to reconcile net loss to net cash used in operating activities:

    

Depreciation

     74,365,472        66,012,090   

Amortization of deferred financing costs

     3,482,303        2,145,285   

Deferred taxes

     33,603,466        18,410,575   

Changes in assets and liabilities:

    

Accounts receivable

     (125,901     (26,430,656

Restricted cash

     (9,193,408     (172,544,201

Other current assets

     1,729,082        19,780,193   

Accounts payable

     168,891        1,316,464   

Accrued expenses and other current liabilities

     19,444,184        (2,238,147

Due to related parties

     (22,784,781     (9,645,879
  

 

 

   

 

 

 

Net cash provided by (used in) operating activities

     101,275,450        (116,277,757
  

 

 

   

 

 

 

Cash flows from investing activities:

    

Capital expenditures

     (329,837,524     (170,572,089

Change in restricted cash

     (5,608,669     (275,856,962
  

 

 

   

 

 

 

Net cash used in investing activities

     (335,446,193     (446,429,051
  

 

 

   

 

 

 

Cash flows from financing activities:

    

Principal payments on long-term debt

     (1,170,845,751     (32,000,000

Proceeds from long-term debt

     1,402,134,477        334,134,477   

Change in restricted cash

            (134,700,000

Proceeds from issuance of common stock

            356,229,726   

Payment of deferred financing costs

     (1,027,730     (49,847,028
  

 

 

   

 

 

 

Net cash provided by financing activities

     230,260,996        473,817,175   
  

 

 

   

 

 

 

Net (decrease) increase in cash and cash equivalents

     (3,909,747     (88,889,633

Cash and cash equivalents at beginning of year

     4,483,962        93,373,595   
  

 

 

   

 

 

 

Cash and cash equivalents at end of year

     574,215        4,483,962   
  

 

 

   

 

 

 

Supplemental disclosures of cash flow information:

    

Cash paid for interest

     (201,776,117     (139,398,035

Cash paid for Income taxes

            11,890   

See accompanying notes to financial statements.

 

F-223


Table of Contents

SEI Solar Power Private Limited

Statements of changes in equity

 

      Common stock      Additional paid
in capital
    Accumulated
deficit
    Total equity  
     Shares      Amount         

Balance at December 31, 2012

     5,000,000         50,000,000         557,058,552        (131,441,755     475,616,797   

Issue of common stock

     1,313,776         13,137,760         151,084,240               164,222,000   

Share application money pending allotment

                     192,007,726               192,007,726   

Net loss

                            (13,083,481     (13,083,481
  

 

 

    

 

 

    

 

 

   

 

 

   

 

 

 

Balance at December 31, 2013

     6,313,776         63,137,760         900,150,518        (144,525,236     818,763,042   
  

 

 

    

 

 

    

 

 

   

 

 

   

 

 

 

Issue of common stock

     1,570,124         15,701,240         (15,701,240              

Net income

                       586,142        586,142   
  

 

 

    

 

 

    

 

 

   

 

 

   

 

 

 

Balance at December 31, 2014

     7,883,900         78,839,000         884,449,278        (143,939,094     819,349,184   
  

 

 

    

 

 

    

 

 

   

 

 

   

 

 

 

See accompanying notes to financial statements.

 

F-224


Table of Contents

SEI Solar Power Private Limited

Notes to financial statements

(Amounts in INR)

1. Nature of operations

SEI Solar Power Private Limited (the “Company”) is domiciled in India and was formed for the purpose of developing, constructing, owning and operating a utility-scale photovoltaic solar energy project with a capacity of 23.9 megawatts (MW) located in Rajasthan, India.

As at December 31 2014, Astroenergy Solar Korea Co. Ltd. holds 51% of total shares and SunEdison Energy Holding (Singapore) Pte. Ltd. holds the remaining 49% of total shares in SEI Solar Power Private Limited. Commercial operations commenced on February 11, 2013.

Basis of presentation

The Company has presented financial statements as of and for the years ended December 31, 2014 and 2013. The Company’s financial statements have been prepared in accordance with U.S. generally accepted accounting principles (“U.S. GAAP”). The Financial Accounting Standards Board (“FASB”) Accounting Standards Codification (“ASC”) is the source of authoritative U.S. GAAP to be applied by nongovernmental entities.

The financial statements are presented in Indian rupees (‘INR’), except when otherwise indicated.

2. Summary of significant accounting policies

Use of estimates

In preparing our financial statements, we use estimates and assumptions that may affect reported amounts and disclosures. Estimates are used when accounting for depreciation, impairment, contingencies, accrued liabilities and income taxes, among others. These estimates and assumptions are based on current facts, historical experience and various other factors that we believe to be reasonable under the circumstances, the results of which form the basis for making judgments about the carrying values of assets and liabilities and the recording of revenue, costs and expenses that are not readily apparent from other sources. To the extent there are material differences between the estimates and actual results, our future results of operations would be affected.

Cash and cash equivalents

Cash and cash equivalents include all cash balances and money market funds with original maturity periods of three months or less when purchased.

Restricted cash

Restricted cash consists of balance in banks and financial institutions that are restricted from use in operations pursuant to the requirements of certain debt agreements. These funds are used to pay for capital expenditure, current operating expenses and current debt service payments in accordance with the restrictions in the debt agreements.

 

F-225


Table of Contents

Accounts receivable and allowance for doubtful accounts

Accounts receivable are reported in the balance sheets at the invoiced amounts adjusted for any write-offs and an allowance for doubtful accounts. We establish an allowance for doubtful accounts to adjust our receivables to amounts considered to be ultimately collectible. Our allowance is based on a variety of factors, including the length of time receivables are past due, significant one-time events, the financial health of our customers and historical experience. There was no allowance for doubtful accounts included in accounts receivable as of December 31, 2014 or December 31, 2013. Unbilled receivables was INR 26,556,557 and INR 26,430,656 as of December 31, 2014 and 2013, respectively

Property and equipment

Property and equipment consists of land, solar energy systems and construction in progress and is stated at cost. Expenditures for major additions and improvements are capitalized and minor replacements, maintenance and repairs are charged to expense as incurred. When property and equipment is retired, or otherwise disposed of, the cost and accumulated depreciation is removed from the accounts and any resulting gain or loss is included in the results of operations for the respective period. Depreciation of property and equipment is recognized using the straight-line method over the estimated useful lives of the solar energy systems which is thirty years. Land owned by the Company is not depreciated. Land has an unlimited useful life.

An item of property and equipment initially recognized is derecognized upon disposal or when no future economic benefits are expected from its use or disposal. Any gain or loss arising on de-recognition of the asset (calculated as the difference between the net disposal proceeds and the carrying amount of the asset) is included in the Statements of Operations when the asset is derecognized. For the periods presented, the Company did not recognize any gain or loss on de-recognition of assets. All repair and maintenance costs that do not meet capitalization criteria are recognized in the Statements of Operations as incurred. The assets’ residual values, useful lives and methods of depreciation are reviewed at each financial year-end and adjusted prospectively, if appropriate

Capitalized interest

Interest expense consisting of amortization of deferred financing costs and amounts incurred on funds borrowed to finance construction of solar energy systems is capitalized until the system is ready for its intended use. The amount of interest capitalized was INR Nil and INR 13,501,370 for the years ended December 31, 2014 and December 31, 2013 respectively.

Deferred financing costs

Financing costs incurred in connection with obtaining construction and term financing are deferred and amortized over the maturities of the respective financing arrangements. Amortization of deferred financing costs is capitalized during construction and recorded as interest expense in the financial statements of operations following commencement of commercial operation.

There was no deferred financial costs that were capitalised. Amortization of deferred financing costs was recorded as interest expense and totalled INR 3,482,303 and INR 2,145,285 during the years ended December 31, 2014 and 2013, respectively.

Impairment of long-lived assets

Long-lived assets that are held and used are reviewed for impairment whenever events or changes in circumstances indicate carrying values may not be recoverable. An impairment loss is recognized if the total

 

F-226


Table of Contents

future estimated undiscounted cash flows expected from an asset are less than its carrying value. An impairment charge is measured as the difference between an asset’s carrying amount and fair value with the difference recorded in operating costs and expenses in the statement of operations. Fair values are determined by a variety of valuation methods, including appraisals, sales prices of similar assets and present value techniques. There were no impairments recognized during the years ended December 31, 2014 and 2013.

Revenue recognition

The Company’s revenues are obtained through the sale of energy pursuant to terms of a power purchase agreement (“PPA”) or other contractual arrangements which has a remaining life of 22 years as of December 31, 2014. The PPA is accounted for as operating leases, has no minimum lease payments and all of the rental income under these lease is recorded as income when the electricity is delivered. The contingent rental income recognized in the years ended December 31, 2014 and 2013 was INR 360,452,144 and INR 316,481,557 respectively.

Income taxes

Income taxes are accounted for under the asset and liability method. Deferred tax assets and liabilities are recognized for the future tax consequences attributable to differences between the financial statement carrying amounts of existing assets and liabilities and their respective tax bases and operating loss and tax credit carry forwards.

Deferred tax assets and liabilities are measured using enacted tax rates expected to apply to taxable income in the years in which those temporary differences are expected to be recovered or settled. We ignore the future originating temporary differences and schedule the existing temporary differences when they originate and reverse on a first-in-first-out basis when determining the tax rate expected to apply for purposes of measuring deferred taxes. The effect on deferred tax assets and liabilities of a change in tax rate is recognized in operations in the period that includes the enactment date. Valuation allowances are established when management determines that it is more likely than not that some portion, or all of the deferred tax asset, will not be realized.

Deferred income taxes arise primarily because of differences in the bases of assets or liabilities between financial statement accounting and tax accounting which are known as temporary differences. We record the tax effect of these temporary differences as deferred tax assets (generally items that can be used as a tax deduction or credit in future periods) and deferred tax liabilities (generally items for which we receive a tax deduction, but have not yet been recorded in the statement of operations).

The Company intends to account for dividend distribution tax in equity in the year in which a dividend is declared.

We regularly review our deferred tax assets for realizability, taking into consideration all available evidence, both positive and negative, including historical pre-tax and taxable income, projected future pre-tax and taxable income and the expected timing of the reversals of existing temporary differences. In arriving at these judgments, the weight given to the potential effect of all positive and negative evidence is commensurate with the extent to which it can be objectively verified.

We believe our tax positions are in compliance with applicable tax laws and regulations. Tax benefits are recognized only for tax positions that are more likely than not to be sustained upon examination by tax authorities. The amount recognized is measured as the largest amount of benefit that is greater than 50 percent likely to be realized upon settlement. We believe that our liabilities for unrecognized tax benefits, including related interest, are adequate in relation to the potential for additional tax assessments. There is a

 

F-227


Table of Contents

risk, however, that the amounts ultimately paid upon resolution of audits could be materially different from the amounts previously included in our income tax expense and, therefore, could have a material impact on our tax provision, net income and cash flows.

Contingencies

We are involved in conditions, situations or circumstances in the ordinary course of business with possible gain or loss contingencies that will ultimately be resolved when one or more future events occur or fail to occur. If some amount within a range of loss appears at the time to be a better estimate than any other amount within the range, that amount will be accrued. When no amount within the range is a better estimate than any other amount, however, the minimum amount in the range will be accrued. We continually evaluate uncertainties associated with loss contingencies and record a charge equal to at least the minimum estimated liability for a loss contingency when both of the following conditions are met: (i) information available prior to issuance of the financial statements indicates that it is probable that an asset had been impaired or a liability had been incurred at the date of the financial statements; and (ii) the loss or range of loss can be reasonably estimated. Legal costs are expensed when incurred. Gain contingencies are not recorded until realized or realizable.

Fair value measurements

Fair value accounting guidance establishes a hierarchy for inputs used in measuring fair value that maximizes the use of observable inputs and minimizes the use of unobservable inputs by requiring that the most observable inputs be used when available. Observable inputs are inputs that market participants would use in pricing the asset or liability, and are based on market data obtained from sources independent of us. Unobservable inputs reflect assumptions market participants would use in pricing the asset or liability based on the best information available in the circumstances. The hierarchy is broken down into three levels based on the reliability of inputs as follows:

 

 

Level 1—Valuations based on quoted prices in active markets for identical assets or liabilities that we have the ability to access. Valuation adjustments and block discounts are not applied to Level 1 instruments. Because valuations are based on quoted prices that are readily and regularly available in an active market, valuation of these instruments does not entail a significant degree of judgment.

 

 

Level 2—Valuations based on quoted prices in markets that are not active or for which all significant inputs are observable, either directly or indirectly. Valuations for Level 2 are prepared on an individual instrument basis using data obtained from recent transactions for identical securities in inactive markets or pricing data from similar instruments in active and inactive markets.

 

 

Level 3—Valuations based on inputs that are unobservable and significant to the overall fair value measurement.

For cash and cash equivalents, restricted cash, accounts receivable, accounts payable, accrued expenses and other current liabilities, the carrying amount approximates fair value because of the short term maturity of the instruments. See Note 4 for disclosures related to the fair value of our long-term debt.

Accounting pronouncements issued but not yet effective

The following accounting standards have been issued but are not yet effective for nor have been adopted by the Company.

 

F-228


Table of Contents

ASU No. 2014-09, Revenue from Contracts with Customers (Topic 606)

In May 2014, the FASB issued ASU No. 2014-09, Revenue from Contracts with Customers, which requires an entity to recognize the amount of revenue to which it expects to be entitled for the transfer of promised goods or services to customers. ASU 2014-09 will replace most existing revenue recognition guidance in U.S. GAAP when it becomes effective. ASU 2014-09 is effective for us on January 1, 2017. Early application is not permitted. The standard permits the use of either a retrospective or cumulative effect transition method. We have not determined which transition method we will adopt, and we are currently evaluating the impact that ASU 2014-09 will have on our financial statements and related disclosures upon adoption.

ASU No. 2014-15, Subtopic 205-40, Presentation of Financial Statements—Going Concern (Topic 718)

In August 2014, the FASB issued ASU No. 2014-15, Presentation of Financial Statements—Going Concern (Subtopic 205-40): Disclosure of Uncertainties about an Entity’s Ability to Continue as a Going Concern, which requires management to evaluate, at each annual and interim reporting period, whether there are conditions or events that raise substantial doubt about the entity’s ability to continue as a going concern within one year after the date the financial statements are issued and to provide related disclosures. ASU 2014-15 is effective for us for our fiscal year ending December 31, 2016 and for interim periods thereafter. We are currently evaluating the impact of this standard on our financial statements.

3. Property and equipment

Property and equipment consists of the following:

 

      As of December 31,  

In INR

   2014     2013  

Land (Refer note 8)

     69,308,894        69,308,894   

Solar energy systems

     2,227,362,376        2,227,353,769   
  

 

 

   

 

 

 

Total property and equipment, at cost

     2,296,671,270        2,296,662,663   

Less accumulated depreciation

     (140,377,562     (66,012,090
  

 

 

   

 

 

 

Total property and equipment, net

     2,156,293,708        2,230,650,573   
  

 

 

   

 

 

 

Depreciation expense was INR 74,365,472 and INR 66,012,090 for the years ended December 31, 2014 and 2013 respectively.

4. Debt

Debt consists of the following:

 

     As of December 31, 2014     As of December 31, 2013  

in INR

  Total principal     Current     Long-term     Total principal     Current     Long-term  

International Finance Corporation

    624,163,204        31,408,640        592,754,564        334,134,478        44,105,751        290,028,727   

PTC India Financial Services Limited

    1,009,260,000        49,395,000        959,865,000                        

Industrial and Commercial Bank of China Limited

                         1,068,000,000        1,068,000,000          
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total

    1,633,423,204        80,803,640        1,552,619,564        1,402,134,478        1,112,105,751        290,028,727   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

 

F-229


Table of Contents

Our solar energy projects for which we have long-term debt obligations are included in these financial statements. We typically finance our solar energy projects through specific debt secured by the entity’s assets including movable and immovable properties, both present and future and share capital. Typically, these financing arrangements provide for a credit facility used for a construction, which upon completion is converted into term debt.

As at December 31, 2014 term debt includes the below:

 

 

Local currency loan availed from International Finance Corporation, Mumbai branch, India is repayable in 29 half yearly installments commencing from 15 April 2014. The loan carries an interest rate equal to the Rupee Based Fixed rate on the date of each disbursement and the relevant spread (currently at 12.15% and 12.41% per annum). The unutilised balances of the Company’s credit facilities are subject to annual commitment fee of 0.5% per annum. There are no undrawn credit facilities as at December 31, 2014 and INR 334,134,477 as at December 31, 2013.

 

 

Local currency loan availed from PTC India Financial Services Limited is repayable in 59 quarterly installments commencing from 15 October 2013. The loan carries an interest rate equal to the Rupee Based Fixed rate on the date of each disbursement and the relevant spread (currently at 12.75% per annum).

The Company did not comply with a covenant in connection with the loan availed from International Finance Corporation which was required that the project financial completion date be met on or before 1 April 2015. The Company obtained an extension for a period of 180 days from 1 April 2015. It is probable that the Company will meet the requirements within the grace period and accordingly, the outstanding loan balances have been continued to be classified as non-current to the extent not repayable within one year.

As at December 31, 2013 term debt included the below:

 

 

Local currency loan availed from Industrial and Commercial Bank of China, Mumbai branch is repayable in August 2014. The Company repaid the loan on 2 January 2014. The loan carried an interest rate of 11.20% per annum. The loan was secured against a standby letter of credit of $25 million issued by ICBC Zhejiang Provincial Branch to ICBC Mumbai Branch. This standby letter of credit is issued by ICBC Zhejiang Provincial Branch to the Company with no recourse. Prepayment charges amounting to INR 24,000,096 during the year ended December 31, 2013 are included under interest expense.

The term debt agreements contain certain representations, covenants and warranties of the borrower including limitations on business activities, guarantees and environmental issues requirements. The fair value of the outstanding debt obligations approximates carrying value.

The term loans are secured by substantially all of the Company’s assets.

Maturities

The aggregate amounts of payments on long-term debt due after December 31, 2014 are as follows:

 

     2015     2016     2017     2018     2019     Thereafter     Total  

in INR

             

Maturities of debt

    80,803,640        86,012,448        90,566,720        97,792,530        104,844,406        1,173,403,460        1,633,423,204   

 

F-230


Table of Contents

5. Income taxes

Income taxes

Income tax expense consists of the following:

 

      Current      Deferred      Total  

Year ended December 31, 2014:

             33,603,466         33,603,466   

Year ended December 31, 2013:

             18,410,575         18,410,575   

Tax rate reconciliation

The applicable Indian statutory tax rate for the tax year ended 2014 and 2013 is 34.61% and 33.99%, respectively.

Income tax expense differed from the amounts computed by applying the statutory Indian income tax rate of 34.61% to profit before income taxes.

 

      As of December 31,  
     2014     2013  

Current tax

              

Income tax at Indian statutory rate

     34.61%        34.61%   

Increase (reduction) in income taxes:

    

Impact of tax holidays

     63.27%        321.27%   

Indexation benefits on land

     (4.67%     (30.65%

Valuation allowance

     4.67%        30.65%   

Others

     0.43%        (10.27)%   
  

 

 

   

 

 

 

Effective tax rate

     98.31%        345.61%   
  

 

 

   

 

 

 

Significant component of deferred taxes

The significant components of deferred tax assets and liabilities attributable to income from operations for the year ended December 31, 2014 and December 31, 2013 are as follows:

 

      As of December 31,  
     2014     2013  

Deferred tax assets / liabilities

    

Deferred tax liabilities:

    

Plant and equipment, principally due to differences in depreciation

     52,014,041        18,410,575   

Deferred tax assets:

    

Land, due to indexation benefits in tax

     3,227,940        1,632,737   

Less: valuation allowance

     (3,227,940     (1,632,737

Net deferred tax liabilities

     52,014,041        18,410,575   

The Company has unabsorbed depreciation for Indian income tax purposes of INR 204,880,652 as at December 31, 2014 and INR 142,405,580 as at December 31, 2013 which are available to offset future taxable income, if any, over an indefinite period. In addition, the Company has a net operating loss carryforward of INR 128,772,265 as at December 31, 2014 and 2013 which is available to offset future taxable income, if any, until the tax year ended March 31, 2021.

 

F-231


Table of Contents

The Company has a tax holiday which expires 15 years from the date of commissioning of the solar energy system and is available for a 10 year period starting from the date on which the project entity starts claiming the holiday. The Company expects the tax holiday to apply from April 1, 2017 through March 31, 2027. The tax holiday provides for a zero percent tax rate during the years it applies. The Company had a net expense as a result of the tax holiday due to the origination of taxable temporary differences expected to reverse after the expiration of the tax holiday, while the related deductions are expected to be utilized during the tax holiday period and provide no tax benefit.

The change in valuation allowance is INR 1,595,203 and INR 1,632,737 during the year ended December 31, 2014 and December 31, 2013, respectively.

The 2014 and 2013 tax years remain open to examination by tax authorities. The Company does not have any unrecognized tax benefits.

6. Equity

Common stock

Holders of common stock are entitled to one vote per share, and to receive dividends and, upon liquidation or dissolution, are entitled to receive all assets available for distribution to stockholders. The holders have no preemptive or other subscription rights and there are no redemption or sinking fund provisions with respect to such shares.

Securities premium received and share application money received are included as part of additional paid in capital.

7. Related parties

The Company’s ultimate parent company was SunEdison Inc. for part of the year in 2013 after which Astronergy Solar Korea Co. Ltd took over as the parent company whose ultimate parent company is Chint Group Corp., China.

Operations and maintenance

Operations and maintenance services are provided to the Company by an affiliate pursuant to contractual agreements. Costs incurred for these services were INR 25,014,033 and INR 18,606,816 for the years ended December 31, 2014 and 2013 respectively. Related amounts were reported as cost of operations in the statements of operations and were reflected in operating activities in the statements of cash flows.

Erection and commissioning of solar energy systems

The contract to erect and commission our solar energy systems was fulfilled by an affiliate. Pursuant to such contract the affiliate is responsible to carry out all such work necessary to construct, install and commission our solar energy systems in such manner that they are deemed to be fit for the purposes for which they are intended to be used. The Company incurred a cost of INR 780,738,851 during the year 2013 in relation to such contract which is capitalized as part of solar energy systems.

Support services

Corporate support services were provided by an affiliate company during the year ended December 31, 2013. The Company incurred a cost of INR 15,212,598 during the year ended December 31, 2013. Related amounts were reported as general and administrative expenses in the statements of operations and were reflected in operating activities in the statements of cash flows.

 

F-232


Table of Contents

Bank guarantee commission

In order to facilitate the term debt facility from Industrial and Commercial Bank of China Limited (‘ICBC’) an affiliate company had provided a counter guarantee to ICBC. Against such guarantee the affiliate charged a fee of INR 43,981,334 during the year 2013 and the same has been reported as part of general and administrative expenses in the statement of operations.

Parent and affiliates

As of December 31, 2014 and 2013, the Company owed affiliates INR 286,181,602 and INR 638,795,302 respectively. Depending on the nature of the activity, amounts are either reflected in operating activities or as a non-cash addition to property and equipment included in due to affiliates.

8. Commitments and contingencies

Legal proceedings

There are certain pending litigations relating to the appropriateness of title of certain portions of land held by the Company, on which the solar energy systems are installed, since the date of purchase of the said land. The Company believes that there are no irregularities in its ownership title and based on the opinion of its legal counsel believes that the likelihood of an unfavourable outcome of its ownership of the said land is not probable. In addition, the Company believes that no further settlement or any significant additional liability is expected on account of such disputes pending resolution.

Apart from this case from time to time, we are notified of possible claims or assessments arising in the normal course of business operations. Management continually evaluates such matters with legal counsel and believes that, although the ultimate outcome is not presently determinable, these matters will not result in a material adverse impact on our financial position or operations.

Commitment

The Company has entered into a Power Purchase Agreement (‘PPA’) with NTPC Vidyut Vyapar Nigam Limited, (‘NVVNL’) on 27 January 2012 for implementation of a 23.9 MW Solar Photovoltaic Power Generation Unit (‘Project’) in the State of Rajasthan under which it has a commitment to sell electricity for a period of 25 years. If the minimum prescribed units of electricity is not generated and supplied, the Company is liable to pay compensation in accordance with the power purchase agreement.

9. Segment information

The Company is engaged in one reportable segment that operates a portfolio of solar energy generation assets. The Company operates as a single reportable segment based on a “management” approach. This approach designates the internal reporting used by management for making decisions and assessing performance as the source of the reportable segments.

Revenue for the years ended December 31, 2014 and 2013 was earned from one customer located in India namely, NTPC Vidyut Vyapar Nigam Limited.

10. Subsequent events

The Company has evaluated subsequent events from the balance sheet date through April 3, 2015, the date the financial statements were available to be issued.

 

F-233


Table of Contents

Independent auditor’s report

Board of Directors

BioTherm Energy Projects

Fourways, South Africa

We have audited the accompanying combined financial statements of BioTherm Energy Projects, consisting of Klipheuwel-Dassiefontein Wind Energy Facility (RF) Proprietary Limited, Sevenstones 159 (RF) Proprietary Limited and Limarco 77 (RF) Proprietary Limited, which comprise the combined balance sheets as at 31 December 2014 and 2013, and the related combined statements of income and comprehensive loss, changes in shareholder’s net investment, and cash flows for the years then ended, and the related notes to the combined financial statements.

Management’s Responsibility for the Financial Statements

Management is responsible for the preparation and fair presentation of these combined financial statements in accordance with accounting principles generally accepted in the United States of America; this includes the design, implementation, and maintenance of internal control relevant to the preparation and fair presentation of combined financial statements that are free from material misstatement, whether due to fraud or error.

Auditor’s Responsibility

Our responsibility is to express an opinion on these combined financial statements based on our audits. We conducted our audits in accordance with auditing standards generally accepted in the United States of America. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the combined financial statements are free from material misstatement.

An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the combined financial statements. The procedures selected depend on the auditor’s judgment, including the assessment of the risks of material misstatement of the combined financial statements, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the entity’s preparation and fair presentation of the combined financial statements in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity’s internal control. Accordingly, we express no such opinion. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluating the overall presentation of the combined financial statements.

We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion.

Opinion

In our opinion, the combined financial statements referred to above present fairly, in all material respects, the financial position of BioTherm Energy Projects as of 31 December 2014 and 2013, and the results of their operations and their cash flows for the years then ended in accordance with accounting principles generally accepted in the United States of America.

/s/ BDO South Africa, Inc.

Johannesburg, South Africa

April 3, 2015

 

F-234


Table of Contents

BioTherm Energy Projects

As at 31 December 2014 and 2013

Combined balance sheets

 

In US dollars

   2014      2013  

Assets

     

Current Assets

     

Cash and cash equivalents

     22,069,224         17,372,573   

Accounts receivable

     5,283,000         667,134   

Prepaids and other current assets

     3,642,203         2,617,269   
  

 

 

    

 

 

 

Total current assets

     30,994,427         20,656,976   

Property, plant and equipment, net

     88,939,623         87,871,017   

Deferred tax asset

     10,196,474         2,579,820   

Derivative financial instrument—Swap

             433,985   
  

 

 

    

 

 

 

Total Assets

     130,130,524         111,541,798   
  

 

 

    

 

 

 

Liabilities and Shareholder’s Net Investment

  

Current Liabilities

  

Shareholders escrow account

     38,479         127,170   

Borrowings, current portion

     2,143,403         1,555,781   

Accounts payable

     3,689,723         10,437,919   

Other accrued liabilities

     2,717,927         89,050   
  

 

 

    

 

 

 

Total current liabilities

     8,589,532         12,209,920   

Borrowings, long term

     77,861,867         69,678,122   

Deferred tax liability

     11,179,933         2,375,391   

Asset retirement obligations

     420,820           

Derivative financial instrument—Swap

     544,261           
  

 

 

    

 

 

 

Total Liabilities

     98,596,413         84,263,433   
  

 

 

    

 

 

 

Commitments and contingencies (Note 14)

  

Shareholder’s Net Investment

  

Shareholder’s net investment

     31,534,111         27,278,365   
  

 

 

    

 

 

 

Total Liabilities and Shareholder’s Net Investment

     130,130,524         111,541,798   
  

 

 

    

 

 

 

The notes form an integral part of these combined financial statements

 

F-235


Table of Contents

BioTherm Energy Projects

For the years ended 31 December 2014 and 2013

Combined statements of income and comprehensive loss

 

In US dollars

   2014     2013  

Revenue

     21,031,872          

Operating expenses

    

Operations management fee—related party

     (368,031     (162,327

Operations management fee

     (1,053,852       

Plant operating costs—related party

     (1,478,999       

Plant operating costs

     (89,341       

General and administrative costs—related party

     (565,246     (414,654

General and administrative costs

     (1,500,260     (267,706

Depreciation

     (5,177,697       
  

 

 

   

 

 

 

Income/(loss) before other income and expenses

     10,798,446        (844,687

Other income and expenses

    

Interest income

     853,805        4,896   

Interest expense

     (8,558,440     (1,028
  

 

 

   

 

 

 

Income/(loss) before income taxes

     3,093,811        (840,819

Income tax (expense) benefit/(expense)

     (1,169,961     207,784   
  

 

 

   

 

 

 

Net income/(loss) for the year

     1,923,850        (633,035

Other comprehensive income/(loss):

    

Foreign currency translation adjustments

     (3,148,347     (2,816,966

Effects of cash flow hedges

     (1,252,155     4,686,560   

Income tax relating to items that may be reclassified

     273,909        (1,025,185
  

 

 

   

 

 

 

Total other comprehensive loss

     (4,126,593     844,409   
  

 

 

   

 

 

 

Comprehensive loss for the year

     (2,202,743     211,374   
  

 

 

   

 

 

 

The notes form an integral part of these combined financial statements

 

F-236


Table of Contents

BioTherm Energy Projects

For the years ended 31 December 2014 and 2013

Combined statements of changes in shareholder’s net investment

 

In US dollars

   Total shareholder’s net
investment
 

Balance at 1 January 2013

     6,259,617   
  

 

 

 

Net loss for the year

     (633,035

Other comprehensive loss for the year

     844,409   

Net contributions from Members

     20,807,374   
  

 

 

 

Balance at 31 December 2013

     27,278,365   

Net income for the year

     1,923,850   

Other comprehensive loss for the year

     (4,126,593

Net contributions from Members

     6,458,489   
  

 

 

 

Balance at 31 December 2014

     31,534,111   
  

 

 

 

The notes form an integral part of these combined financial statements

 

F-237


Table of Contents

BioTherm Energy Projects

For the years ended 31 December 2014 and 2013

Combined statements of cash flows

 

In US dollars

   2014     2013  

Cash flows used in operating activities

    

Net income/(loss) for the year

     1,923,850        (633,035

Adjustments to reconcile net income/(loss) for the year to net cash used in operating activities

    

Depreciation

     5,177,697          

Accretion of asset retirement obligation

     17,886          

Deferred tax

     1,169,961        (207,784

Changes in operating assets and liabilities

    

Accounts receivable

     (4,615,866     (667,134

Prepaids and other assets

     2,202,068        (702,516

Accounts payable

     (10,426,978     (1,338,942

Deferred tax assets and liabilities

              

Other accrued liabilities

     906,902        (540,423
  

 

 

   

 

 

 

Net cash used in operating activities

     (3,644,480     (4,089,834
  

 

 

   

 

 

 

Cash flows used in investing activities

    

Capital expenditures

     (5,692,628     (56,813,961

Delayed liquidate damages received recorded as a reduction to capital expenditure

     2,023,007     
  

 

 

   

 

 

 

Net cash used in investing activities

     (3,669,621     (56,813,961
  

 

 

   

 

 

 

Cash flows provided by financing activities

    

Net contributions from members

     6,458,489        20,807,374   

Proceeds from borrowings

     9,730,445        46,728,426   

Repayment of borrowings

     (1,047,769       
  

 

 

   

 

 

 

Net cash provided by financing activities

     15,141,165        67,535,800   
  

 

 

   

 

 

 

Effect of exchange rate movement on cash balances

     (3,130,413     (2,774,969

Net (decrease) increase in cash and cash equivalents

     7,827,064        6,632,005   

Cash and Cash Equivalents, beginning of the year

     17,372,573        13,515,537   
  

 

 

   

 

 

 

Cash and Cash Equivalents, end of the year

     22,069,224        17,372,573   
  

 

 

   

 

 

 

Supplemental Disclosure of Cash Flow Information:

    

Cash paid for interest

     8,540,554        1,028   

Cash received for interest

     853,805        4,896   

Supplemental Disclosures of non-cash investing and financing activities:

    

Delay liquidation damages receivable recorded as reduction to PPE

     (3,227,002       

Asset retirement obligation recorded as increase to PPE

     402,934     

Liabilities for capital expenditures

     5,400,750     

The notes form an integral part of these combined financial statements

 

F-238


Table of Contents

BioTherm Energy Projects

Notes to the combined financial statements

1. Organization and nature of business

BioTherm Energy Projects (the “Company”) consists of Klipheuwel-Dassiefontein Wind Energy Facility (RF) Proprietary Limited, Sevenstones 159 (RF) Proprietary Limited and Limarco 77 (RF) Proprietary Limited. These Companies are privately owned companies, registered in South Africa, incorporated in 2011 and are all under common control of BTSA Netherlands Cooperatie U.A. (“BTSA”), a Company incorporated in The Netherlands.

The Companies are engaged in electricity generation at the 27MW Klipheuwel-Dassiefontein Wind Energy Facility near Caledon in the Western Cape, South Africa, a 10MW Solar PV Energy Facility near Kenhardt in the Northern Cape, South Africa and a 10MW Konkoonsies Solar PV Energy Facility near Pofadder in the Northern Cape, South Africa. The Company has a contract with Eskom Holdings SOC Limited a South African state owned entity for the supply of electricity.

2. Summary of significant accounting policies

Basis of preparation

The accompanying financial statements are prepared in conformity with generally accepted accounting principles in the United States of America (“U.S. GAAP”). Such combined financial statements have been prepared for inclusion in a filing with the United States Securities and Exchange Commission by TerraForm Global, Inc due to the purchase and sale agreement for purposes of the proposed acquisition of the three entities by a subsidiary of TerraForm Global, Inc. See also Subsequent Events (Note 17).

Throughout the periods presented in the combined financial statements, the Company did not exist as a combined, legally constituted entity. The combined financial statements have therefore been derived from the financial statements of Klipheuwel-Dassiefontein Wind Energy Facility (RF) Proprietary Limited, Sevenstones 159 (RF) Proprietary Limited and Limarco 77 (RF) Proprietary Limited to represent the financial position and performance of the Company on a combined basis throughout those periods in accordance with accounting principles generally accepted in the United States of America.

Management of Klipheuwel-Dassiefontein Wind Energy Facility (RF) Proprietary Limited, Sevenstones 159 (RF) Proprietary Limited and Limarco 77 (RF) Proprietary Limited believe the assumptions underlying the combined financial statements are reasonable based on the scope of the purchase and sale agreement and the entities forming the Company being under common control and management throughout the entire periods covered by the combined financial statements.

Outstanding inter-entity balances, transactions, and cash flows between entities comprising the Company have been eliminated.

BTSA Netherlands Cooperatie U.A. provides executive management services to the Companies and charges a management fee to the Companies for these services, the fees are considered to be a reasonable reflection of all costs of doing business by the Company. For the years ended 31 December 2014 and 2013, the Company paid management fees of $0.1M and NIL, respectively. Management of BTSA determined that it was not practicable to determine an estimate of this fee that would have been incurred had the Company operated as an unaffiliated entity. The combined financial statements included herein may not necessarily represent what the Company’s results, financial position and cash flows would have been had it been a stand-alone entity during the periods presented, or what the Company’s results, financial position and cash flows may be in the future.

 

F-239


Table of Contents

Revenue

The Company earns revenue from the sale of electricity under 20 year Power Purchase Agreements (“PPAs”) with Eskom Holdings SOC Limited a South African state owned entity. The Company is required to sell all energy and related energy attributes generated by the facilities at specific rates as determined by the PPAs. The Company recognizes revenue from the sale of electricity and related energy attributes when the electricity is generated and delivered.

The Company recognizes revenue when all of the following criteria are met: (i) persuasive evidence of an arrangement exists; (ii) delivery or performance has occurred; (iii) the sales price is fixed or determinable; and (iv) collectability is reasonably assured. The Company generates revenue through power purchase agreements. Revenue associated with power purchase agreements are included within revenue.

The Company’s revenue-generating activity consists of long-term power purchase agreements with Eskom Holdings SOC Limited, under which the customer agrees to purchase all of the power generated by the wind and solar energy systems for the term of the contracts, which are 20 years. The agreement includes a fixed price per kilowatt hour with a fixed annual price escalation percentage (to address the impact of inflation and utility rate increases over the period of the contract). The Company has determined that power purchase agreements should be accounted for as operating leases after evaluating the lease classification criteria. As customer payments under a power purchase agreement are dependent on power generation, they are considered contingent rentals and are excluded from future minimum annual lease payments. Revenue from power purchase agreements is recognized based on the actual amount of power generated at rates specified under the contracts, assuming the other revenue recognition criteria discussed above are met.

Concentrations of credit risk

All of the Company’s revenue and net income is derived from local sales.

Financial instruments that potentially subject the Company to concentrations of credit risk consist principally of cash and accounts receivable. The Company places its cash, consisting mostly of deposits, with high credit qualified financial institutions. The Company performs periodic evaluations of the relative credit standing of those financial institutions. The credit risk in accounts receivable is substantially mitigated as all sales are made to Eskom Holdings SOC Limited a state owned entity. The Company does not obtain rights to collateral to reduce its credit risk.

Foreign currency translation

The reporting currency of the Company is the U.S. Dollar. The functional currency of the Company is the South African Rand. The functional currency of the Company is the South African Rand as it is the currency of the primary economic environment in which its operations are conducted. Transactions in currencies other than the functional currency of the Company are recorded at the rates of exchange prevailing at the date of the transaction. Monetary assets and liabilities in currencies other than the operations functional currency are translated at rates of exchange prevailing at the balance sheet date to the operation’s functional currency. The Company translates its assets and liabilities into U.S. Dollars at the exchange rates in effect at the balance sheet dates, revenue and expense items are translated at the average exchange rates for the reporting period. The Company recorded a foreign currency translation net loss of $3.1M and $2.8M in the years ended 31 December 2014 and 2013 respectively presented as a component of accumulated other comprehensive loss in the accompanying combined Statement of Income and Comprehensive loss.

 

F-240


Table of Contents

Cash and cash equivalents

Cash and cash equivalents include cash and highly liquid cash investments with original maturities of three months or less. The Company has cash deposits in a financial institution of reputable standing. The Company has not experienced any losses on such amounts and believes it is not subject to significant credit risk related to cash balances. The Company has no cash equivalents at 31 December 2014 and 2013.

Accounts receivable

The Company records accounts receivable based on amounts billed to Eskom Holdings SOC Limited. Most billings are determined based on contractual terms. The Company does not accrue interest on any of its accounts receivable. There was no allowance for doubtful accounts included in accounts receivable as of 31 December 2014 or 2013.

Derivative instruments

The Company entered into interest rate swap agreements to hedge the variable interest on borrowings utilized for the construction of the energy facilities for a fixed interest rate. As at 31 December 2014 and 2013 the hedges were effective.

The Company’s interest rate swaps meet the requirements for hedge accounting and were designated as qualifying cash flow hedging instruments in all of the periods presented. Movements in the fair value of derivatives are therefore recognized in the Statements of changes in Shareholders Net Investment.

Gains and losses on derivatives designated as cash flow hedges are recorded in other comprehensive (loss) income and reclassified to earnings in a manner that matches the timing of the earnings impact of the hedged transactions. The ineffective portion of all hedges, if any, is recognized currently in earnings. The effective portion of the hedge will be recorded in the same manner as foreign currency translation adjustment in other comprehensive (loss) income. When the hedge position is dissolved and we recognize a gain or loss in interest income (expense), the associated hedge gain or loss in other comprehensive (loss) income will be reclassified to the Statement of Income.

Property, plant and equipment, net

Property, plant and equipment are carried at cost, additions and improvements are capitalized and maintenance and repairs are charged to expenses as incurred. Depreciation is provided by the use of the straight line method over the estimated useful lives of the assets. When an asset is retired or otherwise disposed of, the appropriate accounts are relieved of costs and accumulated depreciation, and any resulting gain or loss is recognized.

The assets’ estimated lives used in computing depreciation are as follows:

 

Item

   Useful lives  

Wind Energy Facility

     5 - 20 years   

Solar Energy Facility

     5 - 20 years   

Substation

     20 years   

Impairment of long-lived assets

US GAAP requires an impairment review to be performed whenever events or changes in circumstances indicate that the carrying amount of an asset may not be recoverable. If an indicator of impairment exists, estimates of

 

F-241


Table of Contents

the future cash flows expected to result from the use of the asset and its eventual disposition is performed. Measurement of an impairment loss for long-lived assets that management expects to hold and use is based on the fair value of the asset. Long-lived assets to be disposed of are reported at the lower of carrying amount or fair value less costs to sell. For the years ended 31 December 2014 and 2013 no impairment was recorded.

Delayed liquidated damages

Delayed liquidated damages represents amounts due from the Engineer, Procure and Construct (“EPC”) contractor for revenues the Company would have earned under the PPA for the period that the EPC contractor did not meet the guaranteed substantial completion date. The Company records the delayed liquidated damages as a reduction in the purchase price of the wind and solar energy facility. Delayed liquidated damages of $3.2M, $1.0M and $1.0m were recorded in 2014 for Klipheuwel-Dassiefontein Wind Energy Facility (RF) Proprietary Limited, Sevenstones 159 (RF) Proprietary Limited and Limarco 77 (RF) Proprietary Limited respectively. As of 31 December 2014, $3.2M was owed to the Company and is included in prepaids and other current assets.

Borrowing costs

Borrowing costs that are directly attributable to the acquisition, construction or production of a qualifying asset are capitalized as part of the cost of that asset until such time as the asset is ready for its intended use. The amount of borrowing costs eligible for capitalization was $0.7M and $4.2M as at 31 December 2014 and 2013 respectively and was determined as follows:

 

  (i)   actual borrowing costs on funds specifically borrowed for the purpose of obtaining a qualifying asset less any temporary investment of those borrowings;

 

  (ii)   weighted average of the borrowing costs applicable to the Company on funds generally borrowed for the purpose of obtaining a qualifying asset. The borrowing costs capitalized do not exceed the total borrowing costs incurred.

The capitalization of borrowing costs commences when:

 

  (i)   expenditures for the asset have occurred;

 

  (ii)   borrowing costs have been incurred; and

 

  (iii)   activities that are necessary to prepare the asset for its intended use or sale are in progress.

Capitalization is suspended during extended periods in which active development is interrupted. Capitalization ceases when substantially all the activities necessary to prepare the qualifying asset for its intended use or sale are complete.

All other borrowing costs are recognized as an expense in the period in which they are incurred.

Borrowings

Borrowings are classified as financial liabilities and are initially measured at fair value, and are subsequently measured at amortized cost.

Tax

Sales tax

The Company collects Value Added Tax from its customer and remits these amounts to the South African Revenue authority. Revenue is recorded net of Value Added Tax.

 

F-242


Table of Contents

Deferred tax assets and liabilities

The Company is a privately held company formed under South African statutes and taxed in terms of South African Tax Laws.

Deferred income taxes are recognized using the liability method. Under the liability method, deferred income taxes are recognized for the income consequences of temporary differences by applying enacted tax rates applicable to future years to difference between the financial statement carrying amount and the tax bases of existing assets and liabilities. The effect on deferred income taxes of a change in tax laws or rates is recognized in income in the period that includes the enactment date.

Where there is uncertainty in income taxes a benefit is recognized only if it is “more likely than not” that the tax position would be sustained in a tax examination, with a tax examination being presumed to occur. The amount recognized is the largest amount of tax benefit that is greater than 50% likely of being realized on examination. For tax positions not meeting the “more likely than not” test, no tax benefit is recorded. Based on the Company’s analysis of the “more likely than not” tax positions there has been no liability recorded for uncertain tax positions at 31 December 2014 and 2013.

The Company recognizes interest and penalties related to unrecognized tax benefits in interest and expenses, respectively. The Company has no amounts accrued for interest or penalties as of 31 December 2014 and 2013. The Company is currently not under audit by the South African Revenue Service for any open tax years.

Operating leases—lessee

Leases in which a significant portion of risks and rewards of ownership are retained by the lessor are classified as operating leases. Payments made under operating leases are recorded in general and administrative costs in the Statement of Income and Comprehensive Loss, incurred $0.3M and NIL in 2014 and 2013 respectively.

Contingencies

Conditions, situations or circumstances in the ordinary course of business may arise with possible gain or loss contingencies that will ultimately be resolved when one or more future events occur or fail to occur. If some amount within a range of loss appears at the time to be a better estimate than any other amount within the range, that amount will be accrued. When no amount within the range is a better estimate than any other amount, however, the minimum amount in the range will be accrued. We continually evaluate uncertainties associated with loss contingencies and record a charge equal to at least the minimum estimated liability for a loss contingency when both of the following conditions are met:

 

  (i)   information available prior to issuance of the financial statements indicates that it is probable that an asset had been impaired or a liability had been incurred at the date of the financial statements; and

 

  (ii)   the loss or range of loss can be reasonably estimated. Legal costs are expensed when incurred. Gain contingencies are not recorded until realized or realizable.

Asset retirement obligation

We operate under lease agreements that include a requirement for the removal of the wind energy systems at the end of the term of the agreement. The fair value of the future retirement cost of the Company’s assets is recorded as a liability on a discounted basis when incurred. The initial recorded obligation is discounted using the Company’s credit-adjusted risk free-rate and is reviewed periodically for changes in the estimated future costs underlying the obligation. Over time, the liability is accreted to its expected future value. The corresponding asset capitalized at inception is depreciated over the useful life of the facility to which the asset relates.

 

F-243


Table of Contents

Shareholder’s net investment

In the combined balance sheets, shareholder’s net investment represents BTSA Netherlands Cooperatie U.A. and all shareholders historical investment in Klipheuwel-Dassiefontein Wind Energy Facility (RF) Proprietary Limited, Sevenstones 159 (RF) Proprietary Limited and Limarco 77 (RF) Proprietary Limited, their accumulated net earnings, including accumulated other comprehensive loss.

3. Property, plant and equipment, net

Property, plant and equipment consist of the following:

 

In US dollar

   2014     2013  

Construction in Progress

            87,871,017   

Wind Energy Facility

     43,784,220          

Solar Energy Facility

     45,689,053          

Substation

     4,239,816          
  

 

 

   

 

 

 

Total property, plant and equipment, at cost

     93,713,089        87,871,017   

Less accumulated depreciation

     (5,177,697       

Effect of movements in exchange rates

     404,231     
  

 

 

   

 

 

 

Total property, plant and equipment, net

     88,939,623        87,871,017   
  

 

 

   

 

 

 

Depreciation expense was $5.2M and $0 for the years ended 31 December 2014 and 2013 respectively.

A special notarial bond and a general notarial bond has been registered over the Company’s present and future movable property for an amount of $92.7M plus an additional amount of $18.5M, as security for the $85.1M first ranking debt. Refer to Note 7 for further details.

4. Deferred tax

Deferred tax assets and liabilities are non-current and are attributable to the following:

 

In US dollar

   2014     2013  

Deferred tax assets

    

Tax losses

     10,078,644        2,579,820   

Asset retirement obligation

     117,830          
  

 

 

   

 

 

 

Total deferred tax assets

     10,196,474        2,579,820   

Deferred tax liabilities

    

Property, plant and equipment

     (11,073,009     (2,375,391

Prepayments

     (106,924       
  

 

 

   

 

 

 

Total deferred tax liabilities

     (11,179,933     (2,375,391
  

 

 

   

 

 

 

Total net deferred tax (liability)/asset

     (983,459     204,429   
  

 

 

   

 

 

 

The ultimate realization of deferred tax assets is dependent upon the generation of future taxable income during the periods in which those temporary differences become deductible. Management considers the scheduled reversal of deferred tax liabilities (including the impact of available carryback and carryforward periods), projected future taxable income and tax planning strategies in making this assessment. Based upon the level of historical taxable income and projections for future taxable income over the periods in which the

 

F-244


Table of Contents

deferred tax assets are deductible, management believes it is more likely than not that the Company will realize the benefits of these deductible differences and carryforwards and no valuation allowance was considered necessary by management as of 31 December 2014 and 2013.

The estimated tax losses available for set off against future taxable income is $32.3M (2013: $9,2M), these losses will not expire. We believe that it is more likely than not, based on our projections of future taxable income that we will generate sufficient taxable income to realize the benefits of the deferred tax asset.

5. Derivative financial instrument—Swap

 

In US dollar

   2014     2013  

Held at fair value

    

Nedbank of South Africa Limited

     (53,069     365,546   

The Standard Bank of South Africa Limited

     (491,192     68,439   
  

 

 

   

 

 

 
     (544,261     433,985   

The Company has entered into an interest rate swap with Nedbank of South Africa Limited to pay fixed interest as follows:

Effective date: 16 November 2012

Notional amount at 31 December 2014: $14,291,458.

The rate was fixed as follows:

(i) For the period from and including 31 December 2013 up to and excluding 31 December 2018, 7.20%

(ii) For the period from and including 31 December 2018 up to and excluding 31 December 2025, 9.00%.

The Company has entered into an interest rate swap with Standard Bank of South Africa Limited to pay fixed interest as follows:

Effective date: 16 November 2012

Notional amount at 31 December 2014: $27,744,390.

The rate was fixed as follows:

(i) For the period from and including 31 January 2014 up to and excluding 31 December 2018, 7.40%

(ii) For the period from and including 31 December 2018 up to and excluding 31 December 2028, 9.50%

The Company has designated the swap as a cash flow hedge and has satisfied itself as to the economic relationship between the swap and the variability in cash flows from borrowings.

 

In US dollar

   2014     2013  

Fair value hierarchy

    

Level 2

     (544,261     433,985   
  

 

 

   

 

 

 

The hierarchy categorizes the inputs used in valuation techniques into three levels. The hierarchy gives the highest priority to (unadjusted) quoted prices in active markets for identical assets or liabilities and the lowest priority to unobservable inputs.

 

F-245


Table of Contents

Level 1 inputs are quoted prices in active markets for identical assets or liabilities that the entity can access at the measurement date.

Level 2 inputs are inputs other than quoted market prices included within Level 1 that are observable for the asset or liability, either directly or indirectly.

Level 3 inputs are unobservable inputs for the asset or liability.

 

In US dollar

   2014     2013  

Reconciliation of hedging reserve

  

Opening balance

     433,985        (3,227,390

Effects of cashflow hedges (net of tax)

     (978,246     3,661,375   
  

 

 

   

 

 

 
     (544,261     433,985   
  

 

 

   

 

 

 

6. Accounts receivable

 

In US dollar

   2014      2013  

Trade receivables

     5,283,000         667,134   
  

 

 

    

 

 

 

Concentrations

The Company’s trade receivables is due solely from Eskom Holdings SOC Limited at 31 December 2014 and 2013.

Credit quality of trade receivables

Trade receivables are generally collected within 30 to 60 days which represents normal terms. Trade receivables are amounts due from Eskom Holdings SOC Limited, for the sale of electricity. The carrying value of trade receivables recorded in the financial statements represents the maximum exposure to credit risk.

 

F-246


Table of Contents

7. Borrowings

 

In US dollar

   2014      2013  

The Standard Bank of South Africa Limited

     

Klipheuwel-Dassiefontein Wind Energy Facility (RF) Proprietary Limited has a senior loan facility of $29.9 million with The Standard Bank of South Africa Limited which was entered into on 5 November 2012. The final utilization amounted to $29,369,290. The loan bears interest at JIBAR plus a margin of 4.05% and the capital is repayable in bi-annual instalments which commenced on 31 December 2014. Interest is paid quarterly while capital is repaid bi- annually. The loan matures on 31 December 2028.

     29,149,021         23,097,411   

Nedbank of South Africa Limited

     

Sevenstones 159 (RF) Proprietary Limited and Limarco 77 (RF) (Proprietary Limited) have senior loan facilities totaling $21.2 million with The Nedbank of South Africa Limited which was entered into on 5 November 2012. The final utilization amounted to $19,861,157. The loan bears interest at JIBAR plus a margin of 3.9% and the capital is repayable in bi-annual instalments which commenced on 30 September 2014, future instalments to occur at June and December. Interest is paid quarterly while capital is repaid bi-annually. The loan matures on 31 December 2028.

     19,154,100         19,118,801   

Industrial Development Corporation of South Africa Limited

     

Klipheuwel-Dassiefontein Wind Energy Facility (RF) Proprietary Limited has a senior loan facility of $12.8 million with Industrial Development Corporation of South Africa Limited which was entered into on 5 November 2012. The final utilization amounted to $12,586,839. The loan bears interest at a fixed rate of 7.7% plus a margin of 3.9% and the capital is repayable in bi-annual instalments which commenced on 31 December 2014. Interest is paid quarterly while capital is repaid bi-annually. The loan matures on 31 December 2028.

     12,492,437         9,898,890   

Industrial Development Corporation of South Africa Limited

     

Sevenstones 159 (RF) Proprietary Limited and Limarco 77 (RF) (Proprietary Limited) have senior loan facilities of $21.2 million with Industrial Development Corporation of South Africa Limited which was entered into on 5 November 2012. The final utilization amounted to $19,861,157. The loan bears interest at a fixed rate of 7.7% plus a margin of 3.8% and the capital is repayable in bi-annual instalments which commenced on 30 September 2014. Interest is paid quarterly while capital is repaid bi-annually. The loan matures on 31 December 2028.

     19,209,712         19,118,801   
  

 

 

    

 

 

 
     80,005,270         71,233,903   
  

 

 

    

 

 

 

 

In US dollar

   2014  

Payments due by period

  

Less than 1 year

     2,143,403   

1-2 years

     2,295,465   

2-3 yeas

     2,796,409   

3-4 years

     3,273,319   

4-5 years

     3,331,714   

After 5 years

     66,164,960   
  

 

 

 
     80,005,270   
  

 

 

 

 

F-247


Table of Contents

Security in favor of Senior Lenders

Security over the $85.1M (maximum amount) first ranking debt to be funded through the Facility Agreement and entered into between the Company and The Standard Bank of South Limited, Nedbank of South Africa Limited and the Industrial Development Corporation of South Africa Limited is as follows:

 

 

A special notarial bond and a general notarial bond registered over the entity’s present and future movable property for an amount of $92.7M plus an additional amount of $18.5M.

 

 

A mortgage bond registered as a first mortgage over the entity’s rights, title and interest in and to the notarial leases over the leased properties and notarial servitude over the servitude property.

 

 

The cession of all of the entity’s secured property, other than restricted property, to the Debt Guarantor as collateral security for the due, proper and punctual payment and performance of the secured obligations by the Companies.

Our facilities agreement with Nedbank of South Africa, Standard Bank of South Africa Limited and the Industrial Development Corporation of South Africa Limited, requires that following ratios are complied with on any Measurement Date:

 

 

The Historic Debt Service Cover Ratio and the Projected Debt Service Cover Ratio exceeds 1.20:1

 

 

The Loan Life Cover Ratio exceeds 1.20:1

 

 

The Project Life Cover Ratio exceeds 1.35:1

If the Debt Service Cover Ratio is between 1.21:1 and 1.30:1 during the first two years from scheduled commercial operation date (“COD”), the Company will be permitted to make distributions equal to 50% of the amount available for distribution (excess cash after funding of the debt service reserve account, the maintenance reserve account and in compliance with South African Companies Act) to the shareholders of the Company and the remaining 50% shall either be transferred to the Debt Service Reserve Account or be used to repay the Facility.

If the Debt Service Cover Ratio exceeds 1.30:1 during the first two years from scheduled COD date, the Company will be permitted to make a distribution equal to 100% of the amount available for distribution.

The first Scheduled Measurement Date relating to the above ratios was 31 December 2014, where all ratios were in compliance, if the ratio is not met then a distribution would not be permissible. Thereafter measurements will be performed bi-annually at each debt repayment date.

 

In US dollar

   2014      2013  

Non-current liabilities

     

At amortized cost

     77,861,867         69,678,122   
  

 

 

    

 

 

 

Current liabilities

     

At amortized cost

     2,143,403         1,555,781   
  

 

 

    

 

 

 
     80,005,270         71,233,903   
  

 

 

    

 

 

 

8. Asset retirement obligation

 

In US dollar

   2014      2013  

Opening balance

               

Capitalized in property, plant and equipment

     402,934           

Accretion

     17,886           
  

 

 

    

 

 

 
     420,820           
  

 

 

    

 

 

 

 

F-248


Table of Contents

An asset retirement obligation of $0.4M was recorded in 2014 from the construction of property, plant and equipment, due to a contractual obligation to remove all structures and other improvements from the leased property in such a manner that normal farming operations can be conducted on the property. The major parts of the carrying amount of the obligation relate to disposal of tower sections; removal of rebar; grid interface material recovery and MV cable extraction. The Company determined the obligations, based on detailed estimates, adjusted for factors that an outside third-party would consider (i.e. inflation, overhead and profit), escalated to the estimated closure dates and then discounted using a credit-adjusted risk-free interest rate of 13%. The Company has the obligation to remove the wind turbines and related equipment from the property at the end of the lease period. The remaining lease period is 23.25 years at 31 December 2014. The accretion of the liability and the amortization of the property and equipment will be recognized over the estimated lives of the assets.

9. Accounts payable

 

In US dollar

   2014      2013  

Trade payables

     3,689,723         10,437,919   
  

 

 

    

 

 

 

Trade payables are obligations to pay for goods or services that have been acquired in the ordinary course of business from suppliers.

Trade payables relating to the Engineer, Procure and Construct (“EPC”) contractor amounting to $3.7M will only be paid upon final completion of the project and are included in trade payables at 31 December 2014. During 2013 the Company was in the construction phase and the majority of payables related to the EPC contractor payments.

10. Revenue

 

In US dollar

   2014      2013  

Sale of electricity

     21,031,872           
  

 

 

    

 

 

 

Revenue is generated from the sale of electricity in South Africa to Eskom Holdings SOC Limited. The Company has Power Purchase Agreements with Eskom Holdings SOC Limited, backed by the Government of the Republic of South Africa, each for a period of 20 years after the scheduled Commercial Operation Date.

11. Interest income

 

In US dollar

   2014      2013  

Interest on bank balances

     853,805         4,896   
  

 

 

    

 

 

 

12. Interest expense

 

In US dollar

   2014      2013  

Interest on borrowings

     8,539,144           

Interest on bank balances

     1,410         1,028   

Asset retirement obligation accretion

     17,886           
  

 

 

    

 

 

 
     8,558,440         1,028   
  

 

 

    

 

 

 

 

F-249


Table of Contents

13. Taxation

 

In US dollar

   2014      2013  

Major components of the tax expense

     

Deferred tax

     

Reversing temporary differences

     1,169,961         (207,784
  

 

 

    

 

 

 

Reconciliation of tax benefit/(expense) to statutory tax rate

     

Income/(loss) before income taxes

     3,093,811         (840,819

Tax at the applicable tax rate of 28% (2013: 28%)

     866,267         (235,429

Tax effect of adjustments on taxable income

     

Non-deductible expenses

     303,694         27,645   
  

 

 

    

 

 

 

Tax expense/(benefit)

     1,169,961         (207,784
  

 

 

    

 

 

 

14. Commitments and contingencies

Contingent asset

The Company is involved in renewable energy and its business, of generating electricity from wind and solar power, has been certified in terms of the Clean Development Mechanism (CDM). The process allows for the reduction in carbon emissions to be converted to carbon credits after a verification process. The Certified Emission Reductions (CER’s) can be sold in the open market, no asset has been recorded during the years 31 December 2014 and 2013.

15. Operating lease

At the reporting date, the Company has commitments for future notarial and servitude lease payments over three land leases for the remaining term of the leases of 23.25 years as of 31 December 2014 amounting to:

 

 

the greater of $10,507 per turbine per year or 2% of gross revenue on the Klipheuwel-Dassiefontein Wind Energy Facility

 

 

0.5% of gross revenue on the Aries Solar PV Energy Facility

 

 

$17,933 per annum on the Konkoonsies Solar PV Energy Facility

The annual minimum payment amount of $10,507 and $17,933 increases annually with South African Inflation. The lease period can be renewed for a further 25 years at the end of the lease.

16. Related parties

 

In US dollar

   2014      2013  

Related party transactions

     

Reimbursement of development cost to related parties

     

BioTherm Energy Proprietary Limited

     2,007,061           
  

 

 

    

 

 

 

Administration fees paid to related parties

     

Friedshelf 1293 (RF) Proprietary Limited

     396,037         414,654   
  

 

 

    

 

 

 

BioTherm Operations and Maintenance (RF) Proprietary Limited

     1,847,030         1,889,323   
  

 

 

    

 

 

 

BTSA Netherlands Cooperatie U.A. (Netherlands)

     169,209           
  

 

 

    

 

 

 

 

F-250


Table of Contents

Biotherm Energy Proprietary Limited a fellow subsidiary Company is a development Company which developed and constructed the energy systems for each project Company to ready for use. Development costs incurred by the developer entity include costs such as environmental studies and impact assessments, technical advisors, milestone payments, EPC, and financial costs. The project companies reimburse the developer entity for costs incurred and services rendered. These costs were capitalized as property, plant and equipment in 2014.

Friedshelf 1293 (RF) Proprietary Limited a fellow subsidiary Company provides administrative services to the Company which includes submission of all compliance documentation as per the facility agreement, ensure that the companies are in compliance with all regulations and orders, and tax and accounting functions including maintenance of records, procurement of audit services and reporting. The term of the agreement extends to the expiration of the initial term of the Power Purchase Agreement being 20 years, however early termination may occur subject to notice. The fee charged is a fixed fee escalated annually at South African Inflation rate. The fee in 2014 was $0.2M, $0.1M and $0.1m for Klipheuwel-Dassiefontein Wind Energy Facility (RF) Proprietary Limited, Sevenstones 159 (RF) Proprietary Limited and Limarco 77 (RF) Proprietary Limited respectively and is recorded in the general and administrative costs in the Statement of Income and Comprehensive Loss.

BioTherm Operations and Maintenance (RF) Proprietary Limited a fellow subsidiary Company provides operations and maintenance services to the energy facilities. These services mainly include the supervision of the operations and maintenance activities at the facilities and supervision of service providers. The term is five years from the commercial operations date being 07 May 2014 for Klipheuwel-Dassiefontein Wind Energy Facility (RF) Proprietary Limited. The fee charged is a fixed fee escalated annually at South African Inflation rate, the fee incurred in 2014 was $0.4M and is recorded in operations management fee in the Statement of Income and Comprehensive Loss.

In addition BioTherm Operations and Maintenance (RF) Proprietary Limited provides construction management services which includes review of engineering and construction related documents and formulate an implementation strategy with overall contract management of the construction process. The agreement will terminate at the Final Completion date of the construction of the facility, this is the date that all work and all other obligations under the EPC Contract are fully and completely performed in accordance with the terms of the EPC Contract. The fee charged is a fixed fee escalated annually at South African Inflation rate. The fee in 2014 was $0.7M, $0.4M and $0.4M for Klipheuwel-Dassiefontein Wind Energy Facility (RF) Proprietary Limited, Sevenstones 159 (RF) Proprietary Limited and Limarco 77 (RF) Proprietary Limited respectively and is recorded in plant operating costs in the Statement of Income and Comprehensive Loss.

BTSA Netherlands Cooperatie U.A. the majority shareholder provides executive management services through policy and decision making and representation on the board in addition to finance and administration support. The agreement may be terminated at any point by mutual consent and will terminate automatically on the day that BTSA ceases to be an equity shareholder in the Company (which will terminate on sale of the Company—see Note 17). The fee charged is a fixed fee escalated annually at South African Inflation rate. The fee in 2014 was $0.1M, $0.04M and $0.04m for Klipheuwel-Dassiefontein Wind Energy Facility (RF) Proprietary Limited, Sevenstones 159 (RF) Proprietary Limited and Limarco 77 (RF) Proprietary Limited respectively and is recorded in the general and administrative costs in the Statement of Income and Comprehensive Loss.

17. Subsequent events

The Company has evaluated subsequent events through April 3, 2015, the date the combined financial statements were available to be issued. 0n 5 February 2015 Klipheuwel-Dassiefontein Wind Energy Facility (RF) Proprietary Limited declared a dividend of $5.3M, on 24 March 2015 Sevenstones 159 (RF) Proprietary Limited declared a dividend of $1.7M. and on 31 March 2015 Limarco 77 (RF) Proprietary Limited declared a dividend of $1.7m.

 

F-251


Table of Contents

On 3 April 2015, BTSA entered into securities purchase agreements to sell its interests in the Company to a subsidiary of TerraForm Global, Inc., an indirect subsidiary of SunEdison, Inc., for $56.3 million in aggregate consideration.

No other subsequent events were identified during this period that would have a material impact on the combined financial statements.

 

F-252


Table of Contents

Independent auditors’ report

The Boards of Directors

Honiton Energy XIL Holdings Limited and Honiton Energy BAV Holdings Limited:

We have audited the accompanying combined financial statements of Honiton Energy XIL Holdings Limited and subsidiary and Honiton Energy BAV Holdings Limited and subsidiary (collectively referred to as the “Combined Entity”), which comprise the combined balance sheets as of December 31, 2013 and 2014, and the related combined statements of comprehensive loss, changes in shareholder’s deficit, and cash flows for the years then ended, and the related notes to the combined financial statements.

Management’s responsibility for the financial statements

Management is responsible for the preparation and fair presentation of these combined financial statements in accordance with U.S. generally accepted accounting principles; this includes the design, implementation, and maintenance of internal control relevant to the preparation and fair presentation of combined financial statements that are free from material misstatement, whether due to fraud or error.

Auditors’ responsibility

Our responsibility is to express an opinion on these combined financial statements based on our audits. We conducted our audits in accordance with auditing standards generally accepted in the United States of America. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the combined financial statements are free from material misstatement.

An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the financial statements. The procedures selected depend on the auditors’ judgment, including the assessment of the risks of material misstatement of the financial statements, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the entity’s preparation and fair presentation of the financial statements in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity’s internal control. Accordingly, we express no such opinion. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluating the overall presentation of the financial statements.

We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion.

Opinion

In our opinion, the combined financial statements referred to above present fairly in all material respects, the financial position of the Combined Entity as of December 31, 2013 and 2014, and the results of its operations and its cash flows for the years then ended in accordance with U.S. generally accepted accounting principles.

/s/ KPMG Huazhen LLP

Beijing, China

May 5, 2015

 

F-253


Table of Contents

Honiton Energy XIL Holdings Limited and Honiton Energy BAV Holdings Limited

Combined balance sheets

(Amounts in thousands)

 

      December 31,  
      2013     2014  

ASSETS:

     US$        US$   

Current assets

    

Cash

     5,233        4,366   

Restricted cash

     3,238        4,584   

Accounts receivable, net of allowance for doubtful accounts

     13,874        14,008   

Notes receivable

     3,772        4,300   

Amounts due from related parties

     4,024        4,032   

Prepayments and other current assets

     3,775        2,853   
  

 

 

   

 

 

 

Total current assets

     33,916        34,143   
  

 

 

   

 

 

 

Property, plant and equipment, net

     224,315        208,838   

Other non-current assets

     4,890        4,303   
  

 

 

   

 

 

 

Total assets

     263,121        247,284   
  

 

 

   

 

 

 

LIABILITIES AND SHAREHOLDER’S DEFICIT:

    

Current portion of long-term bank loans

     10,809        41,514   

Accounts payable

     14,492        11,436   

Amounts due to related parties

     179,625        180,765   

Accrued expenses and other current liabilities

     1,805        1,606   
  

 

 

   

 

 

 

Total current liabilities

     206,731        235,321   
  

 

 

   

 

 

 

Long-term bank loans, excluding current portion

     69,864        28,096   

Other non-current liabilities

     16,125        15,211   
  

 

 

   

 

 

 

Total liabilities

     292,720        278,628   
  

 

 

   

 

 

 

Shareholder’s deficit

    

Share capital

              

Additional paid-in capital

     8,918        8,918   

Accumulated deficit

     (58,819     (60,049

Accumulated other comprehensive income

     20,302        19,787   
  

 

 

   

 

 

 

Total shareholder’s deficit

     (29,599     (31,344
  

 

 

   

 

 

 

Commitments and contingencies (note 7)

              

Total liabilities and shareholder’s deficit

     263,121        247,284   

 

 

The accompanying notes are an integral part of these combined financial statements.

 

F-254


Table of Contents

Honiton Energy XIL Holdings Limited and Honiton Energy BAV Holdings Limited

Combined statements of comprehensive loss

(Amounts in thousands)

 

     

Year ended December 31,

 
   2013      2014  
     US$      US$  

Revenues

     25,832         24,672   

Cost of revenues

     (16,577      (16,741
  

 

 

 

Gross profit

     9,255         7,931   

General and administrative expenses

     (2,085      (1,923
  

 

 

 

Operating income

     7,170         6,008   

Interest income

     33         66   

Interest expense

     (11,339      (10,674

Foreign currency exchange gain (loss), net

     (641      3,324   
  

 

 

 

Loss before income tax expense

     (4,777      (1,276

Income tax benefit

     46         46   
  

 

 

 

Net loss

     (4,731      (1,230

Foreign currency translation adjustments, net of nil income taxes

     4,367         (515
  

 

 

 

Comprehensive loss

     (364      (1,745

 

 

 

 

The accompanying notes are an integral part of these combined financial statements.

 

F-255


Table of Contents

Honiton Energy XIL Holdings Limited and Honiton Energy BAV Holdings Limited

Combined statements of changes in shareholder’s deficit

(Amounts in thousands)

 

      Share
capital
     Additional
paid-in
capital
     Accumulated
deficit
    Accumulated
other
comprehensive
income
    Total
shareholder’s
deficit
 
     US$      US$      US$     US$     US$  

Balance at January 1, 2013

             8,918         (54,088     15,935        (29,235

Net loss

                     (4,731            (4,731

Foreign currency translation adjustments, net of nil income taxes

                            4,367        4,367
  

 

 

    

 

 

    

 

 

   

 

 

   

 

 

 

Balance at December 31, 2013

             8,918         (58,819     20,302        (29,599

Net loss

                     (1,230            (1,230

Foreign currency translation adjustments, net of nil income taxes

                            (515     (515
  

 

 

    

 

 

    

 

 

   

 

 

   

 

 

 

Balance at December 31, 2014

             8,918         (60,049     19,787        (31,344

 

 

 

 

The accompanying notes are an integral part of these combined financial statements.

 

F-256


Table of Contents

Honiton Energy XIL Holdings Limited and Honiton Energy BAV Holdings Limited

Combined statements of cash flows

(Amounts in thousands)

 

     

Year ended December 31,

 
   2013      2014  
     US$      US$  

Cash flows from operating activities

     

Net loss

     (4,731      (1,230

Adjustments to reconcile net loss to net cash provided by operating activities:

     

Depreciation and amortization

     14,924         15,079   

Deferred income tax benefit

     (46      (46

Foreign currency exchange loss (gain), net

     641         (3,324

Changes in operating assets and liabilities:

     

Restricted cash

     (3,211      (1,346

Notes receivable related to customer payments

     (3,602      (543

Accounts receivable

     2,949         (184

Amounts due from related parties

     (93      (8

Prepayments and other current assets

     (1,321      919   

Other non-current assets

     1,236         554   

Accounts payable

     (4,294      (3,009

Amounts due to related parties

     3,951         4,778   

Accrued expenses and other current liabilities

     (1,750      (148

Other non-current liabilities

     (199      (859
  

 

 

 

Net cash provided by operating activities

     4,454         10,633   

Cash flows from investing activities

     

Purchase of property, plant and equipment

     (259      (369
  

 

 

 

Net cash used in investing activities

     (259      (369
  

 

 

 

Cash flows from financing activities:

     

Proceeds from shareholder’s loans

     5,322           

Repayment of bank loans

     (7,398      (10,791
  

 

 

 

Net cash used in financing activities

     (2,076      (10,791

Effect of foreign currency exchange rate changes on cash

     276         (340
  

 

 

 

Net increase (decrease) in cash

     2,395         (867

Cash at beginning of year

     2,838         5,233   
  

 

 

 

Cash at end of year

     5,233         4,366   
  

 

 

 

Supplemental disclosure of cash flow information:

     

Interest paid

     (8,321      (5,897

 

 

The accompanying notes are an integral part of these combined financial statements.

 

F-257


Table of Contents

Honiton Energy XIL Holdings Limited and Honiton Energy BAV Holdings Limited

Notes to the combined financial statements

(Amounts in thousands)

1. Nature of operations, significant concentrations and risks

Nature of operations

Honiton Energy XIL Holdings Limited (“Honiton XIL”) and Honiton Energy BAV Holdings Limited (“Honiton BAV”), each of which was incorporated in 2008 in Hong Kong Special Administration Region (the “Hong Kong” or “HK SAR”), through their respective wholly-owned subsidiaries, Honiton Energy (Xilinguole) Co., Ltd. (“Honiton Xilinguole”) and Honiton Energy (Baotou) Co., Ltd. (“Honiton Baotou”) (collectively referred to hereinafter as the “Combined Entity”), are principally engaged in developing, constructing, owning and operating wind energy projects in the People’s Republic of China (“PRC”).

As of December 31, 2014, the Combined Entity operates a total capacity of 148.5 megawatts (MW) power output in operation located in Inner Mongolia, PRC, including Bailimiao wind farm Phase I, Bailimiao wind farm Phase II and Xiwu wind farm Phase I.

Revenue concentration

The Combined Entity derives all its revenues from its sole customer, Inner Mongolia Power (Group) Co., Ltd., for the wind power dispatched in Inner Mongolia. The Combined Entity expects revenues from the customer to continue to represent a substantial portion of its revenue in the future. Any factors adversely affecting the wind power industry in the PRC or the business operation of the customer will have a material effect on the Combined Entity’s business, financial position and results of operations.

2. Summary of significant accounting policies

a. Basis of presentation

The accompanying combined financial statements have been prepared in accordance with U.S. generally accepted accounting principles (“US GAAP”).

Honiton XIL and Honiton BAV were under the common control of Honiton Energy Caymans Limited (“HECL”) during the years ended December 31, 2013 and 2014. Accordingly, the combined financial statements include the combined results of operations and the combined financial position of 1) Honiton XIL and its wholly owned PRC subsidiary, Honiton Xilinguole and 2) Honiton BAV and its wholly owned PRC subsidiary, Honiton Baotou. For the purpose of the combined statements of shareholder’s deficit, the amounts of reported share capital and additional paid-in capital represent the aggregate of the share capital and additional paid-in capital of Honiton XIL and Honiton BAV.

The accompanying combined financial statements were prepared on a going concern basis, which contemplates the realization of assets and the satisfaction of liabilities in the normal course of business. The realization of assets and the satisfaction of liabilities in the normal course of business are dependent on, among other things, the Combined Entity’s ability to operate profitably, to generate cash flows from operations, and the Combined Entity’s ability to pursue alternative financing arrangements to support its working capital requirements.

During the years ended December 31, 2013 and 2014, the Combined Entity has suffered net loss of US$4,731 and US$1,230, respectively. As of December 31, 2014, the Combined Entity had a shareholder’s deficit of US$31,344.

 

F-258


Table of Contents

The Combined Entity mainly relies on the cash provided by operating activities, bank loans and advances from related parties to finance its investing activities and working capital requirements. In particular, the amount due to related parties in the amount of US$180,765 as of December 31, 2014 is due on demand, and US$41,514 of bank loan will mature in July 2015.

Honiton Energy Caymans Limited (“HECL”), the shareholder of the Combined Entity, has provided a letter of financial support to the Combined Entity including the conversion of the US$180,765 due to HECL as of December 31, 2014 into the share capital of Honiton Energy (Xilinguole) Co. Ltd. and Honiton Energy (Baotou) Co. Ltd, as necessary.

On May 5, 2015, HECL entered into a share purchase agreement to sell all of its equity interests in Honiton XIL and Honiton BAV to a subsidiary of TerraForm Global, Inc. (“Acquirer”). In connection with the proposed acquisition of the Combined Entity, the Acquirer has provided a letter to HECL stating that the Acquirer will take necessary actions to cause the Combined Entity to make payment when the bank loan matures.

Taking into consideration the commitments of HECL and the Acquirer to provide the Combined Entity the necessary financial support, management believes the Combined Entity will be able to meet its commitments and liabilities when they fall due for a period extending at least one year beyond the date of the financial statements.

b. Basis of consolidation

The accompanying combined financial statements include the financial statements of Honiton XIL and its wholly owned subsidiary Honiton Xilinguole, and Honiton BAV and its wholly owned subsidiary Honiton Baotou. All significant intercompany balances and transactions have been eliminated in preparing the combined financial statements.

c. Use of estimates

The preparation of the combined financial statements in accordance with US GAAP requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities at the balance sheet dates and the reported amounts of revenues and expenses during the reporting periods. Actual results could materially differ from those estimates. Significant items subject to such estimates and assumptions include the useful lives of property, plant and equipment and land use rights, the collectibility of accounts receivable, the realizability of deferred income tax assets, the recoverability of the carrying amounts of property, plant and equipment and land use rights, the accruals for tax uncertainties and other contingencies. The Combined Entity bases its estimates on historical experience and various other factors believed to be reasonable under the circumstances, the results of which form the basis for making judgments about the carrying value of assets and liabilities that are not readily apparent from other sources. The current economic environment has increased the degree of uncertainty inherent in those estimates and assumptions.

d. Foreign currency

The accompanying combined financial statements are presented in the U.S. dollar (“US$”). The functional currency of Honiton XIL and Honiton BAV is US$, whereas the functional currency of Honiton Xilinguole and Honiton Baotou is the Renminbi (“RMB”).

Transactions denominated in foreign currencies other than the functional currency are translated into the functional currency at the exchange rates prevailing at the dates of the transactions. Monetary assets and liabilities denominated in foreign currencies are translated into the functional currency using the applicable exchange rates at the balance sheet dates. The resulting exchange differences are recorded in “foreign currency exchange gain (loss), net” in the combined statements of comprehensive loss.

 

F-259


Table of Contents

Assets and liabilities of the entities with functional currencies other than US$ are translated into US$ using the exchange rate on the balance sheet date. Revenues and expenses are translated into US$ at average rates prevailing during the reporting period. The resulting foreign currency translation adjustments are recorded in accumulated other comprehensive income within shareholder’s deficit.

Since RMB is not a fully convertible currency, all foreign exchange transactions involving RMB must take place either through the People’s Bank of China (the “PBOC”) or other institutions authorized to buy and sell foreign exchange. The exchange rates adopted for the foreign exchange transactions are the rates of exchange quoted by the PBOC.

e. Cash and restricted cash

Cash consists of the following:

 

      December 31,  
      2013      2014  
     US$      US$  

RMB denominated bank deposits with financial institutions in the PRC

     4,722         4,300   

US dollar denominated bank deposits with financial institutions in HK SAR

     505         60   

US dollar denominated bank deposits with financial institutions in the PRC

     6         6   
  

 

 

 

Total

     5,233         4,366   

 

 

Cash deposits in bank that are restricted as to withdrawal or usage for up to 12 months are reported as restricted cash in the combined balance sheets and excluded from cash in the combined statements of cash flows. Cash deposits that are restricted for period beyond 12 months from the balance sheet date are included in other non-current assets in the combined balance sheets. Cash deposits that are pledged as collateral for long-term bank loans are reported as restricted cash and amounted to US$3,238 and US$3,251 as of December 31, 2013 and 2014, respectively (note 5). Cash deposits totaling US$1,704 were restricted due to the arbitration and lawsuit as of December 31, 2014 (note 7), of which US$1,333 is included in restricted cash and US$371 is included in other non-current assets.

f. Notes receivable

Notes receivable represent bank acceptance bills endorsed by the customer to the Combined Entity for the payment of wind power generated by the Combined Entity. The Combined Entity receives payments from the financial institutions upon maturity of the bills, which is normally 3-6 months.

g. Accounts receivable

Accounts receivable are recorded at the invoiced amount and do not bear interest. The Combined Entity maintains an allowance for doubtful accounts for estimated losses inherent in its accounts receivable portfolio. In establishing the required allowance, management considers historical losses adjusted to take into account current market conditions and customer’s financial condition, the amount of receivables in dispute, accounts receivables aging and current collection patterns. Account balances are charged off against the allowance after all means of collection have been exhausted and the potential for recovery is considered remote. The Combined Entity does not have any off-balance-sheet credit exposure related to its customer. As of December 31, 2013 and 2014, there was no allowance for doubtful accounts.

 

F-260


Table of Contents

h. Property, plant and equipment, net

Property, plant and equipment are recorded at cost. Depreciation is calculated on the straight-line method over the following estimated useful lives of the assets:

 

Buildings

     20 years   

Machinery and equipment

     10~20 years   

Equipment and furniture

     3~5 years   

Vehicles

     5 years   

 

 

Costs incurred in the construction of property, plant and equipment, including an allocation of interest expense incurred, are capitalized and transferred into their respective asset category when the assets are ready for their intended use, at which time depreciation commences.

Ordinary maintenance and repairs are charged to expenses as incurred, and replacements and betterments are capitalized. When items are retired or otherwise disposed of, income is charged or credited for the difference between the net book value of the item disposed and proceeds realized thereon.

i. Land use rights

Land use rights represent the cost of rights to use land in the PRC. Land use rights are carried at cost and charged to expense on a straight-line basis over the respective periods of the rights of 50 years. As of December 31, 2013 and 2014, the carrying amount of land use rights was US$808 and US$788, respectively, which is included in other non-current assets in the combined balance sheets.

Amortization expense of land use rights for the years ended December 31, 2013 and 2014 were US$17 and US$17, respectively, which is included in cost of revenues in the combined statements of comprehensive loss. The annual amortization expense of land use rights is estimated to be US$17 for each of the following 5 years.

As of December 31, 2013 and 2014, the Combined Entity has pledged its land use rights with a total carrying amount of US$808 and US$788, respectively, to secure bank borrowings (note 5).

j. Impairment of long-lived assets

Long-lived assets, such as property, plant and equipment and land use rights, are reviewed for impairment whenever events or changes in circumstances indicate that the carrying amount of an asset may not be recoverable. If circumstances require a long-lived asset or asset group be tested for possible impairment, the Combined Entity first compares undiscounted cash flows expected to be generated by that asset or asset group to its carrying value. If the carrying value of the long-lived asset or asset group is not recoverable on an undiscounted cash flow basis, an impairment is recognized to the extent that the carrying value exceeds its fair value. Fair value is determined through discounted cash flow models, quoted market values or third-party independent appraisals, as considered necessary. Assets to be disposed are reported at the lower of carrying amount or fair value less costs to sell, and are no longer depreciated. No impairment of long-lived assets was recognized for the years ended December 31, 2013 and 2014.

k. Revenue recognition

The Combined Entity’s revenues are generated through the sales of wind power pursuant to terms of power purchase agreements (“PPAs”) or other contractual arrangements. The Combined Entity is required to sell all wind power generated by the facilities at specific rates as determined by the PPAs. The Combined Entity recognizes revenue from the sale of wind power when the electricity is generated and delivered.

 

F-261


Table of Contents

The Combined Entity recognizes revenue when all of the following criteria are met: (i) persuasive evidence of an arrangement exists; (ii) delivery or performance has occurred; (iii) the sales price is fixed or determinable; and (iv) collectability is reasonably assured.

The Combined Entity’s revenue-generating activity consists of long-term PPAs with the customer, under which the customer agrees to purchase all of the power generated. The Combined Entity has determined that PPAs should be accounted for as operating leases after evaluating the lease classification criteria. As customer payments under a power purchase agreement are dependent on power generation, they are considered contingent rentals and are excluded from future minimum annual lease payments. Revenue from PPAs is recognized based on the actual amount of power generated at rates specified under the contracts, assuming the other revenue recognition criteria discussed above are met.

l. Employee benefits

The Combined Entity’s full-time PRC employees participate in government-mandated defined contribution plans pursuant to which certain pension benefits, medical care, unemployment insurance, employee housing fund and other welfare benefits are provided to employees. The Combined Entity accrues for these benefits based on a certain percentage of the employees’ salaries as stipulated by PRC labor rules and regulations. The costs of the Combined Entity’s obligations to the defined contribution plans are charged to the combined statements of comprehensive loss when the related employee service is provided and amounted to US$174 and US$202 for the years ended December 31, 2013 and 2014, respectively. The Combined Entity has no other obligation for the payment of employee benefits associated with these plans.

m. Government grants

Government grants are non-reciprocal transfers of monetary or non-monetary assets from the government to the Combined Entity.

A government grant is recognized when there is reasonable assurance that the grant will be received and that the Combined Entity will comply with the conditions attaching to the grant.

A government grant related to an asset is recognized initially as deferred income and amortized to profit or loss on a straight-line basis over the useful life of the asset. A grant that compensates the Combined Entity for expenses to be incurred in the future is recognized initially as deferred income, and released to profit or loss in the periods in which the expenses are recognized. A grant that compensates the Combined Entity for expenses already incurred is recognized in profit or loss immediately.

For the years ended December 31, 2013 and 2014, US$848 and US$859 representing the amortization of government grant of US$16,715 related to the equipment purchased in prior years was credited against depreciation expense which is included in cost of revenues in the combined statements of comprehensive loss. As of December 31, 2013 and 2014, the balance of unamortized government grant was US$14,173 and US$13,263, respectively, of which the current portion of US$910 and US$859 was included in accrued expenses and other current liabilities, and the non-current portion US$13,263 and US$12,404 was included in other non-current liabilities in the combined balance sheets, respectively.

n. Operating leases

The Combined Entity leases premises for offices under non-cancellable operating leases. Leases with escalated rent provisions are recognized on a straight-line basis commencing with the beginning of the lease term. There are no capital improvement funding, other lease concessions or contingent rent in the lease agreements.

 

F-262


Table of Contents

o. Income taxes

Income taxes are accounted for under the asset and liability method. Deferred income tax assets and liabilities are recognized for the future tax consequences attributable to differences between the financial statements carrying amounts of existing assets and liabilities and their respective tax bases and tax losses and tax credit carryforwards. Deferred income tax assets and liabilities are measured using enacted tax rates expected to apply to taxable income in the years in which those temporary differences are expected to be recovered or settled. The effect on deferred income tax assets and liabilities of a change in tax rates is recognized in the combined statements of comprehensive loss in the period that includes the enactment date. A valuation allowance is provided to reduce the carrying amount of deferred income tax assets if it is considered more likely than not that some portion or all of the deferred income tax assets will not be realized.

The Combined Entity recognizes in the combined financial statements the impact of a tax position, if that position is more likely than not of being sustained upon examination, based on the technical merits of the position. Recognized income tax positions are measured at the largest amount that is greater than 50% likely of being realized. Changes in recognition or measurement are reflected in the period in which the change in judgment occurs. The Combined Entity has elected to classify interest and penalties related to unrecognized tax benefits, if and when required, as part of income tax expense in the combined statements of comprehensive loss.

p. Commitments and contingencies

In the normal course of business, the Combined Entity is subject to loss contingencies, such as legal proceedings and claims arising out of the ordinary course of its business. An accrual for a loss contingency is recognized when it is probable that a liability has been incurred and the amount of loss can be reasonably estimated. If a potential material loss contingency is not probable but is reasonably possible, or is probable but cannot be estimated, then the nature of the contingent liability, together with an estimate of the range of possible loss if determinable and material, is disclosed.

q. Fair value measurements

The Combined Entity applied the provisions of Accounting Standards Codification (“ASC”) Topic 820, Fair Value Measurements and Disclosures (“ASC Topic 820”), for fair value measurements of financial assets and financial liabilities and for fair value measurements of nonfinancial items that are recognized or disclosed at fair value in the financial statements on a recurring and nonrecurring basis. ASC Topic 820 defines fair value as the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date. When determining the fair value measurements for assets and liabilities required or permitted to be recorded at fair value, the Combined Entity considers the principal or most advantageous market in which it would transact and it considers assumptions that market participants would use when pricing the asset or liability. ASC Topic 820 also establishes a framework for measuring fair value and expands disclosures about fair value measurements.

ASC Topic 820 establishes a fair value hierarchy that requires an entity to maximize the use of observable inputs and minimize the use of unobservable inputs when measuring fair value. ASC Topic 820 establishes three levels of inputs that may be used to measure fair value. The hierarchy gives the highest priority to unadjusted quoted prices in active markets for identical assets or liabilities (Level 1 measurements) and the lowest priority to measurements involving significant unobservable inputs (Level 3 measurements). The three levels of the fair value hierarchy are as follows:

 

 

Level 1 inputs are quoted prices (unadjusted) in active markets for identical assets or liabilities that the Combined Entity has the ability to access at the measurement date.

 

F-263


Table of Contents
 

Level 2 inputs are inputs other than quoted prices included within Level 1 that are observable for the asset or liability, either directly or indirectly.

 

 

Level 3 inputs are unobservable inputs for the asset or liability.

The carry amount of cash, restricted cash, notes receivable, accounts receivable, amounts due from related parties, accounts payable, amounts due to related parties, accrued expenses and other current liabilities as of December 31, 2013 and 2014, approximate their fair values.

Long-term bank loans’ fair value is based on the amount of future cash flows associated with each debt instrument discounted at the Combined Entity’s current borrowing rate for similar debt instruments of comparable terms. The carrying value of the long-term loans approximate their fair values as all the long-term bank loans carry variable interest rates which approximate rates currently offered by the Combined Entity’s bankers for similar debt instruments of comparable maturities.

r. Recently issued accounting standards

The Financial Accounting Standards Board (“FASB”) issued Accounting Standards Updates (“ASU”) No. 2014-09, Revenue from Contracts with Customers, in May 2014. ASU 2014-09 requires an entity to recognize revenue to depict the transfer of promised goods or services to customers in an amount that reflects the consideration to which the entity expects to be entitled in exchange for those goods or services. An entity should also disclose sufficient quantitative and qualitative information to enable users of financial statements to understand the nature, amount, timing, and uncertainty of revenue and cash flows arising from contracts with customers. The new standard is effective for annual reporting periods beginning after December 15, 2017. The Combined Entity has not yet determined the impact of the new standard on its current policies for revenue recognition.

3. Property, plant and equipment, net

Property, plant and equipment consists of the following:

 

      December 31,  
      2013     2014  
     US$     US$  

Machinery and equipment

     272,251        271,371   

Buildings

     3,082        3,282   

Equipment and furniture

     293        311   

Vehicles

     354        294   
  

 

 

   

 

 

 
     275,980        275,258   

Less: Accumulated depreciation

     (51,665     (66,420
  

 

 

   

 

 

 

Property, plant and equipment, net

     224,315        208,838   

 

 

Depreciation expense for property, plant and equipment was US$14,907 and US$15,062 for the years ended December 31, 2013 and 2014, respectively. As of December 31, 2013 and 2014, the Combined Entity has pledged property, plant and equipment with a total carrying amount of US$221,480 and US$205,965, respectively, to secure bank borrowings.

4. Income taxes

No provision for Hong Kong profits tax was made for Honiton XIL and Honiton BAV, as they did not have any assessable profits arising in or derived from Hong Kong in 2013 and 2014.

 

F-264


Table of Contents

Honiton Xilinguole and Honiton Baotou incorporated in the PRC are subject to PRC Enterprise Income Tax (“EIT”) on taxable income at the statutory income tax rate of 25% in 2013 and 2014.

The components of loss (income) before income tax expense are as follows:

 

      Year ended December 31,  
      2013        2014  
     US$        US$  

Hong Kong

     4,608           2,640   

PRC

     169           (1,364
  

 

 

      

 

 

 

Total loss before income tax expense

     4,777           1,276   

 

 

The PRC income tax benefit recognized in the combined statements of comprehensive loss consists of deferred income tax benefit in the amount of US$46 for the years ended December 31, 2013 and 2014. Income tax benefit for other jurisdictions is nil.

The actual income tax benefit reported in the combined statements of comprehensive loss for the years ended December 31, 2013 and 2014 differs from the amount computed by applying the PRC statutory income tax rate to income (loss) before income taxes due to the following:

 

      Year ended December 31,  
      2013      2014  
     US$      US$  

PRC statutory income tax rate

     25.0%         25.0%   

Increase (decrease) in effective income tax rate resulting from:

     

Non-PRC entities not subject to income tax

     (24.1%      (51.7%

Non-deductible general and administrative expenses

     (0.6%      (0.7%

Change in valuation allowance

     4.6%         33.5%   

Others

     (3.9%      (2.5%
  

 

 

    

 

 

 

Actual income tax benefit

     1.0%         3.6%   

 

 

The principal components of the Combined Entity’s deferred income tax assets and liabilities are as follows:

 

      December 31,  
      2013     2014  
     US$     US$  

Gross deferred income tax assets:

    

Accrued expenses and other current liabilities

     249        235   

Other non-current liabilities

     3,316        3,101   

Tax loss carryforwards

     6,921        6,660   
  

 

 

   

 

 

 

Total gross deferred income tax assets

     10,486        9,996   

Valuation allowance

     (10,257     (9,767
  

 

 

   

 

 

 

Deferred income tax assets, net

     229        229   
  

 

 

   

 

 

 

Gross deferred income tax liabilities:

    

Property, plant and equipment

     (811     (765
  

 

 

   

 

 

 

Total gross deferred income tax liabilities

     (811     (765
  

 

 

   

 

 

 

Net deferred income tax liabilities-noncurrent (included in other non-current liabilities)

     (582     (536

 

 

 

F-265


Table of Contents

The movements of the valuation allowance are as follows:

 

      Year ended December 31,  
      2013     2014  
     US$     US$  

Balance at the beginning of the year

     (10,160     (10,257

Decrease of valuation allowance

     221        428   

Expiration of tax loss

            24   

Foreign currency translation adjustment

     (318     38   
  

 

 

   

 

 

 

Balance at the end of the year

     (10,257     (9,767

 

 

The valuation allowance as of December 31, 2013 and 2014 was primarily provided for the deferred income tax assets of Honiton Xilinguole and Honiton Baotou, which was at a cumulative loss position. In assessing the realization of deferred income tax assets, management considers whether it is more likely than not that some portion or all of the deferred income tax assets will not be realized. The ultimate realization of deferred income tax assets is dependent upon the generation of future taxable income during the periods in which those temporary differences become deductible or utilizable. Management considers the scheduled reversal of deferred tax liabilities (including the impact of available carryforward periods), projected future taxable income and tax planning strategies in making this assessment. In view of the cumulative losses of Honiton Xilinguole and Honiton Baotou, valuation allowance was provided against its deferred income tax assets as of December 31, 2013 and 2014, which in the judgment of the management, are not more likely than not to be realized. As of December 31, 2014, the Combined Entity’s PRC entities had tax losses carry forwards of US$26,640. Tax losses of US$1,960, US$7,697, US$9,946, US$3,590, and US$3,447 will expire, if unused, by 2015, 2016, 2017, 2018 and 2019, respectively.

The Company recognizes unrecognized tax benefits in the amount of US$2,279 and US$2,270 relating to foreign currency exchange gains as of December 31, 2013 and 2014, respectively, which were included in other non-current liabilities. The unrecognized tax benefits represent the estimated income tax expenses the Company would be required to pay, should its foreign currency exchange gains be recognized in accordance with tax laws and regulations. Nil interest and penalty expenses were recorded for the years ended December 31, 2013 and 2014.

According to the PRC Tax Administration and Collection Law, the statute of limitations is three years if the underpayment of taxes is due to computational errors made by the taxpayer or the withholding agent. The statute of limitations will be extended to five years under special circumstances where the underpayment of taxes is more than RMB 100,000. In the case of transfer pricing issues, the statute of limitations is 10 years. The income tax returns of the Combined Entity are open to examination by the PRC state and local tax authorities for the tax years from 2010 to 2014. There is no statute of limitations in the case of tax evasion.

 

F-266


Table of Contents

5. Bank loans

Long-term bank loans consist of the following:

 

      December 31,  
      2013     2014  
     US$     US$  

Long-term bank loans:

    

Loans from Standard Chartered Bank

     40,682        37,265   

Loans from Minsheng Bank

     39,991        32,345   
  

 

 

   

 

 

 
     80,673        69,610   

Less: current portion

     (10,809     (41,514
  

 

 

   

 

 

 

Total long-term bank loans

     69,864        28,096   

 

 

In May 2009, Honiton Baotou entered into a 12-year RMB330 million (US$54 million) loan agreement with China Minsheng Bank at a floating interest rate of the five-year RMB benchmark loan rates as published by PBOC plus an additional surcharge of 10% of the interest rate per annum. The loan is pledged by the bank account used for accounts receivable collection, accounts receivable, property, plant and equipment, and land use right of the Bailimiao wind farm Phase I and the 100% paid-in capital of Honiton Baotou. Pursuit to the loan agreement, no distribution of dividend is allowed if Honiton Baotou fails to pay the interest due. As of December 31, 2013 and 2014, there is no unpaid interest to China Minsheng Bank. The principal of US$4 million, US$5 million, US$5 million, US$5 million, US$5 million, US$6 million, and US$2 million will be repaid in 2015, 2016, 2017, 2018, 2019, 2020 and 2021, respectively.

In March 2011, Honiton Baotou and Honiton Xilinguole entered into an 12-month RMB362 million (US$59 million) loan agreement with Standard Chartered Bank at a floating interest rate of the one-to three-year RMB benchmark loan rates as published by PBOC plus an additional surcharge of 15%-70% of the interest rate per annum. As Honiton Baotou and Honiton Xilinguole failed to repay the loan on the original maturity date, the outstanding loan principal and interest of RMB283 million (US$46 million) was extended to July 2015 and the interest rate was based on the one-to three-year Renminbi benchmark loan rates plus an additional surcharge of 30% of the interest rate per annum. The loan is pledged by bank accounts of HECL, property, plant and equipment, land use rights and beneficial rights of insurance of the Bailimiao wind farm Phase II and Xiwu wind farm Phase I, the 100% paid-in capital of Honiton Xilinguole, the 100% issued shares of Honiton XIL and Honiton BAV. US$37 million was outstanding as of December 31, 2014.

6. Related party transactions

As of and for the years ended December 31, 2013 and 2014, the Combined Entity had related party transactions and balances with 1) Honiton Energy Caymans Limited (“HECL”, the immediate parent company of the Combined Entity) 2) Honiton Energy Barbados Ltd., which is a wholly owned subsidiary of HECL, and 3) Windco Cayman Holdings Limited, which is the shareholder of HECL. The significant related party transactions are summarized as follows:

 

              Year ended December 31,  
              2013      2014  
            US$      US$  

Interest-bearing loans provided by HECL

     (a      5,322           

Interest expenses incurred for the shareholder’s loans

     (a      4,448         4,776   

Repayment of the expenses paid by HECL on behalf of the Combined Entity

     (b      497           

Expenses paid by the Combined Entity on behalf of HECL

     (c      93         8   

 

 

 

F-267


Table of Contents

Balances with related parties as of December 31, 2013 and 2014 are as follows:

 

             December 31,  
             2013      2014  
           US$      US$  

Amounts due from related parties:

       

Honiton Energy Caymans Limited

     (c     4,017         4,025   

Honiton Energy Barbados Ltd.

       7         7   
    

 

 

 

Total amounts due from related parties

       4,024         4,032   
    

 

 

 

Amounts due to related parties:

       

Honiton Energy Caymans Limited

     (a )(b)      179,249         180,389   

Windco Cayman Holdings Limited

       376         376   
    

 

 

 

Total amounts due to related parties

       179,625         180,765   

 

 

 

(a)   HECL provided interest-free loans of US$8,500 and interest-bearing loans of US$24,323 at the rate of 15% to the Combined Entity before January 1, 2013. During the years ended December 31, 2013 and 2014, HECL provided loans at the rate of 15% to the Combined Entity in the amount of US$5,322 and nil, respectively. All of the loans are unsecured and unguaranteed. The loans are due and payable on demand. The interest expenses incurred by the Combined Entity were US$4,448 and US$4,776 for the years ended December 31, 2013 and 2014, respectively.

 

(b)   HECL paid construction cost, installation cost and miscellaneous expenses in the amount of US$125,319 on behalf of the Combined Entity before January 1, 2013. The Combined Entity repaid US$497 and nil to HECL during the years ended December 31, 2013 and 2014, respectively. The amount is due and payable on demand.

 

(c)   During the years ended December 31, 2013 and 2014, the Combined Entity paid expenses in the amount of US$93 and US$8, respectively on behalf of HECL.

7. Commitments and contingencies

Operating lease commitments

Future minimum lease payments under non-cancellable operating lease agreements for office premises as of December 31, 2014 were as follows:

 

      US$  

Year ending December 31,

  

2015

     60   

2016

     51   

Thereafter

       
  

 

 

 

Total

     111   

 

 

Rental expenses incurred under operating leases for the years ended December 31, 2013 and 2014 were US$215 and US$86, respectively.

 

F-268


Table of Contents

Legal proceedings

The Combined Entity is the party in one arbitration and the defendant in one lawsuit with one vendor who is the wind turbine and maintenance service provider to the Combined Entity. The vendor filed the arbitration and lawsuit against Honiton Baotou and Honiton Xilingguole in the PRC on August 21, 2014 and January 23, 2015, respectively, seeking claims in the amount of US$1,332 and US$10,724 for the provision of maintenance service and sales of wind turbine and relevant interests, respectively. The arbitration and lawsuit are in preliminary stage and US$1,064 and US$8,398 was accrued based on management’s best estimate of the probable outcomes as of December 31, 2014. In addition, cash in bank in the amount of US$1,704 was restricted for the arbitration and lawsuit as of December 31, 2014. On January 14, 2015, Honiton Baotou filed a claim against the vendor in the arbitration, seeking a claim in the amount of US$1,096 for the overpaid maintenance service fee and relevant interests.

Each of Honiton Baotou and Honiton Xilingguole filed an arbitration against this vendor on March 9, 2015, seeking claims in the amount of US$2,297 and US$1,066 for the undelivered spare parts and relevant interests, respectively.

8. Subsequent events

On May 5 2015, Honiton Energy Caymans Limited entered into share purchase agreements to sell its interests in the Combined Entity to a subsidiary of TerraForm Global, Inc., an indirect subsidiary of SunEdison, Inc., for US$105 million in cash, subject to changes upon the closing of the share purchase.

Management has considered subsequent events through May 5, 2015, which was the date the combined financial statements were available to be issued.

 

F-269


Table of Contents

Independent auditors’ report

To the Shareholders, Directors and Management of

Renova Energia S.A. and

Bahia Eólica Participações S.A., Salvador Eólica Participações S.A. and

Energética Serra da Prata S.A.

São Paulo—SP

We have audited the accompanying combined balance sheets of Renova Energy Projects I, or the “Group”, as of December 31, 2014 and 2013 and January 1, 2013, and the related combined statements of income, comprehensive income, statements of changes in parent’s net investment and cash flows for the years ended December 31, 2014 and 2013, and the related notes to the combined financial statements.

Management’s responsibility for the combined financial statements

Management is responsible for the preparation and fair presentation of these combined financial statements in accordance with International Financial Reporting Standards as issued by the International Accounting Standards Board; this includes the design, implementation, and maintenance of internal control relevant to the preparation and fair presentation of the combined financial statements that are free from material misstatements, whether due to fraud or error.

Auditors’ responsibility

Our responsibility is to express an opinion on these combined financial statements based on our audit. We conducted our audit in accordance with auditing standards generally accepted in the United States of America. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the combined financial statements are free from material misstatement, whether due to fraud or error.

An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the combined financial statements. The procedures selected depend on the auditor’s judgment, including the assessment of the risks of material misstatement of the combined financial statements, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the Group’s preparation and fair presentation of the combined financial statements in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Group’s internal control. Accordingly, we express no such opinion. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluating the overall presentation of the combined financial statements.

We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion.

Opinion

In our opinion, the combined financial statements referred to above present fairly, in all material respects, the financial position of Renova Energy Projects I as of December 31, 2014 and 2013 and January 1, 2013, and the results of its operations and its cash flows for the years ended December 31, 2014 and 2013, in accordance with International Financial Reporting Standards as issued by the International Accounting Standards Board.

 

F-270


Table of Contents

Emphasis of matters

As discussed in Note 3 to the combined financial statements, property plant and equipment of the Group´s power generation assets are depreciated over their estimated economic useful lives, considering facts and assumptions as described therein. As the regulatory agency or the grantor of the Group´s authorizations issue new information or decisions, the depreciation rates for such assets may change. Our opinion is not modified with respect to this matter.

As discussed in Note 2 to the combined financial statements, the Group has not operated as a separate stand-alone entity. The accompanying combined financial statements have been prepared from the accounting records of the Group’s individual legal entities and Renova Energia S.A. (“Renova”). The combined financial statements also include allocations of expenses for certain operating and corporate functions provided to the Group by Renova. Therefore, the combined financial statements do not necessarily reflect what the combined results of operations, financial position and cash flows would have been had the Group operated as a separate, stand-alone entity during the periods presented. Our opinion is not modified with respect to this matter.

/s/ Deloitte Touche Tohmatsu

Deloitte Touche Tohmatsu Auditores Independentes

Salvador—BA, Brazil

May 6, 2015

 

F-271


Table of Contents

Renova Energy Projects I

Combined balance sheets as of December 31, 2014 and 2013 and January 1, 2013

 

Amounts in thousands of Brazilian Reais—R$    Note      12/31/14      12/31/13      01/01/13  

ASSETS

           

CURRENT

           

Cash and cash equivalents

     4         34,109         20,799         13,496   

Short-term investments

     4         24,477         40,567         30,056   

Trade receivables

     5         22,475         20,921         21,152   

Prepaid and recoverable taxes

     12         3,037         1,257         428   

Restricted deposits

     9                 27,192         25,363   

Energy balance-CCEE/Eletrobras

     6         199                   

Prepaid and other current assets

        2,299         2,608         3,487   
     

 

 

 

Total current assets

        86,596         113,344         93,982   
     

 

 

 

NONCURRENT ASSETS

           

Property, plant and equipment

     7         1,388,090         1,445,584         1,498,218   

Restricted deposits

     9         160,488         123,531         82,340   

Energy balance-CCEE/Eletrobras

     6         1,824                   

Prepaid and recoverable taxes

     12         2,211         948         906   

Other assets

        35         35         35   
     

 

 

 

Total noncurrent assets

        1,552,648         1,570,098         1,581,499   
     

 

 

 

TOTAL ASSETS

        1,639,244         1,683,442         1,675,481   

 

 

 

 

The accompanying notes are an integral part of these combined financial statements.

 

F-272


Table of Contents

Renova Energy Projects I

Combined balance sheets as of December 31, 2014 and 2013 and January 1, 2013—(Continued)

 

Amounts in thousands of Brazilian Reais—R$    Note      12/31/14      12/31/13      01/01/13  

LIABILITIES AND PARENT’S NET INVESTMENT

           

CURRENT LIABILITIES

           

Trade payables

        18,460         13,441         62,157   

Borrowings—current portion

     8         70,071         68,760         47,931   

Taxes payable

     11         6,594         4,396         4,300   

Energy balance—CCEE/Eletrobras

     6         22,339         4,290         4,714   

Commitments for social and environmental costs

     13         3,685         2,017         3,439   

Other accounts payable

        35         53         6   
     

 

 

 

Total current liabilities

        121,184         92,957         122,547   
     

 

 

 

NONCURRENT LIABILITIES

           

Borrowings

     8         893,046         953,856         1,000,125   

Energy balance—CCEE/Eletrobras

     6         13,397         11,671         10,938   

Commitments for social and environmental costs

     13         2,222                   
     

 

 

 

Total noncurrent liabilities

        908,665         965,527         1,011,063   
     

 

 

 

PARENT’S NET INVESTMENT

     14         609,395         624,958         541,871   
     

 

 

 

TOTAL LIABILITIES AND PARENT’S NET INVESTMENT

        1,639,244         1,683,442         1,675,481   

 

 

 

 

The accompanying notes are an integral part of these combined financial statements.

 

F-273


Table of Contents

Renova Energy Projects I

Combined income statements for the years ended December 31, 2014 and 2013

 

Amounts in thousands of Brazilian Reais—R$    Note      2014      2013  

NET REVENUE

     15         221,474         227,019   

COST OF SERVICES PROVIDED

        

Depreciation and amortization

        (68,068      (66,912

Operating costs

        (29,314      (11,051

Charges for use of distribution system

        (12,973      (11,431
     

 

 

 
     16         (110,355      (89,394
     

 

 

 

GROSS PROFIT

        111,119         137,625   

General and administrative expenses

        (18,556      (17,095

Other operating income, net

        92         1,213   
     

 

 

 
     16         (18,464      (15,882
     

 

 

 

OPERATING INCOME

        92,655         121,743   

FINANCE INCOME (EXPENSES)

        

Finance income

     17         19,963         12,144   

Finance expenses

     17         (75,972      (80,059
     

 

 

 
        (56,009      (67,915
     

 

 

 

PROFIT BEFORE INCOME AND SOCIAL CONTRIBUTION TAXES

        36,646         53,828   

Income and social contribution taxes

     10         (12,417      (9,968
     

 

 

 

NET INCOME

        24,229         43,860   

 

 

 

The accompanying notes are an integral part of these combined financial statements.

 

F-274


Table of Contents

Renova Energy Projects I

Combined statements of comprehensive income for the years ended

December 31, 2014 and 2013

 

Amounts in thousands of Brazilian Reais—R$    2014      2013  

Net Income

     24,229         43,860   

Other comprehensive income

               
  

 

 

 

TOTAL COMPREHENSIVE INCOME

     24,229         43,860   

 

 

 

 

The accompanying notes are an integral part of these combined financial statements.

 

F-275


Table of Contents

Renova Energy Projects I

Combined statements of changes in parent’s net investment for the years ended December 31, 2014 and 2013

 

Amounts in thousands of Brazilian Reais—R$    Parent’s net
investment
 

AT JANUARY 1, 2013

     541,871   

Net Income

     43,860   

Dividends

     (12,000

Others transfers from parent, net

     51,227   
  

 

 

 

AT DECEMBER 31, 2013

     624,958   
  

 

 

 

Net Income

     24,229   

Dividends

     (52,050

Others transfers from parent, net

     12,258   
  

 

 

 

AT DECEMBER 31, 2014

     609,395   

 

 

 

 

The accompanying notes are an integral part of these combined financial statements.

 

F-276


Table of Contents

Renova Energy Projects I

Combined statements of cash flows for the years ended December 31, 2014 and 2013

 

Amounts in thousands of Brazilian Reais—R$    Note      2014     2013  

CASH FLOWS FROM OPERATING ACTIVITIES

       

Net Income

        24,229        43,860   

Adjustments to reconcile Net Income to cash provided by operating activities:

       

Depreciation and amortization

     7         68,073        66,919   

Interest on borrowings

     17         69,725        73,446   

Debt issuance costs

     8         617        615   

Interest on short-term investments and restricted deposits

     17         (19,963     (12,103

(Increase) decrease in operating assets:

       

Trade receivables

        (1,554       

Prepaid and recoverable taxes

        (1,780     (829

Other assets

        (954     1,068   

Increase (decrease) in operating liabilities:

       

Trade payables

        6,394        (50,138

Taxes payable

        10,831        8,095   

Energy balance-CCEE/Eletrobras, net

     6         17,752        309   

Other payables

        (18     47   

Other cash flows from operating activities:

       

Income and social contribution taxes paid

        (8,633     (7,999

Interest paid on borrowings

     8         (69,721     (54,532
     

 

 

 

Net cash provided by operating activities

        94,998        68,758   
     

 

 

 

CASH FLOWS FROM INVESTING ACTIVITIES

       

Short-term investments

        18,764        (7,940

Restricted deposits

        7,524        (33,488

Purchase of property, plant and equipment

        (8,064     (14,285
     

 

 

 

Net cash provided by (used in) investing activities

        18,224        (55,713
     

 

 

 

CASH FLOWS FROM FINANCING ACTIVITIES

       

Proceeds from borrowings

     8         7,313        2,752   

Payments on borrowings

     8         (67,433     (47,721

Net contribution from parent

        12,258        51,227   

Payment of dividends

     14         (52,050     (12,000
     

 

 

 

Net cash used in financing activities

        (99,912     (5,742
     

 

 

 

INCREASE IN CASH AND CASH EQUIVALENTS

        13,310        7,303   
     

 

 

 

Cash and cash equivalents at beginning of year

     4         20,799        13,496   

Cash and cash equivalents at end of year

     4         34,109        20,799   
     

 

 

 

INCREASE IN CASH AND CASH EQUIVALENTS

        13,310        7,303   

 

 

The accompanying notes are an integral part of these combined financial statements.

 

F-277


Table of Contents

Renova Energy Projects I

Notes to the combined financial statements

For the years ended December 31, 2014 and 2013

(Thousands of Brazilian Reais – R$, unless otherwise stated)

1. Organization and description of business

Renova Energy Projects I (the “Group” or the “Company”) comprises the operating assets, liabilities and operating activities of Energética Serra do Prata S.A. (“Espra”), Salvador Eólica Participações S.A. (“Salvador”), Bahia Eólica Participações S.A. (“Bahia”), all indirect-wholly-owned Brazilian subsidiaries of Renova Energia S.A. (“Renova” or “Parent”), a Brazilian listed company engaged in the development, implementation and operation of projects for the generation of energy from renewable sources, including wind, small hydroelectric power plants (“SHPPs”) and solar, and in the sale of power and related activities.

The Group is engaged in the construction and operation of renewable energy generation projects through SHPPs and wind energy facilities, all located in Brazil, and conducts its operations through various wholly-owned project companies under authorizations granted to them: 30 years from 2003 in the case of small hydroeletric power plants and 35 years from 2010 in the case of wind energy facilities.

Small Hydroelectric Power Plants—Through Espra, the Group sells electric energy generated from its Serra da Prata Hydroelectric Complex, consisting of three SHPPs located in the State of Bahia, which began operations in 2008. All energy generated from the complex is sold under long-term power purchase agreements (“PPAs”) with Eletrobras—Centrais Elétricas Brasileiras S.A., under the Brazilian Alternative Electric Power Source Incentive Program (Programa de Incentivo às Fontes Alternativas de Energia Elétrica—PROINFA). The PPAs have an original term of 20 years through 2028 and include a fixed price per megawatt hour, adjusted annually for inflation based on the change in the Brazilian General Market Price Index—IGPM.

Wind Energy Facilities—Through Bahia and Salvador, the Group sells electric energy generated from its 14 wind energy facilities located in the State of Bahia, which began operations in 2012. All energy generated from the complexes are sold under long-term PPAs with the Câmara de Comercialização de Energia Elétrica—CCEE (Electric Power Trade Chamber), under PROINFA. The PPAs have an original term of 20 years through 2032 and include a fixed price per megawatt hour, adjusted annually for inflation based on the change in the Brazilian Consumer Price Index—IPC-A.

The Group’s operating assets, consisting of its SHPPs and wind energy generation facilities, are held through the following wholly-owned project companies:

Centrais Eólicas Candiba S.A.

Centrais Eólicas Igaporã S.A.

Centrais Eólicas Ilhéus S.A.

Centrais Eólicas Licínio de Almeida S.A.

Centrais Eólicas Pindaí S.A.

Centrais Eólicas Alvorada S.A.

Centrais Eólicas Guanambi S.A.

Centrais Eólicas Guirapá S.A.

Centrais Eólicas Nossa Senhora Conceição S.A.

Centrais Eólicas Pajeú do Vento S.A.

Centrais Eólicas Planaltina S.A.

Centrais Eólicas Porto Seguro S.A.

 

F-278


Table of Contents

Centrais Eólicas Rio Verde S.A.

Centrais Eólicas Serra do Salto S.A.

2. Basis of presentation

The Group has prepared these combined financial statements in accordance with International Financial Reporting Standards (“IFRS”) as issued by the International Accounting Standards Board (“IASB”). The Group has applied IFRS 1, First-Time Adoption of International Financial Reporting Standards (“IFRS1”) in its adoption of IFRS. The transition date (“Transition Date”) is January 1, 2013. The Group has applied IFRS standards effective for the period ended as of December 31, 2014 to all years presented in these combined financial statements. The Group has never prepared financial statements or financial information on the carve-out basis of preparation presented herein. Prior to the Group’s first-time adoption of IFRS, it reported financial information to Renova in accordance with accounting practices adopted in Brazil (BR GAAP). The Group also follows the guidance in the Accounting Manual for the Brazilian Electricity Industry and standards established by the Brazilian National Agency for Electric Energy (Agência Nacional de Energia Elétrica—ANEEL). The financial information is presented in thousands of Brazilian Reais (R$), unless otherwise stated.

The Group applied certain mandatory exceptions as applicable for first-time IFRS adopters. The Group elected not to apply the optional exceptions for first-time adopters. Estimates made by the Group in preparing its first IFRS financial statements reflect the facts and circumstances which existed at the time such estimates were made. Accordingly, the estimates made by the Group to prepare these combined financial statements are consistent with those made in the historical reporting of financial information to Renova.

Since the Group has not previously prepared financial statements, the combined financial statements do not include any IFRS 1 first-time adoption reconciliations.

The financial information with respect to the Group is reflected in the individual legal entities that comprise the Group, which were all under the common control and management of Renova for all periods presented. These combined financial statements have been prepared from the accounting records of Renova and reflect the cash flows, revenues, expenses, assets, and liabilities of these individual legal entities. All transactions and balances between the individual legal entities within the Group have been eliminated in combination.

Because the separate legal entities that comprise the Group were not and are not held by a single legal entity, Parent’s net investment is shown in lieu of shareholders’ equity in these combined financial statements. Parent’s net investment represents the cumulative net investment by Renova in the Group through that date. The impact of transactions between the Group and Renova that were not historically settled in cash, including certain intercompany loans, are also included in Parent’s net investment (see note 14).

During the periods presented, the Group functioned as part of the larger group of companies controlled by Renova, and accordingly, Renova performed certain operating and corporate overhead functions for the Group. These functions include, but are not limited to, executive oversight, legal, finance, human resources, information technology, internal audit, financial reporting, tax planning and investor relations. The costs of such services have been allocated to the Group based on the most relevant allocation method to the service provided, primarily based on relative percentage of revenue, installed capacity or headcount. Management believes such allocations are reasonable; however, they may not be indicative of the actual expense that would have been incurred had the Group been operating as a separate entity apart from Renova. The cost allocated for these functions is included in general and administrative expenses in the combined income statements for the historical periods presented. A complete discussion of the Group’s relationship with Renova and its affiliated entities, together with the cost allocations, is included in note 14 to the combined financial statements.

 

F-279


Table of Contents

As the Group did not operate as a stand-alone entity in the past, these combined financial statements may not be indicative of the Group’s future performance and do not necessarily reflect what its combined results of operations, financial position and cash flows would have been had the Group operated as a separate entity apart from Renova during the periods presented.

Management of the Group authorized the issuance of these combined financial statements on May 6, 2015.

3. Summary of significant accounting policies

The principal accounting policies applied in the preparation of these combined financial statements are set out below. Policies have been consistently applied to all years presented, unless otherwise stated.

Accounting Convention—The combined financial statements are prepared on a historical cost basis except for certain financial instruments that are recorded at fair value or stated otherwise.

Use of Estimates—The preparation of the combined financial statements pursuant to IFRS requires management to make judgments, estimates and assumptions that affect the application of accounting policies and the reported amounts of assets, liabilities, income and expenses. Estimates and assumptions are reviewed on an ongoing basis, and are based on historical experience as well as changes in scenario and other factors considered relevant by management. Actual results could differ from those estimates.

Revisions in relation to accounting estimates are recognized in the period in which the estimates are reviewed, and in any future periods affected.

The areas where assumptions and estimates are subject to higher uncertainties and exposed to a risk that could result in a material adjustment if such assumptions and estimates change within the next fiscal year include:

Impairment of assets—Management concluded that there are no internal or external evidences that would justify the recognition of a provision for impairment of property, plant and equipment, intangible assets.

Useful lives and residual values of property, plant and equipment—The Group reviews annually the estimated useful lives and residual values of property, plant and equipment and intangible assets with finite useful lives, and the depreciation and amortization rates currently used are considered representative of the useful lives of these assets.

Commitments for social and environmental costs—This estimate is recognized based on estimated costs required for the obtaining the licenses for installation and operation of power plants, that were required by Brazilian regulatory authorities. These costs are associated with the basic environmental project or are in addition to this, where the main items are the reforestation of areas, acquisition and regularization of rural areas, restoration and improvement of road infrastructure and the deployment of units conservation.

Valuation of financial instruments—Note 18 contains detailed information on the main assumptions used to measure the fair values of financial instruments and a sensitivity analysis of such assumptions. Management believes that the selected valuation techniques and the assumptions used are appropriate to determine the fair values of financial instruments.

Basis of Combination—The combined financial statements include the accounts of all subsidiaries in which entities in the Group have a controlling financial interest. Control is achieved when the Group has power over the investees; is exposed, or has rights, to variable returns from its involvement with the investee; and has the ability to use its power to affect its returns. During the periods presented, the Group did not have any investments in entities other than its wholly-owned project company subsidiaries.

 

F-280


Table of Contents

Common Control Transactions—The assets (including goodwill, if any) and liabilities acquired or transferred from entities under common control with the Group are recorded at the carrying value recognized by the transferor. The difference, if any, between the carrying value of the net assets acquired or transferred and the consideration paid by the Group is accounted for as an adjustment to Parent´s net investment.

Functional Currency—The functional and reporting currency of the Group and the individual financial statements of the entities included in the combined financial statements is the Brazilian real (R$), the primary economic environment in which they operate. Transactions denominated in currencies other than the functional currency, if any, are measured using exchange rates prevailing at the date of the transactions. Monetary assets and liabilities in foreign currencies are translated to the functional currency using period-end exchange rates. Resulting foreign currency exchange gains and losses from the settlement or translation of foreign currency transactions and balances are recognized in the combined statements of income. During the periods presented, the Group did not enter into any transactions denominated in currencies other than the Brazilian real.

Classification of assets and liabilities as current and noncurrentAssets that are expected to be realized or are intended for sale or consumption within twelve months as of the end of the reporting periods are classified as current assets. Liabilities that are expected to be settled within twelve months as of the end of the reporting periods are classified as current. All other assets and liabilities are classified as noncurrent.

Financial Instruments—Financial assets and liabilities are recognized when the Group or its subsidiaries are parties to the underlying contracts and are initially measured at fair value.

Financial assets—The Group classifies its financial assets as follows:

Held-to-maturity investments—These are assets with fixed or determinable cash flows and maturities in which the Group intends to hold to maturity. The Group has designated its restricted deposits (see note 9) in this category. They are recorded at amortized cost plus interest using the effective interest method, net of any impairment.

Loans and receivables—These are assets with fixed or determinable payments that are not traded or quoted in an active market. The Group´s trade receivables (see note 5) are designated in this category, and are initially recognized at fair value (generally the original invoice amount), and are subsequently recorded at amortized cost, net of any impairment.

Fair value through profit or loss—These are derivatives or assets that are acquired principally for selling in the short term. The Group´s short-term investments have been designated in this category as part of its overall cash management strategy. These assets are recorded at fair value, with changes recognized in the combined statements of income.

Financial assets are derecognized when the rights to receive cash flows from the investments have expired or have been transferred and the Group has transferred substantially all the risks and rewards of ownership.

Impairment of financial assets—The Group assesses at the end of each period whether there is objective evidence that financial assets are impaired. A financial asset is considered impaired and impairment losses are incurred when there is objective evidence of an impairment as a result of events occurring after the initial recognition of the asset, and that these events have an impact on the future cash flows of the asset that can be reliably estimated. If impaired, financial assets are written down to their net recoverable amounts with a corresponding loss recognized in the combined income statements. If, in a subsequent period, the amount of the impairment loss decreases as a result of events subsequent to the recording of the impairment, a reversal of the previous impairment loss is recognized in the combined income statements.

 

F-281


Table of Contents

Financial liabilities—The Group´s financial liabilities consist principally of trade payables and borrowings and are recorded initially at fair value, net of applicable transaction costs, and subsequently measured at amortized cost plus interest, as applicable.

Derivative financial instruments—Derivative financial instruments are recorded at fair value with subsequent changes value recorded in the combined income statements, unless they are designated in a qualifying cash flow or net investment hedging relationship. For the periods presented, the Group did not contract or have any outstanding derivative financial instruments.

Offsetting—Financial assets and liabilities are offset and recorded net in the combined balance sheets when there is a legally enforceable right to offset the recognized amounts and there is an intention to settle on a net basis or realize the asset and settle the liability simultaneously.

Property, plant and equipment Property, plant and equipment consist of land, the Group´s energy generation assets, and construction in progress, which are measured at the historical purchase or construction cost, less accumulated depreciation and accumulated impairment losses, when necessary.

The cost of self-constructed assets includes the cost of materials and direct labor, and any other costs to bring the assets to a working condition for their intended use. Financing costs, consisting of interest expense on borrowings and amortization of deferred financing costs, net of finance income earned on unused financing proceeds as applicable, are capitalized during the construction phase until the asset is ready for its intended use.

Expenditures for major additions and improvements are capitalized, while minor replacements, maintenance and repairs are expensed as incurred.

Property, plant and equipment are depreciated on a straight-line basis over the estimated economic useful life of each component from the date the asset is placed in service and ready for its intended use. The estimated useful lives used in the determination of the depreciation rates consider the manuals and guides of ANEEL, which approximate the useful lives of these assets.

For the SHPPs, the Group considers these rates appropriate since, based on a legal assessment of the prevailing legislation and management’s assessment of ANEEL Permission Resolution granting a license to operate as an independent power generator, the Group will be indemnified for the residual value of the assets upon termination of these licenses, if not renewed. Management considers the renewal of operating licenses probable. As the regulatory agency issues new information or decisions, the current depreciation rates for such assets may be changed.

The following summarizes the estimated useful lives of the Group´s property, plant and equipment.

 

Category    Useful
lives in years
 

Reservoirs, dams and watermains

     43   

Buildings, civil works and improvements

     26 to 37   

Machinery and equipment

     21 to 32   

Other

     7 to 19   

 

 

According to Brazilian electricity regulation, those assets and facilities used in power generation, transmission, distribution and sale of power are linked to these services and cannot be removed, sold, assigned or pledged without the prior and express authorization of the regulatory body.

 

F-282


Table of Contents

Impairment of property, plant and equipmentThe Group reviews the carrying amounts of its fixed and intangible assets to determine if there are any indications that the assets might be impaired. The Group estimates the recoverable amount as the higher of its fair value less costs to sell and value in use. Estimated future cash flows are discounted to present value to determine the value in use at the pretax discount rate that reflects a current market assessment rate of the time value of money and the risks specific to the asset for which the future cash flow estimate was not adjusted. Where it is not possible to estimate the recoverable amount of an individual asset, the Group estimates the recoverable amount of the cash-generating unit to which the asset belongs.

If the recoverable amount of an asset (or cash-generating unit) is estimated to be less than its carrying amount, the carrying amount of the asset (or cash-generating unit) is reduced to its estimated recoverable amount, with a corresponding loss immediately recognized in profit or loss. If a previously recognized impairment loss reverses sometime in the future, the carrying amount of the asset (or cash-generating unit) is increased to the revised estimate of its recoverable value, provided that it does not exceed the carrying amount that would have been obtained if no impairment loss had been recognized for the asset (or cash-generating unit) in prior years. A reversal of an impairment loss is recognized immediately in income.

During the periods presented, the Group did not recognize any impairment losses.

Cash and Cash EquivalentsIn the combined balance sheets, cash and cash equivalents include cash on hand and other short-term, highly-liquid investments with original maturities of three months or less, which are subject to an insignificant risk of change in value, and are used to manage the Group´s short-term obligations

Trade Receivables—Trade receivables are recorded at amounts billed for energy, adjusted for any write-offs and provisions for impairment, if necessary.

Restricted Deposits—Restricted deposits represent cash and highly-liquid investments maintained at financial institutions which are restricted as to their use pursuant to the terms of certain of the Group´s borrowings agreements. Restricted deposit balances with maturity or restriction periods of greater than one year are classified as non-current. Changes in the restricted deposit balances are reflected as investing activities in the combined statements of cash flows.

Borrowings—Borrowings are recognized initially at fair value, net of related issuance and transaction costs. Interest is recognized over the period of the borrowings using the effective interest method. Accrued and unpaid interest is recorded as part of the recorded amount of borrowings.

Trade Payables—Trade payables represent obligations to pay for goods or services acquired in the normal course of business, principally consisting of amounts spent on maintenance and operating costs of the Group´s power generation plants.

ProvisionsA provision is recognized for present obligations (legal or constructive) as a result of past events, for which the amount of the obligation can be reliably estimated and it is probable that an outflow of resources will be required to settle the obligation.

The amounts recognized as provisions represent the best estimate of the consideration required to settle the present obligation at the end of each reporting period, taking into account the risks and uncertainties surrounding the obligation. When a provision is measured based on the estimated cash flows to settle an obligation, its carrying amount corresponds to the present value of such cash flows (where the effect of the time value of money is material).

When some or all of the economic benefits required to settle a provision are expected to be recovered from a third party, an asset is recognized if, and only if, reimbursement is virtually certain and the amount can be reliably measured.

 

F-283


Table of Contents

Commitments for social and environmental costsIn connection with the development of its energy generation projects, the Group has assumed commitments for social and environmental costs to be incurred as condition for obtaining the related licenses and permits for operations. These obligations are recorded at the net present value of the estimated future costs associated with these commitments, and a corresponding charge is capitalized as part of the project assets, when the obligations are incurred. Over time the liability is accreted to its expected future value. That portion of the liability expected to be paid or settled within 12 months is classified as a current liability. The capitalized asset cost is depreciated over the estimated useful life with the related project assets.

Revenue RecognitionThe Group´s revenue derives from the sale of electric energy under long-term power purchase agreements and is recorded based on the quantity of the electricity delivered at the contracted rates, net of applicable federal sales taxes (PIS and COFINS). These rates are generally fixed under the terms of the PPAs and are adjusted annually for inflation. The remaining term of the PPAs at December 31, 2014 was between 14 and 18 years.

Energy Balance CCEE/Eletrobras—The terms of the PPAs with Eletrobras (SHPPs) and CCEE (wind energy) each establish separate mechanisms for the settlement of amounts due from or payable to the parties, representing the differences between the actual volume of electricity generated by the Group as compared to the contracted volumes.

In the case of the Eletrobras PPAs, differences between the amount of electricity generated and that sold in the CCEE environment are adjusted and offset in the monthly billings with Eletrobras in the subsequent year by CCEE.

In the case of the CCEE PPAs, differences in the volumes of actual electricity generated and the contracted volumes within a defined tolerance of 90-130% are accumulated monthly and are available to offset future differences in volumes during the subsequent four-year period; after which time, the accumulated balance will be liquidated. Differences outside of the defined tolerances are liquidated in the subsequent year.

These resulting differences between the actual amount of electricity generated and that billed, result in deferred payable and unbilled receivable amounts with the respective parties until they are liquidated, which are recorded in Energy balance—CCEE/Eletrobras in the combined balance sheets. The related balances are not eligible for offset among the separate PPAs. The outstanding balances are subject to monetary inflation updates in accordance with the applicable inflation index as defined in the respective PPAs, which is recorded as part of finance income / expense in the combined income statements.

Seasonality—There are substantial seasonal variations in monthly and annual volumes, which depend fundamentally on the amount of rain that falls in each rainy season and the wind conditions which are variable and difficult to predict. As such, operating results vary significantly from period to period depending on the weather conditions during the periods in question.

Finance income and expenses

Finance Income—Finance income is principally represented by interest income on the Group´s cash and cash equivalents balances, short-term investments and restricted deposit accounts. Interest income is recognized using the effective interest method.

Finance Expenses—Finance expenses are principally represented by interest on borrowings, contractual monetary inflation adjustments for certain financial assets and liabilities, as well as other financing fees and taxes. Borrowing costs that are not attributable to the acquisition, construction or production of a qualifying asset are recognized in income under the effective interest method.

 

F-284


Table of Contents

Income and Social Contribution TaxesThe legal entities comprising the Group file separate tax returns as required by Brazilian tax law. As such, income taxes have been determined for purposes of the combined financial statements on a separate return basis. Use of this method may result in differences when the sum of the amounts allocated to the Group is compared with amounts presented in the Parent´s consolidated statements.

In general, income tax expense in Brazil is computed based on the combined statutory tax rate of 34% applied to adjusted taxable income, comprised of 25% for income tax (15% base rate plus a 10% surtax for income in excess of R$240) and 9% for social contribution tax (a tax levied on income). This method is referred to as the “real profit” method.

As permitted under Brazilian tax legislation, all of the Group´s operating project companies, where virtually all of the Group´s revenue and substantially all of its operating profit is generated, have elected to be taxed under an alternative “deemed profit” method. Under this regime, entities with annual gross revenues not in excess of R$ 78.000 may elect to be taxed based on deemed taxable income derived from a defined percentage of revenues. Taxable income is computed based on 8% of annual gross operating revenues and 100% of annual finance revenues. This deemed taxable income is then subject to income tax at the rate of 15%, plus a surtax of 10% for deemed income in excess of R$240 and social contribution tax at the rate of 12%.

The Group´s tax expense for the year is comprised of current and deferred income tax, as applicable, in accordance with the applicable tax regime elected by the Group legal entities.

Current income tax—The current income tax expense is calculated on the basis of the tax laws enacted or substantively enacted at the balance sheet date in accordance with the applicable elections made by the Group legal entities.

The Group recognizes liabilities for uncertain tax positions when it is more likely than not that an outflow will occur to settle the position, based on management´s estimation of the expected settlement outcome. These liabilities, along with related interest and penalties as applicable, are recorded as part of taxes payable in the combined balance sheets.

Deferred income tax—Deferred income tax is recognized, as applicable, using the liability method, for tax loss carryforwards and temporary differences arising between the tax basis of assets and liabilities and their carrying amounts in the combined financial statements. Deferred income tax is not accounted for if it arises from initial recognition of an asset or liability in a transactions, other than a business combination, that at the time of the transaction does not affect either accounting or tax profit or loss. Deferred income tax assets are recognized only to the extent that it is probable that future taxable profit will be available against which the temporary difference or tax loss carryforward can be utilized. In Brazil, tax loss carryforwards do not expire, but their utilization is limited to 30% of taxable income in a given year, under the real profit method.

Deferred income tax assets and liabilities, when recognized, are offset when there is a legally enforceable right to offset and relate to income taxes levied by the same taxing authority on the same taxable entity and are classified as long-term in the combined balance sheets.

For those legal entities of the Group who have elected the deemed profit regime, no deferred income tax assets or liabilities have been recognized. Additionally, given the deemed profit election, no related tax impacts, current or deferred, have been recorded for the allocation of expenses from Parent in the combined financial statements.

For more information on income and social contribution taxes see note 10.

 

F-285


Table of Contents

New standards, amendments and interpretations issued, but not effective

The following are descriptions of new standards, amendments and interpretations of IFRS that have been issued but are not yet effective for the Group. The Group is in the process of assessing whether there will be any significant changes to its combined financial statements.

IFRS 9 “Financial Instruments”—reflects all phases of the financial instruments project and replaces IAS 39 Financial Instruments: Recognition and Measurement. The standard introduces new requirements for classification and measurement, impairment and hedge accounting.

 

 

Classification and measurement—Financial assets are classified by reference to the business model within which they are held and their contractual cash flow characteristics. The 2014 version of IFRS 9 introduces a ‘fair value through other comprehensive income’ category for certain debt instruments. Financial liabilities are classified in a similar manner to under IAS 39, however there are differences in the requirements applying to the measurement of an entity’s own credit risk.

 

 

Impairment—The 2014 version of IFRS 9 introduces an ‘expected credit loss’ model for the measurement of the impairment of financial assets, so it is no longer necessary for a credit event to have occurred before a credit loss is recognised.

 

 

Hedge accounting—Introduces a new hedge accounting model that is designed to be more closely aligned with how entities undertake risk management activities when hedging financial and non-financial risk exposures.

 

 

Derecognition—The requirements for the derecognition of financial assets and liabilities are carried forward from IAS 39.

IFRS 9 is effective for annual periods beginning on or after January 1, 2018. Depending on the chosen approach to applying IFRS 9, the transition can involve one or more than one date of initial application for different requirements.

IFRS 15 “Revenue from Contracts with Customers”—is applicable to all entities and supersedes all existing revenue recognition requirements under IFRS. IFRS 15 provides a single, principles based five-step model to be applied to all contracts with customers. It applies to all transactions to provide goods and services except those in the scope of other standards. Guidance is provided on topics such as the point in which revenue is recognized, accounting for variable consideration, costs of fulfilling and obtaining a contract and various related matters. New disclosures about revenue are also introduced. Either full or modified retrospective application is required for annual periods beginning on or after January 1, 2017.

Amendments to IAS 16 “Property, Plant and Equipment” and IAS 38 “Intangible Assets”—cover clarification of the principle of the basis of depreciation and that revenue based depreciation methods are no longer permitted. The amendments are effective as from January 1, 2016.

Amendments to IFRS 10 and IAS 28 “Sale or Contribution of Assets between an Investor and its Associate or Joint Venture”—clarifies the treatment of the sale or contribution of assets from an investor to its associate or joint venture, as follows:

 

 

Requires full recognition in the investor’s financial statements of gains and losses arising on the sale or contribution of assets that constitute a business (as defined in IFRS 3 “Business Combinations’)

 

 

Requires the partial recognition of gains and losses where the assets do not constitute a business, i.e. a gain or loss is recognized only to the extent of the unrelated investors’ interests in that associate or joint venture.

 

F-286


Table of Contents

These requirements apply regardless of the legal form of the transaction, e.g. whether the sale or contribution of assets occurs by an investor transferring shares in a subsidiary that holds the assets (resulting in loss of control of the subsidiary), or by the direct sale of the assets themselves. The amendments are applicable on a prospective basis to a sale or contribution of assets occurring in annual periods beginning on or after January 1, 2016.

Amendments to IAS 1 “Presentation of Financial Statements”—addresses perceived impediments to preparers exercising their judgement in presenting their financial reports by making the following changes:

 

 

Clarification that information should not be obscured by aggregating or by providing immaterial information, materiality considerations apply to the all parts of the financial statements, and even when a standard requires a specific disclosure, materiality considerations do apply;

 

 

Clarification that the list of line items to be presented in these statements can be disaggregated and aggregated as relevant and additional guidance on subtotals in these statements and clarification that an entity’s share of OCI of equity-accounted associates and joint ventures should be presented in aggregate as single line items based on whether or not it will subsequently be reclassified to profit or loss;

 

 

Additional examples of possible ways of ordering the notes to clarify that understandability and comparability should be considered when determining the order of the notes and to demonstrate that the notes need not be presented in the order so far listed in paragraph 114 of IAS 1.

The amendments are effective for annual periods beginning on or after January 1, 2016.

4. Cash and cash equivalents and short-term investments

 

      12/31/14      12/31/13      01/01/13  

Cash

     1         2         1   

Banks accounts

     34,108         20,797         2,595   

Short-term investments

     24,477         40,567         40,956   
  

 

 

 

Total

     58,586         61,366         43,552   
  

 

 

 

Stated as:

        

Cash and cash equivalents

     34,109         20,799         13,496   

Short-term investments

     24,477         40,567         30,056   
  

 

 

 

Total

     58,586         61,366         43,552   

 

 

The Group invests its excess, unrestricted cash in short-term investments, which are generally fixed-income instruments and investments funds that earn interest at rates ranging from 90% to 102% of the CDI rate (Brazilian Interbank Certificate of Deposit rate).

For further discussion regarding the Group’s exposure to interest rate risk and a sensitivity analysis of financial assets and liabilities, see note 18.

 

F-287


Table of Contents

5. Trade receivables

As of December 31, 2014 and 2013, balances are comprised of receivables with average collection periods of 24 to 30 days, for which losses on collection are not expected.

 

      12/31/14      12/31/13      01/01/13  

Câmera de Comercialização de Energia Elétrica—CCEE

     17,731         16,329         15,633   

Centrais Elétricas Brasileiras—Eletrobras

     4,744         4,592         5,519   
  

 

 

 

Total

     22,475         20,921         21,152   

 

 

6. Energy balance—CCEE/eletrobras

 

      Accounts  
      Receivable      Payable  
     12/31/14      12/31/14      12/31/13      01/01/13  

Câmera de Comercialização de Energia Elétrica—CCEE

     2,023         14,562         13,901         14,359   

Centrais Elétricas Brasileiras—Eletrobras

             21,174         2,060         1,293   
  

 

 

 

Total

     2,023         35,736         15,961         15,652   

 

 

 

      Changes in accounts receivable  
      12/31/13      Addition      Receipt      12/31/14  

CCEE

             2,023                 2,023   
  

 

 

 

Total accounts receivable

             2,023                 2,023   

 

 

 

      Changes in accounts payable  
      01/01/13      Provision      Payment     12/31/13      Provision      Payment     12/31/14  

CCEE

     14,359         1,112         (1,570     13,901         2,752         (2,091     14,562   

Eletrobras

     1,293         2,085         (1,318     2,060         21,174         (2,060     21,174   
  

 

 

 

Total accounts payable

     15,652         3,197         (2,888     15,961         23,926         (4,151     35,736   

 

 

 

F-288


Table of Contents

7. Property, plant and equipment

 

     12/31/14     12/31/13     01/01/13  
     Historical
cost
    Accumulated
depreciation
   

Net

value

    Historical
Cost
    Accumulated
depreciation
   

Net

value

    Historical
Cost
    Accumulated
depreciation
   

Net

value

 

Small hydroelectric power plants

                 

Land

    595               595        595               595        595               595   

Reservoirs, dams and watermains

    95,797        (14,474     81,323        95,797        (12,231     83,566        95,797        (9,999     85,798   

Buildings, civil works and improvements

    46,336        (8,101     38,235        46,336        (6,844     39,492        46,336        (5,587     40,749   

Machinery and equipment

    65,005        (13,104     51,901        65,005        (11,085     53,920        65,005        (9,066     55,939   

Other

    434        (336     98        434        (278     156        434        (218     216   
 

 

 

 

Total

    208,167        (36,015     172,152        208,167        (30,438     177,729        208,167        (24,870     183,297   

Wind energy facilities

                 

Buildings, civil works and improvements

    82,995        (8,020     74,975        83,065        (4,329     78,736        73,367        (1,301     72,066   

Machinery and equipment

    1,275,985        (141,443     1,134,542        1,264,920        (82,987     1,181,933        1,264,386        (25,016     1,239,370   

Other

    7,122        (701     6,421        7,538        (352     7,186        3,485               3,485   
 

 

 

 

Total

    1,366,102        (150,164     1,215,938        1,355,523        (87,668     1,267,855        1,341,238        (26,317     1,314,921   
 

 

 

 

Total property, plant and equipment

    1,574,269        (186,179     1,388,090        1,563,690        (118,106     1,445,584        1,549,405        (51,187     1,498,218   

 

 

 

F-289


Table of Contents

Changes in the balances of property, plant and equipment are as follows:

 

      01/01/2013     Additions     12/31/13     Additions     12/31/14  

Historical Cost

          

Small hydroelectric power plants

          

Land

     595               595               595   

Reservoirs, dams and watermains

     95,797               95,797               95,797   

Buildings, civil works and improvements

     46.336               46,336               46,336   

Machinery and equipment

     65,005               65,005               65,005   

Other

     434          434               434   
  

 

 

 

Subtotal

     208,167               208,167               208,167   

Wind energy facilities

          

Buildings, civil works and improvements

     73,367        9,698        83,065               82,995   

Machinery and equipment

     1,264,386        534        1,264,920        10,458        1,275,985   

Other

     3,485        4,053        7,538        121        7,122   
  

 

 

 

Subtotal

     1,341,238        14,285        1,355,523        10,579        1,366,102   
  

 

 

 

Total—historical cost

     1,549,405        14,285        1,563,690        10,579        1,574,269   
  

 

 

 

Accumulated Depreciation:

          

Small hydroelectric power plants

          

Reservoirs, dams and watermains

     (9,999     (2,232     (12,231     (2,243     (14,474

Buildings, civil works and improvements

     (5,587     (1,257     (6,844     (1,257     (8,101

Machinery and equipment

     (9,066     (2,019     (11,085     (2,019     (13,104

Other

     (218     (60     (278     (58     (336
  

 

 

 

Subtotal

     (24,870     (5,568     (30,438     (5,577     (36,015

Wind energy facilities

          

Buildings, civil works and improvements

     (1,301     (3,028     (4,329     (3,691     (8,020

Machinery and equipment

     (25,016     (57,971     (82,987     (58,456     (141,443

Other

            (352     (352     (349     (701
  

 

 

 

Subtotal

     (26,317     (61,351     (87,668     (62,496     (150,164
  

 

 

 

Total—accumulated depreciation

     (51,187     (66,919     (118,106     (68,073     (186,179
  

 

 

 

Total property, plant and equipment—net

     1,498,218        (52,634     1,445,584        (57,494     1,388,090   

 

 

The Group has evaluated whether there were indicators of impairment of its assets that would require an impairment test at December 31, 2014 and 2013. The evaluation was based on external and internal information sources, taking into account variations in interest rates, changes in market conditions and other factors. The result of the assessment indicated no triggers of impairment of these assets in any of the reporting years and therefore no impairment losses were recognized.

 

F-290


Table of Contents

8. Borrowings

The Group´s small hydroelectric and wind energy generating facilities are owned and operated in separate legal entities for which the costs of development and construction have been financed by borrowings with Brazilian development banks through project entity specific debt secured by the project entity assets with no recourse to the Parent. The outstanding balances under these financing arrangements at December 31, 2014 and 2013 are summarized as follows:

 

          12/31/14     12/31/13     01/01/2013  
        Current     Noncurrent     Current     Noncurrent     Current     Noncurrent  
     Interest rate   Interest     Principal     Total     Principal     Interest     Principal     Total     Principal     Interest     Principal     Total     Interest     Principal     Total  

BNDES

  TJLP + 1,92%
to 2,18% p.a.
    2,625        60,625        63,625        805,114        2,604        60,260        62,864        861,581        3,247        37,786        41,033        72,174        832,308        904,432   

BNDES—Subloans

  TJLP     14        1,527        1,541        5,419        11        946        957        4,482        17        446        463        89        3,456        3,545   

BNB

  8,08% p.a.            5,897        5,897        90,738        20        5,536        5,556        96,635        818        5,617        6,435               102,172        102,172   
   

 

 

 

Borrowing subtotal

      2,639        68,049        70,688        901,271        2,635        66,742        69,377        962,698        4,082        43,849        47,931        72,263        937,936        1,010,199   
   

 

 

 

(-) Debt issuance costs

             (617     (617     (8,225            (617     (617     (8,842                                 (10,074     (10,074
   

 

 

 

Total

      2,639        67,432        70,071        893,046        2,635        66,125        68,760        953,856        4,082        43,849        47,931        72,263        927,862        1,000,125   

 

 

BNDES Agreements—The Group´s wind energy generation projects have been financed through the Brazilian National Development Bank (Banco Nacional de Desenvolvimento Econômico e Social—BNDES) in the total amount of R$ 893,457. Borrowings accrue interest at variable rates based on the Long-term Interest Rate (Taxa de Juros de Longo Prazo—TJLP) as offered by BNDES plus a credit spread ranging from 1.92% for subsidiary entities of Salvador and 2.18% for subsidiary entities of Bahia. For the years ended December 31, 2014 and 2013, TJLP was 5.5%. Principal and interest are payable monthly from May 2013, with final maturity in 2029.

The project are also financed by sub-loans with BNDES, which have an outstanding principal amount of R $6,960. The sub-loans bear variable interest at TJLP rate, and mature in 2019 and 2029 for Bahia and Salvador respectively.

Borrowings under the BNDES financing agreements are secured by a pledge of the shares of all subsidiaries of Bahia and Salvador, substantially all the operating assets of the operating subsidiaries, and rights to receivables and cash collections on the future sales of electricity under the subsidiaries’ PPAs. Additionally, these agreements require that the subsidiaries maintain funds in restricted deposit accounts as collateral and guarantee for the related borrowings, equivalent to three months of debt service and three months of operation and maintenance expenses (see note 9).

These agreements contain customary representations, covenants and warranties of the borrower including limitations on business activities, guarantees, environmental matters, and project maintenance standards. Additionally, the agreements require the maintenance of a minimum debt service coverage ratio, as defined in the agreements, of 1.3:1. At December 31, 2014 the Group was in compliance with all related covenants under the individual financing agreements.

BNB Agreements—The Group´s small hydroelectric energy generation projects have been financed through the Bank of the Northeast of Brazil (Banco do Nordeste do Brasil—BNB) for a total amount of R$ 120,096. Borrowings under the agreements are subject to fixed rate interest of 9,5% per annum (which can be reduced to 8.08% due to a 15% timely payment bonus), with principal and interest payable monthly with final maturity in 2026.

Borrowings under the BNB financing agreements are secured by a pledge of the shares of all subsidiaries of Espra, substantially all the operating assets of the operating subsidiaries, and rights to receivables and cash collections on the future sales of electricity under the subsidiaries’ PPAs. Additionally, these agreements require that the subsidiaries maintain funds in a restricted deposit account as collateral and guarantee for the related borrowings (see note 9).

These agreements contain customary representations, covenants and warranties of the borrower including limitations on business activities, guarantees, environmental matters, and project maintenance standards. At December 31, 2014 the Group was in compliance with all related covenants under the individual financing agreements.

 

F-291


Table of Contents

Changes in borrowings—The following table presents the changes in borrowing for the years ended December 31, 2014 and 2013:

 

      Principal     Interest     Total  

At January 1, 2013

     971,705        76,351        1,048,056   
  

 

 

 

Proceeds from borrowings

     2,752               2,752   

Accrued interest

            73,446        73,446   

Interest paid

            (54,532     (54,532

Interest incorporated to the principal—BNDES Agreements

     92,630        (92,630       

Repayment of borrowings

     (47,721            (47,721

Appropriation of debt issuance costs

     615               615   
  

 

 

 

At December 31, 2013

     1,019,981        2,635        1,022,616   
  

 

 

 

Proceeds from financing

     7,313               7,313   

Accrued interest

            69,725        69,725   

Interest paid

            (69,721     (69,721

Repayment of financing

     (67,433            (67,433

Appropriation of debt issuance costs

     617               617   
  

 

 

 

At December 31, 2014

     960,478        2,639        963,117   

 

 

Scheduled maturities of borrowings recorded in noncurrent liabilities—Scheduled future maturities of obligations under long-term borrowings at December 31, 2014 are as follows:

 

Maturity year        

2016

     68,249   

2017

     68,650   

2018

     69,073   

2019

     69,039   

2020

     68,532   

After 2020

     557,728   
  

 

 

 

Total

     901,271   
  

 

 

 

Debt issuance costs

     (8,225
  

 

 

 

Total borrowings—non current

     893,046   

 

 

9. Restricted deposits

The composition of restricted deposits is summarized as follows:

 

      Interest      Current      Noncurrent  
Institution    rate      12/31/13      01/01/13      12/31/14      12/31/13      01/01/13  

Citibank

     94% to 98% CDI         27,192         25,363         147,556         111,835         71,500   

Banco do Nordeste

     97% CDI                         12,932         11,696         10,840   
     

 

 

 

Total

        27,192         25,363         160,488         123,531         82,340   

 

 

As described further at note 8, certain of the Group´s borrowing agreements require that the Group maintain funds in restricted deposit accounts as collateral and guarantee for the related borrowings.

 

F-292


Table of Contents

Citibank—The Group entities maintain restricted deposit accounts for collections made from the sale of generated electricity as collateral for related borrowings with the Brazilian National Development Bank (Banco Nacional de Desenvolvimento Econômico Social—BNDES). Funds in these accounts are invested in low risk, highly-liquid, shorter-term investments that earn interest rates ranging from 94% to 98% of the CDI rate. Funds from these accounts are restricted for the payment of installments on the related borrowings and for other obligations related to the operation and maintenance of the wind generating facilities.

Banco do Nordeste—Espra maintains a restricted deposit account at Banco do Nordeste do Brasil S.A. (“BNB”), whose purpose is to guarantee the repayment of borrowings obtained for the construction of small hydroelectric generating plants. Funds in this account are invested in low risk, highly-liquid, shorter-term investments that earn interest at 97% of the CDI rate. Funds are restricted until the full repayment of the related borrowings, expected to occur in 2026.

10. Income and social contribution taxes

Reconciliation of Effective Tax Rate—The Group´s effective tax rate differs from the amount that would arise using the combined statutory tax rate of 34% applicable for Brazilian entities as follows:

 

      2014     2013  

Income before income tax and social contribution

     36,646        53,827   

Combined income tax and social contribution rate

     34%        34%   
  

 

 

 

Income tax and social contribution at statutory rate

     (12,460     (18,301

Effect of subsidiaries taxed under the deemed profit regime

     3,752        11,884   

Allocation of expense from Parent

     (3,947     (3,888

Utilization of unrecognized tax loss carryforwards

     103        277   

Other permanent differences

     135        60   
  

 

 

 

Income and social contribution tax expense

     (12,417     (9,968
  

 

 

 

Current

     (12,520     (10,245

Deferred

     103        277   
  

 

 

   

 

 

 

Income and social contribution tax expense

     (12,417     (9,968

 

 

Given the deemed profit election at the Group´s operating project companies, no related tax impacts, current or deferred, have been recorded for the allocation of expenses from Parent in the combined financial statements.

Changes in tax law:    Law nº 12.973—On May 13, 2014, Provisional Measure MP 627 was converted into Law nº 12.973, with alterations to some of the original provisions of MP 627, more specifically to those related to the treatment of dividends, interest on own capital and evaluation of investments at net equity value. The Group elected to early adopt such rules beginning calendar year 2014. The effect of these changes had no effect on the combined financial statements of the Group, as dividends and/or interest on capital were not greater than those recorded in accordance with prior tax accounting methods and criteria effective as at December 31, 2007.

 

F-293


Table of Contents

11. Taxes payable

The composition of taxes payable is as follows:

 

      12/31/14      12/31/13      01/01/13  

Income and social contribution taxes (IRPJ and CSLL)

     4,843         2,829         2,829   

Federal sales taxes (PIS and COFINS)

     1,425         1,220         1,205   

Other taxes

     326         347         266   
  

 

 

 

Total

     6,594         4,396         4,300   

 

 

12. Prepaid and recoverable taxes

The balances of prepaid and recoverable taxes consist of the following:

 

      12/31/14      12/31/13      01/01/13  

Income and social contribution taxes (IRPJ and CSLL)

     3,266         925         469   

Federal sales tax (PIS and COFINS)

     1,254         573         668   

Others

     728         707         197   
  

 

 

 

Total

     5,248         2,205         1,334   
  

 

 

 

Current

     3,037         1,257         428   

Noncurrent

     2,211         948         906   
  

 

 

 

Total

     5,248         2,205         1,334   

 

 

13. Commitments for social and environmental costs

The Group provides for commitments for social and environmental costs in current and noncurrent liabilities, and capitalizes such costs in fixed assets over the projects’ construction periods. After plant startup, such costs are reviewed and are added or deducted from the cost of the related fixed asset in the period that it is adjusted.

 

      12/31/13      Addition      Payment     Interest      12/31/14  

Commitment for social and environmental costs

     2,017         5,073         (2,020     837         5,907   

Classified as:

             

Current

     2,017                 3,685   

Non current

                     2,222   
  

 

 

            

 

 

 

Total

     2,017                 5,907   

 

 

14. Parent’s net investment and related party transactions

The separate legal entities that comprise the Group are not held by a single legal entity. As such, Parent’s net investment is shown in lieu of shareholders’ equity in these combined financial statements. Parent’s net investment represents the cumulative net investment by Renova in the Group through that date. The impact of transactions between the Group and Renova that were not historically settled in cash, including certain intercompany loans, are also included in Parent’s net investment.

The following summarizes the Group´s transactions with its parent Renova.

Allocated expenses from Parent—As discussed in note 2, during the periods presented, the Group functioned as part of the larger group of companies controlled by Renova, and accordingly, Renova performed certain

 

F-294


Table of Contents

operating and corporate overhead functions for the Group. These functions include, but are not limited to, executive oversight, legal, finance, human resources, internal audit, financial reporting, tax planning, and investor relations. The costs of such services have been allocated to the Group based on the most relevant allocation method for the service provided, primarily based on relative percentage of revenue, installed capacity or headcount. Management believes such allocations are reasonable; however, they may not be indicative of the actual expense that would have been incurred had the Group been operating as a separate entity apart from Renova. Total corporate expenses that were allocated to the Group and recorded in general and administrative expenses in the combined income statements were R$11,608 and R$11,437 for 2014 and 2013, respectively.

Intercompany loans and balances—Periodically the Group and Renova enter into intercompany loans based on the Group´s working capital needs and available cash positions. These intercompany loans generally bear interest at TJLP plus a credit spread. Outstanding intercompany loans payable and receivable, including accrued interest are reflected as part of Parent´s net investment. At December 31, 2014, the outstanding balances of loans payable by the Group to Renova were R$1,683. During the year ended 2014, R$40,402 of outstanding loans made by Renova to the Group in 2013 were capitalized by the Group companies.

Dividends—The Group companies are all incorporated as Brazilian corporations (sociedades anônimas—S.A.) in accordance with Brazilian corporate law. Based on the law and their articles of incorporation, the Group companies are required to pay mandatory dividends based on net income, if any, after allocations to legal reserves on profits and compensation of accumulated losses, if any. Additional distributions may be made, but are restricted under the terms of the project company borrowing agreements. Any such additional dividends must be approved by the applicable financial institution. During the years ended December 31, 2014 and 2013, the Group paid dividends to Renova in the amounts of R$52,050 and R$12,000, respectively.

Guarantees—Renova has issued nonconvertible debentures which are collateralized by the pledge of its shares in Enerbras and a collateral assignment of assets and certain rights to dividends distributed by Espra, Bahia and Salvador, which are deposited in a restricted accounts.

Transactions with other related parties included the following:

Director´s and key management remuneration expense—Remuneration expense of directors and other key management personnel of Renova of R$1,769 and R$ 783, were allocated to the Group in 2014 and 2013, respectively.

15. Net revenue

 

      2014     2013  

Power generation

    

Electric power supply—Eletrobras

     23,442        42,094   

Electric power supply —CCEE

     206,353        193,434   
  

 

 

 

Gross revenue

     229,795        235,528   
  

 

 

 

Less: Federal sales taxes

    

COFINS

     (6,838     (6,994

PIS

     (1,483     (1,515
  

 

 

 

Total deductions

     (8,321     (8,509
  

 

 

 

Net revenue

     221,794        227,019   

 

 

 

F-295


Table of Contents

16. Costs and expenses by nature

 

      2014     2013  
      Cost of
services
provided
    Expenses     Cost of
services
provided
    Expenses  

Distribution system fee

     (11,715            (11,307       

Inspection fee

     (1,258            (124       
  

 

 

 
     (12,973            (11,431       
  

 

 

 

Depreciation and amortization(*)

     (68,068     (797     (66,912     (895

Third-party services

     (25,424     (10,567     (5,527     (8,896

Personnel expenses

            (6,652            (4,545

Rentals

     (1,921     (413     (1,742     (732

Insurance

     (1,721     (56     (3,538     (53

Other (expenses) income, net

     (248     21        (244     (761
  

 

 

 
     (97,382     (18,464     (77,963     (15,882
  

 

 

 

Total

     (110,355     (18,464     (89,394     (15,882

 

 

 

(*)   Includes R$792 and R$888 for 2014 and 2013, respectively, as allocated from Parent (note 14).

17. Finance Income (expenses)

 

      2014     2013  

Finance income

    

Income from short-term investments and restricted deposits

     19,963        12,103   

Other

            41   
  

 

 

 
     19,963        12,144   
  

 

 

 

Finance expenses

    

Interest on borrowings

     (69,725     (73,552

Financing and guarantee fees, expenses, taxes and others

     (6,247     (6,507
  

 

 

 
     (75,972     (80,059
  

 

 

 

Finance expense—net

     (56,009     (67,915

 

 

18. Financial instruments and risk management

The Group conducts transactions with financial instruments. These financial instruments are managed through operating strategies that aim at liquidity, profitability and security.

The risks associated with these operations are managed according to the practices defined by management of the Group and Renova, including the monitoring of the levels of exposure of each market risk and estimated future cash flows. These practices also determine that the information is updated in the Group´s operating systems, as well as the information and operation of the transactions with counterparties.

 

F-296


Table of Contents

Categories of financial instruments—The following table summarizes the Group´s financial instruments by classification and related carrying amounts as recorded in the combined balance sheets at December 31, 2014 and 2013.

 

     12/31/14     12/31/13  
     Loans and
receivables
    Fair value
through
profit or
loss
    Held to
maturity
    Other at
amortized
cost
    Total     Loans and
receivables
    Fair value
through
profit or loss
    Held to
maturity
    Other at
amortized
cost
    Total  

Financial assets

                   

Current

                   

Short-term Investments

           24,477                 24,477               40,567            40,567   

Trade receivables

    22,675                   22,675        20,921                        20,921   

Restricted deposits

                                                27,192               27,192   

Noncurrent

                   

Restricted deposits

        160,488               160,488            123,531          123,531   

Financial liabilities

                   

Current

                   

Trade payables

                    18,460        18,460                        13,441        13,441   

Borrowings

                    70,071        70,071                        68,760        68,760   

Noncurrent

                   

Borrowings

                          893,046        893,046                              953,856        953,856   

Fair value of financial instruments—The Group is exposed to the risks of changes in the fair value of its financial assets and liabilities. The following table summarizes the fair values and the carrying amounts of the Group´s financial assets and liabilities at December 31, 2014 and 2013.

 

      Fair value      Carrying amount  
      12/31/14      12/31/13      12/31/14      12/31/13  

Financial assets

           

Current

           

Short-terms investments

     24,477         40,567         24,477         40,567   

Trade receivables

     22,675         20,921         22,675         20,921   

Restricted deposits

             27,192                 27,192   

Noncurrent

           

Restricted deposits

     160,488         123,531         160,488         123,531   

Financial liabilities

           

Current

           

Trade payables

     18,460         13,441         18,460         13,441   

Borrowings

     70,688         69,377         70,071         68,760   

Noncurrent

           

Borrowings

     901,271         962,698         893,046         953,856   

 

 

Fair value measurement—The fair values of the financial assets and liabilities are defined as the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date. Methods and assumptions used in the estimation of fair value are based on available market information and methodologies applied consistently for all periods presented. Significant judgment is required to understand the market information and estimate the fair value. The use of different market methodologies or assumptions may have a material effect on the estimated fair values.

 

F-297


Table of Contents

The fair values of short-term investments, restricted deposits, and trade receivables and payables approximate their carrying values due to their short-term nature and as they have characteristics similar to those that would be obtained had these financial instruments been traded in the market.

The fair values for the Group´s financial assets and liabilities that are measured at fair value in the combined financial statements, are classified based on the following fair value hierarchy depending on the inputs used in the valuation methods applied:

Level 1—Use of quoted prices (unadjusted) in active markets for identical instruments. A financial instrument is considered as quoted in an active market if the quoted prices are immediately and regularly available from a stock exchange or organized over-the-counter market, by operators, brokers or market association, by entities whose purpose is to disclose the prices by regulatory agencies, and if these prices represent market transactions regularly carried out between market participants in orderly transactions.

Level 2—Use of inputs other than quoted prices included in Level 1 that are observable for the instrument, either directly (that is, as prices) or indirectly (that is, derived from prices). In relation to financial instruments not traded in an active market, the fair value must be determined based on the valuation/pricing methodology.

Level 3—Use of inputs that are not based on observable market data (non-observable inputs).

The classification of financial instruments that are measured at fair value in the combined financial statements by fair value hierarchy level is as follows:

 

              Fair value as of
December 31, 2014
Description    Balance at
12/31/14
     Level 1    Level 2      Level 3

Assets

           

Short-term investments

     24,477            24,477      

 

Market risk—The market risk reflects the possibility of monetary losses due to the changes in variables that impact the prices and rates traded in the market. These fluctuations basically impact all sectors and, therefore, represent financial risk factors.

The Group´s principal market risk exposure is to interest rate risk, specifically variable rate CDI interest received on the Group´s short term investments and restricted deposits and to the TJLP rate on borrowings with BNDES.

Furthermore, the Group´s borrowings are concentrated with BNB and BNDES. The contractual rules applicable to financial liabilities represent risks related to these exposures.

 

F-298


Table of Contents

The following table details the sensitivity of the expected variation of 10% of the exposure to the rates of interest on financial assets and liabilities as of December 31, 2014. This percentage is the average rate sensitivity used to internally present risks to key management personnel and corresponds to management’s assessment of the possible changes in these rates.

 

      Risk      Impact on
income and
equity
 

Financial assets

     

Short-term investments

     CDI decrease         (264

Restricted deposits

     CDI decrease         (1,728

Financial liabilities

     

Borrowings

     TJLP increase         (5,297

 

 

Liquidity risk—Liquidity risk is the risk associated with the Group’s ability to meet its obligations underlying its financial liabilities.

Cash flow from operating activities provides the funds to service financial liabilities on a day-to-day basis. The Group enters into borrowings solely to leverage its operating capacity. This assumption is confirmed based on the characteristics of the Group’s borrowings.

The table below sets out details of the obligations assumed by the Group according to the contractual maturities of its financial liabilities as of December 31, 2014, taking into account principal and interest, based on the undiscounted cash flows, considering the earliest date on which the Group may have to settle the respective obligation:

 

Financial instruments    Note      Weighted
average
interest
rate
     Less than
1 month
     1 month to
3 months
     3 months
to 1 year
     1 year
to 5 years
     Over
5 years
     Total  

Borrowings

     8         7,02%         5,867         11,735         52,813         348,532         553,012         971,959   

Trade payables

           18,460                                         18,460   
        

 

 

 

Total

           24,327         11,735         52,813         348,532         553,012         990,419   

 

 

Credit risk—Credit risk is the risk of financial loss to the Group that a counterparty will not meet its obligations under a financial instrument or customer contract. The Company is exposed to credit risk from its operating activities (principally, trade receivables) and its investing activities, including deposits with banks and financial institutions, and other financial instruments.

 

              Carrying amount  
            Combined  
      Note      12/31/14      12/31/13  

Financial assets

        

Current

        

Short-term investments

     4         24,477         40,567   

Trade receivables

     5         22,475         20,921   

 

 

Short-term investments—Credit risk from balances with banks and financial institutions is managed by the Group’s treasury department in accordance with the Group’s policy. Investments of surplus funds are made only with approved counterparties and within credit limits assigned to each counterparty.

 

F-299


Table of Contents

Trade receivables and Energy balance—CCEE/Eletrobras—In the power sector, the operations carried out are directed to the regulatory agency that maintains the active information on the positions of produced and consumed power. Based on this structure, planning is made to operate the system without interferences or interruptions. Power is sold through auctions, agreements, among others. This system is reliable and controls the payments by the players in the market.

Derivative transactions—No transactions with derivative financial instruments were conducted in the years reported.

Capital management—The objectives of the Group in managing its capital are to ensure that the Group is always capable of providing return to its shareholders and benefits to other stakeholders, and maintains an adequate capital structure to reduce this cost.

 

      Combined  
      12/31/14     12/31/13  

Borrowings

     963,117        1,022,616   

Less: Cash and cash equivalents and, short-term investments and restricted deposits

     (219,074     (212,089

Net debt

     744,043        810,527   

Parent’s net investment

     609,395        624,958   

Financial leverage ratio—%

     122%        130%   

 

 

Other operational risks

Risk of shortage of wind—This risk results from the shortage of wind due to natural factors, which is reduced because the “wind deposits” in Brazil are one of the best in the world, as in addition to high speed, wind is considered stable, different from certain regions in Asia and the United States, which are subject to cyclones, typhoons and other natural factors.

Hydrological risksThe power supplied through the National Interconnected System (SIN) is mostly generated by hydroelectric power plants. As the SIN operates through an optimized shipment system, centralized at the National Electric System Operator (ONS), each hydroelectric power plant, including those owned by the Group, is exposed to the existing hydrological conditions, both in the region where it operates and other Brazilian regions.

When the hydrological conditions are unfavorable, together with the obligation of delivering the contracted power, the Group could be exposed to the power spot market, which would affect its future financial results. However, the Company’s total hydroelectric power generation capacity is part of the Energy Relocation Mechanism (MRE), which partly mitigates the hydrological risk by spreading it across all the plants included in the MRE.

19. Insurance coverage

The following table presents the main values at risk with insurance coverage contracted by the Group:

 

              Total      Effective term          
Company    Insured item      Coverage      Start      End      Insured  

Bahia

     Guarantee CCT       R$ 722         06/30/2014         06/30/2015         ANEEL   

Salvador

     Guarantee CCT       R$ 1,217         06/30/2014         06/30/2015         ANEEL   

Espra

     Operation risks       R$ 156,109         09/25/2014         09/25/2015         Espra   

Espra

     Operation risks       R$ 20,000         09/25/2014         09/25/2016         Espra   

 

 

 

F-300


Table of Contents

20. Subsequent events

On May 6, 2015, the board of directors of Renova approved a planned share contribution agreement to be entered into with TerraForm Global, Inc. (“TerraForm Global”), an indirect subsidiary of SunEdison, Inc., whereby Renova will contribute all of its interests in the Group’s project companies for shares in TerraForm Global and or cash. The transaction will be conditioned on applicable regulatory and third party approvals, as well as the successful completion of TerraForm Global’s planned underwritten initial public offering of shares to be registered in the United States of America.

Management has considered subsequent events through May 6, 2015, the date these combined financial statements were authorized to be issued.

 

F-301


Table of Contents

Independent auditor’s report

The Board of Directors

SunEdison Energy Southern Africa Proprietary Limited

Report on the financial statements

We have audited the accompanying combined financial statements of Core Energy (RF) Proprietary Limited and Erika Energy (RF) Proprietary Limited, which comprise the combined balance sheets as of December 31, 2014 and 2013, and the related combined statements of operations and comprehensive income, invested equity, and cash flows for each of the years then ended, and the related notes to the combined financial statements.

Management’s responsibility for the financial statements

Management is responsible for the preparation and fair presentation of these combined financial statements in accordance with U.S. generally accepted accounting principles; this includes the design, implementation, and maintenance of internal control relevant to the preparation and fair presentation of the combined financial statements that are free from material misstatement, whether due to fraud or error.

Auditors’ responsibility

Our responsibility is to express an opinion on these combined financial statements based on our audits. We conducted our audits in accordance with auditing standards generally accepted in the United States of America. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the combined financial statements are free from material misstatement.

An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the combined financial statements. The procedures selected depend on the auditors’ judgment, including the assessment of the risks of material misstatement of the combined financial statements, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the entity’s preparation and fair presentation of the combined financial statements in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity’s internal control. Accordingly, we express no such opinion. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluating the overall presentation of the combined financial statements.

We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion.

Opinion

In our opinion, the combined financial statements referred to above present fairly, in all material respects, the combined financial position of Core Energy (RF) Proprietary Limited and Erika Energy (RF) Proprietary Limited as of December 31, 2014 and 2013, and the results of their combined operations and their combined cash flows for each of the years then ended in accordance with U.S. generally accepted accounting principles.

/s/ KPMG Inc.

Johannesburg, South Africa

7 May 2015

 

F-302


Table of Contents

Core Energy (RF) Proprietary Limited and Erika Energy (RF) Proprietary Limited

Combined balance sheets

As at December 31, 2014 and 2013

 

Figures in ZAR ‘000    Note(s)      December 31,
2014
     December 31,
2013
 

Assets

        

Current assets

        

Cash and cash equivalents

     3         147 764           

Restricted cash

     4         128 251         1 160 471   

Accounts receivable

     5         73 582         63   

Deferred financing costs, net

     7         150         1 004   

Deferred income tax

     16         14 685           

Value-added tax (VAT) receivable

                112 003   

Prepaid expenses

        7 699         9 358   
     

 

 

    

 

 

 

Total current assets

        372 131         1 282 899   

Non-current assets

        

Property, plant and equipment, net

     6         2 241 486         838 475   

Derivatives

     8                 8 943   

Deferred financing costs, net

     7         1 472         1 622   
     

 

 

    

 

 

 

Total non-current assets

        2 242 958         849 040   
     

 

 

    

 

 

 

Total assets

        2 615 089         2 131 939   
     

 

 

    

 

 

 

Liabilities and invested equity

        

Current liabilities

        

Current portion of long-term debt

     9         72 598         8 193   

Value-added tax (VAT) payable

        3 680           

Accruals

     11         54 496         1 933   

Accounts payable

     12         7 451           

Accounts payable—related parties

     12         16 598         242 603   

Derivatives

     8         18 763           

Income tax payable

        2 790         2 790   
     

 

 

    

 

 

 

Total current liabilities

        176 376         255 519   

Non-current liabilities

        

Long-term debt

     9         1 927 306         1 403 483   

Loans from shareholders—related parties

     10         361 792         302 277   

Deferred income tax

     16         25 733           

Asset retirement obligation

     13         43 991         14 671   
     

 

 

    

 

 

 

Total non-current liabilities

        2 358 822         1 720 431   
     

 

 

    

 

 

 

Total liabilities

        2 535 198         1 975 950   
     

 

 

    

 

 

 

Invested equity

        

Invested equity

        79 891         155 989   
     

 

 

    

 

 

 

Total liabilities and invested equity

        2 615 089         2 131 939   

 

 

Commitments and contingencies have been discussed in detail in note 18.

See accompanying notes to combined financial statements.

 

F-303


Table of Contents

Core Energy (RF) Proprietary Limited and Erika Energy (RF) Proprietary Limited

Combined statements of operations and comprehensive income

For the years ended December 31, 2014 and 2013

 

Figures in ZAR ‘000    Note(s)      December 31,
2014
     December 31,
2013
 

Power energy revenue

     14         159 582           

Cost of operations

        (13 766        

Depreciation

     6         (29 325        

Accretion of asset retirement obligation

     13         (2 707        

Operating costs and expenses

        (45 798        

Gross profit

        113 784           

General and administrative expenses

        (15 995      (25 686

General and administrative expenses—related Parties

        (42 458      (42 123

Operating income/(loss)

        55 331         (67 809

Other income

     15         46 182         18 996   

Other expenses

     15         (138 857      (31 973

(Loss)/Gain on derivatives

     8         (27 706      9 882   

Net other expenses

        (120 381      (3 095

Loss before income tax

        (65 050      (70 904

Income tax expense

     16         (11 048      (2 790

Net loss

        (76 098      (73 694

Other comprehensive income

                  

Total comprehensive loss

        (76 098      (73 694

 

 

See accompanying notes to combined financial statements.

 

F-304


Table of Contents

Core Energy (RF) Proprietary Limited and Erika Energy (RF) Proprietary Limited

Combined statements of invested equity

For the years ended December 31, 2014 and 2013

 

Figures in ZAR’000    Invested Equity  

Balance at January 1, 2013

     194 166   

Contributions from investors

     35 517   

Total comprehensive loss

     (73 694
  

 

 

 

Balance at December 31, 2013

     155 989   

Total comprehensive loss

     (76 098
  

 

 

 

Balance at December 31, 2014

     79 891   

 

 

 

See accompanying notes to combined financial statements.

 

F-305


Table of Contents

Core Energy (RF) Proprietary Limited and Erika Energy (RF) Proprietary Limited

Combined statements of cash flows

For the years ended December 31, 2014 and 2013

 

Figures in ZAR ‘000    December 31,
2014
     December 31,
2013
 

Cash flows from/(used in) operating activities:

     

Net loss

     (76 098      (73 694

Adjustments to reconcile net loss to net cash provided by (used in) operating activities

     

Fair value loss/(gain) on interest rate swap

     27 706         (9 882

Depreciation expense

     29 325           

Accretion expense

     2 707           

Interest expense accrued

     69 415           

Amortization of debt issuance costs

     2 751         561   

Amortization of deferred financing costs

     1 202         13 760   

Tax expense

     11 048         2 790   

Changes in operating assets and liabilities:

     

Accounts and other receivables

     (71 831      (16 048

Accounts and other payables

     116 789         (111 797
     44 958         (127 845
  

 

 

 

Net cash earned from/(used in) operating activities

     113 014         (194 310
  

 

 

 

Cash flows from/(used in) investing activities:

     

Purchase of property, plant and equipment

     (1 476 672      (477 580

Borrowing costs paid, capitalized to property, plant and equipment

     (96 376      (19 031

Change in restricted cash

     1 032 220         (1 020 332
  

 

 

 

Net cash used in investing activities

     (540 828      (1 516 943
  

 

 

 

Cash flows from financing activities

     

Contributions from investors

             35 517   

Proceeds from long-term loans

     535 725         1 444 816   

Repayment of long term loans

     (10 837        

Proceeds from shareholder loans

     50 690         230 920   
  

 

 

 

Net cash provided by financing activities

     575 578         1 711 253   
  

 

 

 

Net increase in cash and cash equivalents

     147 764      

Cash and cash equivalents at beginning of year

               
  

 

 

 

Cash and cash equivalents at end of year

     147 764           
  

 

 

 

Supplemental disclosures

     

Cash paid for interest including amounts capitalized

     164 763         37 283   

Cash paid for income taxes

               

Schedule of non-cash activities

     

Additions to property, plant and equipment in accounts payable, accrued expenses and other current liabilities

     56 628         223 954   

Additions to property, plant and equipment related to asset retirement obligation (ARO)

     26 613         14 671   

 

  

 

 

    

 

 

 

See accompanying notes to combined financial statements.

 

F-306


Table of Contents

Core Energy (RF) Proprietary Limited and Erika Energy (RF) Proprietary Limited

Notes to the combined financial statements

For the years ended December 31, 2014 and 2013

1. Nature of operations

The Operating Entities (the “Operating Entities”), as used in the combined financial statements, comprise the entities listed below and their solar energy systems:

 

 

Core Energy (RF) Proprietary Limited (“Core”)

 

Erika Energy (RF) Proprietary Limited (“Erika”)

The Operating Entities are not a single stand-alone legal entity, but are a combination of entities that are under common control of SunEdison Green Power Renewable Energy Southern Africa Proprietary Limited (“SEGP Renewable Energy Southern Africa (Pty) Ltd”). The primary assets of the Operating Entities consist of two solar parks (Soutpan Solar Park and Witkop Solar Park), located in South Africa, with a maximum contracted capacity of 58 Megawatts. Apart from having separate signed Power Purchase Agreements (“PPAs”) with Eskom Holdings SOC Limited (“Eskom”), the majority supplier of electricity to the South African public, the Operating Entities have obtained the necessary licenses to perform their activities from the National Energy Regulator of South Africa (“NERSA”). Soutpan Solar Park achieved Commercial Operation Date (“COD”) on 4 July 2014, while Witkop Solar Park achieved COD on 20 September 2014. The PPAs are valid for a period of 20 years from COD.

Basis of presentation

Financial information is required, as part of a listing, for certain entities within the SunEdison LLC Group (“the SunEdison Group”) that are under common control. These entities, however, are not part of a legal sub-group whose financial statements are consolidated. As such, combined financial statements of the Operating Entities have been prepared as at and for the years ended, December 31, 2014 and 2013. The Operating Entities’ combined financial statements have been prepared in accordance with U.S. generally accepted accounting principles (“U.S. GAAP”). The Financial Accounting Standards Board (“FASB”) Accounting Standards Codification (“ASC”) is the source of authoritative U.S. GAAP to be applied by non-governmental entities. During the years ended December 31, 2014 and 2013, there were no material transactions among the combined entities that required elimination. The Operating Entities’ functional and presentation currency is the South African Rand (“ZAR”).

2. Summary of significant accounting policies

Use of estimates

In preparing the combined financial statements, and in conformity with U.S. GAAP, management uses estimates and assumptions that may affect reported amounts and disclosures. Estimates and assumptions are used when determining the fair value of financial instruments, useful lives of assets, accounting for asset retirement obligations and deferred taxes, as well as identifying contingencies. These estimates and assumptions are based on current facts, historical experience, and various other factors that management believes to be reasonable under the circumstances, the results of which form the basis for making judgments about the carrying values of assets and liabilities and the recording of revenue, income, costs and expenses that are not readily apparent from other sources. Actual results could differ from these estimates.

 

F-307


Table of Contents

Revenue

Power purchase agreements

Substantially all of the Operating Entities’ revenues are obtained through the sale of energy to Eskom pursuant to terms of the PPAs. Concentration risk does exist as the Operating Entities transact with only one customer, namely Eskom. This concentration risk cannot be mitigated due to the limitations of the energy market within South Africa. All PPAs are accounted for as operating leases, have no minimum lease payments and all of the rental income under these leases are contingent rental recorded as income when the electricity is delivered.

Leases

The land on which the solar energy systems are situated is leased under operating lease agreements with a lease term of 25 years. Rentals applicable to operating leases, where substantially all of the benefits and risks of ownership remain with the lessor are charged to the statement of operations and comprehensive income on a straight-line basis over the period of the lease.

Income taxes

Income tax balances are accounted for under the asset and liability method. Deferred tax assets and liabilities are recognized for the future tax consequences attributable to differences between the financial statement carrying amounts of existing assets and liabilities and their respective tax bases and operating loss carryforwards.

Deferred tax assets and liabilities are measured using enacted tax rates expected to apply to taxable income in the years in which those basis differences are expected to be recovered or settled. The effect on deferred tax assets and liabilities of a change in tax rate is recognized in operations in the period that includes the enactment date.

Deferred income taxes arise primarily because of differences in the bases of assets or liabilities between financial statement accounting and tax accounting which are known as basis differences. Management records the tax effect of these basis differences as deferred tax assets (generally items that can be used as a tax deduction or credit in future periods) and deferred tax liabilities (generally items that will be taxable in future periods but have not yet been recorded in the combined statement of operations and comprehensive income).

Management regularly reviews the deferred tax assets, including unused tax benefits, for realizability, taking into consideration all available evidence, both positive and negative, including historical pre-tax and taxable income, projected future pre-tax and taxable income, and the expected timing of the reversals of existing basis differences. In arriving at these judgments, the weight given to the potential effect of all positive and negative evidence is commensurate with the extent to which it can be objectively verified. Valuation allowances are established when management determines that it is more likely than not that some portion, or all of the deferred tax asset, will not be realized.

Management has made the best estimates of certain income tax amounts included in the combined financial statements. Application of the accounting policies and estimates, however, involves the exercise of judgment and use of assumptions as to future uncertainties and, as a result, actual results could differ from these estimates. In determining these estimates, management considers various factors, which include how accurate the estimate or assumptions have been in the past, how much the estimate or assumptions have changed, and how likely such change may have a material impact.

Interest and penalties are accounted for as income tax.

 

F-308


Table of Contents

Cash and cash equivalents

Cash and cash equivalents comprise of all cash balances.

Restricted cash

Restricted cash consists of cash on deposit in financial institutions that are restricted from use in operations pursuant to requirements of certain debt agreements. These funds are reserved for current debt service payments in accordance with the restrictions in the debt agreements.

Accounts receivable

Accounts receivable are reported on the combined balance sheet at the invoiced amounts adjusted for any write-offs and the allowance for doubtful accounts. Management establishes an allowance for doubtful accounts to adjust the receivables to amounts considered to be ultimately collectible. The allowance is based on a variety of factors, including the length of time receivables are past due, significant one-time events, the financial health of customers, and historical experience.

Property, plant and equipment

Property, plant and equipment consists of solar energy systems and is stated at cost less accumulated depreciation. Expenditures for major additions and improvements are capitalized, and maintenance and repairs are charged to expense as incurred. When property, plant and equipment is retired or otherwise disposed of, the cost and accumulated depreciation is removed from the accounts, and any resulting gain or loss is included in the results of operations for the respective period. Depreciation of property, plant and equipment is recognized using the straight-line method over the estimated useful lives of the solar energy systems of thirty years.

Borrowings

Borrowings consist of long-term debt facilities entered into by the Operating Entities. The loans are recorded at amortized cost.

Impairment of long-lived assets

Long-lived assets that are held and used are reviewed for impairment whenever events or changes in circumstances indicate carrying values may not be recoverable. Whenever an impairment indicator exists of the total future estimate of undiscounted cash flows expected from an asset being less than its carrying value an impairment calculation is performed. If such an impairment indicator exists, an impairment charge is measured as the difference between an asset’s carrying amount and fair value with the difference recorded in operating costs and expenses in the statement of operations and comprehensive income. Fair values are determined by a variety of valuation methods including appraisals, sales prices of similar assets, and present value techniques. There were no impairments recognized during the year ended December 31, 2014 and 2013.

Deferred financing costs

Deferred financing costs consist of debt issuance costs and commitment fees incurred by the Operating Entities and are directly attributable to the long-term debt facilities.

 

F-309


Table of Contents

Debt issuance costs

Financing costs incurred in connection with obtaining construction and term financing are deferred and amortized over the maturities of the respective financing arrangements using the effective-interest method. The amortization of debt issuance costs is recorded in other expenses.

Commitment fees

Fees associated with commitment facilities that are not revolving lines of credit are deferred and amortized on a straight-line basis over the commitment period. The commitment period, as defined in the loan agreements, terminates at the earlier of actual COD, 140 days after scheduled COD, or the date of the full draw of the committed facility. For each of these loans, the commitment period expired at 140 days after scheduled COD. Amortization of commitment fees is recorded in other expenses, as of December 31, 2014, these fees have been fully amortized.

Derivatives

All derivative instruments are recorded on the combined balance sheet at fair value. As hedge accounting has not been applied, the movement in derivatives is reported directly in earnings.

Asset retirement obligation

The Operating Entities’ asset retirement obligations relate to leased land upon which the solar energy systems were constructed. The Operating Entities are required to restore the leased land to an agreed-upon condition from the date construction of the asset commences. This would involve dismantling property, plant and equipment constructed on the leased land, and restoring the land to its pre-construction condition. The Operating Entities are required to record the present value of the estimated obligations as the solar energy systems are constructed. At the same time, a corresponding asset was capitalized to the solar energy systems’ cost. The asset retirement obligations will be accreted to their future value over the terms of the land leases, and the amounts capitalized through COD will be depreciated over the remainder of the same term.

Commitments and contingencies

The Operating Entities are involved in litigation and claims in the ordinary course of business with possible gain or loss contingencies that will ultimately be resolved when one or more future events occur or fail to occur. If some amount within a range of loss appears at the time to be a better estimate than any other amount within the range, that amount will be accrued. When no amount within the range is a better estimate than any other amount, the minimum amount in the range will be accrued. Management continually evaluates uncertainties associated with loss contingencies and record a charge equal to at least the minimum estimate liability for a loss contingency when both of the following conditions are met: (i) information available prior to issuance of the financial statements indicates that it is probable than an asset had been impaired or a liability had been incurred at the date of the financial statements; and (ii) the loss or range of loss can be reasonably estimated. Legal costs are expensed when incurred. Gain contingencies are not recorded until realized or realizable.

Commitments related to projects, consist of amounts contracted for but not yet incurred.

Fair value measurement

Management performs fair value measurements in accordance with ASC 820. ASC 820 defines fair value as the price that would be received from selling an asset or paid to transfer a liability in an orderly transaction

 

F-310


Table of Contents

between market participants at the measurement date. When determining the fair value measurements for assets and liabilities required to be recorded at their fair values, management considers the principal or most advantageous market in which it would transact and consider assumptions that market participants would use when pricing the assets or liabilities, such as inherent risk, transfer restrictions and risk of non-performance.

ASC 820 establishes a fair value hierarchy that requires an entity to maximize the use of observable inputs and minimize the use of unobservable inputs when measuring fair value. An asset’s or a liability’s categorization within the fair value hierarchy is based upon the lowest level of input that is significant to the fair value measurement. ASC 820 establishes three levels of inputs that may be used to measure fair value:

 

 

Level 1: quoted prices in active markets for identical assets or liabilities;

 

 

Level 2: inputs other than Level 1 that are observable, either directly or indirectly, such as quoted prices in active markets for similar assets or liabilities, quoted prices for identical or similar assets or liabilities in markets that are not active, or other inputs that are observable or can be corroborated by observable market data for substantially the full term of the assets or liabilities; or

 

 

Level 3: unobservable inputs that are supported by little or no market activity and that are significant to the fair values of the assets or liabilities.

The Operating Entities’ interest rate swaps are classified as Level 2 since all significant inputs are observable for similar instruments. The fair value is determined based on observable market prices for interest rates. The fair value of interest rate swaps at the end of the reporting period is determined by discounting the future cash flows using the curves at the end of the reporting period and the credit risk inherent in the contract. There were no transfers between Level 1, Level 2 and Level 3 financial instruments during the years ended December 31, 2014 and 2013.

The Operating Entities maintain various financial instruments recorded at cost in the December 31, 2014 and 2013 combined balance sheets that are not required to be recorded at fair value. For these instruments, the Operating Entities used the following methods and assumptions to estimate the fair value:

 

 

Cash and cash equivalents, restricted cash, accounts receivable and accounts payable, the carrying amount approximates fair value because of the short-term maturity of the instruments.

 

 

Long-term debt fair value is based on the amount of future cash flows associated with each debt instrument discounted at the current borrowing rate for similar debt instruments of comparable terms. As at December 31, 2014, the fair value of the Operating Entities’ long-term debt with unrelated parties is approximately 8.0% greater than its carrying value. At December 31, 2013, the fair value was approximately 2.3% greater than its carrying amount.

 

 

Given that the shareholder loan agreements do not contain a fixed or determinable repayment schedule, and thus no imputed interest rate is applied, the amortized cost carrying value of loans from shareholders is deemed to approximate fair value.

3. Cash and cash equivalents

Cash and cash equivalents consist of:

 

Figures in ZAR ‘000    December 31,
2014
     December 31,
2013
 

Bank balances

     147 764           

 

 

The full value of cash and cash equivalents has been pledged as collateral against the Long-term debt of the Operating Entities.

 

F-311


Table of Contents

4. Restricted cash

Restricted cash consists of:

 

Figures in ZAR ‘000    December 31,
2014
     December 31,
2013
 

Restricted cash

     128 251         1 160 471   

 

 

2014

In terms of the relevant loan agreements, the Operating Entities were required to maintain separate bank accounts with minimum balances to at least fully cover all scheduled debt repayments due in the immediate six month period. Refer to note 9 for further details on these loans.

2013

In terms of the relevant loan agreements, the Operating Entities were required to maintain separate bank accounts with minimum balances to at least fully cover all scheduled milestone payments to the solar energy system construction contractors.

The full value of restricted cash has been pledged as collateral against the long-term debt of the Operating Entities.

5. Accounts receivable

Accounts receivable consist of:

 

Figures in ZAR ‘000    December 31,
2014
     December 31,
2013
 

Trade debtors

     73 582           

Other debtors

             63   
  

 

 

 
     73 582         63   

 

 

The Operating Entities’ sole trade debtor, Eskom, is a state owned entity. The PPA also makes provision in the event that Eskom defaults on payment, the South African Department of Energy will settle the outstanding debt. As the amounts owing by Eskom have been guaranteed by a governmental agency, all amounts owing by Eskom are considered fully recoverable. Further, no allowance for doubtful accounts has been recognized as no default indicator has been identified.

None of the receivables are past due or impaired.

The full value of the accounts receivable has been pledged as collateral against the long-term debt of the Operating Entities.

6. Property, plant and equipment

Property, plant and equipment, net, consists of the following:

 

Figures in ZAR ‘000    December 31,
2014
    December 31,
2013
 

Solar energy systems

     2 270 811        838 475   

Less: accumulated depreciation—solar energy systems

     (29 325       

Property, plant and equipment, net

     2 241 486        838 475   

 

 

 

F-312


Table of Contents

The Operating Entities recorded depreciation expense related to property, plant and equipment of R29 324 589 and Rnil for the years ended December 31, 2014 and 2013, respectively.

Included in the balance of solar energy systems is capitalized interest on expenditures directly attributable to the construction of the solar energy systems of R115 407 221 and R19 031 454 as at December 31, 2014 and 2013, respectively.

Also included in the balance of solar energy systems is an asset relating to the ARO, which is depreciated over the remaining term of the land lease. Amounts totaling R41 284 442 and R14 670 965 were capitalized as at December 31, 2014 and 2013, respectively.

The full value of the solar energy systems has been pledged as collateral against the long-term debt of the Operating Entities. The fair value of the property, plant and equipment is considered to approximate its carrying amount for the years ended December 31, 2014 and 2013.

7. Deferred financing costs

Debt issuance costs, comprising legal fees, which were incurred by both Core and Erika in establishing their loan facilities with the Standard Bank of South Africa Limited (“Standard Bank”), have been deferred on the balance sheet and are amortized based on the effective interest rate over the period of the loan.

The Operating Entities are also required to pay to an agent (for onward distribution to the relevant lenders) a commitment fee for the facility during a specified availability period. The commitment fee is calculated daily during the defined availability period and is payable quarterly in arrears on March 31, June 30, September 30 and December 31 of each year. If any portion of the available commitment under the facility is canceled, the commitment fee is payable on any canceled amount at the time the cancelation is effective. Commitment fees are deferred and amortized on a straight-line basis during the availability period.

As at December 31, 2014 and 2013, deferred financing costs consist of:

 

Figures in ZAR ‘000    December 31,
2014
     December 31,
2013
 

Current

     150         1 004   

Non-current

     1 472         1 622   
  

 

 

 
     1 622         2 626   

 

 

Amortization of debt issuance costs amounted to R146 974 and R39 421 for the years ended December 31, 2014 and 2013, respectively. Amortization of commitment fees amounted to R1 054 893 and R13 720 873 for the years ended December 31, 2014 and 2013, respectively.

8. Derivatives

As part of the Operating Entities’ risk management strategy, Core and Erika separately entered into interest rate swaps to mitigate interest rate exposure. Interest rate swap agreements are utilized in order to economically hedge the variability of Operating Entities’ expected future cash interest payments, and are not utilized for speculative purposes.

These swap agreements were initiated in November 2012, concurrent with the inception of the term loan facilities with Standard Bank. Because these hedges are deemed economic hedges and not accounted for under hedge accounting, the changes in fair value are recorded to the combined statement of operations and comprehensive income.

 

F-313


Table of Contents

The fair value of interest rate swaps at the end of the reporting period is determined by discounting the future cash flows using the curves at the end of the reporting period and the credit risk inherent in the contract.

As at December 31, 2014 and 2013, derivative transactions consisted of the following:

 

                    Fair value at  
Figures in ZAR ‘000    Balance sheet
classification
   Notional
amount
     December 31,
2014
    December 31,
2013
 

Derivative not designated as a hedge

          

Interest rate swap

   Current liabilities—Derivatives      1 721 081         (18 763       

Interest rate swap

   Non-current assets—Derivatives      2 756 453                8 943   

 

 

 

     

Statement of operations
and comprehensive
income classification

   Notional
amount
     Fair value movements  
Figures in ZAR ’000          December 31,
2014
    December 31,
2013
 

Derivative not designated as a hedge

          

Interest rate swap

   Loss on derivatives      1 721 081         (27 706       

Interest rate swap

   Gain on derivatives      2 756 453                9 882   

 

 

The notional amount represents the exposure at the reporting date which varies based on changes in the loan profile.

The Operating Entities’ interest rate swaps have the following maturities:

 

Figures in ZAR ‘000    Notional amount      Maturity date  

Derivative not designated as a hedge

     

As at December 31, 2013

     

Interest rate swap

     650 006         January 30, 2014   

Interest rate swap

     375 904         April 25, 2014   

Interest rate swap

     809 672         March 28, 2024   

Interest rate swap

     920 871         March 28, 2024   

As at December 31, 2014

     

Interest rate swap

     804 814         March 28, 2024   

Interest rate swap

     916 267         March 28, 2024   

 

 

Under the interest rate swap agreement, the Operating Entities pay a fixed rate and the counterparty to the agreement pays the Operating Entities a floating interest rate. The amount recorded in the balance sheet represents the estimated fair value of the net amount that the Operating Entities would receive or pay in order to exit the agreement as at December 31, 2014 and 2013, respectively, if the agreements were transferred to other third parties or canceled by the Operating Entities.

 

F-314


Table of Contents

9. Long-term debt

Debt consists of the following as at December 31, 2014 and 2013:

 

      December  31,
2014
    December  31,
2013
 
Figures in ZAR ‘000    Total     Current     Long-term     Total     Current     Long-term  

Term loan

     1 969 703        14 816        1 954 887        1 444 815        10 943        1 433 872   

Accrued Interest

     60 590        60 590                               

Debt discount

     (30 389     (2 808     (27 581     (33 139     (2 750     (30 389
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total

     1 999 904        72 598        1 927 306        1 411 676        8 193        1 403 483   

 

   

 

 

   

 

 

   

 

 

   

 

 

 

On November 2, 2012, Core entered into a facility agreement with Standard Bank, which provided for a term loan facility with a limit of R1 056 million. The term loan facility bears interest at a rate of three month JIBAR plus a variable spread per annum, which represents liquidity and other risks, and matures in 2031. At December 31, 2014, the balance outstanding under the term loan facility was R1 073 million. At December 31, 2013, the balance outstanding under the term loan facility was R694 million. The average interest rates for the years ended December 31, 2014 and 2013 were 10.03% and 9.32%, respectively.

On November 2, 2012, Erika entered into a facility agreement with Standard Bank, which provided for a term loan facility with a limit of R956 million. The term loan facility bears interest at a rate of three month JIBAR plus a variable spread per annum, which represents liquidity and other risks, and matures in 2031. At December 31, 2014, the balance outstanding under the term loan facility was R958 million. At December 31, 2013, the balance outstanding under the term loan facility was R750 million. The average interest rates for the years ended December 31, 2014 and 2013 were 9.95% and 8.88%, respectively.

The estimated fair value of outstanding debt obligations was R2 159 419 065 and R1 444 709 767 at December 31, 2014 and December 31, 2013, respectively. The fair value of the outstanding debt is calculated based on expected future cash flows discounted at market interest rates for similar instruments with consideration for non-performance risk.

The combined aggregate amount of maturities for all long-term borrowings is as follows:

 

Contractual cash obligations    ZAR ‘000  

2015

     14 818   

2016

     17 062   

2017

     29 221   

2018

     44 262   

2019

     59 416   

Thereafter

     1 773 655   
  

 

 

 

Total

     1 938 434   

 

  

 

 

 

A structuring and underwriting fee to the lender was incurred by Core and Erika as part of the establishment of this facility. The combined aggregate amount of the structuring and underwriting fee amounted to R33 867 285. This fee paid to the lender is recorded as a direct reduction of the carrying amount of the debt.

The carrying value of cash and cash equivalents, restricted cash, accounts receivable and property, plant and equipment have been pledged as collateral against the long-term borrowings of the Operating Entities. Refer to notes 3, 4, 5 and 6 for details.

 

F-315


Table of Contents

10. Loans from shareholders—related parties

Loans from shareholders represent additional funding provided by shareholders of the Operating Entities, which were initially obtained to fund a portion of the Engineering Procurement Contract.

The loans from shareholders bear an interest rate of 13% from the COD. Prior to the COD, no interest was levied on the shareholder loans. The loans are unsecured and are subordinated to the long-term third party debt. The loans become repayable on demand after the long-term third party debt has been repaid.

Refer to the table below for a listing of the shareholder loans for Core and Erika, respectively.

Core

 

      Outstanding amount  
Figures in ZAR ‘000    %
shareholding
     December 31,
2014
     December 31,
2013
 

SEGP Renewable Energy Southern Africa Proprietary Limited

     51         83 169         42 671   

Public Investment Corporation (SOC) Limited

     39         63 600         59 824   

Kurisani Witkop Proprietary Limited

     10         16 308         15 340   
  

 

 

    

 

 

 
        163 077         117 835   

 

    

 

 

 

Erika

 

      Outstanding amount  
Figures in ZAR ‘000    %
shareholding
     December 31,
2014
     December 31,
2013
 

SEGP Renewable Energy Southern Africa Proprietary Limited

     51         101 345         94 065   

Public Investment Corporation (SOC) Limited

     24         47 692         44 266   

Izingwe International Fund Proprietary Limited

     10         29 807         27 667   

Kurisani Witkop Proprietary Limited

     15         19 871         18 444   
  

 

 

    

 

 

    

 

 

 
        198 715         184 442   
  

 

 

    

 

 

    

 

 

 
        361 792         302 277   

 

    

 

 

 

11. Accruals

Accruals comprise:

 

Figures in ZAR ‘000    December 31,
2014
     December 31,
2013
 

Agency Fees

             726   

Audit Fees

             700   

Legal Fees

             507   

Development Fees

     54 496           
  

 

 

    

 

 

 
     54 496         1 933   

 

 

 

F-316


Table of Contents

12. Accounts payable

Accounts payable comprise:

 

Figures in ZAR ‘000    December 31,
2014
     December 31,
2013
 

Trade creditors

     7 451           

Related parties:

     

SunEdison Green Power Southern Africa Proprietary Limited

             223 954   

SEGP Solar Power Southern Africa Proprietary Limited

     3 240           

SunEdison Energy Southern Africa Proprietary Limited

     13 358         18 649   
  

 

 

 
     24 049         242 603   

 

 

13. Asset retirement obligation

The Operating Entities recognized liabilities for asset retirement obligations (“AROs”) for their solar energy systems, from the date that construction commenced. The ARO liability is estimated based on the size of the project and the estimated cost of dismantling, and is accreted over the remainder of the lease term of the land using a credit-adjusted risk-free rate of 10.4% and 10.9% for the years ended December 31, 2014 and 2013, respectively.

The asset retirement obligations for the years ended December 31, 2014 and 2013 are as follows:

 

Figures in ZAR ‘000    December 31,
2014
     December 31,
2013
 

Balance at the beginning of the year

     14 671           

Recognition of liability

     26 613         14 671   

Accretion expense

     2 707           
  

 

 

 

Balance at the end of the year

     43 991         14 671   

 

 

The fair value of the ARO was estimated based on techniques that made use of third party data and management judgment.

The Operating Entities do not have any assets that are legally restricted for the purpose of settling the asset retirement obligations as at December 31, 2014 and 2013.

14. Power energy revenue

The Operating Entities entered into PPAs with Eskom, a state owned entity. In accordance with the PPAs, the counterparty acquires the full output generated by the plant on an “as available” basis.

 

Figures in ZAR ‘000    December 31,
2014
     December 31,
2013
 

Revenue earned from power sales

     159 582           

 

 

As the quantity to be sold under the PPAs is based on the power plants’ actual output on an “as available basis”, the Operating Entities considered all payments as contingent rent (i.e. contingent on generation).

The cost, accumulated depreciation and carrying amount of the property, plant and equipment used as part of the PPAs, for the years ended December 31, 2014 and 2013, has been disclosed in note 6.

 

F-317


Table of Contents

15. Other income/ (expenses)

 

Figures in ZAR ‘000    December 31,
2014
    December 31,
2013
 

Other Income

    

Interest income earned on cash and cash equivalents

     46 182        18 996   
  

 

 

 
     46 182        18 996   

Other Expenses

    

Interest expense on long-term debt

     (226 408     (51 004

Interest expense on shareholder loans – related parties

     (8 825       

Less: capitalized interest

     96 376        19 031   
  

 

 

 
     (138 857     (31 973
  

 

 

 

Total

     (92 675     (12 977

 

 

The interest expense was capitalized at a rate of 10.05% (2013: 9.51%) for Core, and 10.59% (2013: 9.49%) for Erika based on the effective interest rate for each instrument.

16. Income taxes

Income tax expense (benefit) for the years ended December 31, 2014 and 2013 consists of the following:

 

Figures in ZAR ‘000    December 31,
2014
    December 31,
2013
 

Current

            2 790   

Deferred

     307 171          

Benefits of operating loss carryforwards

     (296 123       
  

 

 

 
     11 048        2 790   

 

 

Effective tax rate

Income tax expense (benefit) for the years ended December 31, 2014 and 2013, differed from the amounts computed by applying the statutory South African income tax rate of 28% (2013: 28%). The significant reconciling items have been noted below:

 

%    December 31,
2014
    December 31,
2013
 

Income tax on SA statutory rate

     28.0%        28.0%   

Permanent items

     (66.0%     5.8%   

Change in valuation allowance

     21.0%        (37.7%
  

 

 

 

Effective benefit rate

     (17.0%     (3.9%

 

 

Deferred taxes

Deferred income taxes for the Operating Entities’ taxable project entities reflect the tax effects of temporary differences between the carrying amounts of assets and liabilities for financial reporting purposes and the amounts used for income tax purposes.

 

F-318


Table of Contents

Significant components of the Operating Entities’ deferred tax assets and liabilities at December 31, 2014 and December 31, 2013 are as follows:

 

Figures in ZAR ‘000    December 31,
2014
    December 31,
2013
 

Deferred tax assets

    

Current

     14 685          

Non-current

     319 782          
  

 

 

 
     334 467          

Deferred tax assets consist of the following:

    

- net operating losses and tax credit carryforwards

     296 123          

- pre-trade expenditures

     22 804        22 804   

- accrued expenses

     15 259          

- asset retirement obligation

     13 075        4 108   

- other

     281        (161

- valuation allowance

     (13 075     (26 751
  

 

 

   

 

 

 
     334 467          
  

 

 

   

 

 

 

Deferred tax liabilities

    

Current

              

Non-current

     (345 515       
  

 

 

   

 

 

 
     (345 515       
  

 

 

   

 

 

 

Deferred tax liabilities consist of the following:

    

- property, plant and equipment

     (345 515       
  

 

 

   

 

 

 
     (345 515       

 

 

In assessing the realization of deferred tax assets, management considers whether it is more likely than not that some portion or all of the deferred tax assets will not be realized. The ultimate realization of deferred tax assets is dependent upon the scheduled reversal of deferred tax liabilities and generation of future taxable income during the periods in which the deferred tax assets become deductible. During the year ended December 31, 2014, a valuation allowance was recognized on the tax effect of the Asset Retirement Obligation, as there is insufficient evidence to suggest there will be sufficient taxable income during the periods in which certain of the deferred tax assets will be realized.

The operating loss carryforward period is indefinite, subject to certain conditions.

As at December 31, 2014 and 2013, the Operating Entities have identified no uncertain tax positions, for which a reserve under ASC 740-10 would be required.

 

F-319


Table of Contents

17. Fair value measurement

The fair value of the Operating Entities’ long-term debt was determined using inputs classified as Level 2 and a discounted cash flow approach using market rates for similar debt instruments. The carrying amount and estimated fair value of the Operating Entities’ long-term debt as at December 31, 2014 and 2013 are as follows:

 

      As at December 31,
2014
     As at December 31,
2013
 
Figures in ZAR ‘000    Carrying amount      Fair value      Carrying amount      Fair value  

Liabilities:

           

Long-term debt, including current portion

     1 999 904         2 159 419         1 411 676         1 444 710   

 

 

Recurring fair value measurements

The following table summarizes the financial instruments measured at fair value on a recurring basis classified in the fair value hierarchy (Level 1, 2 or 3) based on the inputs used for valuation in the accompanying combined balance sheet:

 

      As at December 31,
2014
     As at December 31,
2013
 
Figures in ZAR ‘000    Level 1      Level 2      Level 3      Total      Level 1      Level 2      Level 3      Total  

Assets

                       

Interest rate swaps

                                             8 943                 8 943   
  

 

 

 

Total Derivative Assets

                                             8 943                 8 943   
  

 

 

 

Liabilities

                       

Interest rate swaps

             18 763                 18 763                                   
  

 

 

 

Total Derivative Liabilities

             18 763                 18 763                                   

 

 

18. Commitments and contingencies

From time to time, management is notified of possible litigation or claims arising in the normal course of business operations. Management continually evaluates such matters with legal counsel and believes that, although the ultimate outcome is not presently determinable, these matters will not result in a material adverse impact on the financial position or operations.

Operating lease

The Operating Entities are obligated under certain long-term noncancelable operating leases related to land for its solar energy systems. Certain of these lease agreements contain renewal options. Below is a summary of the Operating Entities’ future minimum lease commitments as at December 31, 2014:

 

Contractual cash obligations    ZAR  

2015

     480 795   

2016

     504 835   

2017

     530 076   

2018

     556 580   

2019

     584 409   

Thereafter

     17 140 316   
  

 

 

 

Total

     19 797 011   

 

 

 

F-320


Table of Contents

Total rental expense was R966 550 and R966 550 for the years ended December 31, 2014 and 2013, respectively.

Core fully prepaid the land lease pursuant to the Witkop Solar Plant for R6 278 362 at inception. Erika prepaid three years of the land lease pursuant to the Soutpan Solar Plant for R1 200 000 at inception of the lease.

Plant construction

At December 31, 2013, the Operating Entities had an outstanding commitment relating to the Engineering Procurement Contract contractor for R998 163 319. There are no similar commitments for 2014.

19. Related parties

The following parties are considered related parties of the Operating Entities:

 

Name of related party    Nature of relationship    Type of transactions involved in

SunEdison Green Power Southern Africa Proprietary Limited

   Contractual    Engineering Procurement Contract

SEGP Solar Power Southern Africa Proprietary Limited

   Contractual    Operations and Maintenance Contract

SunEdison Energy Southern Africa Proprietary Limited

   Contractual    Service Level Agreement

SEGP Renewable Energy Southern Africa Proprietary Limited

   Shareholder    Shareholder loan

Public Investment Corporation

   Shareholder    Shareholder loan

Kurisani Witkop Proprietary Limited

   Shareholder    Shareholder loan

Izingwe International Fund Proprietary Limited

   Shareholder    Shareholder loan

 

Various related parties have provided services to the Operating Entities during the years presented. The expenses incurred by the Operating Entities have been described below:

 

Figures in ZAR ‘000    December 31,
2014
     December 31,
2013
 

SunEdison Green Power Southern Africa Proprietary Limited

     

The Operating Entities entered into a contractual arrangement with this entity, a member of the SunEdison Group, for the construction of the solar energy systems.

     1 227 739         736 605   

SunEdison Energy Southern Africa Proprietary Limited:

     

The Operating Entities entered into a contractual arrangement with this entity, a member of the SunEdison Group, for the provision of general administration services.

     42 458         42 123   

Development fees incurred by the Operating Entities.

     56 628           

SEGP Solar Power Southern Africa Proprietary Limited:

     

The Operating Entities entered into a contractual arrangement for the operations and maintenance for the plant.

     8 194           

 

 

Refer to note 10 for details on loans provided by shareholders to the Operating Entities.

 

F-321


Table of Contents

20. Subsequent events

For the combined financial statements as at and for the year then ended December 31, 2014 and 2013, management has evaluated subsequent events through 6 May 2015, the date the combined financial statements were available to be issued.

Management is not aware of any other material event which occurred after the reporting date and up to the date of this report.

 

F-322


Table of Contents

Independent auditors’ report

The Board of Directors

EN Renewable Energy Limited, EN Wind Power Private Limited and Generacion Eolica India Limited

Report on the financial statements

We have audited the accompanying combined financial statements of EN Renewable Energy Limited, EN Wind Power Private Limited and Generacion Eolica India Limited (together referred to as ‘the Group’) which comprise the balance sheets as of December 31, 2014 and 2013, and the related statements of income, changes in equity, and cash flows for the years then ended, and the related notes to the combined financial statements.

Management’s responsibility for the financial statements

Management is responsible for the preparation and fair presentation of these combined financial statements in accordance with U.S. generally accepted accounting principles; this includes the design, implementation, and maintenance of internal control relevant to the preparation and fair presentation of combined financial statements that are free from material misstatement, whether due to fraud or error.

Auditors’ responsibility

Our responsibility is to express an opinion on these combined financial statements based on our audits. We conducted our audits in accordance with auditing standards generally accepted in the United States of America. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the combined financial statements are free from material misstatement.

An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the combined financial statements. The procedures selected depend on the auditors’ judgment, including the assessment of the risks of material misstatement of the combined financial statements, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the entity’s preparation and fair presentation of the combined financial statements in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity’s internal control. Accordingly, we express no such opinion. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluating the overall presentation of the combined financial statements.

We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion.

Opinion

In our opinion, the combined financial statements referred to above present fairly in all material respects, the financial position of the Group as of December 31, 2014 and 2013, and the results of their operations and their cash flows for the years then ended in accordance with U.S. generally accepted accounting principles.

/s/ KPMG

KPMG

Gurgaon

May 5, 2015

 

F-323


Table of Contents

EN Renewable Energy Limited, EN Wind Power Private Limited and Generacion Eolica India Limited

Combined statements of income

All figures in Indian Rupees (INR)

 

              For the year ended December 31,  
      Note      2014     2013  

Revenue

        592,721,549        643,363,091   

Operating costs and expenses:

       

Cost of operations

        (107,866,614     (87,929,903

General and administrative

        (18,803,795     (14,344,393

Depreciation and accretion

        (207,653,529     (167,856,091

Other operating income

        61,968,799        56,384,026   
     

 

 

 

Total operating costs and expenses, net

        (272,355,139     (213,746,361
     

 

 

 

Operating income

        320,366,410        429,616,730   

Other income (expense):

       

Interest expense

        (310,245,757     (271,954,690

Interest income

        49,056,019        36,463,673   

Other income (expense), net

        194,578        (565,153
     

 

 

 

Total other expenses, net

        (260,995,160     (236,056,170
     

 

 

 

Income before income tax expense

        59,371,250        193,560,560   

Income tax expense

     8         (50,150,934     (56,779,093
     

 

 

 

Net Income

        9,220,316        136,781,467   

 

 

See accompanying notes to combined financial statements.

 

F-324


Table of Contents

EN Renewable Energy Limited, EN Wind Power Private Limited and Generacion Eolica India Limited

Combined balance sheets

All figures in Indian Rupees (INR)

 

            As of December 31,  
      Note    2014      2013  

Assets

        

Current assets:

        

Cash and cash equivalents

        567,041         58,633,513   

Restricted cash

        16,899,836         19,289,855   

Accounts receivable

        85,616,649         48,815,975   

Deferred financing costs

        6,187,500         5,928,479   

Other current assets

   4      108,131,397         123,465,976   
     

 

 

 

Total current assets

        217,402,423         256,133,798   

Property and equipment, net

   3      4,236,467,624         4,275,303,200   

Restricted cash

        363,044,948         362,800,000   

Deferred financing costs

        37,031,532         37,169,875   

Other assets

   4      103,648,051         68,465,530   
     

 

 

 

Total assets

        4,957,594,578         4,999,872,402   
     

 

 

 

Liabilities and Equity

        

Current liabilities:

        

Current portion of long-term debt

   6      305,180,720         253,028,720   

Accounts payable

        18,935,893         5,387,489   

Accrued expenses and other current liabilities

   7      952,435         81,108,704   

Due to related parties

   9      6,412,042         8,004,659   
     

 

 

 

Total current liabilities

        331,481,090         347,529,572   

Other liabilities:

        

Long-term debt, less current portion

   6      2,290,071,004         2,366,501,724   

Asset retirement obligations

   5      92,929,601         71,257,279   

Deferred tax liabilities

   8      199,340,895         152,202,464   
     

 

 

 

Total liabilities

        2,913,822,590         2,937,491,039   

Equity:

        

Net parent investment

        1,812,588,687         1,840,418,377   

Accumulated other comprehensive income (loss)

        231,183,302         221,962,986   
     

 

 

 

Total equity

        2,043,771,989         2,062,381,363   

Total liabilities and equity

        4,957,594,579         4,999,872,403   

 

 

See accompanying notes to combined financial statements.

 

F-325


Table of Contents

EN Renewable Energy Limited, EN Wind Power Private Limited and Generacion Eolica India Limited

Combined statement of cash flows

All figures in Indian Rupees (INR)

 

      For the year ended December 31,  
      2014     2013  

Cash flows from operating activities:

    

Net Income

     9,220,316        136,781,467   

Adjustments to reconcile net income to net cash used in operating activities:

    

Depreciation and accretion

     207,653,529        167,856,091   

Amortization of deferred financing costs

     5,928,479        5,151,416   

Deferred taxes

     47,138,431        25,215,490   

Changes in assets and liabilities:

    

Accounts receivable

     (36,800,674     (13,839,797

Other current assets

     24,334,579        (14,078,586

Other non-current assets

     (35,182,521     102,713,391   

Accounts payable and other current liabilities

     (38,691,655     (18,755,466

Due to related parties

     (1,592,617     8,004,659   
  

 

 

   

 

 

 

Net cash provided by operating activities

     182,007,867        399,048,664   

Cash flows from investing activities:

    

Capital expenditures

     (175,061,843     (63,672,487

Change in restricted cash

     2,390,019        33,565,486   

Deposits with bank

     (9,000,000       
  

 

 

   

 

 

 

Net cash used in investing activities

     (181,671,824     (30,107,001

Cash flows from financing activities:

    

Principal payments on long-term debt

     (253,028,720     (243,818,424

Change in restricted cash

     (244,948     (24,914,259

Proceeds from long-term debt

     228,750,000          

Dividend paid

     (27,829,690     (56,663,493

Payment of deferred financing costs

     (6,049,157     (510,403
  

 

 

   

 

 

 

Net cash used in financing activities

     (58,402,515     (325,906,579
  

 

 

   

 

 

 

Net (decrease)/ increase in cash and cash equivalents

     (58,066,472     43,035,084   

Cash and cash equivalents at beginning of year

     58,633,513        15,598,429   
  

 

 

   

 

 

 

Cash and cash equivalents at end of year

     567,041        58,633,513   
  

 

 

   

 

 

 

Supplemental disclosures of cash flow information:

    

Cash paid for interest (net of capitalization)

     304,238,129        266,803,274   

Income taxes paid

     25,692,360        28,247,000   

Schedule of non-cash investing activities:

    

Additions to asset retirement obligation

     13,878,087          

 

 

See accompanying notes to combined financial statements.

 

F-326


Table of Contents

EN Renewable Energy Limited, EN Wind Power Private Limited and Generacion Eolica India Limited

Combined statements of equity

All figures in Indian Rupees (INR)

 

      Net parent
investment
    Accumulated other
comprehensive
income (loss)
     Total equity  

Balance at December 31, 2012

     1,897,081,870        85,181,520         1,982,263,390   
  

 

 

   

 

 

    

 

 

 

Net income

            136,781,467         136,781,467   

Contribution from parent1

                      

Dividend paid, including taxes

     (56,663,493             (56,663,493
  

 

 

 

Balance at December 31, 2013

     1,840,418,377        221,962,986         2,062,381,363   
  

 

 

 

Net income

            9,220,316         9,220,316   

Dividend paid, including taxes

     (27,829,690             (27,829,690
  

 

 

 

Balance at December 31, 2014

     1,812,588,687        231,183,302         2,043,771,989   

 

 

See accompanying notes to combined financial statements.

 

 

 

1   During the year 1,650,600 numbers of shares of INR 10/- each were issued by Generacion Eolica India Limited to EN Wind Power Private Limited. All inter-company investments among the combined entities are being adjusted in net parent investment account.

 

F-327


Table of Contents

EN Renewable Energy Limited, EN Wind Power Private Limited and Generacion Eolica India Limited

Notes to combined financial statements

All figures in Indian Rupees (INR)

1. Nature of operations

EN Renewable Energy Limited (‘ENRE’), EN Wind Power Private Limited (‘ENWP’) and Generacion Eolica India Limited (‘GEI’) (Together ‘the Companies’) are domiciled in India and were formed for the purpose of developing, constructing, owning and operating are engaged in wind power generation businesses. A State Government Power Distribution Companies (‘Discom’) in India has entered into Power Purchase Agreements (‘PPA’) with each of the above mentioned Companies and all the electricity generated by the Companies is purchased by such Discoms.

Fersa Energia Renovables S.A, Spain (‘FERSA’) holds 100% of the total shares in the Companies either directly or through Fersa India Private Limited, its wholly owned subsidiary.

Basis of presentation

These financial statements represent combined financial statements of ENRE, ENWP and GEI as of and for the years ended December 31, 2014 and 2013. The combined financial statements have been prepared in accordance with U.S. generally accepted accounting principles (“U.S. GAAP”). The Financial Accounting Standards Board (“FASB”) Accounting Standards Codification (“ASC”) is the source of authoritative U.S. GAAP to be applied by nongovernmental entities.

These combined financial statements are presented in Indian Rupees (‘INR’) except as otherwise indicated. Transaction gains and losses that arise from exchange rate fluctuations on transactions and balances denominated in a currency other than the functional currency are generally included in the statements of income as incurred.

The combined financial statements have been prepared using the Companies’ historical basis for assets and liabilities, and include all revenues, expenses, assets, and liabilities attributed to these assets.

All significant inter-company transactions and balances have been eliminated in the combined financial statements.

2. Summary of significant accounting policies

Use of estimates

In preparing the combined financial statements, we use estimates and assumptions that may affect reported amounts and disclosures. Estimates are used when accounting for depreciation, leases, asset retirement obligations, contingencies, impairments, accrued liabilities and income taxes, among others. These estimates and assumptions are based on current facts, historical experience and various other factors that we believe to be reasonable under the circumstances, the results of which form the basis for making judgments about the carrying values of assets and liabilities and the recording of revenue, costs and expenses that are not readily apparent from other sources. To the extent there are material differences between the estimates and actual results, our future results of operations would be affected.

 

F-328


Table of Contents

Cash and cash equivalents

Cash and cash equivalents include all cash balances and the bank deposits with original maturity periods of three months or less.

Restricted cash

Restricted cash consists of cash on balance in banks and financial institutions that are restricted from use in operations pursuant to requirements of certain debt agreements. These funds are used to pay for current operating expenses and current debt service requirements in accordance with the restrictions in the debt agreements.

Accounts receivable

Accounts receivable are reported on the combined balance sheets at the invoiced amounts adjusted for any write-offs and an allowance for doubtful accounts. We establish an allowance for doubtful accounts to adjust our receivables to amounts considered to be ultimately collectible. Our allowance is based on a variety of factors, including the length of time receivables are past due, significant one-time events, the financial health of our customers and historical experience. There was no allowance for doubtful accounts as of December 31, 2014 and 2013. Unbilled receivables included in account receivables were INR 36,860,640 and INR 37,918,672 as of December 31, 2014 and 2013 respectively.

Property and equipment

Property and equipment consists of wind energy systems and construction in progress and is stated at cost. Expenditures for major additions and improvements are capitalized and minor replacements, maintenance and repairs are charged to expense as incurred. When property and equipment is retired, or otherwise disposed of, the cost and accumulated depreciation is removed from the accounts and any resulting gain or loss is included in the results of operations for the respective period. Depreciation of property and equipment is recognized using the straight-line method over the estimated useful lives of the wind energy systems, which is the lesser of twenty five years or the term of the underlying non-renewable real property lease to which the assets are affixed. The useful lives of property and equipment are as under:

 

      Useful Lives  

Wind Energy Systems

     25 years   
  

 

 

 

Other equipment

     6 years   

Computers and Computer Software

     6 years   

Office equipment

     15 years   

 

 

Capitalized interest

Interest incurred on funds borrowed to finance construction of wind energy systems is capitalized until the system is ready for its intended use. There was no interest capitalized during the years ended December 31, 2014 and 2013, respectively.

Deferred financing costs

Financing costs incurred in connection with obtaining construction and term financing are deferred and amortized using the straight-line method over the period in which the term financing is expected to be outstanding. Amortization of deferred financing costs related to the term loans is recorded as interest expense in the combined statements of Income.

 

F-329


Table of Contents

Amortization of deferred financing costs recorded as interest expense was INR 5,928,479 and INR 5,151,416 during the years ended December 31, 2014 and 2013, respectively.

Impairment of long-lived assets

Long-lived assets that are held and used are reviewed for impairment whenever events or changes in circumstances indicate carrying values may not be recoverable. An impairment loss is recognized if the total future estimated undiscounted cash flows expected from an asset are less than its carrying value. An impairment charge is measured as the difference between an asset’s carrying amount and fair value with the difference recorded in operating costs and expenses in the statement of Income. Fair values are determined by a variety of valuation methods, including appraisals, sales prices of similar assets and present value techniques. There were no impairments recognized during the years ended December 31, 2014 and 2013.

Asset retirement obligations

The Companies operate under real property operating lease agreements that include a requirement for the removal of the wind energy systems at the end of the term of the agreement. Asset retirement obligations are recognized at fair value in the period in which they are incurred and the carrying amount of the related long-lived asset is correspondingly increased. Over time, the liability is accreted to its expected future value. The corresponding asset capitalized at inception is depreciated over the useful life of the wind energy system.

Revenue recognition

Power purchase agreements

The Companies’ revenues are obtained through the sale of energy pursuant to terms of power purchase agreements (“PPAs”) or other contractual arrangements which have remaining lives of 15-25 years as of December 31, 2014. All PPAs are accounted for as operating leases, have no minimum lease payments and all of the rental income under these leases is recorded as income when the electricity is delivered. The contingent rental income recognized in the years ended December 31, 2014 and 2013 was INR 592,721,549 and INR 521,395,410, respectively.

Grants

For certain owned wind energy systems, we receive certified emissions rights (CERs) under the Clean Development Mechanism of United Nations Framework Convention on Climate Change. CERs are generated as our wind energy systems generate electricity. CER is recognized as revenue at the time we have transferred a CER pursuant to an executed contract relating to the sale of the CERs to a third party. Also, one of the Power Purchase Agreement provides for sharing of CER revenue with the Power Purchaser. In this case, the Power Purchaser’s share of CER revenue has been netted off against total CER revenue.

The Companies are also eligible to receive generation based incentives (‘GBI’) based on Kwh of electricity fed to Discoms. For GBIs, production from our operated systems is certified by a third party and, once verified, revenue is recognized based on the terms of the contract and the fulfillment of all revenue recognition criteria. Income received pursuant to the GBI scheme is recorded as ‘Other operating income’.

Income taxes

Our income tax balances are determined and reported using a “separate return” method. Under the separate return method, income tax amounts have been computed as if the Companies filed separate tax returns.

 

F-330


Table of Contents

Deferred tax assets and liabilities are recognized for the future tax consequences attributable to differences between the financial statement carrying amounts of existing assets and liabilities and their respective tax bases and operating loss carry forwards and tax credit carry forwards. Deferred income taxes arise primarily because of differences in the bases of assets or liabilities between financial statement accounting and tax accounting which are known as temporary differences. We record the tax effect of these temporary differences as deferred tax assets (generally items that can be used as a tax deduction or credit in future periods) and deferred tax liabilities (generally items for which we receive a tax deduction, but have not yet been recorded in the combined statement of Income).

Deferred tax assets and liabilities are measured using enacted tax rates expected to apply to taxable income in the years in which those temporary differences are expected to be recovered or settled. We ignore future originating temporary differences and schedule existing temporary differences to reverse on a first-in-first-out basis when determining the tax rate expected to apply for purposes of measuring deferred taxes. The effect on deferred tax assets and liabilities of a change in tax rate is recognized in operations in the period that includes the enactment date.

We regularly review our deferred tax assets for realizability, taking into consideration all available evidence, both positive and negative, including historical pre-tax and taxable income, projected future pre-tax and taxable income and the expected timing of the reversals of existing temporary differences. In arriving at these judgments, the weight given to the potential effect of all positive and negative evidence is commensurate with the extent to which it can be objectively verified.

Valuation allowances are established when management determines that it is more likely than not that some portion, or all of the deferred tax asset, will not be realized.

The Companies intend to account for dividend distribution tax in equity in the year in which a dividend is declared.

We believe our tax positions are in compliance with applicable tax laws and regulations. Tax benefits are recognized only for tax positions that are more likely than not to be sustained upon examination by tax authorities. The amount recognized is measured as the largest amount of benefit that is greater than 50 percent likely to be realized upon settlement. We believe that our income tax accrued liabilities, including related interest, are adequate in relation to the potential for additional tax assessments. There is a risk, however, that the amounts ultimately paid upon resolution of audits could be materially different from the amounts previously included in our income tax expense and, therefore, could have a material impact on our tax provision, net income and cash flows.

Contingencies

We are involved in conditions, situations or circumstances in the ordinary course of business with possible gain or loss contingencies that will ultimately be resolved when one or more future events occur or fail to occur. If some amount within a range of loss appears at the time to be a better estimate than any other amount within the range, that amount will be accrued. When no amount within the range is a better estimate than any other amount, however, the minimum amount in the range will be accrued. We continually evaluate uncertainties associated with loss contingencies and record a charge equal to at least the minimum estimated liability for a loss contingency when both of the following conditions are met: (i) information available prior to issuance of the financial statements indicates that it is probable that an asset had been impaired or a liability had been incurred at the date of the financial statements; and (ii) the loss or range of loss can be reasonably estimated. Legal costs are expensed when incurred. Gain contingencies are not recorded until realized or realizable.

 

F-331


Table of Contents

Fair value measurements

Fair value accounting guidance establishes a hierarchy for inputs used in measuring fair value that maximizes the use of observable inputs and minimizes the use of unobservable inputs by requiring that the most observable inputs be used when available. Observable inputs are inputs that market participants would use in pricing the asset or liability, and are based on market data obtained from sources independent of us. Unobservable inputs reflect assumptions market participants would use in pricing the asset or liability based on the best information available in the circumstances. The hierarchy is broken down into three levels based on the reliability of inputs as follows:

 

 

Level 1—Valuations based on quoted prices in active markets for identical assets or liabilities that we have the ability to access. Valuation adjustments and block discounts are not applied to Level 1 instruments. Because valuations are based on quoted prices that are readily and regularly available in an active market, valuation of these instruments does not entail a significant degree of judgment.

 

 

Level 2—Valuations based on quoted prices in markets that are not active or for which all significant inputs are observable, either directly or indirectly. Valuations for Level 2 are prepared on an individual instrument basis using data obtained from recent transactions for identical securities in inactive markets or pricing data from similar instruments in active and inactive markets.

 

 

Level 3—Valuations based on inputs that are unobservable and significant to the overall fair value measurement.

We maintain various financial instruments recorded at cost in the December 31, 2014 and 2013 combined balance sheets that are not required to be recorded at fair value. For cash and cash equivalents, restricted cash, accounts receivable, accounts payable, and accrued liabilities, the carrying amount approximates fair value because of the short-term maturity of the instruments. For due to related parties and debt, the carrying amount approximates fair value based on comparable market interest rates for similar instruments.

New accounting standards

In January 2014, the FASB issued ASU No. 2014-05, Service Concession Arrangements (ASC 853). The objective of this Update is to specify that an operating entity should not account for a service concession arrangement within the scope of this Update as a lease in accordance with Topic 840, Leases, rather, it should refer to other Topics as applicable to account for various aspects of a service concession arrangement. The amendments also specify that the infrastructure used in a service concession arrangement should not be recognized as property, plant, and equipment of the operating entity. We are currently evaluating the impact of this standard on our financial statements.

In May 2014, the FASB issued ASU No. 2014-09, Revenue from Contracts with Customers, which requires an entity to recognize the amount of revenue to which it expects to be entitled for the transfer of promised goods or services to customers. ASU 2014-09 will replace most existing revenue recognition guidance in U.S. GAAP when it becomes effective. ASU 2014-09 is effective for us on January 1, 2017. Early application is not permitted. The standard permits the use of either a retrospective or cumulative effect transition method. We have not determined which transition method we will adopt, and we are currently evaluating the impact that ASU 2014-09 will have on our financial statements and related disclosures upon adoption.

In August 2014, the FASB issued ASU No. 2014-15, Presentation of Financial Statements—Going Concern (Subtopic 205-40): Disclosure of Uncertainties about an Entity’s Ability to Continue as a Going Concern, which requires management to evaluate, at each annual and interim reporting period, whether there are conditions or

 

F-332


Table of Contents

events that raise substantial doubt about the entity’s ability to continue as a going concern within one year after the date the financial statements are issued and to provide related disclosures. ASU 2014-15 is effective for us for our fiscal year ending December 31, 2016 and for interim periods thereafter. We are currently evaluating the impact of this standard on our financial statements.

In March 2015, the FASB issued ASU No. 2015-03, Interest—Imputation of Interest (Subtopic 835-30):, which requires that debt issuance costs related to a recognized debt liability be presented in the balance sheet as a direct deduction from the carrying amount of that debt liability, consistent with debt discounts. ASU 2015-03 is effective for us for our fiscal year starting December 31, 2015 and for interim periods within those fiscal years. We are currently evaluating the impact of this standard on our financial statements.

3. Property and equipment

Property and equipment consists of the following:

 

      As of December 31,  
      2014     2013  

Wind energy systems

     5,148,439,380        4,145,214,998   

Office equipment and computers

     368,934        196,885   

Other equipment

     5,185,840          

Less: Accumulated depreciation

     (917,526,530     (717,667,236

Add: Construction in progress

            847,558,553   
  

 

 

 

Property and equipment, net

     4,236,467,624        4,275,303,200   

 

 

Depreciation expense was INR 199,859,294 and INR 161,624,732 for the years ended December 31, 2014 and 2013, respectively.

4. Other assets

Other assets consist of the following:

 

      As at December 31, 2014      As at December 31, 2013  
      Current      Non-Current      Current      Non-Current  

Advance recoverable from Supplier

     2,077,261                 39,052,956           

GBI Receivables

     62,953,045                 63,424,081           

Prepaid Land—lease rent

     5,390,366         100,461,944         3,390,366         67,359,160   

Deposits with banks

     9,000,000                           

Income tax

     18,231,097                           

Others

     10,479,628         3,186,107         17,598,573         1,106,370   
  

 

 

 
     108,131,397         103,648,051         123,465,976         68,465,530   

 

 

 

F-333


Table of Contents

5. Asset retirement obligations

Activity in asset retirement obligations for the years ended December 31, 2014 and 2013 is as follows:

 

      As of December 31,  
      2014      2013  

Balance at the beginning of the year

     71,257,279         65,025,920   

Additional obligation

     13,878,087           

Accretion

     7,794,235         6,231,359   
  

 

 

 

Balance at the end of the year

     92,929,601         71,257,279   

 

 

6. Debt

Debt consists of the following:

 

      As at December 31,  
      2014      2013  

Current

     305,180,720         253,028,720   

Long term

     2,290,071,004         2,366,501,724   
  

 

 

 

Total Principal

     2,595,251,724         2,619,530,444   

 

 

ENRE

ENRE executed a loan agreement on March 19, 2010 with the Indian Renewable Energy Development Agency Limited (‘IREDA’).

The sanctioned term loan from IREDA was for INR 1,860,000,000, carried a rate of interest of 11.6% and required repayment of principal in 48 installments from September 30, 2011 to June 30, 2023. The loan amount borrowed, rate of interest and repayment of principal was revised to INR 1,842,059,000, 12.25% (2013: 10.9%) and 48 installments from March 31, 2012 to December 31, 2023, respectively. The term loan is secured by a mortgage and hypothecation of all existing and future immoveable and movable assets of ENRE and is further secured through a trust and retention account, bank guarantee and pledge of equity in ENRE.

ENWP

ENWP executed a rupee loan agreement on June 21, 2012 (and as amended/modified from time to time) with IREDA.

The term loan sanctioned from IREDA is for INR 745,000,000, carries a rate of interest of 12.25% and requires quarterly repayment of principal in 44 installments from March 31, 2015 to December 31, 2025. The term loan is secured by a mortgage and hypothecation of all existing and future immoveable and movable assets of ENWP and is further secured through a trust and retention account and pledge of equity in ENWP.

GEI

GEI executed a loan agreement on January 29, 2008 with IREDA.

The sanctioned term loan from IREDA was for INR 1,186,500,000, carried a rate of interest of 10.25% and required repayment of principal in 40 installments from March 31, 2009 to December 31, 2018. The rate of

 

F-334


Table of Contents

interest and repayment of principal was revised to 12.50% (2013: 11.40%) and 25 installments from December 31, 2012 to December 31, 2018 respectively. The term loan is secured by a mortgage and hypothecation of all existing and future immoveable and movable assets of GEI and is further secured through a trust and retention account, bank guarantee and pledge of equity in GEI.

Maturities

The aggregate amounts of payments on long-term debt due after December 31, 2014 are as follows:

 

Year   2015     2016     2017     2018     2019     Thereafter  

Maturities of long-term debt

    305,180,720        314,391,016        321,839,016        321,839,016        223,627,016        1,108,374,940   

 

 

The debt arrangements contain certain representations, covenants and warranties of the borrower companies including limitations on business activities, guarantees, project maintenance standards, debt to equity ratios and minimum debt service reserve requirements. The debt service reserve money is required to be maintained out of the cash flows generated from the project, which shall be funded through the receivables from business operations.

7. Accrued expenses and other current liabilities

Accrued expenses and other liabilities consist of the following:

 

      As at December 31,  
      2014      2013  

Income taxes payable

             5,769,826   

Payable to Enercon India Limited

             27,916,210   

Interest payable on term loan

             36,410,491   

Payable to employees

     79,133         55,107   

Other liabilities

     873,302         10,957,070   
  

 

 

 
     952,435         81,108,704   

 

 

8. Income taxes

Income tax balances are determined and reported herein under the “separate return” method.

Income tax expense consists of the following:

 

      Current      Deferred      Total  

Year ended December 31, 2014

     3,012,503         47,138,431         50,150,934   

Year ended December 31, 2013

     31,563,604         25,215,490         56,779,093   

 

 

Tax rate reconciliation

The applicable Indian statutory tax rate for the tax year ended 2014 and 2013 is 34.61% and 33.99%, respectively. Income tax expense differed from the amounts computed by applying the statutory Indian income tax rate of 34.61% to profit before income taxes.

 

F-335


Table of Contents
      For the year ended
December 31,
 
      2014      2013  

Income tax at Indian statutory rate

     34.61%         34.61%   

Increase (reduction) in income taxes:

     

Impact of valuation allowance

     17.68%         17.42%   

Impact of tax holidays

     30.12%         (22.34%

Others

     1.94%         (0.36)%   

Effective tax benefit rate

     84.36%         29.33%   

 

 

The impact of tax holiday is an expense of INR 17,909,015 for the year ended December 31, 2014 and a benefit of INR 43,244,684 for the year ended December 31, 2013.

Significant components of deferred taxes

The significant component of deferred tax assets and liabilities for the year ended December 31, 2014 and December 31, 2013 are as follows:

 

      As of December 31,  
      2014      2013  

Deferred tax assets:

     

Minimum alternate tax credit

     34,576,107         31,563,604   

Asset retirement obligations

     32,162,935         24,662,144   
  

 

 

 

Total deferred tax assets

     66,739,042         56,225,748   

Deferred tax liabilities:

     

Property and equipment

     199,340,895         152,202,464   
  

 

 

 

Total deferred tax liabilities

     199,340,895         152,202,464   
  

 

 

 

Valuation allowance

     66,739,042         56,225,748   
  

 

 

 

Net deferred tax liabilities

     199,340,895         152,202,464   

 

 

The Companies have unabsorbed depreciation for Indian income tax purposes of INR 595,868,456 as at December 31, 2014 and INR 503,436,284 as at December 31, 2013 which are available to offset future taxable income, if any, over an indefinite period. A deferred tax asset has not been recognized since the amounts are forecasted to be utilized during the Companies’ tax holiday periods. The Companies have a minimum alternate tax credit of INR 34,576,107 as at December 31, 2014 and INR 31,563,604 as at December 31, 2013 which are available to offset future taxes and expire during the period from March 31, 2019 to March 31, 2022. The minimum alternate tax rate is 19.05%.

The Companies have a tax holiday which expires 15 years from the date of commissioning of the wind energy system and is available for a 10 year period starting from the date on which the project entity starts claiming the holiday. The tax holiday provides for a zero percent tax rate during the years it applies. The 10 year tax holiday periods apply from March 31, 2012, March 31, 2015 and March 31, 2018 for GEI, ENRE and ENWP, respectively. The tax holiday ends on March 31, 2022, March 31, 2025 and March 31, 2028 for GEI, ENRE and ENWP, respectively. The Companies had a net expense in 2014 as a result of the tax holiday due to the origination of taxable temporary differences expected to reverse after the expiration of the tax holiday, while the related deductions are expected to be utilized during the tax holiday period and provide no tax benefit. Carryforward unabsorbed depreciation of INR 17,312,988 was utilized by ENRE during the year ended December 31, 2013 i.e. prior to its tax holiday period.

 

F-336


Table of Contents

The change in valuation allowance is INR 10,513,293 and INR 33,720,277 during the year ended December 31, 2014 and December 31, 2013, respectively.

The 2014 and 2013 tax years remain open to examination by tax authorities.

The Companies have recognized tax benefits only for tax positions that are more likely than not to be sustained upon examination by tax authorities. As of December 31, 2014 and 2013, the total unrecognized tax benefits amounted to INR 13,900,766 and INR 13,900,766, respectively, towards tax benefits and deductibility of expenses which result in a reduction of unabsorbed depreciation carryforwards. The gross amount of increase in unrecognized tax benefits is INR Nil and INR 12,946,162 during the years ended December 31, 2014 and December 31, 2013, respectively relating to current year tax positions. These unrecognized tax benefits, if recognised, would affect the effective tax rate. Given the expectation that the carryforwards would be expected to be utilized during the tax holiday periods, these unrecognized tax benefits would have no overall tax impact.

9. Related parties

Management and technical fees

The Companies entered into a Technical and Management Services Agreement with FERSA, whereby FERSA will provide technical and management services such as provision of financial services, advising and supporting on day to day operational issues and provision and coordination of legal and tax advice, primarily on a cost-reimbursement basis, plus a 7.5% fee on arm length’s basis. Costs incurred for these services were INR 28,725,599 and INR 8,004,659 for the years ended December 31, 2014 and 2013, respectively. Related amounts were reported as cost of operations in the combined statements of income and were reflected in operating activities in the combined statements of cash flows. Amounts payable to FERSA (included in ‘Due to related parties’) in respect of the above management and technical fees is INR 6,412,042 and INR 8,004,659 as at December 31, 2014 and 2013, respectively.

Net parent investment

Net parent investment account represents common stock and additional paid in capital of ENRE, GEI and ENWP, net of intercompany investments.

Holders of common stock are entitled to one vote per share, and to receive dividends and, upon liquidation or dissolution, are entitled to receive all assets available for distribution to stockholders. The holders have no preemptive or other subscription rights and there are no redemption or sinking fund provisions with respect to such shares.

10. Commitments and contingencies

From time to time, the Companies have become involved in claims and legal matters arising in the ordinary course of business. Management is not currently aware of any matters that will have a material adverse effect on the financial position, results of operations, or cash flows of the Companies.

Contingency

There are certain pending matters relating to the sub-lease of /rights in certain portions of lands for one of the projects in which the lessor holds lease rights. The sub-lease is subject approvals from certain government authorities. The project company believes that there are no irregularities in its right to use the land and based on the opinion of its legal counsel believes that the likelihood of an unfavourable outcome of its lease rights of the said land is not probable. In addition, the Company believes that no further settlement or any significant additional liability is expected on account of such matters pending resolution.

 

F-337


Table of Contents

Operating lease

The Companies have entered into operating lease for Registered Office of the Companies. Rent expense, included in General and Administrative Expenses in the combined statements of Income, was INR 1,931,589 and INR 1,778,450 for the years ended December 31, 2014 and 2013, respectively.

The future minimum payments related to these leases as of December 31, 2014, are as follows:

 

      Amount  

2015

     1,168,400   

Thereafter

       

 

 

Purchase commitments

ENWP has entered an into an agreement with Wind World (India) Limited (‘WWIL’), whereas the WWIL will install an online WEG monitoring mechanism at all WEG commissioned which will help ENWP to view the daily information from their own location.

ENWP had open commitments of INR 522,379 and INR Nil as at December 31, 2014 and 2013, respectively.

ENWP has entered into a turnkey contract with WWIL for construction, development and commissioning of wind power project. The Company had open commitments pertaining to unpaid amount of above turnkey contract of INR Nil and INR 110,098,680 as at December 31, 2014 and 2013, respectively.

11. Segment information

The Companies are engaged in one reportable segment that operates a portfolio of wind energy generation assets. The Companies operate as a single reportable segment based on a “management” approach. This approach designates the internal reporting used by management for making decisions and assessing performance as the source of the reportable segments. The Companies’ chief operating decision maker (the “CODM”), its Board of Directors manages the Companies’ operation.

Revenue for the years ended December 31, 2014 and 2013 were from customers located in India. Customers include government controlled public electricity distribution entities. Revenue to specific customers exceeding 10% of total revenue for the years ended December 31, 2014 and 2013 were as follows:

 

Customer Name    For the year ended December 31,  
     2014      2013  
      Revenue      Percent      Revenue      Percent  

Customer 1

     309,994,383         52%         338,964,551         53%   

Customer 2

     170,167,800         29%         182,430,859         28%   

Customer 3

     112,559,366         19%                 0%   

Customer 4

             0%         121,967,681         19%   

 

 

All property, plant and equipment of the Companies are located in India.

12. Subsequent events

For the combined financial statements as of and for the years ended December 31, 2014 and 2013, we have evaluated subsequent events through May 4, 2015 the date the combined financial statements were available to be issued and determined that no subsequent events had occurred that would require additional disclosures.

 

F-338


Table of Contents

Report of independent auditors

To the Shareholders of Empresa de Generación Eléctrica de Junín S.A.C.

We have audited the accompanying financial statements of Empresa de Generación Eléctrica de Junín S.A.C. (a Peruvian company a direct, subsidiary of Latin America Power Perú S.A.C. and indirect subsidiary of Latin America Power Holding B.V., domiciled in the Netherlands), which comprise the statement of financial position as of December 31, 2014 and 2013, and the related statements of income, comprehensive income, changes in stockholders’ equity and cash flows for the years then ended, and the related notes to the financial statements.

Management’s responsibility for the financial statements

Management is responsible for the preparation and fair presentation of these financial statements in conformity with International Financial Reporting Standards – IFRS, as issued by the International Accounting Standards Board; this includes the design, implementation and maintenance of internal control relevant to the preparation and fair presentation of financial statements that are free of material misstatement, whether due to fraud or error.

Auditor’s responsibility

Our responsibility is to express an opinion on these financial statements based on our audits. We conducted our audits in accordance with auditing standards generally accepted in the United States, as issued by the American Institute of Certified Public Accountants. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement.

An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the financial statements. The procedures selected depend on the auditor’s judgment, including the assessment of the risks of material misstatement of the financial statements, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the entity’s preparation and fair presentation of the financial statements in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity’s internal control. Accordingly, we express no such opinion. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluating the overall presentation of the financial statements.

We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion.

Opinion

In our opinion, the financial statements referred to above present fairly, in all material respects, the financial position of Empresa de Generación Eléctrica de Junín S.A.C. as of December 31, 2014 and 2013, and the results of its operations and its cash flows for the years then ended in conformity with International Financial Reporting Standards.

Lima, Peru

May 7, 2015

Countersigned by:

 

 

Paredes, Zaldivar, Burga & Asociados

 

F-339


Table of Contents

Empresa de Generación Eléctrica de Junín S.A.C.

Statements of financial position

As at December 31, 2014 and 2013

 

      Note    2014
S/.
    2013
S/.
 

Assets

       

Current assets

       

Cash and cash equivalents

   5      4,972,889        15,827,161   

Trade accounts receivable

   6      3,538,985          

Accounts receivable from related parties

   19(b)      94,707        5,875,051   

Other accounts receivable

   7      505,533        5,652,056   
  

 

 

 

Total current assets

        9,112,114        27,354,268   
  

 

 

 

Non-current assets

       

Other accounts receivable

   7      17,752,089        11,517,437   

Property, plant and equipment, net

   8      245,486,986        147,815,468   

Intangible assets, net

   9      25,499        4,194,426   
  

 

 

 

Total assets

        263,264,574        163,527,331   
  

 

 

 
        272,376,688        190,881,599   
  

 

 

 

Liabilities and equity

       

Current liabilities

       

Loans and borrowings

   10      1,674,406        4,404,774   

Trade accounts payable

   11      556,930        41,193   

Other accounts payable

        241,897        5,320   

Accounts payable to related parties

   19(b)      9,866,055        9,991,828   
  

 

 

 

Total current liabilities

        12,339,288        14,443,115   

Non-current liabilities

       

Accounts payable to related parties

   19(b)      5,897,369          

Loans and borrowings

   10      178,987,778        108,998,984   

Deferred taxes

   12      336,974          
  

 

 

 

Total liabilities

        197,561,409        108,998,984   
  

 

 

 

Equity

   13     

Share capital

        53,475,343        42,378,973   

Legal reserve

        37,413,075        29,645,613   

Acumulated losses

        (16,073,139     (4,585,086
  

 

 

 

Total equity

        74,815,279        67,439,500   
  

 

 

 

Total liability and equity

        272,376,688        190,881,599   

 

 

The accompanying notes are an integral part of this statement.

 

F-340


Table of Contents

Empresa de Generación Eléctrica de Junín S.A.C.

Statements of comprehensive income

For the years ended December 31, 2014 and 2013

 

      Note   2014
S/.
    2013
S/.
 

Revenue

      

Energy sales

       3,478,719          

Cost of sales

   15     (956,308       
    

 

 

 

Gross profit

       2,522,410          

Administrative expenses

   16(a)     (1,452,874     (628,744

Other income

       32,408        21,891   

Other expenses

   17     (30,403     (117,358
    

 

 

 

Operating profit

       1,071,542        (724,211

Other income (expenses)

      

Financial income

       10,265          

Financial expenses

       (672,709     (31,750

Exchange gains (losses), net

   20     (11,560,177     (1,589,065
    

 

 

 

Loss before income tax

       (11,151,079     (2,345,026

Deferred income tax

   12     (336,974       
    

 

 

 

Net loss

       (11,488,053     (2,345,026
    

 

 

 

Other comprehensive income

                
    

 

 

 

Total comprehensive income of the year

       (11,488,053     (2,345,026

 

 

All loss for the year relates to continuing operations

 

 

The accompanying notes are an integral part of this statement.

 

F-341


Table of Contents

Empresa de Generación Eléctrica de Junín S.A.C.

Statements of changes in equity

For the years ended December 31, 2014 and 2013

 

      Share
capital
S/.
    

Legal

reserve
S/.

    

Accumulated

losses
S/.

    Total
S/.
 

Balances as at January 1, 2013

     41,647,590         29,133,646         (2,240,060     68,541,176   

Capital contribution, note 13(a) and (b)

     731,383         511,967                1,243,350   

Net loss

                     (2,345,026     (2,345,026
  

 

 

 

Balances as at December 31, 2013

     42,378,973         29,645,613         (4,585,086     67,439,500   

Capital contribution, note 13(a) and (b)

     11,096,370         7,767,462                18,863,832   

Net loss

                     (11,488,053     (11,488,053
  

 

 

 

Balances as at December 31, 2014

     53,475,343         37,413,075         (16,073,139     74,815,279   

 

 

 

The accompanying notes are an integral part of this statement.

 

F-342


Table of Contents

Empresa de Generación Eléctrica de Junín S.A.C.

Statements of cash flows

For the years ended December 31, 2014 and 2013

 

     

2014

S/.

   

2013

S/.

 

Operating activities

    

Payments to suppliers and taxes

     (2,254,167     (3,967,511

Other payments, net

     (1,341,774     (2,260,013
  

 

 

 

Net cash flow from operating activities

     (3,595,941     (6,227,524
  

 

 

 

Investing activities

    

Purchases of property, plant and equipment

     (86,018,646     (101,615,494

Purchases of intangible assets

            (754,455
  

 

 

 

Net cash used in investing activities

     (77,612,560     (102,369,949
  

 

 

 

Financing activities

    

Capital contribution

     6,445,008        1,243,350   

Proceeds from borrowings

     91,486,116        113,403,759   

Repayment of borrowings

     (36,018,809       

Proceeds from borrowings from related parties

     16,848,000          

Amortization of borrowings from related parties

            (79,655
  

 

 

 

Net cash and cash flows from financing activities

     78,760,315        114,567,454   
  

 

 

 

Net decrease (increase) in cash and cash equivalents for the period

     (10,854,272     5,969,981   

Cash and cash equivalents at beginning of year

     15,827,161        9,857,180   
  

 

 

 

Cash and cash equivalents at year—end

     4,972,889        15,827,161   
  

 

 

 

Transactions that do not represent cash flows:

    

Purchases of property, plant and equipment

     (9,365,470     (8,406,086

Capitalization of debts with related parties

     12,488,824          

 

 

 

The accompanying notes are an integral part of this statement.

 

F-343


Table of Contents

Empresa de Generación Eléctrica de Junín S.A.C.

Notes to the financial statements

As of December 31, 2014 and 2013

 

1.   Identification and business activity

 

  (a)   Identification

Empresa de Generación Eléctrica de Junín S.A.C. (hereafter “the Company”) is a Peruvian entity incorporated on December 14, 2009, in the city of Lima by Latin America Power Perú S.A.C. (a subsidiary of Latin America Power Holding B.V., domiciled in the Netherlands) and GCZ Energía S.A.C., which respectively hold 70 percent and 30 percent of the voting shares of the Company’s capital stock.

 

  (b)   Business activity

The Company is dedicated to the generation and sale of electric it to local private and state-owned companies, as well as to engineering activities, and actions related to its business activity. Its legal domicile is Av. del Pinar N° 152, Oficina N° 508, Santiago de Surco, Lima, Peru.

Through Ministerial Resolution N° 072-2012-MEM/DM dated February 16, 2012, the Peruvian State via the Ministry of Energy and Mines (hereafter “MEM”) awarded the Company the definite concession to develop electric generation activities at the Runatullo III Hydroelectric Plant, located in the Mariscal Castilla and Comas districts, province of Concepción, department of Junín. Also, through Ministerial Resolution N° 114-2012-MEM/DM, dated March 2, 2012, the Peruvian State via MEM awarded the Company the definite concession to develop electric generation activities at the Runatullo III Hydroelectric Plant, located in the Mariscal Castilla and Comas districts, province of Concepción, department of Junín, and also approved the subscription of the Concession Contract between the Peruvian State, represented by MEM, and the Company, which took place on September 30, 2011.

On September 30, 2011, the Company was awarded the Tender on Electricity Supply through renewable energy resources (hereafter “RER”) called by the Supervising Agency of Investments in Energy and Mining (OSINERGMIN), which among other RER generating projects, selected the Runatullo III Hydroelectric Plant as supplier of electricity for the National Interconnected Electric System (SEIN under its Spanish acronym) for a 20-year term. The Company committed to start commercial operations at the Runatullo III Hydroelectric Plant, at the latest, on December 15, 2014. As consequence, the Company and the Peruvian State subscribed the corresponding supply contract. The constructions of these Plants were made by its related party GCZ Ingenieros S.A.C.

On December 12, 2013, the Company was awarded the Tender on Electricity Supply through RER called by OSINERGMIN, which among other RER generating projects, selected the Runatullo II Hydroelectric Plant as supplier of electricity for the SEIN for a 20-year period maturity, which establish that, through the mechanism of RER Auctions, the Company receives a fixed fee per megawatt established for each hydroelectric plant. The Company committed to start commercial operations at the Runatullo II Hydroelectric Plant, at the latest, on December 15, 2014. As consequence, the Company and the Peruvian State subscribed the corresponding supply contract.

In November 2014, the Company started operations at the Runatullo III Hydroelectric Plant, which has 20.2 MW of installed capacity.

 

F-344


Table of Contents

In December 2014, the Company started operations at Runatullo II Hydroelectric Plant, which is located all along the Runatullo River located at 6 Km in the department of Junin, which has 19.1 MW of installed capacity.

 

  (c)   Main contracts

 

  (i)   Engineering, Procurement and Construction (“EPC”) Contract for Runatullo II and Runatullo III Hydroelectric Plants

On June 7, 2012, the Company and GCZ Ingenieros S.A.C., subscribed an EPC contract under which GCZ Ingenieros S.A.C. shall be responsible for the execution, making and rendering of all the works, activities and services associated or necessary to execute and develop the engineering, procurement, construction, assembly, testing and definite delivery of the Runatullo II and Runatullo III Hydroelectric Plants.

In return, the Company shall pay to GCZ Ingenieros S.A.C., for the execution of the works, US$91,674,603 (equivalent to S/.274,015,388) including Value Added Tax (“VAT”). The first payment, made on July 1, 2012, accounted for 10 percent of an advance payment of US$8,225,143 (equivalent to S/.24,584,952) including VAT. The remaining shall be paid based on monthly valuations of the direct cost plus general expenses, deducting 10 percent for amortization of the prepayment. The income of the contract shall be cancelled at the definite delivery and conformity declaration of the works.

In order to guarantee to the Company the properly compliance of all the obligations, GCZ Ingenieros S.A.C. surrendered a bank guarantee letter of faithfully compliance issued in its favor for US$8,225,143 (equivalent to S/. 24,584,952).

Likewise, GCZ Ingenieros S.A.C. shall surrender to the Company a mortgage guarantee over shares that GCZ Energía S.A.C. holds in Hidroeléctrica Santa Cruz S.A.C., as correct functioning guarantee. The amount of said guarantee equals 10 percent of the contract’s total price. This guarantee shall cover defects and/or imperfections, quality, duration and functioning of the civil works, equipment, materials and facilities in general corresponding to the works, in accordance with the established by the contract.

On July 20, 2012, it was signed an addendum to the EPC contract by which GCZ Ingenieros S.A.C. committed to deliver the hydroelectric contracts for the starting of the commercial operation, at the latest, on January 1, 2015. These plants were delivered on the agreed date. This contract finalized on December 2014.

 

  (ii)   Administration, Operation and Maintenance (“AOM”) Contract for Runatullo II Hydroelectric Plant and Runatullo III Hydroelectric Plant

On February 1, 2013, the Company and GCZ Servicios S.A.C. subscribed to said contract through which the latter agrees to render the services of administration, operation and minor maintenance to the Runatullo II Hydroelectric Plant and Runatullo III Hydroelectric Plant. The contract has a 5-year term and is renewable at maturity.

During 2014, the Company disbursed S/.1,078,550 (S/.401,052 in 2013), which are recorded in the “Cost of generation” and “Administrative expenses” captions of the statements of comprehensive income.

 

F-345


Table of Contents
  (iii)   Trust agreement

On April 5, 2013, the Company and La Fiduciaria S.A. subscribed to said contract with the purpose of constituting a trust of irrevocable designation, for which the Company transferred the trust assets on fiduciary domain to La Fiduciaria. This trust agreement was signed in order to guarantee the financial obligations assumed which Banco Internacional del Peru S.A.A. for the constructions of the hydroelectric plants. See note 10.

The purpose of the contract is the following:

 

  (i) Administer the trust assets and the trust bank accounts.

 

  (ii) The Trust Equity can be used as payment means of the guaranteed obligations.

 

  (iii) The Trust Equity can be used as guarantee of faithfully and timely compliance of the guaranteed obligations.

 

  (d)   Approval of financial statements

The financial statements for the year ended December 31, 2014, have been approved and authorized for their issuance by Management and will be submitted to the Board of Directors and the General Shareholders’ Meeting for their approval within the terms established by law. In Management’s opinion, said financial statements will be approved without modification.

 

2.   Operating regulation and legislation that affect the activities of the electricity industry

The main regulations affecting the Company’s activities are the following:

 

  (a)   Electrical concessions law—

In Peru, the electricity sector is ruled by the Electrical Concessions Law, Decree-Law N°25844, enacted on November 19, 1992, its Regulation, Supreme Decree N° 009-93-EM, enacted on February 25, 1993, and its amendments and extensions, such as Law N° 28832, “Law to Ensure the Efficient Development of Electric Generation”.

Pursuant to the Electrical Concessions Law, the electricity sector is divided into three main sub-sectors, each one comprising a different activity: electricity generation, transmission and distribution. In accordance with said Law and the “Law to Ensure the Efficient Development of Electricity Generation”, the operation of power generation plants and transmission systems are subject to the provisions of the Economic Operation Committee of the National Interconnected System (COES-SINAC, by its Spanish acronym), with the purpose of coordinating said operation at a minimum cost, preserving the safety of electric energy supply and the best usage of energy resources, as well as the planning of the SEIN development and the short-term market administration. COES-SINAC determines the pricing of the power and energy transfers between generators.

The main changes introduced by the Law are related to the participation in short-term market of distribution companies and large free customers, including distributors and customers, besides generation companies, as members of COES-SINAC, modifying the structure of this organization. Also, it regulates the procedure for distribution companies to convene biddings to ensure energy supply to the regulated market. This law has also amended the legal framework for the electricity transmission activities.

 

F-346


Table of Contents
  (b)   Promotion of investment on electricity generation using renewable energy—

The Legislative Decree N° 1002, published on May 2, 2008 and the regulation, has the purpose of promoting the use of RER in order to enhance the quality of life of the population and to protect the environment through the investment promotion of electricity generation with the use of RER, which is declared of national interest and public necessity. RER are defined as the biomass as well as the wind, solar, geothermal, tidal and hydraulic energies (the latter solely when the generation capacity is less than 20.0 MW).

Eligible to the provisions of said Legislative Decree are the new operations of companies using RER as primary energy, with previous accreditation before the MEM.

Electricity generation via RER enjoys priority in the daily dispatch performed by COES. The production variable cost for the use of RER shall be zero.

The law and its regulations introduced an auction scheme for electricity generated with RER. The energy required for the auctions shall correspond to the participation of the estimated generation with RER by multiplying the National Consumption of Electricity, as established by the Regulation, by the percentage established by the MEM, in which the national consumption of electricity generated with RER must participate, every five years.

 

  (c)   Promotion of investment on electricity generation using water resources and other renewable resources—

The Legislative Decree N°1058 dated June 27, 2008, established the investment promotional framework of electricity generation with the use of RER, thus encouraging scientific research and technological innovation, as well as the designing of projects that qualify as mechanisms of clean development which upon being granted their registration can be subject of the negotiation of Emission Reductions Certificates (hereafter “CER”) that can be sold to companies of industrialized countries, which at their turn can account said reductions of greenhouse gases as part of their qualitative goals committed under the Kyoto Protocol.

This regime benefits the electricity generation based on water resources or based on other renewable resources such as wind, solar, geothermal, biomass or tidal, which will be subject to the accelerated depreciation benefit over the Income Tax. Said regime shall be applied to the generation plants that start operations since the entry into force of the aforementioned Legislative Decree. The accelerated depreciation shall be applicable to machinery, equipment and civil works necessary for the installation and operation of the plant, which are acquired and/or built since the entry into force of the Legislative Decree. The rate to be applied is 20 percent as global annual rate.

 

3. Summary of significant accounting policies and principles

 

  3.1   Basis of preparation and presentation—

The financial statements have been prepared in accordance with International Financial Reporting Standards (IFRS) issued by the “International Accounting Standards Board” (hereinafter “IASB”).

The accompanying financial statements have been prepared on a historical cost basis, based on the accounting records kept by the Company.

 

F-347


Table of Contents

The accounting policies adopted are consistent with policies applied in previous years, except for the new IFRS and revised IAS that are mandatory for periods beginning on or after January 1, 2014, in which the Company has adopted; however, due to the structure of the Company and nature of its operations, the adoption of these standards had no significant effect on its financial position and results of operation; therefore, it has not been necessary to modify the comparative financial statements of the Company. These new IFRS and revised IAS are described below:

 

   

IAS 32 Financial Instruments: Presentation—Offsetting Financial Assets and Financial Liabilities (Amendment)

Defines the meaning of “currently has a legal right to offset” criteria and mechanisms for non-simultaneous solution clearinghouses for entitlement to offsetting modification.

Additionally, this amendment clarifies that to offset two or more instruments financial institutions should have a right to offset that cannot be conditioned on a future event, and should be mandatory the following circumstances: (i) the normal course of business, (ii) in the event of default, and (iii) in the event of insolvency or bankruptcy of the entity or any of the counterparties.

 

   

IAS 36 Impairment of Assets (Amendments)

These amendments eliminate the unforeseen consequences of IFRS 13 on the disclosures required by IAS 36. In addition, the amendments also require disclosure of recoverable amounts of the assets or cash-generating units for which an impairment loss is recognized or when reversals have been recognized in the period.

 

   

IAS 39 Novation derivatives and continuity of hedge accounting (Amendments)

These amendments provide an exception to discontinue hedge accounting when the novation of a derivative designated as a hedging instrument that meets certain criteria is given.

 

   

IFRIC 21 Levies

IFRIC 21 clarifies that an entity recognizes a liability for a levy when the activity giving rise to the payment, as identified in the relevant legislation, is performed. To a levy that is activated when a minimum threshold, the interpretation clarifies that no liability should be anticipated before reaching the minimum threshold specified.

Note 4 includes information about the judgments, significant accounting estimates and assumptions used by Management in the preparation of the accompanying financial statements.

 

  3.2   Summary of significant accounting principles and policies—

Significant accounting policies used by Management for the preparation of financial statements are as follow:

 

  (a)   Cash and cash equivalents—

Cash and cash equivalents presented in the statement of financial position comprises cash balances and current bank accounts and short-team deposits with original maturities less than three months. For purposes of preparing the statement of cash flows, cash and cash equivalents include cash and short-term deposits defined above.

 

F-348


Table of Contents
  (b)   Foreign currency transactions—

 

  (i) Functional and presentation currency—

The Company’s financial statements are presented in Nuevos Soles (except when otherwise indicated), which is also the Company’s functional currency.

 

  (ii) Transactions and balances in foreign currency—

The transactions carried out in a currency other than the functional currency are considered as transactions in foreign currency. Transactions in foreign currencies are initially recorded by the Company at the functional currency rates prevailing at the date of the transaction. Monetary assets and liabilities denominated in foreign currencies are retranslated at the functional currency spot rate exchange ruling at the reporting date. Non-monetary items that are measured in terms of historical cost in a foreign currency are translated using the exchange rates as of the dates of the initial transactions.

 

  (c)   Financial Instruments: Initial recognition and subsequent measurement—

 

  (i) Financial assets—

Initial recognition and measurement—

Financial assets within the scope of International Accounting Standard (IAS) 39, “Financial Statements: Recognition and measurement”, are classified as financial assets at fair value through profit or loss, loans and receivables, held-to-maturity investments, available-for- sale financial investments, or as derivatives designated as hedging instruments in an effective hedge, as appropriate. The Company determines the classification of its financial assets at initial recognition.

All financial assets are recognized initially at fair value and, in the case of assets carried at fair value through profit or loss, directly attributable transaction costs.

Purchases or sales of financial assets that require delivery of assets within a time period established by regulation or market convention are recognized on the trade date, which represents the date that the Company commits to purchase or sell the asset.

Subsequent measurement—

The subsequent measurement of financial assets depends on their classification. As of December 31, 2014 and 2013, the Company only maintains loans and receivables, as described below:

Loans and receivables—

Loans and receivables are non-derivative financial assets with fixed or determinable payments that are not quoted in an active market, for which the entity has no intention of selling indirectly nor in the near future and have no risk other than credit impairment.

After initial recognition, such financial assets are measured at amortized cost using the effective interest rate method (EIR), less any impairment. Amortized cost is calculated by

 

F-349


Table of Contents

taking into account any discount or premium on acquisition and fees or costs that are an integral part of the EIR. The EIR amortization is recognized in the statement of comprehensive income as “Financial income”. Losses resulting from impairment are recognized in the statement of comprehensive income as a provision.

As of December 31, 2014 and 2013, the Company maintains cash and cash equivalents, trade receivables, accounts receivables from related parties and other receivables in this category.

Derecognition—

A financial asset (or, where applicable, a part of a financial asset or part of a group of similar financial assets) is derecognized when the rights to receive cash flows from the asset have expired.

Impairment of financial assets—

At the end of each period under report, the Company assesses whether there is any objective evidence that a financial asset or group of financial assets is impaired in value. A financial asset or group of financial assets is considered impaired in value only if there is objective evidence that there was a loss in value as a result of one or more events that occurred after the initial recognition of the asset (the “event that causes loss”), and the event that caused the loss has an impact on the estimated future cash flows generated by the financial asset or group of financial assets, and that impact can be reasonably estimated.

Evidence of impairment may include, among others, evidence that the debtors or a group of debtors are experiencing significant financial difficulty, default or delinquency in payments of debt principal or interest.

Financial assets carried at amortized cost—

For financial assets carried at amortized cost, the Company first assesses whether objective evidence of impairment exists; individually for financial assets that are individually significant, or collectively for financial assets that are not individually significant. If the Company determines that no objective evidence of impairment for a financial asset evaluated individually, regardless of its importance, it includes the asset in a group of financial assets with credit risk characteristics similar, and evaluates them collectively to determine whether impairment exists. Assets that are individually assessed to determine whether impairment exists, and for which an impairment loss is recognized or is still recognized, are not included in the evaluation of impairment collectively.

If there is objective evidence that there has been an impairment loss, the amount of the loss is measured as the difference between the asset’s carrying amount and the present value of estimated future cash flows (excluding future expected credit losses that have not yet been produced). The present value of estimated future cash flows discounted at the original effective interest rate of financial assets. If the loan bears a variable interest rate, the discount rate for measuring any impairment loss is the current effective interest rate.

 

F-350


Table of Contents

The carrying amount of the asset is reduced through the use of an allowance account and the amount of the loss is recognized in the statement of comprehensive income.

 

  (ii) Financial liabilities—

Initial recognition and measurement—

Financial liabilities within the scope of IAS 39 are classified as financial liabilities at fair value through profit or loss, loans and accounts payable, or as derivatives designated as hedging instruments in an effective hedge, as appropriate. The Company determines the classification of financial liabilities at initial recognition.

All financial liabilities are recognized initially at fair value (in the case of loans and payables carried at amortized cost) plus transaction costs directly attributable.

The Company’s financial liabilities include accounts payable, accounts payable to related parties, other accounts payable and financial obligations.

Subsequent measurement—

The subsequent measurement of financial liabilities depends on their classification. As of December 31, 2014 and 2013, the Company only maintains loans and borrowings as follows:

Debt and interest bearing loans—

After initial recognition, financial liabilities are measured at amortized cost, using the effective interest rate method. Gains and losses are recognized in the statement of comprehensive income when the liabilities are derecognized as well as through the amortization process, using the effective interest rate method.

Amortized cost is calculated by taking into account any discount or premium on acquisition and fees or costs that are an integral part of the effective interest rate. The amortization of the effective interest rate is recognized as “Finance cost” in the statement of comprehensive income.

Derecognition—

A financial liability is derecognized when the relevant obligation is discharged or canceled or expires. When an existing financial liability is replaced by another from the same lender on substantially different terms, or the terms are substantially modified, such replacement or amendment is treated as a derecognition of the original liability and the recognition of a new liability, and the difference in the respective carrying amounts is recognized in the statement of comprehensive income.

 

  (iii) Offsetting of financial instruments—

Financial assets and financial liabilities are offset and the net amount reported in the statement of financial position if, and only if there is a currently enforceable legal right to offset the recognized amounts and there is an intention to settle on a net basis, or to realize the asset and settle the liability simultaneously.

 

F-351


Table of Contents
  (iv) Fair value of financial instruments—

The fair value is the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date.

The fair value of an asset or liability is measured using the assumptions that market participants would use to rank the asset or liability value, assuming that market participants Law in their best economic interest. The fair value measurement of non-financial assets takes into account the ability of a market participant to generate economic benefits through more and better use of the asset or selling it to another market participant that would use the assets in the best possible way.

The Company uses valuation techniques that are appropriate in the circumstances and for which sufficient information is available to measure fair value, maximizing the use of relevant observable inputs and minimize the use of unobservable inputs.

All assets and liabilities which are determined or reveal fair values in the financial statements are classified within the fair value hierarchy, described below , based on the lowest level of the data used that are significant to the measurement at fair value as a whole:

 

   

Level 1: Quoted (unadjusted) prices in active markets for identical assets or liabilities.

 

   

Level 2: Other techniques for all information or data different to quoted prices within level 1, available, either directly or indirectly.

 

   

Level 3: Techniques which use inputs that have a significant effect on the recorded fair value that are not based on observable market data.

For assets and liabilities that are recognized at fair value in the financial statements on a recurring basis, the Company determines whether there have been transfers between levels in the hierarchy by reviewing the categorization at the end of each reporting period.

Management determines the policies and procedures for both recurring fair value measurement. At each reporting date, management analyzes the movements in the values of assets and liabilities which are required to be re-measured or in accordance with the accounting policies of the Company.

For purposes of fair value disclosures, the Company has determined classes of assets and liabilities on the basis of the nature, characteristics and risks and the level of the fair value hierarchy as explained above.

 

  (d)   Property, plant and equipment—

The item of property, plant and equipment is stated at cost, net of accumulated depreciation and / or accumulated impairment losses. The purchase price or construction cost is the total amount paid and the fair value of any other consideration given to acquire the asset. For the significant components of facilities, furniture and equipment that must be replaced periodically, the Company derecognized the replaced component and recognizes the new component with their respective useful lives and depreciation. Similarly, when a major inspection is performed, its cost is recognized as a replacement to the extent that they meet the recognition requirements. Other repair and maintenance costs are recognized as expenses as incurred.

 

F-352


Table of Contents

Land is not depreciated. Depreciation is calculated following the straight-line method using the following estimated useful lives:

 

      Years  

Buildings

     45   

Machinery and equipment

     45   

The asset´s residual value, useful lives and depreciation methods are reviewed at each reporting period, and adjusted prospectively if appropriate.

An item of property, plant and equipment or a significant component is removed upon disposal or when no future economic benefits are expected from its use or disposal. Any gain or loss arising on derecognition of the asset (calculated as the difference between the net disposal proceeds and the carrying amount of the asset) is included in the statement of comprehensive income in the year the asset is derecognized.

Work in progress includes expenditures for building, financing costs, and other direct costs accrued during the construction phase. Work in progress is capitalized when completed and depreciation is calculated from the time they are able to be used.

The criteria for capitalizing borrowing costs and other direct expenses are:

 

   

To capitalize borrowing costs, the Company identifies the liabilities related to the work and determines the amount of interest to be capitalized according to the average investment held each month as work in progress.

 

   

To capitalize the direct staff costs, the Company identifies each of the areas devoted 100 percent to planning, implementation and management, and determines the percentage of time for part-time areas, which is applied to the employee costs in these areas.

 

  (e)   Intangible assets—

Intangible assets are recorded at cost and are presented net of accumulated amortization. Amortization is recognized as an expense and is determined using the straight-line method based on estimated useful lives of assets, which has been estimated between 5 and 10 years.

The estimate of the useful life is reviewed periodically to ensure that the amortization period is consistent with the expected pattern of future economic benefits from these assets.

 

  (f)   Impairment of long-lived assets—

At the end of each year end the Company evaluates if there are indicators that an asset could be impaired. If there is an indicates The Company prepares an estimate of the recoverable amount of the asset when events or economic changes occur that indicate that the value of assets may be impaired, or when it is required to perform the annual asset impairment test. The recoverable amount of an asset is the greater of the fair value of the unit cash of production less the costs to sell and its value in use, and it is determined for an individual asset, unless the asset does not generate cash flows in an independent manner. When the book value of an asset exceeds its recoverable value, an asset is considered impaired and it is reduced to its recoverable value. In assessing value in use, the estimated future cash flows are discounted to their present value using a pre-tax discount rate that reflects current market assessments of the time value of

 

F-353


Table of Contents

money and the risks specific to the asset. In determining fair value less costs to sell, recent market transactions are taken into account, if available. If no such transactions can be identified, an appropriate valuation model is used. These calculations are corroborated by valuation multiples, quoted share prices for publicly traded subsidiaries or other available fair value indicators. The impairment losses are recognized in the statement of income.

That assessment requires certain estimates and assumptions such as volume of projects, investments, working capital budgets, discount rates, list prices and operating costs.

As of December 31, 2014 and 2013, the Company’s Management believes that there is no evidence of operational and / or economic that indicates that the carrying amount of machinery and equipment and intangibles cannot be recovered.

 

  (g)   Borrowing costs—

Borrowing costs that are directly attributable to the acquisition, construction or production of an asset that necessarily takes a substantial period to make it available for its intended use or sale are capitalized as part of cost of the respective assets. All other borrowing costs are expensed in the period incurred. Borrowing costs include interest and other costs that an entity incurs in connection with the celebration of the respective loan agreements.

 

  (h)   Provisions—

A provision is recognized when the Company has a present liability (legal or constructive) as a result of a past event, it is probable that an outflow of resources embodying economic benefits will be required to settle the liability and the amount of the obligation can be reliably estimated. Provisions are reviewed periodically and adjusted to reflect the best estimate as of the date of the statement of financial position. The expense relating to any provision is shown on the statement of comprehensive income.

If the time value of money is material, provisions are discounted using a pre-tax rate that reflects, when appropriate, the risk specific to the liability. When the discount is made, the increase in the provision due to passage of time is recognized as interest expense in the statement of comprehensive income.

 

  (i)   Contingencies—

Liabilities are recorded in the financial statements when it is probable that they are confirmed in time and can be reliably measured. Possible contingencies are not recognized in the financial statements. These are disclosed in notes to the financial statements, unless the possibility of an outflow of economic benefits is remote.

Contingent assets are not recognized in the financial statements but are disclosed when an inflow of economic benefits is virtually certain.

 

  (j)   Revenue recognition—

The Company recognizes revenue when the amount can be reliably measured, it is probable that economic benefits will flow to the Company and meet specific criteria for each type of income,

 

F-354


Table of Contents

described below. It is considered that the amount of revenue cannot be reliably measured until all contingencies related to the sale have been resolved. Revenue is recognized as follows:

Sale of energy and power—

Revenues from sales of electricity and power delivered and unbilled are recognized as income in the month in which the service is provided based on the reports of the Committee on Economic Operation of COES-SINAC National Grid, which are issued a month after the delivery of energy. Sales of energy from Renewable Energy Resources (RER) include a premium established under the RER contracts (see note 1(b)).

 

  (k)   Taxes—

Current income tax—

Current income tax asset or liability is measured at the amount expected to be recovered from or paid to the taxation authorities, according to the existing rules for determining taxable income. The income tax is calculated based on the Company’s financial information.

Deferred income tax—

Deferred income tax is recognized using the liability method on temporary differences between the accounting basis and the tax basis at the date of statement of financial position.

Liabilities for deferred income taxes are recognized for all taxable temporary differences, when the opportunity of reversal can be controlled and it is probable that they will not reverse in the foreseeable future.

Deferred tax assets are recognized for all deductible temporary differences, and the future offset of unused tax credit and tax loss carryforward, to the extent that it is probable that taxable profit will be available against which the deductible temporary differences and the carryforwards of unused tax credits and unused tax losses can be used.

The carrying amount of deferred tax assets is reviewed at each statement of financial position date and is reduced to the extent that it is no longer probable that sufficient future taxable income will be available to allow the benefit of part or the entire deferred asset to be utilized. Unrecognized deferred assets are re-assessed on each statement of financial position date.

Deferred tax assets and liabilities are measured at the tax rates that are expected to apply in the year when the asset is realized or the liability is settled, based on tax rates and tax rules that were approved to date end of the period over which it is reported, or whose approval is near to completion at that time.

Deferred tax items are recognized in correlation to the underlying transaction either in the income statement or directly in equity.

Deferred tax assets and deferred tax liabilities are offset if a legally enforceable right exists to set off current tax assets against current income tax liabilities, and when the deferred taxes related to the same taxable entity and the same taxation authority.

Value added tax—

Revenues, expenses and assets are recognized net of the amount of Value Added Tax (VAT), except for the accounts receivable and payable which are already stated with the amount of VAT included.

 

F-355


Table of Contents

The net amount of VAT recoverable from, or payable to, the taxation authority is included as part of other accounts receivable or payable in the statement of financial position.

 

  3.3   New accounting pronouncements

The Company has decided not to early adopt the following standards and interpretations that were issued by the IASB, but are not effective at December 31, 2014:

 

   

IFRS 9, “Financial Instruments: classification and measurement”

In July 2014, the IASB issued the final version of IFRS 9 Financial Instruments, which reflects all phases of project financial instruments and replace IAS 39 “Financial Instruments: Recognition and Measurement” and all previous versions of IFRS 9. The standard introduces new requirements for the classification and measurement, impairment and hedge accounting. IFRS 9 is effective for annual periods beginning on or after January 1, 2018, with early application permitted. Retrospective application is required, but the comparative information is not mandatory. The early application of the previous versions of IFRS 9 (2009, 2010 and 2013) is allowed if the date of initial application is before February 1, 2015. The adoption of IFRS 9 will have an effect on the classification and measurement financial assets of the Company, but no impact on the classification and measurement of financial liabilities.

 

   

IFRS 15, Revenue from contracts with customers

IFRS 15 was issued in May 2014 and established a new five-step model to be applied to revenue from contracts with customers. Under IFRS 15 revenue is recognized at an amount that reflects the consideration that the entity expects to be entitled in exchange for the transfer of goods or services to a customer. The principles of IFRS 15 provide an approach more structured to measurement and revenue recognition. The new standard of income is applicable to all entities and will replace all current requirements for revenue recognition under IFRS. The retrospective application Complete or modified is required for annual periods beginning on or after January 1, 2017, with early adoption permitted.

 

   

Amendments to IFRS 11 Joint Arrangements: Accounting for acquisitions of interests

Amendments to IFRS 11 requires that a joint operator post the acquisition of an interest in a joint venture in which the activity of the joint venture is a business, according to IFRS 3. The amendments also clarify that a pre-existing interest in a joint operation is not remeasured in the acquisition of an additional interest in the same joint operation, while the joint control is maintained. In addition, a scope exclusion has been added to IFRS 11 to specify that the amendments do not apply when the parties sharing joint control, including reporting entity under common control of the same main controller.

The changes apply to both the acquisition of the initial stake in a joint operation and the acquisition of any additional interest in such joint operation and are effective prospectively for annual periods beginning on or after January 1, 2016, allowing the adoption Advance.

 

F-356


Table of Contents
   

Amendments to IAS 16 and IAS 38: Clarification of acceptable methods of depreciation and amortization.

The amendments clarify the principle of IAS 16 and IAS 38, that revenues reflect a pattern of economic benefits generated from operating a business (which the asset is part) rather than the economic benefits consumed through use of the asset. As a result, the depreciation method based on income cannot be used to depreciate property, plant and equipment and may only be used in very limited to the amortization of intangibles circumstances. The amendments are effective prospectively for annual periods beginning on or after January 1, 2016, with early adoption permitted.

It is not expected that the above amendments will have a significant impact for the Company.

 

4.   Judgments, estimates and significant accounting assumptions

The preparation of financial statements requires Management to make judgments, accounting estimates and assumptions that affect the reported amounts of revenue, expenses, assets, liabilities and disclosure of contingent liabilities at the end of the reporting period under review. These judgments and estimates are based on Management’s best knowledge about the relevant facts and circumstances, taking into account previous experience, however, the results may differ from the amounts included on the financial statements. Information about such judgments and estimates is contained in the accounting policies and / or in the notes to the financial statements.

The main areas of uncertainty associated with the estimates and critical judgments made by Management in the preparation of financial statements include:

 

   

Estimation of useful life of property, plant and equipment and intangible assets, residual values and impairment, note 3.2(d), 3.2(e) and 3.2(f).

 

   

Estimation of income tax, note 3.2(k).

 

   

Contingencies, note 3.2(i).

Any differences in the estimates with subsequent actual results are reported in the year in which they occur.

 

5.   Cash and cash equivalents

 

  (a)   Following is the composition of this caption:

 

      2014
S/.
     2013
S/.
 

Current accounts(b)

     894,961         817,926   

Trust fund account(c)

     4,077,928         9,556,435   

Overnight deposits(d)

             5,452,800   
  

 

 

 
     4,972,889         15,827,161   

 

 

 

  (b)   As of December 31, 2014 and 2013, the Company keeps current bank accounts in local financial entities, denominated in local currency and foreign currency, which are unrestricted and do not bear interest.

 

  (c)  

As of December 31, 2014 and 2013, this balance corresponds to disbursements received from the syndicated loan the Company has with Banco Internacional del Perú S.A.A., the Corporación Andina de Fomento (CAF) and the Corporación Financiera de Desarrollo S.A.

 

F-357


Table of Contents
 

(COFIDE), which becomes available according to the execution and advances of construction works of Runatullo II and Runatullo III Hydroelectric Plants. This account is managed by La Fiduciaria S.A. as indicated by the trust agreement. As of the date of this report, this balances were entirely used in the construction of the plants.

 

  (d)   As of December 31, 2013, corresponds to overnight deposits for S/.2,100,000 and US$1,200,000 (equivalent to S/.3,352,800), which accrued annual interest rates of 4.1 and 0.05 percent in Nuevos Soles and US Dollars, respectively. Said deposits were entirely cancelled on January 6, 2014.

 

6.   Trade accounts receivable

 

  (a)   Following is the composition of this caption:

 

      2014
S/.
     2013
S/.
 

Trade accounts receivable(b)

     1,108,696           

Accrued income for RER auctions(c)

     2,430,289           
  

 

 

    

 

 

 
     3,538,985           

 

 

 

  (b)   Trade accounts receivable correspond mainly to the estimation performed by Management of accounts receivable from energy delivered but not billed in the month. These accounts receivable are billed on the first days of the following month and are denominated in Nuevos Soles.

 

       As of December 31, 2014 and 2013, the aging of the accounts receivable is mainly comprised by non-past due balances shorter than 30 days.

 

  (c)   Corresponds to unbilled sales of energy delivered into the current month. These sales are invoiced within the billing cycle of the following month.

 

  (d)   No provision for doubtful accounts as of December 31, 2014 and 2013 was recorded as management assessed that there were no significant risks of default.

 

7.   Other accounts receivable

 

  (a)   Following is the composition of this caption:

 

      2014
S/.
     2013
S/.
 

VAT credit(b)

     18,227,326         17,116,010   

Cash delivered on accountability

     8,660         47,954   

Advances to suppliers

     6,636         5,529   

Other

     15,000           
  

 

 

 
     18,257,622         17,169,493   
  

 

 

 

Maturity:

     

Current portion

     505,533         5,652,056   

Non-current portion

     17,752,089         11,517,437   
  

 

 

 
     18,257,622         17,169,493   

 

  

 

 

 

 

  (b)   As of December 31, 2014 and 2013, this caption corresponds mainly to the VAT credit as result of purchases and acquisitions from suppliers for the construction of the Runatullo II and Runatullo III Hydroelectric Plants. Said VAT credit will be applied to the tax payable in the medium-term.

 

F-358


Table of Contents
8.   Property, plant and equipment

 

  (a)   Following is the movement and composition of the caption at the date of the financial statements:

 

     Land
S/.
    Buildings
and other
constructions
S/.
    Machinery
S/.
    Financing
cost
S/.
    Work-in-
progress
S/.
    Total
S/.
 

Cost

           

Balance as of January 1, 2013

    340,388                             36,822,779        37,163,167   

Additions(b)

    118,271                             109,903,309        110,021,580   

Interest capitalization(g)

                                630,721        630,721   
 

 

 

 

Balance as of December 31, 2013

    458,659                             147,356,809        147,815,468   

Additions(b)

           63,196,000        23,782,030                      86,978,030   

Transfers(c)

           90,135,634        48,883,926        8,337,249        (147,356,809       

Interest capitalization

                         10,909,375               10,909,375   
 

 

 

 

Balance as of December 31, 2014

    458,659        153,331,634        72,665,956        19,246,624               245,702,873   
 

 

 

 

Accumulated depreciation

           

Balance as of January 1, 2013

                                         

Depreciation for the period

                                         
 

 

 

 

Balance as of December 31, 2013

                                         

Depreciation for the period, note 15

           (125,436     (72,629     (17,822            (215,887
 

 

 

 

Balance as of December 31, 2014

           (125,436     (72,629     (17,822            (215,887
 

 

 

 

Net book value as of December 31, 2014

    458,659        140,559,525        72,593,330        19,228,802               245,486,986   
 

 

 

 

Net book value as of December 31, 2013

    458,659                             147,356,809        147,815,468   

 

 

 

F-359


Table of Contents
  (b)   As of December 31, 2014 and 2013, main additions correspond to civil works, electromechanic works and transmission lines that are part of the construction and development of the Runatullo II and Runatullo III Hydroelectric Plants.

 

  (c)   During 2014, correspond to the activation of works in progress to each item of property, plant and equipment at the completion of the construction and development of the Runatullo II and III Hydroelectric Plants.

 

  (d)   The Company has contracted multi-risk insurance policies that cover in a sufficient manner the entirety of the Runatullo II and Runatullo III Hydroelectric Plants.

 

  (e)   As of December 31,2014 and 2013, the Company has granted property as security for financial obligations with Banco Internacional del Peru S.A.A. with a net book value of S/.140,559,525, see note 10.

 

  (f)   As of December 31, 2014 and 2013, Management performed an assessment on use and conditions of its property, plant and equipment, and has not found any impairment indicator in such assets. Thus, in its opinion, their book value is recoverable with the future income generated by the Company.

 

  (g)   The Company ended the construction of Runatullo III Hydroelectric plant in November 2014 and Runatullo II Hydroelectric plant in December 2014. These constructions are financed by Banco International del Perú S.AA. (see note 10). The amount of borrowing costs capitalized during the year ended December 31, 2014 was S/.10,808,375 (S/.638,721 during year 2013). the rate used to determine the amount of borrowing cost eligible for capitalization was 8.06 percent which is the effective interest rate of specific borrowing.

 

9.   Intangible assets, net

 

  (a)   Following is the movement and composition of the caption:

 

     2014     2013  
    

Project

development
S/.

    Concessions,
licenses and other
S/.
    Carbon bonds
S/.
    Software
S/.
    Total
S/.
    Total
S/.
 

Cost

           

Balance as of January 1

    2,692,595        938,437        520,786        42,608        4,194,426        3,439,971   

Additions

                                       754,455   

Transfers to property, plant and equipment(b)

    (2,692,595     (938,437                   (3,631,032       

Disposals

                  (520,786            (520,786       
 

 

 

 

Balance as of December 31

                         42,608        42,608        4,194,426   
 

 

 

 

Cumulative amortization

           

Balance as of January 1

                                         

Amortization of the period

                         (17,109     (17,109       
 

 

 

 

Balance as of December 31

                         (17,109     (17,109       
 

 

 

 

Net book value

                         25,499        25,499        4,194,426   

 

 

 

  (b)   As of December 31, 2014 and 2013, the main transfers made to the cost of the plants correspond to disbursements related to easement payments and land affectation, among others, with the purpose of developing the construction project of the Runatullo II and Runatullo III Hydroelectric Plants.

 

  (c)   As of December 31, 2014 and 2013, Management has determined that there are not any events or economic changes indicating that the value of intangible assets cannot be recoverable.

 

F-360


Table of Contents
10.   Loans and borrowings

 

  (a)   We show below an analysis of loans and borrowings:

 

     Annual
interest rate
    Maturity     Currency     Guarantee     Total
2014
S/.
    Total
2013
S/.
 

Loans

           

Banco Internacional del Perú S.A.A.(b)

    8.5%        April 2026      US$          Property        48,710,058        29,663,170   

Banco Internacional del Perú S.A.A.(b)

    8.7%        April 2028      US$          Property        65,138,860        39,667,907   

Banco Internacional del Perú S.A.A.(b)

   
 
3 month
LIBOR + 6%
  
  
    April 2028      US$          Property        65,138,860        39,667,907   

Banco Internacional del Perú S.A.A.(c)

    6.8%        April 2015        S/.        Property        1,674,406        4,404,774   
         

 

 

 

Total

            180,662,184        113,403,758   
         

 

 

 

Maturities(d)

           

Current portion

            1,674,406        4,404,774   

Non-current portion

            178,987,778        108,998,984   
         

 

 

   

 

 

 

Total

            180,662,184        113,403,758   

 

 

In order to comply with the financial obligations above mentioned, the Company constituted a trust fund with La Fiduciaria S.A., see note 1(c).

 

  (b)   On April 5, 2013, the Company subscribed a long-term loan contract with Banco Internacional del Perú S.A.A., co-financed by Corporación Andina de Fomento (CAF) and Corporación Financiera de Desarrollo S.A. (COFIDE) for US$62,100,000, which shall finance the construction of the Runatullo II and Runatullo III Hydroelectric Plants.

As of December 31, 2014 and 2013, the Company has received disbursements for US$59,882,182 and US$38,983,900, respectively (equivalent to S/.178,987,778 and S/.108,998,984, respectively).

Additionally, on April 5, 2013, the Company, Banco Internacional del Perú S.A.A., CAF and La Fiduciaria S.A. subscribed to two trust contracts (see note 5(c)). The purpose of the contract is the following:

 

  (i)   Administer the trust assets and the trust bank accounts.

 

  (ii)   The Trust Equity can be used as payment means of the guaranteed obligations.

 

  (iii)   The Trust Equity can be used as guarantee of faithfully and timely compliance of the guaranteed obligations.

 

F-361


Table of Contents

Since June 1, 2015, the Company shall comply with certain financial ratios related to its payment ability of the debt and to its leverage level, in order to assure the compliance of its obligations. The financial ratios required to the Company are presented below:

 

      Required  

Debt service coverage ratio – From June 2015

     Higher than 1.25   

Total leverage ratio – From December 2015

     Lower than 7.5   

Total leverage ratio – From June 2016

     Lower than 7.0   

Total leverage ratio – From December 2016

     Lower than 6.5   

Total leverage ratio – From June 2017

     Lower than 5.5   

Total leverage ratio – From December 2018

     Lower than 5.0   

Total leverage ratio – From June 2019

     Lower than 4.0   

 

 

 

  (c)   On November 14, 2013, the Company obtained a short-term revolving loan from Banco Internacional del Perú S.A.A., whose purpose was to finance the construction of the Runatullo II and Runatullo III Hydroelectric Plants. This loan will be cancelled with the resources from the VAT Refund request that the Company will file to the Tax Authority.

 

  (d)   As of December 31, 2014 and 2013, the financial obligations have the following maturities:

 

Year   

2014

S/.

    

2013

S/.

 

2014

             4,404,774   

2015

     1,674,406           

2016

     3,275,281         1,953,034   

2017

     9,993,507         3,887,458   

2018

     11,394,151         5,175,534   

2019 onwards

     154,324,839         97,982,958   
  

 

 

 
     180,662,184         113,403,758   

 

  

 

 

 

 

  (e)   Based on the fund flows from the Company’s normal commercialization activities, Management estimates it will comply with the service of this obligation within the terms previously established by the financial entities.

 

11.   Trade accounts payable

As of December 31, 2014, corresponds mainly to accounts payable for supervision services and construction progress of the construction of Runatullo II and III Runatullo Hydroelectric Plants.

As of December 31, 2013, corresponds mainly to accounts payable for advisory services on the obtaining of the syndicated loan and to the consultancy on the negotiation of land purchases.

As of December 31, 2014 and 2013, accounts payable are denominated in Nuevos Soles and US Dollars, do not accrue interests and has current maturities. There have not been granted any guarantees on these obligations.

 

F-362


Table of Contents
12.   Deferred income tax liability

(a) Following is the composition of this caption:

 

     

Balance as of

January 1,

2014
S/.

     Expenses
S/.
    

Balance as of

December 31,
2014
S/

 

Difference of in book and tax depreciation rates

             320,757         320,757   

Amortization of capitalized interest

             16,217         16,217   
  

 

 

 
             336,974         336,974   

 

 

 

  (b)   The income tax expenses for the years ended December 31, 2014 and 2013, comprises the following:

 

     

2014

S/.

     2013
S/.
 

Current

               

Deferred

     336,974           
  

 

 

 
     336,974           

 

 

 

13.   Equity

 

  (a)   Share capital –

As of December 31, 2014, capital stock is represented by S/.53,475,343 common shares (42,378,973 common shares as of December 31, 2013) fully subscribed and paid-in; whose notional book value is S/.1 per share.

The General Shareholders’ Meeting held on January 7, 2014 agreed to increase the Company’s capital stock by S/.2,225,783 through cash contributions by shareholders (S/.1,558,048 and S/.667,735 from Latin America Power Perú S.A.C. and GCZ Energía S.AC. respectively).

The General Shareholders’ Meeting held on November 4, 2014 agreed to increase the Company’s capital stock by S/.8,870,587 through capitalization of credits for S/.6,209,411 by Latin America Power Perú S.A.C. and cash contributions for S/.2,661,176 by GCZ Energía S.A.C.

The General Shareholders’ Meeting held on September 12, 2013, agreed to increase the Company’s capital stock by S/.731,383 through cash contributions by shareholders.

As of December 31, 2014 and 2013, the shareholding participation is as follows:

 

Shareholder   

Participation

%

 

GCZ Energía S.A.C.

     30%   

Latin America Power Perú S.A.C.

     70%   
  

 

 

 
     100%   

 

 

 

  (b)   Additional capital –

The General Shareholders’ Meeting held on January 7, 2014, agreed to contribute additional capital to the Company by S/.1,558,049 through contributions in cash by the majority shareholder. The General Shareholders’ Meeting held on November 4, 2014, agreed to contribute additional capital to the

 

F-363


Table of Contents

Company by S/.6,209,413 through capitalization of credits by the majority shareholder. As of today, such increase are pending to be subscribed and inscripted at the Public Registry.

The General Shareholders’ Meeting held on September 12, 2013, agreed to contribute additional capital to the Company by S/.511,967 through contributions in cash by the majority shareholder.

 

14.   Tax situation

 

  (a)   The Company is subject to the Peruvian tax legislation. As of December 31, 2014 and 2013, the statutory Income Tax rate was 30 percent on the taxable income, after deducting the workers’ profit sharing which is calculated with a 5 percent rate on the taxable income.

Beginning in 2015, in attention to Article 55 of Law No. 30296, the tax rate applicable on the taxable income, after deducting the workers’ profit sharing, is as follows:

 

   

2015 and 2016: 28 percent.

 

   

2017 and 2018: 27 percent.

 

   

2019 onwards: 26 percent.

Legal persons not domiciled in Peru and natural persons are subject to retention of an additional tax on dividends received. In this regard and in attention to Law No. 30296, the additional tax on dividends for generated income is as follows:

 

   

4.1 percent of the profits generated until December 31, 2014.

 

   

For the profits generated from 2015 onwards, whose distribution is made after that date, the percentages will be the following:

 

   

2015 and 2016: 6.8 percent.

 

   

2017 and 2018: 8 percent.

 

   

2019 onwards: 9.3 percent.

 

  (b)   For the purpose of determining the Income Tax and Value Added Tax (VAT), the transfer pricing agreed for transactions with related entities and with companies domiciled in countries considered tax havens, prices should be supported by documentation containing information on the valuation methods applied and criteria used in its determination. Based in an analysis of the Company’s operations, in the opinion of Management and its legal advisors, as consequence of the application of these regulations, there will not arise any material consequences for the Company as of December 31, 2014 and 2013.

 

  (c)   The Tax Authority is legally entitled to review and, if necessary, adjust the Income Tax and Value Added Tax (VAT) and VAT computed by the Company during a term of four years following the year in which a tax return was filed. The Company’s Income Tax and VAT returns corresponding to the years 2010 to 2014 are open to examination. Given the possible interpretations that the Tax Authority may give to the legislation in effect, up to date it is not possible to determine whether or not any tax examination to be conducted would result in liabilities for the Company; thus any increased tax or surcharge that may arise from possible tax examinations would be applied to the income of the period in which such tax increase or surcharge may be determined. In the opinion of Management and its legal advisors, any eventual additional tax settlement would not be significant for the financial statements as of December 31, 2014 and 2013.

 

F-364


Table of Contents
  (d)   As of December 31, 2014 and 2013, the Company presents tax losses amounting to S/.13,553,742 and S/.3,304,388 respectively. Management will assess at the closing date of each year the evolution of market conditions and legislation in effect in order to determine whether a deferred income tax asset must be recognized at some moment.

In accordance with the established by the Income Tax Law and its amendments, entities established in Peru are able to opt between the two following methods to carry forward their tax losses:

 

  (i)   The tax loss can be offset with future income until its final extinction, by applying said loss until 50 percent of the taxable income; or

 

  (ii)   The tax loss can be used up until four years after being generated.

The Company has chosen method (ii).

We show below the composition of the tax loss carryforward for the years 2014 and 2013:

 

      2014
S/.
     2013
S/.
 

Loss before income tax

     (11,151,079      (2,345,026

Non-deductible expenses

     901,725         8,962   
  

 

 

 

Tax loss of the year

     (10,249,354      (2,366,064

Tax loss of previous years

     (3,304,388      (968,324
  

 

 

 

Tax loss carryforward

     (13,553,742      (3,304,388

 

 

 

15.   Cost of generation

Following is the composition of this caption:

 

      2014
S/.
     2013
S/.
 

Operating, administrative and maintenance costs, note 19(a)

     502,567           

Depreciation, note 8(a)

     215,887           

Various management charges

     187,319           

Taxes

     30,424           

Other

     20,111           
  

 

 

 
     956,308           

 

 

 

16.   Administrative expenses

We show below a composition of this caption:

 

      2014
S/.
    

2013

S/.

 

Other services rendered by third parties

     703,531         151,559   

Administrative and maintenance services, note 19(a)

     575,983         401,052   

Advisory and consultancy

     133,217         50,429   

Other expenses

     40,143         25,704   
  

 

 

 
     1,452,874         628,744   

 

 

 

F-365


Table of Contents
17.   Other expenses

In the year 2014, corresponds mainly to expenditures for land damages made during the construction phase assumed by the Company. In the year 2013, this caption corresponds to non-domiciled income taxes that have been assumed by the Company.

 

18.   Contingencies

In the opinion of Management and its legal advisors, there are neither any significant trials nor lawsuits pending resolution against the Company as of December 31, 2014 and 2013.

 

19.   Balances and transactions with related entities

 

  (a)   During the years 2014 and 2013, the Company performed the following transactions with related entities:

 

      2014
S/.
     2013
S/.
 

Services received –

     

GCZ Servicios S.A.C., notes 15 and 16

     1,078,550         401,052   

Latin America Power Perú S.A.C.

             23,941   

GCZ Ingenieros S.A.C. – works valuations (d)

     6,767,197         9,991,828   

Loans received –

     

Latin America Power Perú S.A.C. (d)

     17,934,000           

EGE Junín Tulumayo IV S.A.C

     9,500           

EGE Junín Tulumayo V S.A.C

     9,500           

Services provided –

     

EGE Junín Tulumayo IV S.A.C

             80,000   

Advances to suppliers –

     

GCZ Ingenieros S.A.C. (c)

     60,613         5,795,051   

 

 

 

F-366


Table of Contents
  (b)   As consequence of these and other minor transactions, the Company held the following accounts receivable and accounts payable with related entities as of December 31, 2014 and 2013:

 

      2014
S/.
     2013
S/.
 

Accounts receivable

     

Current

     

GCZ Ingenieros S.A.C.

     32,408           

EGE Junín Tulumayo IV S.A.C.

             80,000   
  

 

 

 
     32,408         80,000   
  

 

 

 

Advances to suppliers

     

GCZ Ingenieros S.A.C. (c)

     60,613         5,795,051   

GCZ Desarrollo y Gestión S.A.C.

     1,686           
  

 

 

    

 

 

 
     62,299         5,795,051   
  

 

 

    

 

 

 

Total

     94,707         5,875,051   

 

 

Accounts payable

     

GCZ Ingenieros S.A.C. (c)

     9,343,919         9,991,288   

GCZ Servicios S.A.C.

     451,975           

GCZ Construcción S.A.C.

     28,930           

GCZ Desarrollo y Gestión S.A.C.

     22,231         540   
  

 

 

 
     9,847,055         9,991,828   
  

 

 

 

Loans payable

     

Current

     

EGE Junín Tulumayo IV S.A.C.

     9,500           

EGE Junín Tulumayo V S.A.C.

     9,500           
  

 

 

 
     19,000           
  

 

 

 

Non-current

     

Latin America Power Perú S.A.C. (d)

     5,897,369           
  

 

 

 
     5,916,369           
  

 

 

 

Total

     15,763,424         9,991,828   

 

 

 

  (c)   In June 2012, the Company granted an advance to this related entity for the construction of the Runatullo II and Runatullo III Hydroelectric Plants at the EPC contract commencement date that amounted to US$6,970,460 (equivalent to S/.17,782,737). As of December 31, 2014 and 2013, the balances pending to apply were US$20,278 (equivalent to S/.60,613) and US$2,072,622 (equivalent to S/.5,795,051), respectively.

Additionally, the accounts payable correspond to the valuations performed by the progress of the construction of hydroelectric plants of Runatullo II and III Runatullo. At December 31, 2014 and 2013, balances payable correspond to the thirty valuation of the EPC contract for US$2,264,034 (equivalent to S/.6,767,197) and US$3,573,422 (equivalent to S/.9,991,828), respectively. It also includes billings for the valuations of the EPC contract with the company GCZ Ingenieros SAC by the construction of hydroelectric Runatullo II and III by US$833,803 (equivalent to S/.2,492,236) as of December 31, 2014.

 

F-367


Table of Contents
  (d)   Corresponds to a subordinated loan from Latin America Power Peru S.A.C. granted in June 20, 2014, for US$6,000,000 (equivalent to S/.16,848,000) with effective interest rate of 15.5 percent, to be repaid with future flows that are credited to the trust account the company. It is worth mentioning that the loan was granted in order to cover costs and pre-operating expenses, commissions, and other construction costs related to the development and implementation of Runatullo II and III Runatullo Hydroelectric Plants. This loan does not have a specific maturity date.

The financial expenses generated by such loans during 2014 amounted to S/.535,909 and is presented under the caption “Financial expenses” in the statement of comprehensive income.

 

20.   Transactions in foreign currency

Operations in foreign currency are performed at free market exchange rates. As of December 31, 2014 and 2013, the weighted average exchange rates of the free market published by the Superintendence of Banking, Insurance and Private Pension Funds Administrators (SBS) for transactions in U.S. dollars were S/.2.981 (buy) and S/.2.989 (sell) (S/.2.794 (buy) and S/.2.796 (sell), as of December 31, 2013).

As of December 31, 2014 and 2013, the Company held the following assets and liabilities in US dollars:

 

      2014
US$
    2013
US$
 

Assets

    

Cash and cash equivalents

     1,623,164        4,778,482   

Other accounts receivable

     1,754          

Accounts receivable from related parties

     20,278        2,072,622   
  

 

 

 
     1,645,196        6,851,104   
  

 

 

 

Liabilities

    

Financial obligations

     (59,882,182     (38,983,900

Trade accounts payable

     (155,291     (4,937

Accounts payable to related entities

     (5,061,592     (3,518,155
  

 

 

 
     (65,099,065     (42,506,992
  

 

 

 

Net liability position

     (63,453,869     (35,695,888

 

 

As of December 31, 2014 and 2013, the Management of the Company has decided to take the risk of this position, so it has not used derivative instruments to cover the exchange rate risk.

During the year 2014, the Company has recorded a net exchange difference loss amounting to S/.11,560,177 (loss of S/.1,589,065 during 2013), which is presented in the “Exchange difference, net” caption in the statement of comprehensive income.

 

21.   Financial risks management

The activities of the Company expose it to a variety of financial risks, including the effects of variations of exchange rates, credit and liquidity. The risk management program of the Company tries to minimize the potential adverse effects on its financial performance.

 

F-368


Table of Contents

Management is aware of the existing market conditions and based on its knowledge and experience, controls the liquidity risk, exchange rate risk and credit risk by following the policies approved by the Board. The most important aspects in the management of these risks are the following:

Market risk

Market risk is the risk that the fair value of future cash flows of a financial instrument fluctuates due to changes in market prices. Market prices comprise three risk types: interest rate risk, exchange rate risk and commodity prices risk. In the case of the Company, the financial instruments affected by market risk include deposits and financial obligations, which are exposed to exchange rate risk and interest rate risk.

The sensitivity analysis presented in the following section relates to the position as of December 31, 2014 and 2013. The sensitivity analysis has been prepared considering that the proportion of financial instruments in foreign currency remains constant.

 

  (i)   Interest rate risk

Interest rate risk is defined as a risk whereby a fair value, or a financial instrument’s future cash flow, fluctuates as a result of changes to interest rates in the market. The Company’s exposure to market interest rate risk relates principally to long-term financial obligations with variable interest rates.

The Company’s policy is to mainly obtain financing at fixed interest rate. The Company´s Management considers that interest rate’s risk is not significant due to the interest rates of its financing agreements are not significantly different from the market interest rates of similar financial instruments.

The short-term and long-term debts are agreed at fixed rates, therefore, any change in interest rates will not affect the results of the Company.

 

  (ii)   Exchange rate risk

Exchange rate risk is the risk that the fair value or future cash flows of a financial instrument fluctuate due to changes in the exchange rates. The Company’s exposure to exchange rates is related mainly to its operating activities.

The following table presents the effects on income before income tax of a reasonable variation in the exchange rate, considering constant the rest of variables, described in note 20:

 

     

Increase (decrease)

in basis points

     Effect on income
before Income Tax
S/.
 

2014

     +10 basis points         18,967,678   

2014

     -10 basis points         (18,967,678

2013

     +10 basis points         9,970,757   

2013

     -10 basis points         (9,970,757

 

 

Credit risk

Credit risk is the risk that counterparty fails to meet its obligations under a financial instrument or contract, causing a loss. The Company is exposed to credit risk from its operating activities, mainly for its accounts receivable, and its financing activities, including deposits with banks and financial institutions, foreign currency transactions and other financial instruments. Management believes that the Company has

 

F-369


Table of Contents

no credit risk because their main customers have payment periods of 30 days on average, not having had problems meanings collections. The Company places its excess liquidity in prestigious financial institutions, provides conservative credit policies and constantly evaluates existing conditions in the market in which it operates. Accordingly, the Company does not anticipate significant losses arising from this risk.

 

  (a)   Credit risk associated with:

 

  (a.1)   Trade receivables

The Company assesses concentrations of credit risk related to the trade accounts receivable. The Company performs an assessment over the risk of recoverability of its accounts receivables in order to determine the appropriate allowance for doubtful accounts. The maximum exposure to credit risk at December 31, 2014, is the carrying value of each class of trade accounts receivable, see note 6. As of December 31, 2014, 4 customers represent 72 percent of the trade accounts receivable.

Management of the Company believes that there is no significant credit risk because customers of the Company are renowned in the local market and are regulated.

 

  (a.2)   Financial instruments and cash deposits

This risk is managed by the Administration according to corporate policies determined by its Principal, in order to minimize the concentration of risks and therefore mitigate financial loss through counterparty’s potential failure to make payments. The Company’s maximum exposure to credit risk for the components of the statement of financial position at 31 December 2014 and 2013 is the carrying amount of “Cash and cash equivalents”.

Liquidity risk

The Company monitors its risk of funds shortage by using a short-term and long-term projected cash flow.

The Company’s objective is to keep certain funds continuity and flexibility through an adequate quantity of committed credit sources and the ability to settle transactions, mainly those of indebtedness. The Company has sufficient credit capacity to have access to credit lines from first-level financial entities and under reasonable conditions.

The following table presents the maturities of the obligations contracted by the Company at the date of the statement of financial position and the amounts to disburse at their maturity, based on the non-discounted payments to be made:

 

      2014  
      Less than 1 year
S/.
     Between 1 and 3 years
S/.
     More than 3 years
S/.
     Total
S/.
 

Loans and Borrowings (including interest)

     15,080,022         54,578,759         22,148,539         291,807,320   

Trade accounts payable

     556,930                         556,930   

Accounts payable to related entities

     9,866,055         5,897,369                 15,763,424   

Other accounts payable

     241,897                         241,897   
  

 

 

 
     25,744,904         60,476,128         22,148,539         308,369,571   

 

 

 

F-370


Table of Contents
      2013  
      Less than 1 year
S/.
     Between 1 and 3
years
S/.
     More than 3 years
S/.
     Total
S/.
 

Loans and Borrowings (including interest)

     12,742,157         20,530,752         170,166,525         203,439,434   

Trade accounts payable

     41,193                         41,193   

Accounts payable to related entities

     9,991,828                         9,991,828   
  

 

 

 
     22,775,178         20,530,752         170,166,525         213,472,455   

 

 

Capital management

The Company actively manages a capital base to cover the risks inherent to its activities. The Company’s capital adequacy is monitored by using, among other measurements, the ratios established by Management.

The Company’s objectives when managing its capital is a concept broader than the “Equity” that appears in the statements of financial position and they are: (i) to safeguard the Company’s ability to keep on operating so that it continues offering returns to the shareholders in the future; and (ii) to maintain a sound capital base to support the development and growth of its activities.

As of December 31, 2014 and 2013, there have not been any changes in the activities and policies of the Company’s capital management.

The Company monitors capital using a gearing ratio, defined as the result of net debt divided by total capital plus net debt. In Management’s opinion, gearing ratios as of December 31, 2014 and 2013 are in line with the financial policies of the Company.

 

      2014
S/.
     2013
S/.
 

Financial debt

     180,662,184         108,998,984   
  

 

 

    

 

 

 

Gross debt

     180,662,184         108,998,984   

Total equity

     74,815,279         67,439,500   
  

 

 

    

 

 

 

Total equity y gross debt

     255,477,463         176,438,484   
  

 

 

    

 

 

 

Gearing ratio (%)

     70.72         61.78   

 

 

 

22.   Information on fair value of financial instruments

The methodologies and assumptions used by the Company to determine the estimated market values depend on the terms and risk characteristics of the diverse financial instruments and comprise the following:

 

  (i)   Assets whose fair value is similar to their book value. For financial assets and liabilities that are liquid or have short-term maturities (shorter than 3 months), it is deemed that their book value is similar to their fair value. This assumption is also applicable to term deposits, savings accounts without specific maturity and financial instruments at variable interest rate. These instruments are classified into Level 1 of the fair value hierarchy.

 

F-371


Table of Contents
  (ii)   Financial instruments at fixed rate. The fair value of financial assets and liabilities at fixed rate and amortized cost is determined by comparing market interest rates at the moment of their initial recognition with the current market interest rates related to similar financial instruments. These instruments are classified into Level 2 of the fair value hierarchy.

Following is shown a comparison by category of carrying amounts and fair values of financial instruments of the Company presented in the financial statements:

 

      Book value      Fair value  
      2014
S/.
     2013
S/.
     2014
S/.
     2013
S/.
 

Financial liabilities

           

Loans and Borrowings:

           

Fixed rate loans

     180,662,184         108,998,984         209,534,310         133,462,580   
  

 

 

 

Total

     180,662,184         108,998,984         209,534,310         133,462,580   

 

 

On the basis of the criteria described above, Management estimates that there are not significant differences between the book value and the fair value of the Company’s financial instruments as of December 31, 2014 and 2013.

 

23.   Subsequent events

Between January 1, 2015, and the issuance date of the present financial statements May 7, 2015, there have not been any significant subsequent events of financial-accounting nature that could affect the interpretation of the present financial statements.

 

24.   Additional explanation for English translation

The accompanying financial statements are presented on the basis of International Financial Reporting Standards. Certain accounting practices applied by the Company, that conform with International Financial Reporting Standards, may differ in certain respects from generally accepted accounting principles in other countries. In the event of any discrepancy, the Spanish-language version prevails.

 

F-372


Table of Contents

Report of independent auditors

To the shareholders of Hidroeléctrica Santa Cruz S.A.C.

We have audited the accompanying financial statements of Hidroeléctrica Santa Cruz S.A.C. (a Peruvian company, subsidiary of Latin America Power Perú S.A.C. and indirect subsidiary of Latin America Power Holding B.V., domiciled in the Netherlands), which comprise the statement of financial position as of December 31, 2014 and 2013, and the related statements of income, comprehensive income, changes in stockholders’ equity and cash flows for the years then ended, and the related notes to the financial statements.

Management’s responsibility for the financial statements

Management is responsible for the preparation and fair presentation of these financial statements in conformity with International Financial Reporting Standards – IFRS, as issued by the International Accounting Standards Board; this includes the design, implementation and maintenance of internal control relevant to the preparation and fair presentation of financial statements that are free of material misstatement, whether due to fraud or error.

Auditor’s responsibility

Our responsibility is to express an opinion on these financial statements based on our audits. We conducted our audits in accordance with auditing standards generally accepted in the United States, as issued by American Institute of Certified Public Accountants. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement.

An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the financial statements. The procedures selected depend on the auditor’s judgment, including the assessment of the risks of material misstatement of the financial statements, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the entity’s preparation and fair presentation of the financial statements in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity’s internal control. Accordingly, we express no such opinion. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluating the overall presentation of the financial statements.

We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion.

Opinion

In our opinion, the financial statements referred to above present fairly, in all material respects, the financial position of Hidroeléctrica Santa Cruz S.A.C. as of December 31, 2014 and 2013, and the results of its operations and its cash flows for the years then ended in conformity with International Financial Reporting Standards.

 

F-373


Table of Contents

Restatement of 2013 financial statements

As discussed in Note 3.4 to the financial statements, the 2013 financial statements have been restated to correct an error in the deferred income tax, as well as to recognize the effect of unrecorded derivative instruments contracts celebrated in prior years. Our opinion is not modified with respect to this matter.

Lima, Peru

May 7, 2015

Countersigned by:

 

 

Paredes, Zaldivar, Burga & Asociados

 

F-374


Table of Contents

Hidroeléctrica Santa Cruz S.A.C.

Statements of financial position

As at December 31, 2014 and 2013

 

      Note     2014
S/.(000)
     2013
S/.(000)
(Restated,
note 3.4)
     01.01.2013
S/.(000)
(Restated,
note 3.4)
 

Assets

          

Current assets

          

Cash and cash equivalents

     5        1,406         2,980         2,472   

Trade accounts receivable

     6        2,566         2,475         1,516   

Accounts receivable from related parties

     21 (b)                      10   

Other accounts receivable

     7        3,702         4,732         5,602   

Prepaid expenses and other

       375         378         1,290   
    

 

 

 

Total current assets

       8,049         10,565         10,890   
    

 

 

 

Non-current assets

          

Other accounts receivable

     7        5,121         5,826         7,884   

Property, plant and equipment

     8        154,482         156,973         159,506   

Intangible assets, net

     9        2,280         2,442         2,643   
    

 

 

 

Total non-current assets

       161,883         165,241         170,033   
    

 

 

 

Total assets

       169,932         175,806         180,923   
    

 

 

 

Liabilities and equity

          

Current liabilities

          

Loans and borrowings

     10        8,263         7,354         5,744   

Trade accounts payable

       304         52         1,558   

Accounts payable to related parties

     21 (b)      5         146         1,830   

Other accounts payable

     11        471         339         1,449   

Derivate financial instruments

     12        8,722         6,378         304   
    

 

 

 

Total current liabilities

       17,765         14,269         10,885   
    

 

 

 

Non-current liabilities

          

Loans and borrowings

     10        112,129         113,983         112,313   

Deferred taxes

     13        4,469         2,124         2,066   
    

 

 

 

Total non-current liabilities

       116,598         116,107         114,379   
    

 

 

 

Total liabilities

       134,363         130,376         125,264   
    

 

 

 

Equity

     14           

Share capital

       31,238         31,238         31,238   

Legal reserve

       6,248         6,248         6,248   

Other reserves

       4,198         4,198         4,198   

Retained earnings

       (6,115      3,746         13,975   
    

 

 

 

Total equity

       35,569         45,430         55,659   
    

 

 

 

Total liability and equity

       169,932         175,806         180,923   

 

 

The accompanying notes are an integral part of this statement.

 

F-375


Table of Contents

Hidroeléctrica Santa Cruz S.A.C.

Statements of comprehensive income

For the years ended December 31, 2014 and 2013

 

      Note     2014
S/.(000)
    2013
S/.(000)
(Restated,
note 3.4)
 

Revenue

      

Energy sales

       23,667        24,456   

Power sales

       1,474        1,590   

Other operating income

     9 (c)             231   
    

 

 

 
       25,141        26,277   

Cost of sales

     16        (9,568     (9,000
    

 

 

 

Gross profit

       15,573        17,277   

Operating expenses

      

Administrative expenses

     17 (a)      (931     (901

Other expenses, net

     18        (195     (179
    

 

 

 

Operating profit

       14,447        16,197   

Financial income

       12        84   

Financial expenses

     19        (11,244     (15,196

Exchange gains (losses), net

     21        (6,355     (9,033
    

 

 

 

Loss before income tax

       (3,140     (7,948

Income tax

     13 (b)      (2,345     (58
    

 

 

 

Net loss

       (5,485     (8,006
    

 

 

 

Other comprehensive income

                
    

 

 

 

Total comprehensive income of the year

       (5,485     (8,006

 

  

 

 

   

 

 

   

 

 

 

All loss for the year relates to continuing operations

 

The accompanying notes are an integral part of this statement.

 

F-376


Table of Contents

Hidroeléctrica Santa Cruz S.A.C.

Statements of changes in equity

For the years ended December 31, 2014 and 2013

 

      Share
capital
S/.(000)
    

Legal

reserve
S/.(000)

     Other reserves
S/.(000)
     Retained earnings
S/.(000)
    Total
S/.(000)
 

Balances as at January 1, 2013 (restated, note 3.4)

     31,238         6,248         4,198         13,975        55,659   

Net loss , (restated, note 3.4)

                             (8,006     (8,006

Dividends, note 14(d)

                             (2,223     (2,223
  

 

 

 

Balances as at December 31, 2013, (restated, note 3.4)

     31,238         6,248         4,198         3,746        45,430   

Net loss

                             (5,485     (5,485

Dividends, note 14(d)

                             (4,376     (4,376
  

 

 

 

Balances as at December 31, 2014

     31,238         6,248         4,198         (6,115     35,569   

 

  

 

 

 

 

 

 

The accompanying notes are an integral part of this statement.

 

F-377


Table of Contents

Hidroeléctrica Santa Cruz S.A.C.

Statements of cash flows

For the years ended December 31, 2014 and 2013

 

      2014
S/.(000)
    2013
S/.(000)
 

Operating activities

    

Collections from customers

     25,416        25,328   

Payments to suppliers

     (5,942     (9,320

Payments of taxes, interest and other, net

     (7,576     (14,314
  

 

 

 

Net cash flow from operating activities

     11,898        1,694   
  

 

 

 

Investing activities

    

Restricted funds

     (101     (1,099

Purchase of property, plant and equipment

     (1,230     (1,121

Purchase of intangible assets

     (58     (23
  

 

 

 

Net cash used in investing activities

     (1,389     (2,243
  

 

 

 

Financing activities

    

Repayment of borrowings

     (7,707     (28,373

Dividends paid

     (4,376     (2,223

Proceeds from borrowings

            31,653   
  

 

 

 

Net cash flows from (used in) financing activities

     (12,083     1,057   
  

 

 

 

Net increase (decrease) in cash and cash equivalents for the period

     (1,574     508   

Cash and cash equivalents at beginning of year

     2,980        2,472   
  

 

 

 

Cash and cash equivalents at year—end

     1,406        2,980   

 

 

 

F-378


Table of Contents

Hidroeléctrica Santa Cruz S.A.C.

Notes to the financial statements

As of December 31, 2014 and 2013

 

1. Identification and business activity

 

  (a)   Identification

Hidroeléctrica Santa Cruz S.A.C. (hereafter “the Company”) is a Peruvian entity incorporated on December 21, 2006, in the city of Lima, subsidiary of Latin America Power Perú S.A.C. (a Subsidiary of Latin America Power Holding B.V., domiciled in the Netherlands), which holds 65.7 percent of the voting shares of the Company’s capital stock (a 30.54 percent direct participation, and a 35.16 percent indirect participation through HSC Holding S.A.C.).

 

  (b)   Business activity

The Company is dedicated to the generation and sale of electricity it to local private and state-owned companies, as well as to engineering activities, and actions related to its business activity. Its legal domicile is Av. del Pinar N° 152, Oficina N° 508, Santiago de Surco, Lima, Peru.

As of December 31, 2014 and 2013, the Company is developing the Santa Cruz III Hydroelectric Plant, which is located all along the Santa Cruz River (Caraz, department of Áncash). Said plant will have 2.8 MW of generation capacity. Construction started in January 2015 and commercial operations are estimated to start by July 2016.

On January 12, 2012, and February 15, 2012, the Company started the commercial operations of Group 1 and Group 2, respectively, of the Huasahuasi I Hydroelectric Plant, which has 10.0 MW of generation capacity. Said plant is located in the basins of the Huasahuasi and Huacuas rivers, Huasahuasi district, province of Tarma, department of Junín.

On April 18, 2012, and May 5, 2012, the Company started the commercial operations of Group 1 and Group 2, respectively, of the Huasahuasi II Hydroelectric Plant, which has 10.0 MW of generation capacity. Said plant is located in the basins of the Huasahuasi and Huacuas rivers, Huasahuasi district, province of Tarma, department of Junín.

In 2010, the Company started operations of the Santa Cruz II Hydroelectric Plant, has 7.4 MW of generation capacity.

In 2009, the Company started operations of the Santa Cruz I Hydroelectric Plant, which is located on the Santa Cruz River (15 km north of the city of Caraz, department of Áncash), which has 6.0 MW of generation capacity.

In 2008, the Company entered to the Regime of Investment Promotion on Electricity Generation by Using Renewable Energy Resources (hereafter “RER”), through which the Company supplies the National Interconnected Electric System (SEIN under its Spanish acronym) with the energy generated by its four hydroelectric plants that are currently operating. For this purpose, the Company and the Peruvian government signed RER contracts which have a 20-year period maturity, which establish that, through the mechanism of RER Auctions, the Company receives a fixed fee adjusted for WPS5OP3500 rate (finished goods less food and energy) per megawatt established for each hydroelectric plant.

 

F-379


Table of Contents
  (c)   Main contracts

 

  (i)   Administration, Operation and Maintenance (“AOM”) Contract for Santa Cruz I Hydroelectric Plant and Santa Cruz II Hydroelectric Plant

On March 1, 2012, the Company and GCZ Servicios S.A.C. subscribed to said contract through which the latter agrees to render the services of administration, operation and minor maintenance to the Santa Cruz I Hydroelectric Plant and Santa Cruz II Hydroelectric Plant. The contract has a 5-year term and is renewable at maturity. On August 15, 2012, an addendum to the AOM contract was signed which amends the amount of services to be rendered, reflecting the addition of new services to the original contract.

During 2014, the Company disbursed S/.1,282,000 (S/.1,127,000 in 2013), which is recorded in the “Cost of generation” and “Administrative expenses” captions of the statements of comprehensive income.

 

  (ii)   AOM Contract for the Huasahuasi I and II Hydroelectric Plants and associated transmission lines

On March 1, 2012, the Company and GCZ Servicios S.A.C. subscribed to said contract through which the latter agrees to render the services of administration, operation and minor maintenance to the Huasahuasi I and II Hydroelectric Plants. The contract has a 5-year term and is renewable at maturity.

On August 15, 2012, an addendum to the AOM contract was signed which amends the amount of services to be rendered, reflecting the addition of new services to the original contract.

During 2014, the Company disbursed S/.2,000,000 (S/.1,885,000 in 2013), which is recorded in the “Cost of generation” and “Administrative expenses” captions of the statements of comprehensive income.

 

  (iv)   Trust agreement

On June 15, 2010, the Company and La Fiduciaria S.A. subscribed to said contract with the purpose of constituting a trust of irrevocable designation, for which the Company transferred the trust assets on fiduciary domain to La Fiduciaria. This trust agreement was signed in order to guarantee the financial obligations assumed with Banco Internacional del Perú S.A.A. and BBVA Banco Continental for the construction of the four hydroelectric plants. See note 10.

The purpose of the contract is the following:

 

  (i) Administer the trust assets and the trust bank accounts.

 

  (ii) The Trust Equity can be used as payment means of the guaranteed obligations.

 

  (iii) The Trust Equity can be used as guarantee of faithful and timely compliance of the guaranteed obligations.

On December 20, 2012, it was signed a second addendum to the Trust Agreement through which the parties agree on the modification of the financing installments, the payment schedule and the major maintenance fund and maintenance account.

 

F-380


Table of Contents
  (d)   Approval of financial statements

The financial statements for the year ended December 31, 2014 and 2013, have been approved and authorized for their issuance by Management and will be submitted to the Board of Directors and the General Shareholders’ Meeting for their approval within the terms established by law. In Management’s opinion, said financial statements will be approved without modification.

 

2. Operating regulation and legislation that affect the activities of the electricity industry

The main regulations affecting the Company’s activities are the following:

 

  (a)   Electrical Concessions Law—

In Peru, the electricity sector is ruled by the Electrical Concessions Law, Decree-Law N°25844, enacted on November 19, 1992, its Regulation, Supreme Decree N° 009-93-EM, enacted on February 25, 1993, and its amendments and extensions, such as Law N° 28832, “Law to Ensure the Efficient Development of Electric Generation”.

Pursuant to the Electrical Concessions Act, the electricity sector is divided into three main sub-sectors, each one comprising a different activity: electricity generation, transmission and distribution. In accordance with said act and the “Law to Ensure the Efficient Development of Electricity Generation”, the operation of power generation plants and transmission systems are subject to the provisions of the Economic Operation Committee of the National Interconnected System (COES-SINAC, by its Spanish acronym), with the purpose of coordinating said operation at a minimum cost, preserving the safety of electric energy supply and the best usage of energy resources, as well as the planning of the SEIN development and the short-term market administration. COES-SINAC determines the pricing of the power and energy transfers between generators.

The main changes introduced by the Law are related to the participation in short-term market of distribution companies and large free customers, including distributors and customers, besides generation companies, as members of COES-SINAC, modifying the structure of this organization. Also, it regulates the procedure for distribution companies to convene biddings to ensure energy supply to the regulated market. This law has also amended the legal framework for the electricity transmission activities.

 

  (b)   Promotion of Investment on Electricity Generation Using Renewable Energy—

The Legislative Decree N° 1002, published on May 2, 2008 and it’s regulation, has the purpose of promoting the use of RER in order to enhance the quality of life of the population and to protect the environment through the investment promotion of electricity generation with the use of RER, which is declared of national interest and public necessity. RER are defined as the biomass as well as the wind, solar, geothermal, tidal and hydraulic energies (the latter solely when the generation capacity is less than 20.0 MW).

Eligible to the provisions of said Legislative Decree are the new operations of companies using RER as primary energy, with previous accreditation before the MEM.

Electricity generation via RER enjoys priority in the daily dispatch performed by COES. The production variable cost for the use of RER shall be zero.

The law and it’s regulation introduced an auction scheme for electricity generated with RER.

 

F-381


Table of Contents

The energy required for the auctions shall correspond to the participation of the estimated generation with RER by multiplying the National Consumption of Electricity, as established by the Regulation, by the percentage established by the MEM, in which the national consumption of electricity generated with RER must participate, every five years.

 

  (c)   Promotion of Investment on Electricity Generation Using Water Resources and other Renewable Resources—

The Legislative Decree N°1058 dated June 27, 2008, established the investment promotional framework of electricity generation with the use of RER, thus encouraging scientific research and technological innovation, as well as the designing of projects that qualify as mechanisms of clean development which upon being granted their registration can be subject to the negotiation of Emission Reductions Certificate (hereafter “CER” for its Spanish acronym) that can be sold to companies of industrialized countries, which at their turn can account said reductions of greenhouse gases as part of their qualitative goals committed under the Kyoto Protocol.

This regime benefits the electricity generation based on water resources or based on other renewable resources such as wind, solar, geothermal, biomass or tidal, which will be subject to the accelerated depreciation benefit over the Income Tax. Said regime shall be applied to the generation plants that start operations since the entry into force of the aforementioned Legislative Decree. The accelerated depreciation shall be applicable to machinery, equipment and civil works necessary for the installation and operation of the plant, which are acquired and/or built since the entry into force of the Legislative Decree. The rate to be applied is 20 percent as global annual rate.

 

3. Summary of significant accounting policies and principles

 

  3.1   Basis of preparation and presentation—

The financial statements have been prepared in accordance with International Financial Reporting Standards (IFRS) issued by the “International Accounting Standards Board” (hereinafter “IASB”).

The accompanying financial statements have been prepared on a historical cost basis, based on the accounting records kept by the Company.

The accounting policies adopted are consistent with policies applied in previous years, except for the new IFRS and revised IAS that are mandatory for periods beginning on or after January 1, 2014, in which the Company has adopted; however, due to the structure of the Company and nature of its operations, the adoption of these standards had no significant effect on its financial position and results of operation; therefore, it has not been necessary to modify the comparative financial statements of the Company. These new IFRS and revised IAS are described below:

 

   

IAS 32 Financial Instruments: Presentation—Offsetting Financial Assets and Financial Liabilities (Amendment)

Defines the meaning of “currently has a legal right to compensation” criteria and mechanisms for non-simultaneous solution clearinghouses for entitlement to compensation modification. Additionally, this amendment clarifies that to compensate two or more instruments financial institutions should have a right to compensation that cannot be conditioned on a future event, and should be mandatory the following circumstances: (i) the normal course of business, (ii) in the event of default, and (iii) in the event of insolvency or bankruptcy of the entity or any of the counterparties.

 

F-382


Table of Contents
   

IAS 36 Impairment of Assets (Amendments)

These amendments eliminate the unforeseen consequences of IFRS 13 on the disclosures required by IAS 36. In addition, the amendments also require disclosure of recoverable amounts of the assets or cash-generating units for which an impairment loss is recognized or when reversals have been recognized in the period.

 

   

IAS 39 Novation derivatives and continuity of hedge accounting (Amendments)

These amendments provide an exception to discontinue hedge accounting when the novation of a derivative designated as a hedging instrument that meets certain criteria is given.

 

   

IFRIC 21 Levies

IFRIC 21 clarifies that an entity recognizes a liability for a levy when the activity giving rise to the payment, as identified in the relevant legislation, is performed. For levies which are activated by a minimum threshold, the interpretation clarifies that no liability should be anticipated before reaching the minimum threshold specified.

Note 4 includes information about the judgments, significant accounting estimates and assumptions used by Management in the preparation of the accompanying financial statements.

 

  3.2   Summary of significant accounting principles and policies—

Significant accounting policies used by Management for the preparation of financial statements are as follow:

 

  (a)   Cash and cash equivalents—

Cash and cash equivalent presented in the statement of financial position comprises cash balances and current bank accounts and short-team deposits with original maturities less than three months. For purposes of preparing the statement of cash flows, cash and cash equivalent include cash and short-term deposits defined above.

 

  (b)   Foreign currency transactions—

 

  (i) Functional and presentation currency—

The Company’s financial statements are presented in thousands of Nuevos Soles (except when otherwise indicated), which is also the Company’s functional currency.

 

  (ii) Transactions and balances in foreign currency—

The transactions carried out in a currency other than the functional currency are considered as transactions in foreign currency. Transactions in foreign currencies are initially recorded by the Company at the functional currency rates prevailing at the date of the transaction. Monetary assets and liabilities denominated in foreign currencies are retranslated at the functional currency spot rate exchange ruling at the reporting date. Non-monetary items that are measured in terms of historical cost in a foreign currency are translated using the exchange rates as of the dates of the initial transactions.

 

F-383


Table of Contents
  (c)   Financial Instruments: Initial recognition and subsequent measurement—

 

  (i) Financial assets—

Initial recognition and measurement—

Financial assets within the scope of International Accounting Standard (IAS) 39, “Financial Statements: Recognition and measurement”, are classified as financial assets at fair value through profit or loss, loans and receivables, held-to-maturity investments, available-for- sale financial investments, or as derivatives designated as hedging instruments in an effective hedge, as appropriate. The Company determines the classification of its financial assets at initial recognition.

All financial assets are recognized initially at fair value and, in the case of assets carried at fair value through profit or loss, directly attributable transaction costs.

Purchases or sales of financial assets that require delivery of assets within a time period established by regulation or market convention are recognized on the trade date, which represents the date that the Company commits to purchase or sell the asset.

Subsequent measurement—

The subsequent measurement of financial assets depends on their classification. As of December 31, 2014 and 2013, the Company only maintains loans and receivables, as described below:

Loans and receivables—

Loans and receivables are non-derivative financial assets with fixed or determinable payments that are not quoted in an active market, for which the entity has no intention of selling indirectly nor in the near future and have no risk other than credit impairment.

After initial recognition, such financial assets are measured at amortized cost using the effective interest rate method (EIR), less any impairment. Amortized cost is calculated by taking into account any discount or premium on acquisition and fees or costs that are an integral part of the EIR. The EIR amortization is recognized in the statement of comprehensive income as “Financial income”. Losses resulting from impairment are recognized in the statement of comprehensive income as a provision.

As of December 31, 2014 and 2013, the Company maintains cash and cash equivalent, trade receivables and other receivables in this category.

Derecognition—

A financial asset (or, where applicable, a part of a financial asset or part of a group of similar financial assets) is derecognized when the rights to receive cash flows from the asset have expired.

 

F-384


Table of Contents

Impairment of financial assets—

At the end of each period under report, the Company assesses whether there is any objective evidence that a financial asset or group of financial assets is impaired in value. A financial asset or group of financial assets is considered impaired in value only if there is objective evidence that there was a loss in value as a result of one or more events that occurred after the initial recognition of the asset (the “event that causes loss”), and the event that caused the loss has an impact on the estimated future cash flows generated by the financial asset or group of financial assets, and that impact can be reasonably estimated.

Evidence of impairment may include, among others, evidence that the debtors or a group of debtors are experiencing significant financial difficulty, default or delinquency in payments of debt principal or interest.

Financial assets carried at amortized cost—

For financial assets carried at amortized cost, the Company first assesses whether objective evidence of impairment exists; individually for financial assets that are individually significant, or collectively for financial assets that are not individually significant. If the Company determines that no objective evidence of impairment for a financial asset evaluated individually, regardless of its importance, it includes the asset in a group of financial assets with credit risk characteristics similar, and evaluates them collectively to determine whether impairment exists. Assets that are individually assessed to determine whether impairment exists, and for which an impairment loss is recognized or is still recognized, are not included in the evaluation of impairment collectively.

If there is objective evidence that there has been an impairment loss, the amount of the loss is measured as the difference between the asset’s carrying amount and the present value of estimated future cash flows (excluding future expected credit losses that have not yet been produced). The present value of estimated future cash flows discounted at the original effective interest rate of financial assets. If the loan bears a variable interest rate, the discount rate for measuring any impairment loss is the current effective interest rate.

The carrying amount of the asset is reduced through the use of an allowance account and the amount of the loss is recognized in the statement of comprehensive income.

 

  (ii) Financial liabilities—

Initial recognition and measurement—

Financial liabilities within the scope of IAS 39 are classified as financial liabilities at fair value through profit or loss, loans and accounts payable, or as derivatives designated as hedging instruments in an effective hedge, as appropriate. The Company determines the classification of financial liabilities at initial recognition.

All financial liabilities are recognized initially at fair value (in the case of loans and payables carried at amortized cost) plus transaction costs directly attributable.

The Company’s financial liabilities include accounts payable, accounts payable to related parties, other accounts payable and financial obligations.

 

F-385


Table of Contents

Subsequent measurement—

The subsequent measurement of financial liabilities depends on their classification. As of December 31, 2014 and 2013, the Company only maintains loans and borrowings as follows:

Debt and interest bearing loans—

After initial recognition, financial liabilities are measured at amortized cost, using the effective interest rate method. Gains and losses are recognized in the statement of comprehensive income when the liabilities are derecognized as well as through the amortization process, using the effective interest rate method.

Amortized cost is calculated by taking into account any discount or premium on acquisition and fees or costs that are an integral part of the effective interest rate. The amortization of the effective interest rate is recognized as “Finance cost” in the statement of comprehensive income.

Derecognition—

A financial liability is derecognized when the relevant obligation is discharged or canceled or expires. When an existing financial liability is replaced by another from the same lender on substantially different terms, or the terms are substantially modified, such replacement or amendment is treated as a derecognition of the original liability and the recognition of a new liability, and the difference in the respective carrying amounts is recognized in the statement of comprehensive income.

 

  (iii) Offsetting of financial instruments—

Financial assets and financial liabilities are offset and the net amount reported in the statement of financial position if, and only if there is a currently enforceable legal right to offset the recognized amounts and there is an intention to settle on a net basis, or to realize the asset and settle the liability simultaneously.

 

  (iv) Fair value of financial instruments—

The fair value is the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date.

The fair value of an asset or liability is measured using the assumptions that market participants would use to rank the asset or liability value, assuming that market participants act in their best economic interest. The fair value measurement of non-financial assets takes into account the ability of a market participant to generate economic benefits through more and better use of the asset or selling it to another market participant that would use the assets in the best possible way.

The Company uses valuation techniques that are appropriate in the circumstances and for which sufficient information is available to measure fair value, maximizing the use of relevant observable inputs and minimize the use of unobservable inputs.

 

F-386


Table of Contents

All assets and liabilities which are determined or reveal fair values in the financial statements are classified within the fair value hierarchy, described below , based on the lowest level of the data used that are significant to the measurement at fair value as a whole:

 

   

Level 1: Quoted (unadjusted) prices in active markets for identical assets or liabilities.

 

   

Level 2: Other techniques for all information or data different to quoted prices within level 1, available, either directly or indirectly.

 

   

Level 3: Techniques which use inputs that have a significant effect on the recorded fair value that are not based on observable market data.

For assets and liabilities that are recognized at fair value in the financial statements on a recurring basis, the Company determines whether there have been transfers between levels in the hierarchy by reviewing the categorization at the end of each reporting period.

Management determines the policies and procedures for both recurring fair value measurement. At each reporting date, management analyzes the movements in the values of assets and liabilities which are required to be re-measured or in accordance with the accounting policies of the Company.

For purposes of fair value disclosures, the Company has determined classes of assets and liabilities on the basis of the nature, characteristics and risks and the level of the fair value hierarchy as explained above.

 

  (d)   Derivative financial instruments—

Initial recognition and measurement—

The Company uses cross currency interest rate swap to manage its exposure to risk associated with fluctuations in exchange rates and interest rates. Such derivative financial instruments are initially recognized at fair value on the date on which a derivative contract is entered into and are subsequently remeasured at fair value. Derivatives are carried as financial assets when the fair value is positive and as financial liabilities when the fair value is negative.

Any gains or losses arising from changes in the fair value of derivatives are taken directly to profit or loss.

 

  (e)   Property, plant and equipment—

Property, plant and equipment is stated at cost, net of accumulated depreciation and / or accumulated impairment losses. The purchase price or construction cost is the total amount paid and the fair value of any other consideration given to acquire the asset. For the significant components of facilities, furniture and equipment that must be replaced periodically, the Company derecognizes the replaced component and recognizes the new component with its respective useful lives and depreciation. Similarly, when a major inspection is performed, its cost is recognized as a replacement to the extent that they meet the recognition requirements. Other repair and maintenance costs are recognized as expenses as incurred.

 

F-387


Table of Contents

Land is not depreciated. Depreciation is calculated following the straight-line method using the following estimated useful lives:

 

      Years  

Buildings

     33 to 45   

Machinery and equipment

     10 to 45   

Vehicles

     5   

Furniture and fixtures

     10   

Other equipment

     4 to 10   

 

 

Residual values, useful lives and depreciation methods are reviewed at each reporting period, and adjusted prospectively if appropriate.

An item of property, plant and equipment or a significant component is removed upon disposal or when no future economic benefits are expected from its use or disposal. Any gain or loss arising on derecognition of the asset (calculated as the difference between the net disposal proceeds and the carrying amount of the asset) is included in the statement of comprehensive income in the year the asset is derecognized.

Infrastructure assets are controlled by the Company and so are accounted for under IAS 16 Property, plant and equipment rather than under IFRIC 12 Service concession arrangements.

 

  (f)   Intangible assets—

Intangible assets are recorded at cost and are presented net of accumulated amortization. Amortization is recognized as an expense and is determined using the straight-line method based on estimated useful lives of assets, which has been estimated between 5 and 10 years.

The estimate of the useful life is reviewed periodically to ensure that the amortization period is consistent with the expected pattern of future economic benefits from these assets.

 

  (g)   Leases—

The Company recognizes finance leases recording assets and liabilities at the beginning of contracts in the statement of financial position for an amount equal to the fair value of the leased asset or, if lower, the present value of the lease asset. Initial direct costs are considered as part of the asset. Lease payments are apportioned between finance charges and reduction of the lease liability. Finance charges are allocated over the term of the lease liability to generate interest expense on the balance of the liability for each period and are recognize as financial expenses in the statement of comprehensive income.

The lease generates depreciation expense for the asset as well as interest expense for each accounting period. The depreciation policy for leased assets is consistent with the policy for other depreciable assets owned by the Company.

Leases where the lessor effectively retains substantially all the risks and rewards of ownership of the leased benefits are classified as operating leases. Operating lease payments are recognized as expenses in the statement of comprehensive income based on the straight-line method over the term of the contract.

 

F-388


Table of Contents
  (h)   Impairment of long-lived assets—

The Company reviews and evaluates the impairment of long-lived assets when events or economic changes indicate that the book value may not be recovered. An impairment loss is the amount by which the book value of long-lived assets exceeds the net selling price or value in use, whichever is higher. The net selling price is the amount that may be obtained in the sale of an asset in a free market, while the value in use of an asset is the present value of estimated future flows expected to be obtained from the continuous use of an asset and its disposal at the end of its useful life. An impairment loss recognized in prior years is reversed if a change occurs in the estimates that were used last time in which such loss was recognized.

 

  (i)   Provisions—

A provision is recognized when the Company has a present liability (legal or constructive) as a result of a past event, it is probable that an outflow of resources embodying economic benefits will be required to settle the liability and the amount of the obligation can be reliably estimated. Provisions are reviewed periodically and adjusted to reflect the best estimate as of the date of the statement of financial position. The expense relating to any provision is shown on the statement of comprehensive income. If the time value of money is material, provisions are discounted using a pre-tax rate that reflects, when appropriate, the risk specific to the liability. When the discount is made, the increase in the provision due to passage of time is recognized as interest expense in the statement of comprehensive income.

 

  (j)   Contingencies—

Contingent liabilities are recorded on the financial statements when it is probable that they are confirmed in time and can be reliably measured. Possible contingencies are not recognized in the financial statements. These are disclosed in notes to the financial statements, unless the possibility of an outflow of economic benefits is remote.

Contingent assets are not recognized in the financial statements but are disclosed when an inflow of economic benefits is probable.

 

  (k)   Revenue recognition—

The Company recognizes revenue when the amount can be reliably measured, it is probable that economic benefits will flow to the Company and meet specific criteria for each type of income, described below. It is considered that the amount of revenue cannot be reliably measured until all contingencies related to the sale have been resolved. Revenue is recognized as follows:

Sale of energy and power—

Revenues from sales of electricity and power delivered unbilled are recognized as income in the month in which the service is provided based on the reports of the Committee on Economic Operation of COES-SINAC National Grid, which are issued a month after the delivery of energy. Sales of energy from Renewable Energy Resources (RER) include a premium established under the RER contracts (see note 1(b)).

 

  (l)   Taxes—

Current income tax—

Current income tax asset or liability is measured at the amount expected to be recovered from or paid to the taxation authorities, according to the existing rules for determining taxable income. The income tax is calculated based on the Company’s financial information.

 

F-389


Table of Contents

Deferred income tax—

Deferred income tax is recognized using the liability method on temporary differences between the accounting basis and the tax basis at the date of statement of financial position.

Liabilities for deferred income taxes are recognized for all taxable temporary differences, when the opportunity of reversal can be controlled and it is probable that they will not reverse in the foreseeable future.

Deferred tax assets are recognized for all deductible temporary differences, and the future offset of unused tax credit and tax loss carryforward, to the extent that it is probable that taxable profit will be available against which the deductible temporary differences and the carryforwards of unused tax credits and unused tax losses can be used.

The carrying amount of deferred tax assets is reviewed at each statement of financial position date and is reduced to the extent that it is no longer probable that sufficient future taxable income will be available to allow the benefit of part or the entire deferred asset to be utilized. Unrecognized deferred assets are re-assessed on each statement of financial position date.

Deferred tax assets and liabilities are measured at the tax rates that are expected to apply in the year when the asset is realized or the liability is settled, based on tax rates and tax rules that were approved to date end of the period over which it is reported, or whose approval is near to completion at that time.

Deferred tax items are recognized in correlation to the underlying transaction either in the income statement or directly in equity.

Deferred tax assets and deferred tax liabilities are offset if a legally enforceable right exists to set off current tax assets against current income tax liabilities, and when the deferred taxes related to the same taxable entity and the same taxation authority.

Value added tax—

Revenues, expenses and assets are recognized net of the amount of Value Added Tax, except:

 

   

When the Value Added Tax (VAT) incurred on a purchase of assets or services is not recoverable from the taxation authority, in which case the VAT is recognized as part of the cost of acquisition of the asset or as part of the item of expenditure, as appropriate;

 

   

Accounts receivable and payable are already stated with the amount of VAT included.

The net amount of VAT recoverable from, or payable to, the taxation authority is included as part of other accounts receivable or payable in the statement of financial position.

 

  3.3   New accounting pronouncements

The Company has decided not to early adopt the following standards and interpretations that were issued by the IASB, but are not effective at December 31, 2014:

 

   

IFRS 9, “Financial Instruments: classification and measurement”

In July 2014, the IASB issued the final version of IFRS 9 Financial Instruments, which reflects all phases of project financial instruments and replace IAS 39 “Financial Instruments: Recognition and Measurement” and all previous versions of IFRS 9. The standard introduces new

 

F-390


Table of Contents

requirements for the classification and measurement, impairment and hedge accounting. IFRS 9 is effective for annual periods beginning on or after January 1, 2018, with early application permitted. Retrospective application is required, but the comparative information is not mandatory. The early application of the previous versions of IFRS 9 (2009, 2010 and 2013) is allowed if the date of initial application is before February 1, 2015. The adoption of IFRS 9 will have an effect on the classification and measurement financial assets of the Company, but no impact on the classification and measurement of financial liabilities.

 

   

IFRS 15, Revenue from contracts with customers

IFRS 15 was issued in May 2014 and established a new five-step model to be applied to revenue from contracts with customers. Under IFRS 15 revenue is recognized at an amount that reflects the consideration that the entity expects to be entitled in exchange for the transfer of goods or services to a customer. The principles of IFRS 15 provide an approach more structured to measurement and revenue recognition. The new standard of income is applicable to all entities and will replace all current requirements for revenue recognition under IFRS. The retrospective application Complete or modified is required for annual periods beginning on or after January 1, 2017, with early adoption permitted.

 

   

Amendments to IFRS 11 Joint Arrangements: Accounting for acquisitions of interests

Amendments to IFRS 11 requires that a joint operator post the acquisition of an interest in a joint venture in which the activity of the joint venture is a business, according to IFRS 3. The amendments also clarify that a pre-existing interest in a joint operation is not remeasured in the acquisition of an additional interest in the same joint operation, while the joint control is maintained. In addition, a scope exclusion has been added to IFRS 11 to specify that the amendments do not apply when the parties sharing joint control, including reporting entity under common control of the same main controller.

The changes apply to both the acquisition of the initial stake in a joint operation and the acquisition of any additional interest in such joint operation and are effective prospectively for annual periods beginning on or after January 1, 2016, allowing the adoption Advance.

It is not expected that these amendments will have an impact for the Company, since the Company does not have joint arrangements.

 

   

Amendments to IAS 16 and IAS 38: Clarification of acceptable methods of depreciation and amortization.

The amendments clarify the principle of IAS 16 and IAS 38, that revenues reflect a pattern of economic benefits generated from operating a business (which the asset is part) rather than the economic benefits consumed through use of the asset. As a result, the depreciation method based on income cannot be used to depreciate property, plant and equipment and may only be used in very limited to the amortization of intangibles circumstances. The amendments are effective prospectively for annual periods beginning on or after January 1, 2016, with early adoption permitted.

It is not expected that these amendments will have an impact for the Company, since the Company has not used a method based on income to depreciate its non-current assets.

 

F-391


Table of Contents
  3.4   Restatement of 2013 financial statements of previous years

During 2014 management identified the following adjustments as of and for the year ended December 31, 2013:

 

  (i)   Error in the deferred income tax recognized as of December 31, 2013, relating to the non-recognition of a deferred income tax liability of S/.2,987,000 arising from a temporary difference between the financial and tax basis of property, plant and equipment.

 

  (ii)   Cross currency interest rate swaps not accounted as derivatives at pair value in previous years, which represent an account payable of S/.6,378,000 and S/.304,000 as of December 31, 2013 and January 1, 2013, respectively.

Consequently, the Company has restated the 2013 comparative information to adjust for such amounts. The impacts of such adjustments are shown in the reconciliations of the statement of financial position as of December 31, 2013 and the Income statement for the year ended December 31, 2013, presented below.

The Company has also presented a restated statement of financial position as of January 1, 2013.

In addition, the Company reclassified the balance of “insurance paid in advance” amounting to S/.1,145,000, offsetting it with the corresponding amount included in “insurance payables” within the “Other payables” balance, for comparability purposes with the presentation reflected in the statement of financial position as of December 31, 2013. Such reclassification is also presented in the reconciliations below.

 

F-392


Table of Contents

Reconciliation of statement of financial position as of January 1, 2013:

 

      Balances
according to
originally issued
financial
statements
01.01.2013
S/.(000)
     Adjustments
S/.(000)
     Reclassifications
S/.(000)
     Restated
balances at
01.01.2013
S/.(000)
 

Statement of financial position—

           

Assets

           

Current assets

           

Cash and Cash equivalents

     2,472                         2,472   

Trade accounts receivable

     1,516                         1,516   

Accounts receivable from related parties

     10                         10   

Other accounts receivable

     5,602                         5,602   

Prepaid expenses

     1,290                         1,290   
  

 

 

 

Total current assets

     10,890                         10,890   
  

 

 

 

Non-current assets

           

Other accounts receivable

     7,884                         5,826   

Property, plant and equipment

     159,506                         156,973   

Intangible assets, net

     2,643                         2,442   
  

 

 

 

Total non-current assets

     170,033                         170,033   
  

 

 

 

Total assets

     180,923                         180,923   
  

 

 

 

Liabilities and equity

           

Loans and borrowings

     5,744                         5,744   

Trade accounts payable

     1,558                         1,558   

Accounts payable to related parties

     1,830                         1,830   

Other accounts payable

     1,449                         1,449   

Derivative financial instruments

             304                 304   
  

 

 

 

Total current liability

     10,581         304                 10,885   

Loans and borrowings

     112,313                         112,313   

Deferred tax liability

     2,066                         2,066   
  

 

 

 

Total non-current liabilities

     114,379                         114,379   
  

 

 

 

Total liabilities

     124,960         304                 125,264   
  

 

 

 

Equity

           

Share capital

     31,238                         31,238   

Legal reserve

     6,248                         6,248   

Other reserves

     4,198                         4,198   

Retained earnings

     14,279         (304)                 13,975   
  

 

 

 

Total equity

     55,963         (304)                 55,659   
  

 

 

 

Total liabilities and equity

     180,923                         180,923   

 

 

 

F-393


Table of Contents

Reconciliation of statement of financial position as of December 31, 2013:

 

      Balances
according to
originally issued
financial
statements
31.12.2013
S/.(000)
     Adjusments
S/.(000)
    Reclasifications
S/.(000)
    Restated
balances at
31.12.2013
S/.(000)
 

Statement of financial position—

         

Assets

         

Current assets

         

Cash and Cash equivalents

     2,980                       2,980   

Trade accounts receivable

     2,475                       2,475   

Inventories

     92                       92   

Other accounts receivable

     4,732                       4,732   

Prepaid expenses

     1,431                (1,145     286   
  

 

 

 

Total current assets

     11,710                (1,145     10,565   
  

 

 

 

Non-current assets

         

Other accounts receivable

     5,826                       5,826   

Property, plant and equipment

     156,973                       156,973   

Intangible assets, net

     2,442                       2,442   

Deferred income tax assets (i)

     863         (863              
  

 

 

 

Total non-current assets

     166,104         (863     (1,145     165,241   
  

 

 

 

Total assets

     177,814         (863     (1,145     175,806   
  

 

 

 

Liabilities and equity

         

Loan and borrowings

     7,354                       7,354   

Trade accounts payable

     52                       52   

Accounts payable to related parties

     146                       146   

Other accounts payable

     1,484                (1,145     339   

Derivative financial instruments

             6,378               6,378   
  

 

 

 

Total current liability

     9,036         6,378        (1,145     14,269   

Loan and borrowings

     113,983                       113,983   

Deferred income tax liability (i)

             2,124               2,124   
  

 

 

 

Total non-current liabilities

     113,983         2,124               116,107   
  

 

 

 

Total liabilities

     123,019         8,502        (1,145     130,376   
  

 

 

 

Equity

         

Share capital

     31,238                       31,238   

Legal reserve

     6,248                       6,248   

Other reserves

     4,198                       4,198   

Retained earnings

     13,111         (9,365            3,746   
  

 

 

 

Total equity

     54,795         (9,365            51,808   
  

 

 

 

Total liabilities and equity

     177,814         (863     (1,145     175,806   

 

 

 

F-394


Table of Contents

Reconciliation of income statement for the year ended December 31, 2013:

 

      Balances
according to
originally issued
financial
statements
31.12.2013
S/.(000)
    Adjusments
S/.(000)
    Reclasifications
S/.(000)
     Restated
balances at
31.12.2013
S/.(000)
 

Statement of comprehensive income—

         

Energy Sales

     24,456                       24,456   

Power Sales

     1,590                       1,590   

Other operating income

     231                       231   

Other third income

                             
  

 

 

 
     26,277                       26,277   

Cost of sales

     (9,000          (9,000
  

 

 

 

Gross profit

     17,277                       17,277   

Operating Expenses

         

Administrative expenses

     (901                    (901

Other expenses, net

     (179                    (179
  

 

 

 

Operating profit

     16,197                       16,197   

Financial income

     84                       84   

Financial expenses

     (9,122     (6,074             (15,196

Exchange gains (losses), net

     (9,033                    (9,033
  

 

 

 

Loss before income tax

     (1,874     (6,074             (7,948

Income tax (i)

     2,929        (2,987        (58
  

 

 

 

Net loss

     1,055        (9,061             (8,006

 

 

 

4. Judgments, estimates and significant accounting assumptions

The preparation of financial statements requires Management to make judgments, accounting estimates and assumptions that affect the reported amounts of revenue, expenses, assets, liabilities and disclosure of contingent liabilities at the end of the reporting period under review. These judgments and estimates are based on Management’s best knowledge about the relevant facts and circumstances, taking into account previous experience, however, the results may differ from the amounts included on the financial statements. Information about such judgments and estimates is contained in the accounting policies and / or in the notes to the financial statements.

The main areas of uncertainty associated with the estimates and critical judgments made by Management in the preparation of financial statements include:

 

   

Estimation of useful life of property, plant and equipment and intangible assets, residual values and impairment, notes 3.2(e), 3.2(f) and 3.2(h).

 

   

Estimation of income tax, notes 3.2(l).

 

   

Contingencies, notes 3.2(j).

Any differences in the estimates with subsequent actual results are reported in the year in which they occur.

 

F-395


Table of Contents
5. Cash and cash equivalents

 

  (a)   Following is the composition of this caption:

 

      2014
S/.(000)
     2013
S/.(000)
 

Current accounts(b)

     625         2,303   

Trust fund account(c)

     781         677   
  

 

 

 
     1,406         2,980   

 

 

 

  (b)   As of December 31, 2014 and 2013, the Company keeps current bank accounts in local financial entities, denominated in local currency and foreign currency, are unrestricted and do not bear interest.

 

  (c)   Correspond to the “collections bank account” which include collections from customers of the Company which are deposited in a bank account in local and foreign currency in a local financial entity, according to the Trust Agreement subscribed with La Fiduciaria (note 1(c)). These balances are freely available.

 

6. Trade accounts receivable

 

  (a)   Following is the composition of this caption:

 

      2014
S/.(000)
     2013
S/.(000)
 

Trade accounts receivable(b)

     2,084         2,303   

Accrued income for RER auctions(c)

     482         172   
  

 

 

    

 

 

 
     2,566         2,475   

 

 

 

  (b)   Trade accounts receivable correspond mainly to the estimation performed by Management of accounts receivable from energy delivered but not billed in the month. These accounts receivable are billed on the first days of the following month and are denominated in Nuevos Soles.

 

      As of December 31, 2014 and 2013, the aging of the balance of accounts receivable is mainly comprised by non-past due balances shorter than 30 days.

 

  (c)   Corresponds to unbilled sales of energy delivered into the current month. These sales are invoiced within the billing cycle of the following month.

 

  (d)   No provision for doubtful accounts as of December 31, 2014 and 2013 was recorded as management assessed that there were no significant risks of default.

 

F-396


Table of Contents
7. Other accounts receivable

 

  (a)   Following is the composition of this caption:

 

      2014
S/.(000)
     2013
S/.(000)
 

VAT credit(b)

     5,820         7,884   

Restricted funds(c)

     1,608         1,507   

Advance payment of Income Tax

     640         1,016   

Other accounts receivable

     755         151   
  

 

 

 
     8,823         10,558   
  

 

 

 

Maturities:

     

Current portion

     3,702         4,732   

Non-current portion

     5,121         5,826   
  

 

 

 
     8,823         10,558   

 

 

 

  (b)   During 2014 and 2013, the VAT credit was generated by purchases and acquisitions from suppliers for the development of electricity generation activities, which will be recovered in the medium term.

 

  (c)   Corresponds to the fiduciary reserve deposits made as result of the loan with Banco Internacional del Perú S.A.A., note 10(a). As of December 31, 2014 and 2013. The deposits are equivalent to two installments of the aforementioned loan, according to the maturity schedule.

 

8. Property, plant and equipment

 

  (a)   Following is the movement and composition of the caption at the date of the financial statements:

 

     Land
S/.(000)
    Buildings and
other
constructions
S/.(000)
    Machinery
and
equipment
S/.(000)
    Transport
units
S/.(000)
    Miscellaneous
equipment
S/.(000)
    In-transit
units
S/.(000)
    Work-in-
progress
S/.(000)
    Total
S/.(000)
 

Cost

               

Balance as of January 1, 2013

    1,481        90,350        71,360        70        161        662               164,084   

Additions(b)

    10        85        36               44        314        632        1,121   

Transfers(c)

           407                      272        (343     (336       

Disposals

                                       (10            (10
 

 

 

 

Balance as of December 31, 2014

    1,491        90,842        71,396        70        477        623        296        165,195   

Additions(b)

           229                      6        262        733        1,230   

Transfers(c)

           334                                    (334       

Disposals

                                                       
 

 

 

 

Balance as of December 31, 2014

    1,491        91,405        71,396        70        482        885        917        166,425   
 

 

 

 

 

F-397


Table of Contents
     Land
S/.(000)
    Buildings and
other
constructions
S/.(000)
    Machinery
and
equipment
S/.(000)
    Transport
units
S/.(000)
    Miscellaneous
equipment
S/.(000)
    In-transit
units
S/.(000)
    Work-in-
progress
S/.(000)
    Total
S/.(000)
 

Accumulated depreciation

               

Balance as of January 1, 2013

           1,962        2,556        41        19                      4,578   

Depreciation for the period (e)

           2,016        1,584        13        31                      3,644   
 

 

 

 

Balance as of December 31, 2014

           3,978        4,140        54        50                      8,222   

Depreciation for the period (e)

           2,049        1,592        13        67                      3,721   
 

 

 

 

Balance as of December 31, 2014

           6,027        5,732        67        117                      11,943   
 

 

 

 

Net book value as of December 31, 2014

    1,491        85,378        65,664        3        366        885        695        154,482   
 

 

 

 

Net book value as of December 31, 2013

    1,491        86,864        67,256        16        427        623        296        156,973   

 

 

 

  (b)   As of December 31, 2014 and 2013, main additions correspond mainly to complementary civil works performed at the Huasahuasi I and II Hydroelectric Plants.

 

  (c)   During 2014, it corresponds to activation of Civil Works (Slope Stabilization) in Hydroelectric Plant Huasahuasi II.

 

  (d)   The caption “Property, plant and equipment” includes assets acquired through finance lease contracts. The Company acquired machinery and equipment, and financed the construction of the Santa Cruz I and II Hydroelectric Plants, and Huasahuasi I and II Hydroelectric Plants under said modality. The cost and corresponding, accumulated depreciation of these assets is comprised as follows:

 

      As of December 31, 2014      As of December 31, 2013  
      Cost
S/.(000)
     Depreciation
S/.(000)
     Book value
S/.(000)
     Cost
S/.(000)
     Depreciation
S/.(000)
     Book value
S/.(000)
 

Buildings and other constructions

     19,693         2,154         17,539         19,693         1,716         17,977   

Machinery and equipment

     32,320         3,561         28,759         32,320         2,843         29,477   
  

 

 

 
     52,013         5,715         46,298         52,013         4,559         47,454   

 

 

 

F-398


Table of Contents
  (e)   The depreciation expense of the period has been recorded in the following captions of the statements of comprehensive income:

 

      2014
S/.(000)
     2013
S/.(000)
 

Cost of generation, note 76

     3,721         3,637   

Administrative expenses, note 77(a)

             7   
  

 

 

    

 

 

 
     3,721         3,644   

 

 

 

  (f)   The Company has contracted multi-risk insurance policies that cover in a sufficient manner the entirety of the Santa Cruz I and II Hydroelectric Plants and the Huasahuasi II and II Hydroelectric Plants, (note 11(c)).

 

  (g)   As of December 31, 2014 and 2013, Management performed an assessment on use and conditions of its property, plant and equipment, and has not found any impairment indicator in such assets. Thus, in its opinion, their book value is recoverable with the future income generated by the Company.

 

9. Intangible assets, net

 

  (a)   Following is the movement and composition of this caption:

 

     2014     2013  
    

Project

development(b)
S/.(000)

    Concessions,
licenses and other
S/.(000)
    Certified
Emission
Reductions(c)
S/.(000)
    Software
S/.(000)
    Total
S/.(000)
    Total
S/.(000)
 

Cost

           

Balance as of January 1

    2,482        231        12        43        2,768        2,760   

Additions

                         58        58        23   

Disposals and/or adjustments

                  (11            (11     (15
 

 

 

 

Balance as of December 31

    2,482        231        1        101        2,815        2,768   
 

 

 

 

Cumulative amortization

           

Balance as of January 1

    317                      9        326        117   

Amortization of the period, notes 76 and 77(a)

    200                      9        209        209   
 

 

 

 

Balance as of December 31

    517                      18        535        326   
 

 

 

 

Net book value

    1,965        231        1        83        2,280        2,442   

 

 

 

  (b)   As of December 31, 2014 and 2013, it corresponds to disbursements related to the development of the project and definitive concessions, among others, related to the development of the Huasahuasi I and II Hydroelectric Plants and the project of the Santa Cruz III Hydroelectric Plant.

 

  (c)   As of December 31, 2014 and 2013, the balance of this caption corresponds to the estimation of 9,314 and 53,306 Certified Emission Reduction generated by the production at the Santa Cruz I and II Hydroelectric Plants, respectively.

 

F-399


Table of Contents

During April 2013, the Company sold 43,992 CERs for EUR 67,000 (equivalent to S/.231,000) at a net cost of EUR 5,000 (equivalent to S/.17,000), to the German agency KfW, which performs the purchase of carbon bonds globally. Revenues from this operation are presented in the statements of comprehensive income in the caption “Other operating income”, note 78.

 

  (d)   In Management’s opinion, there are not any events or economic changes indicating an impairment of intangible assets as of December 31, 2014 and 2013.

 

10. Loans and borrowings

 

  (a)   We show below an analysis of loans and borrowings:

 

                                        Total  
            Currency     Guarantee    

Fixed
annual

interest
rate

    Maturities     2014
S/.(000)
    2013
S/.(000)
 

Loans

             

Banco Internacional del Perú S.A.A.(b)

    US$          Property        7.30%        November
2022
       75,862        74,657   
           

 

 

 
              75,862        74,657   
           

 

 

 

Finance leases

             

BBVA Banco Continental(c)

    Leasing        S/.        Equipment        7.35%        June 2019        6,414        7,119   

BBVA Banco Continental(c)

    Leasing        S/.        Property        7.35%        June 2019        3,476        3,858   

BBVA Banco Continental(d)

    Leasing      US$          Property        7.00%        February 2023        7,493        7,495   

BBVA Banco Continental(e)

    Leaseback        S/.        Equipment        7.20%        March 2023        13,737        14,639   

BBVA Banco Continental(e)

    Leaseback        S/.        Property        7.20%        April 2023        2,718        2,892   

BBVA Banco Continental(f)

    Leaseback      US$          Equipment        6.90%        March 2023        6,776        6,776   

BBVA Banco Continental(f)

    Leaseback      US$          Property        6.90%        April 2023        3,916        3,901   
           

 

 

 
              44,530        46,680   
           

 

 

 

Total

              120,392        121,337   
           

 

 

 

Maturities(g)

             

Current portion

              8,263        7,354   

Non-current portion

              112,129        113,983   
           

 

 

 

Total

              120,392        121,337   
           

 

 

 

In order to comply with the financial obligations above mentioned, the Company constituted a trust fund with La Fiduciaria. See note 1(c)

 

  (b)   Corresponds to the commercial loan for US$28,000,000 (equivalent to S/.83,692,000) that was used for the construction and to start commercial operations of the Huasahuasi I and II Hydroelectric Plants, that was granted between 2010 and 2012.

 

F-400


Table of Contents
  (c)   Corresponds to two finance lease contracts that were used for the supply, installation, assembly and starting of commercial operations of the electromechanical equipment, and for the civil works of the Santa Cruz I Hydroelectric Plant with a capital financed for S/.15,888,000 that were subscribed during 2007.

 

  (d)   Corresponds to the leaseback contract to finance the construction, equipment and start of operations of the Santa Cruz II Hydroelectric Plant with a capital financed for US$2,671,000 (equivalent to S/.6,814,000).

During March 2013, a refinancing of the contract was made, considering a financed capital of US$2,804,000 (equivalent to S/.7,840,000).

 

  (e)   Corresponds to two leaseback contracts subscribed on March 15 and April 9, 2013, for the acquisition of furniture, equipment and land at the Santa Cruz II Hydroelectric Plant, for S/.15,295,000 and S/.3,009,000, respectively.

 

  (f)   Corresponds to two leaseback contracts subscribed on March 26 and April 8, 2013, for the acquisition of machinery, equipment and land at the Santa Cruz I Hydroelectric Plant, for US$2,535,000 (equivalent to S/.7,088,000) and US$1,451,000 (equivalent to S/.4,057,000), respectively.

 

  (g)   The minimum future payments for finance leases as of December 31, 2014 and 2013, were as follows:

 

      2014      2013  
     

Minimum

payments
S/.(000)

    Present value of
payments
S/.(000)
    

Minimum

payments
S/.(000)

    Present value of
payments
S/.(000)
 

Up to 1 year

     6,766        3,794         6,601        3,457   

Between 1 and 3 years

     20,464        13,098         13,202        7,678   

Between 3 and 5 years

     14,098        11,348         13,202        8,824   

More than 5 years

     18,137        16,290         31,332        26,721   
  

 

 

 

Total payments

     59,330        44,530         64,337        46,680   

Minus interests payable

     (14,935             (17,657       
  

 

 

 

Total

     44,530        44,530         46,680        46,680   

 

 

 

  (h)   As of December 31, 2014 and 2013, loans and borrowings have the following maturities:

 

Year    2014
S/.(000)
     2013
S/.(000)
 

2014

             7,354   

2015

     8,263         7,887   

2016

     8,861         8,457   

2017

     9,505         9,072   

2018

     10,194         10,178   

2019 onwards

     83,569         78,389   
  

 

 

 
     120,392         121,337   

 

  

 

 

    

 

 

 

 

  (i)   The financial expenses generated by bank loans and financial leasings during 2014 amount to S/.8,768,000 (S/.8,544,000 during 2013); see note 79.

 

F-401


Table of Contents
11. Other accounts payable

 

  (a)   Following is the composition of this caption:

 

      2014
S/.(000)
     2013
S/.(000)
 

Miscellaneous provisions(b)

     304         1,301   

Insurances payable(c)

     148         178   

Other minor

     19         5   
  

 

 

 
     471         1,484   

 

 

 

  (b)   As of December 31, 2014 and 2013, correspond mainly to provisions for social expenses and current maintenance expenses incurred by the Company.

 

  (c)   As of December 31, 2014 and 2013, correspond to multi-risk insurance policies that were contracted with Rímac Internacional Compañía de Seguros y Reaseguros S.A. for the Santa Cruz I and II Hydroelectric Plants and Huasahuasi I and II Hydroelectric Plants for US$574,968 (equivalent to S/.1,718,579) and US$465,000 (equivalent to S/.1,301,000), respectively.

 

12. Derivative financial instruments

As of December 31, 2014 and 2013, the Company has contracted cross currency interest swaps with BBVA Banco Continental in order to manage the interest rate risk. The detail of such instruments is as follows:

 

                   Nominal amount            Fair value  
Description   Beginning
date
    Maturity
date
    US$(000)     S/.(000)     Exchange
rate
    2014
S/.(000)
   

2013

S/.(000)

(Restated,
note 3.4)

 

Swap agreement – BBVA Banco Continental

    26/10/2010        30/07/2019        6,060        16,878        2.785        2,249        1,526   

Swap agreement – BBVA Banco Continental

    15/03/2013        15/03/2023        6,982        18,048        2.585        5,380        4,026   

Swap agreement – BBVA Banco Continental

    09/04/2013        10/04/2023        1,383        3,551        2.567        1,093        826   
     

 

 

     

 

 

 

Total

        14,425        38,477          8,722        6,378   

 

 

Effects of the accounting of derivative financial instruments held by the Company are presented in the “Financial expenses” caption of the statements of comprehensive income, see note 19.

 

F-402


Table of Contents
13. Deferred income tax

 

  (a)   The movement of the components of this caption during the years 2014 and 2013 is as follows:

 

    

Balance as of

January 1, 2013
S/.(000)

   

Income
(expenses)

restated
(Note 3.4)
S/.(000)

   

Balance as of

December 31, 2013,

restated (Note 3.4)
S/.(000)

    Income
(expenses)
S/.(000)
   

Balance as of

December 31, 2014
S/.(000)

 

Deferred assets

         

Tax loss carryforward

    4,103        (2,149     1,954        (183     1,771   

Exchange difference loss considered for tax purposes as cost of plant and equipment

           2,417        2,417        (387     2,030   
 

 

 

 
    4,103        268        4,371        (570     3,801   
 

 

 

 

Deferred liabilities

         

Difference from book and tax depreciation rates

    4,809        1,194        6,003        1,676        7,679   

Amortization of capitalized interest

           492        492        99        591   

Exchange difference gain considered for tax purposes as cost of the fixed assets of the structural loan

    876        (876                     

Exchange difference capitalized in plant and equipment acquired under financial leasing

    484        (484                     
 

 

 

 
    6,169        326        6,495        1,775        8,270   
 

 

 

 

Deferred liability, net

    (2,066     (58     (2,124     (2,345     (4,469

 

 

 

  (b)   The income tax expenses for the years ended December 31, 2014 and 2013, comprises the following:

 

      2014
S/.(000)
     2013
S/.(000)
 

Current

               

Deferred

     2,345         58   
  

 

 

 
     2,345         58   

 

 

 

14. Equity

 

  (a)   Share capital—

As of December 31, 2014 and 2013, the Company’s capital stock is represented by 31,238,030 common shares fully subscribed and paid-in; whose notional book value is S/.1 per share.

 

F-403


Table of Contents

As of December 31, 2014 and 2013, the shareholding participation is as follows:

 

Shareholder   

Participation
percentage

%

 

GCZ Energía S.A.C.

     15.00   

Manuel Montori Alfaro

     19.30   

Latin America Power Perú S.A.C.

     30.54   

HSC Holding S.A.C.

     35.16   
  

 

 

 
     100.00   

 

 

 

  (b)   Legal reserve—

Pursuant to the General Act of Corporations, it is required that a minimum of 10 percent of the distributable income of each period be transferred to a legal reserve up until it equals 20 percent of the capital stock. The legal reserve can offset losses or be capitalized, existing in both cases the mandate of replenish it. The Company records the appropriation of the legal reserve when it is approved by the General Shareholders’ Meeting.

 

  (c)   Other reserves—

The Shareholders made statutory reserves and capital premiums as part of the development process of the construction project of the Santa Cruz I and II Hydroelectric Plants and Huasahuasi I and II Hydroelectric Plants.

 

  (d)   Retained earnings

During 2014, the Annual Shareholders’ Meetings agreed the distribution of dividends for the year 2013, which were approved in the following meetings:

 

Agreement date for the Annual Shareholders’ Meetings    Agreed
amount
     Total amount
S/.
 

January 6, 2014

     S/.983,000         983,000   

April 24, 2014

   US$ 400,000         1,122,000   

July 9, 2014

   US$ 400,000         1,114,000   

October 3, 2014

   US$ 400,000         1,157,000   
     

 

 

 
        4,376,000   

 

 

These dividends were entirely paid by the Company in January, April, July and October, 2014.

The Annual Shareholders’ Meetings held on June 21, 2013 and September 13, 2013, agreed on the distribution of dividends of the year 2012 for S/.1, 113,000 and S/.1, 110,000, respectively. These dividends were entirely paid by the Company in July and September 2013.

 

15. Tax situation

 

  (a)   The Company is subject to the Peruvian tax legislation. As of December 31, 2014 and 2013, the statutory Income Tax rate was 30 percent on the taxable income, after deducting the workers’ profit sharing which is calculated with a 5 percent rate on the taxable income.

 

F-404


Table of Contents

Beginning in 2015, in attention to Article 55 of Law No. 30296, the tax rate applicable on the taxable income, after deducting the workers’ profit sharing, is as follows:

 

   

2015 and 2016: 28 percent.

 

   

2017 and 2018: 27 percent.

 

   

2019 onwards: 26 percent.

Legal persons not domiciled in Peru and natural persons are subject to retention of an additional tax on dividends received. In this regard and in attention to Law No. 30296, the additional tax on dividends for income generated is as follows:

 

   

4.1 percent of the profits generated until December 31, 2014.

 

   

For the profits generated from 2015 onwards, whose distribution is made after that date, the percentages will be the following:

 

   

2015 and 2016: 6.8 percent.

 

   

2017 and 2018: 8 percent.

 

   

2019 onwards: 9.3 percent.

 

  (b)   For the purpose of determining the Income Tax and Value Added Tax (VAT), the transfer pricing agreed for transactions with related entities and with companies domiciled in low or zero tax countries must be supported by documentation containing information on the valuation methods applied and criteria used in the determination of such prices. On the basis of the analysis of the Company’s operations, in the opinion of Management and its legal advisors, as consequence of the application of these regulations, there will not arise any material consequences for the Company as of December 31, 2014 and 2013.

 

  (c)   The Tax Authority is legally entitled to review and, if necessary, adjust the Income Tax computed by the Company during a term of four years following the year in which a tax return was filed. The Company’s Income Tax and VAT returns corresponding to the years 2010 to 2014 are open to examination. Given the possible interpretations that the Tax Authority may give to the legislation in effect, up to date it is not possible to determine whether or not any tax examination to be conducted would result in liabilities for the Company; thus, any increased tax or surcharge that may arise from possible tax examinations would be applied to the income of the period in which such tax increase or surcharge may be determined. In the opinion of Management and its legal advisors, any eventual additional tax settlement would not be significant for the financial statements as of December 31, 2014 and 2013.

 

  (d)   As of December 31, 2014 and 2013, the Company presents tax losses amounting to S/.24,145,000 and S/.14,056,000, respectively. Management will assess at the closing date of each year the evolution of market conditions and legislation in effect in order to determine whether said asset must be recognized at some moment.

In accordance with the established by the Income Tax Act and its amendments, entities established in Peru are able to opt between the two following methods to carry forward their tax losses:

 

  (i)   The tax loss can be offset with future income until its final extinction, by applying said loss until 50 percent of the taxable income; or

 

  (ii)   The tax loss can be used up until four years after being generated.

 

F-405


Table of Contents

The Company has chosen method (ii).

We show below the composition of the tax loss carryforward for de years 2014 and 2013:

 

      2014
S/.(000)
     2013
S/.(000)
 

Loss before income tax

     (796      (1,874

Non-deductible expenses

     540         1,044   

Temporary items

     (9,833      (10,600
  

 

 

 

Tax loss of the year

     (10,089      (11,430

Tax loss of previous years, net of adjustment

     (14,056      (2,626
  

 

 

 

Tax loss carryforward

     (24,145      (14,056
  

 

 

 

Recognized

     (6,513      (6,513

Unrecognized

     (17,632      (7,543
  

 

 

 
     (24,145      (14,056

 

 

 

16. Cost of generation

Following is the composition of this caption:

 

      2014
S/.(000)
     2013
S/.(000)
 

Depreciation, note 8(e)

     3,721         3,637   

Operating, administrative and maintenance cost

     2,655         2,581   

Insurance

     1,307         1,341   

Tributes

     495         453   

Consulting and advisory services

     228         187   

Amortization, note 9(a)

     209         200   

Maintenance of fixed assets

     137         29   

Other

     816         572   
  

 

 

 
     9,568         9,000   

 

 

 

17. Administrative expenses

 

  (a)   We show below a composition of this caption:

 

      2014
S/.(000)
     2013
S/.(000)
 

Services rendered by third parties (b)

     881         877   

Tributes

     46         8   

Depreciation, note 8(e)

             7   

Amortization, note 9(a)

             9   

Other

     4           
  

 

 

 
     931         901   

 

 

 

  (b)   Correspond mainly to the services of administration, operation and maintenance rendered at the Santa Cruz I and II Hydroelectric Plants and the Huasahuasi I and II Hydroelectric Plants by GCZ Servicios S.A.C., a related entity.

 

F-406


Table of Contents
18. Other income (expenses), net

 

  (a)   Following is the composition of this caption:

 

      2014
S/.(000)
    2013
S/.(000)
 

Other income:

    

Other

            16   
  

 

 

 
            16   
  

 

 

 

Other expenses:

    

Provision for fair value measurement of CERs

     (5     (2

Other

     (190     (193
  

 

 

 
     (195     (195
  

 

 

 
     (195     (179

 

 

 

19. Financial expenses

Following is the composition of this caption:

 

      2014
S/.(000)
     2013
S/.(000)
(Restated, note 3.4)
 

Interests on loans and financial leasings, note 10(i)

     8,768         8,544   

Results from derivative financial instruments

     2,344         6,074   

Financial expenses for loans and financial leasings

     112         385   

Bank charges

     20         103   

Other

             90   
  

 

 

 
     11,244         15,196   

 

 

 

20. Contingencies

In the opinion of Management and its legal advisors, there are neither any significant trials nor lawsuits pending resolution against the Company as of December 31, 2014 and 2013.

 

21. Transactions in foreign currency

Operations in foreign currency are performed at free market exchange rates. As of December 31, 2014 and 2013, the weighted average exchange rates of the free market published by the Superintendence of Banking, Insurance and Private Pension Funds Administrators (SBS) for transactions in US dollars were S/.2,981 (buy) and S/.2.989 (sell) (S/.2.794 (buy) and S/.2.796 (sell), as of December 31, 2013).

 

F-407


Table of Contents

As of December 31, 2014 and 2013, the Company held the following assets and liabilities in US dollars:

 

      2014
US$(000)
    2013
US$(000)
 

Assets

    

Cash and cash equivalent

     197        316   

Other accounts receivable

     539        539   

Trade accounts receivable

     162        101   

Expenses contracted in advance

     536        410   
  

 

 

 
     1,434        1,366   
  

 

 

 

Liabilities

    

Financial obligations

     (31,384     (33,200

Trade accounts payable

     (29     (3

Other accounts payable

     (575     (465
  

 

 

 
     (31,988     (33,668
  

 

 

 

Net liability

     (30,554     (32,302

 

 

During 2014, the Company has recorded a net loss for exchange difference amounting to S/.6,355,000 (S/.9,033,000 during 2013), which is presented in the “Exchange difference, net” caption of the statements of comprehensive income.

 

22. Transactions with related entities

 

  (a)   During the years 2014 and 2013, the Company performed the following transactions with related entities, which were performed under market conditions:

 

      2014
S/.(000)
     2013
S/.(000)
 

Services received

     

GCZ Servicios S.A.C.

     3,309         3,241   

GCZ Fabricaciones S.A.C.

     378         40   
  

 

 

 
     3,687         3,281   

 

 

 

  (b)   As consequence of these and other minor transactions, the Company held the following accounts receivable and accounts payable with related entities as of December 31, 2014 and 2013:

 

      2014
S/.(000)
     2013
S/.(000)
 

Accounts payable

     

GCZ Servicios S.A.C.(c)

     5         146   
  

 

 

 
     5         146   

 

 

The balances of accounts receivable and accounts payable have current maturity.

 

  (c)   As of December 31, 2013, corresponds to the additional bonus for services rendered according to the administration, operation and minor maintenance contract of the Santa Cruz I, Santa Cruz II, Huasahuasi I and Huasahuasi II Hydroelectric Plants.

 

F-408


Table of Contents
23. Financial risks management

The activities of the Company expose it to a variety of financial risks, including the effects of variations of exchange rates, credit and liquidity. The risk management program of the Company tries to minimize the potential adverse effects on its financial performance.

Management is aware of the existing market conditions and based on its knowledge and experience, controls the liquidity risk, exchange rate risk and credit risk by following the policies approved by the Board. The most important aspects in the management of these risks are the following:

Market risk

Market risk is the risk that the fair value of future cash flows of a financial instrument fluctuates due to changes in market prices. Market prices comprise three risk types: interest rate risk, exchange rate risk and commodity prices risk. In the case of the Company, the financial instruments affected by market risk include deposits and financial obligations, which are exposed to exchange rate risk and interest rate risk.

The sensitivity analysis presented in the following section relates to the position as of December 31, 2014 and 2013. The sensitivity analysis has been prepared considering that the proportion of financial instruments in foreign currency remains constant.

 

  (i)   Interest rate risk

Interest rate risk is defined as a risk whereby a fair value, or a financial instrument’s future cash flow, fluctuates as a result of changes to interest rates in the market. The Company’s exposure to market interest rate risk relates principally to long-term financial obligations with variable interest rates.

The Company’s policy is to mainly obtain financing at fixed interest rate. The Company´s Management considers that interest rate’s risk is not significant due to the interest rates of its financing agreements are not significantly different from the market interest rates of similar financial instruments. To manage this risk, the Company entered into cross currency interest rate swaps, see note 12.

The short-term and long-term debts are agreed at fixed rates, therefore, any change in interest rates will not affect the results of the Company.

 

  (ii)   Exchange rate risk

Exchange rate risk is the risk that the fair value or future cash flows of a financial instrument fluctuate due to changes in the exchange rates. The Company’s exposure to exchange rates is related mainly to its operating activities. To manage this risk, the Company entered into cross currency interest rate swaps, see note 12.

The following table presents the effects on income before income tax of a reasonable variation in the exchange rate, considering constant the rest of variables, described in note 21:

 

     

Increase (decrease)

in basis points

    

Effect on income

before income tax
S/.(000)

 

2014

     +10 basis points         (9,274

2014

     -10 basis points         9,274   

2013

     +10 basis points         (9,146

2013

     -10 basis points         9,146   

 

 

 

F-409


Table of Contents

Credit risk

Credit risk is the risk that counterparty fails to meet its obligations under a financial instrument or contract, causing a loss. The Company is exposed to credit risk from its operating activities, mainly for its accounts receivable, and its financing activities, including deposits with banks and financial institutions, foreign currency transactions and other financial instruments. Management believes that the Company has no credit risk because their main customers have payment periods of 30 days on average, not having had problems meanings collections. The Company places its excess liquidity in prestigious financial institutions, provides conservative credit policies and constantly evaluates existing conditions in the market in which it operates. Accordingly, the Company does not anticipate significant losses arising from this risk.

 

  (a)   Credit risk associated with:

 

  (a.1)   Trade receivables

The Company assesses concentrations of credit risk related to the trade accounts receivable. The Company performs an assessment over the risk of recoverability of its accounts receivables in order to determine the appropriate allowance for doubtful accounts. The maximum exposure to credit risk at December 31, 2014, is the carrying value of each class of trade accounts receivable, see note 6. As of December 31, 2014 and 2013, 4 and 5 customers represent 72 and 75 percent of the trade accounts receivable, respectively.

Management of the Company believes that there is no significant credit risk because customers of the Company are renowned in the local market and are regulated.

 

  (a.2)   Financial instruments and cash deposits

This risk is managed by the Administration according to corporate policies determined by its Principal, in order to minimize the concentration of risks and therefore mitigate financial loss through counterparty’s potential failure to make payments. The Company’s maximum exposure to credit risk for the components of the statement of financial position at 31 December 2014 and 2013 is the carrying amount of “Cash and cash equivalents”.

Liquidity risk

The Company monitors its risk of funds shortage by using a short-term and long-term projected cash flow.

The Company’s objective is to keep certain funds continuity and flexibility through an adequate quantity of committed credit sources and the ability to settle transactions, mainly those of indebtedness. The Company has sufficient credit capacity to have access to credit lines from first-level financial entities and under reasonable conditions.

The following table presents the maturities of the obligations contracted by the Company at the date of the statements of financial position and the amounts to disburse at their maturity, based on the non-discounted payments to be made:

 

     2014  
    

Less than

1 year
S/.(000)

    Between 1
and 3 years
S/.(000)
    Between 3
and 5 years
S/.(000)
   

More than

5 years
S/.(000)

    Total
S/.(000)
 

Loans and borrowings (including interest)

    16,436        50,118        33,608        65,834        165,996   

Trade accounts payable

    304                             304   

Accounts payable to related entities

    5                             5   

Other accounts payable

    471                             471   
 

 

 

 
    17,216        50,118        33,608        65,834        166,776   

 

 

 

F-410


Table of Contents
      2013  
     

Less than

1 year
S/.(000)

     Between 1
and 3 years
S/.(000)
     Between 3
and 5 years
S/.(000)
    

More than

5 years
S/.(000)

     Total
S/.(000)
 

Loans and borrowings (including interest)

     15,648         31,297         32,051         94,168         173,164   

Trade accounts payable

     52                                 52   

Accounts payable to related entities

     146                                 146   

Other accounts payable

     339                                 339   
  

 

 

 
     16,185         31,297         32,051         94,168         173,701   

 

 

Capital management

The Company actively manages a capital base to cover the risks inherent to its activities. The Company’s capital adequacy is monitored by using, among other measurements, the ratios established by Management.

The Company’s objectives when managing its capital is a concept broader than the “Equity” that appears in the statements of financial position and they are: (i) to safeguard the Company’s ability to keep on operating so that it continues offering returns to the shareholders in the future; and (ii) to maintain a sound capital base to support the development and growth of its activities.

As of December 31, 2014 and 2013, there have not been any changes in the activities and policies of the Company’s capital management.

The Company monitors capital using a gearing ratio, defined as the result of net debt divided by total capital plus net debt. In Management’s opinion, gearing ratios as of December 31, 2014 and 2013 are in line with the financial policies of the Company.

 

      2014
S/.(000)
     2013
S/.(000)
 

Financial debt

     120,392         121,337   
  

 

 

 

Gross debt

     120,392         121,337   

Total equity

     35,569         45,430   
  

 

 

 

Total equity and gross debt

     155,961         166,767   
  

 

 

 

Gearing ratio (%)

     77.19         72.76   

 

 

 

24. Information on fair value of financial instruments

The methodologies and assumptions used by the Company to determine the estimated market values depend on the terms and risk characteristics of the diverse financial instruments and comprise the following:

 

  (i)   Assets whose fair value is similar to their book value. For financial assets and liabilities that are liquid or have short-term maturities (shorter than 3 months), it is deemed that their book value is similar to their fair value. This assumption is also applicable to term deposits, savings accounts without specific maturity and financial instruments at variable interest rate. These instruments are classified into Level 1 of the fair value hierarchy.

 

F-411


Table of Contents
  (ii)   Financial instruments at fixed rate. The fair value of financial assets and liabilities at fixed rate and amortized cost is determined by comparing market interest rates at the moment of their initial recognition with the current market interest rates related to similar financial instruments. These instruments are classified into Level 2 of the fair value hierarchy.

 

  (iii)   Financial instruments held at fair value. The Company carries at fair value only derivative financial instruments, as explained in note 12, considered at Level 2 of the fair value hierarchy.

On the basis of the criteria described above, Management estimates that there are not significant differences between the book value and the fair value of the Company’s financial instruments as of December 31, 2014 and 2013.

Following is shown a comparison by category of carrying amounts and fair values of financial instruments of the Company presented in the financial statements:

 

      Book value      Fair value  
      2014
S/.(000)
     2013
S/.(000)
     2014
S/.(000)
     2013
S/.(000)
 

Financial liabilities

           

Loans and borrowings:

           

Fixed rate loans

     120,392         121,337         140,482         139,044   
  

 

 

 

Total

     120,392         121,337         140,482         139,044   

 

 

On the basis of the criteria described above, Management estimates that there are not significant differences between the book value and the fair value of the Company’s financial instruments as of December 31, 2014 and 2013.

 

25. Subsequent events

Between January 1, 2015, and the issuance date of the present financial statements May 7, 2015, there have not been any significant subsequent events of financial-accounting nature that could affect the interpretation of the present financial statements.

 

26. Additional explanation for english translation

The accompanying financial statements are presented on the basis of International Financial Reporting Standards. Certain accounting practices applied by the Company, that conform with International Financial Reporting Standards, may differ in certain respects from generally accepted accounting principles in other countries. In the event of any discrepancy, the Spanish-language version prevails.

 

F-412


Table of Contents

Independent auditors’ report

To the Board of Directors and Quotaholders of

Plantas Eólicas, S.R.L.

We have audited the accompanying restated financial statements of Plantas Eólicas, S.R.L., which comprise the statements of financial position as of December 31, 2014 and 2013, and the related statements of comprehensive income, changes in equity and cash flows for the years then ended, and the related notes to the financial statements.

Management’s responsibility for the financial statements

Management is responsible for the preparation and fair presentation of these financial statements in conformity with International Financial Reporting Standards as issued by the International Accounting Standards Board; this includes the design, implementation and maintenance of internal control relevant to the preparation and fair presentation of financial statements that are free of material misstatement, whether due to fraud or error.

Auditor’s responsibility

Our responsibility is to express an opinion on these financial statements based on our audits. We conducted our audits in accordance with auditing standards generally accepted in the United States of America. Those standards require that we plan and perform the audits to obtain reasonable assurance about whether the financial statements are free of material misstatement.

An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the financial statements. The procedures selected depend on the auditor’s judgment, including the assessment of the risks of material misstatement of the financial statements, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the entity’s preparation and fair presentation of the financial statements in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity’s internal control. Accordingly, we express no such opinion. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluating the overall presentation of the financial statements.

We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion.

Opinion

In our opinion, the restated financial statements referred to above present fairly, in all material respects, the financial position of Plantas Eólicas, S.R.L. as of December 31, 2014 and 2013, and the results of its operations and its cash flows for the years then ended in conformity with International Financial Reporting Standards as issued by the International Standards Board.

 

F-413


Table of Contents

To the Board of Directors and Quotaholders of

Plantas Eólicas, S.R.L.

Restatement of financial statements

As discussed in Note 3.2, the financial statements have been restated for the correction of errors in the accounting for decommissioning provision, depreciation of property, plant and equipment and deferred income taxes. This restatement has also resulted in the disclosure of the January 1, 2013 statement of financial position. Our opinion is not modified with respect to this matter.

/s/ Ernst & Young, S.A.

Ernst & Young, S.A.

San Jose, Costa Rica

June 13, 2015

 

F-414


Table of Contents

Plantas Eólicas, S.R.L.

(A Costa Rican Entity)

Statements of financial position

As of December 31, 2014 and 2013 and January 1, 2013

 

              December 31,
2014
     December 31,
2013
     January 1,
2013
 
(expressed in US dollars)    Notes      Restated (Note 3.2)  

ASSETS

           

Current assets:

           

Cash

     6       $ 815,424       $ 341,813       $ 131,417   

Accounts receivable

     7         747,502         639,071         796,488   

Spare parts inventory

        732,524         695,859         848,601   

Prepaid expenses

        67,185         71,931         70,271   

Income tax prepaid

                112,682           
     

 

 

 

Total current assets

        2,362,635         1,861,356         1,846,777   

Non-current assets:

           

Property, plant and equipment

     8         977,754         1,027,168         1,323,015   

Other financial assets

        11,857         14,660         11,378   
     

 

 

 

Total assets

      $ 3,352,246       $ 2,903,184       $ 3,181,170   
     

 

 

 

LIABILITIES AND EQUITY

           

Current liabilities:

           

Notes and loans payable

      $       $       $ 111,538   

Accounts payable and accrued expenses

     9         185,009         104,326         128,768   

Accounts payable to related parties

     10         72,280         83,545           

Income tax payable

        291,090                 117,739   
     

 

 

 

Total current liabilities

        548,379         187,871         358,045   

Non-current liabilities:

           

Deferred income tax, net

     13         63,306         55,302         48,500   

Decommissioning provision

     12         571,448         527,563         550,236   
     

 

 

 

Total liabilities

        1,183,133         770,736         956,781   

Equity:

           

Capital quotas

     11         376,881         376,881         376,881   

Legal reserve

     11         37,504         37,504         37,504   

Retained earnings

        1,754,728         1,718,063         1,810,004   
     

 

 

 

Total equity

        2,169,113         2,132,448         2,224,389   
     

 

 

 

Total liabilities and equity

      $ 3,352,246       $ 2,903,184       $ 3,181,170   

 

 

 

The accompanying notes are part of the financial statements.

 

F-415


Table of Contents

Plantas Eólicas, S.R.L.

(A Costa Rican Entity)

Statements of comprehensive income

Years ended December 31, 2014 and 2013

 

              2014     2013  
(expressed in US dollars)    Notes      Restated (Note 3.2)  

Income:

       

Sale of electric power and capacity

      $ 5,711,023      $ 4,937,268   
     

 

 

 

Operating costs and expenses:

       

Cost of operations

     14         2,259,345        2,118,961   

Administrative expenses

     15         1,083,887        1,146,298   

Depreciation of non-financial assets

     8         239,852        394,048   
     

 

 

 

Total operating costs and expenses

        3,583,084        3,659,307   
     

 

 

 

Operating income

        2,127,939        1,277,961   

Other income (expenses):

       

Interest income

        10,159        8,849   

Finance costs from decommissioning provision

        (58,625     (23,412

Other financial charges

        (1,880     (5,452

Exchange rate differences, net

        111,827        60,906   

Other income (expenses), net

        17,609        (10,281
     

 

 

 

Income before income tax

        2,207,029        1,308,571   

Income tax

     13         (720,364     (400,512
     

 

 

 

Total comprehensive income

      $ 1,486,665      $ 908,059   

 

 

 

 

 

 

 

The accompanying notes are part of the financial statements.

 

F-416


Table of Contents

Plantas Eólicas, S.R.L.

(A Costa Rican Entity)

Statements of changes in equity

Years ended December 31, 2014 and 2013

 

              Capital
cuotas
     Legal
reserve
     Retained
earnings
    Total equity  
(expressed in US dollars)    Notes      Restated (Note 3.2)  

As of January 1, 2013

      $ 376,881       $ 37,504       $ 1,810,004      $ 2,224,389   

Comprehensive income

                        908,059        908,059   

Dividends

     11                         (1,000,000     (1,000,000
     

 

 

 

As of December 31, 2013

        376,881         37,504         1,718,063        2,132,448   

Comprehensive income

                        1,486,665        1,486,665   

Dividends

     11                         (1,450,000     (1,450,000
     

 

 

 

As of December 31, 2014

      $ 376,881       $ 37,504       $ 1,754,728      $ 2,169,113   

 

 

 

 

 

 

 

 

 

The accompanying notes are part of the financial statements.

 

F-417


Table of Contents

Plantas Eólicas, S.R.L.

(A Costa Rican Entity)

Statements of cash flows

Years ended December 31, 2014 and 2013

 

              2014     2013  
(expressed in US dollars)    Notes      Restated (Note 3.2)  

Operating activities:

       

Income before income tax

      $ 2,207,029      $ 1,308,571   

Adjustments to reconcile income before income tax to cash flows from operating activities:

       

Depreciation expense

     8         239,852        394,048   

Financing cost

        1,880        5,452   

Loss on disposal of assets

               7,475   

Decommissioning provision

        (14,740     (46,085

Finance costs from decommissioning provision

        58,625        23,412   

Interest income

        (10,159     (8,849
     

 

 

 
        2,482,487        1,684,024   

Changes in operating assets and liabilities:

       

Accounts receivable

        (108,431     157,417   

Spare parts inventory

        (36,665     152,742   

Prepaid expenses

        4,746        (1,660

Accounts payable and accrued expenses

        80,683        (24,442

Accounts payable with related parties

        (11,265     83,545   

Income tax paid

      $ (308,588     (624,131
     

 

 

 

Net cash provided by operating activities

        2,102,967        1,427,495   
     

 

 

 

Investing activities:

       

Additions to property, plant and equipment

     8         (190,438     (105,676

Other assets

        2,803        (3,282

Interest received

        10,159        8,849   
     

 

 

 

Net cash used in investing activities

        (177,476     (100,109
     

 

 

 

Financing activities:

       

Dividends paid

     11         (1,450,000     (1,000,000

Interest paid

        (1,880     (5,452

Loan settlements

               (111,538
     

 

 

 

Net cash used in financing activities

        (1,451,880     (1,116,990
     

 

 

 

Net increase in cash

        473,611        210,396   

Cash at beginning of year

        341,813        131,417   
     

 

 

 

Cash at end of year

      $ 815,424      $ 341,813   

 

 

 

The accompanying notes are part of the financial statements.

 

F-418


Table of Contents

Plantas Eólicas, S.R.L.

(A Costa Rican Entity)

Notes to Financial Statements

December 31, 2014 and 2013

(amounts expressed in US dollars)

1. Corporate information

Plantas Eólicas, S.R.L. (“Plantas Eólicas” or “the Company”) was incorporated in accordance with the laws of the Republic of Costa Rica on November 9, 1990 for a ninety-nine-year term. Its legal address is in the city of Tilarán, Guanacaste Costa Rica. The Company is a wholly-owned subsidiary of Inversiones Eólicas de Costa Rica, S.A., which in turn is controlled by Globeleq Mesoamerica (Wind) Limited (“GME Wind”) an entity domiciled in Bermuda and Orosí’s ultimate parent is Actis Infrastructure Fund 2LP. The ultimate parent of Plantas Eólicas is Actis Infrastructure Fund 2LP.

The Company’s main activity is the generation of electricity from its 23 megawatt (MW) wind electric power generating plant located in Guanacaste, Costa Rica. All the electricity generated by the plant is sold to Instituto Costarricense de Electricidad (“ICE”).

The Company does not have traded debt or equity in the public markets. The accompanying financial statements have been prepared for use in a securities filing in connection with the acquisition of the Company as explained in Note 20.

2. Power purchase agreement and regulations governing autonomous or parallel generation of electricity

2.1 Electric power purchase and sale agreement

On January 19, 1995 the Company entered into an electric power purchase and sale agreement (“PPA”) with the ICE for an initial 15-year period. The PPA term may be extended by mutual agreement of the parties provided that the Company requests the extension in writing from ICE at least six months prior to expiration. On September 25, 2014 the PPA between ICE and Plantas Eólicas was extended until November 28, 2020. This extension was ratified by the regulator (ARESEP) on October 15, 2014.

2.2 Law on Autonomous or Parallel Generation of Electric Power

The Company is subject to Costa Rican Law N° 7200 dated September 28, 1990, and the amendments thereto through Law N° 7508 of April 30, 1995 which define autonomous or parallel generation of electric power as energy produced by limited-capacity power plants owned by private companies or cooperatives that can be integrated into the national electric power grid.

3. Basis of preparation

3.1 Statement of compliance

The financial statements of Plantas Eólicas as of December 31, 2014 and 2013 were prepared in accordance with International Financial Reporting Standards (IFRS) as issued by the International Accounting Standards Board.

The Company’s financial statements as of December 31, 2014 were first approved for issuance by the Company’s Chief Executive Officer and Chief Financial Officer on January 8, 2015, and were subsequently

 

F-419


Table of Contents

approved by the Company’s quotaholders. The accompanying restated financial statements have been prepared for use in a securities filing in connection with the acquisition of the Company as explained in Note 20. They have also been restated for the correction of certain errors as explained in Note 3.2. The Company’s Chief Executive Officer and Chief Financial Officer approved these financial restated statements for issuance on June 13, 2015 and subsequent events have been considered through that later date.

3.2 Restatement of financial statements

During its preparation of the accompanying restated financial statements for the purpose described in Note 3.1, the Company identified certain accounting errors that are being retrospectively corrected herein. They are explained as follows:

 

 

The Company has identified the need for a decommissioning provision in the accompanying financial statements given obligations that it believes exist under IAS 37 Provisions, Contingent Liabilities and Contingent Assets. Disclosure of such provision is presented in Note 12.

 

 

The Company has determined residual values for its wind turbines which resulted in a change in the depreciation expense.

 

 

The aforementioned matters have an impact on deferred income tax.

 

 

Certain accounting disclosures have been expanded from those previously presented.

 

F-420


Table of Contents

These corrections have impacted the accompanying financial statements as follows (amounts in US dollars):

 

     Balance as of
or for the
year ended
December 31,
2014 as
previously
reported
    Retrospective
adjustments
   

Balance as

of or for the
year ended
December 31,
2014 as
restated

        

Balance as

of or for the
year ended
December 31,
2013 as
previously
reported

    Retrospective
adjustments
   

Balance as

of or for the
year ended
December 31,
2013 as
restated

         Balance as
of January 1,
2013 as
previously
reported
    Retrospective
adjustments
    Balance as
of January 1,
2013 as
restated
 

Statement of financial position:

                     

Current assets

    2,362,635               2,362,635          1,861,356               1,861,356          1,846,777               1,846,777   

Non-current assets

    338,532        651,079        989,611          376,010        665,818        1,041,828          622,490        711,903        1,334,393   
 

 

 

     

 

 

     

 

 

 

Total assets

    2,701,167        651,079        3,352,246          2,237,366        665,818        2,903,184          2,469,267        711,903        3,181,170   
 

 

 

     

 

 

     

 

 

 

Current liabilities

    548,379               548,379          187,871               187,871          358,045               358,045   

Non-current liabilities

           634,754        634,754                 582,865        582,865                 598,736        598,736   
 

 

 

     

 

 

     

 

 

 

Total liabilities

    548,379        634,754        1,183,133          187,871        582,865        770,736          358,045        598,736        956,781   
 

 

 

     

 

 

     

 

 

 

Equity

    2,152,788        16,325        2,169,113          2,049,495        82,953        2,132,448          2,111,222        113,167        2,224,389   
 

 

 

     

 

 

     

 

 

 

Statement of comprehensive income:

                     

Revenues

    5,711,023               5,711,023          4,937,268               4,937,268           

Operating expenses

    (3,445,370     (58,624     (3,503,994       (3,605,285     (23,412     (3,628,697        
 

 

 

     

 

 

         

Income before income taxes

    2,265,653        (58,624     2,207,029          1,331,983        (23,412     1,308,571           

Income taxes

    (712,360     (8,004     (720,364       (393,710     (6,802     (400,512        
 

 

 

     

 

 

         

Comprehensive income

    1,553,293        (66,628     1,486,665          938,273        (30,214     908,059           
 

 

 

     

 

 

         

Statement of cash flows:

                     

Cash flows from operating activities

    2,115,826        (12,859     2,102,967          1,468,128        (40,633     1,427,495           

Cash flows from investing activities

    (192,215     14,739        (177,476       (146,194     46,085        (100,109        

Cash flows from financing activities

    (1,450,000     (1,880     (1,451,880       (1,111,538     (5,452     (1,116,990        

Cash at beginning of year

    341,813               341,813          131,417               131,417           
 

 

 

     

 

 

         

Cash at end of year

    815,424               815,424          341,813               341,813           
 

 

 

     

 

 

         

 

F-421


Table of Contents

3.3 Basis of valuation and presentation currency

The financial statements as of December 31, 2014 and 2013 were prepared on a historical cost basis, except for certain items that are measured in accordance with the accounting policies described in Note 4. The financial statements are expressed in US dollars (US$ or $).

3.4 Changes in accounting policies

The accounting policies adopted by the Company to prepare its financial statements as of December 31, 2014 are consistent with those used to prepare its financial statements as of December 31, 2013.

The Company adopted for the first time the following amendments to standards and interpretations, which are effective for annual periods beginning on or after January 1, 2014. These amendments and interpretations have no material impact on the Company’s financial statements as of December 31, 2014.

Investment Entities (Amendments to IFRS 10, IFRS 12 and IAS 27)

These amendments provide an exception to the consolidation requirement for entities that meet the definition of an investment entity under IFRS 10 Consolidated Financial Statements and must be applied retrospectively, subject to certain transition relief. The exception to consolidation requires investment entities to account for subsidiaries at fair value through profit or loss.

Offsetting Financial Assets and Financial Liabilities—Amendments to IAS 32

These amendments clarify the meaning of “currently has a legally enforceable right to set-off” and the criteria for non-simultaneous settlement mechanisms of clearing houses to qualify for offsetting and is applied retrospectively.

Novation of Derivatives and Continuation of Hedge Accounting—Amendments to IAS 39

These amendments provide relief from discontinuing hedge accounting when novation of a derivative designated as a hedging instrument meets certain criteria and retrospective application is required.

IFRIC 21 Levies

IFRIC 21 clarifies that an entity recognizes a liability for a levy when the activity that triggers payment, as identified by the relevant legislation, occurs. For a levy that is triggered upon reaching a minimum threshold, the interpretation clarifies that no liability should be anticipated before the specified minimum threshold is reached. Retrospective application is required for IFRIC 21.

Recoverable Amount Disclosures for Non-Financial Assets—Amendments to IAS 36 Impairment of Assets

These amendments remove the unintended consequences of IFRS 13 on the disclosures required under IAS 36. In addition, these amendments require disclosure of the recoverable amounts for the assets or cash generating units for which impairment loss has been recognized or reversed during the period.

Annual Improvements 2010-2012 Cycle

In the 2010-2012 annual improvements cycle, the IASB issued seven amendments to six standards, which included an amendment to IFRS 13 Fair Value Measurement. The amendment to IFRS 13 is effective immediately and, thus, for periods beginning at January 1, 2014 and it clarifies in the Basis for Conclusions that short-term receivables and payables with no stated interest rates can be measured at invoice amounts when the effect of discounting is immaterial.

 

F-422


Table of Contents

Annual Improvements 2011-2013 Cycle

In the 2011-2013 annual improvements cycle, the IASB issued four amendments to four standards, which included an amendment to IFRS 1 First-time Adoption of International Financial Reporting Standards. The amendment to IFRS 1 is effective immediately and, thus, for periods beginning at January 1, 2014 and clarifies in the Basis for Conclusions that an entity may choose to apply either a current standard or a new standard that is not yet mandatory, but permits early application, provided either standard is applied consistently throughout the periods presented in the entity’s first IFRS financial statements.

4. Summary of significant accounting policies

4.1 Currency and foreign currency transactions

4.1.1 Functional and presentation currency of the financial statements

Plantas Eólicas adopted the US dollar as the functional and presentation currency since it better reflects the events and transactions performed by the Company. Adoption of the US dollar as functional currency was based on the following facts: income from energy capacity is generated in dollars, some obligations are denominated in dollars and certain operating costs and expenses are also incurred in that currency. Information related to exchange regulations and risks is included in Note 17.

Considering that the accounting records are kept in Costa Rican colons, and that the US dollar was adopted as the functional currency, assets and liabilities denominated in foreign currency were translated into the financial statements’ functional currency using the exchange rate ruling on the date of the statement of financial position. Non-monetary items measured on a historical cost basis were converted on the date of the statement of financial position using the exchange rate ruling on the original transaction date. Income and expenses are converted at the exchange rate in effect on the transaction date.

4.1.2 Transactions in foreign currency

Transactions in foreign currency, any currency other than the functional currency, are recorded at the exchange rate ruling on the transaction date. In determining its financial situation and operating results, the Company appraises and adjusts its assets and liabilities denominated in foreign currency at the exchange rate ruling on the date of this valuation and determination. Exchange differences resulting from the application of these procedures are recognized in the results of the period in which they occur.

4.2 Cash

Cash is comprised of cash on-hand and in banks. For purposes of the statement of cash flows, cash is presented net of bank overdrafts, if any.

4.3 Financial instruments

The valuation of the Company’s financial instruments is determined using the amortized cost or fair value, as defined below:

Amortized cost—The amortized cost is calculated using the effective interest method less any allowance for impairment. The calculation takes into consideration any award or discount in the acquisition and includes the transaction costs and fees which are an integral part of the effective interest rate.

 

F-423


Table of Contents

Fair value—The fair value of a financial instrument negotiated in an organized financial market is determined using as reference the prices quoted in that financial market for negotiations performed as of the date of the statement of financial position. With respect to financial instruments for which there is no active financial market, the fair value is determined using valuation techniques.

These techniques include recent market transactions between interested, fully informed parties who act independently; references to the fair value of another substantially similar financial instrument; and discounted cash flows or other valuation models.

4.4 Financial assets

4.4.1 Initial recognition and measurement of financial assets

Financial assets within the scope of IAS 39 Financial Instruments: Recognition and Measurement are classified as financial assets at fair value through profit or loss, loans and receivables, held-to-maturity investments, available-for-sale financial assets, or as derivatives designated as hedging instruments in an effective hedge, as appropriate. The Company determines the classification of its financial assets at initial recognition.

The Company initially recognizes all of its financial assets at fair value plus costs directly attributable to the transaction, except for financial assets valued at fair value through profit or loss in which these costs are not considered.

The Company recognizes the purchase or sale of financial assets on the date of each transaction, which is the date on which the Company commits to buy or sell a financial asset.

In addition to cash, the Company’s financial assets correspond to accounts receivable.

4.4.2 Subsequent measurement of financial assets

The subsequent measurement of financial assets depends on their classification as described below:

Accounts receivable

Accounts receivable are non-derivative financial assets with fixed or determined payments that are not quoted in active markets, and are initially recognized at the corresponding invoiced amounts. After initial recognition, accounts receivable are recorded by the Company at amortized cost using the effective interest rate method less the allowance for impairment. Gains or losses are recognized in results when the accounts receivable are derecognized or impaired, as well as through the amortization process.

4.4.3 Impairment of financial assets

The Company assesses on the date of the statement of financial position whether there is any objective evidence that a financial asset or group of assets is impaired. A financial asset or group of financial assets is deemed to be impaired if, and only if, there is objective evidence of impairment as a result of one or more events that have occurred after the initial recognition of the financial asset, and that loss event has an impact on the estimated future cash flows of the financial asset or group of financial assets that can be reliably estimated. Evidence of impairment may include indications that the debtors are experiencing significant financial difficulty, default or delinquency in interest or principal payments, the probability that they will enter bankruptcy or other financial reorganization, and where observable data indicate that there is a measurable decrease in the estimated future cash flows due to defaults on contracts.

 

F-424


Table of Contents

Impairment of financial assets recorded at amortized cost

When the Company determines that it has incurred in an impairment loss in the value of its financial assets carried at amortized cost, it estimates the loss amount as the difference between the asset’s carrying amount and the present value of future cash flows discounted at the financial asset’s original effective interest rate; it deducts the loss from the asset’s carrying amount and recognizes such loss in the results of the year in which it occurs.

If, in a subsequent period, the amount of the loss due to impairment decreases and may be objectively related to an event subsequent to the recognition of impairment, the impairment loss is reversed.

Once the reversal is recorded, the carrying amount of the financial asset cannot exceed the original amortized amount. The amount of the reversal is recognized in the results of the year in which it occurs.

4.4.4 Derecognition of financial assets

Financial assets are derecognized by the Company when the rights to receive cash flows from the asset have expired, or when the financial asset is transferred along with its inherent risks and benefits and contractual rights to receive cash flows from the asset are surrendered, or when the Company retains the contractual rights to receive cash flows and assumes the obligation to pay them to one or more parties.

4.5 Financial liabilities

4.5.1 Initial recognition and measurement

Financial liabilities within the scope of IAS 39 are classified as financial liabilities at fair value through profit or loss, loans and borrowings, or as derivatives designated as hedging instruments in an effective hedge, as appropriate. The Company determines the classification of its financial liabilities at initial recognition.

The Company recognizes all financial liabilities initially at fair value on the date of acceptance or contracting of the liability, plus, in the case of loans and borrowings, directly attributable transaction costs.

The Company’s financial liabilities include trade payables and accrued expenses.

4.5.2 Subsequent measurement

The subsequent measurement of financial liabilities depends on their classification as described below:

Trade payables and accrued expenses

After initial recognition, trade payables and accrued expenses are subsequently measured at amortized cost using the effective interest method. The Company recognizes gains or losses in the income statement when the financial liability is derecognized as well as through the amortization process.

4.5.3 Derecognition

Financial liabilities are derecognized when the obligation has been paid, cancelled or expires. When a financial liability is replaced by another, the Company derecognizes the original and recognizes a new liability. Differences that may result from these financial liability replacements are recognized through income or loss when incurred.

4.6 Spare parts inventory

Inventories are valued at the lower of cost and net realizable value on a weighted average basis.

 

F-425


Table of Contents

4.7 Property, plant and equipment

Property, plant, and equipment are stated at acquisition cost less accumulated depreciation and losses due to impairment, if any. These costs include the cost of replacing the components of plant or equipment when the cost is incurred, if it meets the requirements for recognition. Depreciation and those disbursements for repair and maintenance which do not meet the conditions for recognition as assets are recognized as expenses in the year in which they are incurred.

Depreciation is calculated on a straight-line basis over the useful life of each type of asset. The remaining value of the depreciating assets, the estimated useful life, and depreciation methods are periodically reviewed by Management and adjusted when necessary, at the end of each financial year. The estimated useful lives for productive assets is established by the Company as the difference between the date from which the assets are available for their intended use and the power purchase agreement expiration date or the assets’ own estimated useful life, whichever is shorter.

A breakdown of estimated useful lives is as follows:

 

      Estimated
useful life
 

Buildings and leasehold improvements

     20 years   

Furniture and equipment

     1-10 years   

Machinery and equipment (primarily wind turbines)

     20 years   

Vehicles

     5 years   

 

 

Construction and installation costs are charged to temporary accounts and subsequently transferred to the respective asset accounts once the works are completed. These works in process include all disbursements directly related to the design, development and construction of buildings and others, plus financial costs attributable to the works.

The present value of the expected cost for the decommissioning of an asset after its use is included in the cost of the respective asset if the recognition criteria for a provision are met.

A component of property, plant, and equipment is derecognized when it is sold or when the Company does not expect future economic benefits from its use. Any loss or gain from the disposal of the asset, calculated as the difference between the net carrying amount and the sales proceeds, is recognized in income in the year in which it occurs.

4.8 Impairment of non-financial assets

The Company assesses the carrying amounts of its non-current assets at each reporting date to determine reductions in value when events or circumstances indicate that recorded values may not be recovered. If any such indication exists, and the carrying amount exceeds the recoverable amount, the Company measures the assets or cash-generating units at their recoverable amounts, defined as the greater of fair value less selling costs or value in use. Resulting adjustments are recorded in the results of the year in which they are determined.

4.9 Revenue recognition

Plantas Eólicas measures its revenue from ordinary activities using the fair value of the benefit received or to be received, derived from revenue.

 

F-426


Table of Contents

4.9.1 Revenue from energy sales

Revenue from energy sales is recognized in the period in which energy is delivered to ICE. Revenue from the electricity generating capacity is recognized in the period in which such capacity is made available to ICE. No revenue is recognized if there are significant uncertainties regarding recovery of the amount due and associated costs.

4.9.2 Interest income from financial instruments

Revenue arising from financial instruments is recognized in relation to the passage of time, calculated over the average monthly balances for the invested principal, applying the effective interest method.

4.10 Taxes

Deferred tax assets and deferred tax liabilities are offset if a legally enforceable right exists to set off current tax assets against current income tax liabilities and the deferred tax assets against current income tax liabilities and the deferred taxes relate to the same taxable entity and the same taxation authority.

4.10.1 Current income tax

The Company calculates income tax by applying adjustments from certain items, affected by or subject to income tax, in conformity with current tax regulations. Current tax, corresponding to present and prior periods, is recognized by the Company as a liability to the extent that it is not settled. If the amount already paid, which corresponds to present and prior periods, exceeds the amount payable for those periods, the excess is recognized as an asset.

4.10.2 Deferred income tax

Deferred income tax is determined by applying the liability method to all temporary differences existing between the asset, liability, and net equity tax base and the amounts recorded for financial purposes as of the date of the statement of financial position. The deferred income tax is calculated using the tax rate expected to apply to the period when the asset is realized or the liability is settled. Deferred tax assets are recognized only when there is reasonable probability of their realization.

The carrying amount of deferred income tax assets is reviewed on the date of the statement of financial position and reduced to the extent that it is no longer probable that sufficient taxable income will be available to allow all or part of the deferred income tax asset to be utilized. Likewise, on the closing date of each financial period, the Company reassesses the unrecognized deferred tax assets to the extent that it is probable that future taxable income will allow the deferred tax assets to be recovered.

4.10.3 Sales tax

Revenue from sales is recorded by the Company at amounts net of sales tax, and a liability is recognized in the statement of financial position for the related sales tax amount. The acquisition of assets and expenses are recorded by the Company for amounts net of sales tax if these taxes are credited in favor of the Company by the tax authorities, recognizing the accumulated amount receivable in the statement of financial position.

When the sales tax is not credited, the Company includes the tax as part of the expense or the asset, as appropriate.

 

F-427


Table of Contents

4.11 Operating leases

The Company holds certain productive assets under lease agreements with third parties. Leases in which the Company, as lessee, does not substantially retain all risks and benefits incidental to asset ownership are considered operating leases. Payments on these leases, according to rates established in the respective contracts, are recognized as expenses over the lease term.

4.12 Significant accounting estimates and assumptions

Financial statement preparation requires Management to make judgments, estimates and assumptions affecting reported amounts of revenue, expenses, assets and liabilities, and to disclose contingent liabilities as of the reporting date. However, uncertainty about these assumptions and estimates could result in outcomes that require an adjustment to the carrying amount of the asset or liability affected in future periods.

5. Standards issued but not yet effective

The standards and interpretations that are issued, but not yet effective, as of December 31, 2014 are disclosed below. The Company intends to adopt these standards, if applicable to its activities, when they become effective.

IFRS 9 Financial Instruments

In July 2014, the IASB issued the final version of IFRS 9 Financial Instruments which reflects all phases of the financial instruments project and replaces IAS 39 Financial Instruments: Recognition and Measurement and all previous versions of IFRS 9. The standard introduces new requirements for classification and measurement, impairment, and hedge accounting. IFRS 9 is effective for annual periods beginning on or after January 1, 2018 with early application permitted. Retrospective application is required, but comparative information is not compulsory. Early application of previous versions of IFRS 9 (2009, 2010 and 2013) is permitted if the date of initial application is before February 1, 2015.

IFRS 14 Regulatory Deferral Accounts

IFRS 14 is an optional standard that allows an entity, whose activities are subject to rate-regulation, to continue applying most of its existing accounting policies for regulatory deferral account balances upon its first-time adoption of IFRS. IFRS 14 is effective for annual periods beginning on or after January 1, 2016.

IFRS 15 Revenue from Contracts with Customers

IFRS 15 was issued in May 2014 and establishes a new five-step model that will apply to revenue arising from contracts with customers. Under IFRS 15 revenue is recognized at an amount that reflects the consideration to which an entity expects to be entitled in exchange for transferring goods or services to a customer.

The principles in IFRS 15 provide a more structured approach to measuring and recognizing revenue. The new revenue standard is applicable to all entities and will supersede all current revenue recognition requirements under IFRS. Either a full or modified retrospective application is required for annual periods beginning on or after January 1, 2017 with early adoption permitted.

Amendments to IAS 16 and IAS 38: Clarification of Acceptable Methods of Depreciation and Amortization

The amendments clarify the principle in IAS 16 and IAS 38 that revenue reflects a pattern of economic benefits that are generated from operating a business (of which the asset is part) rather than the economic benefits that are consumed through use of the asset. As a result, a revenue-based method cannot be used to depreciate

 

F-428


Table of Contents

property, plant and equipment and may only be used in very limited circumstances to amortize intangible assets. The amendments are effective prospectively for annual periods beginning on or after January 1, 2016 with early adoption permitted.

Amendments to IAS 16 and IAS 41 Agriculture: Bearer Plants

The amendments change the accounting requirements for biological assets that meet the definition of bearer plants. Under the amendments, biological assets that meet the definition of bearer plants will no longer be within the scope of IAS 41. Instead, IAS 16 will apply. After initial recognition, bearer plants will be measured under IAS 16 at accumulated cost (before maturity) and using either the cost model or revaluation model (after maturity). The amendments also require that produce that grows on bearer plants will remain in the scope of IAS 41 measured at fair value less costs to sell. For government grants related to bearer plants, IAS 20 Accounting for Government Grants and Disclosure of Government Assistance will apply. The amendments are retrospectively effective for annual periods beginning on or after January 1, 2016 with early adoption permitted.

Amendments to IAS 19 Defined Benefit Plans: Employee Contributions

IAS 19 requires an entity to consider contributions from employees or third parties when accounting for defined benefit plans. Where the contributions are linked to service, they should be attributed to periods of service as a negative benefit. These amendments clarify that, if the amount of the contributions is independent of the number of years of service, an entity is permitted to recognize such contributions as a reduction in the service cost in the period in which the service is rendered, instead of allocating the contributions to the periods of service. This amendment is effective for annual periods beginning on or after July 1, 2014.

Amendments to IAS 27: Equity Method in Separate Financial Statements

The amendments will allow entities to use the equity method to account for investments in subsidiaries, joint ventures and associates in their separate financial statements. Entities already applying IFRS and electing to change to the equity method in its separate financial statements will have to apply that change retrospectively. For first-time adopters of IFRS electing to use the equity method in its separate financial statements, they will be required to apply this method from the date of transition to IFRS. The amendments are effective for annual periods beginning on or after January 1, 2016 with early adoption permitted.

Amendments to IFRS 11 Joint Arrangements: Accounting for Acquisitions of Interests

The amendments to IFRS 11 require that a joint operator accounting for the acquisition of an interest in a joint operation, in which the activity of the joint operation constitutes a business must apply the relevant IFRS 3 principles for business combinations accounting. The amendments also clarify that a previously held interest in a joint operation is not re-measured on the acquisition of an additional interest in the same joint operation while joint control is retained. In addition, a scope exclusion has been added to IFRS 11 to specify that the amendments do not apply when the parties sharing joint control, including the reporting entity, are under common control of the same ultimate controlling party. The amendments apply to both the acquisition of the initial interest in a joint operation and the acquisition of any additional interests in the same joint operation and are prospectively effective for annual periods beginning on or after January 1, 2016 with early adoption permitted.

Annual improvements from the 2010-2012 and 2011-2013 Cycles

The following list of improvements to standards is effective from July 1, 2014:

 

 

IFRS 2 Share-based Payment.    This improvement is applied prospectively and clarifies various issues relating to the definitions of performance and service conditions which are vesting conditions.

 

F-429


Table of Contents
 

IFRS 3 Business Combinations.    The amendment is applied prospectively and clarifies that all contingent consideration arrangements classified as liabilities (or assets) arising from a business combination should be subsequently measured at fair value through profit or loss whether or not they fall within the scope of IFRS 9 (or IAS 39, as applicable).

 

 

IFRS 3 Business Combinations.    The amendment is applied prospectively and clarifies for the scope exceptions within IFRS 3 that: a) joint arrangements, not just joint ventures, are outside the scope of IFRS 3; and b) this scope exception applies only to the accounting in the financial statements of the joint arrangement itself.

 

 

IFRS 8 Operating Segments.    The amendments are applied retrospectively and clarifies that: a) an entity must disclose the judgments made by management in applying the aggregation criteria in paragraph 12 of IFRS 8, including a brief description of operating segments that have been aggregated and the economic characteristics (e.g., sales and gross margins) used to assess whether the segments are “similar”; and b) the reconciliation of segment assets to total assets is only required to be disclosed if the reconciliation is reported to the chief operating decision maker, similar to the required disclosure for segment liabilities.

 

 

IFRS 13 Fair Value Measurement.    The amendment is applied prospectively and clarifies that the portfolio exception in IFRS 13 can be applied not only to financial assets and financial liabilities, but also to other contracts within the scope of IFRS 9 (or IAS 39, as applicable).

 

 

IAS 16 Property, Plant and Equipment and IAS 38 Intangible Assets.    The amendment is applied retrospectively and clarifies in IAS 16 and IAS 38 that the asset may be revalued by reference to observable data on either the gross or the net carrying amount. In addition, the accumulated depreciation or amortization is the difference between the gross and carrying amounts of the asset. IAS 24 Related Party Disclosures.

 

 

IAS 24 Related Party Disclosures.    The amendment is applied retrospectively and clarifies that a management entity (an entity that provides key management personnel services) is a related party subject to the related party disclosures. In addition, an entity that uses a management entity is required to disclose the expenses incurred for management services.

 

 

IAS 40 Investment Property.    The description of ancillary services in IAS 40 differentiates between investment property and owner-occupied property (i.e., property, plant and equipment). The amendment is applied prospectively and clarifies that IFRS 3, and not the description of ancillary services in IAS 40, is used to determine if the transaction is the purchase of an asset or business combination.

The Company has not yet evaluated the impact that the aforementioned new accounting standards will have on its financial statements.

6. Cash

 

      2014      2013  

Cash in banks and on hand:

     

Banks

   $ 814,500       $ 340,813   

Petty cash

     924         1,000   
  

 

 

 
   $ 815,424       $ 341,813   

 

 

Cash deposited in bank accounts earns interest based on daily rates determined by the corresponding banks. As of December 31, 2014 and 2013, there were no restrictions on the use of cash balances.

 

F-430


Table of Contents

7. Accounts receivable

 

      2014      2013  

Instituto Costarricense de Electricidad (ICE)

   $ 668,459       $ 575,836   

Advance payments to suppliers

     78,916         45,491   

Others

     127         17,744   
  

 

 

 
   $ 747,502       $ 639,071   

 

 

The outstanding balances due from ICE correspond to trade receivables for the sale of electric power. Terms of these accounts receivable extend to 30 days from the corresponding invoice issue dates; are not subject to early-payment discounts, and do not generate interest except for late charges.

As of December 31, 2014 and 2013, receivable balances were not past due. Based on the collection analysis performed by Management, it has been determined that no impairment existed as of those dates.

8. Property, plant and equipment

 

     Land     Buildings     Machinery
and
equipment
    Furniture
and
equipment
    Vehicles     Work in
process
    Total  

Cost:

             

As of December 31, 2012

  $ 206,697      $ 323,586      $ 9,502,442      $ 130,431      $ 228,632      $ 16,184      $ 10,407,972   

Additions

           21,206        58,153        26,317                      105,676   

Reclassification

           16,184                             (16,184       

Retirements

                  (1,566,462     (17,463                   (1,583,925
 

 

 

 

As of December 31, 2013

    206,697        360,976        7,994,133        139,285        228,632               8,929,723   

Additions

           1,865        131,088        20,449        37,036               190,438   

Retirements

                  (3,010     (8,390     (30,000            (41,400
 

 

 

 

As of December 31, 2014

  $ 206,697      $ 362,841      $ 8,122,211      $ 151,344      $ 235,668      $      $ 9,078,761   
 

 

 

 

Accumulated depreciation:

             

As of December 31, 2012

  $      $ 299,708      $ 8,441,471      $ 115,146      $ 228,632      $      $ 9,084,957   

Depreciation

           31,162        339,150        23,736                      394,048   

Retirements

                  (1,559,087     (17,363                   (1,576,450
 

 

 

 

As of December 31, 2013

           330,870        7,221,534        121,519        228,632               7,902,555   

Depreciation

           30,154        188,803        19,044        1,851               239,852   

Retirements

                  (3,010     (8,390     (30,000            (41,400
 

 

 

 

As of December 31, 2014

  $      $ 361,024      $ 7,407,327      $ 132,173      $ 200,483      $      $ 8,101,007   
 

 

 

 

Carrying amounts:

             

As of December 31, 2012

  $ 206,697      $ 23,878      $ 1,060,971      $ 15,285      $      $ 16,184      $ 1,323,015   
 

 

 

 

As of December 31, 2013

  $ 206,697      $ 30,106      $ 772,599      $ 17,766      $      $      $ 1,027,168   
 

 

 

 

As of December 31, 2014

  $ 206,697      $ 1,817      $ 714,884      $ 19,171      $ 35,185      $      $ 977,754   

 

 

The Company has recognized a decommissioning provision related to its wind farm as described in Note 12.

 

F-431


Table of Contents

9. Accounts payable and accrued expenses

 

      2014      2013  

Sales taxes

   $ 87,704       $ 44,781   

Commercial vendors

     80,196         44,999   

Land rents payable

     15,656         14,546   

Others

     1,453           
  

 

 

 
   $ 185,009       $ 104,326   

 

 

Accounts payable and accrued expenses are interest free, are not subject to any discount for early payment, do not generate late charges, and their maturity terms are generally less than one year.

10. Balances and transactions with related parties

The related parties with whom the Company maintains balances and performs transactions are entities under the common control of Globeleq Mesoamerica Energy (Wind) Limited. A breakdown of these balances and the respective terms and conditions is as follows:

 

      2014      2013  

CR Operaciones y Mantenimiento, S.A.

   $ 72,280       $ 83,545   

 

 

The maturity term for the balance payable extends up to 30 days from the corresponding invoices’ issue dates, and is not subject to interest or discounts for early-payment.

Transactions performed with related parties are summarized below:

 

      2014      2013  

Plant operation expenses (Note 14 and 15):

     

CR Operaciones y Mantenimiento, S.A.

   $ 1,025,367       $ 1,048,160   
  

 

 

 

Administrative expenses:

     

TCR Holdings, S.A.

   $ 840,000       $ 840,000   

 

 

Plant operation expenses correspond to billings from the related party which operates and provides maintenance to the plant. Administrative expenses correspond to payments for accounting, financial, logistical, market, human resources, IT and engineering services.

Compensation to key management personnel:

The Company does not directly incur in compensation for key personnel because TCR Holdings, S.A. provides those management services, however the allocation of key personnel compensation at TCR Holdings, S.A. that is attributable to the Company amounts to US$47,666 for 2014 (2013: US $20,259).

11. Equity

Capital quotas

As of December 31, 2014 and 2013 the Company’s capital consists of 1,922,037 subscribed and paid quotas with a par value of ¢100 each, equivalent to a total of US$376,881.

 

F-432


Table of Contents

Legal reserve

In accordance with Costa Rican legislation, all corporations must record a legal reserve equal to 5% of the net income for the year until reaching 10% of the common share capital.

Dividends

On June 2014 the Company declared dividends in cash for US$1,450,000, equivalent to US$0.75 per quota (2013: US$1,000,000 equivalent to US$0.52 per quota).

12. Decommissioning provision

The Company has recognized a provision for decommissioning obligations associated with its wind farm. In determining the fair value of the provision, assumptions and estimates are made in relation to discount rates, the expected cost to dismantle and remove the plant from the site and the expected timing of those costs. Plantas Eólicas estimates that the decommissioning costs would be realized in 6 years’ time upon the expiration of the PPA. The Company calculates the provision using the discounted cash flow method based on the following assumptions: a) current estimated range of cost per wind turbine, and b) discount rate.

The rollforward of the decommissioning provision is as follows:

 

      2014      2013  

Balance at beginning of year

   $ 527,563       $ 550,236   

Unwinding of discount and changes in the discount rate

     43,885         (22,673
  

 

 

 

Balance at year end

   $ 571,448       $ 527,563   

 

 

13. Income tax

Plantas Eólicas is subject to income tax, therefore tax returns are prepared and filed with the corresponding tax authorities. The income tax rate in effect for the fiscal years ending December 31, 2014 and 2013 was 30%.

A breakdown of the income tax components presented in the statement of comprehensive income is provided below:

 

      2014      2013  

Current income

   $ 712,360       $ 393,710   

Recognition and reversal of temporary differences

     8,004         6,802   
  

 

 

 
   $ 720,364       $ 400,512   

 

 

The current income tax calculation is presented in the reconciliation below:

 

      2014     2013  

Income before tax

   $ 2,207,029      $ 1,308,571   

Add—non-deductible expenses

     139,732        14,862   

Deduct—non-taxable income

     (457     (16,890

Differences in exchange rates between the financial and tax basis

     54,910        28,498   
  

 

 

 

Taxable income

   $ 2,401,214      $ 1,335,041   
  

 

 

 

Current income tax at effective rate of 30% in 2014 (2013: 30%)

   $ 720,364      $ 400,512   

 

 

 

F-433


Table of Contents

The components of the deferred tax assets and liabilities are presented below:

 

      Statement of
financial position
    Statement of
comprehensive income
 
      2014     2013             2014                 2013  

Deferred tax asset:

        

Decommissioning provision

   $ 171,435      $ 158,269      $ 13,166      $ (6,802

Deferred tax liability:

        

Property, plant and equipment

     (234,741     (213,571     (21,170       
  

 

 

 
   $ (63,306   $ (55,302   $ (8,004   $ (6,802

 

 

14. Cost of operations

 

      2014      2013  

Plant operation expenses

   $ 868,316       $ 889,223   

Materials and supplies

     437,088         468,541   

Insurance

     219,028         214,358   

Leasing of land and equipment (Note 16)

     166,206         143,036   

Plant maintenance

     149,352         63,252   

Professional services

     62,533         80,521   

Public utilities

     41,805         104,747   

Crane maintenance

     50,509         34,370   

Taxes other than income tax

     99,851         32,050   

Vehicles

     38,064         30,031   

Donations

     29,000         17,853   

Travel

     16,979         16,155   

Other

     80,614         24,824   
  

 

 

 
   $ 2,259,345       $ 2,118,961   

 

 

Most of the plant operation expenses derive from the services rendered by CR Operaciones y Mantenimiento, S.A. (Note 10).

15. Administrative expenses

 

      2014      2013  

Professional services

   $ 890,815       $ 925,994   

Plant operation expenses

     157,051         160,832   
Materials and supplies      18,370         52,060   

Travel

     3,071         2,922   

Other

     14,580         4,490   
  

 

 

 
   $ 1,083,887       $ 1,146,298   

 

 

Most of the plant operation expenses derive from the services provided by TCR Holdings, S.A. (Note 10).

 

F-434


Table of Contents

16. Operating leases—Company as lessee

Plantas Eólicas has entered into operating leases of lands. These contracts are for an initial period of 35 years. These lease agreements expire in 2035. Quarterly payments are determined as three percent of income generated from wind energy; therefore, future payments on these agreements cannot be precisely estimated by the Company.

The lease expense incurred by the Company in 2014 amounted to US$166,206 (2013: $143,036) (Note 14).

17. Financial risk management objectives and policies

The Company’s main financial instruments are cash, accounts receivable, accounts payable and accrued expenses. The main purpose of these financial instruments is to manage cash flows and raise financing for the Company’s capital needs.

Plantas Eólicas is exposed to market, credit, and liquidity risks. The Company’s senior Management oversees the management of these risks.

17.1 Market risk

Market risk is the risk that the fair value of future cash flows of a financial instrument will fluctuate because of changes in market prices. Market risk comprises three types of risk: interest rate risk, currency risk and other price risk, such as equity price risk and commodity risk. The relevant market risk affecting the Company’s financial statements is the foreign currency risk.

Foreign currency risk

Foreign currency risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in foreign exchange rates. Plantas Eólicas’ exposure to the risk of changes in foreign exchange rates relates primarily to the Company’s operating activities (when revenue or expense is denominated in a different currency from the Company’s presentation currency).

The Costa Rican colon is the main foreign currency used by the Company in its transactions. The Costa Rican Central Bank is the entity responsible for managing the national banking system and regulating the Costa Rican colon’s parity to other currencies. Sell and buy rates are established by authorized financial institutions, according to market supply and demand. As of December 31, 2014, sell and buy rates for US dollars were ¢545.53 and ¢533.31, respectively (2013: ¢507.80 and ¢495.01).

 

F-435


Table of Contents

The following table summarizes assets and liabilities denominated in foreign currencies and expressed in US dollars:

 

      2014     2013  

Assets:

    

Cash

   $ 469,213      $ 108,801   

Accounts receivable

     126        2,150   

Prepaid expenses

     1,546        2,471   

Other financial assets

     11,857        14,660   

Income tax prepaid

            112,682   
  

 

 

 
     482,742        240,764   
  

 

 

 

Liabilities:

    

Accounts payable

     (39,760     (12,100

Accounts payable with related parties

     (72,280     (83,545

Accrued expenses

     (87,704     (44,781

Income tax payable

     (291,090       
  

 

 

 
     (490,834     (140,426
  

 

 

 

Net exposure to foreign currency

   $ (8,092   $ 100,338   

 

 

Sensitivity analysis:

The effect of an exchange rate variation of in a range of +8% / -8% (+1 / -1 % in 2013) on the monetary assets and liabilities as of December 31, 2014 and 2013, assuming that the remaining variables are held constant, would impact the period results by US$648 (2013: US$1,272).

17.2 Credit risk

Credit risk is the risk that a counter party will not meet its obligations under a financial instrument or customer contract, leading to a financial loss. The Company is exposed to credit risk from its operating activities (primarily trade receivables) and from its financing activities, including deposits with banks and financial institutions.

Plantas Eolicas’ sole customer is ICE. Under the Power Purchase Agreement, credit terms are 30 days, and receivable balances with ICE are current as of December 31, 2014 and 2013. An impairment analysis is performed at each reporting date on an individual basis for major customers; however an impairment allowance has not been recognized as customers’ balances are not past due.

With regards to credit risk on other financial assets, the maximum exposure to this risk is represented by the balances recorded for each financial asset. Exposure to credit risk is monitored constantly in accordance with the debtors’ payment behavior.

17.3 Liquidity risk

The Company monitors its liquidity on a daily basis, maintaining greater liquid assets than liquid liabilities, considering the maturity of its financial assets. It performs cash flow projections on a periodic basis in order to timely detect potential cash shortages or excesses to support its operations.

The Company’s financial liabilities, based on contractual terms, mature within six months from the date of the statement of financial position.

 

F-436


Table of Contents

18. Capital management

The Company’s main objective on capital management is to ensure that it maintains a solid credit ratio and healthy financial capital ratios to support its business and maximize profits. The Company manages its capital structure and timely requests quotaholders for any adjustment to this capital considering the economic environment in which the Company operates. To maintain or adjust its capital structure, it may request quotaholders for variations to dividends and capital returns previously agreed on, as well as for increases in capital contributions if necessary. These policies had no significant changes in 2014 and 2013.

19. Fair value of financial instruments

As indicated in Note 17, the Company’s main financial instruments are comprised of cash, accounts receivable, accounts payable and accrued expenses. Management believes that the carrying amounts of cash, accounts receivable, and accounts payable approach their fair market value due to their short-term nature.

Fair value hierarchy

The Company uses the following hierarchy for determining and disclosing the fair value of its financial instruments by valuation technique:

 

 

Level 1: Quoted (unadjusted) prices in active markets for identical assets or liabilities.

 

 

Level 2: Techniques that use inputs different from quoted prices that are observable for the asset or liability, whether directly or indirectly.

 

 

Level 3: Techniques that use inputs that have a significant effect on the recorded fair value that are not based on observable market data.

As of December 31, 2014 and 2013 the Company did not have financial instruments measured at fair value, thus the classification in levels of said instruments is not presented in these financial statements.

20. Subsequent events

On June 12, 2015, a Stock Purchase Agreement (SPA) was signed between Globeleq Holdings (Americas Renewables) Limited and Mesoamerica Power Limited as sellers and an affiliate of SunEdison as purchaser, for the sale of a 100% interest in the Company’s upstream shareholder, Globeleq Mesoamerica Energy (Wind) Limited. The SPA is subject to various conditions, not all of which have been met as of the date of these financial statements. There is no guarantee that such transaction will be consummated.

 

F-437


Table of Contents

INDEPENDENT AUDITORS’ REPORT

To the Board of Directors and Shareholders of

Energía Eólica de Honduras, S.A.

We have audited the accompanying restated financial statements of Energía Eólica de Honduras, S.A., which comprise the statements of financial position as of December 31, 2014 and 2013, and the related statements of comprehensive income, changes in equity and cash flows for the years then ended, and the related notes to the financial statements.

Management’s Responsibility for the Financial Statements

Management is responsible for the preparation and fair presentation of these financial statements in conformity with International Financial Reporting Standards as issued by the International Accounting Standards Board; this includes the design, implementation and maintenance of internal control relevant to the preparation and fair presentation of financial statements that are free of material misstatement, whether due to fraud or error.

Auditor’s Responsibility

Our responsibility is to express an opinion on these financial statements based on our audits. We conducted our audits in accordance with auditing standards generally accepted in the United States of America. Those standards require that we plan and perform the audits to obtain reasonable assurance about whether the financial statements are free of material misstatement.

An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the financial statements. The procedures selected depend on the auditor’s judgment, including the assessment of the risks of material misstatement of the financial statements, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the entity’s preparation and fair presentation of the financial statements in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity’s internal control. Accordingly, we express no such opinion. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluating the overall presentation of the financial statements.

We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion.

Opinion

In our opinion, the restated financial statements referred to above present fairly, in all material respects, the financial position of Energía Eólica de Honduras, S.A. as of December 31, 2014 and 2013, and the results of its operations and its cash flows for the years then ended in conformity with International Financial Reporting Standards as issued by the International Accounting Standards Board.

 

F-438


Table of Contents

To the Board of Directors and Shareholders of

Energía Eólica de Honduras, S.A.

Restatement of financial statements

As discussed in Note 3.2, the financial statements have been restated for the correction of errors in the accounting for decommissioning and restoration provisions, depreciation of property, plant and equipment, deferred income taxes and the classification of the restricted cash. This restatement has also resulted in the disclosure of the January 1, 2013 statement of financial position. Our opinion is not modified with respect to this matter.

/s/ Ernst & Young, S.A.

Ernst & Young, S.A.

San Jose, Costa Rica

June 13, 2015

 

F-439


Table of Contents

Energía Eólica de Honduras, S.A.

(A Honduran Entity)

Statements of Financial Position

As of December 31, 2014 and 2013, and January 1, 2013

(expressed in US dollars)

 

      Notes      December 31,
2014
    December 31,
2013
    January 1,
2013
 
                  Restated (Note 3.2)        

ASSETS

         

Current assets:

         

Cash

     6       $ 4,468,345      $ 3,135,050      $ 2,773,027   

Restricted cash

     6         15,197,262        14,944,204        28,572,623   

Accounts receivable

     7         12,396,177        5,878,148        4,648,682   

Spare parts inventory

        3,030,477        2,273,008        2,312,326   

Prepaid expenses and other current assets

        235,671        493,743        1,330,112   
     

 

 

 

Total current assets

        35,327,932        26,724,153        39,636,770   

Non-current assets:

         

Restricted cash

     6         18,171,075        18,188,292        21,517,835   

Accounts receivable

     7         2,430,661        3,107,508        3,884,401   

Intangible assets

     8         13,389,592        10,532,819        11,125,370   

Property, plant and equipment

     9         228,513,010        194,561,410        195,776,959   

Deferred financing costs

     10                1,277,712          

Deferred income tax, net

     18         182,916        317        15,953   

Derivative financial instruments

     13         826,034        2,118,788        787,456   

Other financial assets

        13,798        14,967        20,153   
     

 

 

 

Total assets

      $ 298,855,018      $ 256,525,966      $ 272,764,897   
     

 

 

 

LIABILITIES AND EQUITY

         

Current liabilities:

         

Notes and loans payable

     10       $ 10,303,543      $ 8,481,330      $ 8,926,318   

Accrued interest payable

     10         5,987,891        5,377,002        5,639,250   

Accounts payable and accrued expenses

     11         9,254,830        655,260        2,133,343   
     

 

 

 

Total current liabilities

        25,546,264        14,513,592        16,698,911   

Non-current liabilities:

         

Long-term notes and loans payable

     10         206,686,501        183,099,772        191,710,019   

Derivative financial instruments

     13         4,536,571        5,093,068        6,556,345   

Decommissioning and restoration provisions

     14         792,588        467,971        558,908   
     

 

 

 

Total liabilities

        237,561,924        203,174,403        215,524,183   
     

 

 

 

Equity:

         

Share capital

     15         48,000,856        48,000,856        38,512,248   

Contributed capital

     15         2,465,909               17,902,664   

Legal reserve

     15         679,873        248,692          

Other equity components

     15         (3,548,591 )      (3,412,977     (5,421,411

Retained earnings

        13,695,047        8,514,992        6,247,213   
     

 

 

 

Total equity

        61,293,094        53,351,563        57,240,714   
     

 

 

 

Total liabilities and equity

      $ 298,855,018      $ 256,525,966      $ 272,764,897   

 

 

The accompanying notes are part of the financial statements.

 

F-440


Table of Contents

Energía Eólica de Honduras, S.A.

(A Honduran Entity)

Statements of Comprehensive Income

Years ended December 31, 2014 and 2013

 

 

(expressed in US dollars)

 

           

2014

   

2013

 
           

Restated (Note 3.2)

 
     Notes               

Income:

       

Sale of electric power and capacity

      $ 48,159,766      $ 40,057,315   

Net revenue from availability, liquidated damages

               302,738   
     

 

 

   

 

 

 

Total income

        48,159,766        40,360,053   

Operating costs and expenses:

       

Cost of operations

     16         6,845,413        6,023,452   

General and administrative

     17         405,821        482,973   

Depreciation and amortization of non-financial assets

     8-9         10,964,769        10,645,813   
     

 

 

   

 

 

 

Total operating costs and expenses

        18,216,003        17,152,238   
     

 

 

   

 

 

 

Operating income

        29,943,763        23,207,815   

Other income (expenses):

       

Interest income

        62,913        40,900   

Finance costs from loans and notes payable

        (15,975,471     (15,791,655

Finance costs from decommissioning provisions

        (42,262     (42,142

Change in fair value of derivative financial instruments

        (678,689     686,306   

Exchange rate differences

        (265,641     19,541   

Other income, net

        271,509        292,559   
     

 

 

   

 

 

 

Total other income (expenses)

        (16,627,641     (14,794,491
     

 

 

   

 

 

 

Income before income tax

        13,316,122        8,413,324   

Income tax

     18         164,681        (15,636
     

 

 

   

 

 

 

Net income

        13,480,803        8,397,688   

Other comprehensive income (loss) to be reclassified to profit or loss in subsequent periods:

       

Net movement on cash flow hedge

     13         (153,532     2,008,434   

Income tax effect

     18         17,918          
     

 

 

   

 

 

 

Other comprehensive income, net of income tax

        (135,614     2,008,434   
     

 

 

   

 

 

 

Total comprehensive income

      $ 13,345,189      $ 10,406,122   
     

 

 

   

 

 

 

The accompanying notes are part of the financial statements.

 

F-441


Table of Contents

Energía Eólica de Honduras, S.A.

(A Honduran Entity)

Statements of Changes in Equity

Years ended December 31, 2014 and 2013

 

 

(expressed in US dollars)

 

      Share
capital
    Contributed
capital
    Legal
reserve
    Hedging
reserve
    Retained
earnings
    Total
equity
 
    Notes                             Restated (Note 3.2)  

As of January 1, 2013

    $ 38,512,248      $ 17,902,664      $      $ (5,421,411   $ 6,247,213      $ 57,240,714   

Net income

                                  8,397,688        8,397,688   

Other comprehensive income

    13                             2,008,434               2,008,434   
   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total comprehensive income

                           2,008,434        8,397,688        10,406,122   
   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Capital contributed

    15               11,242,824                             11,242,824   

Capital withdrawn

             (27,926,846                          (27,926,846

Share capital

    15        9,488,608        (1,218,642                          8,269,966   

Legal reserve

    15                      248,692               (248,692       

Dividends

    15                                    (5,881,217     (5,881,217
   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

As of December 31, 2013

      48,000,856               248,692        (3,412,977     8,514,992        53,351,563   

Net income

                                  13,480,803        13,480,803   

Other comprehensive income

    13                             (135,614            (135,614
   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Total comprehensive income

                           (135,614     13,480,803        13,345,189   
   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Capital contributed

    15               6,392,546                             6,392,546   

Capital withdrawn

    15               (3,926,637                          (3,926,637

Legal reserve

    15                      431,181               (431,181       

Dividends

    15                                    (7,869,567     (7,869,567
   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

As of December 31, 2014

    $ 48,000,856      $ 2,465,909      $ 679,873      $ (3,548,591   $ 13,695,047      $ 61,293,094   
   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

The accompanying notes are part of the financial statements.

 

F-442


Table of Contents

Energía Eólica de Honduras, S.A.

(A Honduran Entity)

Statements of Cash Flows

Years ended December 31, 2014 and 2013

 

(expressed in US dollars)

 

                      
           

2014

   

2013

 
           

Restated (Note 3.2)

 
     Notes        

Operating activities:

       

Income before income tax

      $ 13,316,122      $ 8,413,324   

Adjustments to reconcile income before income tax to cash flows from operating activities:

       

Interest income

        (62,913 )      (40,900

Finance costs from loans and notes payable

        15,975,471        15,791,655   

Finance costs from provisions

        42,462        42,142   

Decommissioning and environmental provisions

        (510,405 )      (135,158

Change in fair value of derivative financial instruments

        678,689        (686,306

Depreciation expense

     9         10,460,187        10,041,997   

Amortization expense

     8         504,581        603,815   

(Gain) loss on disposal of property, plant and equipment

        (8,508 )      5,795   
     

 

 

   

 

 

 
        40,395,686        34,036,364   

Changes in operating assets and liabilities:

       

Accounts receivable

        (5,841,182 )      (452,573

Spare parts inventory

        (757,469 )      39,318   

Prepaid expenses

        258,072        836,369   

Other assets

        1,170        5,186   

Accounts payable and accrued expenses

        9,392,127        (1,478,083
     

 

 

   

 

 

 

Net cash provided by operating activities

        43,448,404        32,986,581   
     

 

 

   

 

 

 

Investing activities:

       

Additions to property, plant and equipment

     9         (44,415,810 )      (8,832,243

Additions to intangible assets

     8         (3,361,354 )      (11,264

Proceeds from sale of property, plant and equipment

        12,532          

Interest received

        62,913        40,900   
     

 

 

   

 

 

 

Net cash used in investing activities

        (47,701,719 )      (8,802,607
     

 

 

   

 

 

 

Financing activities:

       

(Increase) decrease in restricted cash accounts designated for financing activities

        (235,841 )      16,957,962   

New loans

        36,773,582          

Loan settlements

        (8,074,213 )      (9,229,016

Finance costs paid

        (17,473,260 )      (17,257,703

Dividends

     15         (7,869,567 )      (5,881,217

Contributed capital

        6,392,546        19,512,790   

Capital withdrawn

        (3,926,637 )      (27,926,846
     

 

 

   

 

 

 

Net cash provided by (used in) financing activities

        5,586,610        (23,824,030
     

 

 

   

 

 

 

Net increase in cash

        1,333,295        359,944   

Cash at beginning of year

        3,135,050        2,775,106   
     

 

 

   

 

 

 

Cash at end of year

      $ 4,468,345      $ 3,135,050   
     

 

 

   

 

 

 

The accompanying notes are part of the financial statements.

 

F-443


Table of Contents

Energía Eólica de Honduras, S.A. (A Honduran Entity)

Notes to Financial Statements

December 31, 2014 and 2013

(amounts expressed in US dollars)

 

1.   Corporate information

Energía Eólica de Honduras, S.A. (“Energía Eólica” or “the Company”) was organized as a corporation on June 10, 2005 under the laws of the Republic of Honduras, where the Company is domiciled. As of December 31, 2014 the Company is a 99.9% subsidiary of Globeleq Mesoamerica Energy (Wind) Limited (“GME Wind”), a company incorporated in Bermuda, and Energía Eólica’s ultimate parent company is Actis Infrastructure Fund 2LP.

The Company’s main activity is the operation of a 126 megawatt wind park called “Cerro de Hula” and the sale of energy to the Honduran National Electric Energy Company (ENEE) through the power purchase agreement signed between the parties. Energy sales began in October 2011. This activity is regulated by Honduras electricity law No. 158-94 of November 1994 (Honduran Law—Electricity Sub-sector).

On October 1, 2008 Energía Eólica entered into a 20-year power purchase agreement (“PPA”) with the Honduran National Electric Energy Company (“ENEE”) to operate a 102 megawatt wind park (“Cerro de Hula Project” or “the Project”). The Company was granted the “commercial operation” status (as defined in the PPA) by ENEE on December 21, 2011. On December 20, 2012, the PPA was amended to contemplate that: a) the Company would increase the wind park’s capacity by 24 megawatts to reach a total of 126 megawatts, and b) the PPA’s term would increase from 20 to 25 years starting on December 21, 2011 and ending on December 2036. Construction of the 24 megawatt expansion (“the Project Expansion”) began on November 22, 2013. Acceptance of compliance by ENEE with the Project Expansion’s technical requirements was granted on November 13, 2014. The Project Expansion started generating power in November 2014.

The Project was registered as a Clean Development Mechanism (CDM) Project under the United Nations Framework Convention on Climate Change on April 24, 2012 and for a 10 years crediting period, from April 24 2012 through April 23 2022. The Project is therefore eligible to issue Certified Emission Reductions (CERs) starting on April 24, 2012.

The Company does not have traded debt or equity in the public markets. The accompanying financial statements have been prepared for use in a securities filing in connection with the acquisition of the Company as explained in Note 23.

 

2.   Regulations governing autonomous private or parallel generation of electricity

As per Honduran regulation, either public, private, or mixed companies subject to Law No. 158-94 of November 1994 will have the following options to sell the electricity produced: a) sell directly to a large consumer or distributing company; in these cases they must build the lines necessary to do so; and b) sell their electricity to ENEE. In the latter case, if the sale is by initiative of a private or mixed entity, ENEE will guarantee the purchase of the production if it is sold at a price equal to or less than the short-term marginal cost. If the sale/purchase is promoted by ENEE, the rate will be that resulting from the corresponding tender and the terms of the contract. The purchase of Energía Eólica’s energy is promoted by ENEE.

 

F-444


Table of Contents
3.   Basis of preparation of the financial statements

 

  3.1   Statement of compliance

The Company’s financial statements as of December 31, 2014 and 2013 were prepared in accordance with International Financial Reporting Standards (IFRS) as issued by the International Accounting Standards Board.

The Company’s financial statements as of December 31, 2014 were first approved for issuance by the Company’s Chief Executive Officer and Chief Financial Officer on January 8, 2015, and were subsequently approved by the Company’s shareholders. The accompanying restated financial statements have been prepared for use in a securities filing in connection with the acquisition of the Company as explained in Note 23. They have also been restated for the correction of certain errors as explained in Note 3.2. The Company’s Chief Executive Officer and Chief Financial Officer approved these financial restated statements for issuance on June 13, 2015 and subsequent events have been considered through that later date.

 

  3.2   Restatement of financial statements

During its preparation of the accompanying restated financial statements for the purpose described in Note 3.1, the Company identified certain accounting errors that are being retrospectively corrected herein. They are explained as follows:

 

   

The Company previously accounted for restricted cash as a component of cash in its statement of cash flows. It has corrected that classification to now exclude those amounts. The Company also modified the current versus non-current classification of restricted cash to correspond with contractual terms.

 

   

The Company has identified the need for a decommissioning and restoration provisions in the accompanying financial statements given obligations that it believes exist under IAS 37 Provisions, Contingent Liabilities and Contingent Assets. Disclosure of such provisions are presented in Note 14.

 

   

The Company has determined residual values for its wind turbines which resulted in a change in the depreciation expense.

 

   

The aforementioned matters have an impact on deferred income tax.

 

   

Certain accounting disclosures have been expanded from those previously presented.

 

F-445


Table of Contents

These corrections have impacted the accompanying financial statements as follows (amounts in US dollars):

 

    

Balance as

of or for the
year ended
December 31,
2014 as
previously
reported

    Retrospective
adjustments
   

Balance as

of or for the
year ended
December 31,
2014 as
restated

        

Balance as

of or for the
year ended
December 31,
2013 as
previously
reported

    Retrospective
adjustments
   

Balance as

of or for the
year ended
December 31,
2013 as
restated

        

Balance as

of January 1,
2013 as
previously
reported

    Retrospective
adjustments
   

Balance as

of January 1,
2013 as
restated

 

Statement of financial position:

                     

Current assets

    53,499,007        (18,171,075     35,327,932          44,912,445        (18,188,292     26,724,153          61,154,605        (21,517,835     39,636,770   

Non-current assets

    243,673,148        19,853,938        263,527,086          210,666,777        19,135,036        229,801,813          210,763,537        22,364,590        233,128,127   
 

 

 

     

 

 

     

 

 

 

Total assets

    297,172,155        1,682,863        298,855,018          255,579,222        946,744        256,525,966          271,918,142        846,755        272,764,897   
 

 

 

     

 

 

     

 

 

 

Current liabilities

    25,521,153        25,111        25,546,264          14,513,592               14,513,592          16,698,911               16,698,911   

Non-current liabilities

    211,338,658        677,002        212,015,660          188,359,492        301,319        188,660,811          198,344,513        480,759        198,825,272   
 

 

 

     

 

 

     

 

 

 

Total liabilities

    236,859,811        702,113        237,561,924          202,873,084        301,319        203,174,403          215,043,424        480,759        215,524,183   
 

 

 

   

 

 

   

 

 

     

 

 

   

 

 

   

 

 

     

 

 

   

 

 

   

 

 

 

Equity

    60,312,344        980,750        61,293,094          52,706,138        645,425        53,351,563          56,874,718        365,996        57,240,714   
 

 

 

     

 

 

     

 

 

 

Statement of comprehensive income:

                     

Revenues

    48,138,011        21,755        48,159,766          40,432,360        (72,307     40,360,053           

Operating expenses

    35,025,681        (182,037     34,843,644          32,225,598        (278,869     31,946,729           
 

 

 

     

 

 

     

Income before income taxes

    13,112,330        203,792        13,316,122          8,206,762        206,562        8,413,324           

Income taxes

    33,148        131,533        164,681          (88,503     72,867        (15,636        
 

 

 

     

 

 

     

Net income

    13,145,478        335,325        13,480,803          8,118,259        279,429        8,397,688           
 

 

 

     

 

 

     

Statement of cash flows:

                     

Cash flows from operating activities

    43,080,739        367,665        43,448,404          31,804,781        1,181,800        32,986,581           

Cash flows from investing activities

    (47,334,054     (367,665     (47,701,719       (8,896,440     93,833        (8,802,607        

Cash flows from financing activities

    5,822,451        (235,841     5,586,610          (39,504,280     15,680,250        (23,824,030        

Cash at beginning of year

    36,267,546        (33,132,496     3,135,050          52,863,485        (50,088,379     2,775,106           
 

 

 

     

 

 

     

Cash at end of year

    37,836,682        (33,368,337     4,468,345          36,267,546        (33,132,496     3,135,050           
 

 

 

     

 

 

     

 

F-446


Table of Contents
3.3   Basis of valuation and presentation currency

The financial statements as of December 31, 2014 and 2013 were prepared on a historical cost basis, except for certain items that are measured in accordance with the accounting policies described in Note 4. The financial statements are expressed in US dollars (US$ or $).

 

3.4   Changes in accounting policies

The accounting policies adopted by the Company to prepare its financial statements as of December 31, 2014 are consistent with those used to prepare its financial statements as of December 31, 2013.

The Company adopted for the first time the following amendments to standards and interpretations, which are effective for annual periods beginning on or after January 1, 2014. These amendments and interpretations had no material impact on the Company’s financial statements as of December 31, 2014.

Investment Entities (Amendments to IFRS 10, IFRS 12 and IAS 27)

These amendments provide an exception to the consolidation requirement for entities that meet the definition of an investment entity under IFRS 10 Consolidated Financial Statements and must be applied retrospectively, subject to certain transition relief. The exception to consolidation requires investment entities to account for subsidiaries at fair value through profit or loss.

Offsetting Financial Assets and Financial Liabilities—Amendments to IAS 32

These amendments clarify the meaning of “currently has a legally enforceable right to set-off” and the criteria for non-simultaneous settlement mechanisms of clearing houses to qualify for offsetting and is applied retrospectively.

Novation of Derivatives and Continuation of Hedge Accounting—Amendments to IAS 39

These amendments provide relief from discontinuing hedge accounting when novation of a derivative designated as a hedging instrument meets certain criteria and retrospective application is required.

IFRIC 21 Levies

IFRIC 21 clarifies that an entity recognizes a liability for a levy when the activity that triggers payment, as identified by the relevant legislation, occurs. For a levy that is triggered upon reaching a minimum threshold, the interpretation clarifies that no liability should be anticipated before the specified minimum threshold is reached. Retrospective application is required for IFRIC 21.

Recoverable Amount Disclosures for Non-Financial Assets—Amendments to IAS 36 Impairment of Assets

These amendments remove the unintended consequences of IFRS 13 on the disclosures required under IAS 36. In addition, these amendments require disclosure of the recoverable amounts for the assets or cash generating units for which impairment loss has been recognized or reversed during the period.

Annual Improvements 2010-2012 Cycle

In the 2010-2012 annual improvements cycle, the IASB issued seven amendments to six standards, which included an amendment to IFRS 13 Fair Value Measurement. The amendment to IFRS 13 is effective immediately and, thus, for periods beginning at January 1, 2014 and it clarifies in the Basis for Conclusions that short-term receivables and payables with no stated interest rates can be measured at invoice amounts when the effect of discounting is immaterial.

 

F-447


Table of Contents

Annual Improvements 2011-2013 Cycle

In the 2011-2013 annual improvements cycle, the IASB issued four amendments to four standards, which included an amendment to IFRS 1 First-time Adoption of International Financial Reporting Standards. The amendment to IFRS 1 is effective immediately and, thus, for periods beginning at 1 2014, and clarifies in the Basis for Conclusions that an entity may choose to apply either a current standard or a new standard that is not yet mandatory, but permits early application, provided either standard is applied consistently throughout the periods presented in the entity’s first IFRS financial statements.

 

4.   Summary of significant accounting policies

 

4.1   Currency and foreign currency transactions

4.1.1 Functional and presentation currency of the financial statements

The Company adopted the US dollar (US$ or $) as the functional and presentation currency since it better reflects the events and transactions performed by the Company. Adoption of the US dollar as functional currency was based on the following facts: income from energy sales is generated in dollars, debt obligations are denominated in dollars, capital contributions are made in dollars, and certain operating costs and expenses are also incurred in that currency. Information relating to exchange regulations and rates is included in Note 20.

Considering that the Company’s accounting records are kept in Honduran lempiras, and that the US dollar was adopted as the functional currency, assets and liabilities denominated in foreign currency were translated into the financial statements’ functional currency using the exchange rate ruling on the date of the statement of financial position. Non-monetary items measured on a historical cost basis were converted on the date of the statement of financial position using the exchange rate ruling on the original transaction date. Income and expenses are converted at the exchange rate in effect on the transaction date.

4.1.2 Transactions in foreign currency

Transactions in foreign currency, any currency other than the functional currency, are recorded at the exchange rate ruling on the transaction date. In determining its financial situation and operating results, the Company appraises and adjusts its assets and liabilities denominated in foreign currency at the exchange rate ruling on the date of this valuation and determination. Exchange rate differences resulting from the application of these procedures are recognized in the results of the period in which they occur.

 

4.2   Cash

Cash is comprised of cash on-hand and in banks.

 

4.3   Restricted Cash

Restricted bank account balances are not considered either unrestricted cash balances or cash equivalent balances for the purpose of the statement of cash flows. They are presented in the accompanying statements of financial position as “restricted cash”, and are presented as current or non-current assets given management’s expectation that they will be withdrawn for their defined purposes within the coming twelve-month period or otherwise. Net changes in such restricted cash balances are classified as a financing activity in the statement of cash flows based on the requirement for them under the debt agreements.

 

F-448


Table of Contents
4.4   Financial instruments

The valuation of the Company’s financial instruments is determined using the fair value or amortized cost, as defined below:

Fair value—The fair value of a financial instrument negotiated in an organized financial market is determined using as reference the prices quoted in that financial market for negotiations performed as of the date of the statement of financial position. With respect to financial instruments for which there is no active financial market, the fair value is determined using valuation and other techniques.

Amortized cost—The amortized cost is calculated using the effective interest method less any allowance for impairment. The calculation takes into consideration any award or discount in the acquisition and includes the transaction costs and fees which are an integral part of the effective interest rate.

These techniques include recent market transactions between interested, fully informed parties who act independently; references to the fair value of another substantially similar financial instrument; and discounted cash flows or other valuation methods.

 

4.5   Financial assets

4.5.1 Initial recognition and measurement of financial assets

Financial assets within the scope of IAS 39 Financial Instruments: Recognition and Measurement are classified as financial assets at fair value through profit or loss, loans and receivables, held-to-maturity investments, available-for-sale financial assets, or as derivatives designated as hedging instruments in an effective hedge, as appropriate. The Company determines the classification of its financial assets at initial recognition. The Company only has accounts receivable and derivative financial instruments, which are described in Note 4.7.

The Company initially recognizes all of its financial assets at fair value plus costs directly attributable to the transaction, except for financial assets valued at fair value through profit or loss in which these costs are not considered.

The Company recognizes the purchase or sale of financial assets on the date of each transaction, which is the date on which the Company commits to buy or sell a financial asset.

4.5.2 Subsequent measurement of accounts receivable

Accounts receivable are non-derivative financial assets with fixed or determined payments that are not quoted in active markets, and are initially recognized at the corresponding invoiced amounts. After initial recognition, accounts receivable are recorded by the Company at amortized cost using the effective interest rate method less the allowance for impairment. Gains or losses are recognized in results when the accounts receivable are derecognized or impaired, as well as through the amortization process.

4.5.3 Impairment of financial assets

The Company assesses on the date of the statement of financial position whether there is any objective evidence that a financial asset or group of assets is impaired. A financial asset or group of financial assets is deemed to be impaired if, and only if, there is objective evidence of impairment as a result of one or more events that have occurred after the initial recognition of the financial asset, and that loss event has an impact on the estimated future cash flows of the financial asset or group of financial assets that can be reliably estimated. Evidence of impairment may include indications that the debtors are experiencing

 

F-449


Table of Contents

significant financial difficulty, default or delinquency in interest or principal payments, the probability that they will enter bankruptcy or other financial reorganization, and where observable data indicate that there is a measurable decrease in the estimated future cash flows due to defaults on contracts.

Impairment of financial assets recorded at amortized cost

When the Company determines that it has incurred in an impairment loss in the value of its financial assets carried at amortized cost, it estimates the loss amount as the difference between the asset’s carrying amount and the present value of future cash flows discounted at the financial asset’s original effective interest rate; it deducts the loss from the asset’s carrying amount and recognizes such loss in the results of the year in which it occurs. If, in a subsequent period, the amount of the loss due to impairment decreases and may be objectively related to an event subsequent to the recognition of impairment, the impairment loss is reversed. Once the reversal is recorded, the carrying amount of the financial asset cannot exceed the original amortized amount. The amount of the reversal is recognized in the results of the year in which it occurs.

4.5.4 Derecognition of financial assets

Financial assets are derecognized by the Company when the rights to receive cash flows from the asset have expired, or when the financial asset is transferred along with its inherent risks and benefits and contractual rights to receive cash flows from the asset are surrendered, or when the Company retains the contractual rights to receive cash flows and assumes the obligation to pay them to one or more parties.

 

4.6   Financial liabilities

4.6.1 Initial recognition and measurement

Financial liabilities within the scope of IAS 39 are classified as financial liabilities at fair value through profit or loss, loans and borrowings, or as derivatives designated as hedging instruments in an effective hedge, as appropriate. The Company determines the classification of its financial liabilities at initial recognition. Energía Eólica recognizes all financial liabilities initially at fair value on the date of acceptance or contracting of the liability, plus, in the case of loans and borrowings, directly attributable transaction costs.

The Company’s financial liabilities include notes and accounts payable, accrued expenses and derivative financial instruments (Note 4.7).

4.6.2 Subsequent measurement of notes and accounts payable, and accrued expenses

After initial recognition, these financial instruments are subsequently measured at amortized cost using the effective interest method. The Company recognizes gains or losses in the statement of comprehensive income when the financial liability is derecognized as well as through the amortization process.

4.6.3 Derecognition

Financial liabilities are derecognized when the obligation has been paid, cancelled or expires. When a financial liability is replaced by another, the Company derecognizes the original and recognizes a new liability. Differences that may result from these financial liability replacements are recognized through profit or loss when incurred.

 

F-450


Table of Contents
4.7   Derivative financial instruments and hedge accounting

4.7.1 Initial recognition and subsequent measurement

The Company uses derivative financial instruments, interest rate swaps and caps, to hedge the risk of interest rate fluctuations, and does not hold or issue derivative financial instruments for trading purposes. Such derivative financial instruments are initially recognized at fair value on the date on which a derivative contract is obtained, and are subsequently re-measured at fair value.

Derivatives are carried as financial assets when the fair value is positive and as financial liabilities when the fair value is negative. The fair value of an interest rate swap/cap is the estimated amount that the Company would receive or pay to terminate the swap/cap on the date of the statement of financial position, taking into account current interest rates and the payment capacity of the counterparties.

Changes in fair value of the Company’s derivative financial instruments that qualify for hedge accounting are recognized as follows: changes in the time value of instruments and any ineffectiveness are taken directly to the income statement while changes in the intrinsic value are recognized as part of other comprehensive income.

For hedge accounting purposes, the Company’s interest rate swaps/caps are classified as cash flow hedges. At the beginning date of a hedge agreement, the Company formally designates and documents the hedge relationship to which the Company wishes to apply hedge accounting and the risk management objective and strategy for undertaking the hedge. The documentation includes identification of the hedging instrument, the hedged item or transaction, the nature of the risk being hedged, and how the entity will assess the hedging instrument’s effectiveness in offsetting the exposure to changes in the hedged item’s cash flows attributable to the hedged risk.

Such hedges are expected to be highly effective in achieving offsetting changes in cash flows and are assessed on a quarterly basis to determine that they actually have been highly effective throughout the financial reporting periods for which they were designated.

Cash flow hedges which meet the strict criteria for hedge accounting are recorded as follows: a) the effective portion of the gain or loss on the hedging instrument is recognized directly in equity, within other comprehensive income, while any ineffective portion is recognized immediately in the income statement; b) amounts taken to equity are transferred to the income statement when the hedged transaction affects profit or loss, such as when the hedged financial income or financial expense is recognized or when a forecast sale occurs.

If the hedging instrument no longer meets the criteria for hedge accounting, expires or is sold, terminated or exercised, then the hedge accounting is discontinued. The cumulative gain or loss previously recognized in equity remains there until the forecast transactions occurs.

4.7.2 Current versus non-current classification

Derivative instruments that are designated as hedges, and are effective hedging instruments, are classified consistently with the classification of the underlying hedged item. The derivative instrument is separated into a current portion and a non-current portion only if a reliable allocation can be made.

 

4.8   Inventory

4.8.1 Spare parts inventory

Inventories are valued at the lower of cost and net realizable value on a weighted average basis.

 

F-451


Table of Contents

4.8.2 Certified Emission Reductions (CERs)

The Company recognizes CERs in accordance with IAS 2 Inventory because they are held for sale in the ordinary course of business. CERs are measured, initially and subsequently, at fair value.

 

4.9   Intangible assets

Intangible assets acquired separately are measured initially at cost. Following initial recognition, intangible assets are carried at cost less any accumulated amortization and any accumulated impairment losses, as necessary. The Company records the intangible assets generated internally as expenses in the year in which they are incurred, except for development costs that are capitalized.

The useful lives of intangible assets are assessed to be either finite or indefinite. Energía Eólica only has intangible assets with finite useful lives, which are amortized under the straight-line method over the assets’ estimated useful lives, which are periodically reviewed by Management.

Gains or losses from the derecognition of an intangible asset are determined by the Company as the difference between the proceeds from sale or disposal and the net carrying amount of the intangible asset, recognizing them in the results of the year in which they are incurred.

4.9.1 Connectivity rights

As part of the obligations set forth in PPA with ENEE, the Company had to build, at its own cost, an electrical substation on behalf of ENEE. Because the Company does not own the physical asset, the respective cost was considered a right to be able to operate the wind park and therefore recognized as an intangible asset. Connectivity rights are amortized on a straight-line basis over the PPA term.

4.9.2 Research and development costs

Research costs are expensed as incurred.

Development activities involved a plan or design for the construction of new wind power generation projects. An intangible asset arising from the development phase of a project is recognized if the Company can demonstrate all of the following: the technical feasibility of completing the asset so that it will be available for use or sale; its intention to complete the asset and use it or sell it; its ability to use or sell the asset; how the asset will generate probable future economic benefits; the availability of adequate technical and financial resources to complete the development and to use or sell the asset, and its ability to reliably measure the expenditure attributable to the intangible asset during its development.

Useful life for intangible assets arising from development costs is determined based on the PPA term and amortization occurs on a straight-line basis.

4.9.3 Software

Software represents the cost of accounting software licenses. Software is amortized over a useful life between one and three years, on a straight-line basis.

 

4.10   Property, plant and equipment

Property, plant, and equipment are stated at acquisition cost less accumulated depreciation and losses due to impairment, if any. These costs include the cost of replacing the components of plant or equipment

 

F-452


Table of Contents

when the cost is incurred, if it meets the requirements for recognition. Depreciation and those disbursements for repair and maintenance which do not meet the conditions for recognition as assets are recognized as expenses in the year in which they are incurred.

Depreciation is calculated on a straight-line basis over the useful life of each type of asset. The remaining value of the depreciating assets, the estimated useful life, and depreciation methods are periodically reviewed by Management and adjusted when necessary, at the end of each financial year.

The estimated useful lives for productive assets is established by the Company as the difference between the date from which the assets are available for their intended use and the PPA expiration date or the assets’ own estimated useful life, whichever is shorter.

A breakdown of estimated useful lives is as follows:

 

      Useful life  

Buildings

     17-20 years   

Machinery and equipment (primarily wind turbines)

     20 years   

Furniture and equipment

     3-10 years   

Vehicles and crane

     5-20 years   

 

  

 

 

 

Construction and installation costs are charged to temporary accounts and subsequently transferred to the respective asset accounts once the works are completed. These works in process include all disbursements directly related to the design, development and construction of buildings and others, plus financial costs attributable to the works.

The present value of the expected cost for the decommissioning of an asset after its use is included in the cost of the respective asset if the recognition criteria for a provision are met.

A component of property, plant, and equipment is derecognized when it is sold or when the Company does not expect future economic benefits from its use. Any loss or gain from the disposal of the asset, calculated as the difference between the net carrying amount and the sales proceeds, is recognized in income in the year in which it occurs.

 

4.11   Impairment of non-financial assets

The Company assesses the carrying amounts of its non-current assets at each reporting date to determine reductions in value when events or circumstances indicate that recorded values may not be recovered. If any such indication exists, and the carrying amount exceeds the recoverable amount, the Company measures the assets or cash-generating units at their recoverable amounts, defined as the greater of fair value less selling costs or the value in use. Resulting adjustments are recorded in the results of the year in which they are determined.

 

4.12   Revenue recognition

The Company measures its revenue from ordinary activities using the fair value of the benefit received or to be received, derived from revenue.

4.12.1 Revenue from energy sales

Revenue from energy sales is recognized in the period in which energy is delivered to the Company customer. Revenue from the electricity generating capacity is recognized in the period in which such

 

F-453


Table of Contents

capacity is made available to its customer ENEE, in conformity with the terms specified in the PPA. No revenue is recognized if there are significant uncertainties regarding recovery of the amount or its associated costs.

4.12.2 Interest income from financial instruments

Revenue arising from financial instruments is recognized in relation to the passage of time, calculated over the average monthly balances for the invested principal, applying the effective interest method. Interest income is included in finance income in the statement of comprehensive income.

 

4.13   Borrowing costs

Borrowing costs directly attributable to the acquisition, construction or production of an asset that necessarily takes a substantial period of time to get ready for its intended use or sale are capitalized as part of the cost of the respective asset. Borrowing costs include interest, exchange differences and other borrowing costs. Borrowing costs that do not meet the criteria for capitalization are recorded in the results of the year in which they are incurred.

Borrowing costs, including transaction costs, related to notes and loans payable for the financing of qualifying assets under construction are initially recognized as a non-current asset and subsequently reclassified to the balance of notes and loans payable when the funds from the financing have been substantially withdrawn by the Company.

 

4.14   Benefits for termination of employment contracts

According to Decree No. 150-2008 of November 5, 2008 employees that are terminated without justified cause are entitled to a severance benefit equivalent to one month of salary for each year of service, up to a maximum of 25 months. The Company is obligated to pay 35% of the severance benefit to those employees with more than 15 years of service at the Company, if they decide to voluntarily terminate the labor relationship. Also, the Company has to pay 75% of the severance benefit to the beneficiaries of deceased employees who have six months or more of service at the Company.

 

4.15   Taxes

The Company offsets its current and deferred tax assets with current and deferred tax liabilities, respectively, if a legally enforceable right exists to set off the amounts recognized before the same taxation authority and when it has the intention to liquidate them for the net amount or to realize the asset and settle the liability simultaneously.

4.15.1 Current income tax

The Company calculates income tax by applying adjustments from certain items, affected by or subject to income tax, in conformity with current tax regulations. Current tax, corresponding to present and prior periods, is recognized by the Company as a liability to the extent that it is not settled. If the amount already paid, which corresponds to present and prior periods, exceeds the amount payable for those periods, the excess is recognized as an asset.

The Company recognizes current income tax related to items of other comprehensive income directly in these items and not in the results of the period.

 

F-454


Table of Contents

4.15.2 Deferred income tax

Deferred income tax is determined by applying the liability method to all temporary differences existing between the asset, liability, and net equity tax base and the amounts recorded for financial purposes as of the date of the statement of financial position. Deferred income tax is calculated using the tax rate expected to apply on the period when the asset is realized or the liability is settled. Deferred tax assets are recognized only when there is reasonable probability of their realization.

The carrying amount of deferred income tax assets is reviewed on the date of the statement of financial position and reduced to the extent that it is no longer probable that sufficient taxable income will be available to allow all or part of the deferred income tax asset to be utilized. Likewise, on the closing date of each financial period, the Company reassesses the unrecognized deferred tax assets to the extent that it is probable that future taxable income will allow the deferred tax assets to be recovered.

Deferred taxes related to items of other comprehensive income are recognized directly in those items and not in the results of the period.

4.15.3 Sales tax

Revenue from sales is recorded by the Company net of sales tax, and a liability is recognized in the statement of financial position for the related sales tax amount. Expenses and assets acquired are recorded by the Company net of sales tax if the tax authorities credit these taxes to the Company, recognizing the accumulated amount receivable in the statement of financial position. When the sales tax incurred is not recoverable the Company includes within the expense or asset, as applicable.

 

4.16   Operating leases

The Company holds certain productive assets under lease agreements with third parties. Leases in which the Company, as lessee, does not substantially retain all risks and benefits incidental to asset ownership are considered operating leases. Payments on these leases, according to rates established in the respective contracts, are recognized as expenses over the lease term.

 

4.17   Significant accounting judgments, estimates, and assumptions

Financial statement preparation requires management to make judgments, estimates and assumptions affecting reported amounts of revenue, expenses, assets and liabilities, and to disclose contingent liabilities as of the reporting date. However, uncertainty about these assumptions and estimates could result in outcomes that require a material adjustment to the carrying amount of the asset or liability affected in future periods.

4.17.1 Judgments

In applying the Company’s accounting policies, management has used the following judgment, apart from those implied in the estimates, which has a significant effect on the amounts recognized in the financial statements:

Classification of derivative financial instruments (interest rate swaps and caps) as cash flow hedges

The Company has classified its derivative financial instruments as cash flow hedges, and has adopted hedge accounting under the assumption that the hedge relationship is highly effective.

 

F-455


Table of Contents

4.17.2 Estimates and assumptions

The main assumptions related to future events and other sources of estimates subject to variations as of the reporting date, which due to their nature carry a risk of causing adjustments to the asset and liability amounts in next year’s financial statements, are presented below:

Fair value of financial instruments

When the fair value of financial assets and financial liabilities recorded in the statement of financial position cannot be derived from active markets, they are determined using valuation techniques including the discounted cash flows model. The inputs to these models are taken from observable markets where possible, but where this is not feasible, a degree of judgment is required in establishing fair values. The judgments include considerations of inputs such as liquidity risk, credit risk and volatility. Changes in assumptions about these variables could affect the reported fair value of financial instruments.

Impairment of non-financial assets

The Company estimates that there are no indicators of impairment for any of its non-financial assets as of the reporting date.

Operating leases

The Company’s commercial activities include the lease of land on which the project was established. Based on an evaluation of the terms and conditions of the signed lease contracts, the Company has determined that it does not retain the risks and rewards of the leased properties; therefore, it has classified the lease contracts as operating leases.

Development costs

The Group capitalizes development costs for a project in accordance with the accounting policy. Initial capitalization of costs is based on management’s judgment that technological and economic feasibility is confirmed, usually when a product development project has reached a defined milestone according to an established project management model. In determining the amounts to be capitalized, management makes assumptions regarding the expected future cash generation of the project, discount rates to be applied and the expected period of benefits.

 

5.   Standards issued but not yet effective

The standards and interpretations that are issued, but not yet effective, as of December 31, 2014 are disclosed below. The Company intends to adopt these standards, if applicable to its activities, when they become effective.

IFRS 9 Financial Instruments

In July 2014, the IASB issued the final version of IFRS 9 Financial Instruments which reflects all phases of the financial instruments project and replaces IAS 39 Financial Instruments: Recognition and Measurement and all previous versions of IFRS 9. The standard introduces new requirements for classification and measurement, impairment, and hedge accounting. IFRS 9 is effective for annual periods beginning on or after January 1, 2018 with early application permitted. Retrospective application is required, but comparative information is not compulsory. Early application of previous versions of IFRS 9 (2009, 2010 and 2013) is permitted if the date of initial application is before February 1, 2015.

 

F-456


Table of Contents

IFRS 14 Regulatory Deferral Accounts

IFRS 14 is an optional standard that allows an entity, whose activities are subject to rate-regulation, to continue applying most of its existing accounting policies for regulatory deferral account balances upon its first-time adoption of IFRS. IFRS 14 is effective for annual periods beginning on or after January 1, 2016.

IFRS 15 Revenue from Contracts with Customers

IFRS 15 was issued in May 2014 and establishes a new five-step model that will apply to revenue arising from contracts with customers. Under IFRS 15 revenue is recognized at an amount that reflects the consideration to which an entity expects to be entitled in exchange for transferring goods or services to a customer.

The principles in IFRS 15 provide a more structured approach to measuring and recognizing revenue. The new revenue standard is applicable to all entities and will supersede all current revenue recognition requirements under IFRS. Either a full or modified retrospective application is required for annual periods beginning on or after January 1, 2017 with early adoption permitted.

Amendments to IAS 16 and IAS 38: Clarification of Acceptable Methods of Depreciation and Amortization

The amendments clarify the principle in IAS 16 and IAS 38 that revenue reflects a pattern of economic benefits that are generated from operating a business (of which the asset is part) rather than the economic benefits that are consumed through use of the asset. As a result, a revenue-based method cannot be used to depreciate property, plant and equipment and may only be used in very limited circumstances to amortize intangible assets. The amendments are effective prospectively for annual periods beginning on or after January 1, 2016 with early adoption permitted.

Amendments to IAS 16 and IAS 41 Agriculture: Bearer Plants

The amendments change the accounting requirements for biological assets that meet the definition of bearer plants. Under the amendments, biological assets that meet the definition of bearer plants will no longer be within the scope of IAS 41. Instead, IAS 16 will apply. After initial recognition, bearer plants will be measured under IAS 16 at accumulated cost (before maturity) and using either the cost model or revaluation model (after maturity). The amendments also require that produce that grows on bearer plants will remain in the scope of IAS 41 measured at fair value less costs to sell. For government grants related to bearer plants, IAS 20 Accounting for Government Grants and Disclosure of Government Assistance will apply. The amendments are retrospectively effective for annual periods beginning on or after January 1, 2016 with early adoption permitted.

Amendments to IAS 19 Defined Benefit Plans: Employee Contributions

IAS 19 requires an entity to consider contributions from employees or third parties when accounting for defined benefit plans. Where the contributions are linked to service, they should be attributed to periods of service as a negative benefit. These amendments clarify that, if the amount of the contributions is independent of the number of years of service, an entity is permitted to recognize such contributions as a reduction in the service cost in the period in which the service is rendered, instead of allocating the contributions to the periods of service. This amendment is effective for annual periods beginning on or after July 1, 2014.

 

F-457


Table of Contents

Amendments to IAS 27: Equity Method in Separate Financial Statements

The amendments will allow entities to use the equity method to account for investments in subsidiaries, joint ventures and associates in their separate financial statements. Entities already applying IFRS and electing to change to the equity method in its separate financial statements will have to apply that change retrospectively. For first-time adopters of IFRS electing to use the equity method in its separate financial statements, they will be required to apply this method from the date of transition to IFRS. The amendments are effective for annual periods beginning on or after January 1, 2016 with early adoption permitted.

Amendments to IFRS 11 Joint Arrangements: Accounting for Acquisitions of Interests

The amendments to IFRS 11 require that a joint operator accounting for the acquisition of an interest in a joint operation, in which the activity of the joint operation constitutes a business must apply the relevant IFRS 3 principles for business combinations accounting. The amendments also clarify that a previously held interest in a joint operation is not re-measured on the acquisition of an additional interest in the same joint operation while joint control is retained. In addition, a scope exclusion has been added to IFRS 11 to specify that the amendments do not apply when the parties sharing joint control, including the reporting entity, are under common control of the same ultimate controlling party. The amendments apply to both the acquisition of the initial interest in a joint operation and the acquisition of any additional interests in the same joint operation and are prospectively effective for annual periods beginning on or after January 1, 2016 with early adoption permitted.

Annual improvements from the 2010-2012 and 2011-2013 Cycles

The following list of improvements to standards is effective from July 1, 2014:

 

   

IFRS 2 Share-based Payment. This improvement is applied prospectively and clarifies various issues relating to the definitions of performance and service conditions which are vesting conditions.

 

   

IFRS 3 Business Combinations. The amendment is applied prospectively and clarifies that all contingent consideration arrangements classified as liabilities (or assets) arising from a business combination should be subsequently measured at fair value through profit or loss whether or not they fall within the scope of IFRS 9 (or IAS 39, as applicable).

 

   

IFRS 3 Business Combinations. The amendment is applied prospectively and clarifies for the scope exceptions within IFRS 3 that: a) joint arrangements, not just joint ventures, are outside the scope of IFRS 3; and b) this scope exception applies only to the accounting in the financial statements of the joint arrangement itself.

 

   

IFRS 8 Operating Segments. The amendments are applied retrospectively and clarifies that: a) an entity must disclose the judgments made by management in applying the aggregation criteria in paragraph 12 of IFRS 8, including a brief description of operating segments that have been aggregated and the economic characteristics (e.g., sales and gross margins) used to assess whether the segments are “similar”; and b) the reconciliation of segment assets to total assets is only required to be disclosed if the reconciliation is reported to the chief operating decision maker, similar to the required disclosure for segment liabilities.

 

   

IFRS 13 Fair Value Measurement. The amendment is applied prospectively and clarifies that the portfolio exception in IFRS 13 can be applied not only to financial assets and financial liabilities, but also to other contracts within the scope of IFRS 9 (or IAS 39, as applicable).

 

   

IAS 16 Property, Plant and Equipment and IAS 38 Intangible Assets. The amendment is applied retrospectively and clarifies in IAS 16 and IAS 38 that the asset may be revalued by reference to

 

F-458


Table of Contents
 

observable data on either the gross or the net carrying amount. In addition, the accumulated depreciation or amortization is the difference between the gross and carrying amounts of the asset. IAS 24 Related Party Disclosures.

 

   

IAS 24 Related Party Disclosures. The amendment is applied retrospectively and clarifies that a management entity (an entity that provides key management personnel services) is a related party subject to the related party disclosures. In addition, an entity that uses a management entity is required to disclose the expenses incurred for management services.

 

   

IAS 40 Investment Property. The description of ancillary services in IAS 40 differentiates between investment property and owner-occupied property (i.e., property, plant and equipment). The amendment is applied prospectively and clarifies that IFRS 3, and not the description of ancillary services in IAS 40, is used to determine if the transaction is the purchase of an asset or business combination.

The Company has not yet evaluated the impact that the aforementioned new accounting standards will have on its financial statements.

6. Cash and restricted cash

 

      2014      2013  

Unrestricted cash:

     

Banks

   $ 4,463,157       $ 3,129,324   

Petty cash

     5,188         5,726   
  

 

 

 
   $ 4,468,345       $ 3,135,050   
  

 

 

 

Restricted cash in banks:

     

Current

     15,197,262         14,944,204   

Non-current

     18,171,075         18,188,292   
  

 

 

 
   $ 33,368,337       $ 33,132,496   

 

  

 

 

    

 

 

 

Cash deposited in bank accounts earns interest based on daily rates determined by the corresponding banks.

Cash balances for US$33,368,337 and US$33,132,496 as of December 31, 2014 and 2013, respectively, are restricted under the financing documents between Energía Eólica and the Lenders (Note 10). Under the terms of its debt agreements, the Company has a series of restricted bank accounts both “on-shore” in Honduras, and also off-shore. Cash receipts from operations are initially deposited directly into these restricted accounts and then based on contractually agreed provisions are allocated into a series of sub-accounts, restricted for specific operational and other purposes including, but not limited to, construction, debt service, major maintenance, insurance, and shareholders distributions. Except as expressly provided in those debt agreements, the restricted bank accounts are under the control of a trustee and the Company has the right to withdraw or transfer funds only as expressly provided in those debt agreements.

 

F-459


Table of Contents

7. Accounts receivable

 

      2014     2013  

Empresa Nacional de Energía Eléctrica (ENEE)

   $ 12,293,184      $ 5,660,657   

Value added taxes (VAT) related to the Project’s construction

     2,430,661        3,107,508   

Crane rental services receivable

     25,947        161,187   

Others

     77,046        56,304   
  

 

 

 
     14,826,838        8,985,656   

Less non-current portion (VAT)

     (2,430,661     (3,107,508
  

 

 

 
   $ 12,396,177      $ 5,878,148   

 

  

 

 

 

The outstanding balances due from ENEE correspond to trade receivables for the sale of electric power. Terms of these accounts receivable extend to 18 days for ENEE from the corresponding invoice issue dates; are not subject to early-payment discounts, and do not generate interest except for late charges.

The outstanding balance of VAT relates to funds reimbursed to the main Project’s subcontractors, Gamesa and Iberdrola, who were obligated to pay VAT on the acquisition of certain equipment and materials during the construction phase of the Project. Nonetheless, the Company was exempted from such VAT. The VAT receivable is denominated in Lempiras. The Honduran Tax Authority has been recognizing the Company’s right to such VAT, however its reimbursement depends on the timing of the review of the documentation by the Tax Authority. Reimbursement of such amounts occurs through credit notes issued by the Tax Authority. Those credit notes can be traded in the local market, although normally with a discount ranging from 15% to 20%. The Company believes that such VAT is fully recoverable in credit notes from the Tax Authority. VAT balances as presented above reflect the anticipated discount that will be realized upon collection.

 

8.   Intangible assets

 

      Connectivity
rights (a)
     Development
costs (b)
     Software      Total  

Cost:

           

As of December 31, 2012

   $ 11,309,448       $ 549,350       $ 18,245       $ 11,877,043   

Additions

                     11,264         11,264   
  

 

 

    

 

 

    

 

 

    

 

 

 

As of December 31, 2013

     11,309,448         549,350         29,509         11,888,307   

Additions

     3,343,309                 18,045         3,361,354   
  

 

 

    

 

 

    

 

 

    

 

 

 

As of December 31, 2014

   $ 14,652,757       $ 549,350       $ 47,554       $ 15,249,661   
  

 

 

    

 

 

    

 

 

    

 

 

 

Accumulated amortization:

           

As of December 31, 2012

   $ 706,794       $ 34,381       $ 10,498       $ 751,673   

Amortization

     565,435         27,505         10,875         603,815   
  

 

 

    

 

 

    

 

 

    

 

 

 

As of December 31, 2013

     1,272,229         61,886         21,373         1,355,488   

Amortization

     436,778         44,000         23,803         504,581   
  

 

 

    

 

 

    

 

 

    

 

 

 

As of December 31, 2014

   $ 1,709,007       $ 105,886       $ 45,176       $ 1,860,069   
  

 

 

    

 

 

    

 

 

    

 

 

 

Carrying amounts:

           

As of December 31, 2012

   $ 10,602,654       $ 514,969       $ 7,747       $ 11,125,370   
  

 

 

    

 

 

    

 

 

    

 

 

 

As of December 31, 2013

   $ 10,037,219       $ 487,464       $ 8,136       $ 10,532,819   
  

 

 

    

 

 

    

 

 

    

 

 

 

As of December 31, 2014

   $ 12,943,750       $ 443,464       $ 2,378       $ 13,389,592   

 

  

 

 

    

 

 

    

 

 

    

 

 

 

 

F-460


Table of Contents
  a)   Under the PPA terms with ENEE, the Company had to build, at its own cost, the high voltage section of the electrical substation on behalf of ENEE. Because the Company has to transfer ownership of such section to ENEE, the corresponding construction costs were considered as a right to be able to operate the wind project and therefore recognized as an intangible asset. The increase in 2014 is also related to the high voltage section of the substation built for the Project Expansion.

 

  b)   Correspond to certain costs incurred in relation to wind projects in the development phase, for which the Company believes that it has achieved both technological feasibility and has committed funding for completion.

 

9.   Property, plant and equipment

 

     Land     Buildings    

Machinery
and

equipment

    Major spare
parts
   

Furniture

and

equipment

    Vehicles    

Construction

in progress

    Total  

Cost:

               

As of December 31, 2012

  $ 1,344,304      $ 20,595,574      $ 178,483,088      $ 3,383,159      $ 197,650      $ 3,834,735      $ 298,686      $ 208,137,196   

Additions

    68,361        451,365        (60,517            148,783        48,000        8,176,251        8,832,243   

Retirements

                  (526            (15,838                   (16,364

Reclassifications

           607,036                      118,252               (725,288       
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

As of December 31, 2013

    1,412,665        21,653,975        178,422,045        3,383,159        448,847        3,882,735        7,749,649        216,953,075   

Additions and reclassifications

    170,979        5,437,002        45,216,252        1,016,036        219,062        67,707        (7,711,228     44,415,810   

Retirements

                  (163            (4,569     (19,000            (23,732
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

As of December 31, 2014

  $ 1,583,644      $ 27,090,977      $ 223,638,134      $ 4,399,195      $ 663,340      $ 3,931,442      $ 38,421      $ 261,345,153   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Accumulated depreciation:

               

As of December 31, 2012

  $      $ 1,292,395      $ 10,773,792      $      $ 58,117      $ 235,915      $      $ 12,360,219   

Depreciation

           1,035,923        8,686,589               34,240        285,245               10,041,997   

Retirements

                  (209            (10,341                   (10,550
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

As of December 31, 2013

           2,328,318        19,460,172               82,016        521,160               22,391,666   

Depreciation

           1,105,145        9,003,891               58,472        292,679               10,460,187   

Retirements

                  (164            (2,141     (17,405            (19,710
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

As of December 31, 2014

  $      $ 3,433,463      $ 28,463,899      $      $ 138,347      $ 796,434      $      $ 32,832,143   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Carrying amounts:

               

As of December 31, 2012

  $ 1,344,304      $ 19,303,179      $ 167,709,296      $ 3,383,159      $ 139,533      $ 3,598,820      $ 298,686      $ 195,776,977   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

As of December 31, 2013

  $ 1,412,665      $ 19,325,657      $ 158,961,873      $ 3,383,159      $ 366,831      $ 3,361,575      $ 7,749,649      $ 194,561,409   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

As of December 31, 2014

  $ 1,583,644      $ 23,657,514      $ 195,174,235      $ 4,399,195      $ 524,993      $ 3,135,008      $ 38,421      $ 228,513,010   
 

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

The Company’s property, plant and equipment is pledged as fiduciary guarantee under the third-party borrowing arrangements (Note 10).

Construction in progress is mainly comprised of advances to subcontractors (mainly Gamesa and Iberdrola) for the construction of the Project Expansion (Note 1).

Finance costs of US$756,928 were capitalized in 2014 (2013: US$0) with respect to the Project Expansion (Note 1) based on an average effective interest rate of 7.47% (2013: 0%) of the corresponding loans obtained to finance such expansion.

 

F-461


Table of Contents

The Company has recognized decommissioning and restoration provisions related to its wind farm as described in Note 14.

 

10.   Notes and loans payable

Notes and loans payable are denominated in US dollars and were as follows:

 

      Interest rate   Maturity date      2014     2013  

Export-Import Bank of the United States

   7% fixed     Feb-2029       $ 141,632,725      $ 147,626,103   

Central American Bank for Economic Integration (CABEI)

   Libor 6 months +

+5.75%(*)

    Aug-2025         47,587,689        50,075,642   

Export-Import Bank of the United States

   3.72% fixed

(**)

    Aug-2031         23,091,223          

Central American Bank for Economic Integration (CABEI)

   Libor 6 months

+5.75%(*)

    Aug-2028         13,682,358          
       

 

 

   

 

 

 

Principal

          225,993,995        197,701,745   

Less—Deferred finance costs

          (9,003,951     (6,120,643
       

 

 

   

 

 

 
          216,990,044        191,581,102   

Less—Maturity of one year or less

          (10,303,543     (8,481,330
       

 

 

   

 

 

 

Principal

        $ 206,686,501      $ 183,099,772   

 

 

 

  (*)   CABEI’s rate will change to Libor 6 months + 6.10% after November 2023.

 

  (**)   Ex-Im’s rate will increase to 6.72% after construction of the Project Expansion.

A summary of the maturities of the long-term notes and loans payable is presented below:

 

      2014     2013  

As of December 31, 2015

   $      $ 9,603,746   

As of December 31, 2016

     11,039,418        10,281,890   

As of December 31, 2017

     12,443,205        10,997,458   

As of December 31, 2018

     13,844,749        11,768,611   

As of December 31, 2019 and thereafter

     178,363,080        146,568,710   
  

 

 

   

 

 

 
     215,690,452        189,220,415   

Less—Deferred finance costs

     (9,003,951     (6,120,643
  

 

 

   

 

 

 
   $ 206,686,501      $ 183,099,772   

 

 

The balances of the notes payable above derived from secured loans obtained in November 2010 from Export—Import Bank of the United States (“Ex-Im”) and Central American Bank for Economic Integration (“CABEI”) for the financing the Cerro de Hula Project. Ex-Im and CABEI provided financing for a total of US$154,867,635 and US$53,564,360, respectively. To protect the security interest of Ex-Im and CABEI, the Company entered into arrangements typical of financing projects of this nature, including the pledge of Company assets (Notes 8 and 9).

 

F-462


Table of Contents

On November 22, 2013 the Company entered into secured loans with Ex-Im and CABEI to finance the Project Expansion for a total of US$53,733,675 (Note 1). Overall terms of these secured loans are:

 

            Ex-Im   CABEI

Available credit facility

      $29,633,675   $24,100,000

Interest rate

      CIRR*   Libor + 5.75%

Period

      August 2031   August 2028

Guarantee

   Security Package with all Company assets and share pledge

 

As of December 31, 2013, the Company had not made any withdrawals from credit facilities obtained to finance the Project Expansion. Therefore, the balance of deferred finance costs associated with the financing of the Project Expansion amounted to US$1,277,712 as of that date and was presented as an asset in the accompanying statement of financial position. When withdrawals occurred in 2014, this deferred financing cost was reclassified as an offset to the outstanding liability balance.

Refer to a discussion of restricted cash conditions under the credit agreement as explained in Note 6 above.

Debt agreements contained the following financial covenants. Breaches in meeting the financial covenants would permit the lenders to immediately call loans and borrowings.

 

Distribution requirements      

Debt service coverage ratio (historical)

   1.25x

Debt service coverage ratio (projected)

   1.25x

Debt to equity ratio ( + definition)

  

2016: 82:18

2017: 81:19

2018: 80:20

2019: 78:22

2020: 76:24

2021 onwards: 75:25

Total debt less DSRA, to

Total equity less “other equity components”

Financial maintenance covenants

  

Debt service coverage ratio

  

Debt to equity ratio

  

Minimum capital

  

$48,000,000

(only CABEI loans)

 

As of December 31, 2014, The Company was in compliance with these restrictive covenants.

As of December 31, 2014 accrued interest and fees on notes and loans payable amount to US$5,987,891 (2013: US$5,377,002).

 

F-463


Table of Contents
11.   Accounts payable and accrued expenses

 

      2014      2013  

Engineering and procurement costs payable

   $ 6,636,496       $ 6,753   

Commercial vendors

     2,447,656         538,821   

Rent of land

     85,847         21,401   

Christmas and other employee bonuses

     51,061         37,282   

Social security withholdings payable

     8,659         7,210   

Related parties (Note 12)

             12,793   

Other

     25,111         31,000   
  

 

 

 
   $ 9,254,830       $ 655,260   

 

  

 

 

    

 

 

 

The engineering and procurement costs accrual correspond to payables related to the Cerro de Hula Project for which sub-contractor invoices had not been received as of the statements of financial position date.

Maturity terms for accounts payable with commercial vendors extend up to 30 days from the corresponding invoices’ issue dates, are not subject to any discounts for early payment and do not generate interest except for late charges.

Accrued expenses and other accounts payable are interest free, are not subject to any discount for early payment, do not generate late charges, and their maturity terms are less than one year.

 

12.   Balances and transactions with related parties

The related parties with whom the Company maintains balances and performs transactions are entities under the common control of the parent company, Globeleq Mesoamerica Energy (Wind), Limited. A breakdown of these balances and the respective terms and conditions is as follows:

 

      2014      2013  

Accounts payable:

     

Administración de Energías Renovables, S.A. (Note 11)

   $       $ 12,793   

 

  

 

 

    

 

 

 

Maturity terms for accounts receivable and payable extend up to 30 days from the corresponding invoices’ issue dates, and are not subject to any discounts for early-payment.

A breakdown of transactions performed with related parties is summarized below:

 

      2014      2013  

Professional services expenses:

     

Administración de Energías Renovables, S.A. a/

   $ 799,188       $ 632,103   

TCR Holdings, S.A.

     36,648           

CR Operaciones y Mantenimiento, S.A.

     13,088           
  

 

 

    

 

 

 
   $ 848,924       $ 632,103   

 

  

 

 

    

 

 

 

 

  a/   Professional services provided by Administración de Energías Renovables, S.A. are in relation to the development, operation and construction of the Expansion Project of the wind farm. Professional services for US$799,188 were capitalized (under property, plant and equipment) by Energía Eólica in 2014.

 

F-464


Table of Contents

Compensation to key management personnel

The Company does not directly incur in compensation for key personnel because Administración de Energías Renovables, S.A. provides those management services, however the allocation of key personnel compensation at Administración de Energías Renovables, S.A. that is attributable to the Company amounts to US$254,682 in 2014 (2013: US$253,302).

13. Fair value of derivative instruments

The Company uses interest rate swaps and interest rate caps to hedge its variable interest rate exposure on a portion of the Company’s loans with CABEI (Note 10). Under the interest rate swaps/caps agreements the Company receives a fixed rate of interest as disclosed below and pays interest at a variable rate on the notional amounts. These derivative financial instruments have been designated as hedging instruments and have been assessed to be highly effective as of the financial statements dates. The effects of the above derivative instruments in the Company’s financial statements are summarized as follows:

 

      2014      2013  

Statements of Financial Position:

     

Assets:

     

Cap agreement of November 2010

   $ 484,884       $ 1,402,665   

Cap agreement of December 2013

     341,150         716,123   
  

 

 

    

 

 

 
   $ 826,034       $ 2,118,788   
  

 

 

    

 

 

 

Liabilities:

     

Swap agreement of November 2010

   $ 3,148,111       $ 4,174,901   

Swap agreement of December 2013

     1,388,460         918,167   
  

 

 

    

 

 

 
   $ 4,536,571       $ 5,093,068   

 

 

 

      2014     2013  

Statements of Comprehensive Income—gain / (loss):

    

Change in time value of derivative instruments—Profit and loss:

    

Cap agreement of November 2010

   $ (826,621   $ 524,049   

Cap agreement of December 2013

     171,204        169,945   
  

 

 

   

 

 

 
   $ (655,417   $ 693,994   
  

 

 

   

 

 

 

Ineffectiveness of derivative instruments—Profit and loss:

    

Swap agreement of November 2010

   $ (12,830   $ (683

Swap agreement of December 2013

     (10,442     (7,005
  

 

 

   

 

 

 
   $ (23,272   $ (7,688
  

 

 

   

 

 

 

Change in intrinsic value of derivative instruments—Other comprehensive income:

    

Cap agreement of November 2010

   $ (91,160   $ 91,160   

Cap agreement of December 2013

     (546,178     546,177   

Swap agreement of November 2010

     973,199        2,282,214   

Swap agreement of December 2013

     (466,121     (918,805

Ineffectiveness recycled to profit or loss

     (23,272     7,688   
  

 

 

   

 

 

 

Subtotal

     (153,532     2,008,434   

Deferred income tax (Note 18)

     17,918          
  

 

 

   

 

 

 
   $ (135,614   $ 2,008,434   

 

 

 

F-465


Table of Contents

The main characteristics of the derivative instruments are as follows:

 

     Swap Transactions     Cap Transactions  
    Nov. 2010     Dec. 2013     Nov. 2010     Dec. 2013  

Effective date

    29-Nov-2010        25-Feb-2014        25-Feb-2018        25-Feb-2021   

Termination date

    25-Feb-2018        25-Feb-2021        25-Aug-2025        25-Aug-2028   

Current notional amount

    US$51,887,761        US$10,991,597                 

Maximum notional amount

    US$56,732,737        US$19,410,815        US$39,289,122        US$11,652,389   

Fixed interest rate

    3.63%        3.36%        4.75%        3.36%   

Variable interest rate

    US Libor-6 months        US Libor-6 months        US Libor-6 months        US Libor-6 months   

 

14.   Decommissioning and restoration provisions

The Company has recognized a provision for decommissioning obligations associated with its wind farm. In determining the fair value of the provision, assumptions and estimates are made in relation to discount rates, the expected cost to dismantle and remove the wind farm from the site and the expected timing of those costs. Energía Eólica estimates that the decommissioning costs would be realized in 22 years’ time upon the expiration of the PPA. The Company calculates the provision using the discounted cash flow method based on the following assumptions: a) current estimated range of cost per wind turbine, and b) discount rate.

The restoration provision reflects the costs estimated by the Company to comply with the environmental reforestation plan described in Note 19.2. The Company also calculates the provision using the discounted cash flow method.

The roll-forward of the decommissioning and restoration provisions is as follows:

 

    

2014

    

2013

 

Balance at beginning of year

   $ 467,971       $ 558,908   

Unwinding of discount and changes in the discount rate

     324,617         (90,937
  

 

 

    

 

 

 

Balance at year end

   $ 792,588       $ 467,971   
  

 

 

    

 

 

 

 

15.   Equity

Share capital

As of December 31, 2014 and 2013 the number of authorized common shares was 13,190,969 with a par value of L100 each. As of December 31, 2014 and 2013 the authorized, registered and paid share capital amounts to US$48,000,856 that is represented by 7,277,516 common shares.

As of December 31, 2014 and 2013 the totality of share capital is securing the loan agreements between the Company, Ex-Im Bank and CABEI (Note 10).

Contributed capital

Contributed capital is comprised of contributed cash, in addition to the share capital, received from the shareholders. Shareholders have increased or decreased their capital contributions depending on the capital needs to develop the Company’s projects.

 

F-466


Table of Contents

Legal reserve

In accordance with Honduran legislation, all corporations must record a legal reserve equal to 5% of the net income of the year, until it reaches 20% of the common share capital. In 2013 the company increased the legal reserve to 5% of the common share capital. The reserve amount of US$431,181 established in 2014 (2013: US$248,692) was based on 5% of the net income earned in Lempiras, the Honduran official currency.

Equity transactions

During the year ended December 31, 2013 the Company issued share capital with a stated amount of US$9,488,608 in exchange for US$8,269,966. The difference of US$1,218,642 was recorded as a reduction of contributed capital.

During the years ended December 31, 2014 and 2013, capital contributions were made by Company shareholders in the amount of US$6,392,546 and US$11,242,824, respectively. Furthermore, during the years ended December 31, 2014 and 2013, capital withdrawals were taken by Company shareholders in the amount of US$3,926,637 and US$27,926,846, respectively.

Dividends

Dividends for a total of US$7,869,567 were declared by the Company’s shareholders in 2014, equivalent US$1.08 per share (2013: US$5,881,217, equivalent to US$0.81 per share).

Distributions to Company shareholders, including dividends or any reduction of capital, are considered “restricted payments” as per the loan agreements with Ex-Im and CABEI. Therefore, the Company must comply with certain requirements before such distributions can be made.

Hedging reserve (other equity components)

This reserve includes the portion of gains or losses of the hedge instruments that the Company has determined to be effective cash flow hedges.

16. Cost of operations

 

      2014      2013  

Repair and maintenance of equipment

   $ 2,299,587       $ 1,245,878   

Professional services

     1,020,697         1,267,327   

Insurance

     948,617         730,939   

Donations

     809,113         473,623   

Employee salaries and benefits

     476,278         520,229   

Leasing of land and equipment (Note 19.5)

     337,687         326,196   

Travel

     204,607         211,795   

Environmental costs

     172,858         67,944   

Public utilities

     97,777         97,119   

Operating permits

     87,435         703,468   

Certified emission reductions costs

     20,253         87,824   

Materials and supplies

     18,611         55,743   

Others

     351,893         235,367   
  

 

 

    

 

 

 
   $ 6,845,413       $ 6,023,452   

 

  

 

 

    

 

 

 

 

F-467


Table of Contents

17. General and administrative expenses

 

      2014      2013  

Employee salaries and benefits

   $ 204,119       $ 192,413   

Professional services

     89,280         214,479   

Materials and supplies

     69,613         30,016   

Marketing

     18,563         28,349   

Public utilities

     3,485           

Others

     20,761         17,716   
  

 

 

    

 

 

 
   $ 405,821       $ 482,973   

 

  

 

 

    

 

 

 

18. Income tax

The Honduran income tax rate in effect for the fiscal years ending December 31, 2014 and 2013 is 25%. In addition, entities are obligated to pay a temporary solidary contribution of 5% on their taxable income after deducting a fixed deductible amount of 1,000,000 lempiras. However, as part of the PPA, the Company was granted a corporate income tax holiday of 10 years starting on the date of commercial operations, which was December 21, 2011 (Note 1). As of the date of these financial statements, the Company has not incurred current income tax liabilities due to this exemption.

The components of the deferred tax assets and liabilities are presented below:

 

      Statement of Financial
Position
    Statement of
Comprehensive
Income
 
      2014     2013     2014      2013  

Deferred tax assets:

         

Decommissioning and restoration provisions

   $ 204,424      $ 116,993      $ 87,431       $ (22,734

Property, plant and equipment

     94,078        49,976        44,102         95,601   

Deferred tax liabilities:

         

Derivative financial instruments a/

     (115,586     (166,652     33,148         (88,503
  

 

 

   

 

 

   

 

 

    

 

 

 

Net deferred taxes

   $ 182,916      $ 317      $ 164,681       $ (15,636

 

  

 

 

   

 

 

   

 

 

    

 

 

 

 

  a/   The deferred tax corresponding to the change in intrinsic value of derivative financial instruments recognized in other comprehensive income amounted to US$17,918 in 2014 (2013: US$0) (Note 13).

 

19.   Agreements and commitments

19.1 Guarantees

As required under the original PPA with ENEE, the Company has provided a bank compliance guarantee of US$4,500,000, which is backstopped by Globeleq Mesoamerica Energy (Wind) Limited and not by the Company. The Company has also provided a performance bond of US$122,200 to the Secretariat of Natural Resources (Secretaría de Recursos Naturales y Ambiente—SERNA) as required by the operating agreement with SERNA.

These performance bonds must be maintained during the PPA term and are not funded, thus the Company has engaged a commercial bank to issue them based on a commission fee. In October 2013 the Company also provided a performance bond of US$1,125,000 to ENEE as required by the amended PPA.

 

F-468


Table of Contents

19.2 Environmental commitments

As part of the Environmental License for the Project granted by SERNA, the Company committed to certain requirements during the construction and operation phases of the Project. Those requirements contemplate: establishment of a reforestation plan, maintaining a log of environmental incidents, proper management of waste materials, and submission of environmental compliance reports periodically to SERNA, among others. The Company has complied with the environmental laws and SERNA requirements as of the dates of the financial statements.

19.3 Cerro de Hula’s wind park expansion

The Company entered into a Turnkey Engineering, Procurement and Construction Agreement (“EPC”) with Gamesa Wind US LLC. (“Gamesa”) and Iberdrola Ingeniería y Construcción Mexico S.A. de C.V. (“Iberdrola”) to construct the Project Expansion. The EPC was signed on April 24 2013 for a total price of US$51,594,145. As of December 31, 2014 Energía Eólica had already advanced an amount of US$43,934,121 to Gamesa and Iberdrola, which is included under property, plant and equipment.

19.4 Wind park maintenance

The Company, Gamesa and Iberdrola entered into a Maintenance and Service Agreement on June 24, 2010 that was subsequently amended on April 24, 2012, to ensure that the Project will operate as technically designed after its construction. Under this agreement, Gamesa and Iberdrola guarantee that the Project will meet an average availability on the turbine equipment of no less than 97% beginning on the second anniversary of the Project’s substantial completion, which occurred on April 24, 2014. Maintenance services began on April 24, 2012 and the total fee was US$1,726,520.

The result of the plant availability below the guaranteed value was recognized in the 2013 statement of comprehensive income as “net revenue from availability, liquidated damages” (as a component of other revenue) for US$302,738 (2014: US$0). This resulted from Gamesa’s commitment that the wind park would reach a measured average availability of no less than 95% during the first year and 97% during the second year of the warranty period (from April 24, 2012 to April 24, 2014) as defined in the Engineering, Procurement and Construction Agreement (EPC) signed between the Company and Gamesa and Iberdrola. When the guaranteed average availability was not met, Gamesa compensated Energía Eólica with liquidated damages based on the formula established in the EPC.

A Maintenance and Service Agreement was also signed by the Company, Gamesa, and Iberdrola on April 24, 2013 for the Project Expansion. This agreement will take effect upon substantial completion, which is being agreed in 2015 to retroactively take place on December 14, 2014.

19.5 Operating leases—Company as lessee

The Company has entered into several operating lease contracts as lessee for the rental of land on which a significant portion of the wind park is located. The lease terms extend up to 25 years, renewable upon maturity for an additional 20-year term. Most of the lease agreements have been established in Lempiras, although some are in US dollars, and the rental fee is paid on a quarterly basis. Rental fees are subject to an inflation adjustment, based on the Honduran inflation as published by Banco de Honduras, after the second year of commencement of the agreement.

The Company also has entered into other minor lease agreements for offices and equipment.

 

F-469


Table of Contents

The lease expense incurred by the Company in 2014 amounted to US$337,687 (2013: US$326,196) (Note 16). The Company believes that future annual lease commitments cost should approximate 2014 lease expense amounts (exclusion of the aforementioned inflation adjustments) through the expiration of the PPA discussed above.

 

20.   Financial risk management objectives and policies

The Company’s main financial instruments are cash, accounts receivable, notes and loans payable, accounts payable and accrued expenses, and derivative financial instruments. The main purpose of these financial instruments is to manage cash flows and raise financing for the Company’s capital needs.

Energía Eólica is exposed to market, credit and liquidity risks. The Company’s senior Management oversees the management of these risks.

 

  20.1   Market risk

Market risk is the risk that the fair value of future cash flows of a financial instrument will fluctuate because of changes in market prices. Market risk comprise three types of risk: interest rate risk, currency risk and other price risk, such as equity price risk and commodity risk. Significant market risks affecting the Company’s financial statements are foreign currency risk and interest rate risk.

Foreign currency risk

Foreign currency risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in foreign exchange rates. Energía Eólica’s exposure to the risk of changes in foreign exchange rates relates primarily to the Company’s operating activities (when revenue or expense is denominated in a different currency from the Company’s presentation currency).

The Honduran Lempira is the main foreign currency used by the Company in its transactions. The Honduran Central Bank is the entity responsible for managing the national banking system and regulating the currency’s parity to other currencies. Buy and sell rates are established by authorized financial institutions, according to market supply and demand. As of December 31, 2014 and 2013, buy and sell rates for US dollars were L21.51 and L21.66 (2013: L20.59 and L20.74), respectively.

Below is a summary of monetary assets and liabilities in foreign currencies, expressed in US dollars:

 

      2014     2013  

Assets:

    

Cash

   $ 63,268      $ 4,076,230   

Accounts receivable

     2,432,716        3,158,791   
  

 

 

   

 

 

 
     2,495,984        7,235,021   
  

 

 

   

 

 

 

Liabilities:

    

Accounts payable and accrued expenses

     (135,094     (320,234
  

 

 

   

 

 

 

Net monetary assets

   $ 2,360,890      $ 6,914,787   

 

 

Sensitivity analysis:

The effect of a reasonable exchange rate variation between the Lempira and the US$ of +4% / -4% on the monetary assets and liabilities as of December 31, 2014 (2013: +3% / -3%), assuming that the remaining variables are held constant, would imply the recognition of gains or losses from exchange rate differences of US$104,726 in 2014 (2013: US$220,172).

 

F-470


Table of Contents

Interest rate risk

Interest rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in market interest rates. Energía Eólica’s exposure to the risk of changes in market interest rates relates primarily to the Company’s long-term debt obligations with floating interest rates. Energía Eólica’s exposure to the risk of changes in market interest rates is primarily related to the Company’s debt obligations with floating interest rates. To manage this, the Company enters into interest rate swaps/caps (Note 13), in which it agrees to exchange, at specified intervals, the difference between fixed and variable rate interest amounts calculated by reference to an agreed-upon notional principal amount.

As of the date of the statement of financial position, the interest rate profile of the Company’s interest-bearing financial instruments was as follows:

 

      2014     2013  

Fixed rate instruments:

    

Financial liabilities

   $ (164,723,948   $ (147,626,103
  

 

 

   

 

 

 

Variable rate instruments:

    

Financial assets

   $ 37,831,494      $ 36,261,820   

Financial liabilities

     (61,270,047     (50,075,642
  

 

 

   

 

 

 
   $ (23,438,553   $ (13,813,822

 

 

20.2 Credit risk

Credit risk is the risk that a counter party will not meet its obligations under a financial instrument or customer contract, leading to a financial loss. The Company is exposed to credit risk from its operating activities (primarily trade receivables) and from its financing activities, including deposits with banks and financial institutions.

Energía Eólica’s sole customer is ENEE. Under the PPA, credit terms are 18 days, and receivable balances with ENEE are current as of December 31, 2014 and 2013.

With regards to credit risk on other financial assets, the maximum exposure to this risk is represented by the balances recorded for each financial asset. Exposure to credit risk is monitored constantly in accordance with the debtors’ payment behavior.

20.3 Liquidity risk

The Company monitors its liquidity on a daily basis, attempting to maintain greater liquid assets than liquid liabilities, considering the maturity of its financial assets. It performs cash flow projections on a periodic basis in order to timely detect potential cash shortages or excesses to support its operations.

 

F-471


Table of Contents

The following table summarizes the maturity of the Company’s financial liabilities, based on payment commitments:

As of December 31, 2014:

 

     

0 to 6

Months

    

6 to 12

months

    

More than

1 year

     Total  

Notes and loans payable

   $ 5,011,836       $ 5,291,707       $ 206,686,501       $ 216,990,044   

Account payable and accrued expenses

     9,178,658         76,172                 9,254,830   

Accrued interest payable

     5,987,891                         5,987,891   

Decommissioning and restoration provisions

                     792,588         792,588   
  

 

 

    

 

 

    

 

 

    

 

 

 
   $ 20,178,385       $ 5,367,879       $ 207,479,089       $ 233,025,353   

 

  

 

 

    

 

 

    

 

 

    

 

 

 

As of December 31, 2013:

 

     

0 to 6

Months

    

6 to 12

months

    

More than

1 year

     Total  

Notes and loans payable

   $ 4,422,984       $ 4,058,346       $ 183,099,772       $ 191,581,102   

Accrued interest payable

     5,377,002                         5,377,002   

Accounts payable and accrued expenses

     655,260                         655,260   

Decommissioning and restoration provisions

                     467,971         467,971   
  

 

 

    

 

 

    

 

 

    

 

 

 
   $ 10,455,246       $ 4,058,346       $ 183,567,743       $ 198,081,335   

 

  

 

 

    

 

 

    

 

 

    

 

 

 

 

21.   Capital management

The Company’s main objective on capital management is to ensure that it maintains a solid credit ratio and healthy financial capital ratios to support its business and maximize profits. The Company manages its capital structure and timely requests shareholders for any adjustment to this capital considering the economic environment in which the Company operates. To maintain or adjust its capital structure, it may request shareholders for variations to dividends and capital returns previously agreed on, as well as for increases in capital contributions if necessary. These policies had no significant changes in 2014 and 2013.

The Company is financed through third-party debt and shareholders’ equity. The Company’s capital management is focused on maximizing shareholders’ returns through the optimization of the debt to equity gearing ratio. As of December 31, the Company’s gearing ratio was as follows:

 

      2014     2013  

Notes and loans payable

   $ 216,990,044      $ 191,581,102   

Accounts payable and accrued expenses

     9,254,830        655,260   

Accrued interest payable

     5,987,891        5,377,002   

Less—cash and restricted cash

     (37,836,682     (36,267,546
  

 

 

   

 

 

 

Net liabilities

     194,396,083        161,345,818   

Total capital

     61,293,094        53,351,563   
  

 

 

   

 

 

 

Capital and net liabilities

   $ 255,689,177      $ 214,697,381   
  

 

 

   

 

 

 

Gearing ratio

     76%        75%   

 

 

 

F-472


Table of Contents
22.   Fair value of financial instruments

As indicated in Note 20, the Company’s main financial instruments are comprised of cash, accounts receivable, notes and loans payable, accounts payable and accrued expenses, and derivative financial instruments. Management believes that the carrying values of cash, accounts receivable, and accounts payable approach their fair market value due to their short-term nature. Derivative financial instruments have been measured at fair value.

In considering the fair value of loans payable with variable interest rates the Company has considered that LIBOR based borrowings reset periodically and the LIBOR spread on those outstanding approximate those obtained by affiliates in recent financings. In evaluating the fair value of loans payable at fixed rates the Company has considered country risks, market conditions existing both at the date of the loans and those at the statement of financial position dates, and that there are not a significant number of comparable financings in this market. As of December 31 2014 and 2013, the fair value of the loans, taking into account current market interest rates, are the following:

 

      Carrying amount     

(Level 3)

Fair value

 
     2014      2013      2014      2013  

Ex-Im Loan 1

   $ 141,632,725       $ 147,626,103       $ 143,337,646       $ 149,500,382   

Ex-Im Loan 2

     23,091,223                 23,891,784           

CABEI Loan 1

     47,587,689         50,075,642         48,215,006         50,787,070   

CABEI Loan 2

     13,682,358                 13,920,137           
  

 

 

    

 

 

    

 

 

    

 

 

 
   $ 225,993,995       $ 197,701,745       $ 229,364,573       $ 200,287,452   

 

  

 

 

    

 

 

    

 

 

    

 

 

 

 

Fair   value hierarchy

The Company uses the following hierarchy for determining and disclosing the fair value of its financial instruments by valuation technique:

 

   

Level 1: Quoted (unadjusted) prices in active markets for identical assets or liabilities.

 

   

Level 2: Techniques that use inputs different from quoted prices that are observable for the asset or liability, whether directly or indirectly.

 

   

Level 3: Techniques that use inputs that have a significant effect on the recorded fair value that are not based on observable market data.

The inputs used in the fair value disclosure of loans payable are categorized within Level 3 of the fair value hierarchy

As of December 31, 2014 and 2013 classification in levels of instruments measured at fair value is as follows (Note 13):

 

      2014      Level 1      Level 2      Level 3  

Interest rate cap—asset

   $ 826,034       $       $ 826,034       $   
  

 

 

    

 

 

    

 

 

    

 

 

 

Interest rate swap—liability

   $ 4,536,571       $         —       $ 4,536,571       $         —   

 

  

 

 

    

 

 

    

 

 

    

 

 

 

 

      2013      Level 1      Level 2      Level 3  

Interest rate cap—asset

   $ 2,118,788       $         —       $ 2,118,788       $         —   
  

 

 

    

 

 

    

 

 

    

 

 

 

Interest rate swap—liability

   $ 5,093,068       $       $ 5,093,068       $   

 

  

 

 

    

 

 

    

 

 

    

 

 

 

 

F-473


Table of Contents
23.   Subsequent events

On June 12, 2015, a Stock Purchase Agreement (SPA) was signed between Globeleq Holdings (Americas Renewables) Limited and Mesoamerica Power Limited as sellers and an affiliate of SunEdison as purchaser, for the sale of a 100% interest in the Company’s upstream shareholder, Globeleq Mesoamerica Energy (Wind) Limited. The SPA is subject to various conditions, not all of which have been met as of the date of these financial statements. There is no guarantee that such transaction will be consummated.

 

F-474


Table of Contents

Independent auditors’ report

To the Board of Directors and Shareholders of Eolo de Nicaragua, S.A.

We have audited the accompanying restated financial statements of Eolo de Nicaragua, S.A., which comprise the statements of financial position as of December 31, 2014 and 2013, and the related statements of comprehensive income, changes in equity and cash flows for the years then ended, and the related notes to the financial statements.

Management’s responsibility for the financial statements

Management is responsible for the preparation and fair presentation of these financial statements in conformity with International Financial Reporting Standards as issued by the International Accounting Standards Board; this includes the design, implementation and maintenance of internal control relevant to the preparation and fair presentation of financial statements that are free of material misstatement, whether due to fraud or error.

Auditor’s responsibility

Our responsibility is to express an opinion on these financial statements based on our audits. We conducted our audits in accordance with auditing standards generally accepted in the United States of America. Those standards require that we plan and perform the audits to obtain reasonable assurance about whether the financial statements are free of material misstatement.

An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the financial statements. The procedures selected depend on the auditor’s judgment, including the assessment of the risks of material misstatement of the financial statements, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the entity’s preparation and fair presentation of the financial statements in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity’s internal control. Accordingly, we express no such opinion. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluating the overall presentation of the financial statements.

We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion.

Opinion

In our opinion, the restated financial statements referred to above present fairly, in all material respects, the financial position of Eolo de Nicaragua, S.A. as of December 31, 2014 and 2013, and the results of its operations and its cash flows for the years then ended in conformity with International Financial Reporting Standards as issued by the International Accounting Standards Board.

 

F-475


Table of Contents

To the Board of Directors and Shareholders of

Eolo de Nicaragua, S.A.

Restatement of financial statements

As discussed in Note 3.2, the financial statements have been restated for the correction of errors in the accounting for decommissioning provisions, depreciation of property, plant and equipment, deferred income taxes and the classification of the restricted cash. This restatement has also resulted in the disclosure of the January 1, 2013 statement of financial position. Our opinion is not modified with respect to this matter.

/s/ Ernst & Young, S.A.

Ernst & Young, S.A.

San Jose, Costa Rica

June 13, 2015

 

F-476


Table of Contents

Eolo de Nicaragua, S.A.

(A Nicaraguan Entity)

Statements of financial position

As of December 31, 2014 and 2013 and January 1, 2013

(expressed in US dollars)

 

            December 31,
2014
    December 31,
2013
    January  1,
2013
 
      Notes    Restated (Note 3.2)  

ASSETS

         

Current assets:

         

Cash

   6    $ 961,156      $ 4,088,911      $ 18,106,279   

Restricted cash

   6      5,202,845        6,988,114        2,301,900   

Accounts receivable

   7      5,133,648        3,946,370        2,742,759   

Accounts receivable from related parties

   9             997        18,135   

Spare parts inventory

        375,912        406,909        395,987   

Prepaid expenses and other current assets

   8      552,628        1,568,770        1,363,663   
     

 

 

 

Total current assets

        12,226,189        17,000,071        24,928,723   

Non-current assets:

         

Restricted cash

   6      5,373,044        4,879,867          

Held-to-maturity investments

               40,226        40,226   

Prepaid expenses

   8             334,373        1,337,490   

Guarantee deposits

   20.1      538,591        497,547        904,769   

Notes receivable with related parties

   9      3,395,540        3,216,257        3,025,842   

Property, plant and equipment

   10      71,520,238        75,193,168        78,708,356   

Intangible assets

   11      3,177,481        3,358,681        3,541,727   

Other financial assets

        1,560        1,560        1,560   
     

 

 

 

Total assets

      $ 96,232,643      $ 104,521,750      $ 112,488,693   
     

 

 

 

LIABILITIES AND EQUITY

         

Current liabilities:

         

Notes and loans payable

   12    $ 4,395,670      $ 2,740,993      $ 254,085   

Accounts payable

   13      684,174        265,987        149,409   

Accrued expenses and other accounts payable

   14      404,109        1,333,138        26,584,956   

Accrued interest payable

   12      318,268        342,403        271,093   
     

 

 

 

Total current liabilities

        5,802,221        4,682,521        27,259,543   

Non-current liabilities:

         

Long-term notes and loans payable

   12      79,440,447        83,388,144        71,640,522   

Deferred income tax, net

   16      2,568,436        1,352,757        102,841   

Decommissioning provision

   15      319,728        238,184        270,750   
     

 

 

 

Total liabilities

        88,130,832        89,661,606        99,273,656   
     

 

 

 

Equity:

         

Share capital

   17      3,000        3,000        3,000   

Contributed capital

   17      9,942,084        22,758,446        22,758,446   

Accumulated deficit

        (1,843,273     (7,901,302     (9,546,409
     

 

 

 

Total equity

        8,101,811        14,860,144        13,215,037   
     

 

 

 

Total liabilities and equity

      $ 96,232,643      $ 104,521,750      $ 112,488,693   

 

 

The accompanying notes are part of the financial statements.

 

F-477


Table of Contents

Eolo de Nicaragua, S.A.

(A Nicaraguan Entity)

Statements of comprehensive income

Years ended December 31, 2014 and 2013

(expressed in US dollars)

 

            2014     2013  
      Notes    Restated (Note 3.2)  

Income:

       

Sale of electric power and capacity

      $ 24,354,801      $ 18,828,069   
     

 

 

 

Operating cost and expenses:

       

Costs of operations

   18      4,536,924        3,733,954   

General and administrative

   19      353,311        561,645   

Depreciation and amortization of non-financial assets

   10-11      4,035,697        4,035,414   
     

 

 

 

Total operating costs and expenses

        8,925,932        8,331,013   
     

 

 

 

Operating income

        15,428,869        10,497,056   

Other income (expenses):

       

Interest income

        25,019        50,992   

Finance costs from loans and notes payable

        (7,939,811     (7,537,464

Finance costs from decommissioning provision

        (21,961     (21,768

Finance income from receivables from related parties

   9      179,282        190,416   

Exchange rate differences

        (225,771     (159,446

Other expenses, net

        (171,919     (124,763
     

 

 

 

Total other income (expenses)

        (8,155,161     (7,602,033
     

 

 

 

Income before income tax

        7,273,708        2,895,023   

Income tax

   16      (1,215,679     (1,249,916
     

 

 

 

Total comprehensive income

      $ 6,058,029      $ 1,645,107   

 

 

The accompanying notes are part of the financial statements.

 

F-478


Table of Contents

Eolo de Nicaragua, S.A.

(A Nicaraguan Entity)

Statements of changes in equity

Years ended December 31, 2014 and 2013

(expressed in US dollars)

 

            Share
capital
     Contributed
capital
    Accumulated
deficit
    Total
equity
 
      Notes                   Restated (Note 3.2)  

As of January 1, 2013

      $ 3,000       $ 22,758,446      $ (9,546,409   $ 13,215,037   

Comprehensive income

                       1,645,107        1,645,107   
     

 

 

 

As of December 31, 2013

        3,000         22,758,446        (7,901,302     14,860,144   

Capital withdrawn

   17              (12,816,362            (12,816,362

Comprehensive income

                       6,058,029        6,058,029   
     

 

 

 

As of December 31, 2014

      $ 3,000       $ 9,942,084      $ (1,843,273   $ 8,101,811   

 

 

The accompanying notes are part of the financial statements.

 

F-479


Table of Contents

Eolo de Nicaragua, S.A.

(A Nicaraguan Entity)

Statements of cash flows

Years ended December 31, 2014 and 2013

(expressed in US dollars)

 

            2014     2013  
      Notes    Restated (Note 3.2)  

Operating activities:

       

Income before income tax

      $ 7,273,708        2,895,023   

Adjustments to reconcile income before income tax to cash flows from operating activities:

       

Financing costs from loans and notes payable

        7,939,811        7,537,464   

Finance income from notes receivable with related parties

   9      (179,282     (190,416

Decommissioning provision

        21,961        21,768   

Depreciation expense

   10      3,851,278        3,850,215   

Amortization expense

   11      184,419        185,199   

Loss in disposal of property, plant and equipment

        7,147        2,668   

Interest income

        (25,019     (50,992
     

 

 

 
        19,074,023        14,250,929   

Changes in operating assets and liabilities:

       

Accounts receivable

        (1,187,278     (1,203,611

Accounts receivable from related parties

        997        17,138   

Prepaid expenses

        1,350,515        798,010   

Spare parts inventory

        30,997        (10,922

Accounts payable to related parties

          (2,502,294

Accounts payable

        418,187        116,578   

Accrued expenses

        (869,446     (22,803,858
     

 

 

 

Net cash provided by (used in) operating activities

        18,817,995        (11,338,030
     

 

 

 

Investing activities:

       

Additions to property, plant and equipment

   10      (185,496     (337,694

Additions to intangible assets

   11      (3,219     (2,153

Investments

        40,226          

Interest received

        25,019        50,992   

Net (payments) proceeds from guarantee deposits

        (41,044     407,222   
     

 

 

 

Net cash (used in) provided by investing activities

        (164,514     118,367   
     

 

 

 

Financing activities:

       

Increase (decrease) in restricted cash accounts designated for financing activities

        1,292,092        (9,566,081

New loans

               14,492,891   

Loan settlements

        (2,740,982     (258,361

Capital withdrawn

   17      (12,816,362       

Financing costs paid

        (7,515,984     (7,466,154
     

 

 

 

Net cash used in financing activities

        (21,781,236     (2,797,705
     

 

 

 

Net decrease in cash

        (3,127,755     (14,017,368

Cash at beginning of year

        4,088,911        18,106,279   
     

 

 

 

Cash at end of year

      $ 961,156      $ 4,088,911   

 

 

The accompanying notes are part of the financial statements.

 

F-480


Table of Contents

Eolo de Nicaragua, S.A.

(A Nicaraguan Entity)

Notes to financial statements

December 31, 2014 and 2013

(amounts expressed in US dollars)

 

1. Corporate information

Eolo de Nicaragua, S.A. (“Eolo” or “the Company”) was organized as a corporation on July 1, 2008 under the laws of the Republic of Nicaragua. Eolo is domiciled in Rivas, Nicaragua. The Company is a wholly-owned subsidiary of Globeleq Mesoamerica Energy (Wind) Limited (“GME Wind”), a company incorporated in Bermuda, and Eolo’s ultimate parent company is Actis Infrastructure Fund 2LP.

The Company’s main activity is the generation of electricity from its 44 megawatt wind electric power-generating park located in Rivas, Nicaragua (“the Project”). This activity is regulated by Nicaraguan Law No. 272 of June 23, 1998. Eolo was granted the commercial operation status on December 1, 2012 by the Instituto Nicaragüense de Energía. Energy sales began in December 2012.

The Company has entered into two power purchase agreements (PPAs) with Distribuidora de Electricidad del Sur, S.A. (Dissur) and Distribuidora de Electricidad del Norte, S.A. (Disnorte) to sell the Project’s energy.

The Project was registered as a Clean Development Mechanism (CDM) project under the United Nations Framework Convention on Climate Change on June 18, 2012 and for a crediting period from January 1, 2013 through December 31, 2019. The Project is therefore eligible for Certified Emission Reductions (CERs) starting on January 1, 2013.

The Company does not have traded debt or equity in the public markets. The accompanying financial statements have been prepared for use in a securities filing in connection with the acquisition of the Company as explained in Note 24.

 

2. Power purchase agreements and regulations governing autonomous private or parallel generation of electricity in Nicaragua

As per Nicaraguan regulation, public, private and mixed companies are subject to Law No. 272 of June 23, 1998. According to this law, economic agents dedicated to energy generation activities can subscribe contracts for the purchase-sale of electricity with distributors and large consumers, and can sell their production fully or partially in the spot market and can export electricity as well.

 

3. Basis of preparation of the financial statements

 

  3.1   Statement of compliance

The Company’s financial statements as of December 31, 2014 and 2013 were prepared in accordance with International Financial Reporting Standards (IFRS) as issued by the International Accounting Standards Board.

The Company’s financial statements as of December 31, 2014 were first approved for issuance by the Company’s Chief Executive Officer and Chief Financial Officer on January 8, 2015, and were subsequently approved by the Company’s shareholders. The accompanying restated financial statements have been

 

F-481


Table of Contents

prepared for use in a securities filing in connection with the acquisition of the Company as explained in Note 24. They have also been restated for the correction of certain errors as explained in Note 3.2 below. The Company’s Chief Executive Officer and Chief Financial Officer approved these restated financial statements for issuance on June 13, 2015 and subsequent events have been considered through that later date.

 

  3.2   Restatement of financial statements

During its preparation of the accompanying restated financial statements for the purpose described in Note 3.1, the Company identified certain accounting errors that are being retrospectively corrected herein. They are explained as follows:

 

   

The Company previously accounted for restricted cash as a component of cash in its statement of cash flows. It has corrected that classification to now exclude those amounts. The Company also modified the current versus non-current classification of restricted cash to correspond with contractual terms.

 

   

The Company has identified the need for a decommissioning provision in the accompanying financial statements given obligations that it believes exist under IAS 37 Provisions, Contingent Liabilities and Contingent Assets. Disclosure of such provision is presented in Note 15.

 

   

The Company has determined residual values for its wind turbines which resulted in a change in the depreciation expense.

 

   

The aforementioned matters have an impact on deferred income tax.

 

   

Certain accounting disclosures have been expanded from those previously presented.

 

F-482


Table of Contents

These corrections have impacted the accompanying financial statements as follows (amounts in US dollars):

 

     Balance as of
or for the
year ended
December 31,
2014 as
previously
reported
    Retrospective
adjustments
    Balance as of
or for the
year ended
December 31,
2014 as
restated
    Balance as of
or for the year
ended
December 31,
2013 as
previously
reported
    Retrospective
adjustments
    Balance as of
or for the year
ended
December 31,
2013 as
restated
    Balance as of
January 1,
2013 as
previously
reported
    Retrospective
adjustments
    Balance as of
January 1,
2013 as
restated
 

Statement of financial position:

                 

Current assets

    18,137,824        (5,911,635     12,226,189        22,377,485        (5,377,414     17,000,071        25,833,492        (904,769     24,928,723   

Non-current assets

    77,568,202        6,438,252        84,006,454        81,798,301        5,723,378        87,521,679        86,375,971        1,183,999        87,559,970   
 

 

 

 

Total assets

    95,706,026        526,617        96,232,643        104,175,786        345,964        104,521,750        112,209,463        279,230        112,488,693   
 

 

 

 

Current liabilities

    5,802,221               5,802,221        4,682,521               4,682,521        27,259,543               27,259,543   

Non-current liabilities

    81,949,449        379,162        82,328,611        84,692,828        286,257        84,979,085        71,843,476        170,637        72,014,113   
 

 

 

 

Total liabilities

    87,751,670        379,162        88,130,832        89,375,349        286,257        89,661,606        99,103,019        170,637        99,273,656   
 

 

 

 

Equity

    7,954,356        147,455        8,101,811        14,800,437        59,707        14,860,144        13,106,444        108,593        13,215,037   
 

 

 

 

Statement of comprehensive income:

                 

Revenues

    24,327,668        27,133        24,354,801        18,855,202        (27,133     18,828,069         

Operating expenses

    (17,153,069     71,976        (17,081,093     (16,059,479     126,433        (15,933,046      
 

 

 

       

Income before income taxes

    7,174,599        99,109        7,273,708        2,795,723        99,300        2,895,023         

Income taxes

    (1,204,318     (11,361     (1,215,679     (1,101,730     (148,186     (1,249,916      
 

 

 

       

Comprehensive income

    5,970,281        87,748        6,058,029        1,693,993        (48,886     1,645,107         
 

 

 

       

Statement of cash flows:

                 

Cash flows from operating activities

    18,758,411        59,584        18,817,995        (11,283,695     (54,335     (11,338,030      

Cash flows from investing activities

    (145,156     (19,358     (164,514     64,032        54,335        118,367         

Cash flows from financing activities

    (23,073,328     1,292,092        (21,781,236     6,768,376        (9,566,081     (2,797,705      

Cash at beginning of year

    15,997,118        (11,908,207     4,088,911        20,448,405        (2,342,126     18,106,279         
 

 

 

       

Cash at end of year

    11,537,045        (10,575,889     961,156        15,997,118        (11,908,207     4,088,911         

 

 

 

F-483


Table of Contents
  3.3   Basis of valuation and presentation currency

The financial statements as of December 31, 2014 and 2013 were prepared on a historical cost basis, except for certain items that are measured in accordance with the accounting policies described in Note 4. The financial statements are expressed in US dollars ($ or US$).

 

  3.4   Changes in accounting policies

The accounting policies adopted by the Company to prepare its financial statements as of December 31, 2014 are consistent with those used to prepare its financial statements as of December 31, 2013.

The Company adopted for the first time the following amendments to standards and interpretations, which are effective for annual periods beginning on or after January 1, 2014. These amendments and interpretations had no material impact on the Company’s financial statements as of December 31, 2014.

Investment Entities (Amendments to IFRS 10, IFRS 12 and IAS 27)

These amendments provide an exception to the consolidation requirement for entities that meet the definition of an investment entity under IFRS 10 Consolidated Financial Statements and must be applied retrospectively, subject to certain transition relief. The exception to consolidation requires investment entities to account for subsidiaries at fair value through profit or loss.

Offsetting Financial Assets and Financial Liabilities – Amendments to IAS 32

These amendments clarify the meaning of “currently has a legally enforceable right to set-off” and the criteria for non-simultaneous settlement mechanisms of clearing houses to qualify for offsetting and is applied retrospectively.

Novation of Derivatives and Continuation of Hedge Accounting – Amendments to IAS 39

These amendments provide relief from discontinuing hedge accounting when novation of a derivative designated as a hedging instrument meets certain criteria and retrospective application is required.

IFRIC 21 Levies

IFRIC 21 clarifies that an entity recognizes a liability for a levy when the activity that triggers payment, as identified by the relevant legislation, occurs. For a levy that is triggered upon reaching a minimum threshold, the interpretation clarifies that no liability should be anticipated before the specified minimum threshold is reached. Retrospective application is required for IFRIC 21.

Recoverable Amount Disclosures for Non-Financial Assets – Amendments to IAS 36 Impairment of Assets

These amendments remove the unintended consequences of IFRS 13 on the disclosures required under IAS 36. In addition, these amendments require disclosure of the recoverable amounts for the assets or cash generating units for which impairment loss has been recognized or reversed during the period.

Annual Improvements 2010-2012 Cycle

In the 2010-2012 annual improvements cycle, the IASB issued seven amendments to six standards, which included an amendment to IFRS 13 Fair Value Measurement. The amendment to IFRS 13 is effective immediately and, thus, for periods beginning at January 1, 2014, and it clarifies in the Basis for Conclusions that short-term receivables and payables with no stated interest rates can be measured at invoice amounts when the effect of discounting is immaterial.

 

F-484


Table of Contents

Annual Improvements 2011-2013 Cycle

In the 2011-2013 annual improvements cycle, the IASB issued four amendments to four standards, which included an amendment to IFRS 1 First-time Adoption of International Financial Reporting Standards. The amendment to IFRS 1 is effective immediately and, thus, for periods beginning at January 1, 2014, and clarifies in the Basis for Conclusions that an entity may choose to apply either a current standard or a new standard that is not yet mandatory, but permits early application, provided either standard is applied consistently throughout the periods presented in the entity’s first IFRS financial statements.

 

4. Summary of significant accounting policies

 

  4.1   Currency and foreign currency transactions

 

  4.1.1   Functional and presentation currency of the financial statements

The legal currency in Nicaragua is the Cordoba (C$); however, the Company has adopted the US dollar (US$ or $) as the functional and presentation currency since it better reflects the events and transactions performed by the Company. Adoption of the US dollar as functional currency was based on the following facts: income from energy sales is generated in dollars, debt obligations are denominated in dollars, capital contributions are made in dollars, investments in intangible assets and property, plant and equipment were mostly made in said currency and certain operating costs and expenses are also incurred in that currency. Information relating to exchange regulations and rates is included in Note 21.1.

Considering that the Company’s accounting records are kept in the legal currency of its domicile, Nicaraguan Cordobas, and that the US dollar was adopted as the functional currency, monetary assets and liabilities denominated in Cordobas were translated into the financial statements’ functional currency using the exchange rate ruling on the date of the statement of financial position. Non-monetary items measured on a historical cost basis were converted on the date of the statement of financial position using the exchange rate ruling on the original transaction date. Income and expenses are converted at the exchange rate in effect on the transaction date.

 

  4.1.2   Transactions in foreign currency

Transactions in foreign currency, any currency other than the functional currency, are recorded at the exchange rate ruling on the transaction date. In determining its financial situation and operating results, the Company appraises and adjusts its assets and liabilities denominated in foreign currency at the exchange rate ruling on the date of this valuation and determination. Exchange rate differences resulting from the application of these procedures are recognized in the results of the period in which they occur.

 

  4.2   Cash

Cash is comprised of cash on-hand and in banks.

 

  4.3   Restricted cash

Restricted bank account balances are not considered either unrestricted cash balances or cash equivalent balances for the purpose of the statement of cash flows. They are presented in the accompanying statements of financial position as “restricted cash”, and are presented as current or non-current assets given management’s expectation that they will be withdrawn for their defined purposes within the coming twelve-month period or otherwise. Net changes in such restricted cash balances are classified as a financing activity in the statement of cash flows based on the requirement for them under the debt agreements.

 

F-485


Table of Contents
  4.4   Financial instruments

The valuation of the Company’s financial instruments is determined using the fair value or amortized cost, as defined below:

Fair value - The fair value of a financial instrument negotiated in an organized financial market is determined using as reference the prices quoted in that financial market for negotiations performed as of the date of the statement of financial position. With respect to financial instruments for which there is no active financial market, the fair value is determined using valuation techniques.

Amortized cost - The amortized cost is calculated using the effective interest method less any allowance for impairment. The calculation takes into consideration any award or discount in the acquisition and includes the transaction costs and fees which are an integral part of the effective interest rate.

These techniques include recent market transactions between interested, fully informed parties who act independently; references to the fair value of another substantially similar financial instrument; and discounted cash flows or other valuation models.

 

  4.5   Financial assets

 

  4.5.1   Initial recognition and measurement of financial assets

Financial assets within the scope of IAS 39 Financial Instruments: Recognition and Measurement are classified as financial assets at fair value through profit or loss, loans and receivables, held-to-maturity investments, available-for-sale financial assets, or as derivatives designated as hedging instruments in an effective hedge, as appropriate. The Company determines the classification of its financial assets at initial recognition. The Company only has notes and accounts receivable.

The Company initially recognizes all of its financial assets at fair value plus costs directly attributable to the transaction, except for financial assets valued at fair value through profit or loss in which these costs are not considered.

The Company recognizes the purchase or sale of financial assets on the date of each transaction, which is the date on which the Company commits to buy or sell a financial asset.

 

  4.5.2   Subsequent measurement of notes and accounts receivable

Notes and accounts receivable are non-derivative financial assets with fixed or determined payments that are not quoted in active markets, and are initially recognized at the corresponding invoiced amounts. After initial recognition, notes and accounts receivable are recorded by the Company at amortized cost using the effective interest rate method less the allowance for impairment. Gains or losses are recognized in results when the accounts receivable are derecognized or impaired, as well as through the amortization process.

 

  4.5.3   Impairment of financial assets

The Company assesses on the date of the financial statements whether there is any objective evidence that a financial asset or group of assets is impaired. A financial asset or group of financial assets is deemed to be impaired if, and only if, there is objective evidence of impairment as a result of one or more events that have occurred after the initial recognition of the financial asset, and that loss event has an impact on the estimated future cash flows of the financial asset or group of financial assets that can be reliably estimated. Evidence of impairment may include indications that the debtors are experiencing significant financial difficulty, default or delinquency in interest or principal payments, the probability that they will enter bankruptcy or other financial reorganization, and where observable data indicate that there is a measurable decrease in the estimated future cash flows due to defaults on contracts.

 

F-486


Table of Contents

Impairment of financial assets recorded at amortized cost

When the Company determines that it has incurred in an impairment loss in the value of its financial assets carried at amortized cost, it estimates the loss amount as the difference between the asset’s carrying amount and the present value of future cash flows discounted at the financial asset’s original effective interest rate; it deducts the loss from the asset’s carrying amount and recognizes such loss in the results of the year in which it occurs. If, in a subsequent period, the amount of the loss due to impairment decreases and may be objectively related to an event subsequent to the recognition of impairment, the impairment loss is reversed. Once the reversal is recorded, the carrying amount of the financial asset cannot exceed the original amortized amount. The amount of the reversal is recognized in the results of the year in which it occurs.

 

  4.5.4   Derecognition of financial assets

Financial assets are derecognized by the Company when the rights to receive cash flows from the asset have expired, or when the financial asset is transferred along with its inherent risks and benefits and contractual rights to receive cash flows from the asset are surrendered, or when the Company retains the contractual rights to receive cash flows and assumes the obligation to pay them to one or more parties.

 

  4.6   Financial liabilities

 

  4.6.1   Initial recognition and measurement

Financial liabilities within the scope of IAS 39 are classified as financial liabilities at fair value through profit or loss, loans and borrowings, or as derivatives designated as hedging instruments in an effective hedge, as appropriate. The Company determines the classification of its financial liabilities at initial recognition. Eolo recognizes all financial liabilities initially at fair value on the date of acceptance or contracting of the liability, plus, in the case of loans and borrowings, directly attributable transaction costs.

The Company’s financial liabilities include notes and accounts payable, and accrued expenses.

 

  4.6.2   Subsequent measurement of notes and accounts payable, and accrued expenses

After initial recognition, these financial liabilities are subsequently measured at amortized cost using the effective interest method. The Company recognizes gains or losses in the statement of comprehensive income when the financial liability is derecognized as well as through the amortization process.

 

  4.6.3   Derecognition

Financial liabilities are derecognized when the obligation has been paid, cancelled or expires. When a financial liability is replaced by another, the Company derecognizes the original and recognizes a new liability. Differences that may result from these financial liability replacements are recognized through profit or loss when incurred.

 

  4.7   Inventory

 

  4.7.1   Spare parts inventory

Inventories are valued at the lower of cost and net realizable value on a weighted average basis.

 

  4.7.2   Certified Emission Reductions (CERs)

The Company recognizes CERs in accordance with IAS 2 Inventory because they are held for sale in the ordinary course of business. CERs are measured, initially and subsequently, at fair value.

 

F-487


Table of Contents
  4.8   Property, plant and equipment

Property, plant, and equipment are stated at acquisition cost less accumulated depreciation and losses due to impairment, if any. These costs include the cost of replacing the components of plant or equipment when the cost is incurred, if it meets the requirements for recognition. Depreciation and those disbursements for repair and maintenance which do not meet the conditions for recognition as assets are recognized as expenses in the year in which they are incurred.

Depreciation is calculated on a straight-line basis over the useful life of each type of asset. The remaining value of the depreciating assets, the estimated useful life, and depreciation methods are periodically reviewed by Management and adjusted when necessary, at the end of each financial year. The estimated useful lives for productive assets is established by the Company as the difference between the date from which the assets are available for their intended use and the power purchase agreement expiration date or the assets’ own estimated useful life, whichever is shorter.

A breakdown of estimated useful lives is as follows:

 

      Useful life  

Buildings

     20 years   

Machinery and equipment (primarily wind turbines)

     20 years   

Furniture and equipment

     2-5 years   

Vehicles

     5-8 years   

 

 

Construction and installation costs are charged to temporary accounts and subsequently transferred to the respective asset accounts once the works are completed. These works in process include all disbursements directly related to the design, development and construction of buildings and others, plus financial costs attributable to the works.

The present value of the expected cost for the decommissioning of an asset after its use is included in the cost of the respective asset if the recognition criteria for a provision are met.

A component of property, plant, and equipment is derecognized when it is sold or when the Company does not expect future economic benefits from its use. Any loss or gain from the disposal of the asset, calculated as the difference between the net carrying amount and the sales proceeds, is recognized in income in the year in which it occurs.

 

  4.9   Intangible assets

Intangible assets acquired separately are measured initially at cost. Following initial recognition, intangible assets are carried at cost less any accumulated amortization and any accumulated impairment losses, as necessary. The Company records the intangible assets generated internally as expenses in the year in which they are incurred, except for development costs that are capitalized.

The useful lives of intangible assets are assessed to be either finite or indefinite. Eolo only has intangible assets with finite useful lives, which are amortized under the straight-line method over the assets’ estimated useful lives, which are periodically reviewed by Management.

Gains or losses from the derecognition of an intangible asset are determined by the Company as the difference between the proceeds from sale or disposal and the net carrying amount of the intangible asset, recognizing them in the results of the year in which they are incurred.

 

F-488


Table of Contents
  4.9.1   Research and development costs

Research costs are expensed as incurred.

Development activities involved a plan or design for the construction of new wind power generation projects. An intangible asset arising from the development phase of a project is recognized if the Company can demonstrate all of the following: the technical feasibility of completing the asset so that it will be available for use or sale; its intention to complete the asset and use it or sell it; its ability to use or sell the asset; how the intangible asset will generate probable future economic benefits; the availability of adequate technical and financial resources to complete the development and to use or sell the asset, and its ability to reliably measure the expenditure attributable to the intangible asset during its development.

The useful life for intangible assets arising development costs is determined based on the PPA term of 20 years and amortization occurs on a straight-line basis.

 

  4.9.2   Land usufruct rights

Land usufruct rights relate to the non-refundable prepayment made by Eolo to third parties to be able to occupy the farms where the Project is located (Note 20.2). The useful life assigned to these rights corresponds to 20 years in accordance with the PPA term, and amortization occurs on a straight-line basis.

 

  4.9.3   Software

Software represents the cost of accounting software licenses. Software is amortized over a useful life between one and three years, on a straight-line basis.

 

  4.10   Impairment of non-financial assets

The Company assesses the carrying amounts of its non-financial assets at each reporting date to determine reductions in value when events or circumstances indicate that recorded values may not be recovered. If any indication exists, and the carrying amount exceeds the recoverable amount, the Company measures the assets or cash-generating units at their recoverable amounts, defined as the higher of fair value less costs to sell and its value in use. Resulting adjustments are recorded in the results of the year in which they are determined.

 

  4.11   Revenue recognition

The Company measures its revenue from ordinary activities using the fair value of the benefit received or to be received, derived from revenue.

 

  4.11.1   Revenue from energy sales

Revenue from energy sales is recognized in the period in which energy is delivered to the Company´s customers. Revenue from the electricity generating capacity is recognized in the period in which such capacity is made available to Company customers in conformity with the terms specified in the Power Purchase Agreements. No revenue is recognized if there are significant uncertainties regarding recovery of the amount or its associated costs.

 

  4.11.2   Interest income from financial instruments

Revenue arising from financial instruments is recognized in relation to the passage of time, calculated over the average monthly balances for the invested principal, applying the effective interest method. Interest income is included in finance income in the statement of comprehensive income.

 

F-489


Table of Contents
  4.12   Borrowing costs

Borrowing costs directly attributable to the acquisition, construction or production of an asset that necessarily takes a substantial period of time to get ready for its intended use or sale are capitalized as part of the cost of the respective asset. Borrowing costs include interest, exchange differences and other borrowing costs. Borrowing costs that do not meet the criteria for capitalization are recorded in the results of the year in which they are incurred.

 

  4.13   Benefits for termination of employment contracts

The post-employment benefits liability is recognized by the Company in the period results to cover the payment of the seniority premium for personnel who resign, retire or are dismissed without cause, which is required by Nicaragua’s Labor Code as follows: one month of salary for each year worked for the first three years of service, and twenty days of salary for each additional year. However, no compensation shall be less than one month or greater than five months of salary. Eolo records a liability on a monthly basis to cover future disbursements for this concept. The Company has not established a pension benefit plan after retirement.

 

  4.14   Taxes

The Company offsets its current and deferred tax assets with current and deferred tax liabilities, respectively, if a legally enforceable right exists to set off the amounts recognized before the same taxation authority and when it has the intention to liquidate them for the net amount or to realize the asset and settle the liability simultaneously.

 

  4.14.1   Current income tax

The Company calculates income tax by applying adjustments from certain items, affected by or subject to income tax, in conformity with current tax regulations. Current tax, corresponding to present and prior periods, is recognized by the Company as a liability to the extent that it is not settled. If the amount already paid, which corresponds to present and prior periods, exceeds the amount payable for those periods, the excess is recognized as an asset.

The Company recognizes current income tax related to items of other comprehensive income directly in these items and not in the results of the period.

 

  4.14.2   Deferred income tax

Deferred income tax is determined by applying the liability method to all temporary differences existing between the asset, liability, and net equity tax base and the amounts recorded for financial purposes as of the date of the statement of financial position. Deferred income tax is calculated using the tax rate expected to apply on the period when the asset is realized or the liability is settled. Deferred tax assets are recognized only when there is reasonable probability of their realization.

The carrying amount of deferred income tax assets is reviewed on the date of the statement of financial position and reduced to the extent that it is no longer probable that sufficient taxable income will be available to allow all or part of the deferred income tax asset to be utilized. Likewise, on the closing date of each financial period, the Company reassesses the unrecognized deferred tax assets to the extent that it is probable that future taxable income will allow the deferred tax assets to be recovered.

Deferred taxes related to items of other comprehensive income are recognized directly in those items and not in the results of the period.

 

F-490


Table of Contents
  4.14.3   Sales tax

Revenue from sales is recorded by the Company net of sales tax, and a liability is recognized in the statement of financial position for the related sales tax amount. Expenses and assets acquired are recorded by the Company net of sales tax if the tax authorities credit these taxes to the Company, recognizing the accumulated amount receivable in the statement of financial position. When the sales tax incurred is not recoverable, the Company includes it within the expense or asset, as applicable.

 

  4.15   Operating leases

The Company holds lands for the Project under lease agreements with third parties. Leases in which the Company, as lessee, does not substantially retain all risks and benefits incidental to asset ownership are considered operating leases. Payments on these leases, according to rates established in the respective contracts, are recognized as expenses over the lease term.

 

  4.16   Significant accounting judgments, estimates, and assumptions

Financial statement preparation requires Management to make judgments, estimates and assumptions affecting reported amounts of revenue, expenses, assets and liabilities, and to disclose contingent liabilities as of the reporting date. However, uncertainty about these assumptions and estimates could result in outcomes that require an adjustment to the carrying amount of the asset or liability affected in future periods.

 

  4.16.1   Judgments

In applying the Company’s accounting policies, management has used the following judgment, apart from those implied in the estimates, which has an effect on the amounts recognized in the financial statements:

 

  Operating   leases

The Company’s commercial activities include the lease of land on which the Project was established. Based on an evaluation of the terms and conditions of the signed lease contracts, the Company has determined that it does not retain the risks and rewards of the leased properties; therefore, it has classified the lease contracts as operating leases.

 

  Development   costs

The Company capitalizes development costs for a project in accordance with the accounting policy. Initial capitalization of costs is based on management’s judgment that technological and economic feasibility is confirmed, usually when a product development project has reached a defined milestone according to an established project management model. In determining the amounts to be capitalized, management makes assumptions regarding the expected future cash generation of the project, discount rates to be applied and the expected period of benefits.

 

  4.16.2   Estimates and assumptions

The main assumption related to future events and other sources of estimates subject to variations as of the reporting date, which due to their nature carry a risk of causing adjustments to the asset and liability amounts in next year’s financial statements, is presented below:

Impairment of non-financial assets

The Company estimates that there are no indicators of impairment for any of its non-financial assets as of the reporting date.

 

F-491


Table of Contents
5.   Standards issued but not yet effective

The standards and interpretations that are issued, but not yet effective, as of December 31, 2014 are disclosed below. The Company intends to adopt these standards, if applicable to its activities, when they become effective.

IFRS 9 Financial Instruments

In July 2014, the IASB issued the final version of IFRS 9 Financial Instruments which reflects all phases of the financial instruments project and replaces IAS 39 Financial Instruments: Recognition and Measurement and all previous versions of IFRS 9. The standard introduces new requirements for classification and measurement, impairment, and hedge accounting. IFRS 9 is effective for annual periods beginning on or after January 1, 2018, with early application permitted. Retrospective application is required, but comparative information is not compulsory. Early application of previous versions of IFRS 9 (2009, 2010 and 2013) is permitted if the date of initial application is before February 1, 2015.

IFRS 14 Regulatory Deferral Accounts

IFRS 14 is an optional standard that allows an entity, whose activities are subject to rate-regulation, to continue applying most of its existing accounting policies for regulatory deferral account balances upon its first-time adoption of IFRS. IFRS 14 is effective for annual periods beginning on or after January 1, 2016.

IFRS 15 Revenue from Contracts with Customers

IFRS 15 was issued in May 2014 and establishes a new five-step model that will apply to revenue arising from contracts with customers. Under IFRS 15 revenue is recognized at an amount that reflects the consideration to which an entity expects to be entitled in exchange for transferring goods or services to a customer.

The principles in IFRS 15 provide a more structured approach to measuring and recognizing revenue. The new revenue standard is applicable to all entities and will supersede all current revenue recognition requirements under IFRS. Either a full or modified retrospective application is required for annual periods beginning on or after January 1, 2017 with early adoption permitted.

Amendments to IAS 16 and IAS 38: Clarification of Acceptable Methods of Depreciation and Amortization

The amendments clarify the principle in IAS 16 and IAS 38 that revenue reflects a pattern of economic benefits that are generated from operating a business (of which the asset is part) rather than the economic benefits that are consumed through use of the asset. As a result, a revenue-based method cannot be used to depreciate property, plant and equipment and may only be used in very limited circumstances to amortize intangible assets. The amendments are effective prospectively for annual periods beginning on or after January 1, 2016, with early adoption permitted.

Amendments to IAS 16 and IAS 41 Agriculture: Bearer Plants

The amendments change the accounting requirements for biological assets that meet the definition of bearer plants. Under the amendments, biological assets that meet the definition of bearer plants will no longer be within the scope of IAS 41. Instead, IAS 16 will apply. After initial recognition, bearer plants will be measured under IAS 16 at accumulated cost (before maturity) and using either the cost model or revaluation model (after maturity). The amendments also require that produce that grows on bearer

 

F-492


Table of Contents

plants will remain in the scope of IAS 41 measured at fair value less costs to sell. For government grants related to bearer plants, IAS 20 Accounting for Government Grants and Disclosure of Government Assistance will apply. The amendments are retrospectively effective for annual periods beginning on or after January 1, 2016, with early adoption permitted.

Amendments to IAS 19 Defined Benefit Plans: Employee Contributions

IAS 19 requires an entity to consider contributions from employees or third parties when accounting for defined benefit plans. Where the contributions are linked to service, they should be attributed to periods of service as a negative benefit. These amendments clarify that, if the amount of the contributions is independent of the number of years of service, an entity is permitted to recognize such contributions as a reduction in the service cost in the period in which the service is rendered, instead of allocating the contributions to the periods of service. This amendment is effective for annual periods beginning on or after July 1, 2014.

Amendments to IAS 27: Equity Method in Separate Financial Statements

The amendments will allow entities to use the equity method to account for investments in subsidiaries, joint ventures and associates in their separate financial statements. Entities already applying IFRS and electing to change to the equity method in its separate financial statements will have to apply that change retrospectively. For first-time adopters of IFRS electing to use the equity method in its separate financial statements, they will be required to apply this method from the date of transition to IFRS. The amendments are effective for annual periods beginning on or after January 1, 2016, with early adoption permitted.

Amendments to IFRS 11 Joint Arrangements: Accounting for Acquisitions of Interests

The amendments to IFRS 11 require that a joint operator accounting for the acquisition of an interest in a joint operation, in which the activity of the joint operation constitutes a business must apply the relevant IFRS 3 principles for business combinations accounting. The amendments also clarify that a previously held interest in a joint operation is not re-measured on the acquisition of an additional interest in the same joint operation while joint control is retained. In addition, a scope exclusion has been added to IFRS 11 to specify that the amendments do not apply when the parties sharing joint control, including the reporting entity, are under common control of the same ultimate controlling party. The amendments apply to both the acquisition of the initial interest in a joint operation and the acquisition of any additional interests in the same joint operation and are prospectively effective for annual periods beginning on or after January 1, 2016, with early adoption permitted.

Annual improvements from the 2010-2012 and 2011-2013 Cycles

The following list of improvements to standards is effective from July 1, 2014:

 

  -   IFRS 2 Share-based Payment. This improvement is applied prospectively and clarifies various issues relating to the definitions of performance and service conditions which are vesting conditions.

 

  -   IFRS 3 Business Combinations. The amendment is applied prospectively and clarifies that all contingent consideration arrangements classified as liabilities (or assets) arising from a business combination should be subsequently measured at fair value through profit or loss whether or not they fall within the scope of IFRS 9 (or IAS 39, as applicable).

 

F-493


Table of Contents
  -   IFRS 3 Business Combinations. The amendment is applied prospectively and clarifies for the scope exceptions within IFRS 3 that: a) joint arrangements, not just joint ventures, are outside the scope of IFRS 3; and b) this scope exception applies only to the accounting in the financial statements of the joint arrangement itself.

 

  -   IFRS 8 Operating Segments. The amendments are applied retrospectively and clarifies that: a) an entity must disclose the judgments made by management in applying the aggregation criteria in paragraph 12 of IFRS 8, including a brief description of operating segments that have been aggregated and the economic characteristics (e.g., sales and gross margins) used to assess whether the segments are “similar”; and b) the reconciliation of segment assets to total assets is only required to be disclosed if the reconciliation is reported to the chief operating decision maker, similar to the required disclosure for segment liabilities.

 

  -   IFRS 13 Fair Value Measurement. The amendment is applied prospectively and clarifies that the portfolio exception in IFRS 13 can be applied not only to financial assets and financial liabilities, but also to other contracts within the scope of IFRS 9 (or IAS 39, as applicable).

 

  -   IAS 16 Property, Plant and Equipment and IAS 38 Intangible Assets. The amendment is applied retrospectively and clarifies in IAS 16 and IAS 38 that the asset may be revalued by reference to observable data on either the gross or the net carrying amount. In addition, the accumulated depreciation or amortization is the difference between the gross and carrying amounts of the asset. IAS 24 Related Party Disclosures.

 

  -   IAS 24 Related Party Disclosures. The amendment is applied retrospectively and clarifies that a management entity (an entity that provides key management personnel services) is a related party subject to the related party disclosures. In addition, an entity that uses a management entity is required to disclose the expenses incurred for management services.

 

  -   IAS 40 Investment Property. The description of ancillary services in IAS 40 differentiates between investment property and owner-occupied property (i.e., property, plant and equipment). The amendment is applied prospectively and clarifies that IFRS 3, and not the description of ancillary services in IAS 40, is used to determine if the transaction is the purchase of an asset or business combination.

The Company has not yet evaluated the impact that the aforementioned new accounting standards will have on its financial statements.

 

6. Cash and restricted cash

 

      2014      2013  

Unrestricted cash:

     

Banks

   $ 961,156       $ 4,086,509   

Petty cash

             2,402   
  

 

 

 
   $ 961,156       $ 4,088,911   
  

 

 

 

Restricted cash in banks:

     

Current

   $ 5,202,845       $ 6,988,114   

Non-current

     5,373,044         4,879,867   
  

 

 

 
   $ 10,575,889       $ 11,867,981   

 

 

 

F-494


Table of Contents

Cash deposited in bank accounts earns interest based on daily rates determined by the corresponding banks.

Cash balances for US$10,575,889 and US$11,867,981 as of December 31, 2014 and 2013, respectively, are restricted under the financing documents between Eolo and the Lenders (Note 12). Under the terms of its debt agreements, the Company has a series of restricted bank accounts both “on-shore” in Nicaragua, and also off-shore. Cash receipts from operations are initially deposited directly into these restricted accounts and then based on contractually agreed provisions are allocated into a series of sub-accounts, restricted for specific operational and other purposes including, but not limited to, construction, debt service, major maintenance, insurance, and shareholders distributions. Except as expressly provided in those debt agreements, the restricted bank accounts are under the control of a trustee and the Company has the right to withdraw or transfer funds only as expressly provided in those debt agreements.

 

7. Accounts receivable

 

      2014      2013  

Distribuidora de Electricidad del Sur, S.A. (Dissur)

   $ 2,488,061       $ 1,961,102   

Distribuidora de Electricidad del Norte, S.A. (Disnorte)

     2,488,061         1,961,102   

Advance payments to vendors

     148,618         22,934   

Others

     8,908         1,232   
  

 

 

 
   $ 5,133,648       $ 3,946,370   

 

 

The outstanding balances due from Dissur and Disnorte correspond to trade receivables for the sale of electric power. Terms of these accounts receivable extend to 30 days from the corresponding invoice’s issue dates; are not subject to early-payment discounts, and do not generate interest except for late charges. As of December 31, 2014 and 2013 receivable balances were not past due. Based on the collection analysis performed by Management, it has been determined that no impairment existed as of those dates.

 

8. Prepaid expenses and other current assets

 

      2014      2013  

Prepaid Project maintenance

   $ 334,372       $ 1,671,863   

CERs

             27,133   

Others

     218,256         204,147   
  

 

 

 
     552,628         1,903,143   

Less – Non-current portion of the prepaid maintenance

             (334,373
  

 

 

 
   $ 552,628       $ 1,568,770   

 

 

The Engineering, Procurement and Construction agreement with Gamesa Eólica, S.L. (Note 20.3) contemplated a maintenance and repair service fee for the wind park equipment that was prepaid, which was based on US$60,795 per wind turbine for a total of US$2,674,980 that covered the first two years of operations starting on April 1, 2013.

 

F-495


Table of Contents
9. Balances and transactions with related parties

The related parties with whom the Company maintains balances and performs transactions are entities under the common control of the parent company, Globeleq Mesoamerica Energy (Wind) Limited. A breakdown of these balances and the respective terms and conditions is as follows:

 

      2014      2013  

Accounts receivable (current):

     

Administración de Energías Renovables, S.A.

   $       $ 997   

Notes receivable (non-current):

     

Globeleq Mesoamerica Energy (Wind) Limited

     3,395,540         3,216,257   
  

 

 

 
   $ 3,395,540       $ 3,217,254   

 

 

As explained in Note 1, the Company is controlled Globeleq Mesoamerica Energy (Wind) Limited, which in turn is controlled by Globeleq Holdings (Americas Renewables) Limited. The note receivable from Globeleq Mesoamerica Energy (Wind) Limited originated on May 23, 2012. The note did not bear interest until March 2013 when it was amended to incorporate a fixed interest rate of 6.21% paid semi-annually, is unsecured and full collection of principal shall occur no later than December 31, 2032.

As explained in Note 24, on June 12, 2015 a Stock Purchase Agreement (SPA) was signed between Globeleq Holdings (Americas Renewables) Limited and Mesoamerica Power Limited as sellers and an affiliate of SunEdison as purchaser.

A breakdown of transactions performed with related parties is summarized below:

 

      2014      2013  

Globeleq Mesoamerica Energy (Wind) Limited:

     

Finance income from note receivable

   $ 179,282       $ 190,416   
  

 

 

 

Administración de Energías Renovables, S.A. (AER):

     

Professional services related to the construction of the Project

(capitalized under property, plant and equipment in 2013)

   $ 602,487       $ 780,000   
  

 

 

 

CR Operaciones y Mantenimiento, S.A.:

     

Professional services

   $ 10,576       $   

 

 

(*) The Company and AER, a related party under common control, entered into a Management Services Agreement on March 1, 2012 whereby Eolo engaged AER to perform certain management activities such as preparing and maintaining the accounting records, treasury, tax and legal matters, among others. The Agreement is for an indefinite period unless terminated by a party upon written notice to the other party.

Compensation to key management personnel

The Company does not directly incur compensation for key personnel because Administración de Energías Renovables, S.A. provides the required management services, however the allocation of key personnel compensation at Administración de Energías Renovables, S.A. that is attributable to the Company amounts to US$145,401 in 2014 (2013: US $119,239).

 

F-496


Table of Contents
10. Property, plant and equipment

 

      Buildings      Machinery
and
equipment
    Major
spare
parts
     Furniture
and
equipment
    Vehicles      Construction
in progress
     Total  

Cost:

                  

As of December 31, 2012

   $ 10,148,637       $ 67,834,807      $ 895,712       $ 81,556      $ 92,174       $       $ 79,052,886   

Additions

     105,792         176,269                52,133        3,500                 337,694   

Retirements

                            (8,996                     (8,996
  

 

 

 

As of December 31, 2013

     10,254,429         68,011,076        895,712         124,693        95,674                 79,381,584   

Additions

             114,508                10,988                60,000         185,496   

Retirements

             (10,751                                    (10,751
  

 

 

 

As of December 31, 2014

   $ 10,254,429       $ 68,114,833      $ 895,712       $ 135,681      $ 95,674       $ 60,000       $ 79,556,329   
  

 

 

 

Accumulated depreciation:

                  

As of December 31, 2012

   $ 42,286       $ 272,869      $       $ 21,310      $ 8,065       $       $ 344,530   

Depreciation

     509,744         3,288,341                40,292        11,838                 3,850,215   

Retirements

                            (6,329                     (6,329
  

 

 

 

As of December 31, 2013

     552,030         3,561,210                55,273        19,903                 4,188,416   

Depreciation

     512,721         3,299,017                27,318        12,222                 3,851,278   

Retirements

             (3,603                                    (3,603
  

 

 

 

As of December 31, 2014

   $ 1,064,751       $ 6,856,624      $       $ 82,591      $ 32,125       $       $ 8,036,091   
  

 

 

 

Carrying amounts:

                  

As of December 31, 2012

   $ 10,106,351       $ 67,561,938      $ 895,712       $ 60,246      $ 84,109       $       $ 78,708,356   
  

 

 

 

As of December 31, 2013

   $ 9,702,399       $ 64,449,866      $ 895,712       $ 69,420      $ 75,771       $       $ 75,193,168   
  

 

 

 

As of December 31, 2014

   $ 9,189,678       $ 61,258,209      $ 895,712       $ 53,090      $ 63,549       $ 60,000       $ 71,520,238   

 

 

The agreement with Empresa Nacional de Transmisión Eléctrica of Nicaragua (Enatrel), the Nicaraguan public transmission company, contemplates the transfer of certain components of the substation built by the Company to Enatrel, who will reimburse Eolo for the cost of such components. Eolo had communicated to Enatrel that the costs associated with the elements to be transferred are US$3,215,684. Enatrel, however, has not notified Eolo of the acceptance of this amount. Eolo will continue to classify the substation as property, plant and equipment until an agreement between the two parties is reached because the substation is being used in its own operations.

The Company has recognized a decommissioning provision related to its wind farm as described in Note 15.

 

F-497


Table of Contents
11. Intangible assets

 

      Development
costs a/
     Land
usufruct
rights b/
     Software
c/
     Total  

Cost:

           

As of December 31, 2012

   $ 2,668,578       $ 900,000       $ 11,790       $ 3,580,368   

Additions

                     2,153         2,153   
  

 

 

 

As of December 31, 2013

     2,668,578         900,000         13,943         3,582,521   

Additions

                     3,219         3,219   
  

 

 

 

As of December 31, 2014

   $ 2,668,578       $ 900,000       $ 17,162       $ 3,585,740   
  

 

 

 

Accumulated Amortization:

           

As of December 31, 2012

   $ 11,119       $ 26,250       $ 1,272       $ 38,641   

Amortization

     133,429         45,000         6,770         185,199   
  

 

 

 

As of December 31, 2013

     144,548         71,250         8,042         223,840   

Amortization

     133,429         45,000         5,990         184,419   
  

 

 

 

As of December 31, 2014

   $ 277,977       $ 116,250       $ 14,032       $ 408,259   
  

 

 

 

Carrying amounts:

           

As of December 31, 2012

   $ 2,657,459       $ 873,750       $ 10,518       $ 3,541,727   
  

 

 

 

As of December 31, 2013

   $ 2,524,030       $ 828,750       $ 5,901       $ 3,358,681   
  

 

 

 

As of December 31, 2014

   $ 2,390,601       $ 783,750       $ 3,130       $ 3,177,481   

 

 

 

  a/   Project development costs mainly include a fee of US$2,500,000 paid in 2012 to Globeleq Mesoamerica Energy (Wind) Limited, EOLO’s parent company, for certain services such as the negotiation of the letter of agreement with Gamesa Eólica, S.L. (the wind park’s constructor), negotiation of the non-recourse project finance with lenders, and the negotiation of the political risk insurance policy for the Project. Amortization of development costs began in December 2012 when the Project started selling energy and the amortization period is 20 years based on the PPA term.

 

  b/   Land usufruct rights relate to the land where the Project is located and are amortized over a 20-year period.

 

  c/   Software is amortized over a two-year period.

 

F-498


Table of Contents
12. Notes and loans payable

To finance the development, construction and completion of the Project, the Company entered into four loan agreements on April 20, 2012 for a total aggregate principal amount up to US$91,500,000. Notes and loans payable are denominated in US dollars and were as follows:

 

      Interest rate prevailing on        
     December 31      December 31             
      2014      2013    2014     2013  

Nederlandse Financierings-Maatschappij Voor Ntwikkelingslanden N.V. (FMO Senior)

     7.28%       7.53%    $ 26,758,615      $ 27,592,710   

Société de Promotion et de Participation pour la Coopération Économique (PROPARCO)

     7.21%       7.34% - 8.27%      25,325,117        26,114,530   

Deutsche Investitions-und Entwicklungsgesellschaft MBH (DEG)

     8.17%       8.42%      23,891,620        24,636,349   

Nederlandse Financierings-Maatschappij Voor Ontwikkelingslanden N.V. (FMO Subordinated)

     12.50%       12.50%      11,471,796        11,844,540   
        

 

 

 

Principal

           87,447,148        90,188,129   

Less – Deferred finance costs

           (3,611,031     (4,058,992
        

 

 

 
           83,836,117        86,129,137   

Less – Maturity of one year or less

           (4,395,670     (2,740,993
        

 

 

 

Principal

         $ 79,440,447      $ 83,388,144   

 

 

FMO acted as the “Lead Arranger” in the project financing. The provisions of the loans are included in the “Common Terms Agreement”, the “Master Accounts Agreement”, the “Equity Contribution and Share Retention Agreement”, and the four “Loan Agreements”. The loan documents establish affirmative, negative and financial covenants for the Company.

The loans are secured by the Project and all its assets, with Citibank, N.A. acting as offshore security trustee and Banco de América Central, S.A. (BAC) acting as onshore security trustee.

Refer to a discussion of restricted cash conditions under the credit agreement as explained in Note 6 above.

 

F-499


Table of Contents

Debt agreements contained the following financial covenants. Breaches in meeting the financial covenants would permit the lenders to immediately call loans and borrowings.

 

Distribution requirements      

Debt service coverage ratio (historical)

   Senior: 1.20x
   Total: 1.15x

Debt service coverage ratio (projected)

   Senior: 1.30x
   Total: 1.15x

Debt to equity ratio ( + definition)

   70:30:00
   Senior debt divided by: Capital + RE + sub debt + intangibles + $8,577,282 + $3,000,000 (until 30/6/2016)
Financial maintenance covenants      

Debt service coverage ratio

  

Same as above

(only historical)

Debt to equity ratio

   Same as above

 

As of December 31, 2014, the Company was in compliance with these restrictive covenants.

As of December 31, 2014 accrued interest and fees payable on the loan agreements amount to US$318,268 (December 31, 2013: US$342,403).

A summary of the maturities of the long-term notes and loans payable as of December 31, is presented below:

 

      2014     2013  

December 31, 2015

   $      $ 4,395,670   

December 31, 2016

     5,279,973        5,279,973   

December 31, 2017

     6,072,199        6,072,199   

December 31, 2018

     6,254,368        6,254,368   

December 31, 2019 and thereafter

     65,444,938        65,444,926   
  

 

 

 
     83,051,478        87,447,136   

Less – Deferred finance cost

     (3,611,031     (4,058,992
  

 

 

 
   $ 79,440,447      $ 83,388,144   

 

 

 

13. Accounts payable

Maturity terms for accounts payable with third-party vendors for US$684,174 as of December 31, 2014 (2013: US$265,987) extend up to 30 days from the corresponding invoices’ issue dates, are not subject to any discounts for early payment and do not generate interest except for late charges.

 

F-500


Table of Contents
14. Accrued expenses and other accounts payable

 

      2014      2013  

Sales tax

   $ 282,535       $ 705,700   

Social security withholdings payable

     75,986         46,804   

Employee bonus entitlements

     40,409           

Engineering, procurement and construction contract accrual (Note 20.3)

             504,226   

Others

     5,179         76,408   
  

 

 

 
   $ 404,109       $ 1,333,138   

 

 

Accrued expenses and other accounts payable are interest free, are not subject to any discount for early payment, do not generate late charges, and their maturity terms are generally less than one year.

Engineering, procurement and construction contract accrual were payables related to of the Project for which contractor invoices had not been received as of December 31, 2013.

 

15. Decommissioning provision

The Company has recognized a provision for decommissioning obligations associated with its wind farm. In determining the fair value of the provision, assumptions and estimates are made in relation to discount rates, the expected cost to dismantle and remove the plant from the site and the expected timing of those costs. Eolo estimates that the decommissioning costs would be realized in 18 years’ time upon the expiration of the PPA. The Company calculates the provision using the discounted cash flow method based on the following assumptions: a) estimated range of cost per wind turbine, and b) discount rate.

The rollforward of the decommissioning and restoration provisions is as follows:

 

      2014      2013  

Balance at beginning of year

   $ 238,184       $ 270,750   

Unwinding of discount and changes in the discount rate

     81,544         (32,566
  

 

 

 

Balance at year end

   $ 319,728       $ 238,184   

 

 

 

16. Income tax

The Company is subject to the payment of income tax. Therefore, it annually prepares and files its tax return with the corresponding authorities. The income tax rate in effect for the fiscal years ended December 31, 2014 and 2013 was 30%. The annual income tax shall be subject to a minimum definite payment that shall be made through advance payments equal to 1% of the gross monthly income. The income tax payment shall be the greater of the minimum definite payment or 30% applicable to the taxable base. However, Eolo was granted a seven-year exemption on corporate income taxes starting on November 12, 2012.

 

F-501


Table of Contents

The components of the deferred tax assets and liabilities are presented below:

 

      Statement of
Financial Position
    Statement of
Comprehensive Income
 
      2014     2013     2014     2013  

Deferred tax asset:

        

Decommissioning provision

   $ 95,918      $ 71,455      $ 24,463      $ (9,770

Deferred tax liabitiy:

        

Property, plant and equipment

     (2,664,354     (1,424,212     (1,240,142     (1,240,146
  

 

 

 
   $ (2,568,436   $ (1,352,757   $ (1,215,679   $ (1,249,916

 

 

 

17. Equity

Share capital

As of December 31, 2014 and 2013, the authorized, registered and paid share capital amounts to US$3,000, represented by 60 common shares with a value of C$1,000 each.

As of December 31, 2014 and 2013 the totality of share capital is securing the loan agreements detailed in Note 12.

Contributed capital

Contributed paid-in capital is comprised of additional contributions made by shareholders.

Equity transactions

During the years ended December 31, 2014 capital withdrawals were taken by Company shareholders in the amount of US$12,816,362.

Dividends

Distributions to Company shareholders, including dividends or any reduction of capital, are considered “restricted payments” as per the loan agreements described in Note 12. Therefore, the Company must comply with certain requirements before such distributions can be made.

 

F-502


Table of Contents
18. Costs of operations

 

      2014      2013  

Repair and maintenance of equipment

   $ 1,771,822       $ 1,059,775   

Insurance

     810,165         638,487   

Professional services

     598,305         740,952   

Employee compensation

     433,712         453,808   

Lease of land and equipment

     353,827         317,077   

Tax and permits

     109,379         77,878   

Environmental costs

     84,937         77,240   

Public utilities

     81,950         152,601   

Travel expenses

     81,329         127,575   

Donations

     58,772         26,454   

Certified emission reductions costs

     9,670         20,000   

Facility and supplies

     4,899         8,251   

Others

     138,157         33,856   
  

 

 

 
   $ 4,536,924       $ 3,733,954   

 

 

 

19. General and administrative expenses

 

      2014      2013  

Professional services

   $ 178,714       $ 221,323   

Employee compensation

     115,290         120,632   

Facility and supplies

     22,317         37,587   

Travel expenses

     16,658         26,130   

Public utilities

     9,106         16,956   

Marketing

     9,830         138,675   

Others

     1,396         342   
  

 

 

 
   $ 353,311       $ 561,645   

 

 

 

20. Agreements, commitments and contingencies

 

  20.1   Guarantee deposits

 

      2014      2013  

Distribuidora de Electricidad del Sur, S.A. (Dissur)

   $ 215,625       $ 215,625   

Distribuidora de Electricidad del Norte, S.A. (Disnorte)

     215,625         215,625   

Empresa Nacional de Transmisión Eléctrica (Enatrel)

     58,907         56,407   

Others

     48,434         9,890   
  

 

 

 
   $ 538,591       $ 497,547   

 

 

In connection with the PPAs signed with Dissur and Disnorte (Note 1) the Company is required to maintain guarantees of compliance with PPAs’ terms. Those guarantees are supported by performance bonds for US$215,625 each that are renewed on an annual basis.

Eolo has provided a performance bond to Enatrel of Nicaragua to guarantee the future payment of the electricity transmission covenant. The bond is renewed on an annual basis and its balance as of December 31, 2014 is US$58,907 (2013: US$56,407).

 

F-503


Table of Contents
  20.2   Land usufruct and lease agreements

The Company entered into land usufruct agreements with Ganadería El Limón, S.A. and Corporación Ganadera Interamericana, S.A., Nicaraguan entities who allow the Company to develop the Project in their farms, with a total area of approximately 2,200 hectares. The term of the usufruct agreements is for 20 years starting when the Project began commercial operations (December 1, 2012). As compensation, Ganadería El Limón will receive the higher of 0.75% of energy sales or an annual amount of US$55,000, which will increase 3% on an annual basis. Corporación Ganadera Interamericana will receive 2.00% of energy sales. All utility and tax expenses over the farms are assumed by Eolo.

In addition, the Company had to pay a non-refundable amount of US$900,000 to Ganadería El Limón as a security deposit. The Company recognized such payment as an intangible asset, which is amortized in 20 years (Note 11).

The Company also signed lease agreements with Ganadería El Limón and Corporación Ganadera Interamericana over the farms for a period of 10 years that will commence upon finalization of the land usufruct agreements. The rent charge for Ganadería El Limón’s farms will be the higher of 0.75% of energy sales or an annual amount of US$55,000, which will increase by 3% on an annual basis. The rent charge for Corporación Ganadera Interamericana’s farms will be equivalent to 2% of energy sales.

 

  20.3   Wind farm construction and maintenance

The Company entered into an Engineering, Procurement and Construction Agreement with Gamesa Eólica, S.L. through which Gamesa designed, engineered, procured, installed and constructed the wind farm of 44 MW as a turnkey project including the construction and installation of 22 wind turbines. The total contract price amounted to US$78,746,608 and the Company has paid the total amount to Gamesa as of December 31, 2014 (2013: US$78,242,322 with a remaining balance of US$504,226 – Note 14.), which is included under the item of property, plant and equipment in the statement of financial position.

The Company and Gamesa also entered into an Operation and Maintenance Agreement on December 31, 2011 to ensure that the Project will operate as technically designed after its construction. Under this agreement, Gamesa guarantees that the Project will meet an average availability on the turbine equipment of no less than 97% beginning on the second anniversary of the Project’s commissioning completion (April 1, 2015). The maintenance service began in April 2013 and the annual fee is equivalent to US$60,795 per wind turbine, for total of US$1,337,496 a year, which includes the cost of corrective maintenance.

 

  20.4   Contingencies

In January 2014 Eolo was notified by the Municipality of Rivas, Nicaragua, of a tax assessment of property taxes on land and equipment corresponding to the 2013 fiscal period. The property taxes claimed by the Municipality amounts to a total of US$137,321. Eolo has responded that it should not bear those taxes because it does not own the lands (the lands on which the wind farm operates is leased) and its equipment does not fall under the “fixtures” definition of the tax law on which the property taxes are levied. On May 28, 2014, Eolo filed a lawsuit against the Municipality of Rivas at the Contentious Administrative Court. This process is expected to take between one or two years. In the meantime, the Municipality is precluded from enforcing the tax assessment because Eolo rendered a guarantee of US$14,739 as part of the contentious process. The Company, after consultation with its legal advisors, considers that there are strong arguments to revert the tax assessment claimed and that any ultimate payment is not probable. Therefore, as of December 31, 2014 the financial statements do not contain a provision for this matter.

 

F-504


Table of Contents
  21.   Financial risk management and policies

The Company’s main financial instruments are cash, notes and accounts receivable, notes and loans payable, accounts payable and accrued expenses. The main purpose of these financial instruments is to manage cash flows and raise financing for the Company’s capital needs.

Eolo is exposed to market, credit and liquidity risks. The Company’s senior Management oversees the management of these risks.

 

  21.1   Market risk

Market risk is the risk that the fair value of future cash flows of a financial instrument will fluctuate because of changes in market prices. Market risk comprises three types of risk: interest rate risk, currency risk and other price risk, such as equity price risk and commodity risk. The most relevant market risks affecting the Company’s financial statements is the foreign currency risk. The Company is not exposed to interest rate risks as its debt, fully related to the construction of the Project (Note 12) bears fixed interest rates once the Project was completed.

Foreign currency risk

Foreign currency risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in foreign exchange rates. Eolo’s exposure to the risk of changes in foreign exchange rates relates primarily to the Company’s operating activities (when revenue or expense is denominated in a different currency from the Company’s presentation currency).

The Nicaraguan Cordoba is the main foreign currency used by the Company in its transactions. The Central Bank of Nicaragua is the entity responsible for managing the national banking system and regulating the currency’s parity to other currencies. Buy and sell rates are established by authorized financial institutions, according to market supply and demand. As of December 31, 2014 and 2013, buy and sell rates for US dollars were C$26.59 and C$26.91 (2013: C$25.33 and C$24.12) per $1.00 respectively.

Below is a summary of monetary assets and liabilities in foreign currencies, expressed in US dollars:

 

      2014      2013  

Assets:

     

Cash

   $ 427,188       $ 235,058   

Accounts receivable

     1,227         1,001   
  

 

 

 
     428,415         236,059   
  

 

 

 

Liabilities:

     

Accounts payable

     18,236         34,598   

Accrued expenses and other accounts payable

     75,610         47,606   
  

 

 

 
     93,846         82,204   
  

 

 

 

Net monetary assets

   $ 334,569       $ 153,855   

 

 

Sensitivity analysis:

The effect of a reasonable exchange rate variation between the Cordoba and the US dollar of +5% / -5% on the monetary assets and liabilities as of December 31, 2014 (2013: +5% / -5%), assuming that the remaining variables are held constant, would imply the recognition of gains or losses from exchange rate differences of US$16,643 in 2014 (2013: US$7,718).

 

F-505


Table of Contents

21.2 Credit risk

Credit risk is the risk that a counter party will not meet its obligations under a financial instrument or customer contract, leading to a financial loss. The Company is exposed to credit risk from its operating activities (primarily trade receivables) and from its financing activities, including deposits with banks and financial institutions.

Eolo’s sole customers are Disnorte and Dissur. Under the Power Purchase Agreement, credit terms are 30 days, and receivable balances with Disnorte and Dissur are current as of December 31, 2014 and 2013. An impairment analysis is performed at each reporting date on an individual basis for major clients; however an impairment allowance has not been recognized as customers’ balances are not past due.

With regards to credit risk on other financial assets, the maximum exposure to this risk is represented by the balances recorded for each financial asset. Exposure to credit risk is monitored constantly in accordance with the debtors’ payment behavior.

21.3 Liquidity risk

The Company monitors its liquidity on a daily basis, attempting to maintain greater liquid assets than liquid liabilities, considering the maturity of its financial assets. It performs cash flow projections on a periodic basis in order to timely detect potential cash shortages or excesses to support its operations.

The following table summarizes the maturity of the Company’s financial liabilities, based on payment commitments:

As of December 31, 2014:

 

      0 to 6
months
     6 to 12
months
    

More than

1 year

     Total  

Accounts payable

   $ 684,174       $       $       $ 684,174   

Notes and loans payable

     3,956,104         439,566         79,440,447         83,836,117   

Accrued interest payable

     318,268                         318,268   

Accrued expenses

     404,109                         404,109   

Decommissioning provision

                     319,728         319,728   
  

 

 

 
   $ 5,362,655       $ 439,566       $ 79,760,175       $ 85,562,396   

 

 

As of December 31, 2013:

 

      0 to 6
months
     6 to 12
months
     More than 1
year
     Total  

Accounts payable

   $ 265,987       $       $       $ 265,987   

Notes and loans payable

     1,096,393         1,644,600         83,388,144         86,129,137   

Accrued interest payable

     342,403                         342,403   

Accrued expenses

     1,333,138                         1,333,138   

Decommissioning provision

                     238,184         238,184   
  

 

 

 
   $ 3,037,921       $ 1,644,600       $ 83,626,328       $ 88,308,849   

 

 

 

22. Capital management

The Company’s main objective regarding capital management is to ensure that it maintains a solid credit ratio and healthy financial capital ratios to support its business and maximize profits.

 

F-506


Table of Contents

The Company manages its capital structure and timely requests shareholders for any adjustment to this capital considering the economic environment in which the Company operates. To maintain or adjust its capital structure, it may request shareholders for variations to dividends and capital returns previously agreed on, as well as for increases in capital contributions if necessary. These policies had no significant changes in 2014 and 2013.

The Company monitors capital using a gearing ratio, which is net liabilities divided by total equity plus net liabilities. The Company’s policy is to keep the gearing ratio between 50% and 90%. The Company includes within net liabilities, notes and loans payable, accounts payable and accrued expenses, less cash.

The Company is financed through third-party debt and shareholders’ equity. The Company’s capital management is focused on maximizing shareholders’ returns through the optimization of the debt to equity gearing ratio. As of December 31, the Company’s gearing ratio was as follows:

 

      2014     2013  

Notes and loans payable

   $ 83,836,117      $ 86,129,137   

Accounts payable

     684,174        265,987   

Accrued expenses

     404,109        1,333,138   

Accrued interest payable

     318,268        342,403   

Decommissioning provision

     319,728        238,184   

Less – cash and restricted cash

     (11,537,045     (15,956,892
  

 

 

 

Net liabilities

     74,025,351        72,351,957   

Total equity

     8,101,811        14,860,144   
  

 

 

 

Equity and net liabilities

   $ 82,127,162      $ 87,212,101   
  

 

 

 

Gearing ratio

     90%        83%   

 

 

 

23. Fair value of financial instruments

As indicated in Note 21, the Company’s main financial instruments are comprised of cash, notes and accounts receivable, notes and loans payable, accounts payable and accrued expenses. Management believes that the carrying amounts of cash, accounts receivable, and accounts payable approach their fair market value due to their short-term nature.

In evaluating the fair value of loans payable at fixed rates the Company has considered the country risks, market conditions existing both at the date of the loans and those at the statement of financial position dates, and that there are not a significant number of comparable financings in its market. As of December 31, 2014 and 2013 the fair value of the loans, taking into account current market interest rates, are the following:

 

      Carrying amount      (Level 3)
Fair value
 
      2014      2013      2014      2013  

FMO

   $ 26,758,615       $ 27,592,710       $ 26,296,130       $ 27,140,700   

DEG

     23,891,620         24,636,349         24,559,599         25,442,385   

Proparco

     25,325,117         26,114,530         24,797,292         25,585,888   

FMO Subordinated

     11,471,796         11,844,540         12,503,838         12,672,986   
  

 

 

 
   $ 87,447,148       $ 90,188,129       $ 88,156,859       $ 90,841,959   

 

 

 

F-507


Table of Contents
      Carrying amount      (Level 3)
Fair value
 
      2014      2013      2014      2013  

Loan to GME

   $ 3,395,540       $ 3,216,257       $ 3,399,090       $ 3,232,338   

 

 

Fair value hierarchy

The Company uses the following hierarchy for determining and disclosing the fair value of its financial instruments by valuation technique:

 

  -   Level 1: Quoted (unadjusted) prices in active markets for identical assets or liabilities.

 

  -   Level 2: Techniques that use inputs different from quoted prices that are observable for the asset or liability, whether directly or indirectly.

 

  -   Level 3: Techniques that use inputs that have a significant effect on the recorded fair value that are not based on observable market data.

The inputs used in the fair value disclosure of loans payable are categorized within Level 3 of the fair value hierarchy.

 

24. Subsequent events

On March 23, 2015, the Company declared a cash dividend of US$7,007,000, equivalent to US$0.96 per share.

On June 12, 2015, a Stock Purchase Agreement (SPA) was signed between Globeleq Holdings (Americas Renewables) Limited and Mesoamerica Power Limited as sellers and an affiliate of SunEdison as purchaser, for the sale of a 100% interest in the Company’s upstream shareholder, Globeleq Mesoamerica Energy (Wind) Limited. The SPA is subject to various conditions, not all of which have been met as of the date of these financial statements. There is no guarantee that such transaction will be consummated.

 

F-508


Table of Contents

INDEPENDENT AUDITORS’ REPORT

To the Board of Directors and Shareholders of

Inversiones Eólicas de Orosí Dos, S.A.

We have audited the accompanying restated financial statements of Inversiones Eólicas de Orosí Dos, S.A., which comprise the statements of financial position as of December 31, 2014 and 2013, and the related statements of comprehensive income, changes in equity and cash flows for the years then ended, and the related notes to the financial statements.

Management’s Responsibility for the Financial Statements

Management is responsible for the preparation and fair presentation of these financial statements in conformity with International Financial Reporting Standards as issued by the International Accounting Standards Board; this includes the design, implementation and maintenance of internal control relevant to the preparation and fair presentation of financial statements that are free of material misstatement, whether due to fraud or error.

Auditor’s Responsibility

Our responsibility is to express an opinion on these financial statements based on our audits. We conducted our audits in accordance with auditing standards generally accepted in the United States of America. Those standards require that we plan and perform the audits to obtain reasonable assurance about whether the financial statements are free of material misstatement.

An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the financial statements. The procedures selected depend on the auditor’s judgment, including the assessment of the risks of material misstatement of the financial statements, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the entity’s preparation and fair presentation of the financial statements in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity’s internal control. Accordingly, we express no such opinion. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluating the overall presentation of the financial statements.

We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion.

Opinion

In our opinion, the restated financial statements referred to above present fairly, in all material respects, the financial position of Inversiones Eólicas de Orosí Dos, S.A. as of December 31, 2014 and 2013, and the results of its operations and its cash flows for the years then ended in conformity with International Financial Reporting Standards as issued by the International Accounting Standards Board.

Restatement of financial statements

As discussed in Note 3.2, the financial statements have been restated for the correction of errors in the accounting for restoration provisions, and the classification of the restricted cash. Also the previously issued financial statements were restated to reflect the change in the current balance of prepaid sales tax to reflect information known to the Company subsequent to the statement of financial position date. This restatement has also resulted in the disclosure of the January 1, 2013 statement of financial position. Our opinion is not modified with respect to this matter.

/s/ Ernst & Young, S.A.

Ernst & Young, S.A.

San Jose, Costa Rica

June 13, 2015

 

F-509


Table of Contents

Inversiones Eólicas de Orosí Dos, S.A.

(A Costa Rican Entity)

Statements of Financial Position

As of December 31 2014 and 2013 and January 1, 2013

(expressed in US dollars)

 

            December 31,
2014
    December 31,
2013
    January 1,
2013
 
      Notes    Restated (Note 3.2)  

ASSETS

         

Current assets:

         

Cash

   6    $ 6,314,132      $ 5,696,826      $ 1,103,261   

Restricted cash

   6      228,323                 

Accounts receivable

        17,364        20,457        7,385   

Prepaid expenses

        3,950                 

Prepaid sales tax

   7      409,626                 
     

 

 

 

Total current assets

        6,973,395        5,717,283        1,110,646   

Non-current assets:

         

Prepaid sales tax

   7      6,743,445                 

Intangible assets

   8      99,506,733        18,945,663          

Project equipment

   9      437,595        94,659          

Derivative financial instruments

   10      426,296                 

Deferred income tax, net

   20      1,529,119        1,597,423          

Deferred financing costs

   11             2,354,062          

Other financial assets

        25,660        7,369        220,025   
     

 

 

 

Total assets

      $ 115,642,243      $ 28,716,459      $ 1,330,671   
     

 

 

 

LIABILITIES AND EQUITY

         

Current liabilities:

         

Notes and loans payable

   11    $ 2,385,238      $ 130,000      $   

Accounts payable

   12      123,044        305,939        981,455   

Restoration provision

   15      46,959                 

Accrued expenses and other accounts payable

   13      10,991,136        229,976        37,297   

Accrued interest payable

   11      693,229                 
     

 

 

 

Total current liabilities

        14,239,606        665,915        1,018,752   

Non-current liabilities:

         

Restoration provision

   15      187,834                 

Notes and loans payable

   11      88,634,232        3,414,600          
     

 

 

 

Total liabilities

        103,061,672        4,080,515        1,018,752   
     

 

 

 

Equity:

         

Share capital

   16      20        20        20   

Contributed capital

        17,687,469        29,425,953        4,170,545   

Accumulated deficit

        (5,106,918     (4,790,029     (3,858,646
     

 

 

 

Total equity

        12,580,571        24,635,944        311,919   
     

 

 

 

Total liabilities and equity

      $ 115,642,243      $ 28,716,459      $ 1,330,671   

 

 

The accompanying notes are part of the financial statements.

 

F-510


Table of Contents

Inversiones Eólicas de Orosí Dos, S.A.

(A Costa Rican Entity)

Statements of Comprehensive Income

Years ended December 31, 2014 and 2013

(expressed in US dollars)

 

              2014     2013  
      Notes      Restated (Note 3.2)  

Construction revenue

     8       $ 94,519,373      $ 4,752,567   

Construction costs

     8         93,787,828        4,718,125   
     

 

 

 

Construction margin

        731,545        34,442   

Research expenses

     17                2,352,577   

Operating costs and expenses:

       

Cost of operations

     18         1,171,107        104,755   

General and administrative

     19         115,767        91,055   

Depreciation and amortization of non-financial assets

     9         49,653        345   
     

 

 

 

Total operating costs and expenses

        1,336,527        2,548,732   
     

 

 

 

Operating loss

        (604,982     (2,514,290

Other income (expenses):

       

Interest income

        1,387          

Change in fair value of derivative financial instruments

     10         426,296          

Exchange rate differences, net

        (61,459     (9,592

Other expenses

        (9,827     (4,924
     

 

 

 

Loss before income tax

        (248,585     (2,528,806

Income tax

     20         (68,304     1,597,423   
     

 

 

 

Comprehensive loss

      $ (316,889   $ (931,383

 

 

 

The accompanying notes are part of the financial statements.

 

F-511


Table of Contents

Inversiones Eólicas de Orosí Dos, S.A.

(A Costa Rican Entity)

Statements of Changes in Equity

Years ended December 31, 2014 and 2013

(expressed in US dollars)

 

            Share
capital
     Contributed
capital
    Accumulated
deficit
    Total
equity
 
      Notes                   Restated (Note 3.2)  

As of January 1, 2013

      $ 20       $ 4,170,545      $ (3,858,646   $ 311,919   

Comprehensive loss

                       (931,383     (931,383

Contributed capital

   16              25,255,408               25,255,408   
     

 

 

 

As of December 31 2013

        20         29,425,953        (4,790,029     24,635,944   

Comprehensive loss

                       (316,889     (316,889

Contributed capital

   16              5,492,467               5,492,467   

Capital withdrawn

   16              (17,230,951            (17,230,951
     

 

 

 

As of December 31 2014

      $ 20       $ 17,687,469      $ (5,106,918   $ 12,580,571   

 

 

The accompanying notes are part of the financial statements.

 

F-512


Table of Contents

Inversiones Eólicas de Orosí Dos, S.A.

(A Costa Rican Entity)

Statements of Cash Flows

Years ended December 31, 2014 and 2013

(expressed in US dollars)

 

            2014     2013  
      Notes    Restated (Note 3.2)  

Operating activities:

       

Loss before income tax

      $ (248,585   $ (2,528,806

Adjustments to reconcile loss before income tax to cash flows from operating activities:

       

Depreciation expense

   9      49,653        345   

Finance cost

          4,924   

Interest income

        (1,387       

Change in fair value of derivative financial instruments

   10      (426,296       

Loss on disposal of project equipment

        75          
     

 

 

 
        (626,540     (2,523,537

Changes in operating assets and liabilities:

       

Accounts receivable

        3,093        (13,072

Prepaid expenses

        (3,950       

Prepaid sales tax

        (7,153,071       

Other financial assets

        (18,291     212,656   

Accounts payable

        (182,895     (675,516

Accrued expenses and other accounts payable

        10,995,954        192,679   
     

 

 

 

Net cash provided by (used in) operating activities

        3,014,300        (2,806,790
     

 

 

 

Investing activities:

       

Additions to intangible assets

        (80,561,070     (15,401,063

Additions to project equipment

   9      (392,664     (95,004

Interest income received

        1,387          
     

 

 

 

Net cash used in investing activities

        (80,952,347     (15,496,067
     

 

 

 

Financing activities:

       

New loans

        96,578,999          

Increase in restricted cash accounts designated for financing activities

        (228,323       

Loan settlements

        (3,414,600       

Financing cost paid

        (2,642,239     (4,924

Borrowing cost

               (2,354,062

Contributed capital

   16      5,492,467        25,255,408   

Capital withdrawn

   16      (17,230,951       
     

 

 

 

Net cash provided by financing activities

        78,555,353        22,896,422   
     

 

 

 

Net increase in cash

        617,306        4,593,565   

Cash at beginning of year

        5,696,826        1,103,261   
     

 

 

 

Cash at end of year

      $ 6,314,132      $ 5,696,826   

 

 

The accompanying notes are part of the financial statements.

 

F-513


Table of Contents

Inversiones Eólicas de Orosí Dos, S.A.

(A Costa Rican Entity)

Notes to Financial Statements

December 31, 2014 and 2013

(amounts expressed in US dollars)

1. Corporate information

Inversiones Eólicas de Orosí Dos, S.A. (“Orosí” or “the Company”) was organized as a corporation on August 13, 2008 under the laws of the Republic of Costa Rica. Orosí is domiciled in Quebrada Grande de Liberia, Guanacaste, Costa Rica. The Company is a 100% owned subsidiary of Inversiones Eólicas de Costa Rica, S.A., which in turn is controlled by Globeleq Mesoamerica (Wind) Limited (“GME Wind”) an entity domiciled in Bermuda and Orosí’s ultimate parent is Actis Infrastructure Fund 2LP.

The Company’s main activity relates to the construction and future operation of a 50 megawatt wind farm (“the Project”) in the province of Guanacaste, Costa Rica. On August 1, 2013 Orosí entered into a Power Purchase Agreement (PPA) with Instituto Costarricense de Electricidad (“ICE”) to build, operate and transfer the wind farm, which is comprised of 25 wind turbine generators of 2 megawatts each. Orosí began the Project’s construction in December 2013 and it is expected that energy generation will start during the third quarter of 2015. The approximate total investment in the construction of the Project is US$119 million, and it is being financed with the Company’s own capital and through third-party borrowings (Note 11).

As previously indicated, the PPA with ICE was agreed under the build-operate-transfer (BOT) modality with the following significant terms:

 

 

The purpose of the PPA is for Orosí to undertake the financing, construction, operation, and maintenance of the wind park. The wind park has to be transferred to ICE free of any and all encumbrances at the end of the PPA period.

 

 

The PPA period is 20 years, which enter into effect upon notice from ICE of the “Order to Proceed” (a term defined in the PPA), which happened on October 24, 2013.

 

 

Orosí will generate power under the operational and quality standards established by ICE in the PPA, and has to deliver all power generated to ICE, with the exception of that which is required to supply the power plant’s own needs.

 

 

The initial tariff is established in the PPA and a portion is adjusted for inflation on a semi-annual basis.

On November 22, 2013 the Company signed a turnkey Engineering, Procurement and Construction agreement (“EPC”) with Gamesa Wind US LLC (“Gamesa”) by which Gamesa, as the main sub-contractor, committed to design, engineer, manufacture, procure, install, start-up, construct and test the wind farm. The total EPC price is US$97,220,640, including subsequent change orders for a net amount of USD$1,500,000. The EPC contract includes design-defect and performance warranties in favor of Orosí which are supported by a stand-by letter of credit for US$14,358,096.

The Company does not have traded debt or equity in the public markets. The accompanying financial statements have been prepared for use in a securities filing in connection with the acquisition of the Company as explained in Note 25.

 

F-514


Table of Contents

2. Law on Autonomous or Parallel Generation of Electric Power

The Company is bound to the Costa Rican Law N° 7200 dated September 28 1990, and the amendments thereto through Law N° 7508 of 30, April 1995, which define autonomous or parallel generation of electric power as energy produced by limited capacity power plants owned by private companies or cooperatives that can be integrated into the national electric power grid.

3. Basis of preparation of the financial statements

3.1 Statement of compliance

The Company’s financial statements as of December 31, 2014 and 2013 were prepared in accordance with International Financial Reporting Standards (IFRS) as issued by the International Accounting Standards Board.

The Company’s financial statements as of December 31, 2014 were first approved for issuance by the Company’s Chief Executive Officer and Chief Financial Officer on January 8, 2015, and were subsequently approved by the Company’s shareholders. The accompanying restated financial statements have been prepared for use in a securities filing in connection with the acquisition of the Company as explained in Note 25. They have also been restated for the correction of certain errors as explained in Note 3.2 below. The Company’s Chief Executive Officer and Chief Financial Officer approved these financial restated statements for issuance on June 13, 2015 and subsequent events have been considered through that later date.

3.2 Restatement of financial statements

During its preparation of the accompanying restated financial statements for the purpose described in Note 3.1, the Company identified certain accounting errors that are being retrospectively corrected herein. They are explained as follows:

 

 

The Company previously accounted for restricted cash as a component of cash in its statement of cash flows. It has corrected that classification to now exclude those amounts. The Company also modified the current versus non-current classification of restricted cash to correspond with contractual terms.

 

 

The Company has identified the need for a restoration provision in the accompanying financial statements given obligations that it believes exist under IAS 37 Provisions, Contingent Liabilities and Contingent Assets. Disclosure of such provision is presented in Note 15.

 

 

The Company has also retrospectively adjusted the current and non-current classification of prepaid sales taxes to reflect information existing as of the date of the re-approval of these restated financial statements.

 

 

The aforementioned matters have an impact on deferred income tax.

 

 

Certain accounting disclosures have been expanded from those previously presented.

 

F-515


Table of Contents

These corrections have impacted the accompanying financial statements as follows (amounts in US dollars):

 

    

Balance as

of or for the
year ended
December 31,
2014 as
previously
reported

   

Retro-

spective
adjust-

ments

   

Balance as

of or for the
year ended
December 31,
2014 as
restated

   

Balance as

of or for the
year ended
December 31,
2013 as
previously
reported

   

Retro-

spective
adjust-

ments

   

Balance as

of or for the
year ended
December 31,
2013 as
restated

    Balance as
of January 1,
2013 as
previously
reported
   

Retro-

spective
adjust-

ments

    Balance as
of January 1,
2013 as
restated
 

Statement of financial position:

                 

Current assets

    8,186,361        (1,212,966     6,973,395        5,717,283               5,717,283        1,110,646               1,110,646   

Non-current assets

    107,150,651        1,518,197        108,668,848        21,401,753        1,597,423        22,999,176        220,025               220,025   
 

 

 

 

Total assets

    115,337,012        305,231        115,642,243        27,119,036        1,597,423        28,716,459        1,330,671               1,330,671   
 

 

 

 

Current liabilities

    14,192,647        46,959        14,239,606        665,915               665,915        1,018,752               1,018,752   

Non-current liabilities

    88,634,232        187,834        88,822,066        3,414,600               3,414,600                        
 

 

 

 

Total liabilities

    102,826,879        234,793        103,061,672        4,080,515               4,080,515        1,018,752               1,018,752   
 

 

 

 

Equity

    12,510,133        70,438        12,580,571        23,038,521        1,597,423        24,635,944        311,919               311,919   
 

 

 

 

Statement of comprehensive income:

                 

Revenues

    94,519,373               94,519,373        4,752,567               4,752,567         

Operating expenses

    94,767,958               94,767,958        7,281,373               7,281,373         
 

 

 

       

Loss before income taxes

    (248,585            (248,585     (2,528,806            (2,528,806      

Income taxes

    (138,742     70,438        (68,304            1,597,423        1,597,423         
 

 

 

       

Comprehensive loss

    (387,327     70,438        (316,889     (2,528,806     1,597,423        (931,383      
 

 

 

       

Statement of cash flows:

                 

Cash flows from operating activities

    2,779,507        234,793        3,014,300        (5,160,852     2,354,062        (2,806,790      

Cash flows from investing activities

    (80,717,554     (234,793     (80,952,347     (15,500,991     4,924        (15,496,067      

Cash flows from financing activities

    78,783,676        (228,323     78,555,353        25,255,408        (2,358,986     22,896,422         

Cash at beginning of year

    5,696,826               5,696,826        1,103,261               1,103,261         
 

 

 

       

Cash at end of year

    6,542,455        (228,323     6,314,132        5,696,826               5,696,826         
 

 

 

       

 

F-516


Table of Contents

3.3 Basis of valuation and presentation currency

The financial statements as of December 31, 2014 and 2013 were prepared on a historical cost basis, except for certain items that are measured in accordance with the accounting policies described in Note 4. The financial statements are expressed in US dollars (US$ or $).

3.4 Changes in accounting policies

The accounting policies adopted by the Company to prepare its financial statements as of December 31, 2014 are consistent with those used to prepare its financial statements as of December 31, 2013.

The Company adopted for the first time the following amendments to standards and interpretations, which are effective for annual periods beginning on or after January 1, 2014. These amendments and interpretations had no material impact on the Company’s financial statements as of December 31, 2014.

Investment Entities (Amendments to IFRS 10, IFRS 12 and IAS 27)

These amendments provide an exception to the consolidation requirement for entities that meet the definition of an investment entity under IFRS 10 Consolidated Financial Statements and must be applied retrospectively, subject to certain transition relief. The exception to consolidation requires investment entities to account for subsidiaries at fair value through profit or loss.

Offsetting Financial Assets and Financial Liabilities–Amendments to IAS 32

These amendments clarify the meaning of “currently has a legally enforceable right to set-off” and the criteria for non-simultaneous settlement mechanisms of clearing houses to qualify for offsetting and is applied retrospectively.

Novation of Derivatives and Continuation of Hedge Accounting–Amendments to IAS 39

These amendments provide relief from discontinuing hedge accounting when novation of a derivative designated as a hedging instrument meets certain criteria and retrospective application is required.

IFRIC 21 Levies

IFRIC 21 clarifies that an entity recognizes a liability for a levy when the activity that triggers payment, as identified by the relevant legislation, occurs. For a levy that is triggered upon reaching a minimum threshold, the interpretation clarifies that no liability should be anticipated before the specified minimum threshold is reached. Retrospective application is required for IFRIC 21.

Recoverable Amount Disclosures for Non-Financial Assets–Amendments to IAS 36 Impairment of Assets

These amendments remove the unintended consequences of IFRS 13 on the disclosures required under IAS 36. In addition, these amendments require disclosure of the recoverable amounts for the assets or cash generating units for which impairment loss has been recognized or reversed during the period.

Annual Improvements 2010-2012 Cycle

In the 2010-2012 annual improvements cycle, the IASB issued seven amendments to six standards, which included an amendment to IFRS 13 Fair Value Measurement. The amendment to IFRS 13 is effective immediately and, thus, for periods beginning at January 1, 2014, and it clarifies in the Basis for Conclusions that short-term receivables and payables with no stated interest rates can be measured at invoice amounts when the effect of discounting is immaterial.

 

F-517


Table of Contents

Annual Improvements 2011-2013 Cycle

In the 2011-2013 annual improvements cycle, the IASB issued four amendments to four standards, which included an amendment to IFRS 1 First-time Adoption of International Financial Reporting Standards. The amendment to IFRS 1 is effective immediately and, thus, for periods beginning at January 1, 2014, and clarifies in the Basis for Conclusions that an entity may choose to apply either a current standard or a new standard that is not yet mandatory, but permits early application, provided either standard is applied consistently throughout the periods presented in the entity’s first IFRS financial statements.

4. Summary of significant accounting policies

4.1 Currency and foreign currency transactions

4.1.1 Functional and presentation currency of the financial statements

Orosí adopted the US dollar ($) as the functional and presentation currency since it better reflects the events and transactions performed by the Company. Adoption of the US dollar as functional currency was based on the following facts: that the capital was contributed in US$ dollars, capital expenditures were mostly paid in said currency, future revenue from energy will be earned in dollars, debt obligations are denominated in dollars, capital contributions are made in dollars, and certain operating costs and expenses are also incurred in that currency. Information relating to exchange regulations and rates is included in Note 22.

Considering that the accounting records are kept in Costa Rican colons (¢), and that the US dollar was adopted as the functional currency, assets and liabilities denominated in foreign currency were translated into the financial statements’ functional currency using the exchange rate ruling on the date of the statement of financial position. Non-monetary items measured on a historical cost basis were converted on the date of the statement of financial position using the exchange rate ruling on the original transaction date. Income and expenses are converted at the exchange rate in effect on the transaction date.

4.1.2 Transactions in foreign currency

Transactions in foreign currency, any currency other than the functional currency, are recorded at the exchange rate ruling on the transaction date. In determining its financial position and income, the Company appraises and adjusts its assets and liabilities denominated in foreign currency at the exchange rate ruling on the date of this valuation and determination. Exchange differences resulting from the application of these procedures are recognized in the results of the period in which they occur.

4.2 Cash

Cash is comprised of cash on-hand and in banks.

4.3 Restricted Cash

Restricted bank account balances are not considered either unrestricted cash balances or cash equivalent balances for the purpose of the statement of cash flows. They are presented in the accompanying statements of financial position as “restricted cash”, and are presented as current or non-current assets given management’s expectation that they will be withdrawn for their defined purposes within the coming twelve-month period or otherwise. Net changes in such restricted cash balances are classified as a financing activity in the statement of cash flows based on the requirement for them under the debt agreements.

 

F-518


Table of Contents

4.4 Financial instruments

The valuation of the Company’s financial instruments is determined using the fair value or amortized cost method, as defined below:

Fair value—The fair value of a financial instrument negotiated in an organized financial market is determined using as reference the prices quoted in that financial market for negotiations performed as of the date of the statement of financial position. For financial instrument for which there is no active financial market, the fair value is determined using valuation techniques.

Amortized cost—The amortized cost is calculated using the effective interest method less any allowance for impairment. The calculation takes into consideration any award or discount in the acquisition and includes the transaction costs and fees which are an integral part of the effective interest rate.

These techniques include recent market transactions between interested, fully informed parties who act independently; references to the fair value of other substantially similar financial instrument; and discounted cash flows or other valuation models.

4.5 Financial assets

4.5.1 Initial recognition and measurement of financial assets

Financial assets within the scope of IAS 39 Financial Instruments: Recognition and Measurement are classified as financial assets at fair value through profit or loss, loans and receivables, held-to-maturity investments, available-for-sale financial assets, or as derivatives designated as hedging instruments in an effective hedge, as appropriate. The Company determines the classification of its financial assets at initial recognition. The Company only has accounts receivable and derivate financial instruments, which are described in Note 4.6.

The Company initially recognizes all of its financial assets at fair value plus costs directly attributable to the transaction, except for financial assets valued at fair value through changes in profit or loss in which these costs are not considered.

The Company recognizes the purchase or sale of financial assets on the date of each transaction, which is the date on which the Company commits to buy or sell a financial asset.

4.5.2 Subsequent measurement of accounts receivable

Accounts receivable are non-derivative financial assets with fixed or determined payments that are not quoted in active markets, and are initially recognized at the corresponding invoiced amounts. After initial recognition, notes and accounts receivable are recorded by the Company at amortized cost using the effective interest rate method less the allowance for impairment. Gains or losses are recognized in results when the accounts receivable are derecognized or impaired, as well as through the amortization process.

4.5.3 Impairment of financial assets

The Company assesses on the date of the statement of financial position whether there is any objective evidence that a financial asset or group of assets is impaired. A financial asset or group of financial assets is deemed to be impaired if, and only if, there is objective evidence of impairment as a result of one or more events that have occurred after the initial recognition of the financial asset, and that loss event has an impact on the estimated future cash flows of the financial asset or group of financial assets that can be reliably estimated. Evidence of impairment may include indications that the debtors are experiencing significant financial difficulty, default or delinquency in interest or principal payments, the probability that they will enter bankruptcy or other financial reorganization, and where observable data indicate that there is a measurable decrease in the estimated future cash flows due to defaults on contracts.

 

F-519


Table of Contents

Impairment of financial assets recorded at amortized cost

When the Company determines that it has incurred in an impairment loss in the value of its financial assets carried at amortized cost, it estimates the loss amount as the difference between the asset’s carrying amount and the present value of future cash flows discounted at the financial asset’s original effective interest rate; it deducts the loss from the asset’s carrying amount and recognizes such loss in the results of the year in which it occurs. If, in a subsequent period, the amount of the loss due to impairment decreases and may be objectively related to an event subsequent to the recognition of impairment, the impairment loss is reversed. Once the reversal is recorded, the carrying amount of the financial asset cannot exceed the original amortized amount. The amount of the reversal is recognized in the results of the year in which it occurs.

4.5.4 Derecognition of financial assets

Financial assets are derecognized by the Company when the rights to receive cash flows from the asset have expired, or when the financial asset is transferred along with its inherent risks and benefits and contractual rights to receive cash flows from the asset are surrendered, or when the Company retains the contractual rights to receive cash flows and assumes the obligation to pay them to one or more parties.

4.6 Financial liabilities

4.6.1 Initial recognition and measurement

Financial liabilities within the scope of IAS 39 are classified as financial liabilities at fair value through profit or loss, loans and borrowings, or as derivatives designated as hedging instruments in an effective hedge, as appropriate. The Company determines the classification of its financial liabilities at initial recognition. Orosí recognizes all financial liabilities initially at fair value on the date of acceptance or contracting of the liability, plus, in the case of loans and borrowings, directly attributable transaction costs.

The Company’s financial liabilities include notes and accounts payable and accrued expenses.

4.6.2 Subsequent measurement of notes and accounts payable, and accrued expenses

After initial recognition, these financial instruments are subsequently measured at amortized cost using the effective interest method. The Company recognizes gains or losses in the statement of comprehensive income when the financial liability is derecognized as well as through the amortization process.

4.6.3 Derecognition

Financial liabilities are derecognized when the obligation has been paid, cancelled or expires. When a financial liability is replaced by another, the Company derecognizes the original and recognizes a new liability. Differences that may result from these financial liability replacements are recognized through profit or loss when incurred.

4.7 Derivative financial instruments and hedge accounting

4.7.1 Initial recognition and subsequent measurement

The Company uses derivative financial instruments, interest rate caps, to hedge the risk of interest rate fluctuations, and does not hold or issue derivative financial instruments for trading purposes. Such derivative financial instruments are initially recognized at fair value on the date on which a derivative contract is obtained, and are subsequently re-measured at fair value.

 

F-520


Table of Contents

Derivatives are carried as financial assets when the fair value is positive and as financial liabilities when the fair value is negative. The fair value of an interest rate cap is the estimated amount that the Company would receive or pay to terminate the cap on the date of the statement of financial position, taking into account current interest rates and the payment capacity of the counterparties.

Changes in fair value of the Company’s derivative financial instruments that qualify for hedge accounting are recognized as follows: changes in the time value of instruments and any ineffectiveness are taken directly to the income statement while changes in the intrinsic value are recognized as part of other comprehensive income.

For hedge accounting purposes, the Company’s interest rate caps are classified as cash flow hedges. At the beginning date of a hedge agreement, the Company formally designates and documents the hedge relationship to which the Company wishes to apply hedge accounting and the risk management objective and strategy for undertaking the hedge. The documentation includes identification of the hedging instrument, the hedged item or transaction, the nature of the risk being hedged, and how the entity will assess the hedging instrument’s effectiveness in offsetting the exposure to changes in the hedged item’s cash flows attributable to the hedged risk. Such hedges are expected to be highly effective in achieving offsetting changes in cash flows and are assessed on a quarterly basis to determine that they actually have been highly effective throughout the financial reporting periods for which they were designated.

Cash flow hedges which meet the strict criteria for hedge accounting are recorded as follows: a) the effective portion of the gain or loss on the hedging instrument is recognized directly in equity, within other comprehensive income, while any ineffective portion is recognized immediately in the income statement; b) amounts taken to equity are transferred to the income statement when the hedged transaction affects profit or loss, such as when the hedged financial income or financial expense is recognized or when a forecast sale occurs.

If the hedging instrument no longer meets the criteria for hedge accounting, expires or is sold, terminated or exercised, then the hedge accounting is discontinued. The cumulative gain or loss previously recognized in equity remains there until the forecast transactions occurs.

4.7.2 Current versus non-current classification

Derivative instruments that are designated as hedges, and are effective hedging instruments, are classified consistently with the classification of the underlying hedged item. The derivative instrument is separated into a current portion and a non-current portion only if a reliable allocation can be made.

4.8 Project equipment

Project equipment is stated at acquisition cost less accumulated depreciation and losses due to impairment, if any. These costs include the cost of replacing the components of project equipment when the cost is incurred, if it meets the requirements for recognition. Depreciation and those disbursements for repair and maintenance which do not meet the conditions for recognition as assets are recognized as expenses in the year in which they are incurred.

Depreciation is calculated on a straight-line basis over the useful life of each type of asset. The remaining value of the depreciating assets, the estimated useful life, and depreciation methods are periodically reviewed by Management and adjusted when necessary, at the end of each financial year. The estimated useful lives for productive assets is established by the Company as the difference between the date from which the assets are available for their intended use and the power purchase agreement expiration date or the assets’ own estimated useful life, whichever is shorter.

 

F-521


Table of Contents

A breakdown of estimated useful lives is as follows:

 

      Useful life  

Machinery and equipment (primarily wind turbines)

     20 Years   

Furniture and equipment

     5-10 years   

Vehicles

     10 years   

 

 

A component of project equipment is derecognized when it is sold or when the Company does not expect future economic benefits from its use. Any loss or gain from the disposal of the asset, calculated as the difference between the net carrying amount and the sales proceeds, is recognized in income in the year in which it occurs.

4.9 Intangible assets

Intangible assets acquired separately are initially measured at cost. Following initial recognition, intangible assets are carried at cost less any accumulated amortization and any accumulated impairment losses, as necessary. The Company records as expenses the intangible assets generated internally in the year in which they are incurred, except for development costs that are capitalized.

The useful lives of intangible assets are assessed to be either finite or indefinite. The Company’s intangible assets have finite useful lives only. Intangible assets with finite lives are amortized under the straight-line method over the assets’ estimated useful lives, which are periodically reviewed by the Company. Expenses for the amortization of intangible assets are recognized in the income statement of the year in which they are incurred.

Gains or losses from the derecognition of an intangible asset are determined by the Company as the difference between the proceeds from sale or disposal and the net carrying amount of the intangible asset, recognizing them in the results of the year in which they are incurred.

4.9.1 Research and development costs

Research costs are expensed as incurred.

Development activities involved a plan or design for the construction of new wind power generation projects. An intangible asset arising from the development phase of a project is recognized if the Company can demonstrate all of the following: the technical feasibility of completing the asset so that it will be available for use or sale; its intention to complete the asset and use it or sell it; its ability to use or sell the intangible asset; how the intangible asset will generate probable future economic benefits; the availability of adequate technical and financial resources to complete the development and to use or sell the asset, and its ability to reliably measure the expenditure attributable to the asset during its development. Useful life for intangible assets arising development costs is determined based on the PPA term and amortization occurs on a straight-line basis.

4.9.2 Service concession arrangement

The Company, as operator under the PPA, recognizes an intangible asset equivalent to the consideration receivable for the construction of the wind farm (Note 8). This recognition is based on the premises of IFRIC Interpretation 12 Service Concession Arrangements by which Orosí does not have an unconditional contractual right to receive cash or another financial asset in return for the public service provided.

During the construction phase of the Project, the intangible asset is comprised of advances made to sub-contractors as well as the construction revenue for the construction services performed by Orosí, which are measured in accordance with International Accounting Standard 11 Construction Contracts. The intangible asset will be amortized over the PPA term once the wind park is available for its intended use.

 

F-522


Table of Contents

4.10 Impairment of non-financial assets

The Company assesses the carrying amounts of its non-current assets at each reporting date to determine reductions in value when events or circumstances indicate that recorded values may not be recovered. If any such indication exists, and the carrying amount exceeds the recoverable amount, the Company measures the assets or cash-generating units at their recoverable amounts, defined as the greater of fair value less selling costs or the value in use. Resulting adjustments are recorded in the results of the year in which they are determined.

4.11 Revenue recognition

The Company measures its revenue from ordinary activities using the fair value of the benefit received or to be received, derived from revenue.

4.11.1 Revenue from construction services

The Company records revenue from construction activities using the percentage of completion method, recognizing revenue in relation to the physical progress of the Project.

4.11.2 Interest income from financial instruments

Revenue arising from financial instruments is recognized in relation to the passage of time, calculated over the average monthly balances for the invested principal, applying the effective interest method. Interest income is included in finance income in the statement of comprehensive income.

4.12 Borrowing costs

Borrowing costs directly attributable to the acquisition, construction or production of an asset that necessarily takes a substantial period of time to get ready for its intended use or sale are capitalized as part of the cost of the respective asset. Borrowing costs include interest, exchange differences and other borrowing costs. Borrowing costs that do not meet the criteria for capitalization are recorded in the results of the year in which they are incurred.

Borrowing costs, including transaction costs, related to notes and loans payable for the financing of qualifying assets under construction are initially recognized as a non-current asset and subsequently reclassified to the balance of notes and loans payable when the funds from the financing have been substantially withdrawn by the Company.

4.13 Benefits for termination of employment contracts

In accordance with Costa Rica’s Labor Code, severance compensations accumulated on behalf of employees shall be reimbursed in the event of death, retirement or unjustified termination. Compensation is determined as 8.33% of average monthly salaries earned by the employee during the last six months of work for each year worked, for a maximum of 8 years. The Company transfers 3% of employees’ monthly salaries to the Complementary Pension Fund established by law.

Any severance paid by the Company during termination in excess of amounts transferred and the definite severance calculated based on the labor rights mentioned is recognized as an expense in the year in which it occurs. Given the limited number of employees, the Company believes that any potential future liability related to current employees is immaterial to the accompanying financial statements.

 

F-523


Table of Contents

4.14 Taxes

The Company offsets its current and deferred tax assets with current and deferred tax liabilities, respectively, if a legally enforceable right exists to set off the amounts recognized before the same taxation authority and when it has the intention to liquidate them for the net amount or to realize the asset and settle the liability simultaneously.

4.14.1 Current income tax

The Company calculates income tax by applying adjustments from certain items, affected by or subject to income tax, in conformity with current tax regulations. Current tax, corresponding to present and prior periods, is recognized by the Company as a liability to the extent that it is not settled. If the amount already paid, which corresponds to present and prior periods, exceeds the amount payable for those periods, the excess is recognized as an asset.

The Company recognizes current income tax related to items of other comprehensive income directly in these items and not in the results of the period.

4.14.2 Deferred income tax

Deferred income tax is determined by applying the liability method to all temporary differences existing between the asset, liability, and net equity tax base and the amounts recorded for financial purposes as of the date of the statement of financial position. Deferred income tax is calculated using the tax rate expected to apply on the period when the asset is realized or the liability is settled. Deferred tax assets are recognized only when there is reasonable probability of their realization.

The carrying amount of deferred income tax assets is reviewed on the date of the statement of financial position and reduced to the extent that it is no longer probable that sufficient taxable income will be available to allow all or part of the deferred income tax asset to be utilized. Likewise, on the closing date of each financial period, the Company reassesses the unrecognized deferred tax assets to the extent that it is probable that future taxable income will allow the deferred tax assets to be recovered.

Deferred taxes related to items of other comprehensive income are recognized directly in those items and not in the results of the period.

4.14.3 Sales tax

Revenue from sales is recorded by the Company net of sales tax, and a liability is recognized in the statement of financial position for the related sales tax amount. Expenses and assets acquired are recorded by the Company net of sales tax if the tax authorities credit these taxes to the Company, recognizing the accumulated amount receivable in the statement of financial position. When the sales tax incurred is not recoverable, the Company includes it within the expense or asset, as applicable.

4.15 Significant accounting estimates and assumptions

Financial statement preparation requires management to make judgments, estimates and assumptions affecting reported amounts of revenue, expenses, assets and liabilities, and to disclose contingent liabilities as of the reporting date.

However, uncertainty about these assumptions and estimates could result in outcomes that require a material adjustment to the carrying amount of the asset or liability affected in future periods.

 

F-524


Table of Contents

4.15.1 Estimates and assumptions

The main assumptions related to future events and other sources of estimates subject to variations as of the reporting date, which due to their nature carry a risk of causing adjustments to the asset and liability amounts in next year’s financial statements, are presented below:

Revenue recognition for projects in progress

The Company records revenue from construction activities using the percentage of completion method, recognizing revenue in relation to the progress of the Project. This method emphasizes the importance of having accurate estimates of the progress of the works until their completion. Management constantly monitors the estimates involved in these construction activities, and adjusts them when required.

Impairment of non-financial assets

The Company estimates that there are no indicators of impairment for any of its non-financial assets as of the reporting date.

5. Standards issued but not yet effective

The standards and interpretations that are issued, but not yet effective, as of December 31, 2014 are disclosed below. The Company intends to adopt these standards, if applicable to its activities, when they become effective.

IFRS 9 Financial Instruments

In July 2014, the IASB issued the final version of IFRS 9 Financial Instruments which reflects all phases of the financial instruments project and replaces IAS 39 Financial Instruments: Recognition and Measurement and all previous versions of IFRS 9. The standard introduces new requirements for classification and measurement, impairment, and hedge accounting. IFRS 9 is effective for annual periods beginning on or after January 1 2018, with early application permitted. Retrospective application is required, but comparative information is not compulsory. Early application of previous versions of IFRS 9 (2009, 2010 and 2013) is permitted if the date of initial application is before February 1, 2015.

IFRS 14 Regulatory Deferral Accounts

IFRS 14 is an optional standard that allows an entity, whose activities are subject to rate-regulation, to continue applying most of its existing accounting policies for regulatory deferral account balances upon its first-time adoption of IFRS. IFRS 14 is effective for annual periods beginning on or after January 1, 2016.

IFRS 15 Revenue from Contracts with Customers

IFRS 15 was issued in May 2014 and establishes a new five-step model that will apply to revenue arising from contracts with customers. Under IFRS 15 revenue is recognized at an amount that reflects the consideration to which an entity expects to be entitled in exchange for transferring goods or services to a customer.

The principles in IFRS 15 provide a more structured approach to measuring and recognizing revenue. The new revenue standard is applicable to all entities and will supersede all current revenue recognition requirements under IFRS. Either a full or modified retrospective application is required for annual periods beginning on or after January 1, 2017 with early adoption permitted.

 

F-525


Table of Contents

Amendments to IAS 16 and IAS 38: Clarification of Acceptable Methods of Depreciation and Amortization

The amendments clarify the principle in IAS 16 and IAS 38 that revenue reflects a pattern of economic benefits that are generated from operating a business (of which the asset is part) rather than the economic benefits that are consumed through use of the asset. As a result, a revenue-based method cannot be used to depreciate property, plant and equipment and may only be used in very limited circumstances to amortize intangible assets. The amendments are effective prospectively for annual periods beginning on or after January 1, 2016, with early adoption permitted.

Amendments to IAS 16 and IAS 41 Agriculture: Bearer Plants

The amendments change the accounting requirements for biological assets that meet the definition of bearer plants. Under the amendments, biological assets that meet the definition of bearer plants will no longer be within the scope of IAS 41. Instead, IAS 16 will apply. After initial recognition, bearer plants will be measured under IAS 16 at accumulated cost (before maturity) and using either the cost model or revaluation model (after maturity). The amendments also require that produce that grows on bearer plants will remain in the scope of IAS 41 measured at fair value less costs to sell. For government grants related to bearer plants, IAS 20 Accounting for Government Grants and Disclosure of Government Assistance will apply. The amendments are retrospectively effective for annual periods beginning on or after January 1, 2016, with early adoption permitted.

Amendments to IAS 19 Defined Benefit Plans: Employee Contributions

IAS 19 requires an entity to consider contributions from employees or third parties when accounting for defined benefit plans. Where the contributions are linked to service, they should be attributed to periods of service as a negative benefit. These amendments clarify that, if the amount of the contributions is independent of the number of years of service, an entity is permitted to recognize such contributions as a reduction in the service cost in the period in which the service is rendered, instead of allocating the contributions to the periods of service. This amendment is effective for annual periods beginning on or after July 1, 2014.

Amendments to IAS 27: Equity Method in Separate Financial Statements

The amendments will allow entities to use the equity method to account for investments in subsidiaries, joint ventures and associates in their separate financial statements. Entities already applying IFRS and electing to change to the equity method in its separate financial statements will have to apply that change retrospectively.

For first-time adopters of IFRS electing to use the equity method in its separate financial statements, they will be required to apply this method from the date of transition to IFRS. The amendments are effective for annual periods beginning on or after January 1, 2016, with early adoption permitted.

Amendments to IFRS 11 Joint Arrangements: Accounting for Acquisitions of Interests

The amendments to IFRS 11 require that a joint operator accounting for the acquisition of an interest in a joint operation, in which the activity of the joint operation constitutes a business must apply the relevant IFRS 3 principles for business combinations accounting. The amendments also clarify that a previously held interest in a joint operation is not re-measured on the acquisition of an additional interest in the same joint operation while joint control is retained. In addition, a scope exclusion has been added to IFRS 11 to specify that the amendments do not apply when the parties sharing joint control, including the reporting entity, are under common control of the same ultimate controlling party.

 

F-526


Table of Contents

The amendments apply to both the acquisition of the initial interest in a joint operation and the acquisition of any additional interests in the same joint operation and are prospectively effective for annual periods beginning on or after January 1, 2016, with early adoption permitted.

Annual improvements from the 2010-2012 and 2011-2013 Cycles

The following list of improvements to standards is effective from July 1, 2014:

 

 

IFRS 2 Share-based Payment. This improvement is applied prospectively and clarifies various issues relating to the definitions of performance and service conditions which are vesting conditions.

 

 

IFRS 3 Business Combinations. The amendment is applied prospectively and clarifies that all contingent consideration arrangements classified as liabilities (or assets) arising from a business combination should be subsequently measured at fair value through profit or loss whether or not they fall within the scope of IFRS 9 (or IAS 39, as applicable).

 

 

IFRS 3 Business Combinations. The amendment is applied prospectively and clarifies for the scope exceptions within IFRS 3 that: a) joint arrangements, not just joint ventures, are outside the scope of IFRS 3; and b) this scope exception applies only to the accounting in the financial statements of the joint arrangement itself.

 

 

IFRS 8 Operating Segments. The amendments are applied retrospectively and clarifies that: a) an entity must disclose the judgments made by management in applying the aggregation criteria in paragraph 12 of IFRS 8, including a brief description of operating segments that have been aggregated and the economic characteristics (e.g., sales and gross margins) used to assess whether the segments are “similar”; and b) the reconciliation of segment assets to total assets is only required to be disclosed if the reconciliation is reported to the chief operating decision maker, similar to the required disclosure for segment liabilities.

 

 

IFRS 13 Fair Value Measurement. The amendment is applied prospectively and clarifies that the portfolio exception in IFRS 13 can be applied not only to financial assets and financial liabilities, but also to other contracts within the scope of IFRS 9 (or IAS 39, as applicable).

 

 

IAS 16 Property, Plant and Equipment and IAS 38 Intangible Assets. The amendment is applied retrospectively and clarifies in IAS 16 and IAS 38 that the asset may be revalued by reference to observable data on either the gross or the net carrying amount. In addition, the accumulated depreciation or amortization is the difference between the gross and carrying amounts of the asset. IAS 24 Related Party Disclosures.

 

 

IAS 24 Related Party Disclosures. The amendment is applied retrospectively and clarifies that a management entity (an entity that provides key management personnel services) is a related party subject to the related party disclosures. In addition, an entity that uses a management entity is required to disclose the expenses incurred for management services.

 

 

IAS 40 Investment Property. The description of ancillary services in IAS 40 differentiates between investment property and owner-occupied property (i.e., property, plant and equipment). The amendment is applied prospectively and clarifies that IFRS 3, and not the description of ancillary services in IAS 40, is used to determine if the transaction is the purchase of an asset or business combination.

The Company has not yet evaluated the impact that the aforementioned new accounting standards will have on its financial statements.

 

F-527


Table of Contents

6. Cash

 

      2014      2013  

Banks

   $ 6,312,107       $ 5,696,136   

Petty cash

     2,025         690   
  

 

 

 
   $ 6,314,132       $ 5,696,826   
  

 

 

 

Restricted cash in banks

   $ 228,323       $   

 

 

Cash deposited in bank accounts earns interest based on daily rates determined by the corresponding banks.

The cash balance for US$228,323 as of December 31, 2014 is restricted under the financing documents between Energía Eólica and the Lenders (Note 11). Under the terms of its debt agreements, the Company has a series of restricted bank accounts both “on-shore” in Costa Rica, and also off-shore. Cash receipts from operations are initially deposited directly into these restricted accounts and then based on contractually agreed provisions are allocated into a series of sub-accounts, restricted for specific operational and other purposes including, but not limited to, construction, debt service, major maintenance, insurance, and shareholders distributions. Except as expressly provided in those debt agreements, the restricted bank accounts are under the control of a trustee and the Company has the right to withdraw or transfer funds only as expressly provided in those debt agreements.

7. Prepaid sales tax

As of December 31, 2014, the Company reflects an asset for a total of US$7,153,071 (2013: US$0) in its financial statements which is related to sales taxes paid. Out of this balance, US$7,022,301 relates to taxes for the import of the generation equipment for the Project. The Company filed an application with the Ministry of Treasury to obtain tax exempt purchase orders for the import of the equipment necessary for the Project’s construction. This application, however, was denied. Orosi was therefore forced to pay all of the sales taxes for the imports.

On February 12, 2015 the Company filed a claim against the State of Costa Rica through an ordinary process that would allow for the recovery of these taxes plus interest. In the meantime, the Company will use the taxes paid as tax credits to be offset against taxes collected from the sale of energy. Because the Company believes that it is probable that it will ultimate recover such prepaid sales tax amounts, it has reflected these amounts as a prepaid amount in its financial statements and not as an incremental component of the project construction.

8. Intangible assets

As indicated in Note 4.8.2, the Company accounts for the construction of the wind park under the intangible asset model contemplated in IFRIC 12. Construction of the wind park began in December 2013. The intangible asset balance as of December 31 is as follows:

 

      2014      2013  

Construction revenue during 2014

   $ 94,519,373       $   

Construction revenue during 2013

     4,752,567         4,752,567   

Restoration Obligation (note 15)

     234,793           

Advances to the wind park sub-contractors

             14,193,096   
  

 

 

 
   $ 99,506,733       $ 18,945,663   

 

 

Construction costs in the year 2014 associated to revenue amount to US$93,787,828 (2013: US$4,718,125).

 

F-528


Table of Contents

As of December 31, 2014 the Company accrues a liability for construction costs of US$10,846,303 (2013: US$0) (Note 13) over completed construction work for which the sub-contractor (Gamesa, Note 21.3) has not yet billed the Company as of that date.

Management has estimated the overall percentage of completion of the Project to be 90% as of December 31, 2014 (2013: 5%). It is also expected that the Project will begin operations by the end of the third quarter 2015. Construction revenue corresponds to construction costs paid to third-party subcontractors plus revenue associated to project management activities performed by the Company.

Finance costs of US$2,349,740 were capitalized in 2014 (2013: US$0) with respect to the Project construction based on an average effective interest rate of 6.18% (2013: 0%) of the corresponding loans obtained to finance construction.

9. Project equipment

 

     

Machinery
and

equipment

    

Furniture

and

equipment

    Vehicles      Total  

Cost:

          

As of December 31 2012

   $       $      $       $   

Additions

             95,004                95,004   
  

 

 

 

As of December 31 2013

             95,004                95,004   

Additions

     6,337         138,967        247,360         392,664   

Retirements

             (88             (88
  

 

 

 

As of December 31 2014

   $ 6,337       $ 233,883      $ 247,360       $ 487,580   
  

 

 

 

Accumulated depreciation:

          

As of December 31 2012

   $       $      $       $   

Depreciation

             345                345   
  

 

 

 

As of December 31 2013

             345                345   

Depreciation

     298         26,915        22,440         49,653   

Retirements

             (13             (13
  

 

 

 

As of December 31 2014

   $ 298       $ 27,247      $ 22,440       $ 49,985   
  

 

 

 

Carrying amounts:

          

As of December 31 2013

   $       $ 94,659      $       $ 94,659   
  

 

 

 

As of December 31 2014

   $ 6,039       $ 206,636      $ 224,920       $ 437,595   

 

 

10. Fair value of derivative instruments

The Company uses an interest rate cap to hedge its variable interest rate exposure of the Company’s loan with BICSA (Note 11). Under the interest rate cap agreement contracted by the Company on February 11, 2014, it pays interest at a variable rate and receives a fixed rate in instances where the variable interest rate is above a given cap rate, both in relation to contracted notional amounts.

This derivative financial instrument has been designated as a hedging instrument and has been assessed to be highly effective as of the date of the financial statements. The fair value of the interest rate cap amounts to US$426,296 as of December 31, 2014 and the change in fair value from inception to that date was a gain for the same amount that is recognized in profit or loss as the instrument was out-of-the money as of that date.

 

F-529


Table of Contents

The main characteristics of the cap agreement are as follows:

 

   

Effective date

   25-Apr-2014

Termination date

   25-Oct-2028

Maximum notional amount

   US$19,526,000

Fixed cap interest rate

   Between 2.50% and 4.75%

Variable interest rate

   US Libor—BBA—6 months

11. Notes and loans payable

Notes and loans payable correspond to finance obtained for the purchase of land and easements where the Project is located and for construction costs. A summary of the notes and loans payable, which are denominated in US dollars, as of December 31 is presented below:

 

     Interest rate   Maturity date   2014     2013  

Construction (*):

       

Export-Import Bank of the United States (“Ex-Im”)

  3.94%(**)   October 2031   $ 52,016,373      $   

Nederlandse Financierings-Maatschappij Voor Ontwikkelingslanden N.V. (FMO)

  Libor+4%(**)   October 2028     14,249,869          

Banco Internacional de

Costa Rica, S.A.

  Libor+4%(**)   October 2028     12,090,000          

Subordinated loan with related parties:

       

Administración de Energías Renovables, S.A. (Note 14)

  11% fixed   April 2033     18,222,757          

Purchase of land and easements:

       

Hermanos Ocampo

Fernández, S.A.

    July 2015     130,000        230,000   

Corporación Ganadera nteramericana, S.A.

  7.5%   April 2015            2,088,850   

Punta Los Meros, S.A.

  10%   March 2016            970,000   

Hacienda Borinquen, S.A.

    April 2015            225,750   

Inversiones Román Ocampo, S.A.

    Sept. 2014            30,000   
     

 

 

 

Principal

        96,708,999        3,544,600   

Less—Deferred finance costs

        (5,689,529       
     

 

 

 
        91,019,470        3,544,600   

Less—Maturity of one year or less

        (2,385,238     (130,000
     

 

 

 

Long-term notes and payables

      $ 88,634,232      $ 3,414,600   

 

 

 

(*)   The total available principal for the financing of the construction is US$109,147,375, comprised as follows: US$61,147,375 from Ex-Im, US$20,000,000 from BICSA, and US$28,000,000 from FMO. As of December 31 2013, the Company had not made any withdrawals from these credit facilities.

 

(**)   Interest rate during the construction phase of the Project.

A summary of the maturities of the long-term notes and loans payable is presented below:

 

      2014     2013  

As of December 31 2015

   $      $ 2,444,600   

As of December 31 2016

     5,309,490        970,000   

As of December 31 2017

     3,525,948          

As of December 31 2018

     4,109,184          

As of December 31 2019 and thereafter

     81,379,139          
  

 

 

 
     94,323,761        3,414,600   

Less—Deferred finance cost

     (5,689,529       
  

 

 

 
   $ 88,634,232      $ 3,414,600   

 

 

 

F-530


Table of Contents

The provisions of the construction loans are included in the “Common Terms Agreement”, the “Master Security and Account Agreement”, the “Equity Contribution and Share Retention Agreement”, the “Intercreditor Agreement”, the “Security Trust Agreement”, and the three “Loan Agreements”. The loan documents establish affirmative, negative and certain financial covenants for the Company.

The loans for the financing of construction are secured by the Project and all its assets, with Banco BCT, S.A. acting as security trustee and onshore Account Bank. Loans for the purchase of land are secured by a mortgage on said land. These liens were specifically permitted by the grantor of the BOT (ICE), who retains its residual interest through its ability to step into the loans or pay them off to maintain control of the Project in the event that the Company defaults on such obligations.

The aforementioned loan agreements do not contain any financial covenant ratios requiring compliance.

On September 2, 2014 the Company entered into an unsecured subordinated loan agreement with a related party, Administración de Energías Renovables, S.A. Debt payments, including principal and interest, will be made in April and October of each year, from 2015 up to April 2033.

Debt agreements contained the following financial covenants. Breaches in meeting the financial covenants would permit the lenders to immediately call loans and borrowings.

 

Distribution requirements      

Debt service coverage ratio (historical)

   1.25x

Debt service coverage ratio (projected)

   1.30x

Debt to equity ratio

   75:25:00

( + definition)

   Senior debt divided by:
   Equity excl. (cap)revaluation + SHL + intangibles + [0, $7.5M]

 

Financial maintenance covenants

  

 

Debt service coverage ratio

   Same as above

Debt to equity ratio

   Same as above

 

As of December 31, 2014, the Company is in compliance with these restrictive covenants.

As of December 31, 2014 accrued interest on notes and loans payable amounts to US$693,229 (2013: US$0).

Deferred finance costs

Deferred finance costs of US$2,354,062 as of December 31, 2013 related to notes and loans payable for the financing of qualifying assets under construction. These costs were initially recognized as non-current assets and subsequently reclassified to the notes and loans payable balance as the funds from the financing were substantially withdrawn by the Company during 2014.

12. Accounts payable

 

      2014      2013  

Commercial vendors

   $ 123,044       $ 305,687   

Related parties (Note 14)

             252   
  

 

 

 
   $ 123,044       $ 305,939   

 

 

 

F-531


Table of Contents

Maturity terms for accounts payable with commercial vendors extend up to 30 days from the corresponding invoices’ issue dates, are not subject to any discounts for early payment and do not generate interest except for late charges.

13. Accrued expenses and other accounts payable

 

      2014      2013  

Engineering, procurement and construction contract accrual (note 8)

   $ 10,846,303       $   

Others

     144,833         229,976   
  

 

 

 
   $ 10,991,136       $ 229,976   

 

 

The engineering and procurement costs accrual for US$10,846,303 (2013: US$0) corresponds to payables related to the Orosí Project for which sub-contractor invoices had not been received as of the statement of financial position date (Note 8).

Accrued expenses and other accounts payable are interest-free, are not subject to any discount for early payment, do not generate late charges, and their maturity terms are generally less than one year.

14. Balances and transactions with related party

The related parties with whom the Company maintains balances and performs transactions are entities under the common control of the parent company, Globeleq Mesoamerica Energy (Wind), Limited. A breakdown of these balances and the respective terms and conditions is as follows:

 

      2014      2013  

Notes and loans payable:

     

Administración de Energías Renovables, S.A. (Note 11)

   $ 18,222,757       $   
  

 

 

 

Accounts payable:

     

Plantas Eólicas, Limited (Note 12)

   $       $ 252   

 

 

Maturity terms for accounts payable to related parties extend up to 30 days from the corresponding invoices’ issue dates, and are not subject to any discounts for early-payment.

A breakdown of transactions performed with related parties is summarized below:

 

      2014      2013  

Various construction costs capitalized to the Project:

     

TCR Holdings, S.A. a/

   $ 1,169,785       $   
  

 

 

 

CR Operaciones y Mantenimientos, S.A. b/

   $ 72,387       $   
  

 

 

 

Administración de Energías Renovables, S.A. c/

   $ 71,429       $   
  

 

 

 

Finance costs:

     

Administración de Energías Renovables, S.A. (nota 11)

   $ 720,368       $   
  

 

 

 

Professional services—expense:

     

TCR Holdings, S.A. a/

   $       $ 600,000   

 

 

a/ The Company and TCR Holdings, S.A. entered into a Management Services Agreement whereby Orosí engaged TCR to perform the following services: engineering, technical support, construction supervision,

 

F-532


Table of Contents

project management, bookkeeping, treasury, and tax and legal matters, among others. As consideration for the services, the agreement contemplated a monthly fee (plus expenses) of US$50,000 which will increase to US$80,000 after the Financial Closing, and will be reduced after the Project’s Commercial Operation to US$50,000. The Agreement is for an indefinite period unless it is terminated by either party upon written notice to the other party.

b/ The Company and CR Operaciones y Mantenimientos, S.A. entered into an Inspection Contract on May 22 2014 for the installation of wind turbines.

c/ The Company paid to the subsidiary Administración de Energías Renovables, S.A. certain reimbursable expenses related with the construction of the Project.

Compensation to key management personnel

The Company does not directly incur compensation for key personnel because TCR Holdings, S.A. provides the required management services, however the allocation of key personnel compensation at TCR Holdings, S.A. that is attributable to the Company amounts to US$357,230 for 2014 (2013: US$280,843).

15. Restoration provision

The Company recognized a provision for restoration obligations of US$234,793, as of December 31, 2014, associated with its wind farm. In determining the fair value of the provision, assumptions and estimates are made in relation to discount rates, the expected cost to restore the environmental impact of constructing the plant. The restoration provision reflects the costs estimated by the Company to comply with the environmental reforestation plan described in Note 21.2.

16. Equity

Share capital

As of December 31, 2013 and 2012, authorized, registered, and paid-in share capital amounted to $20 represented by 10 common shares with a par value of ¢1,000 each.

Contributed capital

As of December 31, 2014 and 2013 contributed capital is comprised of contributed cash, in addition to the share capital, received from the shareholders. This contributed capital is mainly used to finance the construction of the Project.

Equity transactions

During the years ended December 31, 2014 and 2013, capital contributions were made by Company shareholders in the amount of US$5,492,467 and US$25,255,408, respectively. Furthermore, during the year ended December 31, 2014, capital withdrawals were taken by Company shareholders in the amount of US$17,230,951.

 

F-533


Table of Contents

17. Research expenses

Research expenses in 2013 correspond to activities undertaken by the Company in relation to the Project prior to its development.

 

      2014      2013  

Professional services

   $       $ 2,044,882   

Tax stamps for PPA contract with ICE

             307,695   
  

 

 

 
   $       $ 2,352,577   

 

 

18. Cost of operations

 

      2014      2013  

Taxes and permits

   $ 278,053       $   

Employee salaries and benefits

     207,231           

Travel expenses

     200,628           

Donations for land protection (*)

     106,328         104,755   

Facility and supplies

     100,473           

Professional services

     91,349           

Other donations

     61,818           

Others

     54,902           

Rent of land and equipment

     50,908           

Repair and maintenance of equipment

     11,671           

Certified emission reductions costs

     7,746           
  

 

 

 
   $ 1,171,107       $ 104,755   

 

 
(*)   The Company has agreed to donate an annual amount of US$100,000 to the Guanacaste Dry Conservation Fund in order to protect the lands on which the Project’s electricity transmission lines will be located. The donation is to be adjusted in January of every year based on the Consumer Price Index as published by the U.S. Bureau of Labor Statics. Orosí recognizes the donation as an expense when paid.

19. General and administrative expenses

 

      2014      2013  

Various general and administrative

   $ 115,767       $ 91,055   

 

 

20. Income tax

Orosí is subject to income tax, therefore tax returns are prepared and filed with the corresponding tax authorities. The income tax rate in effect for the fiscal years ending December 31, 2014 and 2013 was 30%.

A breakdown of the income tax components presented in the income statement is provided below:

 

      2014     2013  

Recognition and reversal of temporary differences

   $ (68,304   $ 1,597,423   
  

 

 

 
      

 

F-534


Table of Contents

The current income tax calculation is presented in the reconciliation below:

 

      2014     2013  

Loss before tax

   $ (248,585   $ (2,528,806

Deduct—non-deductible expenses

     2,443,985        2,068,310   

Add—non-taxable income

     (858,000       

Differences in exchange rates from monetary balances in foreign currency

     (594,865     460,496   

Application of organization costs

     (742,535       
  

 

 

 

Taxable income

   $      $   
  

 

 

 

Current income tax at effective rate of 30%

   $      $   

 

 

The components of the deferred tax assets and liabilities are presented below:

 

      Statement of Financial Position      Statement of Comprehensive Income  
      December 31
2014
    December 31
2013
     December 31
2014
    December 31
2013
 

Deferred tax asset:

         

Organization costs

   $ 1,845,562      $ 1,597,423       $ 248,139      $ 1,597,423   

Restoration provision

     70,438                70,438          

Deferred tax liability:

         

Effect of non-monetary assets denominated in Costa Rican colons for tax purposes

     (258,992             (258,992       

Fair value of derivative financial instruments

     (127,889             (127,889       
  

 

 

 
   $ 1,529,119      $ 1,597,423       $ (68,304   $ 1,597,423   

 

 

Organization costs relate to start-up costs accumulated by the Company prior to the beginning of commercial operations. These costs may be amortized within the next five fiscal periods after the Company starts recognizing energy sales. The effect on non-monetary assets denominated in Costa Rican colons for tax purposes originates because the tax base of the Company’s non-monetary assets and liabilities is determined in Costa Rican colons, while the Company’s functional currency is the US dollar.

The Company has considered the past experience of the group (Globeleq Mesoamerica Energy (Wind) Limited and subsidiaries), in constructing similar operations, construction financing that it has in place as well as its in place PPA. Based on these considerations Inversiones Eólicas believes that it is more likely than not that it will ultimately recover its deferred tax assets recorded at both December 31, 2014 and 2013.

21. Agreements and commitments

21.1 Guarantees

The Company has recognized a restoration provision to comply with the reforestation plan commitment (Note 15).

21.2 Environmental commitments

As part of the environmental license for the Project granted by Setena, the Company committed to certain requirements during the construction and operation phases of the Project. Those requirements contemplate:

 

F-535


Table of Contents

establishment of a reforestation plan, maintaining a log of environmental incidents, proper management of waste materials, and submission of environmental compliance reports periodically to Setena, among others. The Company has a guarantee with Banco Nacional de Costa Rica of US$920,000.

21.3 Power plant construction

The Company entered into an EPC agreement with Gamesa (Note 1) for a total price of US$95,342,713 (Note 1). As of December 31, 2014 Orosí had paid Gamesa an amount of US$75,906,527 (2013: US$14,193,096), which is included under intangible assets.

22. Financial risk management objectives and policies

The Company’s main financial instruments are cash, accounts receivable, notes and loans payable, accounts payable and accrued expenses, and derivative financial instruments. The main purpose of these financial instruments is to manage cash flows and raise financing for the Company’s capital needs.

The Company is exposed to market and liquidity risks. The Company’s senior Management oversees the management of these risks.

22.1 Market risk

Market risk is the risk that the fair value of future cash flows of a financial instrument will fluctuate because of changes in market prices. Market risk comprise three types of risk: interest rate risk, currency risk and other price risk, such as equity price risk and commodity risk. Significant market risks affecting the Company’s financial statements are foreign currency risk and interest rate risk.

Interest rate risk

Interest rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in market interest rates. The Company’s exposure to the risk of changes in market interest rates relates primarily to the Company’s long-term debt obligations with floating interest rates. Orosí’s exposure to the risk of changes in market interest rates is primarily related to the Company’s debt obligations with floating interest rates. The Company’s exposure to the risk of changes in market interest rates is primarily related to the Company’s debt obligations with floating interest rates. To manage this, the Company enters into interest rate caps (Note 11), in which it receives, at specified intervals, the difference between the cap rate and variable rate interest amounts (only in cases where the variable rate is higher), calculated by reference to an agreed-upon notional principal amount.

As of the dates of the statements of financial position, the interest rate profile of the Company’s interest-bearing financial instruments was as follows:

 

      2014     2013  

Fixed rate instruments:

    

Financial liabilities

   $ (70,369,130 )    $ 230,000   
  

 

 

 

Variable rate instruments:

    

Financial assets

   $ 6,542,455      $ 5,696,136   

Financial liabilities

     (26,339,869 )      (3,314,600
  

 

 

   

 

 

 
   $ (19,797,414   $ 2,381,531   
  

 

 

 

 

F-536


Table of Contents

Foreign currency risk

Foreign currency risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in foreign exchange rates. Orosí’s exposure to the risk of changes in foreign exchange rates relates primarily to the Company’s operating activities (when revenue or expense is denominated in a different currency from the Company’s presentation currency).

The Costa Rican colon is the main foreign currency used by the Company in its transactions. The Costa Rica Central Bank is the entity responsible for managing the national banking system and regulating the currency’s parity to other currencies. Buy and sell rates are established by authorized financial institutions, according to market supply and demand. As of December 31, 2014 and 2013, buy and sell rates for US dollars were ¢533.31 and ¢545.53 (2013: ¢507.80 and ¢495.01), respectively.

Below is a summary of monetary assets and liabilities in foreign currencies, expressed in US dollars:

 

      2014      2013  

Assets:

     

Cash

   $ 21,806       $ 6,113   

Accounts receivable

     5,785         60   

Prepaid expenses

     3,950           

Prepaid sales taxes

     7,153,071           
  

 

 

 
     7,184,612         6,173   
  

 

 

 

Liabilities:

     

Accounts payable and accrued expenses

     222,888         63,079   
  

 

 

 

Net monetary assets (liabilities)

   $ 6,961,724       $ (56,906

 

 

Sensitivity analysis:

The effect of a reasonable exchange rate variation between the Colon and the US$ of +7% / -7% on the monetary assets and liabilities as of December 31, 2014 (2013: +1% / -1%), assuming that the remaining variables are held constant, would imply the recognition of gains or losses from exchange rate differences of US$517,262 in 2014 (2013: US$721).

22.2 Liquidity risk

The Company monitors its liquidity on a daily basis, attempting to maintain greater liquid assets than liquid liabilities, considering the maturity of its financial assets. It performs cash flow projections on a periodic basis in order to timely detect potential cash shortages or excesses to support its operations.

The following table summarizes the maturity of the Company’s financial liabilities, based on payment commitments:

As of December 31, 2014:

 

     

0 to 6

Months

    

6 to 12

months

    

More than

1 year

     Total  

Notes and loans payable

   $ 625,855       $ 1,759,383       $ 88,634,232       $ 91,019,470   

Account payable

     123,044                         123,044   

Accrued interest payable

     693,229                         693,229   

Accounts payable and accrued expenses

     10,985,679         5,457                 10,991,136   

Restoration provision

             46,959         187,834         234,793   
  

 

 

 
   $ 12,427,807       $ 1,811,799       $ 88,822,066       $ 103,061,672   

 

 

 

F-537


Table of Contents

As of December 31 2013:

 

     

0 to 6

Months

    

6 to 12

months

    

More than

1 year

     Total  

Notes and loans payable

   $ 130,000       $       $ 3,414,600       $ 3,544,600   

Account payable

     305,939                         305,939   

Accounts payable and accrued expenses

             229,976                 229,976   
  

 

 

 
   $ 435,939       $ 229,976       $ 3,414,600       $ 4,080,515   

 

 

23. Capital management

The Company’s main objective on capital management is to ensure that it maintains a solid credit ratio and healthy financial capital ratios to support its business and maximize profits. The Company manages its capital structure and timely requests shareholders for any adjustment to this capital considering the economic environment in which it operates. To maintain or adjust its capital structure, it may request shareholders for variations to dividends and capital returns previously agreed on, as well as for increases in capital contributions if necessary. These policies had no significant changes in 2014 and 2013.

24. Fair value of financial instruments

As indicated in Note 22, the Company’s main financial instruments are comprised of cash, accounts receivable, notes and loans payable, accounts payable and accrued expenses. Management believes that the carrying amounts of cash, accounts receivable, and accounts payable approach their fair market value due to their short-term nature. In considering the fair value of loans payable with variable interest rates the Company has considered that LIBOR based borrowings resent periodically and the LIBOR spread on those outstanding approximate those obtained by affiliates in recent financings. In evaluating the fair value of loans payable at fixed rates the Company has considered the country risks, market conditions existing both at the date of the loans and those at the statement of financial position dates, and that there are not a significant number of comparable financings in its market. Therefore, the Company believes that the carrying value of loans payable at fixed rates reasonably approximates carrying value as of both December 31, 2014 and 2013. Derivative financial instruments have been measured at fair value as explained below.

Fair value hierarchy

The Company uses the following hierarchy for determining and disclosing the fair value of its financial instruments by valuation technique:

 

 

Level 1: Quoted (unadjusted) prices in active markets for identical assets or liabilities.

 

 

Level 2: Techniques that use inputs different from quoted prices that are observable for the asset or liability, whether directly or indirectly.

 

 

Level 3: Techniques that use inputs that have a significant effect on the recorded fair value that are not based on observable market data.

During 2014, classification in levels of instruments measured at fair value is as follows:

 

      2014      Level 1      Level 2      Level 3  

Interest rate cap—asset

   $ 426,296       $       $ 426,296       $   

 

 

 

F-538


Table of Contents

As of December 31, 2014 the fair value of banks loans, taking into account current market interest rates, are the following:

 

      Carrying
amount
     Level 3
Fair value
 
      2014      2014  

Ex-Im

   $ 52,016,373       $ 53,886,895   

AER

     18,222,757         18,222,757   

FMO

     14,249,869         14,552,632   

BICSA

     12,090,000         12,041,195   

Hermanos Ocampo Fernández, S.A.

     130,000         130,000   
  

 

 

 

Total

   $ 96,708,999       $ 98,833,479   
  

 

 

 

25. Subsequent events

During 2014, Orosí signed a turnkey construction contract (EPC) with Gamesa Wind US LLC (Gamesa) for the construction of a wind-power park. Due to delays in the construction schedule, Orosí negotiated a Letter Agreement with Gamesa which allowed Orosí to invoice US$8,600,000 for “delay liquidated damages” per article 8 of the EPC, while at the same time agreeing to pay Gamesa US$2,000,000 associated with various change orders. Orosí received the full amount of the liquidated damages during April and May 2015. The final liquidated damages could reach up to approximately US$9,700,000, equivalent to 10% of the EPC value, which is subject to change due to potential change orders. It is now estimated that the park will start commercial operations during the third quarter of 2015. The dates agreed with Instituto Costarricense de Electricidad (ICE) for the partial and total start of operations were May 12 and June 2, 2015. Orosí could therefore be exposed to fines per article 4.9.1 of the PPA contract with ICE for approximately US$2,550,000.

On June 12, 2015, a Stock Purchase Agreement (SPA) was signed between Globeleq Holdings (Americas Renewables) Limited and Mesoamerica Power Limited as sellers and an affiliate of SunEdison as purchaser, for the sale of a 100% interest in the Company’s upstream shareholder, Globeleq Mesoamerica Energy (Wind) Limited. The PSA is subject to various conditions, not all of which have been met as of the date of these financial statements. There is no guarantee that such transaction will be consummated.

 

F-539


Table of Contents

            shares

 

 

LOGO

Class A Common Stock

Preliminary Prospectus

 

  J.P. Morgan  
  Barclays  
  Citigroup  
  Morgan Stanley  
  Goldman, Sachs & Co.  
  BofA Merrill Lynch  
  Deutsche Bank Securities  

 

 

 

                    , 2015

 

Through and including                     , 2015 (the 25th day after the date of this prospectus), all dealers that effect transactions in these securities may be required to deliver a prospectus.


Table of Contents

Part II

Item 13. Other expenses of issuance and distribution

The following table sets forth the costs and expenses, other than underwriting discounts and commissions and the structuring fee, to be paid by us in connection with the sale of the shares of Class A common stock being registered hereby. All amounts are estimates except for the SEC registration fee, the FINRA filing fee and the stock exchange listing fee.

 

SEC registration fee

   $ 92,960   

FINRA filing fee

     *   

Exchange listing fee

     *   

Legal fees and expenses

     *   

Accounting fees and expenses

     *   

Printing and engraving expenses

     *   

Transfer agent and registrar fees and expenses

     *   
  

 

 

 

Total

   $         *   

 

  

 

 

 
*   To be provided by amendment.

Item 14. Indemnification of directors and officers

Section 102(b)(7) of the DGCL allows a corporation to provide in its certificate of incorporation that a director of the corporation will not be personally liable to the corporation or its stockholders for monetary damages for breach of fiduciary duty as a director, except where the director breached the duty of loyalty, failed to act in good faith, engaged in intentional misconduct or knowingly violated a law, authorized the payment of a dividend or approved a stock repurchase in violation of Delaware corporate law or obtained an improper personal benefit. Our amended and restated certificate of incorporation will provide for this limitation of liability.

Section 145 of the DGCL, or “Section 145,” provides that a Delaware corporation may indemnify any person who was, is or is threatened to be made, party to any threatened, pending or completed action, suit or proceeding, whether civil, criminal, administrative or investigative (other than an action by or in the right of such corporation), by reason of the fact that such person is or was an officer, director, employee or agent of such corporation or is or was serving at the request of such corporation as a director, officer, employee or agent of another corporation or enterprise. The indemnity may include expenses (including attorneys’ fees), judgments, fines and amounts paid in settlement actually and reasonably incurred by such person in connection with such action, suit or proceeding, provided such person acted in good faith and in a manner he reasonably believed to be in or not opposed to the corporation’s best interests and, with respect to any criminal action or proceeding, had no reasonable cause to believe that his or her conduct was illegal. A Delaware corporation may indemnify any persons who are, were or are threatened to be made a party to any threatened, pending or completed action or suit by or in the right of the corporation by reason of the fact that such person is or was a director, officer, employee or agent of another corporation or enterprise. The indemnity may include expenses (including attorneys’ fees) actually and reasonably incurred by such person in connection with the defense or settlement of such action or suit, provided such person acted in good faith and in a manner he reasonably believed to be in or not opposed to the corporation’s best interests, provided that no indemnification is permitted without judicial approval if the officer, director, employee or agent is adjudged to be liable to the corporation. Where an officer or director is successful on the merits or otherwise in the defense of any action referred to above, the corporation must indemnify him against the expenses which such officer or director has actually and reasonably incurred.

 

II-1


Table of Contents

Section 145 further authorizes a corporation to purchase and maintain insurance on behalf of any person who is or was a director, officer, employee or agent of the corporation or is or was serving at the request of the corporation as a director, officer, employee or agent of another corporation or enterprise, against any liability asserted against him and incurred by him in any such capacity, or arising out of his or her status as such, whether or not the corporation would otherwise have the power to indemnify him under Section 145.

Our amended and restated bylaws will provide that we must indemnify our directors and officers to the fullest extent permitted by the DGCL and must also pay expenses incurred in defending any such proceeding in advance of its final disposition upon delivery of an undertaking, by or on behalf of an indemnified person, to repay all amounts so advanced if it should be determined ultimately that such person is not entitled to be indemnified.

We intend to enter into indemnification agreements with certain of our executive officers and directors pursuant to which we will agree to indemnify such persons against all expenses and liabilities incurred or paid by such person in connection with any proceeding arising from the fact that such person is or was an officer or director of our company, and to advance expenses as incurred by or on behalf of such person in connection therewith.

The indemnification rights set forth above shall not be exclusive of any other right which an indemnified person may have or hereafter acquire under any statute, provision of our certificate of incorporation, our bylaws, agreement, vote of stockholders or disinterested directors or otherwise.

We expect to maintain standard policies of insurance that provide coverage (1) to our directors and officers against loss rising from claims made by reason of breach of duty or other wrongful act and (2) to us with respect to indemnification payments that we may make to such directors and officers.

The proposed form of Underwriting Agreement to be filed as Exhibit 1.1 to this Registration Statement will provide for indemnification of our directors and officers by the underwriters party thereto against certain liabilities. See “Item 17. Undertakings” for a description of the SEC’s position regarding such indemnification provisions.

Item 15. Recent sales of unregistered securities

Except as set forth below, we have not sold any securities, registered or otherwise, within the past three years, except for the shares issued upon our formation to our sole shareholder.

On September 29, 2014 and March 31, 2015, we granted an aggregate of 31,350 shares and 44,700 shares of restricted stock, respectively, to certain of our executives and other employees of SunEdison who will provide services to us. These grants of restricted securities were made in the ordinary course of business and did not involve any cash payments from the recipients. The restricted securities did not involve a “sale” of securities for purposes of Section 2(3) of the Securities Act and were otherwise made in reliance upon Rule 701 under the Securities Act.

On June 9, 2015, Baron Capital Management and Zimmer Partners entered into a stock purchase agreement with Global in which they agreed to purchase $43.0 million and $25.0 million, respectively, of its Class A common stock at a price per share equal to the initial public offering price in a separate private placement transaction. These share purchases are subject to certain customary closing conditions and will be completed concurrently with the closing of this offering. Based on an assumed initial public offering price of $         per share, which is the midpoint of the range listed on the cover of this prospectus, these purchasers will purchase an aggregate of              shares of our Class A common stock in this concurrent private placement. We relied upon the “private placement” exemption from the registration requirements of the Securities Act, provided by Section 4(a)(2) thereof in connection with the sale of these shares of Class A common Stock. In that regard, we

 

II-2


Table of Contents

obtained representations from each of the purchasers that it was an institutional “accredited investor” as defined in Rule 501(a)(1), (2), (3) or (7) of Regulation D promulgated under the Securities Act or a “qualified institutional buyer” as defined in Rule 144A promulgated under the Securities Act, and that it had such knowledge and experience in financial or business matters that such purchaser was capable of evaluating the merits and risk of an investment in our securities. In addition, the securities to be issued in connection with these transactions will bear a restrictive legend that prohibits their transfer without registration under the Securities Act unless an exemption is available.

Item 16. Exhibits and financial statement schedules

 

(a)   Exhibits The exhibit index attached hereto is incorporated herein by reference.

 

(b)   Financial Statement Schedule All schedules have been omitted because the information required to be set forth in the schedules is either not applicable or is shown in the financial statements or notes thereto.

Item 17. Undertakings

For the purpose of determining liability of the registrant under the Securities Act of 1933 to any purchaser in the initial distribution of the securities, the undersigned registrant undertakes that in a primary offering of securities of the undersigned registrant pursuant to this registration statement, regardless of the underwriting method used to sell the securities to the purchaser, if the securities are offered or sold to such purchaser by means of any of the following communications, the undersigned registrant will be a seller to the purchaser and will be considered to offer or sell such securities to such purchaser:

 

(1)   Any preliminary prospectus or prospectus of the undersigned registrant relating to the offering required to be filed pursuant to Rule 424;

 

(2)   Any free writing prospectus relating to the offering prepared by or on behalf of the undersigned registrant or used or referred to by the undersigned registrant;

 

(3)   The portion of any other free writing prospectus relating to the offering containing material information about the undersigned registrant or its securities provided by or on behalf of the undersigned registrant; and

 

(4)   Any other communication that is an offer in the offering made by the undersigned registrant to the purchaser.

The undersigned registrant hereby undertakes to provide to the underwriters at the closing specified in the underwriting agreement certificates in such denominations and registered in such names as required by the underwriters to permit prompt delivery to each purchaser.

Insofar as indemnification for liabilities arising under the Securities Act may be permitted to directors, officers and controlling persons of the registrant pursuant to the provisions referenced in Item 14 of this registration statement or otherwise, the registrant has been advised that in the opinion of the SEC such indemnification is against public policy as expressed in the Securities Act and is, therefore, unenforceable. In the event that a claim for indemnification against such liabilities (other than the payment by the registrant of expenses incurred or paid by a director, officer or controlling person of the registrant in the successful defense of any action, suit or proceeding) is asserted by such director, officer or controlling person in connection with the securities being registered hereunder, the registrant will, unless in the opinion of its counsel the matter has been settled by controlling precedent, submit to a court of appropriate jurisdiction the question whether such indemnification by it is against public policy as expressed in the Securities Act and will be governed by the final adjudication of such issue.

 

II-3


Table of Contents

The undersigned registrant hereby undertakes that:

 

(1)   For purposes of determining any liability under the Securities Act of 1933, the information omitted from the form of prospectus filed as part of this registration statement in reliance upon Rule 430A and contained in the form of prospectus filed by the registrant pursuant to Rule 424(b)(1) or (4) or 497(h) under the Securities Act shall be deemed to be part of this registration statement as of the time it was declared effective; and

 

(2)   For the purpose of determining any liability under the Securities Act of 1933, each post-effective amendment that contains a form of prospectus shall be deemed to be a new registration statement relating to the securities offered therein, and the offering of such securities at the time shall be deemed to be the initial bona fide offering thereof.

 

II-4


Table of Contents

Signatures

Pursuant to the requirements of the Securities Act of 1933, TerraForm Global, Inc., a Delaware corporation, has duly caused this Amendment No. 3 to Registration Statement on Form S-1 to be signed on its behalf by the undersigned, thereunto duly authorized, in the City of Bethesda, Maryland, on July 10, 2015.

 

TERRAFORM GLOBAL, INC.

By:

 

/s/ Carlos Domenech Zornoza

  Name:   Carlos Domenech Zornoza
  Title:   Chief Executive Officer

* * * * *

Pursuant to the requirements of the Securities Act of 1933, this Amendment No. 3 to Registration Statement on Form S-1 has been signed by the following persons in the capacities indicated on July 10, 2015.

 

Signature    Title

*

Ahmad Chatila

  

Director and Chairman

/s/ Carlos Domenech Zornoza

Carlos Domenech Zornoza

  

Chief Executive Officer and Director

(principal executive officer)

*

Jeremy Avenier

  

Chief Financial Officer

(principal financial officer and principal

accounting officer)

*

Martin Truong

   Director

*

Brian Wuebbels

   Director

 

*   The undersigned by signing his name hereto, signs and executes this Amendment No. 3 to Registration Statement pursuant to the Powers of Attorney executed by the above named signatories and previously filed with the Securities and Exchange Commission on May 7, 2015.

 

/s/ Carlos Domenech Zornoza

Carlos Domenech Zornoza

  

 

II-5


Table of Contents

Exhibit index

 

Exhibit
number
   Exhibit description
  1.1*    Form of Underwriting Agreement.
  2.1*   

Stock Contribution Agreement by and among TerraForm Global, Inc., SunEdison, Inc. and the investors named therein.

  2.2*   

Stock Purchase Agreement between TerraForm Global Operating, LLC, SunEdison, Inc. and the investors named therein.

  3.1*    Form of Amended and Restated Certificate of Incorporation of TerraForm Global, Inc. to be effective immediately prior to the completion of this offering.
  3.2*    Form of Amended and Restated Bylaws of TerraForm Global, Inc. to be effective immediately prior to the completion of this offering.
  4.1*    Specimen Class A Common Stock Certificate.
  5.1    Form of opinion of Kirkland & Ellis LLP.
10.1*    Form of Management Services Agreement by and among TerraForm Global, Inc., TerraForm Global, LLC, TerraForm Global Operating, LLC and SunEdison, Inc.
10.2*    Form of Project Support Agreement by and between TerraForm Global, LLC and SunEdison, Inc.
10.3*    Form of Repowering Services Agreement by and among TerraForm Global, Inc., TerraForm Global, LLC, TerraForm Global Operating, LLC and SunEdison, Inc.
10.4*    Form of Exchange Agreement by and among TerraForm Global, Inc., TerraForm Global, LLC and SunEdison, Inc.
10.5*    Form of Registration Rights Agreement by and between TerraForm Global, Inc. and SunEdison, Inc.
10.6*    Form of Indemnification Agreement between TerraForm Global, Inc. and its directors and officers.
10.7*    Form of Amended and Restated Operating Agreement of TerraForm Global, LLC.
10.8†*    TerraForm Global, Inc. 2014 Long-Term Incentive Plan.
10.9*    Investment Agreement, dated as of December 22, 2014, by and among TerraForm Global, LLC, SunEdison, Inc. and SunEdison Holdings Corporation.
10.10*    Direct Agreement, dated as of December 22, 2014, by and among TerraForm Global, LLC, SunEdison, Inc., SunEdison Holdings Corporation and JPMorgan Chase Bank, National Association, as collateral agent.
10.11*    Form of Interest Payment Agreement by and among TerraForm Global, LLC, SunEdison Holdings Corporation and SunEdison Inc.
10.12*    Unit Purchase Agreement dated as of May 6, 2015, by and among TerraForm Global, LLC and the purchasers named therein.
10.13*    Registration Rights Agreement dated as of May 6, 2015, by and among TerraForm Global, LLC and the investors named therein.
10.14*    Form of Project Investment Agreement by and between TerraForm Global, Inc. and SunEdison, Inc.
21.1*    List of subsidiaries of TerraForm Global, Inc.
23.1    Consent of KPMG LLP – Global (Predecessor).
23.2    Consent of BDO South Africa, Inc., independent accountants – BioTherm Energy Projects.

 

II-6


Table of Contents
Exhibit
number
   Exhibit description
23.3    Consent of KPMG Gurgaon – SEI Solar Power Private Limited.
23.4    Consent of KPMG Huazhen LLP – Honiton Energy XIL Holdings Limited and Honiton Energy BAV Holdings Limit.
23.5    Consent of Deloitte Touche Tohmatsu Auditores Independentes – Renova Energy Projects I.
23.6    Consent of KPMG Inc. – Core Energy (RF) Proprietary Limited and Erika Energy (RF) Proprietary Limited.
23.7    Consent of KPMG Guragaon – EN Renewable Energy Limited, EN Wind Power Private Limited and Generacion Eolica India Limited.
23.8    Consent of Paredes, Zaldivar, Burga & Asociados – Hidroeléctrica Santa Cruz S.A.C. and Empresa de Generación Eléctrica de Junín S.A.C.
23.9    Consent of Ernst & Young S.A.—Energia Eólica de Honduras, S.A.
23.10    Consent of Ernst & Young S.A.—Eolo de Nicaragua, S.A.
23.11    Consent of Ernst & Young S.A.—Inversiones Eólicas de Orosi Dos S.A.
23.12    Consent of Ernst & Young S.A.—Plantas Eólicas, S.R.L.
23.13    Consent of Kirkland & Ellis (included in Exhibit 5.1).
24.1**    Power of Attorney.

 

 

*   To be filed by amendment.

 

**   Indicates exhibits previously filed.

 

  Indicates exhibits that constitute compensatory plans or arrangements.

 